0% found this document useful (0 votes)
21 views15 pages

Ready Mix For BLK B, C, D & E - 4-10-17

Uploaded by

ablemruk25
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views15 pages

Ready Mix For BLK B, C, D & E - 4-10-17

Uploaded by

ablemruk25
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

ቲ.ኤን.

ቲ ኮንስትራክሽን እና ንግድ ሥራዎች


T N T Construction & Trading Document No: 1

Kind of Doc: Issue No:

Title: Take off sheet From: Issue Date: Page No:


Project Name: AASTU Commercial Complex Building
Client: Addis Ababa Science and Techonology University (AASTU)
Consultant: Acute Engineering Plc
Contractor: TNT Construction and Trading
Location: Addis Ababa
Size Size
No (L*W*H) Qty. Description No (L*W*H) Qty. Description

Copping

Access A to F

Second Floor

2 23.50

47.00 ml

47.00 ml length of Copping on Second Floor

47.00 ml Total length of Copping Access A to F

Access B to E

First Floor

2 10.43 H //4D-7A

20.86 ml

20.86 ml length of Copping on First Floor

Second Floor

2 10.43 H //4D-7A

20.86 ml

20.86 ml length of Copping on Second Floor

Third Floor

1 10.43 H //4D-7A

10.43 ml

10.43 ml length of Copping on Third Floor

52.15 ml Total length of Copping on Access B to E

99.15 ml Total length of Copping


ቲኤንቲ
TNTኮንስትራክሽንና ንግድ ሥራዎች
CONSTRUCTION Document №:
Company name: AND TRADING TNT/ AASTU/01
Title: Isue No- 1
AASTU COMMERCIAL
TAKEOFF SHEET BUILDING PROJECT Page 1 of 1
Size Size
No (L*W*H) Qty. Description No (L*W*H) Qty. Description
CURB STONE
AROUND ROAD -5

AROUND ROAD -3 0+000


0+000 1 34.5700 Parking Area
2 20.4822 Road Side 34.57 m
40.96 m 1 6.4900 Parking Area
1 9.8634 Road Side 6.49 m
9.86 m 1 5.2900 Parking Area
1 1.5000 Road Side 5.29 m
1.50 m 0+020
0+020 2 6.8000 Parking Area
2 20.0000 Road Side 13.60 m
40.00 m 1 4.9000 Parking Area
1 42.7153 Road Side 4.90 m
42.72 m 1 5.0500 Parking Area
1 45.3954 Road Side 5.05 m
45.40 m 1 4.9900 Parking Area
1 28.9849 Road Side 4.99 m
28.98 m 1 9.0800 Parking Area
0+040 9.08 m
2 20.0000 Road Side 1 24.5800 Parking Area
40.00 m 24.58 m
0+060 1 23.7600 Parking Area
2 20.0000 Road Side 23.76 m
40.00 m 0+040
1 11.8161 Road Side 1 17.2400 Green Area
11.82 m 17.24 m
1 2.1662 Road Side 0+050
2.17 m 1 31.3800 Green Area
0+080 31.38 m
2 20.0000 Road Side 1 31.2900 Green Area
40.00 m 31.29 m
1 16.0491 Road Side 2 1.8000 Green Area
16.05 m 3.60 m
1 1.9430 Road Side 1 12.3600 Green Area
1.94 m 12.36 m
0+100 1 4.3500 Green Area
1 12.5323 Road Side 4.35 m
12.53 m 1 5.6400 Green Area
1 18.9498 Road Side 5.64 m
18.95 m 238.17 m Total Summery of curbstone Around Road 5
1 17.8115 Road Side 86.00 m Previosly Excuted
17.81 m 152.17 m Current Excuted
1 2.0000 Road Side
2.00 m
1 5.3891 Road Side
5.39 m
1 8.1169 Road Side
8.12 m
0+120
1 7.3531 Road Side
7.35 m
1 7.4623 Road Side
7.46 m
441.01 m Total Summery of curbstone Around Road 3
91.00 m Previosly Excuted
350.01 m Current Excuted
ቲ.ኤን.ቲ ኮንስትራክሽን እና ንግድ ሥራዎች
T N T Construction & Trading Document No: 1
Kind of Doc: Issue No:
Title: Take off sheet From: Issue Date: Page No:
Project Name: AASTU Commercial Complex Building
Client: Addis Ababa Science and Techonology University (AASTU)
Consultant: Acute Engineering Plc
Contractor: TNT Construction and Trading
Location: Addis Ababa Size
Size (L*W*H
No (L*W*H) Qty. Description No ) Qty. Description

Reinforced Concrete for Storm Water Ditch


Ditch Cover Concrete for Storm Water Ditch

1 200.0 pcs
0.143 Volume/pcs=(0.478 m2 )*(0.3)=0.1434 m3
28.68 m3
28.68 m3 Total Concrete for Storm Water Ditch Cover
ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች Document №:
TNT CONSTRUCTION
Company name: AND TRADING TNT/ AASTU/01

Title: Isue No- 1


AASTU COMMERCIAL
TAKEOFF SHEET BUILDING PROJECT Page 1 of 1
Size Size
No (L*W*H) Qty. Description No (L*W*H) Qty. Description

CURB STONE AROUND ROAD -5

AROUND ROAD-2 0+020

0+060 1 23.7600 Parking Area

1 2.8243 Parking Area 23.76 m

2.82 m 0+040

0+080 1 17.2400 Green Area

1 2.8243 Parking Area 17.24 m

2.82 m 41.00 m Total Summery of curbstone Around Road 5

0+100

1 5.7700 Parking Area 163.08 m Total Summery of curbstone

5.77 m

2 3.0994 Parking Area

6.20 m

1 1.9636 Parking Area

1.96 m

0+120

1 56.2935 Green Area

56.29 m

0+140

1 19.1936 Parking Area

19.19 m

2 1.9438 Parking Area

3.89 m

0+160

1 19.1936 Parking Area

19.19 m

2 1.9662 Parking Area

3.93 m

122.08 m Total Summery of curbstone Around Road 2

__________________ __________________Approved by
ቲኤንቲ
TNTኮንስትራክሽንና ንግድ ሥራዎች
CONSTRUCTION Document №:
Company name: AND TRADING TNT/ AASTU/01
Title: Isue No- 1
AASTU COMMERCIAL
Size TAKEOFF SHEET BUILDING
Size
PROJECT Page 1 of 1
No (L*W*H) Qty. Description No (L*W*H) Qty. Description
Bridge A to G Bridge B to E
Second Floor Slab (@+7.90) Roof Floor Beam (@+17.50)
2 4.40 On Axis S-S''//A''-B'',B''-C'' 4.105 On Axis H//6D-6E
3.90 1 0.500
34.32 m2 0.300
2 1.85 On Axis S-S''//A''-Above and below Axis C'' 0.62 m3
4.40 4.105 On Axis H//6E-7A
16.28 m2 1 0.500
m2 Total Area Of Second Floor Slab for Bridge
50.60 A
m3toTotal
G Volume Of Second Floor Slab for 0.300
8.62 Bridge A to G 0.62 m3
m3 Total Volume Of Roof Floor Beam for B
Roof Floor Slab (@+11.10) 1.23 to E (+17.50)
2 4.40 On Axis S-S''//A''-B'',B''-C'' 1.1 Ground Floor Slab (@+1.50)
3.90 1 32.76 On Axis 6D-6E//H-G
34.32 m2 1.00 Cad Area
2 1.85 On Axis S-S''//A''-Above and below Axis C'' 32.76 m2
4.40 1 5.90 On Axis 6E-7A//H-G
16.28 m2 4.41
50.60 m2 Total Area Of Roof Slab for Bridge A to G 25.99 m2
m2 Total Area Of Ground Floor Slab for B
8.62 m3 Total Volume Of Roof Slab for Bridge A to G 58.74 to
m3ETotal Volume Of Ground Floor Slab for
Ground Floor Beam (@+0.00) 5.87 B to E
3.700 On Axis S,S''//A''-B'',B''-C'' Bridge A to F
4 0.500 Second Floor Beam (@+7.90)
0.300 4.670 On Axis N',M'//Y-Y2,Y2-Y3,Y3-Y4 and M'//Y4-Y5'
2.22 m3 7 0.500
4.000 On Axis A'',B'',C''//S-S'' 0.300
3 0.500 4.90 m3
0.300 4.170 On Axis N'//Y4-Y5'
1.80 m3 1 0.500
m3 Total Volume Of Ground Floor Beam for A
4.02 to G 0.300
Second Floor Beam (@+7.90) 0.63 m3
3.700 On Axis S,S''//A''-B'',B''-C'' 3.700 On Axis Y,Y2,Y3,Y4,Y5'//N'-M'
4 0.500 5 0.500
0.300 0.300
2.22 m3 2.78 m3
m3 Total Volume Of Second Floor Beam
4.000 On Axis A'',B'',C''//S-S'' 8.30 for A to F
3 0.500 Second Floor Slab (@+7.90)
0.300 3 5.70 On Axis N'-M'//Y-Y2,Y2-Y3,Y3-Y4
1.80 m3 4.87
1.750 On Axis S,S''//above Axis A'' and Below C'' 83.28 m2
4 0.500 1 16.86 On Axis N'-M'//Y4-Y5'
0.300 1.00 Cad Area
1.05 m3 16.86 m2
m3 Total Volume Of Second Floor Beam for A m2 Total Area Of Second Floor Slabfor
5.07 to
m3G(+7.90)
Total Volume Of Roof Floor Beam for A to G 100.14 Bridge A to
m3 Total F
Volume Of Second Floor Slab for
5.07 (+11.10) 18.02 Bridge A to F
Ground Elevation Column 9.01 m2 Previosly Excuted
2 0.196 C-1(0.50*7.90) 9.01 m2 Current Excuted
7.900 On Axis C''//S,S''
3.10 m3
4 0.196 C-2(0.50*7.90)
7.900 On Axis A'',B''//S,S''
6.20 m3
m3 Total Volume of Ground Floor Elevation
9.30 Column on Bridge A to G

Second Elevation Column


2 0.196 C-1(0.50*7.90)
3.200 On Axis C''//S,S''
1.26 m3
4 0.196 C-2(0.50*7.90)
3.200 On Axis A'',B''//S,S''
2.51 m3
m3 Total Volume of Second Floor Elevation
3.77 Column on Bridge A to G

r
ቲ.ኤን.ቲ ኮንስትራክሽን እና ንግድ ሥራዎች
T N T Construction & Trading Document No: 1
Kind of Doc: Issue No:
Title: Take off sheet From: Issue Date: Page No:
Project Name: AASTU Commercial Complex Building
Client: Addis Ababa Science and Techonology University (AASTU)
Consultant: Acute Engineering Plc
Contractor: TNT Construction and Trading
Location: Addis Ababa Size
Size (L*W*H
No (L*W*H) Qty. Description No ) Qty. Description
Cement Screed 1.3) Block C
1.Ground Floor Slab 1 91.64 Shop
1.1)Block A 1.00
1 312.30 Supermarket 91.64 m2
1.00 1 115.14 Snack Bar
312.30 m2 1.00
(13) 0.50 Deduction for columns 115.14 m2
0.50 1 87.37 Bank
(3.25) m2 1.00
1 174.71 Shop-1 87.37 m2
1.00 1 204.84 Corridor
174.71 m2 1.00 Area with Column Deduction
(5) 0.50 Deduction for columns 204.84 m2
0.50 498.99 m2 Sub Total Area of Ground Floor Screed on Block C
(1.25) m2 1.4) Block D
1 262.37 Corridor 1 146.34 Game Zone
1.00 With Deductions 1.00
262.37 m2 146.34 m2
744.88 m2 Sub Total Area of Ground Floor Screed on Block A 1 52.78 Juice Bar
402.90 m2 Previosly Excuted 1.00
341.98 m2 Excuted 50% 52.78 m2
1.2) Block B 1 469.52 Lobby
1 181.54 Shop-2 1.00 Area with Column Deduction
1.00 469.52 m2
181.54 m2 668.64 m2 Sub Total Area of Ground Floor Screed on Block D
(6) 0.50 Deduction for columns 334.32 m2 Excuted 50%
0.50
(1.50) m2
1 22.42 Utility room
1.00
22.42 m2
1 36.30 Boutique
1.00
36.30 m2
1 10.19 2 Shops
1.00
10.19 m2
1 7.18 Security
1.00
7.18 m2
1 26.35 Reception
1.00
26.35 m2
1 17.46 Info Center
1.00
17.46 m2
1 45.36 Gift Shop
1.00
45.36 m2
1 200.38 Bank
1.00
200.38 m2
1 720.98 All in One Coridor & Lobby With eductions
1.00
720.98 m2
1,266.66 m2 Sub Total Area of Ground Floor Screed on Block B
950.00 m2 Excuted 75%
Company name: Document №:
ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች
OF/TNT/ ECD/012
TNT CONSTRUCTION AND TRADING
Title: Issue №: Page №:
Material Demand 1 Page 1 of 1

PROJECT NAME Design and Build of Women Rehabilitation and Skill Development Center Project
CLIENT Addis Ababa City Administration Mega Projects Construction Office
COSULTANT Addis Ababa Institute of Technology- Addis Ababa University
CONTRACTOR TNT Construction and Trading PLC
LOCATION ADDIS ABABA, AKAKI KALITY SUBCITY, WOREDA 08

Material Request for Fence Masonry Work

NO Description Planned work Activities Unit Qty Input Material Unit Qty

Foundation m³ Err:509 Sand m³ Err:509


Stone m³ Err:509
01 Fence Masonry
Cement Q Err:509

m³ Err:509 Sand m³ Err:509


Stone Trip Err:509
Cement Q Err:509
Grand Summary for Materials

Labour Br. Err:509

Prepared by:______________ Checked By: Approved By:


Abel H.:_________________ Nebiyou S.: _________________
Project: CONSTRICTION OF B+G+5 ADMINISTRATION BUILDING CONSTRICTION
Contractor: TILAHUN ABEBE GENERAL CONTRACTOR
Client: CONSTRUCTION MANAGEMENT INSTITUTE
Consultant: ETHIOPIAN ENGINEERING CORPORATION
Ready-Mix Concrete Works Budget Summary
Wastage (10- Net Required
S/No Planned Activity UOM Planned Qty S/No Material Required UOM Required Qty Remarks
5%) Qty
1 Basement Floor Slab Blk B m³ 120.26
2 Block C Basement Beams m³ 25.35
3 Block E Basement Beams m³ 45.33
4 Block D Basement Beams m³ 38.36
5 Block A & B SW and Liftshafts m³ 109.59
1 C-30 Ready Mix Concrete m³ 338.89 0.34 339
- - -
- - -

Prepared By:___________________________ Checked By:_____________________________ Approved By:_________________________


Project: CONSTRICTION OF B+G+5 ADMINISTRATION BUILDING CONSTRICTION
Contractor: TILAHUN ABEBE GENERAL CONTRACTOR
Client: CONSTRUCTION MANAGEMENT INSTITUTE
Consultant: ETHIOPIAN ENGINEERING CORPORATION Description of Works: C-30 Ready-Mix Concrete

TAKE - OFF

No L*W*H Qty. Description No L*W*H Qty. Description


C-30 Ready Mix Concrete Work
Block A Block E
Basement Floor Slab BB-1, On Axis 10, 11 & 12/A-G'
On Axis I-J/3-4 3 43.31 Length
1 7.20 0.25 Width
6.50 0.50 Depth
0.15 16.24 m³
7.02 m³
BB-2, On Axis 13/A-D, Refer Drawing
Block B 1 21.85 Length
Basement Floor Slab 0.25 Width
On Axis J'-K/1-2 & 3-4, K-L & M-N/3-4, K-L/1-2, 0.50 Depth
11 7.20 2.73 m³
6.93
0.15 BB-3, Between Axis E' & E
82.33 m³ 1 7.40 Length
0.30 Width
On Axis L-M/1-4 0.60 Depth
3 7.10 1.33 m³
7.15
0.15 BB-4, On Axis 13/E-G'
22.84 m³ 1 14.01 Length
0.25 Width
On L-M & M-N/1-1' 0.50 Depth
1 14.03 1.75 m³
4.40
0.15 BB-5, On Axis 14/D-F
9.26 m³ 1 15.10 Length
0.25 Width
DDT 0.50 Depth
For Lift 1.89 m³
-1 3.05
2.60 BB-6, On Axis A, B, C & G'/10-13
0.15 4 22.40 Length
-1.19 m³ 0.25 Width
0.50 Depth
11.20 m³
120.26 m³ Total for Blk B BF Slab
BB-7, On Axis D/10-14
Basement Floor Beams 1 22.85 Length
Block C 0.25 Width
BB-1, On Axis 4, 5, 6, 7, 8 & 9/H-K 0.50 Depth
6 22.60 Length 2.86 m³
0.25 Width
0.50 Depth BB-8, On Axis E/10-14
16.95 m³ 1 25.90 Length
0.25 Width
BB-2, On Axis H, I, J & K/4-10' 0.50 Depth
4 39.80 Length 3.24 m³
0.25 Width
0.50 Depth BB-9, On Axis 14 @ E'
19.90 m³ 1 6.85 Length
0.25 Width
BB-3, On Axis 10'/H-I & J-k 0.50 Depth
1 16.00 Length 0.86 m³
0.25 Width
0.50 Depth BB-10, On Axis F/10-14
2.00 m³ 1 25.90 Length
0.25 Width
38.85 m³ Total for Blk C BB 0.50 Depth
18.90 m³ Total for Previously Casted 3.24 m³
25.35 m³ Total for Next Casting 45.33 m³ Total for Blk E BB

Block D
Block A BB-1, On Axis 10&11 /G-I

Prepared By:________________________ Checked By: __________________________ Approved By_____________________


Project: CONSTRICTION OF B+G+5 ADMINISTRATION BUILDING CONSTRICTION
Contractor: TILAHUN ABEBE GENERAL CONTRACTOR
Client: CONSTRUCTION MANAGEMENT INSTITUTE
Consultant: ETHIOPIAN ENGINEERING CORPORATION Description of Works: C-30 Ready-Mix Concrete

TAKE - OFF

No L*W*H Qty. Description No L*W*H Qty. Description


Basement Floor Shearwall 3 15.10 Length
All Axises 0.25 Width
1 64.60 0.50 Depth
0.25 5.66 m³
3.30
53.29 m³ BB-3, On Axis 12 /G-L
1 36.20 Length
Basement Floor Columns 0.25 Width
External Axises 0.50 Depth
4.53 m³

BB-6, On Axis H,I, J & K /10-13


33.13 m³ 4 22.40 Length
0.30 Width
Basement Floor Lift Shaft 0.60 Depth
Block A 16.13 m³
1 12.20
0.30 On Axis J & K/10-11 & 12-13
3.30 4 7.20 Length
12.08 m³ 0.30 Width
0.60 Depth
Block B 5.18 m³
1 11.20
0.30 On Axis 13/J-L
3.30 2 7.20 Length
11.09 m³ 0.30 Width
0.60 Depth
2.59 m³

BB 4
1 7.40 Length
0.30 Width
109.59 m³ Total forBlk A&B SW, Columns And liftshafts 0.60 Depth
1.33 m³

BB 8
1 6.50 Length
0.30 Width
0.60 Depth
1.17 m³

BB 9 & 11 Between Axis 13-14


2 4.55 Length
0.30 Width
0.60 Depth
1.64 m³

BB 5
1 15.10 Length
0.30 Width
0.60 Depth
2.72 m³
DDT for J & K/10-12
-2 7.20 Length
0.30 Width
0.60 Depth
-2.59 m³

38.36 m³ Total for Blk D BB

Prepared By:________________________ Checked By: __________________________ Approved By_____________________


Company name: Document №:
ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች OF/TNT/ ECD/012
TNT CONSTRUCTION AND TRADING
Title: Issue №: Page №:
TAKE-OFF 1 Page 1 of 1

PROJECT: Women's Rehabilitation and Skill Development Centre


LOCATION : Addis Ababa
CLIENT : Addis Ababa City Administration Mega Project Construction Office
CONTRACTOR : TNT Construction & Trading Description of Work:- Roof Truss
CONSULTANT: Addis Ababa Institute of Technology Block:- Dry Waste

Size Size
No (L*W*H) Qty. Unit Description No (L*W*H) Qty. Unit Description
1. Dry Waste
a. Truss 3 Truss Perpendicular Member
SHS - 60x60x3mm 2 0.18 L = 0.18 m
Truss Bottom Member 0.36 m
3 11.20 L = 11.20 m 3
33.60 m 2 0.30 L = 0.303 m
0.61 m
Truss Top Member 3
6 5.72 L = 5.72 m 2 0.51 L = 0.51 m
34.32 m 1.02 m
3
Lattice Purlin 2 0.72 L = 0.72 m
Purlin Top Member 1.44 m
26 7.46 L = 7.46 m 3
193.96 m 2 0.92 L = 0.92 m
1.84 m
Lattice Purlin 3
Purlin Bottom Member 2 1.13 L = 1.13 m
26 6.78 L = 6.78 m 2.26 m
176.28 m
3 1.40 L = 1.40 m
4.20 m
438.16 m Total Length for SHS 60x60x3mm Size Lattice Purlin
1 Diagonal Member
58.00 Pcs Total Quantity for SHS 60x60x3mm Size 26 0.51 L = 0.51 m
13.26 m
SHS - 40x40x3mm 13
2 Truss Diagonal Member 26 0.56 L = 0.56 m
3 1.48 L = 1.48 m 189.28 m
8.88 m 13 Perpendicular Member
3 26 0.38 L = 0.38 m
2 1.34 L = 1.34 m 128.44 m
8.04 m
3
2 1.18 L = 1.18 m
7.08 m
3
2 1.18 L = 1.18 m
7.08 m
3
2 1.05 L = 1.05 m
Total Length for SHS 40x40x3mm
2.10 m 378.69 m Size
Total Quantity for SHS 40x40x3mm
3 64.00 Pcs Size
2 0.90 L = 0.90 m b. EGA Sheet
1.80 m 1 5.72 L = 5.72 m
3 1 14.96 W = 14.96 m
2 0.50 L = 0.50 m 85.57 m
1.00 m Cutting Schedule
L = 5.72+0.15 = 5.90 m
Member = 6.34/0.83 = 8 Pcs
19 Pcs Size = 5.90x0.83 m

Prepared By:________________________ Checked By: __________________________ Approved By_____________________


Company name: Document №:
ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች OF/TNT/ ECD/012
TNT CONSTRUCTION AND TRADING
Title: Issue №: Page №:
TAKE-OFF 1 Page 1 of 1

PROJECT: Women's Rehabilitation and Skill Development Centre


LOCATION : Addis Ababa
CLIENT : Addis Ababa City Administration Mega Project Construction Office
CONTRACTOR : TNT Construction & Trading Description of Work:- Roof Truss
CONSULTANT: Addis Ababa Institute of Technology Block:- Dry Waste

Size Size
No (L*W*H) Qty. Unit Description No (L*W*H) Qty. Unit Description

c. Plate
2 3.00 Size = 2x25x25x6 mm
1 3.00
18.00 Pcs

d. J-Bolt
3 3.00 Size = 4xM16
1 4.00
36.00 Pcs

e. Dia. 12 Bracing Bar


1 7.81 L = 6.61m
1 16.00 Number = 8*2 = 16
16.00 Berga
Bracing Bar Connector

2 16.00 Number = 12 Pcs


32.00 Berga

Prepared By:________________________ Checked By: __________________________ Approved By_____________________


ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች
Company name: Document №:
TNT CONSTRUCTION AND TRADING TNT/ ASTU/01
Title: Issue No- 1
AASTU COMMERCIAL BUILDING PROJECT
TAKE OFF SHEET Page 1 of 1

SUMMERY Quantity unit Remark

Concrete Err:509 m3

Cement Screed Err:509 m2

HCB Err:509 m2

Plastering Err:509 m2
Curb Stone
Err:509 m
Stone Masonry
Err:509 m3

Prepared by(Office Engineer) Checked by (S.Office Engineer) Approved By; (Project Manager)

Anteneh.w ______________ Habtamu.A ________________ Amaha.C__________________


ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች Document №:

TNT CONSTRUCTION AND TRADING TNT/ ASTU/01


Issue No- 1
AASTU COMMERCIAL BUILDING PROJECT
Page 1 of 1
Date: 04/11/2012

Utilization for PPC & Sand

Item Description Quantity(m3) Cement(qtl) Sand(m3) Remark

1 Block-A First FloorScreed work #NAME? #NAME? #NAME?


Utilization for sand
2 Block-B First FloorScreed work #NAME? #NAME? #NAME?
0.95m3/1m3
3 Block-C First FloorScreed work #NAME? #NAME? #NAME?
Block-E First & Second FloorScreed
4 #NAME? #NAME? #NAME? Cement=4.41per 1m3
work
Block-G Second & Roof FloorScreed
5 #NAME? #NAME? #NAME?
work
Total Quantity #NAME? #NAME? Area Converted by
0.08depth
Total Utilized with Wastage 10% #NAME? #NAME?

Prepared by: Checked by : Approved By;

Anteneh.ww_____________ Habtamu.A ________________ Amaha.C _________________


at point X=475324.4158 Y=983808.5825 Z=2182.0000
at point X=475323.3837 Y=983809.3760 Z=2182.0000
at point X=475322.8651 Y=983809.8801 Z=2182.0000
at point X=475321.9999 Y=983810.9506 Z=2182.0000
at point X=475321.5394 Y=983811.7049 Z=2182.0000
at point X=475321.1886 Y=983812.4173 Z=2182.0000
at point X=475320.8708 Y=983813.2682 Z=2182.0000
at point X=475320.6485 Y=983814.1195 Z=2182.0000
at point X=475320.5146 Y=983814.9714 Z=2182.0000
at point X=475320.4657 Y=983815.7872 Z=2182.0000
at point X=475320.4964 Y=983816.6454 Z=2182.0000
at point X=475320.6099 Y=983817.4908 Z=2182.0000
at point X=475320.8123 Y=983818.3458 Z=2182.0000
at point X=475321.1050 Y=983819.1853 Z=2182.0000
at point X=475321.2811 Y=983819.5750 Z=2182.0000
at point X=475321.4142 Y=983819.8695 Z=2182.0000
at point X=475321.8599 Y=983820.6458 Z=2182.0000
at point X=475322.3788 Y=983821.3682 Z=2182.0000
at point X=475322.6649 Y=983821.6923 Z=2182.0000
at point X=475322.9509 Y=983822.0164 Z=2182.0000
at point X=475323.5374 Y=983822.5654 Z=2182.0000
at point X=475324.2790 Y=983823.1329 Z=2182.0000
at point X=475324.9800 Y=983823.5654 Z=2182.0000
at point X=475325.7666 Y=983823.9509 Z=2182.0000
at point X=475326.7223 Y=983824.3694 Z=2182.0000
at point X=475327.5811 Y=983824.8297 Z=2182.0000
at point X=475327.9404 Y=983825.0484 Z=2182.0000
at point X=475328.4484 Y=983825.3865 Z=2182.0000
at point X=475328.9608 Y=983825.7761 Z=2182.0000
at point X=475329.2322 Y=983825.9824 Z=2182.0000
at point X=475329.8970 Y=983826.5782 Z=2182.0000
at point X=475330.7336 Y=983827.4414 Z=2182.0000
at point X=475331.3163 Y=983828.1604 Z=2182.0000
at point X=475331.8515 Y=983828.9298 Z=2182.0000
at point X=475332.3881 Y=983829.8472 Z=2182.0000