Ready Mix For BLK B, C, D & E - 4-10-17
Ready Mix For BLK B, C, D & E - 4-10-17
Copping
Access A to F
Second Floor
2 23.50
47.00 ml
Access B to E
First Floor
2 10.43 H //4D-7A
20.86 ml
Second Floor
2 10.43 H //4D-7A
20.86 ml
Third Floor
1 10.43 H //4D-7A
10.43 ml
1 200.0 pcs
0.143 Volume/pcs=(0.478 m2 )*(0.3)=0.1434 m3
28.68 m3
28.68 m3 Total Concrete for Storm Water Ditch Cover
ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች Document №:
TNT CONSTRUCTION
Company name: AND TRADING TNT/ AASTU/01
2.82 m 0+040
0+100
5.77 m
6.20 m
1.96 m
0+120
56.29 m
0+140
19.19 m
3.89 m
0+160
19.19 m
3.93 m
__________________ __________________Approved by
ቲኤንቲ
TNTኮንስትራክሽንና ንግድ ሥራዎች
CONSTRUCTION Document №:
Company name: AND TRADING TNT/ AASTU/01
Title: Isue No- 1
AASTU COMMERCIAL
Size TAKEOFF SHEET BUILDING
Size
PROJECT Page 1 of 1
No (L*W*H) Qty. Description No (L*W*H) Qty. Description
Bridge A to G Bridge B to E
Second Floor Slab (@+7.90) Roof Floor Beam (@+17.50)
2 4.40 On Axis S-S''//A''-B'',B''-C'' 4.105 On Axis H//6D-6E
3.90 1 0.500
34.32 m2 0.300
2 1.85 On Axis S-S''//A''-Above and below Axis C'' 0.62 m3
4.40 4.105 On Axis H//6E-7A
16.28 m2 1 0.500
m2 Total Area Of Second Floor Slab for Bridge
50.60 A
m3toTotal
G Volume Of Second Floor Slab for 0.300
8.62 Bridge A to G 0.62 m3
m3 Total Volume Of Roof Floor Beam for B
Roof Floor Slab (@+11.10) 1.23 to E (+17.50)
2 4.40 On Axis S-S''//A''-B'',B''-C'' 1.1 Ground Floor Slab (@+1.50)
3.90 1 32.76 On Axis 6D-6E//H-G
34.32 m2 1.00 Cad Area
2 1.85 On Axis S-S''//A''-Above and below Axis C'' 32.76 m2
4.40 1 5.90 On Axis 6E-7A//H-G
16.28 m2 4.41
50.60 m2 Total Area Of Roof Slab for Bridge A to G 25.99 m2
m2 Total Area Of Ground Floor Slab for B
8.62 m3 Total Volume Of Roof Slab for Bridge A to G 58.74 to
m3ETotal Volume Of Ground Floor Slab for
Ground Floor Beam (@+0.00) 5.87 B to E
3.700 On Axis S,S''//A''-B'',B''-C'' Bridge A to F
4 0.500 Second Floor Beam (@+7.90)
0.300 4.670 On Axis N',M'//Y-Y2,Y2-Y3,Y3-Y4 and M'//Y4-Y5'
2.22 m3 7 0.500
4.000 On Axis A'',B'',C''//S-S'' 0.300
3 0.500 4.90 m3
0.300 4.170 On Axis N'//Y4-Y5'
1.80 m3 1 0.500
m3 Total Volume Of Ground Floor Beam for A
4.02 to G 0.300
Second Floor Beam (@+7.90) 0.63 m3
3.700 On Axis S,S''//A''-B'',B''-C'' 3.700 On Axis Y,Y2,Y3,Y4,Y5'//N'-M'
4 0.500 5 0.500
0.300 0.300
2.22 m3 2.78 m3
m3 Total Volume Of Second Floor Beam
4.000 On Axis A'',B'',C''//S-S'' 8.30 for A to F
3 0.500 Second Floor Slab (@+7.90)
0.300 3 5.70 On Axis N'-M'//Y-Y2,Y2-Y3,Y3-Y4
1.80 m3 4.87
1.750 On Axis S,S''//above Axis A'' and Below C'' 83.28 m2
4 0.500 1 16.86 On Axis N'-M'//Y4-Y5'
0.300 1.00 Cad Area
1.05 m3 16.86 m2
m3 Total Volume Of Second Floor Beam for A m2 Total Area Of Second Floor Slabfor
5.07 to
m3G(+7.90)
Total Volume Of Roof Floor Beam for A to G 100.14 Bridge A to
m3 Total F
Volume Of Second Floor Slab for
5.07 (+11.10) 18.02 Bridge A to F
Ground Elevation Column 9.01 m2 Previosly Excuted
2 0.196 C-1(0.50*7.90) 9.01 m2 Current Excuted
7.900 On Axis C''//S,S''
3.10 m3
4 0.196 C-2(0.50*7.90)
7.900 On Axis A'',B''//S,S''
6.20 m3
m3 Total Volume of Ground Floor Elevation
9.30 Column on Bridge A to G
r
ቲ.ኤን.ቲ ኮንስትራክሽን እና ንግድ ሥራዎች
T N T Construction & Trading Document No: 1
Kind of Doc: Issue No:
Title: Take off sheet From: Issue Date: Page No:
Project Name: AASTU Commercial Complex Building
Client: Addis Ababa Science and Techonology University (AASTU)
Consultant: Acute Engineering Plc
Contractor: TNT Construction and Trading
Location: Addis Ababa Size
Size (L*W*H
No (L*W*H) Qty. Description No ) Qty. Description
Cement Screed 1.3) Block C
1.Ground Floor Slab 1 91.64 Shop
1.1)Block A 1.00
1 312.30 Supermarket 91.64 m2
1.00 1 115.14 Snack Bar
312.30 m2 1.00
(13) 0.50 Deduction for columns 115.14 m2
0.50 1 87.37 Bank
(3.25) m2 1.00
1 174.71 Shop-1 87.37 m2
1.00 1 204.84 Corridor
174.71 m2 1.00 Area with Column Deduction
(5) 0.50 Deduction for columns 204.84 m2
0.50 498.99 m2 Sub Total Area of Ground Floor Screed on Block C
(1.25) m2 1.4) Block D
1 262.37 Corridor 1 146.34 Game Zone
1.00 With Deductions 1.00
262.37 m2 146.34 m2
744.88 m2 Sub Total Area of Ground Floor Screed on Block A 1 52.78 Juice Bar
402.90 m2 Previosly Excuted 1.00
341.98 m2 Excuted 50% 52.78 m2
1.2) Block B 1 469.52 Lobby
1 181.54 Shop-2 1.00 Area with Column Deduction
1.00 469.52 m2
181.54 m2 668.64 m2 Sub Total Area of Ground Floor Screed on Block D
(6) 0.50 Deduction for columns 334.32 m2 Excuted 50%
0.50
(1.50) m2
1 22.42 Utility room
1.00
22.42 m2
1 36.30 Boutique
1.00
36.30 m2
1 10.19 2 Shops
1.00
10.19 m2
1 7.18 Security
1.00
7.18 m2
1 26.35 Reception
1.00
26.35 m2
1 17.46 Info Center
1.00
17.46 m2
1 45.36 Gift Shop
1.00
45.36 m2
1 200.38 Bank
1.00
200.38 m2
1 720.98 All in One Coridor & Lobby With eductions
1.00
720.98 m2
1,266.66 m2 Sub Total Area of Ground Floor Screed on Block B
950.00 m2 Excuted 75%
Company name: Document №:
ቲኤንቲ ኮንስትራክሽንና ንግድ ሥራዎች
OF/TNT/ ECD/012
TNT CONSTRUCTION AND TRADING
Title: Issue №: Page №:
Material Demand 1 Page 1 of 1
PROJECT NAME Design and Build of Women Rehabilitation and Skill Development Center Project
CLIENT Addis Ababa City Administration Mega Projects Construction Office
COSULTANT Addis Ababa Institute of Technology- Addis Ababa University
CONTRACTOR TNT Construction and Trading PLC
LOCATION ADDIS ABABA, AKAKI KALITY SUBCITY, WOREDA 08
NO Description Planned work Activities Unit Qty Input Material Unit Qty
TAKE - OFF
Block D
Block A BB-1, On Axis 10&11 /G-I
TAKE - OFF
BB 4
1 7.40 Length
0.30 Width
109.59 m³ Total forBlk A&B SW, Columns And liftshafts 0.60 Depth
1.33 m³
BB 8
1 6.50 Length
0.30 Width
0.60 Depth
1.17 m³
BB 5
1 15.10 Length
0.30 Width
0.60 Depth
2.72 m³
DDT for J & K/10-12
-2 7.20 Length
0.30 Width
0.60 Depth
-2.59 m³
Size Size
No (L*W*H) Qty. Unit Description No (L*W*H) Qty. Unit Description
1. Dry Waste
a. Truss 3 Truss Perpendicular Member
SHS - 60x60x3mm 2 0.18 L = 0.18 m
Truss Bottom Member 0.36 m
3 11.20 L = 11.20 m 3
33.60 m 2 0.30 L = 0.303 m
0.61 m
Truss Top Member 3
6 5.72 L = 5.72 m 2 0.51 L = 0.51 m
34.32 m 1.02 m
3
Lattice Purlin 2 0.72 L = 0.72 m
Purlin Top Member 1.44 m
26 7.46 L = 7.46 m 3
193.96 m 2 0.92 L = 0.92 m
1.84 m
Lattice Purlin 3
Purlin Bottom Member 2 1.13 L = 1.13 m
26 6.78 L = 6.78 m 2.26 m
176.28 m
3 1.40 L = 1.40 m
4.20 m
438.16 m Total Length for SHS 60x60x3mm Size Lattice Purlin
1 Diagonal Member
58.00 Pcs Total Quantity for SHS 60x60x3mm Size 26 0.51 L = 0.51 m
13.26 m
SHS - 40x40x3mm 13
2 Truss Diagonal Member 26 0.56 L = 0.56 m
3 1.48 L = 1.48 m 189.28 m
8.88 m 13 Perpendicular Member
3 26 0.38 L = 0.38 m
2 1.34 L = 1.34 m 128.44 m
8.04 m
3
2 1.18 L = 1.18 m
7.08 m
3
2 1.18 L = 1.18 m
7.08 m
3
2 1.05 L = 1.05 m
Total Length for SHS 40x40x3mm
2.10 m 378.69 m Size
Total Quantity for SHS 40x40x3mm
3 64.00 Pcs Size
2 0.90 L = 0.90 m b. EGA Sheet
1.80 m 1 5.72 L = 5.72 m
3 1 14.96 W = 14.96 m
2 0.50 L = 0.50 m 85.57 m
1.00 m Cutting Schedule
L = 5.72+0.15 = 5.90 m
Member = 6.34/0.83 = 8 Pcs
19 Pcs Size = 5.90x0.83 m
Size Size
No (L*W*H) Qty. Unit Description No (L*W*H) Qty. Unit Description
c. Plate
2 3.00 Size = 2x25x25x6 mm
1 3.00
18.00 Pcs
d. J-Bolt
3 3.00 Size = 4xM16
1 4.00
36.00 Pcs
Concrete Err:509 m3
HCB Err:509 m2
Plastering Err:509 m2
Curb Stone
Err:509 m
Stone Masonry
Err:509 m3
Prepared by(Office Engineer) Checked by (S.Office Engineer) Approved By; (Project Manager)