0% found this document useful (0 votes)
22 views6 pages

Standard Net Metering PPAformat

The document outlines the approved Power Purchase Agreement (PPA) format for Solar Rooftop PV Plants with net metering between Chamundeshwari Electricity Supply Corporation Limited (CESC) and the seller. It details the technical, safety, and interconnection requirements for the solar system, as well as the commercial settlement terms, including tariff rates and billing procedures. The agreement is valid for 25 years and includes provisions for dispute resolution and termination conditions.

Uploaded by

Mehul Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views6 pages

Standard Net Metering PPAformat

The document outlines the approved Power Purchase Agreement (PPA) format for Solar Rooftop PV Plants with net metering between Chamundeshwari Electricity Supply Corporation Limited (CESC) and the seller. It details the technical, safety, and interconnection requirements for the solar system, as well as the commercial settlement terms, including tariff rates and billing procedures. The agreement is valid for 25 years and includes provisions for dispute resolution and termination conditions.

Uploaded by

Mehul Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Approved PPA format for Solar Rooftop PV Plants

STANDARD FORMAT OF POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV


PLANTS WITH NET METERING
This Power Purchase Agreement is entered into at (place) .................................. ……………..
on this………………day of ……………. between Chamundeshwari Electricity Supply
Corporation Limited (CESC), Mysuru, a Government of Karnataka undertaking, being a
Company formed and incorporated in India under the Companies Act, 1956, with its
registered office at Mysuru, Karnataka State, represented by
........................................................................................................................................... ………………
. hereinafter, referred to as the "CESC, Mysuru", (which expression shall, unless repugnant
to the context or meaning thereof, include its successors and permitted assigns), as party
of the first part
AND
...................................................... ……………………..(Name) the consumer of CESC, Mysuru,
residing at (address) ………………………………………………………………………………
hereinafter, referred to as the "Seller (which expression shall, unless repugnant to the
context or meaning thereof, include his successors and permitted assigns), as party of
the second part.
Whereas,
a. The Seller intends to connect and operate the Solar Roof Top Photo Voltaic (SRTPV)
system with CESC's HT/LT, Distribution system for sale of the Solar Power to CESC,
Mysuru, in terms of the Karnataka Electricity Regulatory Commission's (KERC) Order
No. ………………………….. dated: ………………………
b. The Seller intends to install a SRTPV system of………………kWp capacity on the existing
roof top of the premises, situated at……………………………………………………and
bearing RR. No……………………..in the same premises,
under………………………………Sub-Division of CESC, Mysuru.
c. The Seller intends to sell the energy, generated from the SRTPV system to CESC,
Mysuru on net-metering basis, from the date of commissioning of the SRTPV system.
Explanation: The ‘Commissioning’ means the stage at which the SRTPV system starts
generating the power for the use by the Seller and injects surplus power
if any, into the grid.
d. CESC, Mysuru intends to purchase the energy, generated by such SRTPV system, on
net- metering basis, at the tariff determined by the KERC.
Now therefore, in consideration of the foregoing premises, the parties, hereto, intending
to be legally bound, hereby, agree as under:

Karnataka Electricity Regulatory Commission Page 1


Approved PPA format for Solar Rooftop PV Plants

1. Technical and Interconnection Requirements:


Seller shall ensure his SRTPV system complies with the following, technical and
interconnection requirements and shall:
1.1 Comply with the applicable standards and conditions, in respect of integrating the
SRTPV system with the distribution system.
1.2 Connect and operate the SRTPV system to CESC's distribution system, in
accordance with the State Grid Code, and Distribution Code as amended from
time to time.
1.3 Install, prior to connection of SRTPV system to CESC's distribution system, an inverter
with an automatic inbuilt isolation device.
1.4 Provide external manual isolation mechanism with suitable locking facility, so that
SRTPV system will not back-feed into the CESC's network, in case of power outage of
the CESC's distribution system, and it shall be accessible for CESC, Mysuru to
operate, if required, during maintenance/emergency conditions.
1.5 Install all the equipment of the SRTPV system, compliant with relevant International
(IEEE/IEC) and Indian Standards (BIS).
1.6 (a) The SRTPV system shall be designed, engineered and constructed and operated
by the seller or any other person on his behalf, with reasonable diligence, subject to
all applicable Indian Laws, Rules, Regulations as amended from time to time and
orders having the force of law.

(b) The Seller, shall commission the SRTPV system, within six months from the date of
approval of PPA.

1.7 Adhere to the following power quality measures, as per the International and Indian
standards and/or such other measures, stipulated by the KERC/CESC, Mysuru:

a. Harmonic current: Harmonic current injections from a generation unit shall not
exceed the limits specified in IEEE 519.
b. Voltage at the injection point should be in the operating range of 80% to 1 10%,
of the nominal connected voltage.
c. Flicker: Operation of Photovoltaic system shouldn’t cause voltage flicker in excess
of the limits stated in the relevant sections of the IEC standards or other
equivalent Indian standards, if any.
d. Frequency: When the system frequency exceeds the upper limit, specified in the
IEGC as amended from time to time, the SRTPV system shall shift to island mode.
e. DC Injection: Photovoltaic system, should not inject DC power more than 0.5% of

Karnataka Electricity Regulatory Commission Page 2


Approved PPA format for Solar Rooftop PV Plants

full rated output at the interconnection point or 1% of rated inverter output


current into distribution system, under any operating conditions.
f. Power Factor: While the output of the inverter is greater than 50%, a lagging power
factor of greater than 0.9, shall be maintained.
g. The SRTPV system, in the event of voltage or frequency variations must
island/disconnect itself, as per the IEGC/KEGC Regulations, within the stipulated
period.
2. Safety:
The Seller, shall comply with the following safety measures:
2.1 The Seller shall comply with the Central Electricity Authority (Measures Relating to
Safety and Electricity Supply) Regulations, 2010.

2.2 The Seller shall ensure that, the design; installation; maintenance, and operation of
the SRTPV system, are in a manner, conducive to the safety of the SRTPV system, as
well as, the CESC's distribution system.

2.3 If the Seller’s SRTPV system either, causes damage to and/or produces adverse
effects on the other consumers' or CESC’s assets, Seller will disconnect SRTPV system
immediately, from the distribution system, by himself or upon directions from the
CESC, Mysuru and rectify the same at his own cost before reconnection.

3. Clearances and Approvals:


The Seller, shall obtain CESC's and other statutory approvals and clearances, before
connecting the SRTPV system to the distribution system.
4. Access and Disconnection
4.1 CESC, Mysuru shall have access to metering equipment and disconnecting device
of SRTPV system, both automatic and manual, at all times.

4.2 In emergency or outage situation, where there is no access to a disconnecting


device either, automatic or manual, the CESC, Mysuru shall have the right to
disconnect power supply to the premises.

5. Liabilities
The Seller, shall be solely responsible for availing any fiscal or other incentive, provided by
the State/ Central government at his own expenses.

6. Commercial Settlement

6.1 Tariff:
a. The CESC, Mysuru shall pay for the Net energy at Rs………………per kWh, as

Karnataka Electricity Regulatory Commission Page 3


Approved PPA format for Solar Rooftop PV Plants

determined by the KERC in the Order dated ………………………..for the term of this
agreement.
b. If for any reason the date of commissioning is delayed, beyond the date of
commissioning agreed, the tariff payable by the ESCOM, shall be lower of the:
i. Tariff agreed to in this agreement.
OR
ii. Any revised tariff, determined by the Commission, prevailing on the date of
commissioning.
OR
iii. 90% of the tariff agreed to in this agreement.
c. The Seller, shall pay the Electricity tax and other statutory levies, pertaining to SRTPV
generation, as may be levied from time to time.
d. The Seller, shall not have any claim for compensation, if the solar power generated by
his SRTPV system, could not be absorbed by the distribution system due to failure of
power supply in the grid/ distribution system for the reasons, such as line clear, load
shedding and line faults, whatsoever

7. Metering:

7.1 The Seller, shall arrange to shift the existing meter to the generation side of SRTPV
plant to measure solar power generation and install Bi-directional meter (whole
current/CT operated) at the point of interconnection to the distribution system, at a
suitable place in the premises, accessible for recording export of energy, from the
SRTPV system to the grid and import of energy to the premises of the consumer from
the grid. The bi-directional meter, shall comply with the Central Electricity Authority
(Installation and operation of meters) Regulations, 2006 and shall have the following
features:
i. Separate registers, for recording export and import energy with facility to
download by Meter Reading Instrument (MRI).
ii. kVA, kW and kVAR measuring registers, for both import and export of energy.
iii. The Meter, shall have RS232 (or higher) communication optical port / Radio
Frequency (RF) port to support Automatic Meter Reading (AMR).

8. BILLING AND PAYMENT:


8.1 CESC, Mysuru, shall issue monthly electricity bill for the net-energy on the scheduled
date of meter reading.
8.2 In case, the exported energy is more than the imported energy, the CESC, Mysuru

Karnataka Electricity Regulatory Commission Page 4


Approved PPA format for Solar Rooftop PV Plants

shall pay for the net-energy exported, as per Tariff agreed in this agreement, within
30 days from the date of issue of bill, duly adjusting the fixed charges and electricity
duty, if any.
8.3 In case, the exported energy is less than the imported energy, the Seller, shall pay
CESC, Mysuru for the net-energy imported, as per the prevailing retail supply tariff,
determined by the Commission from time to time.
8.4 The CESC, Mysuru shall pay interest at the same rates, as is being levied on the
consumers, for late payment charges, in case of any delay in payment, beyond 30
(thirty) days period from the date of issue of bill, for the Net-energy exported.
Explanation: Net-energy means, the difference of meter readings of energy injected by
the SRTPV system into the grid (export) and the energy drawn from the grid
for use by the seller (import) recorded in the bi-directional meter.

9. Term and Termination of the Agreement


9.1 This agreement, shall be in force for a period of 25 years from the date of
commissioning of the SRTPV system, unless terminated otherwise, as provided here
under.
9.2 If the CESC, Mysuru commits any breach of the terms of the Agreement, Seller shall
serve a written notice specifying the breach and calling upon the CESC, Mysuru to
remedy/ rectify the same, within 30 (thirty) days or at such other period and at the
expiry of 30 (Thirty) days or such other period from the delivery of the notice, Seller
may terminate the agreement by delivering the termination notice, if the CESC,
Mysuru fails to remedy/ rectify the same.
9.3 If the Seller, commits any breach of the terms of the Agreement, the CESC, Mysuru
shall serve a written notice specifying the breach and calling upon the seller to
remedy/ rectify the same within 30 (thirty) days or at such other period and at the
expiry of 30 (Thirty) days or such other period from the delivery of the notice, the
CESC, Mysuru may terminate the agreement by delivering the termination notice, if
the seller, fails to remedy/ rectify the same.
9.4 Upon termination of this Agreement, Seller shall cease to supply power to the
distribution system and any injection of power shall not be paid for by the CESC,
Mysuru.

10. Dispute Resolution:

All the disputes, between the parties, arising out of or in connection with this agreement,
shall be first tried to be settled through mutual negotiation.

Karnataka Electricity Regulatory Commission Page 5


Approved PPA format for Solar Rooftop PV Plants

The parties shall resolve the dispute in good faith and in equitable manner.

In case of failure to resolve the dispute, either of the parties may approach the
appropriate Forum.

IN WITNESS WHEREOF, the Seller and the CESC, Mysuru have entered into this Agreement
to be executed as of the date and the year first set forth above.

FOR AND ON BEHALF OF CHAMUNDESHWARI


FOR AND ON BEHALF OF SELLER
ELECTRICITY SUPPLY CORPORATION LIMITED
(CESC), MYSURU
By: By:

Designation: Designation:
Address: Address:

WITNESS WITNESS
In Presence of In Presence of

Name: Name:
Designation: Designation:

WITNESS WITNESS
In Presence of In Presence of

Name: Name:
Designation: Designation:

Karnataka Electricity Regulatory Commission Page 6