Sample Verification Report
Sample Verification Report
BIM
PODIUM 1 LEVEL L01 VALIDATION REPORT & AS-BUILT
MODEL
Approved by
Prepared by Checked by Reviewed by
Print Name Hussein Eid Motasem Albanna Kaharodin Guiamaludin Chady Tanios
(Erga) Head of Arch
Project QA/QC
Job Title Dev./Project Design BIM Manager Project Director
Manager
Manager
Signature
Date 23/09/2024
This document has been issued in a controlled manner to the following recipients:
(In the event of a revision, the parties listed are to be issued with the updated version)
PODIUM 1
1 LIGHTING FIXTURE BIM MODEL MISMATCHED WITH POINT CLOUD. LT/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
LEVEL 01
PODIUM 1
2 PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. LEVEL 01 PB/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
4 LEVEL 01
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
5 BEAM SLEEVE MISMATCHED. LEVEL 01 ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
7 LIGHTING FIXTURE BIM MODEL MISMATCHED WITH POINT CLOUD. LEVEL 01 LT/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
BEAM SLEEVE MISMATCHED. ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
8 LEVEL 01
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
9 BEAM SLEEVE MISMATCHED. LEVEL 01 ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
10 AIR TERMINAL MISSING. LEVEL 01 ME/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
11 THE PIPE IS MISSING IN THE POINT CLOUD SCAN. LEVEL 01 PB/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
12 THE PIPE IS MISSING IN THE POINT CLOUD SCAN. LEVEL 01 PB/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
13 AIR TERMINAL MISSING. LEVEL 01 ME/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
15 BEAM SLEEVE MISMATCHED. LEVEL 01 ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
17 LEVEL 01
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
18 DUCT BIM MODEL MISMATCH WITH POINT CLOUD SCAN. LEVEL 01 ME/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
20 LEVEL 01
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
26 THE PIPE IS MISSING IN THE POINT CLOUD SCAN. LEVEL 01 PB/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
29 LEVEL 01
PODIUM 1
30 FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. LEVEL 01 FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
FIRE PROTECTION PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. FF/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
31 LEVEL 01
31 LEVEL 01
PODIUM 1
32 PIPE BIM MODEL MISMATCHED WITH POINT CLOUD. LEVEL 01 PB/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
PODIUM 1
33 MISSING BEAM OPENING ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
LEVEL 01
PODIUM 1
34 MISSING BEAM OPENING ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
LEVEL 01
PODIUM 1
35 COLUMN NOT ALIGNED AS PER SCAN ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
LEVEL 01
PODIUM 1
36 Elevated slab as per site condition ELEVATED SLAB AS PER SITE CONDITION ST/9207-BP12D-HDEC-BIM-ME-NS-L05-40300
LEVEL 01