Performance Targetsper
Performance Targetsper
Date 06/18/2025
Section The section includes
Section 1 General Information Information about the project
Section 2 Labor salary breakdown
Section 3 Material price breakdown
Section 4 Equipment cost breakdown
Section 6 Analysis sheets
Class A
Class B
Class C
01 Demolition and site clearance Demolition and removal of natural and artificial articles, objects and
obstructions which are above the original surface
02 Excavation and Earth work Top soil removal
Excavation
Filling and compaction
Disposal
Hard coring
03 Concrete work
031 In situ Concrete Mixing and placing of Insitu concrete using different sizes of gravel and
Cement
032 Concrete form work Form work for the Insitu concrete
033 Reinforcement Reinforcement bar; cutting, bending and fixing
034 Pre-cast concrete Manufacture, erection, joining and fixing of pre-cast concrete units
035 Concrete ancillaries
04 Masonry works Brick walls
HCB walls
Stone masonry
Wall finish
Floor finish
Water proofing
Client
Location
Region Wereda
TRANSPORTA
TION COST
Rate Distance
TRANSPO UNIT
Material Unit weight INITIAL COST UNLOADI
ITEM NO. DESCRIPTION RTATION Others COST AT REMARK
group (qtl/unit) (at source) NG COST
COST PROJECT
(14=910+11+12
(6) (7) (8<=>1) (9) (10) (11=4x9) (12) (13) +13) (10)
car Carpentery
car 1 Anti termite (lit) MG1 0.0100 15.00 0.02 15.02
car 2 Built-in Cup board (m3) MG1 1,427.64 0.00 1427.64 Wanza furniture industry
car 3 Cabinet 1 (m3) MG1 2,000.00 0.00 2000.00
car 4 Cabinet 2 (m3) MG1 1,800.00 0.00 1800.00
Cabinet, made from 1.0mm thick sheet metal
car 5 (m3) MG1 0.00 mat cost?
car 6 Cabinets (m3) MG1 1,427.64 0.00 1427.64 Wanza furniture industry
car 7 Ceiling batten 4x5 cm (ml) MG1 6.0000 3.75 9.75 13.50
car 8 Chip wood, thickness 10mm (m2) MG1 0.0800 39.98 0.13 40.11
car 9 Chip wood, thickness 20mm (m2) MG1 0.1600 66.63 0.26 66.89
car 10 Chip wood, thickness 8mm (m2) MG1 0.0640 26.65 0.10 26.76
car 11 Corner list (ml) MG1 0.0012 1.50 0.00 1.50
car 12 Cupboard latch (pcs) MG1 10.00 0.00 10.00
car 13 Door latches (pcs) MG1 120.00 0.00 120.00
car 14 Door stopper (pcs) MG1 2.00 0.00 2.00
car 15 Eucalyptus Diam. 10 cm (ml) MG1 7.00 0.00 7.00
car 16 Eucalyptus Diam. 12 cm (ml) MG1 7.00 0.00 7.00
car 17 Eucalyptus diam. 6 cm (ml) MG1 5.50 0.00 5.50
car 18 Eucalyptus diam. 8 cm (ml) MG1 5.50 0.00 5.50
car 19 Handle, drawer (pcs) MG1 15.00 0.00 15.00
car 20 Lock, drawer (pcs) MG1 15.00 0.00 15.00
Locker, made from 1.0mm thick sheet metal
car 21 (m3) MG1 1 550.00 1.63 551.63
car 22 Mould Oil (lit) MG1 1.00 0.00 1.00
car 23 Nails (kg) MG1 0.0100 8.00 0.02 8.02 Gift trading, Oman nails
car 24 Pad locks (Pcs) MG1 10.00 0.00 10.00
Parquet, 10X2CM THICK TANGUED AND
car 25 GROOVE ZIGBA (ML) MG1 18.00 0.00 18.00
Parquet, 10X3CM THICK TANGUED AND
car 26 GROOVE KERERO (ML) MG1 24.00 0.00 24.00
car 27 Sawn Eucalyptus purlin 100 x 50 mm (ml) MG1 12.00 0.00 12.00
car 41 Wooden skirting, 6x70mm thick imported (ml) MG1 0.00252 18.00 0.00 18.00
car 42 0.00
car 43 0.00
car 44 0.00
car 45 0.00
car 46 0.00
car 47 0.00
car 0.00
cem Cementing 0.00 0.00
cem 1 Cement, OPC MESEBO (qtl) MG3 1.0000 126.09 50.90 176.98
cem 2 Cement, OPC MUGER (qtl) MG1 1.0000 1.00 1.63 2.63
cem 3 Cement, PPC MESEBO (qtl) MG3 1.0000 1.00 50.90 51.90
cem 4 Cement, PPC MUGER (qtl) MG1 1.0000 1.63 mat cost?
cem 5 Gypsum (qtl) MG1 1.0000 600.00 1.63 601.63
cem 6 Lime (qtl) MG1 1.0000 100.00 1.63 101.63
cem 7 0.00
cem 0.00
DPC Dump proofing 0.00 0.00
AB HAM enterprise, including
DPC 1 Asphalt paper (m2) MG1 135.00 0.00 135.00 labor
Bitumminous roof water proofing membrane
DPC 2 (m2) MG5 170.00 0.00 170.00
DPC 3 Nito proof 230 (m2) MG5 100.00 0.00 100.00
DPC 4 Xypex water proofing (m2) MG5 165.00 0.00 165.00
DPC 5 Testudo water proofing (m2) MG5 150.00 0.00 150.00
DPC 6 0.00
DPC 7 0.00
DPC 0.00
ele Electrical 0.00 0.00
ele 1 Air termination in copper tape of 3x25mm (ml) MG1 110.00 0.00 110.00
ele 2 Amplifier, 120w high power (pcs) MG1 0.00 mat cost?
ele 3 Amplifier, 60w (pcs) MG1 8,000.00 0.00 8000.00
An indicator of 6 digital numbers with
ele 4 transformer of 220/12V /25V A (pcs) MG1 0.00 mat cost?
ele 5 Areal TV anteana (pcs) MG1 180.00 0.00 180.00
ele 6 Bare copper wire, 1x10mm2 (ml) MG1 14.00 0.00 14.00 Mugib commercial center
ele 7 Bare copper wire, 1x12mm2 (ml) MG1 0.00 mat cost? Mugib commercial center
ele 8 Bare copper wire, 1x12mm2 (ml) MG1 0.00 mat cost?
ele 9 Bare copper wire, 1x16mm2 (ml) MG1 16.00 0.00 16.00 Mugib commercial center
ele 10 Bare copper wire, 1x25mm2 (ml) MG1 0.00 mat cost?
ele 11 Bare copper wire, 1x32mm2 (ml) MG1 0.00 mat cost?
ele 12 Bare copper wire, 1x50mm2 (ml) MG1 0.00 mat cost?
ele 13 Bare copper wire, 1x6mm2 (ml) MG1 0.00 mat cost?
ele 14 Bare copper wire, 1x70mm2 (ml) MG1 69.00 0.00 69.00 Electric world
ele 15 Bare copper wire, 1x95mm2 (ml) MG1 0.00 mat cost?
Bushing test, Dia. 80mm & 6m long complete
ele 16 with clamps& 6m Anchor wire (ml) MG1 4,992.00 0.00 4992.00
ele 14 CABLE, 3x10sqmm (ml) MG1 35.56 0.00 35.56 Ethio plastic
ele 17 CABLE, 3x150/70+ 1x70sqmm (ml) MG1 0.00 mat cost?
ele 18 CABLE, 3x150/70sqmm (ml) MG1 0.00 mat cost?
ele 19 CABLE, 3x16sqmm (ml) MG1 0.00 mat cost? Ethio plastic
ele 20 CABLE, 3x185/95+ 1x95sqmm (ml) MG1 0.00 mat cost?
ele 21 CABLE, 3x185/95sqmm (ml) MG1 0.00 mat cost?
ele 22 CABLE, 3x185+ 1x95sqmm (ml) MG1 0.00 mat cost?
ele 23 CABLE, 3x2.5sqmm (ml) MG1 10.04 0.00 10.04 Ethio plastic
ele 24 CABLE, 3x25/16+ 1x16sqmm (ml) MG1 158.00 0.00 158.00 Mugib commercial center
ele 46 Cable, backbone optical fiber cable (ml) MG1 0.00 mat cost?
ele 47 Cable, TV (ml) MG1 1.50 0.00 1.50
ele 63 Copper bond earthing, 1000x12mm2 (Pcs) MG1 560.00 0.00 560.00 Mugib commercial center
ele 64 Copper bond earthing, 2000x16mm2 (Pcs) MG1 250.00 0.00 250.00 Electric world
ele 65 Copper bond earthing, 2400x16mm2 (Pcs) MG1 560.00 0.00 560.00 Mugib commercial center
ele 66 Copper bond earthing, 2500x16mm2 (Pcs) MG1 0.00 mat cost?
ele 67 Data Box (pcs) MG1 0.00 mat cost?
ele 68 Data cable, UTP cat 5e (ml) MG1 1.90 0.00 1.90 Mugib commercial center
ele 69 Data cable, UTP cat 6e (ml) MG1 4.50 0.00 4.50
ele 70 Double switches (pcs) MG1 0.00 mat cost?
E-27 type Incandescent Lamps with globe
ele 71 cover (pcs) MG1 126.09 0.00 126.09 Mugib commercial center
ele 72 Elevator, Electric traction (pcs) MG1 0.00 mat cost?
ele 73 Float switch (pcs) MG1 0.00 mat cost?
Fluorescent lamp with holders and balustrade
ele 74 TMW 012/136w (pcs) MG1 200.00 0.00 200.00 Mugib commercial center
Fluorescent lamp with holders and balustrade
ele 75 TMW 012/236w (pcs) MG1 0.00 mat cost?
ele 76 FUSE 2A (pcs) MG1 0.00 mat cost?
ele 77 Generator, diesel 800KVA (pcs) MG1 0.00 mat cost?
ele 87 Junction box diam 65 mm with cover (pcs) MG1 3.70 0.00 3.70 Mugib commercial center
ele 88 Junction box diam 85 mm (pcs) MG1 0.87 0.00 0.87 Ethio plastic
ele 89 Junction box diam 85 mm with cover (pcs) MG1 4.30 0.00 4.30 Mugib commercial center
Massive 1500/01/42, lamp socket E27 and 100
ele 90 watts Osram lamps MG1 0.00 mat cost?
Massive 30012/06/10 lamp sockets E27 and
ele 91 75W Osram lamps: MG1 0.00 mat cost?
Massive 32064/31/10, lamp sockets E27 and
ele 92 13W energy saving- lamps. MG1 0.00 mat cost?
Massive 34020/11/10, lamp sockets E14 and 11
ele 93 W energy saving- lamps. MG1 0.00 mat cost?
Massive 41899/06/10, lamp sockets 3xE27 and
ele 94 40W Osram lamps. MG1 0.00 mat cost?
Massive 4205/63/87, lamp sockets 3xE14 and
ele 95 40W Osram lamps. MG1 0.00 mat cost?
Massive 5978/01/47, lamps sockets E27 and 60
ele 96 watts Osram lamps. MG1 0.00 mat cost?
Massive 74902/21/87, lamp sockets R7s 78 and
ele 97 150 watts Osram lamps MG1 0.00 mat cost?
ele 98 MAST, 2.5M LONG (pcs) MG1 2,500.00 0.00 2500.00
ele 98 MAST, 4.6M LONG (pcs) MG1 5,000.00 0.00 5000.00
ele 99 Mercury switch (pcs) MG1 0.00 mat cost?
ele 100 Network HUB, 16 connections (pcs) MG1 850.00 0.00 850.00 Kid-tek computer technology
ele 101 Network HUB, 3 connections (pcs) MG1 0.00 mat cost?
ele 102 Network HUB, 8 connections (pcs) MG1 450.00 0.00 450.00 Kid-tek computer technology
ele 103 Pannel switch, 8pcs (pcs) MG1 550.00 0.00 550.00
Passenger lift, electrical CAP= 1000kh and
ele 104 9stops (pcs) MG1 0.00 mat cost?
ele 105 Perforated steel cable try (ml) MG1 0.00 mat cost?
Philips FCW 196 2xPL-L18W I0 with 2x18W
ele 106 for fixtures inside Sauna room MG1 0.00 mat cost?
Philips PARTYONE Red lamp with A60 and
ele 107 60W lamps. MG1 0.00 mat cost?
ele 108 Philips TBH 2xTLD 58W with 2x58W MG1 0.00 mat cost?
ele 109 Philips TCS 058.0.1 36w flourescent lamp (pcs) MG1 347.83 0.00 347.83
Philips TCS 097 1xTL-D36W Ic 0 with 1x36W
ele 110 fluorescent lamps MG1 0.00 mat cost?
ele 121 Philips TMS 022/118I+1xTLD18W/840LAMP MG1 98.00 0.00 98.00 Mugib commercial center
ele 122 Philips TMS 022/136I+1xTLD36W/840LAMP MG1 125.00 0.00 125.00 Mugib commercial center
ele 124 Philips TMS 022/236+1xTLD36W/840LAMP MG1 125.00 0.00 125.00 Mugib commercial center
ele 125 Philips TMS 022/318I+3xTLD18W/840LAMP MG1 0.00 mat cost?
ele 137 RJ 45 connector (pcs) MG1 1.00 0.00 1.00 Kid-tek computer technology
ele 138 RJ 45 TWIN OUTLET (PCS) MG1 45.00 0.00 45.00 Kid-tek computer technology
ele 139 Single switch (pcs) MG1 0.00 mat cost?
ele 140 Socket (pcs) MG1 0.00 mat cost?
ele 141 Socket, single 1ph 16A (pcs) MG1 28.00 0.00 28.00 Mugib commercial center
ele 142 Socket, Single 1ph 16A with on/off switch (pcMG1 130.00 0.00 130.00 Mugib commercial center
ele 143 Socket, single 1ph 25A (pcs) MG1 69.00 0.00 69.00 Mugib commercial center
ele 144 Socket, Single 3ph 16A (pcs) MG1 0.00 mat cost?
ele 145 Socket, Single 3ph 20A (pcs) MG1 0.00 mat cost?
ele 146 Socket, single 3ph 25A (pcs) MG1 0.00 mat cost?
ele 147 Socket, single 3ph 25A with sollar switch (pcs) MG1 0.00 mat cost?
ele 148 Socket, Twin 1ph 16A (pcs) MG1 75.00 0.00 75.00 Mugib commercial center
ele 149 Socket, Twin 1ph 25A (pcs) MG1 0.00 mat cost?
ele 150 Socket, twin 3ph 16A (pcs) MG1 0.00 mat cost?
ele 151 Socket, twin 3ph 20A + IP 65 (pcs) MG1 0.00 mat cost?
ele 152 Socket, Twin 3ph 25A (pcs) MG1 0.00 mat cost?
ele 153 Socket, twin 3ph 25A + IP 65 (pcs) MG1 0.00 mat cost?
ele 154 Steel clamp (pcs) MG1 3.00 0.00 3.00
ele 155 Surface mounted 10w ceiling speaker (pcs) MG1 0.00 mat cost?
ele 156 Surface mounted 24w Column speaker (pcs) MG1 2,375.00 0.00 2375.00
ele 157 Surface mounted 40w Column speaker (pcs) MG1 0.00 mat cost?
ele 158 Surface mounted 6w ceiling speaker (pcs) MG1 1,315.00 0.00 1315.00
Switch box consisting of 3pcs legrand décor
ele 159 10am (pcs) MG1 84.00 0.00 84.00 Electric world
ele 160 Switch box, 5pcs dimmer of 10am/1ph (pcs) MG1 250.00 0.00 250.00 Electric world
ele 161 Switch box, 7pcs dimmer of 10am/1ph (pcs) MG1 2,160.00 0.00 2160.00 Electric world
ele 162 Switch, Dimmer 10A (pcs) MG1 0.00 mat cost?
ele 163 Switch, double pole 10A (pcs) MG1 46.00 0.00 46.00 Mugib commercial center
ele 164 Switch, double two way 10A (pcs) MG1 0.00 mat cost?
ele 165 Switch, intermediate 10A (pcs) MG1 65.00 0.00 65.00 Mugib commercial center
ele 166 Switch, single pole 10A (pcs) MG1 28.00 0.00 28.00 Mugib commercial center
ele 167 Switch, triple pole 10A (pcs) MG1 0.00 mat cost?
ele 168 Switch, two way 10A (pcs) MG1 32.00 0.00 32.00 Mugib commercial center
ele 169 Switch, water proof DOUBLE pole 10A (pcs) MG1 46.00 0.00 46.00 Mugib commercial center
fin 4 Ceramic floor tile, 150x150x8mm (m2) MG2 0.1280 85.00 0.64 85.64 Ethio ceramic PLC
fin 5 Ceramic Skirting, 15x150mm (ml) MG1 0.0360 17.00 0.06 17.06
fin 6 Ceramic wall tile, 150x150x6mm (m2) MG1 0.0960 41.94 0.16 42.10
fin 7 Chicken mesh (m2) MG1 30.00 0.00 30.00
fin 8 CM-43 glue (kg) MG1 0.0100 30.00 0.02 30.02
fin 9 Fine wire mesh (m2) MG1 6.50 0.00 6.50
Saba dimensional stone PLC,
fin 10 Marble chips (m2) MG5 170.00 0.00 170.00 including labor
fin 11 Marble tile, 20mm thick black (m2) MG1 0.5 309.12 0.81 309.93 Saba dimensional stone plc
fin 12 Marble tile, 20mm thick multicolor (m2) MG1 0.5 309.12 0.81 309.93 Saba dimensional stone plc
fin 13 Marble tile, 20mm thick white (m2) MG1 0.5 309.12 0.81 309.93 Saba dimensional stone plc
fin 14 Marble tile, 30mm thick black (m2) MG1 0.75 309.12 1.22 310.34 Saba dimensional stone plc
fin 15 Marble tile, 30mm thick multicolor (m2) MG1 0.75 309.12 1.22 310.34 Saba dimensional stone plc
fin 16 Marble tile, 30mm thick multicolor (m2) MG1 0.75 309.12 1.22 310.34 Saba dimensional stone plc
fin 17 Marble tile, 30mm thick white (m2) MG1 0.75 289.80 1.22 291.02 Saba dimensional stone plc
fin 18 Nitotile XS adhesive (kg) MG1 0.00 mat cost?
fin 19 Parquet (m2) MG1 0.1800 0.29 mat cost?
fin 20 Polymer sealant (lit) MG1 0.00 mat cost?
fin 21 PVC skirting, 2x100mm (ml) MG1 0.00 mat cost?
Zeco bathroom utilities and
fin 22 PVC skirting, 2x80mm (ml) MG1 0.0009 8.00 0.00 8.00 building material shop
Zeco bathroom utilities and
fin 23 PVC tile (m2) MG1 0.0118 48.00 0.02 48.02 building material shop
fin 24 Stainless steel angle, rect 402 series (ml) MG1 0.00 mat cost?
fin 25 Stainless steel plate (m2) MG1 0.00 mat cost?
fin 26 Styrofoam (m2) MG1 0.00 mat cost?
fin 27 Terrazzo Door sill, 300x20mm (ml) MG3 0.138 49.80 7.02 56.82 Saba dimensional stone plc
fin 28 Terrazzo Riser, 20mm thick Class A (m2) MG3 0.0782 26.92 3.98 30.90 Saba dimensional stone plc
fin 29 Terrazzo skirting, 100x20mm (ml) MG3 0.0460 18.20 2.34 20.54 Saba dimensional stone plc
fin 30 Terrazzo tile, 200x200x20mm Class A (m2) MG3 0.4600 80.00 23.41 103.41 Saba dimensional stone plc
fin 31 Terrazzo tile, 200x200x20mm Class B (m2) MG3 0.4600 66.00 23.41 89.41 Saba dimensional stone plc
fin 32 Terrazzo tile, 200x200x20mm Class C (m2) MG3 0.4600 50.00 23.41 73.41 Saba dimensional stone plc
fin 33 Terrazzo tread, 30mm thick class A (m2) MG3 0.69 166.00 35.12 201.12 Saba dimensional stone plc
fin 34 Terrazzo window sill, 30mm (ml) MG3 0.69 54.90 35.12 90.02 Saba dimensional stone plc
fin 35 White cement (Kg) MG1 0.0100 3.83 0.02 3.85 Ethio steel
fin 36 Granite wall cladding, 2cm thick (m2) MG1 0.5 467.34 0.81 468.15 Ethio marble
fin 37 Chequered cement tile, 30mm thick (m2) MG1 0.6900 80.00 1.12 81.12
fin 38 0.00
fin 39 0.00
fin 40 0.00
fin 41 0.00
fin 0.00
gen General 0.00 mat cost?
gen 1 Asphalt, 80/100 (kg) MG1 0.0100 5.11 0.02 5.13
gen 2 Fuel (lit) MG4 0.0080 5.52 0.03 5.55
gen 3 Gabion Box, 2.0x1.0x0.50m (pcs) MG1 300.00 0.00 300.00
gen 4 Pipe mould (pcs) MG5 6.00 0.00 6.00
gen 5 Reflecting material, 17cmx100cm (pcs) MG1 30.00 0.00 30.00
gen 6 Self leveling silicone sealant (tube) MG1 26.00 0.00 26.00
gen 7 Steel formwork (m2) MG5 24.00 0.00 24.00
gen 8 Water (m3) MG5 10 10.00 0.00 10.00
Asphalt, 180/200 (kg) MG1 0.01 6.00 0.02 6.02
gen 0.00
gla Glazing 0.00 mat cost?
gla 1 Glass, Clear 3mm thick (m2) MG1 0.00 mat cost?
gla 2 Glass, Clear 4mm thick (m2) MG1 0.1000 50.22 0.16 50.38 Tefeseha PLC, (Tefera negash)
gla 3 Glass, Clear 5mm thick (m2) MG1 0.00 mat cost?
gla 4 Glass, Clear 6mm thick (m2) MG1 0.00 mat cost?
gla 5 Glass, Figured 4mm thick (m2) MG1 0.00 mat cost?
gla 6 Glass, Figured 5mm thick (m2) MG1 0.00 mat cost?
gla 7 Glass, Figured 6mm thick (m2) MG1 0.00 mat cost?
gla 8 Glass, Frosted 4mm thick (m2) MG1 0.00 mat cost?
gla 9 Glass, Frosted 5mm thick (m2) MG1 0.00 mat cost?
gla 10 Glass, Frosted 6mm thick (m2) MG1 0.00 mat cost?
gla 11 Glass, Tinted 4mm thick (m2) MG1 0.00 mat cost?
gla 12 Glass, Tinted 5mm thick (m2) MG1 0.00 mat cost?
gla 13 Glass, Tinted 6mm thick (m2) MG1 0.00 mat cost?
gla 14 Putty glass (kg) MG1 0.0100 5.22 0.02 5.24 Tefeseha PLC, (Tefera negash)
gla 15 0.00
gla 16 0.00
gla 17 0.00
gla 0.00
mas Masonary 0.00 mat cost?
mas 1 Brick (pcs) MG1 0.0342 0.87 0.06 0.93
mas 2 Brick, bold face (pcs) MG1 0.0342 0.92 0.06 0.98
mas 0.00
mas 0.00
met Metal works 0.00 mat cost?
met 1 0.4 mm thick ribbed sheet metal (m2) MG1 0.0750 95.37 0.12 95.49
met 2 Aluminum baluster, 15cm high (mL) MG1 0.00 mat cost?
met 3 Aluminum baluster, 90cm high (mL) MG1 1,400.00 0.00 1400.00
met 4 Aluminum Curtain Wall (m2) MG1 1,200.00 0.00 1200.00
5 Aluminum door (m2) MG1 950.00 0.00 950.00
met 6 Aluminum door, sliding (m2) MG5 2,000.00 0.00 2000.00
met 7 Aluminum window (m2) MG1 950.00 0.00 950.00
met 8 Aluminum window door (m2) MG1 950.00 0.00 950.00
met 9 Aluminum window, sliding (m2) MG1 1,500.00 0.00 1500.00
met 10 ASSA lock (pcs) MG1 1,500.00 0.00 1500.00
met 11 Band iron (kg) MG1 0.0100 10.00 0.02 10.02
met 12 Black LTZ 38x1.5mm, door (m2) MG1 297.00 0.00 297.00
met 13 Black LTZ 38x1.5mm, window (m2) MG1 297.00 0.00 297.00
met 15 Black LTZ 38x1.5mm, window door (m2) MG1 297.00 0.00 297.00
met 16 Flat metal, 20x2mm (kg) MG1 0.01 10.83 0.02 10.85
met 17 Metal Hinge (pcs) MG1 0.00 mat cost?
met 18 Secco LTZ profile door (m2) MG1 0.2563 532.13 0.42 532.55
met 19 Secco LTZ profile window (m2) MG1 0.1464 256.70 0.24 256.94
met 20 Secco LTZ profile window door (m2) MG1 0.1025 191.72 0.17 191.89
met 21 Secco LTZ profile window, sliding (m2) MG1 0.4848 887.70 0.79 888.49
met Galvanized angle iron (kg) MG1 0.01 18.00 0.02 18.02
mis Miscelaneouse 0.00 0.00
mis 1 Aluminum sheet (m2) MG1 0.00 mat cost?
mis 2 Fisher (pcs) MG1 0.05 0.00 0.05
mis 3 Flat Metal sheet, 10x2mm (ml) MG1 0.0016 1.71 0.00 1.71
mis 4 Nails, Concrete 6cm long (kg) MG1 0.0400 0.07 mat cost?
mis 5 Plastic washer (pcs) MG1 0.05 0.00 0.05
mis 6 Screw, 10cm long (pcs) MG1 0.10 0.00 0.10
mis 7 Screw, 6cm long (pcs) MG1 0.10 0.00 0.10
mis 8 Supporting hook (pcs) MG1 1.20 0.00 1.20
mis PVC water stopper, 250mm wide (ml) MG1 120.00 0.00 120.00
mis MG1 0.00
MG1
Pai Painting 0.00 0.00
pai 1 Antirust (gal) MG1 0.0400 59.13 0.07 59.20 Nefas silk paint factory
pai 2 Epoxy paint (gal) MG1 0.0500 205.00 0.08 205.08 Kadisco paints
pai 3 Epoxy paint hardener (lit) MG1 0.0100 150.00 0.02 150.02 Kadisco paints
pai 4 Epoxy primer (Gal) MG1 0.0500 170.00 0.08 170.08 Kadisco paints
pai 5 Epoxy primer hardener (lit) MG1 0.0100 150.00 0.02 150.02 Kadisco paints
pai 6 Glue for stucco (animal glue) (kg) MG1 0.0100 6.00 0.02 6.02
pai 7 Plastic paint (gal) MG1 0.0400 65.00 0.07 65.07 Nefas silk paint factory
pai 8 Primer (Kg) MG1 0.00 mat cost?
pai 9 Stucco (kg) MG1 0.0100 7.00 0.02 7.02
pai 10 Synthetic paint (gal) MG1 0.0400 87.76 0.07 87.83 Nefas silk paint factory
pai 11 Textured paint (gal) MG1 0.00 mat cost?
pai 12 Thinner (lit) MG1 0.0120 5.00 0.02 5.02
pai 13 Trafic paint, white (gal) MG1 0.0400 133.91 0.07 133.98 Kadisco paints
pai 14 Trafic paint, yellow (gal) MG1 0.0400 145.00 0.07 145.07 Kadisco paints
pai 15 Varnish (gal) MG1 0.0400 60.30 0.07 60.36 Nefas silk paint factory
pai 16 0.00
pai 0.00
pro On site Produced materials 0.00 0.00
pro 1 Backfill (m3) MG5 241.76 0.00 241.76
pro 2 C-20 Concrete (m3) MG5 926.69 0.00 926.69
pro 3 C-25 Concrete (m3) MG5 1,002.58 0.00 1002.58
pro 4 C-30 Concrete (m3) MG5 1,080.28 0.00 1080.28
pro 5 C-5 concrete (m3) MG5 570.10 0.00 570.10
pro 6 Cart away (m3) MG5 8.69 0.00 8.69
pro 7 Cement sand Mortar, 1:2 ratio (m3) MG5 1,215.43 0.00 1215.43
pro 8 Cement sand Mortar, 1:3 ratio (m3) MG5 971.24 0.00 971.24
pro 9 Cement sand Mortar, 1:4 ratio (m3) MG5 825.85 0.00 825.85
pro 10 Ceramic wall tile, finished (m2) MG5 69.99 0.00 69.99
pro 11 Combo Mortar mix 1:2:9 ratio (m3) MG5 687.44 0.00 687.44
pro 12 Plain Concrete pipe, dia 100mm (ml) MG5 26.48 0.00 26.48
pro 14 Plain Concrete pipe, dia 150mm (ml) MG5 31.44 0.00 31.44
pro 16 Plain Concrete pipe, dia 200mm (ml) MG5 36.41 0.00 36.41
pro 17 Plain Concrete pipe, dia 300mm (ml) MG5 46.33 0.00 46.33
pro 19 Plain Concrete pipe, dia 400mm (ml) MG5 69.48 0.00 69.48
pro 20 Plain Concrete pipe, dia 500mm (ml) MG5 82.71 0.00 82.71
pro 21 Plain Concrete pipe, dia 600mm (ml) MG5 115.78 0.00 115.78
pro 22 Plain Concrete pipe, dia 800mm (ml) MG5 175.31 0.00 175.31
pro 23 Plain Concrete pipe, dia 1000mm (ml) MG5 281.14 0.00 281.14
pro 13 Plain Concrete pipe, dia 1200mm (ml) MG5 413.42 0.00 413.42
pro 12 Reinforced Concrete pipe, dia 500mm (ml) MG5 192.51 0.00 192.51
pro 21 Reinforced Concrete pipe, dia 600mm (ml) MG5 2,550.25 0.00 2550.25
pro 22 Reinforced Concrete pipe, dia 800mm (ml) MG5 467.00 0.00 467.00
pro 23 Reinforced Concrete pipe, dia 1000mm (ml) MG5 719.92 0.00 719.92
pro 14 Reinforced Concrete pipe, dia 1200mm (ml) MG5 1,030.04 0.00 1030.04
pro 14 Reinforced Concrete pipe, dia 1600mm (ml) MG5 1,705.69 0.00 1705.69
pro 24 Crushed aggregate, 00 mm (m3) MG5 14.0000 221.16 0.00 221.16
pro 25 Crushed aggregate, 10 mm (m3) MG5 14.0000 222.96 0.00 222.96
pro 26 Crushed aggregate, 20 mm (m3) MG5 14.0000 236.36 0.00 236.36
pro 27 Curbstone, concrete (ml) MG5 0.00 mat cost?
pro 28 Excavation (m3) MG5 23.47 0.00 23.47
pro 29 Formwork (m2) MG5 58.04 0.00 58.04
pro 30 HCB 10 cm, class A (pcs) MG5 4.97 0.00 4.97
pro 31 HCB 10 cm, class B (pcs) MG5 3.72 0.00 3.72
pro 29 HCB 10 cm, class C (pcs) MG5 3.38 0.00 3.38
pro 30 HCB 15 cm, class A (pcs) MG5 6.32 0.00 6.32
pro 31 HCB 15 cm, class B (pcs) MG5 5.13 0.00 5.13
pro 29 HCB 15 cm, class C (pcs) MG5 4.64 0.00 4.64
pro 30 HCB 20 cm, class A (pcs) MG5 7.87 0.00 7.87
pro 31 HCB 20 cm, class B (pcs) MG5 5.89 0.00 5.89
pro 32 HCB 20 cm, class C (pcs) MG5 5.34 0.00 5.34
pro 33 Metal grill for concrete ditch, 50cm (m2) MG5 0.00 mat cost?
pro 34 Plastering (m2) MG5 34.83 0.00 34.83
pro 35 Rebar (kg) MG5 11.91 0.00 11.91
pro 35 Wall, double brick (m2) MG5 227.01 0.00 227.01
pro 36 Wall, Single brick (m2) MG5 108.53 0.00 108.53
pro 37 Wall, stone masonry (m3) MG5 542.92 0.00 542.92
Water tap, lever operated cold water tap only
pro 38 (pcs) 0.00 mat cost?
pro 39 Hollow concrete block, for ribbed slab (pcs) MG5 6.27 0.00 6.27
pro 40 Crushed Sub base (m3) MG5 48.43 0.00 48.43
pro 41 Brocken brick (m3) MG5 0.00 mat cost?
pro 39 Crushed Base coarse (m3) MG5 225.70 0.00 225.70
pro 40 Natural Sub base (m3) MG5 73.05 0.00 73.05
pro 41 0.00
pro 0.00
qua Quarry materials 0.00 mat cost?
qua 1 Basaltic stone (m3) MG6 14.0000 60.23 91.00 30.00 181.23
qua 2 Sand (m3) MG6 14.0000 6.89 91.00 50.00 147.89
qua 3 Granular material (m3) MG6 14.0000 64.29 91.00 30.00 185.29
qua 4 trachytic stone (m3) MG6 14.0000 67.93 91.00 30.00 188.93
qua 5 Pumice (m3) MG6 14.0000 4.83 91.00 50.00 145.83
qua 6 Stone for crushing (m3) MG6 14.0000 60.23 91.00 30.00 181.23
qua 0.00
reb Reinforcement bar 0.00 mat cost?
reb 1 black steel wire diam 1.5 mm (kg) MG1 0.0100 10.00 0.02 10.02
reb 2 Rebar diam 10-16 mm (kg) MG1 0.0100 10.44 0.02 10.45 Akaki Metal Products Factory
reb 3 Rebar diam 18-24 mm (kg) MG1 0.0100 10.44 0.02 10.45 Akaki Metal Products Factory
reb 4 Rebar diam 26-32 mm (kg) MG1 0.0100 10.44 0.02 10.45 Akaki Metal Products Factory
reb 5 Rebar diam 4 mm (kg) MG1 0.0100 12.00 0.02 12.02
reb 6 Rebar diam 6-8 mm (kg) MG1 0.0100 10.44 0.02 10.45 Akaki Metal Products Factory
reb 7 0.00
reb 0.00
roof Roofing 0.00 0.00
Acrylic skylight including Aluminum frame and
roof 1 wooden blocks (m2) MG5 2,000.00 0.00 2000.00
roof 2 Crank bolt, dia 6mm (pcs) MG1 1.00 0.00 1.00 Kaliti metal products
roof 3 Dome shaped nails (kg) MG1 0.0100 15.00 0.02 15.02
roof 4 EGA 300, 0.35mm thick (m2) MG1 0.0334 0.05 mat cost?
roof 5 EGA 300, 0.3mm thick (m2) MG1 0.0286 56.57 0.05 56.62 Kaliti metal products
roof 6 EGA 300, 0.4mm thick (m2) MG1 0.0382 0.06 mat cost?
roof 6 EGA 300, 0.50mm thick (m2) MG1 0.0476 77.80 0.08 77.87 Kaliti metal products
roof 7 EGA 400, 0.35mm thick (m2) MG1 0.0374 0.06 mat cost?
roof 8 EGA 400, 0.3mm thick (m2) MG1 0.0320 0.05 mat cost?
roof 9 EGA 400, 0.4mm thick (m2) MG1 0.0427 61.85 0.07 61.92
roof 10 EGA 500, 0.35mm thick (m2) MG1 0.0352 0.06 mat cost?
roof 11 EGA 500, 0.3mm thick (m2) MG1 0.0301 0.05 mat cost?
roof 12 EGA 500, 0.4mm thick (m2) MG1 0.0402 90.31 0.07 90.38 Kaliti metal products
roof 13 EGA 600, 0.35mm thick (m2) MG1 0.0372 0.06 mat cost?
roof 14 EGA 600, 0.3mm thick (m2) MG1 0.0318 0.05 mat cost?
roof 15 EGA 600, 0.4mm thick (m2) MG1 0.0424 0.07 mat cost?
roof 16 EGA 700, 0.35mm thick (m2) MG1 0.0393 0.06 mat cost?
roof 17 EGA 700, 0.3mm thick (m2) MG1 0.0336 0.05 mat cost?
roof 18 EGA 700, 0.4mm thick (m2) MG1 0.0449 0.07 mat cost?
roof 19 G-28 CIS (pcs) MG1 0.0628 0.10 mat cost? Kaliti metal products
roof 20 G-28 sheet metal (m2) MG1 0.0314 46.39 0.05 46.44 Kaliti metal products
roof 21 G-30 CIS (pcs) MG1 0.00 mat cost?
roof 21 G-30 sheet metal (m2) MG1 0.00 mat cost?
roof 22 Harveyed south African product roof cap (pcs) MG5 150.00 0.00 150.00
Harveyed south African product roof cover
roof 23 (m2) MG5 57.00 0.00 57.00
Harveyed south African product roof ridge cap
roof 24 (ml) MG5 65.50 0.00 65.50
roof 25 Onduline nails (pcs) MG1 0.00 mat cost?
roof Onduline ridge cap (ml) MG1 0.00 mat cost?
roof onduline roof cover (m2) MG1 0.00 mat cost?
roof 0.00
roof 0.00
roof 0.00
roof 0.00
roof 0.00
roof 0.00
roof 0.00
roof 0.00
san Sanitary 0.00 mat cost?
san 7 Check valve, bronze diam 110mm (pcs) MG1 0.00 mat cost?
san 8 Check valve, bronze diam 20mm (pcs) MG1 0.00 mat cost?
san 9 Check valve, bronze diam 25mm (pcs) MG1 0.00 mat cost?
san 9 Check valve, bronze diam 32mm (pcs) MG1 0.00 mat cost?
san 9 Check valve, bronze diam 40mm (pcs) MG1 0.00 mat cost?
san 10 Check valve, bronze diam 50mm (pcs) MG1 0.00 mat cost?
san 11 Check valve, bronze diam 63mm (pcs) MG1 0.00 mat cost?
san 12 Check valve, bronze diam 80mm (pcs) MG1 0.00 mat cost?
san 13 Check valve, bronze diam 90mm (pcs) MG1 0.00 mat cost?
san 14 Chrome plated towel rail (pcs) MG1 23.00 0.00 23.00 Dolphin Trading PLC
Chrome plated towel rail, millenia type cat No.
san 15 64831H8 (pcs) MG1 0.00 mat cost?
san 16 Copper accessory, Ø 110mm (pcs) MG1 0.00 mat cost?
san 16 Copper accessory, Ø 15mm (pcs) MG1 0.00 mat cost?
san 16 Copper accessory, Ø 20mm (pcs) MG1 0.00 mat cost?
san 17 Copper accessory, Ø 25mm (pcs) MG1 0.00 mat cost?
san 9 Copper accessory, Ø 32mm (pcs) MG1 0.00 mat cost?
san 10 Copper accessory, Ø 40mm (pcs) MG1 0.00 mat cost?
san 11 Copper accessory, Ø 50mm (pcs) MG1 0.00 mat cost?
san 12 Copper accessory, Ø 63mm (pcs) MG1 0.00 mat cost?
san 13 Copper accessory, Ø 80mm (pcs) MG1 0.00 mat cost?
san 14 Copper pipe, Ø 110mm (ml) MG1 0.00 mat cost?
san 15 Copper pipe, Ø 15mm (ml) MG1 0.00 mat cost?
san 16 Copper pipe, Ø 20mm (ml) MG1 0.00 mat cost?
san 17 Copper pipe, Ø 25mm (ml) MG1 0.00 mat cost?
san 18 Copper pipe, Ø 32mm (ml) MG1 0.00 mat cost?
san 19 Copper pipe, Ø 40mm (ml) MG1 0.00 mat cost?
san 20 Copper pipe, Ø 50mm (ml) MG1 0.00 mat cost?
san 21 Copper pipe, Ø 63mm (ml) MG1 0.00 mat cost?
san 22 Copper pipe, Ø 80mm (ml) MG1 0.00 mat cost?
san 24 Fire extingusher, 6kg dry powder CO2 (pcs) MG1 0.1000 420.00 0.16 420.16 Hassan Business Group
san 25 Fire extingusher, 9kg dry powder CO2 (pcs) MG1 0.00 mat cost?
san Fixing bracket for gutter and down pipes (pcs) MG1 2.50 0.00 2.50
san Flexible pipe diam 15 mm (pcs) MG1 15.00 0.00 15.00
san Float valve, bronze diam 110mm (pcs) MG1 0.00 mat cost?
san 67 GS pipe, Ø 15mm (ml) MG1 0.005 12.16 0.01 12.17 Akaki Metal Products Factory
san 68 GS pipe, Ø 160mm (ml) MG1 0.1385 0.23 mat cost?
san 69 GS pipe, Ø 20mm (ml) MG1 0.0056 16.79 0.01 16.80 Akaki Metal Products Factory
san 70 GS pipe, Ø 25mm (ml) MG1 0.0087 24.07 0.01 24.09 Akaki Metal Products Factory
san 71 GS pipe, Ø 32mm (ml) MG1 0.0148 30.88 0.02 30.90 Akaki Metal Products Factory
san 72 GS pipe, Ø 40mm (ml) MG1 0.0219 35.72 0.04 35.75 Akaki Metal Products Factory
san 73 GS pipe, Ø 50mm (ml) MG1 0.0293 48.15 0.05 48.20 Akaki Metal Products Factory
san 74 GS pipe, Ø 63mm (ml) MG1 0.0448 0.07 mat cost?
san 75 GS pipe, Ø 80mm (ml) MG1 0.054 0.09 mat cost?
san GS Tee diam 15 mm (pcs) MG1 0.00 mat cost?
san 76 GS Union diam. 15 mm (pcs) MG1 0.00 mat cost?
san 77 Hemp (kg) MG1 0.0400 30.00 0.07 30.07
HEPWORTH DEEP SEAL FLOOR GULLY
san TYPE, 150X150MM (pcs) MG1 0.00 mat cost?
HEPWORTH DEEP SEAL FLOOR GULLY
san 78 TYPE, 200X200MM (pcs) MG1 0.00 mat cost?
san 79 HOOK (pcs) MG1 1.50 0.00 1.50
san 80 HWB fixing support (pcs) MG1 30.00 0.00 30.00
san 14 Chrome plated towel rail, millenia type (pcs) MG1 50.00 0.00 50.00
soap holder: Ceramic matfair type ceramic 150
san x 150 mm (pcs) MG1 0.00 mat cost?
san Liquid soap holder: Stainless steel (pcs) MG1 125.00 0.00 125.00 PGA TECH PLC
san Soldering lead (kg) MG1 60.00 0.00 60.00
san Steel floor drain diam. 100 mm (pcs) MG1 45.00 0.00 45.00 Dolphin Trading PLC
san Steel floor drain diam. 50 mm (pcs) MG1 30.00 0.00 30.00
san Steel floor drain diam. 80 mm (pcs) MG1 0.00 mat cost?
san Tabor soap holder 150 x 150 mm (pcs) MG1 20.00 0.00 20.00
san Tabor toilet paper holder 150 x 150 mm (pcs) MG1 20.00 0.00 20.00
Tabor WC complete with plastic seats, cover
san and low flush cistern (pcs) MG1 0.2000 800.00 0.33 800.33
Toilet paperholder: matfair type 150 x 150 mm
san (pcs) MG1 0.00 mat cost?
Water tap, Chrome plated diam 15mm (pcs) MG1 0.00 mat cost?
Water tap, diam 1/2 in (pcs) MG1 38.00 0.00 38.00
Automatic Air release valve, diam 32mm (pcs) MG1 160.00 160.00 PGA TECH PLC
Water meter, diam 40mm (pcs) MG1 1,500.00 1500.00
san Size 600x400x180mm, pillar type (pcs) MG1 1 2,363.00 1.63 2364.63 Hassen business group
Size 600x400x180mm, FIRE HYDRANT
CABINET (pcs) MG1 0.5 2,300.00 0.81 2300.81 Hassen business group
Pressure boosting system type hydro test, 1.1kw
(pcs) MG1 8,752.00 0.00 8752.00
Pressure boosting system type hydro test,
0.55kw (pcs) MG1 14,703.00 0.00 14703.00
Pressure boosting system type hydro test, 2-6kw
(pcs) MG1 97,681.00 0.00 97681.00
steel 5 J-bolt, diam 10mm and 400mm long (pcs) MG1 15.00 0.00 15.00
steel 6 J-bolt, diam 12mm and 100mm long (pcs) MG1 13.00 0.00 13.00
steel 7 J-bolt, diam 12mm and 300mm long (pcs) MG1 15.00 0.00 15.00
steel 8 J-bolt, diam 16mm and 110mm long (pcs) MG1 16.00 0.00 16.00
steel 9 J-bolt, diam 16mm and 300mm long (pcs) MG1 21.00 0.00 21.00
steel 10 J-bolt, diam 16mm and 400mm long (pcs) MG1 25.00 0.00 25.00
steel 11 J-bolt, diam 16mm and 600mm long (pcs) MG1 30.00 0.00 30.00
steel 12 J-bolt, diam 20mm and 400mm long (pcs) MG1 50.00 0.00 50.00
steel 13 J-bolt, diam 20mm and 500mm long (pcs) MG1 60.00 0.00 60.00 Radel foundary
steel 14 RHS (kg) MG1 11.99 0.00 11.99 Kaliti metal products
steel 15 Steel plate, 10mm thick (kg) MG1 12.00 0.00 12.00
steel 22 Steel plate, 4mm thick (kg) MG1 12.00 0.00 12.00
steel 24 Steel plate, 5mm thick (kg) MG1 12.00 0.00 12.00
steel 26 Steel plate, 6mm thick (kg) MG1 9.95 0.00 9.95
steel 27 Steel plate, 8mm thick (kg) MG1 9.93 0.00 9.93
steel 28
steel 29 Castiron gully cover, 510x410mm (pcs) MG1 0.5 450.00 0.81 450.81 Radel foundary
steel 30 Radel Grill cover, size 1.0mx0.5m MG1 1,800.00 0.00 1800.00 Radel foundary
steel 31 0.00
steel 32 0.00
steel 0.00
SEVERANCE
INDEXED
BASIC PAY AND
HARDSHIP ANNUAL MEDICAL SALLARY
ITEM SALLARY PERDIUM INCURANCE OTHER INDEX
Labor by trade ALLOWANCE LEAVE TREATMENT (WAGE) REMARK
NO. (WAGE) RELATED FACTOR
/DAY
EXPENCES
1 - - - - - - -
2 - - - - - - -
3 - - - - - - -
4 - - - - - - -
5 - - - - - - -
6 - - - - - - -
7 - - - - - - -
8 - - - - - - -
9 - - - - - - -
10 - - - - - - -
11 - - - - - - -
12 - - - - - - -
13 - - - - - - -
14 - - - - - - -
15 - - - - - - -
16 - - - - - - -
17 - - - - - - -
18 - - - - - - -
19 - - - - - - -
20 - - - - - - -
21 - - - - - - -
22 - - - - - - -
23 - - - - - - -
24 - - - - - - -
25 - - - - - - -
26 - - - - - - -
27 - - - - - - -
28 - - - - - - -
29 - - - - - - -
30 - - - - - - -
31 - - - - - - -
32 - - - - - - -
33 - - - - - - -
34 - - - - - - -
35 - - - - - - -
36 - - - - - - -
37 - - - - - - -
38 - - - - - - -
39 - - - - - - -
40 - - - - - - -
41 - - - - - - -
42 - - - - - - -
43 - - - - - - -
MACHINERY RENTAL RATE
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per crew Performance/crew/hr Remark
measure work
Class 1st 2nd 3rd List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
D 1 General clearance
D 2 Trees
D 2 1 Girth 25cm-1m nr Daily laborer 4.00 0.03 0.02
Tree cutter 2.00
D 2 2 Girth 1m-2m nr Daily laborer 4.00 0.01 0.01
Tree cutter 2.00
D 2 3 Girth 2m-3m nr Daily laborer 4.00 0.01 0.01
Tree cutter 2.00
D 2 4 Girth 3m-5m nr Daily laborer 4.00 0.01 0.01
Tree cutter 2.00
D 2 5 Girth exceeding 5m nr Daily laborer 4.00 0.01 0.00
Tree cutter 2.00
D 3 Tumps
D 3 1
D 4 Buildings
D 4 1 Brickwork
D 4 1 1 Volume not exceeding 50m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 4 1 2 Volume 50m3-100m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 4 1 3 Volume 100m3-250m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 4 1 4 Volume 250m3-500m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 4 1 5 Volume exceeding 500m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 4 2 Concrete
D 4 2 1 Volume not exceeding 50m3 m³ Daily laborer 5.00 3.00 2.00
Sledgehammer man 1.00
D 4 2 1 Volume not exceeding 50m3 m³ Daily laborer 6.00 Compressor with jack h 1.00 6.00 5.00
Gang leader 1.00
D 4 2 2 Volume 50m3-100m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 250.00 200.00
D 4 2 3 Volume 100m3-250m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 250.00 200.00
Page116/318
Code As of 06/18/2025
Description Unit of Material usage per unit of Labors per crew Equipment per crew Performance/crew/hr Remark
measure work
Class 1st 2nd 3rd List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
D 4 2 4 Volume 250m3-500m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 250.00 200.00
D 4 2 5 Volume 500m3-1000m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 250.00 200.00
D 4 2 6 Volume exceeeding 1000m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 250.00 200.00
D 4 3 Masonry
D 4 3 1 Volume not exceeding 50m3 m³ Daily laborer 1.00 4.00 3.00
Mason 1.00
D 4 3 2 Volume 50m3-100m3 m³ Daily laborer 1.00 4.00 3.00
Mason 1.00
D 4 3 3 Volume 100m3-250m3 m³ Daily laborer 1.00 4.00 3.00
Mason 1.00
D 4 3 4 Volume 250m3-500m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
D 4 3 5 Volume 500m3-1000m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
D 4 3 6 Volume 1000m3-2500m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
D 4 3 7 Volume 2500m3-5000m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
D 4 3 8 Volume stated exceeding 5000m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
D 4 4 Metal
D 4 4 1
D 4 5 Timber
D 4 5 1
D 4 6 No predominant material
D 4 6 1
D 5 Other structures
D 5 1 Brickwork
D 5 1 1
D 5 2 Concrete
D 5 2 1 Volume not exceeding 50m3 m³ Daily laborer 5.00 0.38 0.25
Sledgehammer man 1.00
D 5 2 1 Volume not exceeding 50m3 m³ Daily laborer 6.00 Compressor with jack h 1.00 0.75 0.63
Gang leader 1.00
D 5 2 2 Volume 50m3-100m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 3.13 2.50
D 5 2 3 Volume 100m3-250m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 3.13 2.50
D 5 2 4 Volume 250m3-500m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 3.13 2.50
D 5 2 5 Volume 500m3-1000m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 3.13 2.50
D 5 2 6 Volume exceeding 1000m3 m³ Daily laborer 2.00 Excavator with jack ham 1.00 3.13 2.50
Page117/318
Code As of 06/18/2025
Description Unit of Material usage per unit of Labors per crew Equipment per crew Performance/crew/hr Remark
measure work
Class 1st 2nd 3rd List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
D 5 3 Masonry
D 5 3 1 Volume not exceeding 50m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 5 3 2 Volume 50m3-100m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 5 3 3 Volume 100m3-250m3 m³ Daily laborer 1.00 0.50 0.38
Mason 1.00
D 5 3 4 Volume 250m3-500m3 m³ Daily laborer 1.00 Excavator with jack ham 1.00 3.13 2.50
Mason 1.00
D 5 3 5 Volume 500m3-1000m3 m³ Daily laborer 1.00 Excavator with jack ham 1.00 3.13 2.50
Mason 1.00
D 5 3 6 Volume exceeding 1000m3 m³ Daily laborer 1.00 Excavator with jack ham 1.00 3.13 2.50
Mason 1.00
D 5 4 Metal
D 5 4 1
D 5 5 Timber
D 5 5 1
D 5 6 No predominant material
D 5 6 1
D 6 Pipe lines
D 1 Nominal bore 100-300mm m Daily laborer 2.00 7.50 6.25
Mason 1.00
Page118/318
02: Excavation and Earth work
Performance target
PROJECT TYPICAL BUILDING PROJECT LOCATION: -
02: Excavation and Earth works
Includes: Excavation, filling, compaction, disposal and Hard coring
Code Description Unit of Material Labor Equipment Performance/hr Remark
measure List of Material Consu. Rate Labor by trade No. Equipment No. Minimum Maximum
Excavation
Excavation works
Excavation and get out
Site clearing, removing of the top soil to the depth of 200 m² Daily laborer 10 4.0 5.0
mm in ordinary soil Gang leader 1
Bulk Excavation in ordinary soil
01 Bulk excavation, in ordinary soil to reduce level. Depth not m³ Daily laborer 10 0.9 1.0
exceeding 150cm Gang leader 1
02 Bulk excavation, in ordinary soil to reduce level. Depth over m³ Daily laborer 10 0.8 0.9
150 but not exceeding 300cm Gang leader 1
03 Bulk excavation, in ordinary soil to reduce level. Depth over m³ Daily laborer 10 0.6 0.8
300 but not exceeding 450cm Gang leader 1
04 Bulk excavation, in ordinary soil to reduce level. Depth over m³ Daily laborer 10 0.5 0.6
450 but not exceeding 600cm Gang leader 1
05 Bulk excavation, in ordinary soil to reduce level. Depth over m³ Daily laborer 10 0.3 0.4
600 but not exceeding 750cm Gang leader 1
Pit or Trench Excavation in ordinary soil
01 Pit or Trench excavation, in ordinary soil depth not m³ Daily laborer 10 0.8 0.9
exceeding 150cm Gang leader 1
02 Pit or Trench excavation, in ordinary soil depth over 150cm m³ Daily laborer 10 0.6 0.7
but not exceeding 300cm Gang leader 1
03 Pit or Trench excavation, in ordinary soil depth over 300cm m³ Steel panel (m2) 1.00 Daily laborer 10 0.5 0.6 Steel panel for shoring
but not exceeding 450cm Nail (kg) 0.30 Gang leader 1
Eucalyptus dia. 8cm (pcs) 1.00
04 Pit or Trench excavation, in ordinary soil depth over 450cm m³ Steel panel (m2) 1.00 Daily laborer 10 0.4 0.5 Steel panel for shoring
but not exceeding 600cm Nail (kg) 0.30 Gang leader 1
Eucalyptus dia. 8cm (pcs) 1.00
05 Pit or Trench excavation, in ordinary soil depth over 600 but m³ Steel panel (m2) 1.00 Daily laborer 10 0.3 0.4 Steel panel for shoring
not exceeding 750cm Nail (kg) 0.30 Gang leader 1
Eucalyptus dia. 8cm (pcs) 1.00
Hard rock
01 Bulk excavation, in hard rock to reduce level. Depth up to m³ Daily laborer 2 0.06 0.08
150cm Sledgehammer man 1
02 Bulk excavation, in hard rock to reduce level. Depth from m³ Daily laborer 2 0.05 0.06
150 to 300cm Sledgehammer man 1
03 Bulk excavation, in hard rock to reduce level. Depth from m³ Daily laborer 2 0.04 0.05
300 to 450cm Sledgehammer man 1
Pit or Trench Excavation in hard rock
01 Pit or Trench excavation, in hard to depth not exceeding m³ Daily laborer 2 0.05 0.06
150cm Sledgehammer man 1
02 Pit or Trench excavation, in Hard rock depth over 150cm m³ Daily laborer 2 0.04 0.05
but not exceeding 300cm Sledgehammer man 1
03 Pit or Trench excavation, in hard rock depth over 300cm but m³ Daily laborer 2 0.03 0.04
not exceeding 450cm Sledgehammer man 1
Page119/EE318
02: Excavation and Earth work
Filling
Selected excavated fill
01 Selected excavated fill around foundation m³ Selected material (m3) 1.35 Daily laborer 4 Plate compactor 1 1.4 1.5
Gang leader 1
Page120/EE318
031: Insitu concrete
Performance targets
PROJECT: TYPICAL BUILDING PROJECT LOCATION: -
03: Concrete work
031. Cast in place concrete
Includes: Mixing and placing of Insitu concrete, using different sizes of gravel, OPC and PPC
Code Description Unit of Material Labor Equipment Performance/hr Remark
measure
List of Material Consu. Rate Labor by trade No. Type No. Minimum Maximum
Below grade
1 Grade: C-5 m³ Cement (qtl) 1.50 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.48 Daily laborer 11
Crushed aggregate (m3) 0.72 Fresh concrete loading
Water (m3) 0.05 Daily laborer 4
Concrete hauling
Daily laborer 8
Concrete placing
Plasterer 2
Daily laborer 4
Gang leader 1
C-7.5 or C-10
2 Grade: C-7.5 or C-10 m³ Cement (qtl) 2.40 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.53 Daily laborer 11
Crushed aggregate (m3) 1.06 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.09 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 8
Concrete placing
Plasterer 2
Daily laborer 4
Gang leader 1
C-15
3 Grade: C-15 m³ Cement (qtl) 2.80 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.45 Daily laborer 11
Crushed aggregate (m3) 0.90 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 8
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
Page121/CON318
031: Insitu concrete
C-20
1 Grade: C-20 m³ Cement (qtl) 3.20 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.51 Daily laborer 11
Crushed aggregate (m3) 0.79 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 8
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
C-25
1 Grade: C-25 m³ Cement (qtl) 3.60 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.52 Daily laborer 11
Crushed aggregate (m3) 0.79 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 8
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
C-30
1 Grade: C-30 m³ Cement (qtl) 4.00 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.48 Daily laborer 11
Crushed aggregate (m3) 0.80 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 8
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
Page122/CON318
031: Insitu concrete
Above grade
C-15
3 Grade: C-15 m³ Cement (qtl) 2.80 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.45 Daily laborer 11
Crushed aggregate (m3) 0.90 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 14
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
C-20
1 Grade: C-20 m³ Cement (qtl) 3.20 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.51 Daily laborer 11
Crushed aggregate (m3) 0.79 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 14
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
C-25
1 Grade: C-25 m³ Cement (qtl) 3.60 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.52 Daily laborer 11
Crushed aggregate (m3) 0.79 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 14
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
Page123/CON318
031: Insitu concrete
C-30
1 Grade: C-30 m³ Cement (qtl) 4.00 Mixing Mechanical mixer, 500lit 1 1.88 2.50
Sand (m3) 0.48 Daily laborer 11
Crushed aggregate (m3) 0.80 Fresh concrete loading Concrete vibrator 2
Water (m3) 0.11 Daily laborer 4 Dumper, 2 ton 1
Concrete hauling
Daily laborer 14
Concrete placing
Plasterer 2
Daily laborer 4
Carpenter 1
Barbender 1
Gang leader 1
Page124/CON318
032: Form work
Performance targets
PROJECT TYPICAL BUILDING PROJECT LOCATION: 0.000
032: Form work
Note:
Below grade
01 Footing m² Steel panel (m2) 1.00 Carpenter 1 0.55 0.65
Eucalyptus Dia. 12mm, 4 1.00 Ass. Carpenter 1
usage (ml)
Eucalyptus beams dia. 10cm, 0.53 Daily laborer 1
3 usage (ml)
2.5cm thick timber, 4 usage 0.003
(m3)
Nails (kg) 0.30
Mould oil (lit) 0.06
02 Foundation column m² Steel panel (m2) 1.00 Carpenter 1 0.45 0.55
Eucalyptus Dia. 12mm, 4 1.00 Ass. Carpenter 1
usage (pcs)
Eucalyptus beams dia. 10cm, 0.53 Daily laborer 1
3 usage (Pcs)
2.5cm thick timber, 4 usage 0.003
(m3)
Nails (kg) 0.30
Mould oil (lit) 0.06
03 Grade beam m² Steel panel (m2) 1.00 Carpenter 1 0.40 0.45
Eucalyptus Dia. 12mm, 4 1.00 Ass. Carpenter 1
usage (pcs)
Eucalyptus beams dia. 10cm, 0.53 Carpenter 1
3 usage (Pcs)
2.5cm thick timber, 4 usage 0.003
(m3)
Nails (kg) 0.30
Mould oil (lit) 0.06
Page125/FW318
032: Form work
Above grade
01 Elevation column m² Steel panel (m2) 1.00 Carpenter 1 0.40 0.45
Eucalyptus Dia. 12mm, 4 1.00 Ass. Carpenter 1
usage (ml)
Eucalyptus beams dia. 10cm, 1.00 Carpenter 1
3 usage (ml)
2.5cm thick timber, 4 usage 0.003
(m3)
Nails (kg) 0.30
Mould oil (lit) 0.06
02 Suspended beams m² Steel panel (m2) 1.00 Carpenter 1 0.35 0.40
Eucalyptus Dia. 12mm, 4 1.00 Ass. Carpenter 1
usage (pcs)
Eucalyptus beams dia. 10cm, 1.00 Carpenter 1
3 usage (Pcs)
2.5cm thick timber, 4 usage 0.003
(m3)
Nails (kg) 0.30
03 Suspended solid sabs and solid slabs m² Steel panel (m2) 1.00 Carpenter 1 0.40 0.50
Eucalyptus Dia. 12mm, 4 1.00 Ass. Carpenter 1
usage (pcs)
Eucalyptus beams dia. 10cm, 1.00 Carpenter 1
3 usage (Pcs)
2.5cm thick timber, 4 usage 0.003
(m3)
Nails (kg) 0.30
Page126/FW318
033: Reinforcement bar
Performance targets
PROJECT TYPICAL BUILDING PROJECT LOCATION: 0.000
033: Reinforcement bar
Note:
Code Description Unit of Material Labor Equipment Performance/hr Remark
measure
List of Material Consump Labor by trade No. Equipment No. Minimum Maximum
tion. Rate
Reinforcement bar
Sub structure
01 Nominal size: 6-8mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 18.00 20.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 120.00 130.00
Bar bender 1
Daily laborer 5
02 Nominal size: 10-16mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 15.00 16.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 95.00 105.00
Bar bender 1
Daily laborer 5
03 Nominal size: 20-24mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 14.00 15.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 86.00 95.00
Bar bender 1
Daily laborer 5
04 Nominal size: 26-32mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 13.00 14.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 77.00 85.00
Bar bender 1
Daily laborer 5
Page127/REIN318
033: Reinforcement bar
Reinforcement bar
Super structure
01 Nominal size: 6-8mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 18.00 20.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 120.00 130.00
Bar bender 1
Daily laborer 7
02 Nominal size: 10-16mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 15.00 16.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 95.00 105.00
Bar bender 1
Daily laborer 7
03 Nominal size: 20-24mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 14.00 15.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 86.00 95.00
Bar bender 1
Daily laborer 7
04 Nominal size: 26-32mm kg Reinforcement bar (kg) 1.05 Cutting and bending Bar cutter 1 13.00 14.00
Black steel wire, diam 0.01 Bar bender 1
1.5mm (kg)
Daily laborer 1
Transporting and tying in place 77.00 85.00
Bar bender 1
Daily laborer 7
Page128/REIN318
034: Pre-cast concrete
Beams
Length not exceeding 6m
01 Grade: C-25, Pre-cast beam (PB1) Pcs Concrete, C-25 (m3) 0.05 Reinforcement bar Mechanical mixer, 250lit 1 7.00 8.00 Concrete: use ready mix of concrete
5100x120x80mm and reinforcement bar Concrete type C-25
Production and placing oin position Reinforcement bar (kg) 20.71 Bar-Bender 7 Plate vibrator 1
Black wire, diam 1.5mm (kg) 0.21 Daily laborer 7
Page129/PRECAST318
035: Concrete ancillaries
Performance targets
PROJECT TYPICAL BUILDING PROJECT LOCATION: 0.000
035: Concrete Ancillaries
Note:
Page130/ANC318
As of 06/18/2025
Common brick
Thickness: not exceeding 150mm
01 Vertical straight wall, both sides m2 Common brick (pcs) 58.000 Mason 1 0.50 0.75
left for plastering Mortar, 1:3 (m3) 0.032 Daily laborer 1
02 Vertical straight wall, One face left m2 Common brick (pcs) 58.000 Mason 1 0.44 0.63
for plastering and the other for Mortar, 1:3 (m3) 0.032 Daily laborer 1
pointing
03 Vertical straight wall, Both faces m2 Common brick (pcs) 58.000 Mason 1 0.38 0.56
left for pointing Mortar, 1:3 (m3) 0.032 Daily laborer 1
Thickness: 250mm
01 Vertical straight wall, both sides m2 Common brick (pcs) 58.000 Mason 1 0.38 0.44
left for plastering Mortar, 1:3 (m3) 0.062 Daily laborer 1
02 Vertical straight wall, One face left m2 Common brick (pcs) 58.000 Mason 1 0.31 0.38
for plastering and the other for Mortar, 1:3 (m3) 0.062 Daily laborer 1
pointing
03 Vertical straight wall, Both faces m2 Common brick (pcs) 58.000 Mason 1 0.25 0.31
left for pointing Mortar, 1:3 (m3) 0.062 Daily laborer 1
Page131/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
Concrete blocks
Hollow concrete blocks
Thickness: 100mm
1 10 cm Thick, both faces left for m2 HCB: 10 cm thick (pcs) 12.500 Mason 1 0.88 1.00
plastering Mortar, 1:3 (m3) 0.011 Daily laborer 1
1 10cm thick, One face left for m2 HCB: 10 cm thick (pcs) 12.500 Mason 1 0.75 0.88
plastering and the other for Mortar, 1:3 (m3) 0.011 Daily laborer 1
pointing
1 10cm thick, both sides left for m2 HCB: 10 cm thick (pcs) 12.500 Mason 1 0.63 0.75
pointing Mortar, 1:3 (m3) 0.011 Daily laborer 1
Thickness: 150mm
1 15 cm Thick, both faces left for m2 HCB: 15 cm thick (pcs) 12.500 Mason 1 8.75 10.00
plastering Mortar, 1:3 (m3) 0.014 Daily laborer 1
1 15cm thick, One face left for m2 HCB: 15 cm thick (pcs) 12.500 Mason 1 7.50 8.75
plastering and the other for Mortar, 1:3 (m3) 0.014 Daily laborer 1
pointing
1 15cm thick, both sides left for m2 HCB: 15 cm thick (pcs) 12.500 Mason 1 6.25 7.50
pointing Mortar, 1:3 (m3) 0.014 Daily laborer 1
1 20cm thick, One face left for m3 HCB: 20 cm thick (pcs) 12.500 Mason 5 1.25 1.88
plastering and the other for Mortar, 1:3 (m3) 0.016 Daily laborer 10
pointing
1 20cm thick, both sides left for m3 HCB: 20 cm thick (pcs) 12.500 Mason 5 1.06 1.63
pointing Mortar, 1:3 (m3) 0.016 Daily laborer 10
1 Vertical straight wall m2 Cement (qtl) 0.084 Plasterer 1 2.50 3.13 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
Page132/318
1
Code Vertical straight wall
Description m2
Unit of 2.50 3.13 1st coat cementAs of 06/18/2025
mortar 1:2.5, wastage 10%
measure 2nd coat cement mortar 1:4, wastage 5%
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum hand mix
Rate
2 Vertical curved wall m2 Cement (qtl) 0.076 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5
mechanical mix
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.084 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
3 Battered straight wall m2 Cement (qtl) 0.076 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5
mechanical mix
Daily laborer 10
3 Battered straight wall m2 Cement (qtl) 0.084 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
4 Battered curved wall m2 Cement (qtl) 0.076 Plasterer 5 5.00 7.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5
mechanical mix
Daily laborer 10
4 Battered curved wall m2 Cement (qtl) 0.084 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.084 Plasterer 1 2.50 3.13 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
1 Vertical curved wall m2 Cement (qtl) 0.076 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5
mechanical mix
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.084 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
2 Battered straight wall m2 Cement (qtl) 0.076 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5
mechanical mix
Page133/318
Unit of
As of 06/18/2025
Code Description
2 Battered straight wall measure
m2 10.00 1st coat cement mortar 1:2.5, wastage 10%
7.50 Maximum
List of Material Consumption. Labor by trade No. Equipment No. Minimum
Rate 2nd coat cement mortar 1:4, wastage 5%
mechanical mix
Daily laborer 10
2 Battered straight wall m2 Cement (qtl) 0.084 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
3 Battered curved wall m2 Cement (qtl) 0.076 Plasterer 5 5.00 7.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5
mechanical mix
Daily laborer 10
3 Battered curved wall m2 Cement (qtl) 0.084 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1
hand mix
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
2 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
2 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
3 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
3 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Page134/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
3 Battered curved wall m2 Rate 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
1 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
2 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 10
2 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
3 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 10
3 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
Page135/318
1
Code Vertical straight wall
Description m2
Unit of 7.50 9.00 3rd coat cementAs of 06/18/2025
mortar 1:2, wastage 5%
measure Hand mix
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
1 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
2 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
2 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
3 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
3 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.025 Plasterer 1 1.25 1.50 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical curved wall m2 Cement (qtl) 0.023 Plasterer 5 6.25 7.50 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
2 Vertical curved wall m2 Cement (qtl) 0.025 Plasterer 1 1.25 1.50 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
2 Battered straight wall m2 Cement (qtl) 0.023 Plasterer 5 6.25 7.50 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Page136/318
Unit of
As of 06/18/2025
Code Description
2 Battered straight wall measure
m2 7.50 Pointing cement mortar 1:2, wastage 5%
6.25 Maximum
List of Material Consumption. Labor by trade No. Equipment No. Minimum
Rate Mechanical mix
Daily laborer 14
2 Battered straight wall m2 Cement (qtl) 0.025 Plasterer 1 1.25 1.50 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
3 Battered curved wall m2 Cement (qtl) 0.023 Plasterer 5 6.25 7.50 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
3 Battered curved wall m2 Cement (qtl) 0.025 Plasterer 1 1.25 1.50 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical straight wall m2 Cement (qtl) 0.092 Plasterer 1 2.50 3.13 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
2 Vertical curved wall m2 Cement (qtl) 0.079 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.092 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
3 Battered straight wall m2 Cement (qtl) 0.079 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 10
3 Battered straight wall m2 Cement (qtl) 0.092 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
4 Battered curved wall m2 Cement (qtl) 0.079 Plasterer 5 5.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 10
Page137/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
4 Battered curved wall m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.092 Plasterer 1 2.50 3.13 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
2 Vertical curved wall m2 Cement (qtl) 0.079 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.092 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
3 Battered straight wall m2 Cement (qtl) 0.079 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 10
3 Battered straight wall m2 Cement (qtl) 0.092 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
4 Battered curved wall m2 Cement (qtl) 0.079 Plasterer 5 5.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 10
4 Battered curved wall m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Page138/318
Unit of
As of 06/18/2025
Code Description
1 Vertical straight wall measure
m2 9.00 3rd coat cement mortar 1:2, wastage 5%
7.50 Maximum
List of Material Consumption. Labor by trade No. Equipment No. Minimum
Rate Hand mix
Daily laborer 6
2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Page139/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
3 Battered straight wall m2 Rate 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 10
3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 10
4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
Page140/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
1 Vertical straight wall m2 Cement (qtl) 0.050 Plasterer 1 1.00 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1
Daily laborer 6
2 Vertical curved wall m2 Cement (qtl) 0.046 Plasterer 5 5.00 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.006 Ass. Plasterer 5
Daily laborer 14
2 Vertical curved wall m2 Cement (qtl) 0.050 Plasterer 1 1.00 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1
Daily laborer 6
3 Battered straight wall m2 Cement (qtl) 0.046 Plasterer 5 5.00 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.006 Ass. Plasterer 5
Daily laborer 14
3 Battered straight wall m2 Cement (qtl) 0.050 Plasterer 1 1.00 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1
Daily laborer 6
4 Battered curved wall m2 Cement (qtl) 0.046 Plasterer 5 5.00 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.006 Ass. Plasterer 5
Daily laborer 14
4 Battered curved wall m2 Cement (qtl) 0.050 Plasterer 1 1.00 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1
Daily laborer 6
Page142/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
1 Vertical straight wall m2 Cement (qtl) 0.079 Plasterer 5 7.50 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 11
Chiseler 3
1 Vertical straight wall m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 5
Chiseler 1
2 Vertical curved wall m2 Cement (qtl) 0.079 Plasterer 5 5.00 82.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 11
Chiseler 3
2 Vertical curved wall m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 5
Chiseler 1
3 Battered straight wall m2 Cement (qtl) 0.079 Plasterer 5 5.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 11
Chiseler 3
3 Battered straight wall m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 5
Chiseler 1
4 Battered curved wall m2 Cement (qtl) 0.079 Plasterer 5 5.00 6.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 11
Chiseler 3
4 Battered curved wall m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 5
Chiseler 1
5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.079 Plasterer 5 10.00 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 11
Chiseler 3
5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.092 Plasterer 1 1.88 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 5
Chiseler 1
6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.079 Plasterer 5 5.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5
mechanical mix
Daily laborer 11
Chiseler 3
Page143/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.092 Plasterer 1 1.25 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1
hand mix
Daily laborer 5
Chiseler 1
Fine coat of cement mortar plaster, Internal
1 Vertical straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
Page144/318
5
Code Horizontal
Descriptionplane Soffit of slab m2
Unit of 6.25 7.50 3rd coat cementAs of 06/18/2025
mortar 1:2, wastage 5%
measure Hand mix
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5 27.50 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1 5.00 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Page145/318
Unit of
As of 06/18/2025
Code Description
5 Horizontal plane Soffit of slab measure
m2 35.00 3rd coat cement mortar 1:2, wastage 5%
31.25 Maximum
List of Material Consumption. Labor by trade No. Equipment No. Minimum
Rate Mechanical mix
Daily laborer 14
5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5 27.50 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5
Daily laborer 14
6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1 5.00 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1
Daily laborer 6
1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5 35.00 40.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1 7.50 9.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5 31.25 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5
Daily laborer 10
4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Page146/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
4 Battered curved wall m2 Rate 6.25 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1
Daily laborer 4
Wall Tile
Ceramic wall finish, Internal straight plane
1 Ceramic tile, 150x150x6mm m2 Ceramic wall tile, 45.300 Tiller 5 Ceramic cutter 1 4.38 5.00 Ceramic tile, wastage 2%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
2 Ceramic tile, 200x200x8mm m2 Ceramic wall tile, 25.750 Tiller 5 Ceramic cutter 1 5.63 6.25 Ceramic tile, wastage 3%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
Ceramic wall finish, Internal curved wall
1 Ceramic tile, 150x150x6mm m2 Ceramic wall tile, 45.300 Tiller 5 Ceramic cutter 1 3.13 4.00 Ceramic tile, wastage 2%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
2 Ceramic tile, 200x200x8mm m2 Ceramic wall tile, 25.750 Tiller 5 Ceramic cutter 1 3.75 4.38 Ceramic tile, wastage 3%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
Floor Finish
Cement screed, trawl finish
1 Cement screed, 5cm thick trowel m2 Cement (qtl) 0.339 Plasterer 5 12.50 18.75 Cement screed: cement mortar 1:4, wastage
15%
finish with 2% slope Sand (m3) 0.067 Ass. Plasterer 5
Mechanical mix
Daily laborer 10
2 Cement screed, 5cm thick trowel m2 Cement (qtl) 0.339 Plasterer 5 12.50 18.75 Cement screed: cement mortar 1:4, wastage
15%
finish in plane surface Sand (m3) 0.067 Ass. Plasterer 5
Mechanical mix
Daily laborer 10
3 Cement screed, 4.8cm thick trowel m2 Cement (qtl) 0.328 Plasterer 5 12.50 18.75 Cement screed: cement mortar 1:4, wastage
15%
finish to receive PVC tile Sand (m3) 0.063 Ass. Plasterer 5
Mechanical mix
Daily laborer 10
4 Cement screed, 3cm thick trowel m2 Cement (qtl) 0.258 Plasterer 5 12.50 18.75 Cement screed: cement mortar 1:4, wastage
15%
finish with 2% slope Sand (m3) 0.040 Ass. Plasterer 5
Mechanical mix
Daily laborer 10
Page147/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
5 Cement screed, 3cm thick trowel m2 Cement (qtl) 0.258 Plasterer 5 12.50 18.75 Cement screed: cement mortar 1:4, wastage
15%
finish in plane surface Sand (m3) 0.040 Ass. Plasterer 5
Mechanical mix
Daily laborer 10
2 25x25x3 cm terrazzo tile m2 Terrazzo tile, 25x25x3cm 1.050 Tiller 10 3.13 4.38
(m2)
Cement (qtl) 0.105 Ass. Mason 3 Grinder 1
Sand (m3) 0.030 Daily laborer 10
3 30x30x3 cm terrazzo tile m2 Terrazzo tile, 30x30x3cm 1.050 Tiller 10 3.75 5.00
(m2)
Cement (qtl) 0.086 Ass. Mason 3 Grinder 1
Sand (m3) 0.024 Daily laborer 10
4 20x20x2 cm chequered cement tile m2 Chequered cement tile, 1.050 Tiller 10 2.50 3.75
20x20x2cm (m2)
Cement (qtl) 0.123 Ass. Mason 3 Grinder 1
Sand (m3) 0.036 Daily laborer 10
5 25x25x3 cm Chequered cement tile m2 Chequered cement tile, 1.050 Tiller 10 3.13 4.38
25x25x3cm (m2)
Cement (qtl) 0.105 Ass. Mason 3 Grinder 1
Sand (m3) 0.030 Daily laborer 10
6 30x30x3 cm chequered cement tile m2 Chequered cement tile, 1.050 Tiller 10 3.75 5.00
30x30x3cm (m2)
Cement (qtl) 0.086 Ass. Mason 3 Grinder 1
Sand (m3) 0.024 Daily laborer 10
7 10x2 cm terrazzo skirting ml Terrazzo skirting, 10x2cm 1.050 Tiller 10 2.50 3.75
(ml)
Cement (qtl) 0.016 Ass. Mason 3 Grinder 1
Sand (m3) 0.001 Daily laborer 10
Page148/318
Unit of
As of 06/18/2025
Code Description
measure
List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
10 20x20x2 cm chequered cement ml Chequered cement skirting, 1.050 Tiller 10 2.50 3.75
20x2cm (ml)
skirting
Cement (qtl) 0.016 Ass. Mason 3 Grinder 1
Sand (m3) 0.001 Daily laborer 10
11 25x25x3 cm Chequered cement ml Chequered cement skirting, 0.110 Tiller 10 3.13 4.38
25x10x3cm (m2)
skirting
12 30x30x3 cm chequered cement ml Chequered cement skirting, 0.110 Tiller 10 3.75 5.00
30x10x3cm (m2)
skirting
2 25x25x3 cm Marble slate tile m2 Marble tile, 25x25x3cm (m2) 1.050 Tiller 10 1.88 2.50
3 30x30x3 cm Marble slate tile m2 Marble tile, 30x30x3cm (m2) 1.050 Tiller 10 3.75 5.00
4 10x2 cm marble slate skirting ml marble skirting, 10x2cm (ml) 1.050 Tiller 10 2.50 3.75
Page149/318
Unit of
As of 06/18/2025
Code
1 Descriptioncm Non-slippery
25x25x0.6 m2 1.88 2.50
measure
ceramic tile List of Material Consumption. Labor by trade No. Equipment No. Minimum Maximum
Rate
Cement (qtl) 0.086 Ass. Mason 3 Grinder 1
Sand (m3) 0.024 Daily laborer 10
Page150/318
05: Water proofing
Damp proofing
Asphalt (Liquid), One ply of glass fiber membrane
1 Upper surface inclined at an angle not m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.31 0.38
(kg))
exceeding 300 to the horizontal
Bitumen (kg) 1.58 Daily laborer 1
Margalss (m2) 1.05
Heating gas (lit) 0.05
2 Upper surface inclined at an angle between m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.31 0.38
(kg))
300-600 to the horizontal
Bitumen (kg) 1.58 Daily laborer 1
Margalss (m2) 1.05
Heating gas (lit) 0.05
3 Upper surface inclined at an angle exceeding m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.31 0.38
(kg))
600 to the horizontal
Bitumen (kg) 1.58 Daily laborer 1
Margalss (m2) 1.05
Heating gas (lit) 0.05
4 Curved surfaces m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.31 0.38
(kg))
Bitumen (kg) 1.58 Daily laborer 1
Margalss (m2) 1.05
Heating gas (lit) 0.05
5 Domed surfaces m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.31 0.38
(kg))
Bitumen (kg) 1.58 Daily laborer 1
Margalss (m2) 1.05
Heating gas (lit) 0.05
Asphalt (Liquid), Two ply of glass fiber membrane
1 Upper surface inclined at an angle not m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.25 0.31
(kg))
exceeding 300 to the horizontal
Bitumen (kg) 3.15 Daily laborer 1
Margalss (m2) 2.10
Heating gas (lit) 0.10
2 Upper surface inclined at an angle between m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.25 0.31
(kg))
300-600 to the horizontal
Bitumen (kg) 3.15 Daily laborer 1
Margalss (m2) 2.10
Heating gas (lit) 0.10
Page151/DPC318
05: Water proofing
Code Description Unit of Material Labor Equipment Performance/ Remark
measur
List of Material Consump Labor by trade No. Equipment No. MinimumhrMaximum
e
tion. Rate
3 Upper surface inclined at an angle exceeding m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.25 0.31
(kg))
600 to the horizontal
Bitumen (kg) 3.15 Daily laborer 1
Margalss (m2) 2.10
Heating gas (lit) 0.10
4 Curved surfaces m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.25 0.31
(kg))
Bitumen (kg) 3.15 Daily laborer 1
Margalss (m2) 2.10
Heating gas (lit) 0.10
5 Domed surfaces m2 Bituminous emulsion primer 0.42 Sprayer 1 Stove 1 0.25 0.31
(kg))
Bitumen (kg) 3.15 Daily laborer 1
Margalss (m2) 2.10
Heating gas (lit) 0.10
Page152/DPC318
As of 06/18/2025
Roofing
USG 32,30 or 28 CIS roof cover, 2.00x0.90 m
1 Upper surface inclined at an angle not m2 CIS (pcs) 0.75 Carpenter 1 2.00 2.50
exceeding 300 to the horizontal Dome shaped nails (kg) 0.10 Daily laborer 1
Plastic washer (pcs) 7.00
2 Upper surface inclined at an angle between m2 CIS (pcs) 0.73 Carpenter 1 1.25 1.88
300-600 to the horizontal Dome shaped nails (kg) 0.10 Daily laborer 1
Plastic washer (pcs) 7.00
Ega 300, 0.4mm thick roof cover
1 Upper surface inclined at an angle not m2 Ega 300, 0.4mm thick (ml) 1.30 Carpenter 1 Electrical drilling machine 1 2.88 3.25
exceeding 300 to the horizontal Crank bolt with steel washer and nut, 5.00 Daily laborer 1
diam 6mm (pcs)
2 Upper surface inclined at an angle between m2 Ega 300, 0.4mm thick (ml) 1.28 Carpenter 1 Electrical drilling machine 1 2.75 3.13
300-600 to the horizontal Crank bolt with steel washer and nut, 5.00 Daily laborer 1
diam 6mm (pcs)
3 Upper surface inclined at an angle exceeding m2 Ega 300, 0.4mm thick (ml) 1.26 Carpenter 1 Electrical drilling machine 1 1.25 1.88
600 to the horizontal Crank bolt with steel washer and nut, 5.00 Daily laborer 1
diam 6mm (pcs)
4 Curved surfaces m2 Ega 300, 0.4mm thick (ml) 1.40 Carpenter 1 Electrical drilling machine 1 1.25 1.88
Crank bolt with steel washer and nut, 5.00 Daily laborer 1
diam 6mm (pcs)
2 Upper surface inclined at an angle between m2 Ega 500, 0.4mm thick (ml) 1.46 Carpenter 1 Electrical drilling machine 1 2.75 3.13
300-600 to the horizontal Crank bolt with steel washer and nut, 7.00 Daily laborer 1
diam 6mm (pcs)
3 Upper surface inclined at an angle exceeding m2 Ega 500, 0.4mm thick (ml) 1.43 Carpenter 1 Electrical drilling machine 1 1.25 1.88
600 to the horizontal Crank bolt with steel washer and nut, 7.00 Daily laborer 1
diam 6mm (pcs)
4 Curved surfaces m2 Ega 500, 0.4mm thick (ml) 1.60 Carpenter 1 Electrical drilling machine 1 1.25 1.88
Crank bolt with steel washer and nut, 7.00 Daily laborer 1
diam 6mm (pcs)
Page153/318
As of 06/18/2025
Code Description Unit of Material Labor Equipment Performance/ Remark
measur
List of Material Consump Labor by trade No. Equipment No. Minimum Maximum
e
tion. Rate
2 Upper surface inclined at an angle between m2 Onduline roof cover (m2) 1.05 Carpenter 3 5.00 6.25
300-600 to the horizontal Dome shaped nails for onduline (kg) 12.30 Daily laborer 3
3 Upper surface inclined at an angle exceeding m2 Onduline roof cover (m2) 1.07 Carpenter 3 3.75 5.63
600 to the horizontal Dome shaped nails for onduline (kg) 12.30 Daily laborer 3
4 Curved surfaces m2 Onduline roof cover (m2) 1.07 Carpenter 3 3.75 5.00
Dome shaped nails for onduline (kg) 12.30 Daily laborer 3
2 Development length, 33-50cm ml Sheet metal (m2) 0.50 Solder 1 Electrical drilling machine 1 0.31 0.38
Screw, 4cm long (pcs) 4.00 Daily laborer 1
PVC fisher (pcs) 4.00
3 Development length, 50-90cm ml Sheet metal (m2) 1.00 Solder 1 Electrical drilling machine 1 0.31 0.38
Screw, 4cm long (pcs) 4.00 Daily laborer 1
PVC fisher (pcs) 4.00
4 Development length, exceeding 90cm m2 Sheet metal (m2) 1.10 Solder 1 Electrical drilling machine 1 0.50 0.63
Screw, 4cm long (pcs) 4.00 Daily laborer 1
PVC fisher (pcs) 4.00
Page154/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page155/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page156/318
I 3 1 6 Depth of trench; 300cm<D<350cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page157/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 3 4 Nominal bore; 600mm<D<900mm
I 3 4 1 Surface mounted m
Page158/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 3 4 2 Depth of trench not exceeding m
150cm
Page159/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 3 4 7 Depth of trench; 350cm<D<400cm m
Page160/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page161/318
I 3 5 8 Depth of trench exceeding 400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page162/318
I 3 6 5 Depth of trench; 250cm<D<300cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page163/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 3 7 2 Depth of trench not exceeding m
150cm
Page164/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 3 7 7 Depth of trench; 350cm<D<400cm m
Page165/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 3 7 8 Depth of trench exceeding 400cm m
Page166/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page167/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page168/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page169/318
I 4 2 2 Depth of trench not exceeding m
150cm Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page170/318
I 4 2 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page171/318
Unit of
As of 06/18/2025
Description Remark
3 3rd4 Depth of trench; 200cm<D<250cm measure
ClassI 1st4 2nd m List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page172/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 4 4 Nominal bore; 600mm<D<900mm
I 4 4 1 Surface mounted m
Page173/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page174/318
I 4 5 2 Depth of trench not exceeding m
150cm
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page175/318
I 4 5 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page176/318
I 4 6 4 Depth of trench; 200cm<D<250cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page177/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 4 7 Nominal bore; 1500mm<D<1800
I 4 7 1 Surface mounted m
Page178/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page179/318
I 4 8 2 Depth of trench not exceeding m
150cm
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page180/318
I 4 8 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 5 Plastic pipes
I 5 1 Nominal bore not exceeding 200mm
I 5 1 1 Surface mounted m
Page181/318
Unit of
As of 06/18/2025
Description Remark
1 3rd4 Depth of trench; 200cm<D<250cm measure
ClassI 1st5 2nd m List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page182/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 5 2 Nominal bore; 200mm<D<300mm
I 5 2 1 Surface mounted m
Page183/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page184/318
I 5 3 2 Depth of trench not exceeding m
150cm
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page185/318
I 5 3 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page186/318
I 5 4 4 Depth of trench; 200cm<D<250cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page187/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 5 5 Nominal bore; 900mm<D<1200mm
I 5 5 1 Surface mounted m
Page188/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page189/318
I 5 6 2 Depth of trench not exceeding m
150cm
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page190/318
I 5 6 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page191/318
I 5 7 4 Depth of trench; 200cm<D<250cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page192/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 5 8 Nominal bore Exceeding 1800mm
I 5 8 1 Surface mounted m
Page193/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 6
I 6 1 Nominal bore not exceeding 200mm
I 6 1 1 Surface mounted m
Page194/318
I 6 1 2 Depth of trench not exceeding m
150cm Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page195/318
I 6 1 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page196/318
Unit of
As of 06/18/2025
Description Remark
2 3rd4 Depth of trench; 200cm<D<250cm measure
ClassI 1st6 2nd m List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page197/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 6 3 Nominal bore; 300mm<D<600mm
I 6 3 1 Surface mounted m
Page198/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page199/318
I 6 4 2 Depth of trench not exceeding m
150cm
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page200/318
I 6 4 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page201/318
I 6 5 4 Depth of trench; 200cm<D<250cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page202/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
I 6 6 Nominal bore; 1200mm<D<1500
I 6 6 1 Surface mounted m
Page203/318
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page204/318
I 6 7 2 Depth of trench not exceeding m
150cm
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page205/318
I 6 7 7 Depth of trench; 350cm<D<400cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page206/318
I 6 7 4 Depth of trench; 200cm<D<250cm m
Unit of
As of 06/18/2025
Description Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page207/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
Class 1st 2nd 3rd work
List of Material Consumption. Labor by trade No. crew
Equipment No. crew/day
Maximum Minimum
Rate
J 1 Fixtures
J 1 1 Hand wash basin
J 1 1 1 500x400mm hand wash without nr Hand wash basin (pcs) 1.00 Plumber 1.00 0.38 0.25
stand Mortar, 1:3 (m3) 0.01 Daily laborer 1.00
Support 2.00 Chisler 0.50
Plasterer 0.50
J 1 2 Water closet
J 1 2 1 Wash down water closets, low nr WC (pcs) 1.00 Plumber 1.00 0.38 0.25
flush Mortar (pcs) 0.01 Daily laborer 1.00
Chisler 0.50
Mason 0.50
J 1 2 2 Wash down water closets, high nr WC (pcs) 1.00 Plumber 1.00 0.38 0.25
flush Mortar (m3) 0.01 Daily laborer 1.00
Chisler 0.50
Mason 0.50
J 1 2 3 Turkish type WC, made of nr Turkish type WC (pcs) 1.00 Plumber 1.00 0.38 0.25
enameled cast iron Mortar (m3) 0.02 Daily laborer 1.00
Chisler 0.50
Mason 0.50
J 1 3 Water heater
J 1 3 4 Boiler, 200 lit nr Boiler, 200 lit (pcs) 1.00 Plumber 1.00 0.50 0.375
Flexible pipe, 1/2 in (pcs) 2.00 Daily laborer 2.00
Page208/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
J 1 3 6 Boiler, 80 lit nr Boiler, 80 lit (pcs) 1.00 Plumber 1.00 0.50 0.375
Flexible pipe, 1/2 in (pcs) 2.00 Daily laborer 2.00
J 1 4 4 Shower unit, 80x80cm nr Shower try, 80x80cm, (pcs) 1.00 Plumber 1.00 0.38 0.25
J 1 5 2 Towel hook nr Towel hook (pcs) 1.00 Plumber 1.00 Electrical drilling 1.00 4.00 3.00
machine
Daily laborer 1.00
J 1 5 3 Soft paper holder nr Soft paper holder (pcs) 1.00 Plumber 1.00 3.00 2.50
Mortar (m3) 0.02 Daily laborer 1.00
Chisler 0.50
Mason 0.50
J 1 5 4 Soap holder nr Soap holder (pcs) 1.00 Plumber 1.00 3.00 2.50
Mortar (m3) 0.02 Daily laborer 1.00
Chisler 0.50
Mason 0.50
Page209/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
J 1 5 5 wall mounted fire hydrant nr Fire hydrant (pcs) 1.00 Plumber 1.00 0.50 0.38
Daily laborer 1.00
Chisler 0.50
Mason 0.50
J 1 5 6 Floor drain, dia. 50mm cast iron nr Floor drain, diam 50 cast 1.00 Plumber 1.00 2.00 1.25
iron (pcs)
Mortar (m3) 0.00 Daily laborer 1.00
J 1 5 7 Floor drain, dia. 80mm cast iron nr Floor drain, diam 50 cast 1.00 Plumber 1.00 2.00 1.25
iron (pcs)
Mortar (m3) 0.00 Daily laborer 1.00
J 1 5 8 Fire extingusher, 6kg nr Fire extingusher, 6kg (pcs) 1.00 Plumber 1.00 2.00 1.25
Page210/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
work crew crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page211/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 5 Trusses and built up girders
M 3 5 1 Straight on plain Kg RHS (kg) 1.050 Welder 1.00 Welding machine 1.00 20.00 15.00
Electrode (kg) 0.010 Assistant 1.00 Grinding machine 1.00
Anti rust (gal) 0.010 Carpenter 1.00
Daily laborer 2.00
M 3 5 2 Curved on plain Kg
M 3 5 3 Straight on plain and cambered Kg RHS (kg) 1.050 Welder 1.00 Welding machine 1.00 20.00 15.00
Electrode (kg) 0.010 Assistant 1.00 Grinding machine 1.00
Anti rust (gal) 0.010 Carpenter 1.00
Daily laborer 2.00
Page212/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 5 4 Curved on plain and cambered Kg
M 3 6 2 Curved on plain Kg
M 3 6 3 Straight on plain and cambered Kg RHS (kg) 1.050 Welder 1.00 Welding machine 1.00 20.00 15.00
Electrode (kg) 0.010 Assistant 1.00 Grinding machine 1.00
Anti rust (gal) 0.010 Carpenter 1.00
Daily laborer 2.00
Page213/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 8 Anchorages and holdings down bolt assemblies
M 3 8 1 Anchorages and holdings down nr Bolt with nut (pcs) 1.000 Carpenter 1.00 9.00 6.25
bolt assemblies Daily laborer 1.00
M 3 8 2 Angle iron; Truss to truss nr Angle iron (kg) 0.050 Welder 1.00 Welding machine 1.00 10.00 7.50 Angle iron truss to truss connection
size = 25x25x4mm and 30mm long
connection and holdings down bolt Electrode (kg) 0.001 Daily laborer 1.00 Grinding machine 1.00
assemblies Assistant 1.00
M 3 8 3 Metal plate Kg Sheet metal (kg) 0.050 Welder 1.00 Welding machine 1.00 0.19 0.13 Plate to be produced on site.
Electrode (kg) 0.001 Daily laborer 2.00 Grinding machine 1.00
Assistant 1.00
Carpenter 1.00
M 3 1 2 Curved on plain Kg
Page214/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 1 4 Curved on plain and cambered Kg
M 3 2 Beams
M 3 2 1 Straight on plain Kg
M 3 2 2 Curved on plain Kg
Page215/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 3 Portal frames
M 3 3 1 Straight on plain Kg
M 3 3 2 Curved on plain Kg
Page216/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 4 2 Curved on plain Kg
M 3 5 2 Curved on plain Kg
Page217/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 5 3 Straight on plain and cambered Kg
M 3 6 2 Curved on plain Kg
Page218/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 3 6 4 Curved on plain and cambered Kg
M 3 7 Grillages
M 3 7 1 Grillages Kg
M 5 2 Permanent erecting
M 5 2 1 Permanent erecting Kg
Page219/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 5 3 Side bolts: Black
M 5 3 1 Diameter: not exceeding 16mm nr
M 5 3 2 Diameter: 16mm<D<20mm nr
M 5 3 3 Diameter: 20mm<D<24mm nr
M 5 3 4 Diameter: 24mm<D<30mm nr
M 5 3 5 Diameter: 30mm<D<36mm nr
Page220/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 5 3 6 Diameter: 36mm<D<42mm nr
M 6 2 Permanent erecting
M 6 2 1 Permanent erecting Kg
Page221/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 6 3 Side bolts: Black
M 6 3 1 Diameter: not exceeding 16mm nr
M 6 3 2 Diameter: 16mm<D<20mm nr
M 6 3 3 Diameter: 20mm<D<24mm nr
M 6 3 4 Diameter: 24mm<D<30mm nr
M 6 3 5 Diameter: 30mm<D<36mm nr
Page222/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 6 3 6 Diameter: 36mm<D<42mm nr
M 7 2 Permanent erecting
M 7 2 1 Permanent erecting Kg
Page223/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 7 3 Side bolts: Black
M 7 3 1 Diameter: not exceeding 16mm nr
M 7 3 2 Diameter: 16mm<D<20mm nr
M 7 3 3 Diameter: 20mm<D<24mm nr
M 7 3 4 Diameter: 24mm<D<30mm nr
M 7 3 5 Diameter: 30mm<D<36mm nr
Page224/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 7 3 6 Diameter: 36mm<D<42mm nr
M 8 2 Pickling
M 7 2 1 Pickling m2
Page225/318
Description Unit of Remark
measure As of 06/18/2025
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
M 8 3 Flame cleaning
M 8 3 1 Flame cleaning m2
M 8 4 Wire brushing
M 8 4 1 Nominal Bore; not exceeding nr
200mm
M 8 5 Metal spraying
M 8 5 1 Metal spraying m2
M 8 6 Galvanizing
M 8 6 1 Galvanizing m2
M 8 8 Painting
M 8 8 1 Painting m2
Page226/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
work crew crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
N 1 1 2 Area, 2.0 - 6.0m2 pcs Screw, 8cm long (pcs) 10.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 10.000 Daily laborer 2.00
N 1 1 3 Area, 6.0 - 10.0m2 pcs Screw, 8cm long (pcs) 15.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 15.000 Daily laborer 2.00
N 1 1 4 Area, Exceeding 10.0m2 pcs Screw, 8cm long (pcs) 20.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 20.000 Daily laborer 2.00
Page227/318
As of 06/18/2025
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
work crew crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
N 1 2 Erection of Windows
N 1 2 1 Area, less than 2.0m2 pcs Screw, 8cm long (pcs) 8.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 8.000 Daily laborer 2.00
N 1 2 2 Area, 2.0 - 6.0m2 pcs Screw, 8cm long (pcs) 10.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 10.000 Daily laborer 2.00
N 1 2 3 Area, 6.0 - 10.0m2 pcs Screw, 8cm long (pcs) 15.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 15.000 Daily laborer 2.00
N 1 2 4 Area, Exceeding 10.0m2 pcs Screw, 8cm long (pcs) 20.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 20.000 Daily laborer 2.00
N 2 Secco profile
N 2 1 Erecting of Doors
N 2 1 1 Area, not exceeding 2.0m2 pcs Screw, 8cm long (pcs) 8.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 8.000 Daily laborer 2.00
N 2 1 2 Area, 2.0 - 6.0m2 pcs Screw, 8cm long (pcs) 10.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 10.000 Daily laborer 2.00
Page228/318
As of 06/18/2025
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
work crew crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
N 2 1 3 Area, 6.0 - 10.0m2 pcs Screw, 8cm long (pcs) 15.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 15.000 Daily laborer 2.00
N 2 1 4 Area, Exceeding 10.0m2 pcs Screw, 8cm long (pcs) 20.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 20.000 Daily laborer 2.00
N 2 2 Erection of Windows
N 2 2 1 Area, less than 2.0m2 pcs Screw, 8cm long (pcs) 8.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 8.000 Daily laborer 2.00
N 2 2 2 Area, 2.0 - 6.0m2 pcs Screw, 8cm long (pcs) 10.000 Carpenter 1.00 Electrical drilling 1.00 0.50 0.38
machine
Fisher, PVC No. 8 (pcs) 10.000 Daily laborer 2.00
N 2 2 3 Area, 6.0 - 10.0m2 pcs Screw, 8cm long (pcs) 15.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 15.000 Daily laborer 2.00
N 2 2 4 Area, Exceeding 10.0m2 pcs Screw, 8cm long (pcs) 20.000 Carpenter 1.00 Electrical drilling 1.00 0.38 0.25
machine
Fisher, PVC No. 8 (pcs) 20.000 Daily laborer 2.00
Page229/318
As of 06/18/2025
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
work crew crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
N 3 Aluminum
N 3 1 Erecting of Doors
N 3 1 1 Area, not exceeding 2.0m2 pcs
N 3 2 Erection of Windows
N 3 2 1 Area, less than 2.0m2
N 3 3 Hand rail
N 3 3 1
Page230/318
As of 06/18/2025
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
measure
work crew crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
N 3 1 2 Straight on Inclined plain ml CHS or RHS, main members 3.350 Welder 1.00 Welding machine 1.00 0.75 0.63 Assumed:
(ml) main structures
dia 50mm CHS or 40x40mm RHS and
CHS or RHS, other members 3.000 Assistant 1.00 Grinding machine 1.00 thickness 2mm
(ml) the rest 40mm CHS or 30x30mm RHS and
Electrode (kg) 0.100 Daily laborer 2.00 thickness 2mm
Antirust (gal) 0.030
Synthetic paint (gal) 0.070
Sand paper, A4 (pcs) 0.500
Grinding disk 0.300
N 3 1 3 Curved on horizontal plain ml CHS or RHS, main members 3.350 Welder 1.00 Welding machine 1.00 0.75 0.63 Assumed:
(ml) main structures
dia 50mm CHS or 40x40mm RHS and
CHS or RHS, other members 8.000 Assistant 1.00 Grinding machine 1.00 thickness 2mm
(ml) the rest 40mm CHS or 30x30mm RHS and
Electrode (kg) 0.150 Daily laborer 2.00 thickness 2mm
Antirust (gal) 0.030
Synthetic paint (gal) 0.070
Sand paper, A4 (pcs) 1.000
Grinding disk 0.060
N 3 1 4 Straight on Inclined plain ml CHS or RHS, main members 3.350 Welder 1.00 Welding machine 1.00 0.75 0.63 Assumed:
(ml) main structures
dia 50mm CHS or 40x40mm RHS and
CHS or RHS, other members 3.000 Assistant 1.00 Grinding machine 1.00 thickness 2mm
(ml) the rest 40mm CHS or 30x30mm RHS and
Electrode (kg) 0.100 Daily laborer 2.00 thickness 2mm
Antirust (gal) 0.030
Synthetic paint (gal) 0.070
Sand paper, A4 (pcs) 0.500
Grinding disk 0.300
Page231/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 Common brick
U 1 1 Thickness: not exceeding 150mm
U 1 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for plastering and the other for
pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 4.38 3.13 Both sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
Page232/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for plastering and the other for
pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 4.38 3.13 Both sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 One side left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One side left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 1 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Mortar, 1;3 (m3) 0.026 Ass. Mason 5.00
Daily laborer 10.00
U 1 2 Thickness: 150mm<t<250mm
U 1 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page233/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page234/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 2 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 2 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 Thickness: 250mm<t<500mm
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page235/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.00 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.75 1.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.63 1.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.25 1.00 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.13 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.63 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page236/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 3 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 1 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 1 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page237/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 0.88 0.63 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 0.88 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 0.63 0.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 0.63 0.38 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 5 Vertical facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.25 1.00 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 5 Vertical facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 6 Battered facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.25 0.88 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 6 Battered facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 7 Casting to metal sections m3 Common brick (pcs) 58.000 Mason 5.00 1.25 0.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 4 7 Casting to metal sections m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page238/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 4 7 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 4.38 3.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page239/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 2 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 4.38 3.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 1 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 Thickness: 150mm<t<250mm
U 2 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page240/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 2 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page241/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 2 2 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 2 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 3 Thickness: 250mm<t<500mm
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.00 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page242/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.75 1.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.63 1.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.25 1.00 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.13 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.63 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page243/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 3 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 1 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 1 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 0.88 0.63 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page244/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 2 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 0.88 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 0.63 0.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 0.63 0.38 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 5 Vertical facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.25 1.00 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 5 Vertical facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 6 Battered facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.25 0.88 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 6 Battered facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 7 Casting to metal sections m3 Common brick (pcs) 58.000 Mason 5.00 1.25 0.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 7 Casting to metal sections m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 2 4 7 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page245/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 3 Engineering brickworks
U 3 1 Thickness: not exceeding 150mm
U 3 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 4.38 3.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page246/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 3 1 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 4.38 3.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 5.00 3.75 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 7.50 5.00 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 6.25 4.38 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 1 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 5.63 3.75 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 Thickness: 150mm<t<250mm
U 3 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page247/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 3 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page248/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 3 2 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 3.75 2.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 3.13 2.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 2 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.88 1.88 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 3 Thickness: 250mm<t<500mm
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 1 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 2.00 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 2 Vertical curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page249/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.75 1.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 3 Battered straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.63 1.13 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.25 1.00 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 4 Battered curved wall m2 Common brick (pcs) 58.000 Mason 5.00 1.13 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.88 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 5 Vertical facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.63 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 6 Battered facing to concrete m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 2.50 1.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page250/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 1 3 7 Casting to metal sections m2 Common brick (pcs) 58.000 Mason 5.00 2.25 1.63 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 1 3 7 Vertical straight wall m2 Common brick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 1 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 1 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.75 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.75 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 2 Vertical curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 0.88 0.63 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 3 Battered straight wall m3 Common brick (pcs) 58.000 Mason 5.00 0.88 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page251/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 3 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 0.63 0.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 4 Battered curved wall m3 Common brick (pcs) 58.000 Mason 5.00 0.63 0.38 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 5 Vertical facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.25 1.00 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 5 Vertical facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 6 Battered facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.25 0.88 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 6 Battered facing to concrete m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 7 Casting to metal sections m3 Common brick (pcs) 58.000 Mason 5.00 1.25 0.88 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 7 Casting to metal sections m3 Common brick (pcs) 58.000 Mason 5.00 1.13 0.88 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 3 4 7 Vertical straight wall m3 Common brick (pcs) 58.000 Mason 5.00 1.00 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page252/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 1 1 Vertical straight wall m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 1 Vertical straight wall m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 2 Vertical curved wall m2 HCB: 10 cm thick (pcs) 13.750 Mason 5.00 8.75 7.50 Both sides left for plastering
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 2 Vertical curved wall m2 HCB: 10 cm thick (pcs) 13.750 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 2 Vertical curved wall m2 HCB: 10 cm thick (pcs) 13.750 Mason 5.00 6.25 5.00 Both sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 3 Battered straight wall m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 Both sides left for plastering
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 3 Battered straight wall m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 3 Battered straight wall m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 6.25 5.00 Both sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 4 Battered curved wall m2 HCB: 10 cm thick (pcs) 13.750 Mason 5.00 7.50 6.25 Both sides left for plastering
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 4 Battered curved wall m2 HCB: 10 cm thick (pcs) 13.750 Mason 5.00 6.25 5.00 One sides left for plastering and the other for
pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
Page253/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 1 4 Battered curved wall m2 HCB: 10 cm thick (pcs) 13.750 Mason 5.00 5.00 3.75 Both sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 5 Vertical facing to concrete m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 One side left for plastering
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 5 Vertical facing to concrete m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 6 Battered facing to concrete m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One side left for plastering
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 6 Battered facing to concrete m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 One sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 7 Casting to metal sections m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 7 Casting to metal sections m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 1 7 Vertical straight wall m2 HCB: 10 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 4 2 Thickness: 150mm
U 4 2 1 Vertical straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 1 Vertical straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 1 Vertical straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
Page254/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 2 2 Vertical curved wall m2 HCB: 15 cm thick (pcs) 13.750 Mason 5.00 8.75 7.50 Both sides left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 2 Vertical curved wall m2 HCB: 15 cm thick (pcs) 13.750 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 2 Vertical curved wall m2 HCB: 15 cm thick (pcs) 13.750 Mason 5.00 6.25 5.00 Both sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 3 Battered straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 Both sides left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 3 Battered straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 3 Battered straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 6.25 5.00 Both sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 4 Battered curved wall m2 HCB: 15 cm thick (pcs) 13.750 Mason 5.00 7.50 6.25 Both sides left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 4 Battered curved wall m2 HCB: 15 cm thick (pcs) 13.750 Mason 5.00 6.25 5.00 One sides left for plastering and the other for
pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 4 Battered curved wall m2 HCB: 15 cm thick (pcs) 13.750 Mason 5.00 5.00 3.75 Both sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 5 Vertical facing to concrete m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 One side left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 5 Vertical facing to concrete m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 6 Battered facing to concrete m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One side left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
Page255/318
U 4 2 6 Battered facing to concrete m2 8.75 7.50 One As of 06/18/2025
side left for plastering
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page256/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 2 6 Battered facing to concrete m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 One sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 7 Casting to metal sections m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 7 Casting to metal sections m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 2 7 Vertical straight wall m2 HCB: 15 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 4 3 Thickness: 200mm
U 4 3 1 Vertical straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 1 Vertical straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 1 Vertical straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 2 Vertical curved wall m2 HCB: 20 cm thick (pcs) 13.750 Mason 5.00 8.75 7.50 Both sides left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 2 Vertical curved wall m2 HCB: 20 cm thick (pcs) 13.750 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 2 Vertical curved wall m2 HCB: 20 cm thick (pcs) 13.750 Mason 5.00 6.25 5.00 Both sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 3 Battered straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 Both sides left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
Page257/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 3 3 Battered straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 3 Battered straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 6.25 5.00 Both sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 4 Battered curved wall m2 HCB: 20 cm thick (pcs) 13.750 Mason 5.00 7.50 6.25 Both sides left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 4 Battered curved wall m2 HCB: 20 cm thick (pcs) 13.750 Mason 5.00 6.25 5.00 One sides left for plastering and the other for
pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 4 Battered curved wall m2 HCB: 20 cm thick (pcs) 13.750 Mason 5.00 5.00 3.75 Both sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 5 Vertical facing to concrete m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 One side left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 5 Vertical facing to concrete m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 6 Battered facing to concrete m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One side left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 6 Battered facing to concrete m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 One sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 7 Casting to metal sections m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 7 Casting to metal sections m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 4 3 7 Vertical straight wall m2 HCB: 20 cm thick (pcs) 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
Page258/318
U 4 3 7 Vertical straight wall m2 7.50 6.25 Both As of 06/18/2025
sides left for pointing
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
Page259/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 4 Thickness: Exceeding 200mm
U 4 4 1 Vertical straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 2.00 1.63 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 1 Vertical straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.88 1.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 1 Vertical straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.63 1.06 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 2 Vertical curved wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 2 Vertical curved wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.63 1.25 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 2 Vertical curved wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.63 1.06 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 3 Battered straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.63 1.06 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 3 Battered straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.50 1.06 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 3 Battered straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.50 1.06 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 4 Battered curved wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.63 1.06 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 4 Battered curved wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.06 0.81 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page260/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 4 4 4 Battered curved wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.06 0.63 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 5 Vertical facing to concrete m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 2.00 1.63 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 5 Vertical facing to concrete m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.88 1.50 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 6 Battered facing to concrete m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 2.00 1.50 One side left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 6 Battered facing to concrete m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.88 1.50 One sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 7 Casting to metal sections m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 2.00 1.50 Both sides left for plastering
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 7 Casting to metal sections m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.88 1.50 One sides left for plastering and the other for
pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 4 4 7 Vertical straight wall m3 HCB: 20 cm thick (pcs) 58.000 Mason 5.00 1.63 1.06 Both sides left for pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page261/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 1 1 Vertical straight wall m2 Solid block: 10 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 1 Vertical straight wall m2 Solid block: 10 cm thick 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 2 Vertical curved wall m2 Solid block: 10 cm thick 13.750 Mason 5.00 8.75 7.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 2 Vertical curved wall m2 Solid block: 10 cm thick 13.750 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 2 Vertical curved wall m2 Solid block: 10 cm thick 13.750 Mason 5.00 6.25 5.00 Both sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 3 Battered straight wall m2 Solid block: 10 cm thick 12.500 Mason 5.00 8.75 7.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 3 Battered straight wall m2 Solid block: 10 cm thick 12.500 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 3 Battered straight wall m2 Solid block: 10 cm thick 12.500 Mason 5.00 6.25 5.00 Both sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
Page262/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 1 4 Battered curved wall m2 Solid block: 10 cm thick 13.750 Mason 5.00 7.50 6.25 Both sides left for plastering
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 4 Battered curved wall m2 Solid block: 10 cm thick 13.750 Mason 5.00 6.25 5.00 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 4 Battered curved wall m2 Solid block: 10 cm thick 13.750 Mason 5.00 5.00 3.75 Both sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 5 Vertical facing to concrete m2 Solid block: 10 cm thick 12.500 Mason 5.00 10.00 8.75 One side left for plastering
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 5 Vertical facing to concrete m2 Solid block: 10 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 6 Battered facing to concrete m2 Solid block: 10 cm thick 12.500 Mason 5.00 8.75 7.50 One side left for plastering
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 6 Battered facing to concrete m2 Solid block: 10 cm thick 12.500 Mason 5.00 7.50 6.25 One sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 7 Casting to metal sections m2 Solid block: 10 cm thick 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 7 Casting to metal sections m2 Solid block: 10 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
U 5 1 7 Vertical straight wall m2 Solid block: 10 cm thick 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
(pcs)
Cement (qtl) 0.026 Ass. Mason 5.00
Sand (m3) 0.009 Daily laborer 10.00
Page263/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 2 Thickness: 150mm<t<250mm
U 5 2 1 Vertical straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 1 Vertical straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 1 Vertical straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 2 Vertical curved wall m2 Solid block: 15 cm thick 13.750 Mason 5.00 8.75 7.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 2 Vertical curved wall m2 Solid block: 15 cm thick 13.750 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 2 Vertical curved wall m2 Solid block: 15 cm thick 13.750 Mason 5.00 6.25 5.00 Both sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 3 Battered straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 8.75 7.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 3 Battered straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 3 Battered straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 6.25 5.00 Both sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
Page264/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 2 4 Battered curved wall m2 Solid block: 15 cm thick 13.750 Mason 5.00 7.50 6.25 Both sides left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 4 Battered curved wall m2 Solid block: 15 cm thick 13.750 Mason 5.00 6.25 5.00 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 4 Battered curved wall m2 Solid block: 15 cm thick 13.750 Mason 5.00 5.00 3.75 Both sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 5 Vertical facing to concrete m2 Solid block: 15 cm thick 12.500 Mason 5.00 10.00 8.75 One side left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 5 Vertical facing to concrete m2 Solid block: 15 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 6 Battered facing to concrete m2 Solid block: 15 cm thick 12.500 Mason 5.00 8.75 7.50 One side left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 6 Battered facing to concrete m2 Solid block: 15 cm thick 12.500 Mason 5.00 7.50 6.25 One sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 7 Casting to metal sections m2 Solid block: 15 cm thick 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 7 Casting to metal sections m2 Solid block: 15 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
U 5 2 7 Vertical straight wall m2 Solid block: 15 cm thick 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
(pcs)
Cement (qtl) 0.038 Ass. Mason 5.00
Sand (m3) 0.013 Daily laborer 10.00
Page265/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 3 Thickness: 250mm<t<500mm
U 5 3 1 Vertical straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 1 Vertical straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 1 Vertical straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 2 Vertical curved wall m2 Solid block: 20 cm thick 13.750 Mason 5.00 8.75 7.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 2 Vertical curved wall m2 Solid block: 20 cm thick 13.750 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 2 Vertical curved wall m2 Solid block: 20 cm thick 13.750 Mason 5.00 6.25 5.00 Both sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 3 Battered straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 8.75 7.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 3 Battered straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 7.50 6.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 3 Battered straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 6.25 5.00 Both sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
Page266/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 3 4 Battered curved wall m2 Solid block: 20 cm thick 13.750 Mason 5.00 7.50 6.25 Both sides left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 4 Battered curved wall m2 Solid block: 20 cm thick 13.750 Mason 5.00 6.25 5.00 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 4 Battered curved wall m2 Solid block: 20 cm thick 13.750 Mason 5.00 5.00 3.75 Both sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 5 Vertical facing to concrete m2 Solid block: 20 cm thick 12.500 Mason 5.00 10.00 8.75 One side left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 5 Vertical facing to concrete m2 Solid block: 20 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 6 Battered facing to concrete m2 Solid block: 20 cm thick 12.500 Mason 5.00 8.75 7.50 One side left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 6 Battered facing to concrete m2 Solid block: 20 cm thick 12.500 Mason 5.00 7.50 6.25 One sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 7 Casting to metal sections m2 Solid block: 20 cm thick 12.500 Mason 5.00 10.00 8.75 Both sides left for plastering
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 7 Casting to metal sections m2 Solid block: 20 cm thick 12.500 Mason 5.00 8.75 7.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
U 5 3 7 Vertical straight wall m2 Solid block: 20 cm thick 12.500 Mason 5.00 7.50 6.25 Both sides left for pointing
(pcs)
Cement (qtl) 0.056 Ass. Mason 5.00
Sand (m3) 0.019 Daily laborer 10.00
Page267/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 4 Thickness: 500mm<t<1000mm
U 5 4 1 Vertical straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 2.00 1.63 Both sides left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 1 Vertical straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.88 1.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 1 Vertical straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.63 1.06 Both sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 2 Vertical curved wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.88 1.25 Both sides left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 2 Vertical curved wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.63 1.25 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 2 Vertical curved wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.63 1.06 Both sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 3 Battered straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.63 1.06 Both sides left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 3 Battered straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.50 1.06 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 3 Battered straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.50 1.06 Both sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page268/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 5 4 4 Battered curved wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.63 1.06 Both sides left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 4 Battered curved wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.06 0.81 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 4 Battered curved wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.06 0.63 Both sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 5 Vertical facing to concrete m3 Solid block: 20 cm thick 58.000 Mason 5.00 2.00 1.63 One side left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 5 Vertical facing to concrete m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.88 1.50 One sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 6 Battered facing to concrete m3 Solid block: 20 cm thick 58.000 Mason 5.00 2.00 1.50 One side left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 6 Battered facing to concrete m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.88 1.50 One sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 7 Casting to metal sections m3 Solid block: 20 cm thick 58.000 Mason 5.00 2.00 1.50 Both sides left for plastering
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 7 Casting to metal sections m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.88 1.50 One sides left for plastering and the other for
(pcs) pointing
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 5 4 7 Vertical straight wall m3 Solid block: 20 cm thick 58.000 Mason 5.00 1.63 1.06 Both sides left for pointing
(pcs)
Cement (qtl) 0.090 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page269/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 6 1 2 Vertical curved wall m2 Fine dressed stone (pcs) 28.000 Mason 5.00 3.13 1.88 Mortar 1:4 cement to sand
Cement (qtl) 0.106 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 6 1 3 Battered straight wall m2 Fine dressed stone (pcs) 28.000 Mason 5.00 3.13 1.88 Mortar 1:4 cement to sand
Cement (qtl) 0.106 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
U 6 1 4 Battered curved wall m2 Fine dressed stone (pcs) 30.000 Mason 5.00 2.50 1.88 Mortar 1:4 cement to sand
Cement (qtl) 0.106 Ass. Mason 5.00
Sand (m3) 0.030 Daily laborer 10.00
Page270/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 7 1 2 Vertical curved wall m3 Fine dressed stone (pcs) 25.000 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 1 2 Vertical curved wall m3 Fine dressed stone (pcs) 50.000 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.400 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 1 3 Battered straight wall m3 Fine dressed stone (pcs) 28.000 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 1 3 Battered straight wall m3 Fine dressed stone (pcs) 56.000 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.450 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 1 4 Battered curved wall m3 Fine dressed stone (pcs) 28.000 Mason 5.00 1.00 0.75 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 1 4 Battered curved wall m3 Fine dressed stone (pcs) 56.000 Mason 5.00 0.88 0.63 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.450 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 Fine dressed stone Thickness: exceeding 600mm
U 7 2 1 Vertical straight wall m3 Fine dressed stone (pcs) 18.000 Mason 5.00 1.50 1.25 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 1.120 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 1 Vertical straight wall m3 Fine dressed stone (pcs) 36.000 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 2 Vertical curved wall m3 Fine dressed stone (pcs) 18.000 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 1.120 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 2 Vertical curved wall m3 Fine dressed stone (pcs) 36.000 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 3 Battered straight wall m3 Fine dressed stone (pcs) 18.000 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 1.120 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
Page271/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 7 2 3 Battered straight wall m3 Fine dressed stone (pcs) 36.000 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 4 Battered curved wall m3 Fine dressed stone (pcs) 18.000 Mason 5.00 1.00 0.75 One side left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 1.120 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 7 2 4 Battered curved wall m3 Fine dressed stone (pcs) 36.000 Mason 5.00 0.88 0.63 Both sides left for pointing
Mortar 1:4 cement to sand
Trachytic stone (m3) 0.840 Ass. Mason 5.00
Cement (qtl) 1.000 Daily laborer 10.00
Sand (m3) 0.310
U 8 1 1 Vertical straight wall m3 Trachytic stone (m3) 1.400 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 1 2 Vertical curved wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 1 2 Vertical curved wall m3 Trachytic stone (m3) 1.400 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 1 3 Battered straight wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 1 3 Battered straight wall m3 Trachytic stone (m3) 1.400 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 1 4 Battered curved wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.00 0.75 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 1 4 Battered curved wall m3 Trachytic stone (m3) 1.400 Mason 5.00 0.88 0.63 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
Page272/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 8 2 Rough dressed stone Thickness: exceeding 600mm
U 8 2 1 Vertical straight wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.50 1.25 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 1 Vertical straight wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 2 Vertical curved wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 2 Vertical curved wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 3 Battered straight wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 3 Battered straight wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.00 0.75 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 4 Battered curved wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.00 0.75 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 8 2 4 Battered curved wall m3 Trachytic stone (m3) 1.300 Mason 5.00 0.88 0.63 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 1 2 Vertical curved wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.50 1.25 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
Page273/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 9 1 2 Vertical curved wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 1 3 Battered straight wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.50 1.25 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 1 3 Battered straight wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 1 4 Battered curved wall m3 Trachytic stone (m3) 1.200 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 1 4 Battered curved wall m3 Trachytic stone (m3) 1.300 Mason 5.00 1.13 0.88 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 2 1 Vertical straight wall m3 Trachytic stone (m3) 1.250 Mason 5.00 1.50 1.25 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 2 2 Vertical curved wall m3 Trachytic stone (m3) 1.150 Mason 5.00 1.50 1.25 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 2 2 Vertical curved wall m3 Trachytic stone (m3) 1.250 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 2 3 Battered straight wall m3 Trachytic stone (m3) 1.150 Mason 5.00 1.50 1.25 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 2 3 Battered straight wall m3 Trachytic stone (m3) 1.250 Mason 5.00 1.25 1.00 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
Page274/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 9 2 4 Battered curved wall m3 Trachytic stone (m3) 1.150 Mason 5.00 1.25 1.00 One side left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 9 2 4 Battered curved wall m3 Trachytic stone (m3) 1.250 Mason 5.00 1.13 0.88 Both sides left for pointing
Mortar 1:4 cement to sand
Cement (qtl) 1.000 Ass. Mason 5.00
Sand (m3) 0.310 Daily laborer 10.00
U 10 1 1 Vertical straight wall m2 Cement (qtl) 0.084 Plasterer 1.00 3.13 2.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 1 2 Vertical curved wall m2 Cement (qtl) 0.076 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 1 2 Vertical curved wall m2 Cement (qtl) 0.084 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 1 3 Battered straight wall m2 Cement (qtl) 0.076 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 1 3 Battered straight wall m2 Cement (qtl) 0.084 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 1 4 Battered curved wall m2 Cement (qtl) 0.076 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 1 4 Battered curved wall m2 Cement (qtl) 0.084 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
Page275/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 10 2 Two coats of cement mortar plaster, External
U 10 2 1 Vertical straight wall m2 Cement (qtl) 0.076 Plasterer 5.00 15.00 10.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 2 1 Vertical straight wall m2 Cement (qtl) 0.084 Plasterer 1.00 3.13 2.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 2 1 Vertical curved wall m2 Cement (qtl) 0.076 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 2 2 Vertical curved wall m2 Cement (qtl) 0.084 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 2 2 Battered straight wall m2 Cement (qtl) 0.076 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 2 2 Battered straight wall m2 Cement (qtl) 0.084 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 2 3 Battered curved wall m2 Cement (qtl) 0.076 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 10 2 3 Battered curved wall m2 Cement (qtl) 0.084 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 10%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.018 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 10 3 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 3 1 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
Page276/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 10 3 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 3 2 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 10 3 2 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 3 3 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 10 3 3 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 4 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 10 4 1 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 10 4 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 10 4 2 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 10 4 2 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
Page277/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 10 4 3 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 10 4 3 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 10 4 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 10 4 1 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 10 4 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 10 4 2 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 10 4 2 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 10 4 3 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 10 4 3 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
Page278/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 10 4 Pointing to Brick/HCB wall with cement mortar
U 10 4 1 Vertical straight wall m2 Cement (qtl) 0.023 Plasterer 5.00 7.50 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 10 4 1 Vertical straight wall m2 Cement (qtl) 0.025 Plasterer 1.00 1.50 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 4 1 Vertical curved wall m2 Cement (qtl) 0.023 Plasterer 5.00 7.50 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 10 4 2 Vertical curved wall m2 Cement (qtl) 0.025 Plasterer 1.00 1.50 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 4 2 Battered straight wall m2 Cement (qtl) 0.023 Plasterer 5.00 7.50 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 10 4 2 Battered straight wall m2 Cement (qtl) 0.025 Plasterer 1.00 1.50 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 10 4 3 Battered curved wall m2 Cement (qtl) 0.023 Plasterer 5.00 7.50 6.25 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 10 4 3 Battered curved wall m2 Cement (qtl) 0.025 Plasterer 1.00 1.50 1.25 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 1 1 Vertical straight wall m2 Cement (qtl) 0.092 Plasterer 1.00 3.13 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
Page279/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 1 2 Vertical curved wall m2 Cement (qtl) 0.079 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 11 1 2 Vertical curved wall m2 Cement (qtl) 0.092 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 1 3 Battered straight wall m2 Cement (qtl) 0.079 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 11 1 3 Battered straight wall m2 Cement (qtl) 0.092 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 1 4 Battered curved wall m2 Cement (qtl) 0.079 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 11 1 4 Battered curved wall m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 2 1 Vertical straight wall m2 Cement (qtl) 0.092 Plasterer 1.00 3.13 2.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 2 2 Vertical curved wall m2 Cement (qtl) 0.079 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 11 2 2 Vertical curved wall m2 Cement (qtl) 0.092 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 2 3 Battered straight wall m2 Cement (qtl) 0.079 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
Page280/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 2 3 Battered straight wall m2 Cement (qtl) 0.092 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 2 4 Battered curved wall m2 Cement (qtl) 0.079 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
U 11 2 4 Battered curved wall m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
U 11 3 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
Page281/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 4 Fine coat of cement mortar plaster, External
U 11 4 1 Vertical straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
Page282/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 1 Vertical straight wall m2 Cement (qtl) 0.050 Plasterer 1.00 1.25 1.00 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.046 Plasterer 5.00 6.25 5.00 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.006 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.050 Plasterer 1.00 1.25 1.00 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.046 Plasterer 5.00 6.25 5.00 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.006 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.050 Plasterer 1.00 1.25 1.00 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1.00
Daily laborer 6.00
Page283/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.046 Plasterer 5.00 6.25 5.00 Pointing cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.006 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.050 Plasterer 1.00 1.25 1.00 Pointing cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.006 Ass. Plasterer 1.00
Daily laborer 6.00
Page284/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 12 1 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.092 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
Chiseler 1.00
U 12 1 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.079 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 10.00
Chiseler 3.00
U 12 1 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 4.00
Chiseler 1.00
U 12 2 Two coats of cement mortar plaster, External
U 12 2 1 Vertical straight wall m2 Cement (qtl) 0.079 Plasterer 5.00 10.00 7.50 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 11.00
Chiseler 3.00
U 12 2 1 Vertical straight wall m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 5.00
Chiseler 1.00
U 12 2 2 Vertical curved wall m2 Cement (qtl) 0.079 Plasterer 5.00 82.50 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 11.00
Chiseler 3.00
U 12 2 2 Vertical curved wall m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 5.00
Chiseler 1.00
U 12 2 3 Battered straight wall m2 Cement (qtl) 0.079 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 11.00
Chiseler 3.00
U 12 2 3 Battered straight wall m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 5.00
Chiseler 1.00
U 12 2 4 Battered curved wall m2 Cement (qtl) 0.079 Plasterer 5.00 6.25 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 11.00
Chiseler 3.00
U 12 2 4 Battered curved wall m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 5.00
Chiseler 1.00
Page285/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 12 2 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.079 Plasterer 5.00 10.00 10.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 11.00
Chiseler 3.00
U 12 2 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.092 Plasterer 1.00 2.50 1.88 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 5.00
Chiseler 1.00
U 12 2 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.079 Plasterer 5.00 7.50 5.00 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 5.00
mechanical mix
Daily laborer 11.00
Chiseler 3.00
U 12 2 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.092 Plasterer 1.00 1.88 1.25 1st coat cement mortar 1:2.5, wastage 12%
2nd coat cement mortar 1:4, wastage 5%
Sand (m3) 0.019 Ass. Plasterer 1.00
hand mix
Daily laborer 5.00
Chiseler 1.00
U 12 3 Fine coat of cement mortar plaster, Internal
U 11 3 1 Vertical straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
Page286/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 3 4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 3 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5.00 31.25 27.50 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 3 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1.00 6.25 5.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
Page287/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 5 Horizontal plane Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.017 Plasterer 5.00 31.25 27.50 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.003 Ass. Plasterer 5.00
Daily laborer 14.00
U 11 4 6 Horizontal curved Soffit of slab m2 Cement (qtl) 0.020 Plasterer 1.00 6.25 5.00 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.003 Ass. Plasterer 1.00
Daily laborer 6.00
U 11 4 1 Vertical straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 2 Vertical curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.017 Plasterer 5.00 40.00 35.00 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
Page288/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 11 4 3 Battered straight wall m2 Cement (qtl) 0.020 Plasterer 1.00 9.00 7.50 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.017 Plasterer 5.00 35.00 31.25 3rd coat cement mortar 1:2, wastage 5%
Mechanical mix
Sand (m3) 0.002 Ass. Plasterer 5.00
Daily laborer 10.00
U 11 4 4 Battered curved wall m2 Cement (qtl) 0.020 Plasterer 1.00 7.50 6.25 3rd coat cement mortar 1:2, wastage 5%
Hand mix
Sand (m3) 0.002 Ass. Plasterer 1.00
Daily laborer 4.00
U 12 Wall Tile
U 12 1 Ceramic wall finish, Internal straight plane
U 12 1 1 Ceramic tile, 150x150x6mm m2 Ceramic wall tile, 45.300 Tiller 5.00 Ceramic cutter 1.00 5.00 4.38 Ceramic tile, wastage 2%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5.00 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
U 12 1 2 Ceramic tile, 200x200x8mm m2 Ceramic wall tile, 25.750 Tiller 5.00 Ceramic cutter 1.00 6.25 5.63 Ceramic tile, wastage 3%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5.00 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
U 12 2 Ceramic wall finish, Internal curved wall
U 12 2 1 Ceramic tile, 150x150x6mm m2 Ceramic wall tile, 45.300 Tiller 5.00 Ceramic cutter 1.00 4.00 3.13 Ceramic tile, wastage 2%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5.00 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
U 12 2 2 Ceramic tile, 200x200x8mm m2 Ceramic wall tile, 25.750 Tiller 5.00 Ceramic cutter 1.00 4.38 3.75 Ceramic tile, wastage 3%
150x150x6mm (pcs) Mortar for bedding 1:3 cement mortar and 10%
wastage
Cement (qtl) 0.049 Daily laborer 5.00 White cement for grouting 10% wastage, 2mm
Sand (m3) 0.012 wide
White cement (kg) 0.300
U 13 Floor Finish
U 13 1 Cement screed, trawl finish
U 13 1 1 Cement screed, 5cm thick trowel m2 Cement (qtl) 0.339 Plasterer 5.00 18.75 12.50 Cement screed: cement mortar 1:4, wastage
15%
finish with 2% slope Sand (m3) 0.067 Ass. Plasterer 5.00
Mechanical mix
Daily laborer 10.00
U 13 1 2 Cement screed, 5cm thick trowel m2 Cement (qtl) 0.339 Plasterer 5.00 18.75 12.50 Cement screed: cement mortar 1:4, wastage
15%
finish in plane surface Sand (m3) 0.067 Ass. Plasterer 5.00
Mechanical mix
Daily laborer 10.00
Page289/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 13 1 3 Cement screed, 4.8cm thick trowel m2 Cement (qtl) 0.328 Plasterer 5.00 18.75 12.50 Cement screed: cement mortar 1:4, wastage
15%
finish to receive PVC tile Sand (m3) 0.063 Ass. Plasterer 5.00
Mechanical mix
Daily laborer 10.00
U 13 1 4 Cement screed, 3cm thick trowel m2 Cement (qtl) 0.258 Plasterer 5.00 18.75 12.50 Cement screed: cement mortar 1:4, wastage
15%
finish with 2% slope Sand (m3) 0.040 Ass. Plasterer 5.00
Mechanical mix
Daily laborer 10.00
U 13 1 5 Cement screed, 3cm thick trowel m2 Cement (qtl) 0.258 Plasterer 5.00 18.75 12.50 Cement screed: cement mortar 1:4, wastage
15%
finish in plane surface Sand (m3) 0.040 Ass. Plasterer 5.00
Mechanical mix
Daily laborer 10.00
U 13 2 2 25x25x3 cm terrazzo tile m2 Terrazzo tile, 25x25x3cm 1.050 Tiller 10.00 4.38 3.13
(m2)
Cement (qtl) 0.105 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.030 Daily laborer 10.00
U 13 2 3 30x30x3 cm terrazzo tile m2 Terrazzo tile, 30x30x3cm 1.050 Tiller 10.00 5.00 3.75
(m2)
Cement (qtl) 0.086 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.024 Daily laborer 10.00
U 13 2 4 20x20x2 cm chequered cement tile m2 Chequered cement tile, 1.050 Tiller 10.00 3.75 2.50
20x20x2cm (m2)
Cement (qtl) 0.123 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.036 Daily laborer 10.00
U 13 2 5 25x25x3 cm Chequered cement tile m2 Chequered cement tile, 1.050 Tiller 10.00 4.38 3.13
25x25x3cm (m2)
Cement (qtl) 0.105 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.030 Daily laborer 10.00
U 13 2 6 30x30x3 cm chequered cement tile m2 Chequered cement tile, 1.050 Tiller 10.00 5.00 3.75
30x30x3cm (m2)
Cement (qtl) 0.086 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.024 Daily laborer 10.00
U 13 2 7 10x2 cm terrazzo skirting ml Terrazzo skirting, 10x2cm 1.050 Tiller 10.00 3.75 2.50
(ml)
Cement (qtl) 0.016 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.001 Daily laborer 10.00
Page290/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 13 2 8 25x25x3 cm terrazzo skirting ml Terrazzo skirting, 0.110 Tiller 10.00 4.38 3.13
25x10x3cm (m2)
Cement (qtl) 0.016 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.001 Daily laborer 10.00
U 13 2 9 30x30x3 cm terrazzo skirting ml Terrazzo skirting, 0.110 Tiller 10.00 5.00 3.75
30x10x3cm (m2)
Cement (qtl) 0.016 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.001 Daily laborer 10.00
U 13 2 10 20x20x2 cm chequered cement ml Chequered cement skirting, 1.050 Tiller 10.00 3.75 2.50
20x2cm (ml)
skirting
Cement (qtl) 0.016 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.001 Daily laborer 10.00
U 13 2 11 25x25x3 cm Chequered cement ml Chequered cement skirting, 0.110 Tiller 10.00 4.38 3.13
25x10x3cm (m2)
skirting
U 13 2 12 30x30x3 cm chequered cement ml Chequered cement skirting, 0.110 Tiller 10.00 5.00 3.75
30x10x3cm (m2)
skirting
U 13 3 2 25x25x3 cm Marble slate tile m2 Marble tile, 25x25x3cm (m2) 1.050 Tiller 10.00 2.50 1.88
U 13 3 3 30x30x3 cm Marble slate tile m2 Marble tile, 30x30x3cm (m2) 1.050 Tiller 10.00 5.00 3.75
U 13 3 4 10x2 cm marble slate skirting ml marble skirting, 10x2cm (ml) 1.050 Tiller 10.00 3.75 2.50
Page291/318
As of 06/18/2025
Description Unit of Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
U 13 4 Non slippery ceramic tile floor finish
U 13 4 1 25x25x0.6 cm Non-slippery m2 Non-slippery ceramic tile, 1.050 Tiller 10.00 2.50 1.88
25x25x0.6cm (m2)
ceramic tile
U 13 4 2 30x30x0.6 cm Non-slippery m2 Non-slippery ceramic tile, 0.110 Tiller 10.00 5.00 3.75
30x10x0.6cm (m2)
ceramic tile
U 13 4 3 10x0.6 cm Non-slippery ceramic ml Non-slippery ceramic 1.050 Tiller 10.00 3.75 2.50
skirting, 10x0.6cm (ml)
skirting
Cement (qtl) 0.016 Ass. Mason 3.00 Grinder 1.00
Sand (m3) 0.001 Daily laborer 10.00
Page292/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/crew/day Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
V 1 1 2 Inclined wall (inclined at an angle m2 Stucco (kg) 0.050 Painter 1.00 3.13 2.50 Brush/ Roller application
300 - 600 to the horizontal) Animal glue 9Kg) 0.013 Daily laborer 1.00
Plastic paint, white 0.080
(gal)
V 1 1 3 Vertical wall (inclined at an angle m2 Stucco (kg) 0.050 Painter 1.00 3.75 3.13 Brush/ Roller application
not exceeding 300 to the horizontal) Animal glue 9Kg) 0.013 Daily laborer 1.00
Plastic paint, other 0.080
than white (gal)
V 1 1 4 Inclined wall (inclined at an angle m2 Stucco (kg) 0.050 Painter 1.00 3.13 2.50 Brush/ Roller application
300 - 600 to the horizontal) Animal glue 9Kg) 0.013 Daily laborer 1.00
Plastic paint, other 0.080
than white (gal)
V 1 1 5 Vertical wall (inclined at an angle m2 Stucco (kg) 0.050 Painter 1.00 2.50 1.88 Brush/ Roller application
exceeding 600 to the horizontal) Animal glue 9Kg) 0.013 Daily laborer 1.00
Plastic paint, white 0.080
(gal)
V 1 1 6 Vertical wall (inclined at an angle m2 Stucco (kg) 0.050 Painter 1.00 2.50 1.88 Brush/ Roller application
exceeding 600 to the horizontal) Animal glue 9Kg) 0.013 Daily laborer 1.00
Plastic paint, other 0.080
than white (gal)
Page293/318
As of 06/18/2025
Description Unit of Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
V 1 1 7 Soffit surfaces (inclined at an angle m2 Stucco (kg) 0.050 Painter 1.00 2.50 3.13 Brush/ Roller application
300 - 600 to the horizontal) Animal glue 9Kg) 0.013 Daily laborer 1.00
Plastic paint, white 0.080
(gal)
V 1 2 2 Inclined wall (inclined at an angle m2 Plastic paint, white (gal) 0.080 Painter 1.00 3.13 2.50 Brush/ Roller application
300 - 600 to the horizontal)
Daily laborer 1.00
V 1 2 3 Vertical wall (inclined at an angle m2 Plastic paint, other than 0.080 Painter 1.00 3.75 3.13 Brush/ Roller application
white (gal)
not exceeding 300 to the horizontal)
Daily laborer 1.00
V 1 2 4 Inclined wall (inclined at an angle m2 Plastic paint, other than 0.080 Painter 1.00 2.50 3.13 Brush/ Roller application
white (gal)
300 - 600 to the horizontal)
Daily laborer 1.00
V 1 2 5 Vertical wall (inclined at an angle m2 Plastic paint, white (gal) 0.080 Painter 1.00 2.50 1.88 Brush/ Roller application
exceeding 600 to the horizontal)
Daily laborer 1.00
V 1 2 6 Vertical wall (inclined at an angle m2 Plastic paint, other than 0.080 Painter 1.00 2.50 1.88 Brush/ Roller application
white (gal)
exceeding 600 to the horizontal)
Daily laborer 1.00
V 1 2 7 Soffit surfaces (inclined at an angle m2 Plastic paint, white (gal) 0.080 Painter 1.00 2.50 3.13 Brush/ Roller application
300 - 600 to the horizontal)
Daily laborer 1.00
V 1 2 2 Inclined wall (inclined at an angle m2 Plastic paint, white (gal) 0.080 Painter 1.00 3.13 2.50 Brush/ Roller application
300 - 600 to the horizontal)
Daily laborer 1.00
V 1 2 3 Vertical wall (inclined at an angle m2 Plastic paint, other than 0.080 Painter 1.00 3.75 3.13 Brush/ Roller application
white (gal)
not exceeding 300 to the horizontal)
Daily laborer 1.00
Page294/318
As of 06/18/2025
Description Unit of Remark
measure
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
V 1 2 4 Inclined wall (inclined at an angle m2 Plastic paint, other than 0.080 Painter 1.00 3.13 2.50 Brush/ Roller application
white (gal)
300 - 600 to the horizontal)
Daily laborer 1.00
V 1 2 5 Vertical wall (inclined at an angle m2 Plastic paint, white (gal) 0.080 Painter 1.00 2.50 1.88 Brush/ Roller application
exceeding 600 to the horizontal)
Daily laborer 1.00
V 1 2 6 Vertical wall (inclined at an angle m2 Plastic paint, other than 0.080 Painter 1.00 2.50 1.88 Brush/ Roller application
white (gal)
exceeding 600 to the horizontal)
Daily laborer 1.00
V 1 2 7 Soffit surfaces (inclined at an angle m2 Plastic paint, white (gal) 0.080 Painter 1.00 2.50 3.13 Brush/ Roller application
300 - 600 to the horizontal)
Daily laborer 1.00
Page295/318
As of 06/18/2025
Note:
Code Description Unit of Material usage per unit of Labors per crew Equipment per Performance/ Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
W 1 Damp proofing
W 1 1 Asphalt (Liquid), One ply of glass fiber membrane
W 1 1 1 Upper surface inclined at an angle m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.38 0.31
(kg))
not exceeding 300 to the horizontal
Bitumen (kg) 1.580 Daily laborer 1.000
Margalss (m2) 1.050
Heating gas (lit) 0.050
W 1 1 2 Upper surface inclined at an angle m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.31 0.25
(kg))
between 300-600 to the horizontal
Bitumen (kg) 1.580 Daily laborer 1.000
Margalss (m2) 1.050
Heating gas (lit) 0.050
W 1 1 3 Upper surface inclined at an angle m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.31 0.25
(kg))
exceeding 600 to the horizontal
Bitumen (kg) 1.580 Daily laborer 1.000
Margalss (m2) 1.050
Heating gas (lit) 0.050
W 1 1 4 Curved surfaces m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.25 0.19
(kg))
Bitumen (kg) 1.580 Daily laborer 1.000
Margalss (m2) 1.050
Heating gas (lit) 0.050
W 1 1 5 Domed surfaces m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.25 0.19
(kg))
Bitumen (kg) 1.580 Daily laborer 1.000
Margalss (m2) 1.050
Heating gas (lit) 0.050
Page296/318
Unit of
As of 06/18/2025
Description Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
W 1 2 Asphalt (Liquid), Two ply of glass fiber membrane
W 1 2 1 Upper surface inclined at an angle m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.38 0.31
(kg))
not exceeding 300 to the horizontal
Bitumen (kg) 3.150 Daily laborer 1.000
Margalss (m2) 2.100
Heating gas (lit) 0.100
W 1 2 2 Upper surface inclined at an angle m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.31 0.25
(kg))
between 300-600 to the horizontal
Bitumen (kg) 3.150 Daily laborer 1.000
Margalss (m2) 2.100
Heating gas (lit) 0.100
W 1 2 3 Upper surface inclined at an angle m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.31 0.25
(kg))
exceeding 600 to the horizontal
Bitumen (kg) 3.150 Daily laborer 1.000
Margalss (m2) 2.100
Heating gas (lit) 0.100
W 1 2 4 Curved surfaces m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.25 0.19
(kg))
Bitumen (kg) 3.150 Daily laborer 1.000
Margalss (m2) 2.100
Heating gas (lit) 0.100
W 1 2 5 Domed surfaces m2 Bituminous emulsion primer 0.420 Sprayer 1.000 Stove 1.00 0.25 0.19
(kg))
Bitumen (kg) 3.150 Daily laborer 1.000
Margalss (m2) 2.100
Heating gas (lit) 0.100
W 1 3 USG 30 or 28 Sheet metal coping
W 1 3 1 Development length, not exceeding ml Sheet metal (m2) 0.300 Solder 1.000 Electrical drilling 1.00 0.38 0.31
machine
33cm
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000
W 1 3 2 Development length, 33-50cm ml Sheet metal (m2) 0.500 Solder 1.000 Electrical drilling 1.00 0.38 0.31
machine
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000
W 1 3 3 Development length, 50-90cm ml Sheet metal (m2) 1.000 Solder 1.000 Electrical drilling 1.00 0.38 0.31
machine
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000
W 1 3 4 Development length, exceeding m2 Sheet metal (m2) 1.100 Solder 1.000 Electrical drilling 1.00 0.63 0.50
machine
90cm
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000
Page297/318
Unit of
As of 06/18/2025
Description Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
W 1 4 USG 30 or 28 Sheet metal flashing
W 1 4 1 Development length, not exceeding ml Sheet metal (m2) 0.300 Solder 1.000 Electrical drilling 1.00 0.38 0.31
machine
33cm
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000 Chiseller 1.00
Plasterer 1.00
W 1 4 2 Development length, 33-50cm ml Sheet metal (m2) 0.300 Solder 1.000 Electrical drilling 1.00 0.38 0.31
machine
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000 Chiseller 1.00
Plasterer 1.00
W 1 4 3 Development length, 50-90cm ml Sheet metal (m2) 0.300 Solder 1.000 Electrical drilling 1.00 0.38 0.31
machine
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000 Chiseller 1.00
Plasterer 1.00
W 1 4 4 Development length, exceeding m2 Sheet metal (m2) 0.300 Solder 1.000 Electrical drilling 1.00 0.63 0.50
machine
90cm
Screw, 4cm long (pcs) 4.000 Daily laborer 1.000
PVC fisher (pcs) 4.000 Chiseller 1.00
Plasterer 1.00
W 2 Tanking
W 2 1
W 2 1 1
W 3 Roofing
W 3 1 USG 32,30 or 28 CIS roof cover, 2.00x0.90 m
W 3 1 1 Upper surface inclined at an angle m2 USG CIS (pcs) 0.750 Carpenter 3.000 7.50 5.63 The area of roof is not projection area
not exceeding 300 to the horizontal Dome shaped nails (kg) 0.098 Daily laborer 3.000
Plastic washer (pcs) 7.000
W 3 1 2 Upper surface inclined at an angle m2 USG CIS (pcs) 0.729 Carpenter 3.000 6.25 5.00 The area of roof is not projection area
between 300-600 to the horizontal Dome shaped nails (kg) 0.098 Daily laborer 3.000
Plastic washer (pcs) 7.000
W 3 1 3 Upper surface inclined at an angle m2 USG CIS (pcs) 0.715 Carpenter 3.000 5.63 3.75 The area of roof is not projection area
exceeding 600 to the horizontal Dome shaped nails (kg) 0.098 Daily laborer 3.000
Plastic washer (pcs) 7.000
W 3 1 4 Curved surfaces m2 USG CIS (pcs) 0.800 Carpenter 3.000 5.00 3.75 The area of roof is not projection area
Dome shaped nails (kg) 0.098 Daily laborer 3.000
Plastic washer (pcs) 7.000
W 3 1 5 Domed surfaces m2 USG CIS (pcs) 0.800 Carpenter 3.000 3.75 2.50 The area of roof is not projection area
Dome shaped nails (kg) 0.098 Daily laborer 3.000
Plastic washer (pcs) 7.000
Page298/318
Unit of
As of 06/18/2025
Description Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
W 3 2 Ega 300, 0.4mm thick roof cover
W 3 2 1 Upper surface inclined at an angle m2 Ega 300, 0.4mm thick (ml) 1.305 Carpenter 3.000 Electrical drilling 1.00 10.00 8.75 The area of roof is not projection area
machine
not exceeding 300 to the horizontal
Crank bolt with steel washer, 5.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 2 2 Upper surface inclined at an angle m2 Ega 300, 0.4mm thick (ml) 1.280 Carpenter 3.000 Electrical drilling 1.00 9.38 8.13 The area of roof is not projection area
machine
between 300-600 to the horizontal
Crank bolt with steel washer, 5.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 2 3 Upper surface inclined at an angle m2 Ega 300, 0.4mm thick (ml) 1.256 Carpenter 3.000 Electrical drilling 1.00 5.63 3.75 The area of roof is not projection area
machine
exceeding 600 to the horizontal
Crank bolt with steel washer, 5.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 2 4 Curved surfaces m2 Ega 300, 0.4mm thick (ml) 1.402 Carpenter 3.000 Electrical drilling 1.00 5.63 3.75 The area of roof is not projection area
machine
Crank bolt with steel washer, 5.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 2 5 Domed surfaces m2 Ega 300, 0.4mm thick (ml) 1.402 Carpenter 3.000 Electrical drilling 1.00 3.75 2.50 The area of roof is not projection area
machine
Crank bolt with steel washer, 5.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 3 2 Upper surface inclined at an angle m2 Ega 500, 0.4mm thick (ml) 1.458 Carpenter 3.000 Electrical drilling 1.00 9.38 8.13 The area of roof is not projection area
machine
between 300-600 to the horizontal
Crank bolt with steel washer, 7.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 3 3 Upper surface inclined at an angle m2 Ega 500, 0.4mm thick (ml) 1.431 Carpenter 3.000 Electrical drilling 1.00 5.63 3.75 The area of roof is not projection area
machine
exceeding 600 to the horizontal
Crank bolt with steel washer, 7.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 3 4 Curved surfaces m2 Ega 500, 0.4mm thick (ml) 1.597 Carpenter 3.000 Electrical drilling 1.00 5.63 3.75 The area of roof is not projection area
machine
Crank bolt with steel washer, 7.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
W 3 3 5 Domed surfaces m2 Ega 500, 0.4mm thick (ml) 1.736 Carpenter 3.000 Electrical drilling 1.00 3.75 2.50 The area of roof is not projection area
machine
Page299/318
Unit of
As of 06/18/2025
Description Remark
Class 1st 2nd 3rd measure
W 3 3 5 Domed surfaces m2 List of Material Consumption. Labor by trade No. Equipment No. Maximum
3.75 Minimum
2.50 The area of roof is not projection area
Rate
Crank bolt with steel washer, 7.000 Daily laborer 3.000
diam 6mm with bolt (pcs)
Page300/318
Unit of
As of 06/18/2025
Description Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
W 3 4 Ondulin roof cover
W 3 4 1 Upper surface inclined at an angle m2 Onduline roof cover (m2) 1.070 Carpenter 3.000 Electrical drilling 1.00 7.50 5.63 The area of roof is not projection area
machine
not exceeding 300 to the horizontal
Dome shaped nails for 0.105 Daily laborer 3.000
onduline (kg)
W 3 4 2 Upper surface inclined at an angle m2 Onduline roof cover (m2) 1.070 Carpenter 3.000 Electrical drilling 1.00 6.25 5.00 The area of roof is not projection area
machine
between 300-600 to the horizontal
Dome shaped nails for 0.105 Daily laborer 3.000
onduline (kg)
W 3 4 3 Upper surface inclined at an angle m2 Onduline roof cover (m2) 1.070 Carpenter 3.000 Electrical drilling 1.00 5.63 3.75 The area of roof is not projection area
machine
exceeding 600 to the horizontal
Dome shaped nails for 0.105 Daily laborer 3.000
onduline (kg)
W 3 4 4 Curved surfaces m2 Onduline roof cover (m2) 1.070 Carpenter 3.000 Electrical drilling 1.00 5.00 3.75 The area of roof is not projection area
machine
Dome shaped nails for 0.105 Daily laborer 3.000
onduline (kg)
W 3 4 5 Domed surfaces m2 Onduline roof cover (m2) 1.070 Carpenter 3.000 Electrical drilling 1.00 3.75 2.50 The area of roof is not projection area
machine
Dome shaped nails for 0.105 Daily laborer 3.000
onduline (kg)
W 4 Protective layers
W 4 1 Sand Asphalt
W 4 4 1 Upper surface inclined at an angle m2
not exceeding 300 to the horizontal
W 4 4 2 Upper surface inclined at an angle m2
between 300-600 to the horizontal
W 4 4 3 Upper surface inclined at an angle m2
exceeding 600 to the horizontal
W 4 4 4 Curved surfaces m2
W 4 4 5 Domed surfaces m2
W 4 2 Flexible sheeting
W 4 2 1 Upper surface inclined at an angle m2
not exceeding 300 to the horizontal
W 4 2 2 Upper surface inclined at an angle m2
between 300-600 to the horizontal
W 4 2 3 Upper surface inclined at an angle m2
exceeding 600 to the horizontal
W 4 2 4 Curved surfaces m2
W 4 2 5 Domed surfaces m2
Page301/318
Unit of
As of 06/18/2025
Description Remark
Class 1st 2nd 3rd measure
List of Material Consumption. Labor by trade No. Equipment No. Maximum Minimum
Rate
W 4 3 Sand
W 4 3 1 Upper surface inclined at an angle m2
not exceeding 300 to the horizontal
W 4 3 2 Upper surface inclined at an angle m2
between 300-600 to the horizontal
W 4 3 3 Upper surface inclined at an angle m2
exceeding 600 to the horizontal
W 4 3 4 Curved surfaces m2
W 4 3 5 Domed surfaces m2
Page302/318
Electrical works
Z 1 Distribution Board
Z 1 1 Surface mounted
Z 1 1 1 Sub distribution board, for Pcs Board (pcs) 1.00 Electrician 1.000 Electrical drilling 1.00 0.05 Work includes connection with line and fixing
machine all accessories.
residential building
Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00
Z 1 1 2 Sub distribution board, for Office Pcs Board (pcs) 1.00 Electrician 1.000 Electrical drilling 1.00 0.05 Work includes connection with line and fixing
machine all accessories.
building
Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00
Z 1 1 3 Sub distribution board, for Public Pcs Board (pcs) 1.00 Electrician 1.000 Electrical drilling 1.00 0.05 Work includes connection with line and fixing
machine all accessories.
building
Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00
Z 1 1 4 Main distribution board, for Pcs Board (pcs) 1.00 Electrician 1.000 Electrical drilling 1.00 0.03 Work includes connection with line and fixing
machine all accessories.
residential building
Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00
Z 1 1 5 Main distribution board, for Office Pcs Board (pcs) 1.00 Electrician 1.000 Electrical drilling 1.00 0.03 Work includes connection with line and fixing
machine all accessories.
building
Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00
Z 1 1 6 Main distribution board, for Public Pcs Board (pcs) 1.00 Electrician 1.000 Electrical drilling 1.00 0.03 Work includes connection with line and fixing
machine all accessories.
building
Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Page303/Z318
Electrical works
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/ Remark
measure
Z 1 1 6 Main distribution board, for Public Pcs crew/hr 0.03 Work includes connection with line and fixing
Class 1st 2nd 3rd building List of Material Consumption. Labor by trade No. Equipment No. Unit/hr all accessories.
Rate
Fisher (pcs) 6.00
Page304/Z318
Electrical works
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/ Remark
measure
crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Unit/hr
Rate
Z 1 2 2 Sub distribution board, for Office Pcs Board (pcs) 1.00 Electrician 1.000 0.03 Work includes connection with line and fixing
all accessories.
building Mortar (m3) 0.03 Daily laborer 1.000
Plasterer 1.00
Z 1 2 3 Sub distribution board, for Public Pcs Board (pcs) 1.00 Electrician 1.000 0.03 Work includes connection with line and fixing
all accessories.
building Mortar (m3) 0.03 Daily laborer 1.000
Plasterer 1.00
Z 1 2 4 Main distribution board, for Pcs Board (pcs) 1.00 Electrician 1.000 0.03 Work includes connection with line and fixing
all accessories.
residential building Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00 Plasterer 1.00
Z 1 2 5 Main distribution board, for Office Pcs Board (pcs) 1.00 Electrician 1.000 0.03 Work includes connection with line and fixing
all accessories.
building Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00 Plasterer 1.00
Z 1 2 6 Main distribution board, for Public Pcs Board (pcs) 1.00 Electrician 1.000 0.03 Work includes connection with line and fixing
all accessories.
building Screw, 6cm long (pcs) 6.00 Daily laborer 1.000
Fisher (pcs) 6.00 Plasterer 1.00
Z 2 Light points
Z 2 1 Surface mounted
Z 2 1 1 Light points for residential Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
buildings
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
screw, 4cm long (pcs) 2.50
Connector (pcs) 4.50
Z 2 1 2 Light points for Office buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
screw, 4cm long (pcs) 2.50
Connector (pcs) 4.50
Z 2 1 3 Light points for Public buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
screw, 4cm long (pcs) 2.50
Connector (pcs) 4.50
Page305/Z318
Electrical works
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/ Remark
measure
crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Unit/hr
Rate
Z 2 2 Flush mounted
Z 2 2 1 Light points for residential Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
buildings
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
Connector (pcs) 4.50
Z 2 2 2 Light points for Office buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
Connector (pcs) 4.50
Z 2 2 3 Light points for Public buildings Pcs PVC conduit, diam 19mm 3.00 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
Connector (pcs) 4.50
Z 3 Socket points
Z 3 1 Surface mounted
Z 3 1 1 Socket points for residential Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
buildings
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
screw, 4cm long (pcs) 2.50
Connector (pcs) 4.50
Z 3 1 2 Socket points for Office buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
screw, 4cm long (pcs) 2.50
Connector (pcs) 4.50
Z 3 1 3 Socket points for Public buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
screw, 4cm long (pcs) 2.50
Connector (pcs) 4.50
Z 3 2 Flush mounted
Z 3 2 1 Socket points for residential Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
buildings
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
Connector (pcs) 4.50
Page306/Z318
Electrical works
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/ Remark
measure
crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Unit/hr
Rate
Z 3 2 2 Socket points for Office buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
Connector (pcs) 4.50
Z 3 2 3 Socket points for Public buildings Pcs PVC conduit, diam 16mm 3.00 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
Electric wire (ml) 5.60 Daily laborer 1.00
Junction box (pcs) 1.50
Connector (pcs) 4.50
Z 4 Data or TV points
Z 4 1 Surface mounted
Z 4 1 1 Data or TV points for residential Pcs PVC conduit, diam 16mm 5.60 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
buildings
Pulling wire (ml) 6.00 Daily laborer 1.00
Junction box (pcs) 1.00
screw, 4cm long (pcs) 2.50
Z 4 1 2 Data or TV points for Office Pcs PVC conduit, diam 16mm 5.60 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
buildings
Pulling wire (ml) 6.00 Daily laborer 1.00
Junction box (pcs) 1.00
screw, 4cm long (pcs) 2.50
Z 4 1 3 Data or TV points for Public Pcs PVC conduit, diam 16mm 5.60 Electrician 1.00 Electrical drilling 1.00 0.75 Work includes connection with line and fixing
(ml) machine all accessories, except fixtures
buildings
Pulling wire (ml) 6.00 Daily laborer 1.00
Junction box (pcs) 1.00
screw, 4cm long (pcs) 2.50
Z 4 2 Flush mounted
Z 4 2 1 Data or TV points for residential Pcs PVC conduit, diam 16mm 5.60 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
buildings
Pulling wire (ml) 6.00 Daily laborer 1.00
Junction box (pcs) 1.00
Z 4 2 2 Data or TV points for Office Pcs PVC conduit, diam 16mm 5.60 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
buildings
Pulling wire (ml) 6.00 Daily laborer 1.00
Junction box (pcs) 1.00
Z 4 2 3 Data or TV points for Public Pcs PVC conduit, diam 16mm 5.60 Electrician 1.00 0.75 Work includes connection with line and fixing
(ml) all accessories, except fixtures
buildings
Pulling wire (ml) 6.00 Daily laborer 1.00
Junction box (pcs) 1.00
Page307/Z318
Electrical works
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/ Remark
measure
crew/hr
Class 1st 2nd 3rd List of Material Consumption. Labor by trade No. Equipment No. Unit/hr
Rate
Z 5 Electrical Fixtures
Z 5 1 Light Fixtures and accessories
Z 5 1 1 Light Fixtures Pcs Fixture (pcs) 1.00 Electrician 1.000 1.13 Work includes fixing fixtures and connecting
with line.
Daily laborer 1.000
Z 5 1 2 Switches Pcs Switch (pcs) 1.00 Electrician 1.000 7.50 Work includes fixing fixtures and connecting
with line.
Daily laborer 1.000
Z 5 1 3 Data/telecom outlets Pcs Conduit (ml) 1.00 Electrician 1.000 0.38 Work includes fixing fixtures and connecting
with line.
Junction box (pcs) 1.00 Daily laborer 1.000
Data socket (pcs) 1.00
Data cable (ml) 15.00
Z 6 Wiring accessories
Z 6 1 Socket outlets
Z 6 4 2 Socket Pcs Socket (pcs) 1.00 Electrician 1.000 7.50 Work includes fixing fixtures and connecting
with line.
Daily laborer 1.000
Z 7 PVC cable
Z 7 1 PVC cable with PVC ducts
Z 7 1 1 Cable less than 5x16mm2 ml Cable (ml) 1.00 Electrician 1.000 0.75 Includes Excavation, pulling wire and back
filling.
PVC conduit, diam 50mm 1.00 Daily laborer 2.000
(ml)
Z 8 Lightning protection
system
Z 8 1 Bare copper
Z 8 1 1 Copper rod of 1.5m Pcs Copper rod (pcs) 1.00 Electrician 1.000 0.30
Clamps (pcs) 2.00 Daily laborer 1.000
Z 8 1 2 Bare copper ml Bare copper (ml) 1.05 Electrician 1.000 7.50
Clamps (pcs) 1.00 Daily laborer 1.000
PVC conduit, diam 25mm 1.00
(ml)
Z 8 1 3 Testing junction box Pcs Junction box (pcs) 1.00 Electrician 1.000 0.75
Clips (pcs) 1.00 Daily laborer 1.000
Z 5 2 4 Earthing road including pit Pcs Earthing rod (pcs) 1.00 Electrician 1.000 0.30
Excavation (m3) 1.60 Daily laborer 2.000
Back fill (m3) 1.20
Cart away (m3) 0.40
Page308/Z318
Crew formation and performance data
PROJECT TYPICAL BUILDING PROJECT LOCATION: -
Section 5: Material production
Includes: Production of Selected material
Stone
Sand
Crushed aggregate
Mortar
HCB
Cement pipes
Tiles
Metal Products
Timber products
Note:
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
A 1 1 Ordinary material m³ Daily laborer 2.00 Excavator, (CAT 255) 1.00 50.00 43.75
A 1 2 Granular material m³ Daily laborer 2.00 Bull dozer (CAT D7H) 1.00 75.00 62.50
A 1 2 Granular material m³ Daily laborer 2.00 Excavator, (CAT 255) 1.00 43.75 31.25
A 2 Gravels
A 2 1 Volume not exceeding 50m3 m³ Daily laborer 1.00 4.00 3.00
Mason 1.00
A 2 2 Volume 50m3-100m3 m³ Daily laborer 1.00 4.00 3.00
Mason 1.00
A 2 3 Volume 100m3-250m3 m³ Daily laborer 1.00 4.00 3.00
Mason 1.00
A 2 4 Volume 250m3-500m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
A 2 5 Volume 500m3-1000m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
A 2 6 Volume 1000m3-2500m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
A 2 7 Volume exceeding 2500m3 m³ Daily laborer 1.00 Bull dozer (CAT D8R) 1.00 250.00 200.00
Mason 1.00
A 3 Stone
A 3 1 Basaltic stone m³ Daily laborer 6.00 Bull dozer (CAT D8R) 1.00 25.00 18.75
A 3 2 Trychatic stone m³ Daily laborer 6.00 Bull dozer (CAT D8R) 1.00 25.00 18.75
Page309/prod318
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
A 4 Natural sand
A 4 1 River sand m³ Daily laborer 20.00 25.00 20.00 Labor based, for less than 1000m3
Gang leader 1.00
A 4 1 River sand m³ Daily laborer 1.00 Wheel loader (CAT938) 1.00 75.00 68.75 Machine intensive, for more than 1000m3
products
A 4 1 River sand m³ Daily laborer 1.00 Excavator, (CAT 255) 1.00 50.00 43.75 Machine intensive, for more than 1000m3
products
B Crushing of materials
B 1 Crushed aggregate
B 1 1 Size over 40mm m³ Basaltic stone (m3) 0.0600 Daily laborer 15.00 Crusher (75 t/hr) 1.00 3.13 2.50 10% of the total production
Sledgehammer man 4.00 Wheel loader (CAT 950F) 1.00
B 1 2 Size 28-40mm Basaltic stone (m3) 0.1500 Daily laborer 15.00 Crusher (75 t/hr) 1.00 7.81 6.25 25% of the total production
Sledgehammer man 4.00 Wheel loader (CAT 950F) 1.00
B 1 3 Size 14-28mm m³ Basaltic stone (m3) 0.2400 Daily laborer 15.00 Crusher (75 t/hr) 1.00 12.50 10.00 40% of the total production
Sledgehammer man 4.00 Wheel loader (CAT 950F) 1.00
B 1 4 Size 5-14mm m³ Basaltic stone (m3) 0.1200 Daily laborer 15.00 Crusher (75 t/hr) 1.00 6.25 5.00 20% of the total production
Sledgehammer man 4.00 Wheel loader (CAT 950F) 1.00
B 1 5 Size aver. Less than 5mm m³ Basaltic stone (m3) 0.0300 Daily laborer 15.00 Crusher (75 t/hr) 1.00 1.56 1.25 5% of the total production
Sledgehammer man 4.00 Wheel loader (CAT 950F) 1.00
B 1 1 Size over 40mm m³ Basaltic stone (m3) 0.0600 Daily laborer 28.00 Crusher (35 t/hr) 1.00 10% of the total production
Sledgehammer man 4.00
B 1 2 Size 28-40mm m³ Basaltic stone (m3) 0.1500 Daily laborer 28.00 Crusher (35 t/hr) 1.00 25% of the total production
Sledgehammer man 4.00
B 1 3 Size 14-28mm m³ Basaltic stone (m3) 0.2400 Daily laborer 28.00 Crusher (35 t/hr) 1.00 40% of the total production
Sledgehammer man 4.00
B 1 4 Size 5-14mm m³ Basaltic stone (m3) 0.1200 Daily laborer 28.00 Crusher (35 t/hr) 1.00 20% of the total production
Sledgehammer man 4.00
B 1 5 Size aver. Less than 5mm m³ Basaltic stone (m3) 0.0300 Daily laborer 28.00 Crusher (35 t/hr) 1.00 5% of the total production
Sledgehammer man 4.00
C Cement products
C 1 Mortar
C 1 1 Cement-sand mortar
C 1 1 1 Mix ratio 1:2 m3 PP Cement (kg) 588.00 Daily laborer 20.00 Mechanical mixer (500 lit) 1.00 4.00 3.00
Sand (m3) 0.96 Gang leader 1.00
C 1 1 2 Mix ratio 1:3 nr PP Cement (kg) 4.41 Daily laborer 20.00 Mechanical mixer (500 lit) 1.00 4.00 3.00
Sand (m3) 1.08 Gang leader 1.00
C 1 1 3 Mix ratio 1:4 nr PP Cement (kg) 3.53 Daily laborer 20.00 Mechanical mixer (500 lit) 1.00 4.00 3.00
Sand (m3) 1.15 Gang leader 1.00
Page310/prod318
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
Page311/prod318
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
C 2 3 2 Size 40x20x15 nr OP Cement (kg) 2.0800 Mixing HCB machine 1.00 1,100.00 1,000.00 Ratio C : S : G
Sand (m3) 0.0060 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1:4:2
Box size 50x40x18cm
Crushed aggregate 10mm (m3) 0.0050 Fresh mix delivery, and fresh HCB tr 24 pcs of HCB per a bag of cement is
water (lit) 20.0000 Daily laborer 8.00 expected
Curing
Daily laborer 2.00
Gang leader 1.00
C 2 3 3 Size 40x20x20 nr OP Cement (kg) 2.6300 Mixing HCB machine 1.00 800.00 750.00 Ratio C : S : G
Sand (m3) 0.0080 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1:4:2
Box size 50x40x18cm
Crushed aggregate 10mm (m3) 0.0060 Fresh mix delivery, and fresh HCB tr 19 pcs of HCB per a bag of cement is
water (lit) 20.0000 Daily laborer 8.00 expected
Curing
Daily laborer 2.00
Gang leader 1.00
C 2 4 Class B
C 2 4 1 Size 40x20x10 nr PP Cement (kg) 1.7900 Mixing HCB machine 1.00 1,600.00 1,400.00 Ratio C : S : RA : G
Sand (m3) 0.0029 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1:2:2:2
Box size 50x40x20cm
Red ash (m3) 0.0028 Fresh mix delivery, and fresh HCB tr 28 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0028 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
C 2 4 2 Size 40x20x15 nr PP Cement (kg) 2.0000 Mixing HCB machine 1.00 1,100.00 1,000.00 Ratio C : S : RA : G
Sand (m3) 0.0032 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1:2:2:2
Box size 50x40x20cm
Red ash (m3) 0.0032 Fresh mix delivery, and fresh HCB tr 25 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0032 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
C 2 4 3 Size 40x20x20 nr PP Cement (kg) 2.5000 Mixing HCB machine 1.00 800.00 750.00 Ratio C : S : RA : G
Sand (m3) 0.0040 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1:2:2:2
Box size 50x40x20cm
Red ash (m3) 0.0040 Fresh mix delivery, and fresh HCB tr 20 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0040 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
C 2 5 Class C
C 2 5 1 Size 40x20x10 nr PP Cement (kg) 1.6100 Mixing HCB machine 1.00 1,600.00 1,400.00 Ratio C : S : RA : G
Sand (m3) 0.0025 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1 : 2 : 2.5 : 2
Box size 50x40x20cm
Red ash (m3) 0.0032 Fresh mix delivery, and fresh HCB tr 31 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0025 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
C 2 5 2 Size 40x20x15 nr PP Cement (kg) 1.7800 Mixing HCB machine 1.00 1,100.00 1,000.00 Ratio C : S : RA : G
Sand (m3) 0.0029 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1 : 2 : 2.5 : 2
Box size 50x40x20cm
Red ash (m3) 0.0036 Fresh mix delivery, and fresh HCB tr 28 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0029 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
Page312/prod318
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
C 2 5 3 Size 40x20x20 nr PP Cement (kg) 2.1700 Mixing HCB machine 1.00 800.00 750.00 Ratio C : S : RA : G
Sand (m3) 0.0035 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1 : 2 : 2.5 : 2
Box size 50x40x20cm
Red ash (m3) 0.0044 Fresh mix delivery, and fresh HCB tr 23 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0035 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
C 2 5 4 Size 40x20x24 (blocks for slab) nr PP Cement (kg) 2.2700 Mixing HCB machine 1.00 750.00 700.00 Ratio C : S : RA : G
Sand (m3) 0.0040 Daily laborer 9.00 Mechanical mixer (500 lit) 1.00 1 : 2 : 2.5 : 2
Box size 50x40x20cm
Red ash (m3) 0.0050 Fresh mix delivery, and fresh HCB tr 19 pcs of HCB per a bag of cement is
Crushed aggregate 10mm (m3) 0.0040 Daily laborer 8.00 expected
water (lit) 20.0000 Curing
Daily laborer 2.00
Gang leader 1.00
Page313/prod318
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
C 4 Cement pipes
C 4 1 Plane cement pipes
C 4 1 1 Dia. 10cm nr PP Cement (qtl) 0.0168 Daily laborer 6.00 Pipe mould 4.75 4.75 3.75
Sand (m3) 0.0027
Crushed aggregate, 00 (m3) 0.0027
Crushed aggregate, 10mm (m3 0.0041 Gang leader 1.00
C 4 1 2 Dia. 15cm nr PP Cement (qtl) 0.0252 Daily laborer 6.00 Pipe mould 4.25 4.25 3.50
Sand (m3) 0.0041
Crushed aggregate, 00 (m3) 0.0041
Crushed aggregate, 10mm (m3 0.3135 Gang leader 1.00
C 4 1 3 Dia. 20cm nr PP Cement (qtl) 0.0364 Daily laborer 6.00 Pipe mould 3.75 3.75 3.13
Sand (m3) 0.0059
Crushed aggregate, 00 (m3) 0.0059
Crushed aggregate, 10mm (m3 0.0089 Gang leader 1.00
C 4 1 4 Dia. 30cm nr PP Cement (qtl) 0.0532 Daily laborer 6.00 Pipe mould 3.13 3.13 2.50
Sand (m3) 0.0087
Crushed aggregate, 00 (m3) 0.0087
Crushed aggregate, 10mm (m3 0.0130 Gang leader 1.00
C 4 1 5 Dia. 40cm nr PP Cement (qtl) 0.0812 Daily laborer 6.00 Pipe mould 2.75 2.75 2.25
Sand (m3) 0.0133
Crushed aggregate, 00 (m3) 0.0133
Crushed aggregate, 10mm (m3 0.0199 Gang leader 1.00
C 4 1 6 Dia. 50cm nr PP Cement (qtl) 0.1260 Daily laborer 6.00 Pipe mould 2.25 2.25 1.88
Sand (m3) 0.0021
Crushed aggregate, 00 (m3) 0.0021
Crushed aggregate, 10mm (m3 0.0309 Gang leader 1.00
C 4 1 7 Dia. 60cm nr PP Cement (qtl) 0.1820 Daily laborer 6.00 Pipe mould 1.75 1.75 1.25
Sand (m3) 0.0297
Crushed aggregate, 00 (m3) 0.0297
Crushed aggregate, 10mm (m3 0.0446 Gang leader 1.00
C 4 1 8 Dia. 80cm nr PP Cement (qtl) 0.2828 Daily laborer 6.00 Pipe mould 1.50 1.50 1.00
Sand (m3) 0.0462
Crushed aggregate, 00 (m3) 0.0462
Crushed aggregate, 10mm (m3 0.0693 Gang leader 1.00
C 4 1 9 Dia. 100cm nr PP Cement (qtl) 0.4032 Daily laborer 6.00 Pipe mould 1.25 1.25 1.00
Sand (m3) 0.0658
Crushed aggregate, 00 (m3) 0.0658
Crushed aggregate, 10mm (m3 0.0988 Gang leader 1.00
C 4 2 Reinforced cement pipes
C 4 2 1 Dia. 80cm nr OP Cement (qtl) 1.2800 Daily laborer 6.00 Pipe mould 1.88 1.88 1.50
Sand (m3) 0.2200 Gang leader 1.00 Mechanical mixer (500 lit) 1.00
Crushed aggregate, 10mm (m3 0.2900
Black wire, diam 1.5mm (kg) 0.7600
Reinforcement, diam 8mm (kg) 38.0000
C 4 2 2 Dia. 1060cm nr OP Cement (qtl) 1.2800 Daily laborer 6.00 Pipe mould 1.88 1.88 1.50
Sand (m3) 0.2200 Gang leader 1.00 Mechanical mixer (500 lit) 1.00
Crushed aggregate, 10mm (m3 0.2900
Black wire, diam 1.5mm (kg) 0.7600
Reinforcement, diam 8mm (kg) 38.0000
C 4 2 3 Dia. 1220cm nr OP Cement (qtl) 1.2800 Daily laborer 6.00 Pipe mould 1.88 1.88 1.50
Sand (m3) 0.2200 Gang leader 1.00 Mechanical mixer (500 lit) 1.00
Crushed aggregate, 10mm (m3 0.2900
Black wire, diam 1.5mm (kg) 0.7600
Page314/prod318
Code Description Unitof Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
C 4 2 3 Dia. 1220cm nr 1.88 1.50
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
Page315/prod318
Code Description Unit of Material usage per unit of work Labors per crew Equipment per crew Performance/crew/hr Remark
Class 1st 2nd 3rd measure List of Material Consu. Rate Labor by trade No. Equipment No. Maximum Minimum
E Metal products
D 5 5 Timber
D 5 5 1 Eucalyptus member, diam 12cm and ml Eucalyptus, diam 12 (ml) 1.1800 Daily laborer 1.00 6.00 5.00
above Nail, 15cm (kg) 0.1500 Carpenter 1.00
Anti termite (lit) 0.0900
Band iron (kg) 0.0200
D 5 5 2 Eucalyptus member, diam 8cm-12cm ml Eucalyptus, diam 10 (ml) 1.1800 Daily laborer 1.00 6.00 5.00
Nail, 15cm (kg) 0.1500 Carpenter 1.00
Anti termite (lit) 0.0700
Band iron (kg) 0.0200
D 5 5 3 Eucalyptus member, diam 6cm-8cm ml Eucalyptus, diam 8 (ml) 1.1800 Daily laborer 1.00 9.00 8.00
Nail, 12cm (kg) 0.1000 Carpenter 1.00
Anti termite (lit) 0.0700
Band iron (kg) 0.0200
Page316/prod318
KASI PROFILES
Rectangular Tubes Square Tubes
Nominal Sizes Nominal Sizes
/outside Wall /outside Wall
Weight per Weight per
dimensions thicknes dimensions thickne
meter meter
across flat s across flat ss
sections sections
mm mm mm mm
1.0 0.42 kg/m 1.0 0.42 kg/m
20x10 15x15
2.0 0.49 kg/m 1.2 0.49 kg/m
1.0 0.58 kg/m 1.0 0.58 kg/m
30x10
1.2 0.68 kg/m 20x20 1.2 0.68 kg/m
1.2 1.06 kg/m 1.5 0.83 kg/m
1.5 1.30 kg/m 1.0 0.73 kg/m
40x20
2.0 1.68 kg/m 1.2 0.87 kg/m
2.5 2.03 kg/m 25x25 1.5 1.06 kg/m
2.0 2.31 kg/m 2.0 1.36 kg/m
50x30 2.5 2.82 kg/m 2.5 1.64 kg/m
3.0 3.30 kg/m 1.2 1.06 kg/m
1.5 1.77 kg/m 1.5 1.30 kg/m
2.0 2.31 kg/m 30x30 2.0 1.68 kg/m
60x20
2.5 2.82 kg/m 2.5 2.03 kg/m
3.0 3.30 kg/m 3.0 2.36 kg/m
2.0 2.93 kg/m 1.5 1.77 kg/m
60x40 2.5 3.60 kg/m 2.0 2.31 kg/m
40x40
3.0 4.24 kg/m 2.5 2.82 kg/m
2.0 3.56 kg/m 3.0 3.30 kg/m
70x50 2.5 4.39 kg/m 2.0 2.93 kg/m
3.0 5.19 kg/m 50x50 2.5 3.60 kg/m
2.0 3.56 kg/m 3.0 4.25 kg/m
80x40 2.5 4.39 kg/m 2.0 3.56 kg/m
3.0 5.19 kg/m 2.5 4.39 kg/m
60x60
2.5 5.96 kg/m 3.0 5.19 kg/m
100x60 3.0 7.07 kg/m 3.5 5.96 kg/m
3.5 8.16 kg/m 2.5 5.96 kg/m
3.0 8.96 kg/m 80x80 3.0 7.07 kg/m
120x60
3.5 10.36 kg/m 3.5 8.16 kg/m
3.0 11.78 kg/m 3.0 8.96 kg/m
160x100 100x100
3.5 13.65 kg/m 3.5 10.36 kg/m
3.0 11.78 kg/m
130x130
3.5 13.66 kg/m
Reinforcement bar
Diameter Weight/meter
6 0.222 kg/m
8 0.395 kg/m
10 0.617 kg/m
12 0.888 kg/m
14 1.209 kg/m
16 1.579 kg/m
18 1.998 kg/m
20 2.467 kg/m
22 2.985 kg/m
24 3.553 kg/m
28 4.836 kg/m
30 5.551 kg/m
CIRCULAR TUBES
Nominal Wall
Weight per
Diameter/outside thicknes
meter
diameter s
mm mm
0.8 0.34 kg/m
18 1.0 0.42 kg/m
1.2 0.50 kg/m
0.8 0.38 kg/m
20 1.0 0.47 kg/m
1.2 0.56 kg/m
1.0 0.52 kg/m
22 1.2 0.62 kg/m
1.5 0.76 kg/m
1.0 0.59 kg/m
25 1.2 0.70 kg/m
1.5 0.87 kg/m
1.0 0.67 kg/m
1.2 0.79 kg/m
28
1.5 0.98 kg/m
2.0 1.28 kg/m
1.2 0.85 kg/m
1.5 1.05 kg/m
30
2.0 1.38 kg/m
2.5 1.70 kg/m
1.2 0.91 kg/m
32 1.5 1.13 kg/m
2.0 1.48 kg/m
1.5 1.35 kg/m
38 2.0 1.78 kg/m
2.5 2.19 kg/m
1.5 1.79 kg/m
50 2.0 2.37 kg/m
2.5 2.93 kg/m
2.0 3.03 kg/m
63.5 2.5 3.76 kg/m
3.0 4.48 kg/m
2.0 3.65 kg/m
76 2.5 4.53 kg/m
3.0 5.40 kg/m
2.5 6.13 kg/m
102 3.0 7.32 kg/m
3.5 8.50 kg/m
2.5 7.68 kg/m
127 3.0 9.17 kg/m
3.5 10.66 kg/m
3.0 11.91 kg/m
164
3.5 13.85 kg/m
3.0 15.32 kg/m
210
3.5 17.82 kg/m