IOSH Managing Safely - Risk Assessment Project

The document is a risk assessment form for the construction project at Lack Hillok Substation, detailing tasks, potential hazards, and risk control measures for workers. It identifies specific risks associated with lifting materials, installation of low voltage wiring, and working near high voltage equipment, along with required safety gear and monitoring actions. The assessment includes a review date and is signed by the assessor, ensuring compliance with safety protocols.

Uploaded by

humayundagem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views6 pages

IOSH Managing Safely - Risk Assessment Project

The document is a risk assessment form for the construction project at Lack Hillok Substation, detailing tasks, potential hazards, and risk control measures for workers. It identifies specific risks associated with lifting materials, installation of low voltage wiring, and working near high voltage equipment, along with required safety gear and monitoring actions. The assessment includes a review date and is signed by the assessor, ensuring compliance with safety protocols.

Uploaded by

humayundagem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

‭Risk assessment form‬

‭Name of assessor‬ ‭Humayun Ahsan‬ ‭Date‬ ‭21/10/2024‬

‭Time‬ ‭10:00‬ ‭Work area‬ ‭ lack Hillok Substation Construction , 1100 square meter , 02 floors,‬
B
‭Roughly (25-30) people working on this project.‬

‭Task being assessed‬ ‭ .‬


1 ‭ ifting the material in a safe way to the installation place as per construction diagram.‬
L
‭2.‬ ‭Installation of LV wiring in LV panels.‬
‭3.‬ ‭Performing the specific activities nearby to live in the HV plant.‬
‭4.‬ ‭Accessing the high rise equipment via scaffolding and perform the required task.‬

‭What is the‬ ‭Who might‬ ‭ ow might‬


H ‭ xisting‬
E ‭Risk rating‬ ‭Additional‬ ‭New risk‬ ‭ ction/‬
A ‭ ction/‬
A
‭hazard?‬ ‭be‬ ‭people be‬ ‭risk control‬ ‭controls‬ ‭rating‬ ‭monitored‬ ‭monitored‬
‭harmed?‬ ‭harmed?‬ ‭measures‬ ‭(Residual)‬ ‭by whom?‬ ‭by when?‬

‭L‬ ‭C‬ ‭R‬ ‭L‬ ‭C‬ ‭R‬

‭ orking on a‬ A
W ‭ ny of the 15‬ ‭Lifting‬ ‭Hard Hat,‬ ‭3‬ ‭4‬ ‭12‬ ‭ o‬
N ‭1‬ ‭4‬ ‭4‬ ‭Completion of‬ ‭Lifting‬
‭Construction‬ ‭ orkers on‬ e
w ‭ quipment or‬ ‭Safety‬ ‭encroachme‬ ‭POWRA.‬ ‭ perations is‬
o
‭Site with‬ ‭site.‬ ‭ echanical‬ ‭Glasses and‬
m ‭nt of‬ ‭Observation‬ ‭ chedule‬
s
‭(Flying /‬ ‭In addition‬ ‭works (such‬ ‭safety shoes‬ ‭machinery‬ ‭by site‬ f‭rom‬
‭Moving‬ ‭any of the 5‬ ‭as‬ t‭o be worn for‬ ‭‘Safety‬ ‭supervisor‬ ‭(23 Oct till 30‬
‭Objects)‬ ‭visitors‬ ‭excavating).‬ ‭ orkers in‬
w ‭Zones’. Work‬ ‭and‬ ‭Oct.‬
‭per day‬ ‭Collision or‬ ‭the‬ ‭areas to be‬ ‭Working‬ ‭Sign /‬
‭roughly.‬ f‭lying objects‬ ‭immediate‬ ‭demarcated.‬ ‭Party Leader.‬ ‭demarcation‬
‭could cause‬ ‭vicinity.‬ ‭Constant‬ ‭to be‬
‭serious injury‬ ‭monitoring of‬ ‭available at‬
‭or damage.‬ ‭the work‬ ‭site during‬
‭area.‬ ‭this period.‬

I‭nstallation in‬ ‭Any of the 5‬ ‭ ive power‬


L ‭Electrical‬ ‭3‬ ‭4‬ ‭12‬ A
‭ ll wiring /‬ ‭1‬ ‭4‬ ‭4‬ ‭ ompletion of‬ ‭Installation‬
C
‭Low Voltage‬ ‭authorized‬ ‭supplies‬ ‭ loves , Hard‬
g ‭installation‬ ‭POWRA.‬ ‭work is‬
‭480V Panels‬ ‭electricians‬ ‭could cause‬ ‭ at, safety‬
H ‭work must be‬ ‭Observation‬ ‭schedule‬
‭assigned to‬ ‭serious injury‬ ‭shoes , safety‬ ‭done ‘Dead’‬ ‭by site‬ ‭from‬
‭this job.‬ ‭or damage‬ ‭ est and‬
v ‭and prior to‬ ‭supervisor,‬ ‭(22 Oct till‬
‭(electrocution‬ ‭ afety‬
S ‭work starting‬ ‭Working‬ ‭15 Nov).‬
‭).‬ ‭Glasses to be‬ ‭this will be‬ ‭Party Leader‬ ‭Electrical‬
‭worn for‬ ‭confirmed‬ ‭and LV‬ ‭Signs / Safe‬
‭Workers in‬ ‭with a‬ ‭Electrical‬ ‭Distance‬
‭the‬ ‭Voltage‬ ‭Control‬ ‭Signs and‬
‭immediate‬ ‭Measuring‬ ‭Person .‬ ‭ emarcation‬
d
‭vicinity.‬ ‭device. Any‬ ‭to be‬
‭live‬ ‭available at‬
‭equipment in‬ ‭site during‬
‭the vicinity of‬ ‭this period.‬
‭the work‬
‭area must be‬
‭shrouded‬
‭and caution‬
‭notices‬
‭applied. Any‬
‭ ork to be‬
w
‭carried out in‬
‭the vicinity of‬
‭live‬
‭equipment‬
‭(or‬
‭equipment‬
‭that can‬
‭become live)‬
‭must be‬
‭done under a‬
‭Safety‬
‭Document‬
‭issued by an‬
‭authorized‬
‭LV Control‬
‭Person (refer‬
‭to client‬
‭Electrical‬
‭Safety‬
‭Rules).‬

‭Risk assessment form‬


‭What is the‬ ‭Who might‬ ‭ ow might‬
H ‭ xisting‬
E ‭Risk rating‬ ‭Additional‬ ‭New risk‬ ‭ ction/‬
A ‭ ction/‬
A
‭hazard?‬ ‭be‬ ‭people be‬ ‭risk control‬ ‭controls‬ ‭rating‬ ‭monitored‬ ‭monitored‬
‭harmed?‬ ‭harmed?‬ ‭measures‬ ‭(Residual)‬ ‭by whom?‬ ‭by when?‬
‭L‬ ‭C‬ ‭R‬ ‭L‬ ‭C‬ ‭R‬

‭Working near‬ ‭Any of the 5‬ I‭mpressed‬ ‭ pecial HV‬


S ‭3‬ ‭4‬ ‭12‬ ‭National Grid‬ ‭1‬ ‭4‬ ‭4‬ ‭ ompletion of‬ ‭This activist‬
C
‭to HV Live‬ ‭HV‬ ‭Voltages or‬ ‭gloves, Arc‬ ‭Safety‬ ‭POWRA and‬ ‭is schedule‬
‭plant /‬ ‭authorized‬ ‭contact with‬ ‭Flash suit‬ ‭Instruction‬ ‭constant‬ ‭from‬
‭equipment‬ ‭electricians‬ ‭live HV‬ ‭Hard Hat,‬ ‭NSI8‬ ‭observation‬ (‭ 25 Oct till 30‬
‭assigned to‬ ‭Conductors‬ ‭safety shoes ,‬ ‭(Movement‬ ‭by all NG‬ ‭ ct). High‬
O
‭this job.‬ ‭could cause‬ ‭safety vest‬ ‭of Objects) to‬ ‭SAP‬ ‭ oltage‬
V
‭death.‬ ‭and Safety‬ ‭be adhered‬ ‭Personnel.‬ ‭warning‬
‭Glasses to be‬ ‭to. All‬ ‭signs and‬
‭worn for‬ ‭metalwork‬ ‭demarcation‬
‭Workers in‬ ‭(including‬ ‭to be‬
‭the‬ ‭machinery)‬ ‭available at‬
‭immediate‬ ‭in HV‬ ‭site during‬
‭vicinity.‬ ‭compound to‬ ‭this period.‬
‭be earthed‬
‭and Drain‬
‭Earth‬
‭Schedule to‬
‭be adhered‬
‭to (if‬
‭applicable).‬
‭HV Safety‬
‭Distances‬
‭shall be‬
‭maintained‬
‭at all times‬
‭while‬
‭working in‬
‭HV‬
‭Substation.‬

‭ ccessing‬
A ‭Any of the 20‬ ‭1.Fall from‬ ‭Hard Hat,‬ ‭3‬ ‭4‬ ‭12‬ ‭ heck‬
C ‭1‬ ‭4‬ ‭1‬ ‭ ompletion of‬ ‭This activity‬
C
‭High Level‬ ‭workers on‬ ‭height could‬ ‭Safety‬ ‭Scaffold has‬ ‭POWRA and‬ i‭s scheduled‬
‭Equipment‬ ‭site.‬ c‭ ause serious‬ G ‭ lasses and‬ ‭in-date‬ ‭Observation‬ ‭from‬
‭via‬ ‭In addition‬ ‭injury.‬ ‭safety shoes‬ ‭‘Scaf-Tag’.‬ ‭by site‬ ‭(30 Oct till 25‬
‭Scaffolding.‬ ‭any of the 5‬ ‭to be worn for‬ ‭Access /‬ ‭supervisor‬ ‭ ov).‬
N
‭visitors‬ ‭ .Dropping‬
2 ‭workers in‬ ‭Egress via‬ ‭and‬
‭per day‬ t‭ools or‬ ‭the‬ ‭designated‬ ‭scaffolding‬ ‭Work area‬
‭roughly.‬ ‭equipment‬ ‭immediate‬ ‭route.‬ ‭inspector.‬ ‭must be‬
‭from height‬ ‭vicinity.‬ ‭Ensure ‘3‬ ‭Constant‬ ‭barricaded‬
‭could cause‬ ‭points of‬ ‭monitoring of‬ ‭ nd‬
a
‭serious injury‬ ‭contact’ with‬ ‭the work‬ ‭demarcated‬
‭or damage.‬ ‭ladder when‬ ‭area.‬ ‭during this‬
‭climbing.‬ ‭period.‬
‭Don’t lean or‬
‭climb over‬
‭the edge of‬
‭the‬
‭scaffolding.‬
‭Use Harness‬
‭if no hand‬
‭barrier and‬
‭foot stop in‬
‭place.‬
‭Use of tool‬
‭ traps. Don’t‬
s
‭leave unused‬
‭equipment‬
‭on the‬
‭scaffold.‬
‭Ensure‬
‭equipment is‬
‭not blocking‬
‭access ways‬
‭(or barrier‬
‭equipment‬
‭off if‬
‭necessary).‬
‭Ensure no‬
‭persons‬
‭working‬
‭directly‬
‭below the‬
‭work area.‬

‭Review date‬ ‭25 Oct 2024‬ ‭Signature‬

‭Training Provider name‬ ‭Commodious‬