JOB SAFETY ANALYSIS
DATE : SITE SUPERVISOR:
JOB : Lifting/Moving Heavy Loads
LOCATION :
JOB Overview Loading / Unloading / Carrying of objects
Personal Protective Equipment Trolley (Manual handaling ), Hand Tools , Hand gloves and helmets
Tools & Equipment Hand held carts likewise hydraulic jacks and etc
OCCUPATIONAL HEALTH CONCERNS
JOB PLAN ACTIVITY POTENTIAL HAZARDS CONTROL MESASURES
* Tool box talk * Unauthorized access/egress,working * All personnel to be project and zone inducted *
platform, Unsafeconditions Ensure all approved controls and prevention measures
arediscussed and JSA discussed with all persons
involved in the work. * All
personnel to attend daily toolbox talk prior to the
commencement of work. * All
personnel should be wear proper PPE
* Identify work Area * Risk of injury due to lowawareness of * Safety induction to new employees, specialized
work activitiesand area condition training tocraftsmen
* Unsafe Access * job pre start meeting, tool box meeting
* Mandatory use Of PPE’s
* Work area pre inspection
* Provide proper access
* Overhead powerlines * Risk of Electrical injury due toelectrical * Safety induction to all area employees
shock. * Job pre start meeting, tool box meeting
* Electrocution (death due toelectrical * Required to maintain proper work distances
shock) * Provide proper access
* Burns due to electrical shock * Area should not be wet because Electric hazards can
* Falls due to electrical shock bemade worse if the worker, location or equipment is
wet
* Lifting area preparation * Improper access * Area should be clear from any debris
* Personal injury * Material must be segregate
* Uneven ground pavement * Housekeeping must be done prior to start the job
* Bad housekeeping and finishedthe job
* Scattered materials * Adequate access.
* Slip, trip * Ensure area is properly prepared for job
* Un authorized entry * Ground pavement must be leveled properly
* Excavations and trenches * Provide proper barricades
* Provide signage
* Provided spill tray for flammable oils
* Provide adequate fire extinguisher
* Follow the monthly color code
* Maintain safe distance from Excavation and
trenches
* Material preparation * Personal injury * Pre inspection of crane equipment prior to start the
* Improper access job.
* Sharp edges * Ensure crane is third party certified
* Hand injury * Follow safe operating procedures
* Pinch point * Proper supervision from immediate supervisor
* Hit by/hit by objects * Prepare proper signage and barricade prior to lifting
* Rolling over of stack pipes job
* Slip, trip hazard * Ensure that over head object has properly place and
* Improper stacking of pipes tied off
* Property damage * Material should be properly stacked
* Falling objects * Pipes must be in proper place ,and must be in pipe
* Scattered pipe materials racks
* Fire * Good house keeping
* Fall of height * If working at height must be undergo training of
* Mechanical failure working atheights
* Lifting tackle failure * Use fall protection gear
* Caught in between * Proper segregation of pipes as per sizes
* Vision blocked * Ensure proper fire extinguisher is available in the
area
* Don’t put the hands in between two pipes/objects
* Ensure sling is third party certified
* Inspect the sling thoroughly prior to use
* Ensure lifting gear has third party certified and valid
* Ensure lifting gear has no signed of damage, if
damage found
don’t use it or replace immediately
* Ensure out rigging pad available and no defects
* Follow monthly color code
* Operation vision must be clear
* Proper communication between operator and
Rigger
* Housekeeping * Tripping Hazards * Arrange/ stage all the material in neat orderly
manner.
* Remove damage, banding, crate material, nails etc.
anddispose of properly
* Waste disposal * Provide trash for work areas means for maintaining.
* Fire * All containers should be labeled
* Slip,Trip,Fall * Clean the spill area immediately, and reporting of
* Crushed by EOT crane incident andspillage.
* Stay away from EOT crane.
* Maintain safe distance from live box bar
ANY OTHER :
PREPARED BY (SAFETY) REVIEWED BY
NAME : NAME :
SIGNATURE : SIGNATURE :
DATE : DATE :
S B KHAKAL
S B KHAKALS B KHAKAL
S B KHAKAL
Date :
NAME : Shravan Rathod (Safety supervisor) location:
Activity/ Facility/Equipment /Substance : Structural Fabrucation and erection work
SI NO SUB -ACTIVITY TYPE OF HAZARD RISK CONTROL MEASURES
1 work platform 1. Improper platform 1. Adequate illumination provided
2.Poor illimination 2.Lifting tools third party inspected
3.Improper access 3.Full body hamess with lanyard.
4.Scafforlding erected on firm levelef surfce with base plate,
erected on plumd ,with prop[er railing and palform
5. Life line provided with Fall and arrester
6. Proper supervision to be maintained
2 Welding 1.Weldin fumes 1. Welding permit system in place
2.Fire 2. Welder face shield available
3.Ultra vilolet rays 3. Eye protection for helpers also ensured
4.Electrode cut piece 4. electrode bits collected in collection box
5.welding M/C 5. Provide fire extinguisher along with welding machine
Conncetion 6.EHS Induction is given to workers, supervisors
6.Electruc shock , 7.Ensure all the labour for use safety helmet ,reflective jacket
Damaged cable,no safety shoes and reuired PPE's
no earthing 8.Double earth to the welding M/S,return cable connected to
the job ,welding M/c placed in the visibility range of welder
9. hot work permit ensured before statring activty
10. Daily toolbox conducted before starting activtes
3 Gas cutting 1. Sparks falling on combustible 1. only authorized operater the machine. Trained helper
combustible materials, Engaged
Fire hazard 2.Leather Hand golves ,leather apron, welding glass,
2.Fall of cyc=linder while welding helmety shall be ensured
unlading /carrying to site, 3.before starting the work ,ensure top side cylinder is covered
Explosion 4.Keep the leaking cylinder well away fron the site
3. Contact with fire inform dealer to take away immediately
4.Leakage of gas cylinder near 5.Flashback arrestors provided tp tprch &LPG cylinder
the vlave 6. Gas hose is not laid on the pathway
5. blocking of gas cutting 7. Use cylinder trollry to transport to site
nozzle,Flash back,Backfire 8. Work permitsystem in place
6.Gas cutting hose laid in
haphazard manner
7.Rolling the cylinder on the
gorund ,Damaged to cylinder
and its valve.
4 Lifting of structure 1.Fall of material 1. Skiied workmen and signal men provided
Manually or 2.Injury to workmen 2.The third party inspection with certificate of crane ,hydra,
Mechanically 3.Damage to propert sling and D-Shackles will be used
4.Fall of person 3.Proper superviion to be maintain
4. All construction vehicles should undergo Equipment fitness
test before being deployed to work
5.barricading the area
5 Fixing ,placing 1. Loose and unsecured 1. Structure should be kept in locked position to prevent
aligment Structure at elevation losing its horizontal balance
2.Improper access 2. Static rope line available to anchor with Stucture
3.Improper removal of 3.Proper work platform ensured.
structure at height 4.Erection area barricade and one person available tp restrict
5.Fall of materiak and person the movememnt of person below the erection area
5.Houskeeping ensured
6.Scaffolding erected on firm leveled surface with base plate
erected on plumb,with prpoper railing and platform
7.Life line with Fall arrester provided
8.Full body harness with double lanyard
6 Grinding 1.Improper use of power hand 1.Guard ensured before start the work
tools 2. plug tops should be ensured
2.Unavilability of wheel 3.Machine connection royted rhorugh RCCB
guard 4.Pre-inspectiob of cable is ensured
3.Electric shock due to joint in 5.Ensure all necessary PPE's(goggle,hand gloves ,safety shoes
cable 6.Wear full body harness working above 1,8M height
7. Hand tools to be inspected before use and to be in
good condition
8.Maintain good house keeping
Safety supervior Name and sign:
Site supervior Name and sign :
NTPC :
Traning give by : Shravan Rathod ( Safety officer )
S B KHAKAL