11
PVsyst TRIAL
PVsyst - Simulation report
Standalone system
PVsyst TRIAL
Jacobabad - Pakistan
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
PVsyst TRIAL
Geographical Site
Jacobabad
Pakistan
Situation
Latitude
Longitude
Altitude
Time zone
Project summary
28.28 °(N)
68.44 °(E)
53 m
UTC+5
Project settings
Albedo 0.20
Weather data
Jacobabad
Meteonorm 8.2 (1996-2015), Sat=100% - Synthetic
System summary
Standalone system Standalone system with batteries
PVsyst TRIAL
Orientation #1
Fixed plane
Tilt/Azimuth
System information
PV Array
43.9 / 0 °
Near Shadings
According to strings : Fast (table)
Electrical effect 100 %
Battery pack
User's needs
Daily household consumers
Constant over the year
Average 12.5 kWh/Day
Results summary
PVsyst TRIAL
Useful energy from solar 4546.9 kWh/year Specific production 1295 kWh/kWp/year Perf. Ratio PR 67.79 %
Missing Energy 11.9 kWh/year Available solar energy 5285.4 kWh/year Solar Fraction SF 99.74 %
Excess (unused) 515.8 kWh/year
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
Detailed User's needs 6
Main results 7
Loss diagram 8
Predef. graphs 9
PVsyst TRIAL
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 2/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
PVsyst TRIAL
Standalone system
Orientation #1
Fixed plane
Tilt/Azimuth 43.9 / 0 °
General parameters
Standalone system with batteries
Sheds configuration
Nb. of sheds
Set of tables
3 units
Sizes
Sheds spacing
Collector width
0.00m
0.00m
Shading limit angle
Limit profile angle °
PVsyst TRIAL
PV module
Manufacturer
Model
(Original PVsyst database)
Unit Nom. Power
Generic
JKM-585N-72HL4-BDV
585 Wp
PV Array Characteristics
Controller
Manufacturer
Model
Technology
Temp coeff.
Generic
SmartSolar MPPT 250/60 48V
MPPT converter
-2.7 mV/°C/Elem.
Number of PV modules 6 units Converter
Nominal (STC) 3510 Wp Maxi and EURO efficiencies 99.0 / 97.0 %
Modules 3 string x 2 In series Battery Management control
At operating cond. (50°C) Threshold commands as SOC calculation
Pmpp 3255 Wp Charging SOC = 0.96 / 0.80
U mpp 79 V Discharging SOC = 0.10 / 0.35
PVsyst TRIAL
I mpp 41 A
Battery
Manufacturer Generic
Model Luna2000-15-SO, with inverter 5 kW
Technology Lithium-ion, LFP
Nb. of units 3 in parallel
Discharging min. SOC 10.0 %
Stored energy 38.9 kWh
Battery Pack Characteristics
Voltage 48 V
Nominal Capacity 900 Ah (C10)
Temperature Fixed 20 °C
Total PV power
PVsyst TRIAL
Nominal (STC) 3.51 kWp
Total 6 modules
Module area 15.5 m²
Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 6.0 % Module temperature according to irradiance Global array res. 31 mΩ
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
Serie Diode Loss LID - Light Induced Degradation Module Quality Loss
Voltage drop 0.7 V Loss Fraction 0.5 % Loss Fraction -0.8 %
Loss Fraction 0.8 % at STC
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 3/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
PVsyst TRIAL
Module mismatch losses
Loss Fraction
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 4/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
PVsyst TRIAL
Iso-shadings diagram
Orientation #1 - Fixed plane, Tilts/azimuths: 43.9°/ 0°
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 5/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
Nb. Power
W
Use
Hour/day
Detailed User's needs
Daily household consumers, Constant over the year, average = 12.5 kWh/day
Energy
Wh/day
Hourly distribution
PVsyst TRIAL
Total daily energy 12490
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 6/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
PVsyst TRIAL
System Production
Useful energy from solar
Available solar energy
Excess (unused)
Loss of Load
4546.9 kWh/year
5285.4 kWh/year
515.8 kWh/year
Main results
Perf. Ratio PR
Solar Fraction SF
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
GlobHor GlobEff E_Avail EUnused E_Miss E_User E_Load SolFrac
kWh/m² kWh/m² kWh kWh kWh kWh kWh ratio
January 104.7 140.9 446.9 38.34 0.00 387.2 387.2 1.000
February 122.4 146.4 457.8 82.53 0.00 349.7 349.7 1.000
March 160.9 162.2 497.4 92.84 0.00 387.2 387.2 1.000
April 175.8 150.2 452.5 59.22 0.00 374.7 374.7 1.000
May 205.0 154.1 452.5 47.50 0.00 387.2 387.2 1.000
June 195.4 139.6 411.7 20.33 0.00 374.7 374.7 1.000
July 175.4 129.1 383.5 0.00 11.91 375.3 387.2 0.969
August 165.9 134.2 401.1 0.00 0.00 387.2 387.2 1.000
September 166.6 158.4 477.5 71.01 0.00 374.7 374.7 1.000
October 139.5 154.2 468.8 63.69 0.00 387.2 387.2 1.000
November 105.2 132.4 412.1 26.40 0.00 374.7 374.7 1.000
December 97.4 134.0 423.7 13.93 0.00 387.2 387.2 1.000
PVsyst TRIAL
Year 1814.2 1735.7 5285.4 515.79 11.91 4546.9 4558.8 0.997
Legends
GlobHor Global horizontal irradiation E_User Energy supplied to the user
GlobEff Effective Global, corr. for IAM and shadings E_Load Energy need of the user (Load)
E_Avail Available Solar Energy SolFrac Solar fraction (EUsed / ELoad)
EUnused Unused energy (battery full)
E_Miss Missing energy
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 7/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
+5.3%
-1.5%
Global horizontal irradiation
Global incident in coll. plane
0.0%
+0.8%
-0.6%
-7.9%
Array nominal energy (at STC effic.)
PV loss due to irradiance level
PVsyst TRIAL
-9.5% Unused energy (battery full)
PVsyst TRIAL
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 8/9
Project: Off Grid System Example 2 with shadow analysis
Variant: New simulation variant
PVsyst V8.0.11
VC0, Simulation date:
05/05/25 01:14
with V8.0.11
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
05/05/25 PVsyst Evaluation mode Page 9/9