IOSH Managing Safely - Risk Assessment Project
IOSH Managing Safely - Risk Assessment Project
Time 10:00 Work area lack Hillok Substation Construction , 1100 square meter , 02 floors,
B
Roughly (25-30) people working on this project.
orking on a A
W ny of the 15 Lifting Hard Hat, 3 4 12 o
N 1 4 4 Completion of Lifting
Construction orkers on e
w quipment or Safety encroachme POWRA. perations is
o
Site with site. echanical Glasses and
m nt of Observation chedule
s
(Flying / In addition works (such safety shoes machinery by site from
Moving any of the 5 as to be worn for ‘Safety supervisor (23 Oct till 30
Objects) visitors excavating). orkers in
w Zones’. Work and Oct.
per day Collision or the areas to be Working Sign /
roughly. flying objects immediate demarcated. Party Leader. demarcation
could cause vicinity. Constant to be
serious injury monitoring of available at
or damage. the work site during
area. this period.
ccessing
A Any of the 20 1.Fall from Hard Hat, 3 4 12 heck
C 1 4 1 ompletion of This activity
C
High Level workers on height could Safety Scaffold has POWRA and is scheduled
Equipment site. c ause serious G lasses and in-date Observation from
via In addition injury. safety shoes ‘Scaf-Tag’. by site (30 Oct till 25
Scaffolding. any of the 5 to be worn for Access / supervisor ov).
N
visitors .Dropping
2 workers in Egress via and
per day tools or the designated scaffolding Work area
roughly. equipment immediate route. inspector. must be
from height vicinity. Ensure ‘3 Constant barricaded
could cause points of monitoring of nd
a
serious injury contact’ with the work demarcated
or damage. ladder when area. during this
climbing. period.
Don’t lean or
climb over
the edge of
the
scaffolding.
Use Harness
if no hand
barrier and
foot stop in
place.
Use of tool
traps. Don’t
s
leave unused
equipment
on the
scaffold.
Ensure
equipment is
not blocking
access ways
(or barrier
equipment
off if
necessary).
Ensure no
persons
working
directly
below the
work area.