R13 013B01 Ajc 08SS Ubazz DWG CD 30001.0001.0001

The document appears to be a detailed architectural or engineering drawing, including various structural elements such as walls, slabs, and drainage systems. It contains specifications for dimensions, elevations, and construction materials, along with general notes for compliance and coordination with other engineering disciplines. The drawing emphasizes the importance of adhering to specified dimensions and slopes for effective drainage and structural integrity.

Uploaded by

ajeckhobarsa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views1 page

R13 013B01 Ajc 08SS Ubazz DWG CD 30001.0001.0001

The document appears to be a detailed architectural or engineering drawing, including various structural elements such as walls, slabs, and drainage systems. It contains specifications for dimensions, elevations, and construction materials, along with general notes for compliance and coordination with other engineering disciplines. The drawing emphasizes the importance of adhering to specified dimensions and slopes for effective drainage and structural integrity.

Uploaded by

ajeckhobarsa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

KEY PLAN

A A

A B C D E F F E D C B A

250 21695 300 300 21695 250

3560 5050 4350 4616 4119 4119 4616 4350 5050 3560

(MIN.)
B B

1000
300mm THK.
PARAPET WALL SHEAR WALL
EL. +10.80 TOP EL. +10.80 TOP EL. +10.80 TOP

PARAPET WALL (TYP.)


SCUPPER DRAIN 2% SLOPE GENERAL NOTES
EL. +9.468 TOCA PACU SCUPPER DRAIN HOLLOW CORE
SLAB 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS ARE IN METERS UNLESS
1B TT SLAB
EL. +8.56 BOB OTHERWISE SPECIFIED.
PARAPET WALL EL. +8.30 BOB
STAIR-1 2. IF ANY DISCREPANCY IN SCALE IS FOUND ON THIS DRAWING, THE WRITTEN
EL. +8.00 TOP EL. +8.00 TOP EL. +8.00 TOP
C 110kV GIS ROOM DIMENSIONS GOVERN. C
PACU

(MIN.)

(MIN.)
1500

1500
DOWN SPOUT PRECAST 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE RELEVANT STRUCTURAL,
1A
PARAPET WALL (TYP.) COVER (TYP.)
MECHANICAL AND ELECTRICAL DRAWINGS.
DOWN SPOUT PRECAST 2% SLOPE 2% SLOPE
2% SLOPE
COVER (TYP.) ROOF ACCESS 4. ALL LOADING/UNLOADING PLATFORMS AT THE FRONT OF DOUBLE DOORS SHALL
SCUPPER DRAIN BE COATED WITH UV RESISTANT POLYURETHANE FLOOR HARDNER & DUST
LADDER (TYP.) EL. +5.95 TOCB
PROOFER.
TT SLAB

(CLEAR HEIGHT)

(CLEAR HEIGHT)
EL. +5.26 BOB EL. +5.26 BOB 5. ONE PERCENT (1%) SLOPE ON TOP SURFACE OF LOADING/UNLOADING PLATFORM &
EL. +5.08 BOB EL. +5.00 BOB EL. +5.08 BOB
ROOF ACCESS SIDEWALK IS TO BE MAINTAINED BY CONCRETE SLAB FOR SURFACE DRAINAGE.
33kV SWITCHGEAR

1000
HOLLOW CORE

8200
LADDER

8450
SLAB ROOM 200mm THK. 6. ALL THE EXPOSED CONCRETE EDGES SHALL HAVE 20mmx20mm CHAMFER.
D CMU WALL (TYP.) D

(CLEAR HEIGHT)
33kV SWGR.
ROOM 7. PRECAST COLUMN SIZES SHOWN ARE TENTATIVE AND WILL BE FINALIZED AFTER
TOCA 260mm THK. EL. +3.471 TOCA TOCA STRUCTURAL DESIGN.

(HOOK HEIGHT)

5380
EL. +3.068 200mm THK. FALSE CEILING EL. +3.068 TOCA EL. +3.068
INSULATED 8. EL.+0.30 = FFL OF SUBSTATION BUILDING THAT IS 300mm HIGHER THAN THE

CLEAR HEIGHT
CMU WALL (TYP.)
PRECAST WALL 260mm THK. INSULATED

6500
CRANE ACCESS CROWN ELEVATION EL.+0.00 OF SUBSTATION YARD.
CONTROL ROOM SANDBLAST PRECAST WALL SANDBLAST

3700
D2 LADDER D1
200mm THK. FINISHED (TYP.) FINISHED (TYP.) 9. ALL EXTERNAL WALLS ARE 260mm THICK INSULATED PRECAST.
CMU WALL
2.5M WIDE D6 D4 RAISED FLOOR D6 D6 D2 D6 10. WALL OPENINGS SHALL BE VERIFIED WITH RELEVANT APPROVED MECHANICAL,
(TYP.) 1.5 Mtr. WIDE 1.5 Mtr. WIDE
LOADING/ UNLOAD ELECTRICAL AND FIRE-FIGHTING DRAWINGS.
EL. +0.30 EL. +0.30 SIDEWALK SIDEWALK EL. +0.30 EL. +0.30
PLATFORM (TYP.) EL. -0.60
FFL FFL FFL FFL 11. MINOR MODIFICATION / CHANGES WILL BE SUBJECTED & HAS TO BE DISCUSSED/
E TOC TOA TOA TOA E
AGREED WITH CLIENT ENGINEER AT SITE AND SHALL BE REFLECTED IN MARKUP/
EL.+0.00 TOA EL.+0.00 EL.+0.00 EL.+0.00

900
AS- BUILT DRAWINGS.

12. 0.5% SLOPE IN CABLE BASEMENT TOWARDS DRAINAGE CHANNEL SHALL BE IN


(CLEAR HEIGHT)

(CLEAR HEIGHT)
3000 (MIN.)

3000 (MIN.)
MONOLITHIC REINFORCED CEMENT CONCRETE.
SEE DETAIL-3
260mm THK. 260mm THK. SEE DETAIL-3
33kV SWITCHGEAR
RETAINING WALL 1 RETAINING WALL 110kV GIS ROOM
33kV SWITCHGEAR ROOM
ROOM CABLE CABLE BASEMENT
260mm THK. - CABLE BASEMENT
D6 BASEMENT EL. -3.30 D6 260mm THK.
RETAINING WALL
TOC EL. -3.30 RETAINING WALL
EL. -3.34 EL. -3.365 EL. -3.34
TWO (2) LAYERS OF ELASTOMERIC PVC WATER STOP PVC WATER STOP TOC
TOC 0.5% SLOPE TOC 0.5% SLOPE 0.5% SLOPE TOC TWO (2) LAYERS OF ELASTOMERIC
F BITUMINOUS WATER PROOFING 200mm WIDE (TYP.)
1 200mm WIDE (TYP.) F
BITUMINOUS WATER PROOFING
MEMBRANE 4mm THK. WITH 15mm -
MEMBRANE 4mm THK. WITH 15mm
PROTECTION BOARD (TYP.)
PROTECTION BOARD (TYP.)
KEYED CONSTRUCTION KEYED CONSTRUCTION
75mm WIDE x 75mm DEEP 2 JOINT (TYP.) JOINT (TYP.)
2 75mm WIDE x 75mm DEEP
DRAINAGE CHANNEL (TYP.) - - DRAINAGE CHANNEL (TYP.)
GRAPHIC SCALE:
B SECTION
A SECTION 0 0.5 1 2 3 4 5 6 7m
01
01 10001 SCALE 1:75
10001 SCALE 1:75 SCALE : 1 : 75

G GRAPHIC SCALE: G
0 0.5 1 2 3 4 5 6 7 8 9 10m

SCALE : 1 : 100

LEGEND

12 11 10 9 8 7 6 5 4 3 2 1 FFL FINISHED FLOOR LEVEL


56780
TOC TOP OF CONCRETE
5200 6950 5710 6650 3120 5730 6200 5850 5770 5600 6550
TOA TOP OF ASPHALT
H H

(MIN.)
PARAPET WALL TOP TOP OF PARAPET

1000
TOP TOP
TOCA TOP OF CANOPY
EL. +10.80 EL. +10.80

MM MILLIMETER
M
BOB BOTTOM OF BEAM

PARAPET WALL BOB


1590 2940 M EL. ELEVATION
EL. +8.30
TOP EL. +8.00 PACU
BOB MIN. MINIMUM
(MIN.)

I 1A
TT SLAB I
1500

EL. +8.30 260mm THK. INSULATED


TYP. TYPICAL
150mm THK. PRECAST PRECAST WALL SANDBLAST
PARAPET WALL (TYP.) TOCB FINISHED (TYP.)
CRANE CORBEL THK. THICK
EL. +5.95
2000
TOCA XX DOOR TYPE
BOB EL. +5.00 EL. +4.971
TOP
1000

EL. +4.40
300mm THK.
CLEAR HEIGHT

TOCA EL. +3.471 SHEAR WALL CRANE ACCESS STAIR-2


TT SLAB 110kV GIS ROOM 300mm THK. LADDER
FALSE
3700

J TOCA EL. +3.068 SHEAR WALL J


FIRE EQUIPMENT CEILING
CONTROL ROOM
2.5M WIDE ROOM 2.5M WIDE
LOADING/ UNLOAD D6 RAISED FLOOR LOADING/ UNLOAD
D3 D3 D1 REFERENCE DRAWINGS
PLATFORM (TYP.) EL. +0.30 EL. +0.30 EL. +0.30 PLATFORM (TYP.)
EL. -0.60
FFL FFL FFL OVERALL EQUIPMENT LAYOUT PLAN R13-013B01-AJC-08SS-YEA00-DWG-ED-10001
TOA TOC TOA
EL.+0.00 EL.+0.00
900

CABLE BASEMENT FLOOR PLAN R13-013B01-AJC-08SS-UBAB1-DWG-CD-10001

(CLEAR HEIGHT)
GROUND FLOOR PLAN R13-013B01-AJC-08SS-UBAGF-DWG-CD-10001

3000 (MIN.)
260mm THK. SEE DETAIL-3
110kV GIS ROOM ROOF PLAN R13-013B01-AJC-08SS-UBA01-DWG-CD-10001
RETAINING WALL
300mm THK. CABLE BASEMENT
BUILDING ELEVATIONS R13-013B01-AJC-08SS-UBAZZ-DWG-CD-20001
K RETAINING WALL
PVC WATER STOP
K
EL. VARIES BUILDING DOOR & HARDWARE SCHEDULE R13-013B01-AJC-08SS-UBAXX-DWG-CD-60001
TWO (2) LAYERS OF ELASTOMERIC
TOC 200mm WIDE (TYP.)
BITUMINOUS WATER PROOFING
1 BUILDING FINISHING SCHEDULE R13-013B01-AJC-08SS-UBAXX-DWG-CD-60002
MEMBRANE 4mm THK. WITH 15mm
- PROTECTION BOARD (TYP.) BASEMENT/CABLE ENTRY FOUNDATION PLAN & DETAILS R13-013B01-AJC-08SS-UBAB1-DWG-CD-40001

75mm WIDE x 75mm DEEP KEYED CONSTRUCTION COLUMN & FOOTING LAYOUT, SECTION AND DETAILS R13-013B01-AJC-08SS-UBAZZ-DWG-CD-40001
DRAINAGE CHANNEL (TYP.)
2 JOINT (TYP.)
GROUND FLOOR FRAMING PLAN R13-013B01-AJC-08SS-UBAGF-DWG-CD-40001
-
GROUND FLOOR OPENING LAYOUT & DETAILS R13-013B01-AJC-08SS-UBAGF-DWG-CD-40002
C SECTION GROUND FLOOR SLAB REBAR DETAILS AND SECTIONS R13-013B01-AJC-08SS-UBAGF-DWG-CD-40003
L 01 L
10001 SCALE 1:100
GROUND FLOOR BEAMS LONGITUDINAL SECTIONS & DETAILS R13-013B01-AJC-08SS-UBAGF-DWG-CD-50001

BASEMENT/ CABLE ENTRY WALL OPENINGS AND DETAILS R13-013B01-AJC-08SS-UBAB1-DWG-CD-40002

STAIRCASE LAYOUT AND SECTIONS R13-013B01-AJC-08SS-UBAZZ-DWG-CD-40002

M M

01 18-07-2021 ISSUED FOR APPROVAL M.A HBA MAK

00 09-06-2021 ISSUED FOR APPROVAL MMH HBA MAK

Rev Date Description Drawn Reviewed by Approved

PROJECT:

Red Sea Utility Assets and Infrastructure Project


N N
OWNER: OWNER ENGINEERING:
POLYSULPHIDE SEALANT
R.C.C. BASE SLAB
(UV RESISTANT)

R.C.C. BASE SLAB 50mm THK. EXPANSION BOLT


PROTECTION SCREED

75mm THK. LEAN CONCRETE TWO LAYERS OF ELASTOMERIC


BITUMINOUS WATERPROOFING
MEMBRANE 4mm THK.
2 LAYERS OF 150 MICRON THK. EPC CONTRACTOR: ENGINEERING:
ALUMINIUM FLASHING
POLYETHYLENE VAPOR BARRIER 75mm THK. LEAN CONCRETE (1mm THK.)
O O
2 LAYERS OF 150 MICRON THK. TWO (2) LAYERS OF ELASTOMERIC
POLYETHYLENE VAPOUR BARRIER BITUMINOUS WATER PROOFING
SUBGRADE COMPACTED TO A MINIMUM
SUBGRADE COMPACTED TO A MINIMUM MEMBRANE 4mm THK. WITH 15mm AL-JAZIRAH ENGINEERS & CONSULTANTS
OF 95% MODIFIED PROCTOR DENSITY OR
BITUMINOUS PROTECTION BOARD
85% RELATIVE DENSITY FOR SAND OF 95% MODIFIED PROCTOR DENSITY
CONFORMING TO ASTM D1557
TITLE:

FORMAT:
BUILDING SECTIONS
DETAIL DETAIL 3 DETAIL A0
1 2
SUBSTATION # SS-SF2 SCALE:
- SCALE 1:5 - SCALE 1:5 - SCALE NTS
P AS SHOWN
P
DOCUMENT NUMBER: SHEET:

01

R13-013B01-AJC-08SS-UBAZZ-DWG-CD-30001 OF:
01
THIS DOCUMENT IS THE PROPERTY OF EPC CONTRACTOR. IT CANNOT BE USED, REPRODUCED, TRANSMITTED AND/OR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION OF EPC CONTRACTOR.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

You might also like