Variation Calculation in Project Work
Variation Calculation in Project Work
Name Of Project : Construction of Storm water Drain and Asphalt Concreting works
Location :- Uday marga Ward no- 03
Total
SN Description of work Nos Length Breadth Height Unit Quantity Rate Amount Remarks
Quantity
Dimantling of existing
1
structures
brick masonry wrks
drain inner portion 2 350.00 0.25 0.50 cum. 87.50
cum. 87.50 87.50 1015.00 88,812.50
2 Gravelling filling
Gravel filling in bed of excavated
material trench with approved
quality in layers not exceeding
15cm at a time and with adequate
watering till full consolidation as per
instruction of engineer
trench filling 2 350.00 0.60 0.80 cum. 336.00
drain bed 2 350.00 1.00 0.10 cum. 70.00
cum. 406.00 406.00 2534.25 1,028,905.50
3 Concreting work.
PCC(1:3:6) with screen river
aggregate and approved level, lines
abd dimension and curing all
complete as per specification and
instruction of engineer
(A) Bed PCC (1:3:6) 2 350.00 1.00 0.100 cum. 70.00
cum. 70.00 70.00 8183.01 572,810.70
Brick work (1:6) in with approved
quality of first class bricks in perfct
line and level, finished including
wetting the bricks packing the joints
4
and curing the complete in all types
and thickness of walls as per
specification and instruction of
engineer
drain wall-inner 2 350.00 0.38 0.80 m3 212.80
drain wall-outer 2 350.00 0.25 0.40 m3 70.00
m3 282.80 282.80 11580.15 3274866.42
12mm thick plaster (1:4) cement
sand plaster on wall of good finish,
including raking the joints, cleaning
5
and wetting the surface and curing
the works all the complete as per
instruction of engineer.
drain wall-inner 2 350.00 0.80 m2 560.00
drain wall-outer 2 350.00 0.40 m2 280.00
m2 840.00 840.00 269.27 226186.80
Punning work: Cement punning of
6 3mm thick cement slurry on
plastered surface
drain wall-inner 2 350.00 0.80 m2 560.00
drain wall-outer 2 350.00 0.40 m2 280.00
m2 840.00 840.00 252.59 212175.60
7 PCC 1:2:4 works
wall
drain wall-inner 2 350.00 0.38 0.050 m3 13.30
drain wall-outer 2 350.00 0.25 0.050 m3 8.75
tick drain 2 350.00 0.20 0.075 m3 10.50
m3 32.55 32.55 9,354.71 304495.81
8 Grader work
Sub-grade ( Existing pitch, gravel &
side shoulder cutting ), preparation
for designed road formation level
with grader machine.
road stretch 1 350.00 8.00 m2 2,800.00
350.00 m2 2,800.00 2,800.00 16.51 46228.00
Detailed Estimate & Abstract Of Cost
Name Of Project : Construction of Storm water Drain and Asphalt Concreting works
Location :- Uday marga Ward no- 03
Total
SN Description of work Nos Length Breadth Height Unit Quantity Rate Amount Remarks
Quantity
9 Preparation of Sub Base Work
Supplying and constrcution of sub-
base with watering and rolling by 8-
10 ton roller in layersnot exceeding
15cm at a time and with adequate
watering til full consolidation as per
instruction of engineer
road stretch 1 350.00 8.00 0.150 m3 420.00
portion 1 150.00 6.00 0.300 m3 270.00
m3 690.00 690.00 2,534.25 1748632.50
10 Preparation of base course
Total
SN Description of work Nos Length Breadth Height Unit Quantity Rate Amount Remarks
Quantity
15 Form work
Centering and shuttering with
wooden/plywood formworks for RCC
works including all necessary
propping, scaffolding, staging
supporting etc. all complete as per
specification and instruction of
engineer.
for cover slab : 1752 2.80 0.10 m2 490.56
m2 490.56 122.64 782.51 95967.03
16 P.C.C for R.C.C (1:2:4)
PCC (1:2:4) for R.C.C work
including mixing, laying, finishing to
approved level, lines and dimension
and curing all complete as per
specification and instruction of
engineer.
for cover slab : 1752 1.00 0.40 0.10 m3 70.08
m3 70.08 70.08 9354.71 655578.08
17 Site Clearance
Clearing of exisitng drain free from
debris, mud , stone , waste and
Depositing of outcasted debris to
site and dumping yard and site LS 15000.00
clearance after completion of work,
with all work complete
Sub-Total 10681300.10
Overhead @ 15% 1602195.02
Sub-Total 12283495.12
VAT @ 13% 1596854.37
Sub-Total 13880349.48
Contingencies @ 3% 416410.48
Grand Total 14296759.97
Detailed Estimate & Abstract Of Cost
Name Of Project : Construction of Storm water Drain and Asphalt Concreting works
Location :- Uday marga Ward no- 03
Sub-Total 16884541.04
VAT @ 13% 2194990.33
Sub-Total 19134531.37
B Road works
Dimantling of existing
1 DoR-2.4 (ii) B
structures
brick masonry works
drain inner portion 2 350.00 0.25 0.50 cum. 87.50
cum. 87.50 87.50
2 DoR-10.8 Stone soling
Providing and laying of hand pack
Stone soling with 150 to 200 mm
thick stones and packing with
smaller stone on prepared surface
as per Drawing and Technical
Specifications.
Unit = cum [For 5 cum]
trench filling 2 350.00 0.60 0.50 cum. 210.00
drain bed 2 350.00 1.00 0.10 cum. 70.00
cum. 280.00 280.00
3 DoR - 20.2 A Concreting work.
PCCM15with screen river aggregate
and approved level, lines abd
dimension and curing all complete
as per specification and instruction
of engineer
(A) Bed PCC M15 2 350.00 1.00 0.100 cum. 70.00
(B) Wall top PCC M15
drain wall-inner 2 350.00 0.38 0.050 m3 13.30
drain wall-outer 2 350.00 0.25 0.050 m3 8.75
tick drain 2 350.00 0.20 0.075 m3 10.50
cum. 102.55 102.55
4 DoR-25.1D Brick masonry works
Brick work (1:6) in with approved
quality of first class bricks in perfct
line and level, finished including
wetting the bricks packing the joints
and curing the complete in all types
and thickness of walls as per
specification and instruction of
engineer
drain wall-inner 2 350.00 0.38 0.80 m3 212.80
drain wall-outer 2 350.00 0.25 0.40 m3 70.00
m3 282.80 282.80
BILL SUMMARY
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
A Provisional Sum
General works:Provide Insurance
of works, materials,construction
1.0
equipments against accident to
workforce including third party PS 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - -
Provide & Maintain protective
safety Equipments including Hats,
2.0 Gloves, Googles, Dust mask, First
Aid Kit with medicine for work
force PS 1.00 15,000.00 15,000.00 1.00 15,000.00 - - 1.00 15,000.00 -
Lab test of the construction
3.0 materials as rebar cement, brick,
as per specified by site incharge PS 1.00 40,000.00 40,000.00 1.00 5,000.00 1.00 5,000.00 - - -
Total Provisional Sum 155,000.00 120,000.00 105,000.00 15,000.00
2 CONSTRUCTION WORK
Provide & Installation of Project
1.0 Information Board 1.2*0.9m Size
No.
as to Complete the work
Specified 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
PAVILION I - -
Earthwork -
Earthwork in excavation for
foundation along with dewatering
water simultaneously till
completion of foundation in all
types of soil including existing
2.0 debris & brick bats of old m3
structure if any up to 25 ft.depth
below as per the design, drawing,
specification & instructions of
consultant and his authorized
representative. 12.58 200.00 2,516.00 12.64 2,528.10 12.64 2,528.10 - - (0.06)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Soling works
4.0 Stone soling works
Providing and laying uncoursed
hand packed Dry Rubble Stone
soling of 150mm on landscape
works with out any special
dressing of stone including filling
interstices with suitable quarry
waste or stone chips or quarry
sand, watering, compacting using
appropriate mechanical
compaction means with all
contractors materials, handling,
placing etc. all complete as per
drawings, specifications and
instruction of the Engineer. The
complete item including all lead &
m3 1.64 3,000.00 4,920.00 2.22 6,664.50 2.22 6,664.50 - - (0.58)
lift.
5.0 Brick soling work
Providing and laying a single
layer flat brick soling on drainage
works on lanscape for preparation
of P.C.C. in which joints should be
packed by sand to the required
levels all complete as per
drawings, specifications and the
instructions of the Engineer. m2 1.57 700.00 1,099.03 1.86 1,303.75 1.86 1,303.75 - - (0.29)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
6.0 PCC Works
PCC (1:3:6) M10 for flooring on
landscape and drainage works in
perfect line and level with proper
compaction and curing at least 15
days including supply of materials
all complete as per design,
drawing, specification and
satisfaction to site engineer. m3 0.93 10,000.00 9,300.00 1.18 11,763.75 1.18 11,763.75 - - (0.25)
7.0 RCC Works
Concrete Works for RCC (1:1.5:3)
M20 on landscape and drainage
works in perfect line and level
with proper compaction and
curing for at least 15 days
including supply of materials all
complete as per design, drawing,
specification and satisfaction to
site engineer. m3 8.65 16,000.00 138,400.00 8.65 138,418.00 8.65 138,418.00 - - (0.00)
8.0 Steel reinforcement works
Fe500 Reinforcement in PCC
including cutting, bending and
placing in position all complete as
per design, drawing, specification
and satisfaction to site engineer. mt 1.36 120,000.00 163,200.00 0.76 91,201.51 0.27 32,466.13 0.49 58,735.38 0.60
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
9.0 Centering and Shuttering Work
Centering and shuttering with
approved 19mm waterproofing
plywood for drain works at any
level with necessary mild steel
propping, scaffolding, staging
supporting. Cutting holes for
utilization works and removal of
formwork and lead upto 30 m etc
all complete as per instruction,
specification and drawing. m2 65.64 600.00 39,384.00 65.65 39,387.00 65.65 39,387.00 - - (0.00)
10.0 STONE PILLAR WORKS
Providingand placing stone pillar
above PCC in cement mortar
(1:4) all complete as per
drawings, specifications and
instruction of the engineer. m3 0.58 7,000.00 4,060.00 0.82 5,712.00 0.82 5,712.00 - - (0.24)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
11.0 Wall Works - - -
Brick Masonry Works in
Superstructure ( 1 : 4 c/s )
Providing and laying first class
chimney fired brick of one or
more brick thick wall in cement
mortar 1:4 (1 cement : 4coarse
sand) in landscape works in all
heights and level including the
cost of single or multi stage
scaffolding, soaking bricks,
curing, raking joints, provision for
recesses, openings, toothing etc.,
all complete as per drawing,
specifications and instructions of
the Engineer.. m3 9.87 15,000.00 148,050.00 9.86 147,975.00 9.86 147,975.00 - - 0.01
WOODEN WORKS
Providing, fabricating & fixing
salwood(agrath) wooden pillars
fixing in stone pillar with joint
properly finished in perfect line,
12.0 level along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction of the Engineer.. m3 0.61 250,000.00 152,500.00 0.62 154,838.75 0.62 154,838.75 - - (0.01)
Engraving designs on wooden
pillars properly finished along
with all necessary accessories
13.0 along with wood primer all
complete as per design, drawing,
specification and instruction of
the Engineer.. nos 6.00 25,000.00 150,000.00 - - - - - - 6.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing, fabricating & fixing
salwood(agrath) wooden beams,
meths, etc. fixing in pillar with
joint properly polished and
14.0 finished in perfect line, level
along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction m3 0.39 250,000.00 97,500.00 0.39 97,920.00 0.39 97,920.00 - - (0.00)
MS STEEL WORKS
Providing and placing structural
steel tested grade Fe-250
equivalent NS, for structural work
including transportation, cutting,
15 connecting and placing in
position,treated with two coat of
anticorrosive paints, all complete
as per drawings, specifications
and instruction. kg 1,187.12 250.00 296,780.17 1,187.12 296,780.17 1,187.12 296,780.17 - - (1,143.88)
Providing and placing decking
sheet for concrete deck slab
including transportation, cutting,
16 connecting and placing in
position with welds and studs all
complete as per drawings,
specifications and instruction. m2 43.24 1,200.00 51,888.00 43.24 51,888.00 43.24 51,888.00 - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Plastering and Painting Works
Providing and laying 12.5mm
thick plaster upto required line
and perfect smooth level as per
site condition in 1:4 cement sand
17 mortar on brick walls including
necessary scaffolding , cleaning &
wetting the surface, packing of
joints and proper curing for 15
days as per drawing, specification
and instruction all complete. m2 56.69 300.00 17,007.00 - - - - - - 56.69
Providing and applying two or
more coats of exterior plastic
emulsion paint of approved
manufacturer and shade over a
coat of alkali resistant cement
primer of approved manufacturer
as per manufacturer's
specifications to the surface of
wall, ceiling, beams columns,
18 canopies, staircase, lobbies etc.,
all complete as per drawings,
specifications and instruction.
The rates shall include for
scraping, washing the surface
with water, surface preparation,
scaffolding etc., all complete as
per the manufacturer's
recommendations and as
approved by the Engineer. m2 56.69 300.00 17,007.00 - - - - - - -
False ceiling works
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and placing false ceiling
with plyboard(one side veneer)
19 including the channels to drop
false ceiling all complete as per
design, drawing, specification and
instruction of site engineer. m2 43.18 2,500.00 107,950.00 - - - - - - 43.18
Providing and applying PU paint
of approved manufacturer and
shade over primer of approved
manufacturer as per
manufacturer's specifications to
the surface of false ceiling all
20 complete as per drawings,
specifications and instruction.
The rates shall include for
surface preparation, scaffolding
etc., all complete as per the
manufacturer's recommendations
and as approved by the Engineer. m2 43.18 300.00 12,954.00 - - - - - - 43.18
21 Toughen glass Works
Providing and laying toughen
glass on roof including fixing with
silicon and necessary support all
complete as per drawing and
specification. m2 1.09 12,000.00 13,080.00 - - - - - - 1.09
22 Fibre cement board cladding for fascia - - -
Providing and laying fibre cement
board cladding on fascia all
complete as per design, drawing,
specification and instruction of
site engineer. rm 27.95 3,000.00 83,850.00 - - - - - - (27.95)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
23 Waterproofing coating on roof - - -
Providing and laying
waterproofing coating on roof all
complete as per design, drawing,
specification and instruction of
site engineer. m2 43.24 500.00 21,620.00 - - - - - - 43.24
24 Cement punning finish on roof - - -
3mm cement punning in 1:1 c/s
mortar in perfect line and level
including trowelling and finishing
in smooth surface on roof as per
design, drawing, specification and
instruction of site engineer. m2 43.24 400.00 17,296.00 - - - - - - 43.24
Timber plank on bench:-
Providing and laying timber plank
25 on bench all complete as per
design,drawing,specification and
instruction of site engineer m2 0.88 12,000.00 10,560.00 - - - - - - 0.88
PAVILION I I- - - -
Earthwork - - -
Earthwork in excavation for
foundation along with dewatering
water simultaneously till
completion of foundation in all
types of soil including existing
26 debris & brick bats of old
structure if any up to 25 ft.depth
below as per the design, drawing,
specification & instructions of
consultant and his authorized
representative. m3 12.51 1,000.00 12,510.00 13.16 13,157.75 13.16 13,157.75 - - (0.65)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Filling with earth or mixed soil
stacked at site in 150mm thick
layer on retaining walls including
27 watering, ramming, consolidation
and dressing as per drawing,
specifications and satisfaction to
site engineer all complete. m3 5.38 300.00 1,614.00 4.55 1,365.63 4.55 1,365.63 - - 0.83
28 Soling works - - -
Providing and laying uncoursed
hand packed Dry Rubble Stone
soling of 150mm on landscape
works with out any special
dressing of stone including filling
interstices with suitable quarry
waste or stone chips or quarry
sand, watering, compacting using
appropriate mechanical
compaction means with all
contractors materials, handling,
placing etc. all complete as per
drawings, specifications and
instruction of the Engineer. The
complete item including all lead &
m3 1.83 3,000.00 5,490.00 2.28 6,828.18 2.28 6,828.18 - - (0.45)
lift.
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
29.0 PCC Works - - -
PCC (1:3:6) M10 for flooring on
landscape and drainage works in
perfect line and level with proper
compaction and curing at least 15
days including supply of materials
all complete as per design,
drawing, specification and
satisfaction to site engineer. m3 0.91 10,000.00 9,100.00 1.14 11,389.12 1.14 11,389.12 - - (0.23)
30.0 RCC Works - - -
Concrete Works for RCC (1:1.5:3)
M20 on landscape and drainage
works in perfect line and level
with proper compaction and
curing for at least 15 days
including supply of materials all
complete as per design, drawing,
specification and satisfaction to
site engineer. m3 6.86 16,000.00 109,760.00 6.86 109,682.24 6.86 109,682.24 - - 0.00
31.0 Steel reinforcement works
Fe500 Reinforcement in PCC
including cutting, bending and
placing in position all complete as
per design, drawing, specification
and satisfaction to site engineer. mt 1.08 120,000.00 129,600.00 0.42 50,609.77 0.25 29,911.07 0.17 20,698.70 0.66
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
32.0 Centering and Shuttering Work
Centering and shuttering with
approved 19mm waterproofing
plywood for drain works at any
level with necessary mild steel
propping, scaffolding, staging
supporting. Cutting holes for
utilization works and removal of
formwork and lead upto 30 m etc
all complete as per instruction,
specification and drawing. m2 21.69 600.00 13,014.00 21.69 13,014.84 21.69 13,014.84 - - (0.00)
33.0 STONE PILLAR WORKS
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
34.0 Wall Works - - -
Brick Masonry Works in
Superstructure ( 1 : 4 c/s )
Providing and laying first class
chimney fired brick of one or
more brick thick wall in cement
mortar 1:4 (1 cement : 4coarse
sand) in landscape works in all
heights and level including the
cost of single or multi stage
scaffolding, soaking bricks,
curing, raking joints, provision for
recesses, openings, toothing etc.,
all complete as per drawing,
specifications and instructions of
the Engineer.. m3 7.27 15,000.00 109,050.00 7.27 109,036.53 7.27 109,036.53 - - 0.00
WOODEN WORKS
Providing, fabricating & fixing
salwood(agrath) wooden pillars
fixing in stone pillar with joint
properly finished in perfect line,
35.0 level along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction of the Engineer.. m3 1.43 250,000.00 357,500.00 1.43 356,661.40 1.43 356,661.40 - - 0.00
Engraving designs on wooden
pillars properly finished along
with all necessary accessories
36.0 along with wood primer all
complete as per design, drawing,
specification and instruction of
the Engineer.. nos 7.00 25,000.00 175,000.00 - - - - - - 7.00
Providing, fabricating & fixing
salwood(agrath) wooden beams,
meths, etc. fixing in pillar with
joint properly polished and
37.0 finished in perfect line, level
along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction m3 0.63 250,000.00 157,500.00 0.63 156,512.50 0.63 156,512.50 - - 0.00
38.0 MS STEEL WORKS
Providing and placing structural
steel tested grade Fe-250
equivalent NS, for structural work
including transportation, cutting,
38.0 connecting and placing in
position,treated with two coat of
anticorrosive paints, all complete
as per drawings, specifications
and instruction. kg 926.34 250.00 231,585.00 926.34 231,584.71 926.34 231,584.71 - - 0.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and placing decking
sheet for concrete deck slab
including transportation, cutting,
39.0 connecting and placing in
position with welds and studs all
complete as per drawings,
specifications and instruction. m2 36.18 6,000.00 217,080.00 36.18 217,080.00 36.18 217,080.00 - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
40.0 Plastering and Painting Works
Providing and laying 12.5mm
thick plaster upto required line
and perfect smooth level as per
site condition in 1:4 cement sand
mortar on brick walls including
necessary scaffolding , cleaning &
wetting the surface, packing of
joints and proper curing for 15
days as per drawing, specification
and instruction all complete. m2 36.15 600.00 21,690.00 - - - - - - 36.15
Providing and applying two or
more coats of exterior plastic
emulsion paint of approved
manufacturer and shade over a
coat of alkali resistant cement
primer of approved manufacturer
as per manufacturer's
specifications to the surface of
wall, ceiling, beams columns,
41.0 canopies, staircase, lobbies etc.,
all complete as per drawings,
specifications and instruction.
The rates shall include for
scraping, washing the surface
with water, surface preparation,
scaffolding etc., all complete as
per the manufacturer's
recommendations and as
approved by the Engineer. m3 36.15 300.00 10,845.00 - - - - - - 36.15
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
42.0 False ceiling works - - -
Providing and placing false ceiling
with plyboard(one side veneer)
including the channels to drop
false ceiling all complete as per
design, drawing, specification and
instruction of site engineer. m2 36.18 2,500.00 90,450.00 - - - - - - 36.18
Providing and applying PU paint
of approved manufacturer and
shade over primer of approved
manufacturer as per
manufacturer's specifications to
the surface of false ceiling all
43.0 complete as per drawings,
specifications and instruction.
The rates shall include for
surface preparation, scaffolding
etc., all complete as per the
manufacturer's recommendations
and as approved by the Engineer. m2 36.18 300.00 10,854.00 - - - - - - 36.18
44.0 Fibre cement board cladding for fascia - - -
Providing and laying fibre cement
board cladding on fascia all
complete as per design, drawing,
specification and instruction of
site engineer. m2 42.30 2,500.00 105,750.00 - - - - - - 42.30
45.0 Waterproofing coating on roof - - -
Providing and laying
waterproofing coating on roof all
complete as per design, drawing,
specification and instruction of
site engineer. m2 36.18 500.00 18,090.00 - - - - - - 36.18
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
46.0 Cement punning finish on roof - - -
3mm cement punning in 1:1 c/s
mortar in perfect line and level
including trowelling and finishing
in smooth surface on roof as per
design, drawing, specification and
instruction of site engineer. m2 10.48 400.00 4,192.00 - - - - - - 10.48
PAVILION III - - - -
Earthwork - - -
Earthwork in excavation for
foundation along with dewatering
water simultaneously till
completion of foundation in all
types of soil including existing
47.0 debris & brick bats of old
structure if any up to 25 ft.depth
below as per the design, drawing,
specification & instructions of
consultant and his authorized
representative. m3 10.55 1,000.00 10,550.00 10.55 10,550.00 10.55 10,550.00 - - -
Filling with earth or mixed soil
stacked at site in 150mm thick
layer on retaining walls including
48.0 watering, ramming, consolidation
and dressing as per drawing,
specifications and satisfaction to
site engineer all complete. m3 6.54 300.00 1,962.00 6.54 1,962.00 6.54 1,962.00 - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Soling works - - -
Providing and laying uncoursed
hand packed Dry Rubble Stone
soling of 150mm on landscape
works with out any special
dressing of stone including filling
interstices with suitable quarry
waste or stone chips or quarry
49.0 sand, watering, compacting using
appropriate mechanical
compaction means with all
contractors materials, handling,
placing etc. all complete as per
drawings, specifications and
instruction of the Engineer. The
complete item including all lead &
m3 2.72 3,000.00 8,160.00 2.72 8,160.00 2.72 8,160.00 - - -
lift.
Providing and laying a single
layer flat brick soling on floor for
preparation of P.C.C. in which
50.0 joints should be packed by sand
to the required levels all
complete as per drawings,
specifications and the instructions
of the Engineer. m2 9.24 700.00 6,468.00 9.24 6,468.00 9.24 6,468.00 - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
51.0 PCC Works - - -
PCC (1:3:6) M10 for flooring on
landscape and drainage works in
perfect line and level with proper
compaction and curing at least 15
days including supply of materials
all complete as per design,
drawing, specification and
satisfaction to site engineer. m3 2.35 10,000.00 23,500.00 2.35 23,500.00 2.35 23,500.00 - - -
52.0 RCC Works - - -
Concrete Works for RCC (1:1.5:3)
M20 on landscape and drainage
works in perfect line and level
with proper compaction and
curing for at least 15 days
including supply of materials all
complete as per design, drawing,
specification and satisfaction to
site engineer. m3 5.82 16,000.00 93,120.00 - - - - - - 5.82
53.0 Steel reinforcement works - - -
Fe500 Reinforcement in PCC
including cutting, bending and
placing in position all complete as
per design, drawing, specification
and satisfaction to site engineer. mt 0.91 120,000.00 109,200.00 - - - - - - 0.91
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
54.0 Centering and Shuttering Work - - -
Centering and shuttering with
approved 19mm waterproofing
plywood for drain works at any
level with necessary mild steel
propping, scaffolding, staging
supporting. Cutting holes for
utilization works and removal of
formwork and lead upto 30 m etc
all complete as per instruction,
specification and drawing. m2 77.62 600.00 46,572.00 - - - - - - 77.62
55.0 STONE PILLAR WORKS - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
56.0 Wall Works - - -
Brick Masonry Works in
Superstructure ( 1 : 4 c/s )
Providing and laying first class
chimney fired brick of one or
more brick thick wall in cement
mortar 1:4 (1 cement : 4coarse
sand) in landscape works in all
heights and level including the
cost of single or multi stage
scaffolding, soaking bricks,
curing, raking joints, provision for
recesses, openings, toothing etc.,
all complete as per drawing,
specifications and instructions of
the Engineer.. m3 3.22 15,000.00 48,300.00 3.22 48,300.00 3.22 48,300.00 - - -
57.0 WOODEN WORKS - - -
Providing, fabricating & fixing
salwood(agrath) wooden pillars
fixing in stone pillar with joint
properly finished in perfect line,
level along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction of the Engineer.. m3 2.27 250,000.00 567,500.00 - - - - - - 2.27
Engraving designs on wooden
pillars properly finished along
with all necessary accessories
58.0 along with wood primer all
complete as per design, drawing,
specification and instruction of
the Engineer.. Nos. 7.00 25,000.00 175,000.00 - - - - - - 7.00
Providing, fabricating & fixing
salwood(agrath) wooden pillars
fixing in stone pillar with joint
properly finished in perfect line,
59.0 level along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction of the Engineer.. m3 2.29 250,000.00 572,500.00 - - - - - - 2.29
60.0 Waterproof plywood works - - -
Providing and placing waterproof
plywood for concrete deck slab
including transportation, cutting,
connecting and placing in
position with nails, hooks, etc. all
complete as per drawings,
specifications and instruction. m2 77.62 700.00 54,334.00 - - - - - - 77.62
61.0 Plastering and Painting Works - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying 12.5mm
thick plaster upto required line
and perfect smooth level as per
site condition in 1:4 cement sand
mortar on brick walls including
necessary scaffolding , cleaning &
wetting the surface, packing of
joints and proper curing for 15
days as per drawing, specification
and instruction all complete. m2 8.24 600.00 4,944.00 8.16 4,896.00 - - 8.16 4,896.00 0.08
Providing and applying two or
more coats of exterior plastic
emulsion paint of approved
manufacturer and shade over a
coat of alkali resistant cement
primer of approved manufacturer
as per manufacturer's
specifications to the surface of
wall, ceiling, beams columns,
62.0 canopies, staircase, lobbies etc.,
all complete as per drawings,
specifications and instruction.
The rates shall include for
scraping, washing the surface
with water, surface preparation,
scaffolding etc., all complete as
per the manufacturer's
recommendations and as
approved by the Engineer. m2 8.24 300.00 2,472.00 - - - - - - 8.24
63.0 False ceiling works - - -
Providing and placing false ceiling
with plyboard(one side veneer)
including the channels to drop
false ceiling all complete as per
design, drawing, specification and
instruction of site engineer. m2 21.29 2,500.00 53,225.00 - - - - - - 21.29
Providing and applying PU paint
of approved manufacturer and
shade over primer of approved
manufacturer as per
manufacturer's specifications to
the surface of false ceiling all
64.0 complete as per drawings,
specifications and instruction.
The rates shall include for
surface preparation, scaffolding
etc., all complete as per the
manufacturer's recommendations
and as approved by the Engineer. m2 21.29 300.00 6,387.00 - - - - - - 21.29
65.0 WPC board for fascia - - -
Providing and laying WPC board
cladding on fascia all complete as
per design, drawing, specification
and instruction of site engineer. rm 55.80 2,500.00 139,500.00 - - - - - - 55.80
66.0 Waterproofing membrane on roof - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying
waterproofing membrane on roof
all complete as per design,
drawing, specification and
instruction of site engineer. m2 77.62 700.00 54,334.00 - - - - - - 77.62
67.0 Panipatti - - -
Providing and laying 20mm. thick
Cement Water Bead (Pani Patti)
finished perfectly smooth
including necessary scaffolding,
raking the joint, wetting the
surface and curing all complete
work rm 55.80 400.00 22,320.00 - - - - - - 55.80
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
68.0 Flooring works - - -
Providing and laying minimum of
25mm and in average of 40 mm
thick Screed of 1:3:3 (Cement
Sand Chip) on thoroughly
chipped floor (to remove laitance,
caked mortar, loose sand, dirt
etc.) all complete as per design,
drawing, specification and
instruction of consultant and his
authorized representative. m2 77.62 800.00 62,096.00 - - - - - - 77.62
3mm cement punning in 1:1 c/s
mortar in perfect line and level
69.0 including trowelling and finishing
in smooth surface on roof as per
design, drawing, specification and
instruction of site engineer. m2 77.62 400.00 31,048.00 - - - - - - 77.62
Providing and laying of 25 mm
thick Telia tile paving work in
(1:2) surki mortar and pointing
the joints with 1:1 C/S mortar
70.0 including curing on floor in
perfect line and level all
complete as per design, drawing,
specification and the instrution of
the site engineer. m2 9.24 3,400.00 31,416.00 - - - - - - 9.24
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying of stone slab
of approved thickness and color
on floor in perfect line and level
71.0 including joint sealing of joint,
grinding, polishing all complete
as per design, drawing,
specification and the instrution of
the site engineer. m2 3.96 7,000.00 27,720.00 - - - - - - 3.96
PAVILION IV - - - -
Earthwork - - -
Earthwork in excavation for
foundation along with dewatering
water simultaneously till
completion of foundation in all
types of soil including existing
72.0 debris & brick bats of old
structure if any up to 25 ft.depth
below as per the design, drawing,
specification & instructions of
consultant and his authorized
representative. m3 11.33 1,000.00 11,330.00 16.61 16,607.00 16.61 16,607.00 - - (5.28)
Filling with earth or mixed soil
stacked at site in 150mm thick
layer on retaining walls including
73.0 watering, ramming, consolidation
and dressing as per drawing,
specifications and satisfaction to
site engineer all complete. m3 8.27 300.00 2,481.00 12.32 3,695.07 12.32 3,695.07 - - (4.05)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Soling works
Providing and laying uncoursed
hand packed Dry Rubble Stone
soling of 150mm on landscape
works with out any special
dressing of stone including filling
interstices with suitable quarry
waste or stone chips or quarry
74.0 sand, watering, compacting using
appropriate mechanical
compaction means with all
contractors materials, handling,
placing etc. all complete as per
drawings, specifications and
instruction of the Engineer. The
complete item including all lead &
m3 0.26 3,000.00 780.00 0.29 882.00 0.29 882.00 - - (0.03)
lift.
Providing and laying a single
layer flat brick soling on floor for
preparation of P.C.C. in which
75.0 joints should be packed by sand
to the required levels all
complete as per drawings,
specifications and the instructions
of the Engineer. m2 24.39 700.00 17,073.00 41.54 29,078.00 41.54 29,078.00 - - (17.15)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
76.0 PCC Works
PCC (1:3:6) M10 for flooring on
landscape and drainage works in
perfect line and level with proper
compaction and curing at least 15
days including supply of materials
all complete as per design,
drawing, specification and
satisfaction to site engineer. m3 4.69 10,000.00 46,900.00 4.73 47,307.84 4.73 47,307.84 - - (0.04)
77.0 STONE PILLAR WORKS
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
79.0 WOODEN WORKS - - -
Providing, fabricating & fixing
salwood(agrath) wooden pillars
fixing in stone pillar with joint
properly finished in perfect line,
level along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction of the Engineer.. m3 0.86 250,000.00 215,000.00 0.86 215,090.00 0.86 215,090.00 - - (0.00)
Engraving designs on wooden
pillars properly finished along
with all necessary accessories
80.0 along with wood primer all
complete as per design, drawing,
specification and instruction of
the Engineer.. nos. 7.00 25,000.00 175,000.00 - - - - - - 7.00
Providing, fabricating & fixing
salwood(agrath) wooden beams,
meths, etc. fixing in pillar with
joint properly polished and
81.0 finished in perfect line, level
along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction m3 1.23 250,000.00 307,500.00 1.23 307,856.56 1.23 307,856.56 - - (0.00)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
82.0 Roofing works
Providing and placing waterproof
plywood for roofing including
transportation, cutting,
connecting and placing in
position with nails, hooks, etc. all
complete as per drawings,
specifications and instruction. m2 27.73 700.00 19,411.00 - - - - - - 27.73
Providing and placing ikotile for
roofing including transportation,
83.0 cutting, connecting and placing in
position with nails all complete as
per drawings, specifications and
instruction. m2 27.73 3,500.00 97,055.00 27.73 97,050.18 - - 27.73 97,050.18 0.00
84.0 Plastering and Painting Works
Providing and laying 12.5mm
thick plaster upto required line
and perfect smooth level as per
site condition in 1:4 cement sand
mortar on brick walls including
necessary scaffolding , cleaning &
wetting the surface, packing of
joints and proper curing for 15
days as per drawing, specification
and instruction all complete. m2 13.72 300.00 4,116.00 - - - - - - 13.72
85.0 False ceiling works - - -
Providing and placing false ceiling
with cement board including the
channels to drop false ceiling all
complete as per design, drawing,
specification and instruction of
site engineer. m2 16.00 2,500.00 40,000.00 - - - - - - 16.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and applying fire
retardant paint of approved
manufacturer and shade over
primer of approved manufacturer
as per manufacturer's
specifications to the surface of
86.0 false ceiling all complete as per
drawings, specifications and
instruction. The rates shall
include for surface preparation,
scaffolding etc., all complete as
per the manufacturer's
recommendations and as
m2 16.00 15,000.00 240,000.00 - - - - - - 16.00
approved by the Engineer.
87.0 WPC Panel for ceiling - - -
Providing and laying WPC Panel
for ceiling all complete as per
design, drawing, specification and
instruction of site engineer. m2 12.73 2,400.00 30,552.00 - - - - - - 12.73
88.0 Waterproofing membrane on roof - - -
Providing and laying
waterproofing membrane on roof
all complete as per design,
drawing, specification and
instruction of site engineer. m2 27.73 500.00 13,865.00 - - - - - - 27.73
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
89.0 Flooring works - - -
Providing and laying minimum of
25mm and in average of 40 mm
thick Screed of 1:3:3 (Cement
Sand Chip) on thoroughly
chipped floor (to remove laitance,
caked mortar, loose sand, dirt
etc.) all complete as per design,
drawing, specification and
instruction of consultant and his
authorized representative. m2 11.02 800.00 8,816.00 - - - - - - 11.02
3mm cement punning in 1:1 c/s
mortar in perfect line and level
90.0 including trowelling and finishing
in smooth surface on roof as per
design, drawing, specification and
instruction of site engineer. m2 13.72 400.00 5,488.00 - - - - - - 13.72
Providing and laying of 25 mm
thick Telia tile paving work in
(1:2) surki mortar and pointing
the joints with 1:1 C/S mortar
91.0 including curing on floor in
perfect line and level all
complete as per design, drawing,
specification and the instrution of
the site engineer. m2 8.20 3,400.00 27,880.00 - - - - - - 8.20
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying of 50mm
thick stone slab of approved
thickness and color on floor in
perfect line and level including
92.0 joint sealing of joint, grinding,
polishing all complete as per
design, drawing, specification and
the instrution of the site
engineer. m2 2.84 7,000.00 19,880.00 - - - - - - 2.84
Providing and laying of flagstone
of approved thickness and color
on floor in perfect line and level
93.0 including joint sealing of joint,
grinding, polishing all complete
as per design, drawing,
specification and the instrution of
the site engineer. m2 29.87 1,400.00 41,818.00 - - - - - - 29.87
Bells on roof:- Providing and
94.0 fixing design, drawing,
specification and instruction of
nos 36.00 6,000.00 216,000.00 - - - - - - 36.00
site engineer
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
MANDAP - - -
Earthwork - - -
Earthwork in excavation for
foundation along with dewatering
water simultaneously till
completion of foundation in all
types of soil including existing
95.0 debris & brick bats of old
structure if any up to 25 ft.depth
below as per the design, drawing,
specification & instructions of
consultant and his authorized
representative. m3 9.72 1,000.00 9,720.00 12.01 12,008.00 12.01 12,008.00 - - (2.29)
Filling with earth or mixed soil
stacked at site in 150mm thick
layer on retaining walls including
96.0 watering, ramming, consolidation
and dressing as per drawing,
specifications and satisfaction to
site engineer all complete. m3 5.62 300.00 1,686.00 8.32 2,494.80 8.32 2,494.80 - - (2.70)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
97.0 Soling works
Providing and laying uncoursed
hand packed Dry Rubble Stone
soling of 150mm on landscape
works with out any special
dressing of stone including filling
interstices with suitable quarry
waste or stone chips or quarry
sand, watering, compacting using
appropriate mechanical
compaction means with all
contractors materials, handling,
placing etc. all complete as per
drawings, specifications and
instruction of the Engineer. The
complete item including all lead &
m3 0.26 3,000.00 780.00 0.29 881.99 0.29 881.99 - - (0.03)
lift.
Providing and laying a single
layer flat brick soling on floor for
preparation of P.C.C. in which
98.0 joints should be packed by sand
to the required levels all
complete as per drawings,
specifications and the instructions
of the Engineer. m2 25.65 700.00 17,955.00 28.76 20,132.00 28.76 20,132.00 - - (3.11)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
99.0 PCC Works
PCC (1:3:6) M10 for flooring on
landscape and drainage works in
perfect line and level with proper
compaction and curing at least 15
days including supply of materials
all complete as per design,
drawing, specification and
satisfaction to site engineer. m3 3.61 10,000.00 36,100.00 4.22 42,187.50 4.22 42,187.50 - - (0.61)
100.0 STONE PILLAR WORKS
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
102.0 WOODEN WORKS
Providing, fabricating & fixing
salwood(agrath) wooden pillars
fixing in stone pillar with joint
properly finished in perfect line,
level along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction of the Engineer.. m3 0.86 250,000.00 215,000.00 0.86 215,090.00 0.86 215,090.00 - - (0.00)
Engraving designs on wooden
pillars properly finished along
with all necessary accessories
103.0 along with wood primer all
complete as per design, drawing,
specification and instruction of
the Engineer.. nos. 7.00 25,000.00 175,000.00 - - - - - - 7.00
Providing, fabricating & fixing
salwood(agrath) wooden beams,
meths, etc. fixing in pillar with
joint properly polished and
104.0 finished in perfect line, level
along with all necessary
accessories along with wood
primer all complete as per
design, drawing, specification and
instruction m3 1.13 250,000.00 282,500.00 1.23 307,856.56 1.23 307,856.56 - - (0.10)
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
105.0 Roofing works
Providing and placing waterproof
plywood for roofing including
transportation, cutting,
connecting and placing in
position with nails, hooks, etc. all
complete as per drawings,
specifications and instruction. m2 27.73 700.00 19,411.00 - - - - - - 27.73
Providing and placing ikotile for
roofing including transportation,
106.0 cutting, connecting and placing in
position with nails all complete as
per drawings, specifications and
instruction. m2 27.73 2,500.00 69,325.00 27.73 69,321.56 - - 27.73 69,321.56 0.00
107.0 Plastering and Painting Works - - -
Providing and laying 12.5mm
thick plaster upto required line
and perfect smooth level as per
site condition in 1:4 cement sand
mortar on brick walls including
necessary scaffolding , cleaning &
wetting the surface, packing of
joints and proper curing for 15
days as per drawing, specification
and instruction all complete. m2 13.72 600.00 8,232.00 - - - - - - 13.72
108.0 False ceiling works - - -
Providing and placing false ceiling
with cement board including the
channels to drop false ceiling all
complete as per design, drawing,
specification and instruction of
site engineer. m2 9.00 2,500.00 22,500.00 - - - - - - 9.00
Providing and applying fire
retardant paint of approved
manufacturer and shade over
primer of approved manufacturer
as per manufacturer's
specifications to the surface of
109.0 false ceiling all complete as per
drawings, specifications and
instruction. The rates shall
include for surface preparation,
scaffolding etc., all complete as
per the manufacturer's
recommendations and as
m2 9.00 15,000.00 135,000.00 - - - - - - 9.00
approved by the Engineer.
110.0 WPC Panel for ceiling - - -
Providing and laying WPC Panel
for ceiling all complete as per
design, drawing, specification and
instruction of site engineer. m2 18.00 1,500.00 27,000.00 - - - - - - 18.00
111.0 Waterproofing membrane on roof - - -
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying
waterproofing membrane on roof
all complete as per design,
drawing, specification and
instruction of site engineer. m2 27.73 600.00 16,638.00 - - - - - - 27.73
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
112.0 Flooring works - - -
Providing and laying minimum of
25mm and in average of 40 mm
thick Screed of 1:3:3 (Cement
Sand Chip) on thoroughly
chipped floor (to remove laitance,
caked mortar, loose sand, dirt
etc.) all complete as per design,
drawing, specification and
instruction of consultant and his
authorized representative. m2 11.02 800.00 8,816.00 - - - - - - 11.02
3mm cement punning in 1:1 c/s
mortar in perfect line and level
113.0 including trowelling and finishing
in smooth surface on roof as per
design, drawing, specification and
instruction of site engineer. m2 13.72 400.00 5,488.00 - - - - - - 13.72
Providing and laying of 25 mm
thick Telia tile paving work in
(1:2) surki mortar and pointing
the joints with 1:1 C/S mortar
114.0 including curing on floor in
perfect line and level all
complete as per design, drawing,
specification and the instrution of
the site engineer. m2 8.20 3,500.00 28,700.00 - - - - - - 8.20
Providing and laying of 50mm
thick stone slab of approved
thickness and color on floor in
perfect line and level including
115.0 joint sealing of joint, grinding,
polishing all complete as per
design, drawing, specification and
the instrution of the site
engineer. m2 2.84 7,000.00 19,880.00 - - - - - - 2.84
Providing and laying of flagstone
of approved thickness and color
on floor in perfect line and level
116.0 including joint sealing of joint,
grinding, polishing all complete
as per design, drawing,
specification and the instrution of
the site engineer. m2 16.26 1,400.00 22,764.00 - - - - - - 16.26
Bells on roof:- Providing and
117.0 fixing design, drawing,
specification and instruction of
nos 36.00 10,000.00 360,000.00 - - - - - - 36.00
site engineer
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Landscape, drainage and
Boundary wall works - - -
118.0 Site Clearance Work - - -
Clearing and grubbing the site for
construction by removing 150mm
thick top soil including bushes,
small trees, levelling of undulated
ground, shorting and
stacking/storing selected top soil
for reuse in landscaping works,
disposing unsuitable materials
from site, etc., all complete as
per drawings, specifications and
instructions of the Engineer. m2 5,893.42 60.00 353,605.20 5,750.00 345,000.00 5,750.00 345,000.00 - - 143.42
Dismantling of existing structures
by manual means comprising of
cement concrete works including
scaffolding wherever necessary,
119.0
sorting the dismantled material,
disposal and stacking materials
with all lifts and leads of
1000meters m3 10.55 1,000.00 10,550.00 10.51 10,508.75 10.51 10,508.75 - - 0.04
Dismantling of existing blocks by
manual means comprising of
brick works including scaffolding
120.0 wherever necessary, sorting the
dismantled material, disposal and
stacking materials with all lifts
and leads of 1000meters m2 304.00 1,000.00 304,000.00 297.25 297,250.00 297.25 297,250.00 - - 6.75
Dismantling of barbed wire
fencing includong posts,
foundation concrete, backfilling of
121.0 pit by manual means including
disposal and stacking materials
with all lifts and leads of
1000meters rm 436.10 1,000.00 436,100.00 418.00 418,000.00 418.00 418,000.00 - - 18.10
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Earthwork in excavation for
foundation along with dewatering
water simultaneously till
completion of foundation in all
types of soil including existing
124.0 debris & brick bats of old
structure if any up to 25 ft.depth
below as per the design, drawing,
specification & instructions of
consultant and his authorized
representative. m3 1,797.24 250.00 449,310.00 1,245.87 311,468.10 1,045.70 261,425.08 200.17 50,043.02 551.37
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Filling with earth or mixed soil
stacked at site in 150mm thick
layer on retaining walls including
125.0 watering, ramming, consolidation
and dressing as per drawing,
specifications and satisfaction to
site engineer all complete. m3 216.67 300.00 65,001.00 354.29 106,287.00 354.29 106,287.00 - - (137.62)
Soling works
Providing and laying uncoursed
hand packed Dry Rubble Stone
soling of 150mm on landscape
works with out any special
dressing of stone including filling
interstices with suitable quarry
waste or stone chips or quarry
sand, watering, compacting using
126.0
appropriate mechanical
compaction means with all
contractors materials, handling,
placing etc. all complete as per
drawings, specifications and
instruction of the Engineer. The
complete item including all lead &
m3 296.93 3,000.00 890,790.00 137.83 413,499.58 99.89 299,680.80 37.94 113,818.78 159.10
lift.
Providing and laying a single
layer flat brick soling on drainage
works on lanscape for preparation
of P.C.C. in which joints should be
127.0
packed by sand to the required
levels all complete as per
drawings, specifications and the
instructions of the Engineer. m2 1,621.11 700.00 1,134,777.00 532.26 372,584.41 418.38 292,863.16 113.89 79,721.25 1,088.85
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
128.0 PCC Works
PCC (1:3:6) M10 for flooring on
landscape and drainage works in
perfect line and level with proper
compaction and curing at least 15
days including supply of materials
all complete as per design,
drawing, specification and
satisfaction to site engineer. m3 384.15 10,000.00 3,841,500.00 177.47 1,774,695.12 108.50 1,084,983.75 68.97 689,711.37 206.68
129.0 RCC Works
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
132.0 Wall Works
STONE MASONRY WORKS IN
CEMENT MORTAR
Providing and laying Random
Rubble stone masonry works on
retaining walls in cement mortar
(1:4) including providing
through/bond stone at required
interval including providing
required scaffolding, preparing
mortar and construction of wall to
any height and shape all
complete as per drawings,
specifications and instruction of
the engineer. m3 808.10 7,000.00 5,656,700.00 874.11 6,118,759.15 874.11 6,118,759.15 - - (66.01)
Brick Masonry Works in
Superstructure ( 1 : 4 c/s )
Providing and laying first class
chimney fired brick of one or
more brick thick wall in cement
mortar 1:4 (1 cement : 4coarse
sand) in landscape works in all
133.0 heights and level including the
cost of single or multi stage
scaffolding, soaking bricks,
curing, raking joints, provision for
recesses, openings, toothing etc.,
all complete as per drawing,
specifications and instructions of
the Engineer.. m3 44.64 15,000.00 669,600.00 28.34 425,163.75 17.84 267,562.50 10.51 157,601.25 16.30
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
PIPEWORKS FOR
WEEPHOLE AND
134.0
GEOTEXTILE WORKS FOR
- - - -
RETAINING
Providing WALLSstructural
and placing
steel tested grade Fe-250
equivalent NS, for structural work
including
transportation,cutting,connecting
and placing in position, treated
with two coat of anticorrosive
paints, all complete as per
drawings,specifications and
instruction.(80mmdi GI medium rm 246.14 700.00 172,298.00 244.32 171,024.00 244.32 171,024.00 - - 1.82
duty)
Providing and placing of Geo
Textile on retaining wall and
135.0
french drain as per the instruction
m2 3,107.32 80.00 248,585.60 1,146.00 91,680.00 1,146.00 91,680.00 - - 1,961.32
of engineer and Painting
Plastering
136.0 - - -
Works
Providing and laying 12.5mm
thick plaster upto required line
and perfect smooth level as per
site condition in 1:4 cement sand
mortar on internal walls including
necessary scaffolding , cleaning &
wetting the surface, packing of
joints and proper curing for 15
days as per drawing, specification
and instruction all complete. m2 1,167.64 600.00 700,584.00 239.36 143,614.66 - - 239.36 143,614.66 928.28
Flushing pointing on the exterior
Brick wall of gate structure by
cement sand mortar of ratio 1:2
all complete as per drawings,
specificatios and instruction. The
rates shall include for scraping,
137.0
washing the surface with water,
surface preparation,
scaffolding,etc.,all complete as
per the manufacturer's
recommendations and as
approved by the Engineer.
m2 2.35 400.00 940.00 - - - - - - 2.35
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and applying two or
more coats of exterior plastic
emulsion paint of approved
manufacturer and shade over a
coat of alkali resistant cement
primer of approved manufacturer
as per manufacturer's
specifications on exterior plaster
138.0 all complete as per drawings,
specifications and instruction.
The rates shall include for
scraping, washing the surface
with water, surface preparation,
scaffolding etc., all complete as
per the manufacturer's
recommendations and as
approved by the Engineer. m2 230.24 300.00 69,072.00 - - - - - - 230.24
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying 20mm. thick
Cement Water Bead (Pani Patti)
finished perfectly smooth
139.0 including necessary scaffolding,
raking the joint, wetting the
surface and curing all complete
work rm 112.45 400.00 44,980.00 - - - - - - 112.45
140.0 Flooring Work - - -
Providing and laying minimum of
25mm and in average of 40 mm
thick Screed of 1:3:3 (Cement
Sand Chip) on thoroughly
chipped floor (to remove laitance,
caked mortar, loose sand, dirt
etc.) all complete as per design,
drawing, specification and
instruction of consultant and his
authorized representative. m2 38.08 800.00 30,464.00 - - - - - - 38.08
3mm cement punning in 1:1 c/s
mortar in perfect line and level
including trowelling and finishing
141.0 in smooth surface on risers of
steps on landscape works as per
design, drawing, specification and
instruction of site engineer. m2 1,123.24 400.00 449,296.00 - - - - - - 1,123.24
Providing and laying of flagstone
of approved thickness and color
on landscape works in perfect line
and level including joint sealing
142.0
of joint, grinding, polishing all
complete as per design, drawing,
specification and the instrution of
the site engineer. m2 1,668.10 1,400.00 2,335,340.00 - - - - - - 1,668.10
Providing and laying of 25 mm
thick Telia brick paving work in
(1:2) surki mortar and pointing
the joints with 1:1 C/S mortar
143.0 including curing on landscape
works in perfect line and level all
complete as per design, drawing,
specification and the instrution of
the site engineer. m2 183.41 3,400.00 623,594.00 - - - - - - 183.41
Providing and laying stone slab of
approved quality and color over
PCC on pavements including
cement mortar of 1:3(cement
sand) in perfect line, level
finished with necessary pointing
144.0 in joints sloped towards drain line
all complete as per design,
drawing, specification and the
instrution of consultant and his
authorized representative.
Samples should be approves by
consultant. m2 13.36 7,000.00 93,520.00 - - - - - - 13.36
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Providing and laying of brick
pavement of approved thickness
and color on landscape works in
perfect line and level including
145.0 joint sealing of joint, grinding,
polishing all complete as per
design, drawing, specification and
the instrution of the site
engineer. m2 463.64 700.00 324,548.00 - - - - - - 463.64
Cement skirting works:-Providing
and laying cement punning
skirting on rammed earth walls
inside rooms in perfect line and
146.0 level with grouting all complete
as per design, drawing ,
specification and instruction of
consultant and his authorized
representative rm 6.94 600.00 4,164.00 - - - - - - 6.94
Waterproofing works:- Providing
and applying water proof coating
work necessary on cement
punning area after preparing the
147.0
surface all complete work as per
design, drawing , specification
and instruction of consultant and
his authorized representative rm 6.94 500.00 3,470.00 - - - - - - 6.94
148.0 FRENCH DRAIN WORKS - - -
Providing and laying subsurface
drain with perforated pipe of
100mm internal diameter of PVC,
closely joined perforations
ranging from 3mm to 6mm
depending upon size of material
surrounding the pipe with 150mm
bedding below the pipe and
300mm cushion above pipe, as
per drawing and specification. rm 202.00 800.00 161,600.00 120.00 96,000.00 120.00 96,000.00 - - 82.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
PEBBLES FOR COVERED
149.0
DRAIN AND TAP - - - -
Providing and laying pebbles for
drain cover and stone tap on
landscape works as per design,
drawing, specification and
instruction of site engineer. m3 1.97 10,000.00 19,700.00 - - - - - - 1.97
STEEL GRATING FOR
150.0
DRAINS and laying light duty
Providing
iron channel grates on drains in
perfect line and level including
finishing in smooth surface on
landscape as per design, drawing,
specification and instruction of
site engineer. kg 1,165.71 250.00 291,427.50 - - - - - - 1,165.71
Supplying and fitting of railing
with 50mm vertical MS circular
pipe of 500mm height at 2m
151.0 interval and 50mm black pipe
handrail including welding, joints,
and prmer painting asper drawing
and instructions all complete. m2 29.16 6,500.00 189,540.00 - - - - - - 29.16
GAMALA POTS ON
LANDSCAPE
Providing, molding and placing
gamala pots on landscape as per
design, drawing, specification and
instruction of site engineer. - - -
152.0 gamala 1 nos 8.00 1,000.00 8,000.00 - - - - - - 8.00
153.0 gamala 2 nos 5.00 1,000.00 5,000.00 - - - - - - 5.00
154.0 gamala 3 nos 2.00 1,000.00 2,000.00 - - - - - - 2.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
155.0 gamala 4 nos 1.00 1,000.00 1,000.00 - - - - - - 1.00
156.0 gamala 5 nos 3.00 1,000.00 3,000.00 - - - - - - 3.00
157.0 gamala 6 nos 10.00 1,000.00 10,000.00 - - - - - - 10.00
158.0 gamala 7 nos 6.00 1,000.00 6,000.00 - - - - - - 6.00
159.0 Wooden railing works - - -
Providing and placing seasoned
laminated timber rail on openings
of gates including transportation,
cutting, connecting and placing in
position with wood primer and
paint, all complete as per
drawings, specifications and
instruction. m2 4.27 2,500.00 10,675.00 - - - - - - 4.27
160.0 Wooden fascia works - - -
Providing and placing 25mm thk.
Treated hardwood fascia board
on roof including transportation,
cutting, connecting and placing in
position with wood primer and
paint, all complete as per
drawings, specifications and
instruction. m2 6.93 12,000.00 83,160.00 - - - - - - 6.93
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Waterproof plyboard on
161.0 - - -
roof
Providing and laying 10mm
waterproof plywood with one side
veneer in perfect line and level
above adobe insulation all
complete as per design, drawing,
specification and instruction of
consultant and his authorized
representative. Samples should
be approved by consultant. m2 30.74 700.00 21,518.00 - - - - - - 30.74
162.0 Iko-tile roofing works - - -
Providing and laying iko-tile
nailed and stacked over plyboard
on sloped roofs in perfect line and
level all complete as per design,
drawing, specification and
instruction of consultant and his
authorized representative. m2 30.74 3,500.00 107,590.00 - - - - - - 30.74
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
163.0 Structural steel Works - - -
Providing and placing structural
steel tested grade Fe-250
equivalent NS, for structural work
on gate roof including
transportation, cutting,
connecting and placing in
position,treated with two coat of
anticorrosive paints, all complete
as per drawings, specifications
and instruction. kg 745.43 250.00 186,357.50 - - - - - - 745.43
Providing and fabricating MS steel
gate and fixing in entrance
polished and finished in perfect
164.0
line, level as per design, drawing,
specification and instruction all
complete. kg 186.69 250.00 46,672.50 - - - - - - 186.69
Supplying and fitting of railing
with M.S. pipe including welding,
165.0 joints and primer painting as per
drawing and instructions all
complete m2 61.00 5,000.00 305,000.00 72.02 360,092.25 72.02 360,092.25 - - (11.02)
166.0 Shera board works
Providing, fabricating & fixing
shera board works on gate
finished in perfect line, level
along with all necessary
accessories all complete as per
design, drawing, specification and
instruction m2 2.60 2,500.00 6,500.00 - - - - - - 2.60
Supplying and Fixing Indian
pattern C.P. valves with wall
167.0
flange Including c.p. nipple all
nos 6.00 2,000.00 12,000.00 - - - - - - 6.00
complete set.
Supplying and Fixing CP Bib Cock
168.0 with wall flange,cp nipple all
complete set nos 3.00 4,000.00 12,000.00 - - - - - - 3.00
Supplying and Fixing 20 mm
CPVC pipe with pipe Jointing
materials (Tee, Elbow, Union),
making holes, clips and vent cowl
169.0
all complete set as per
specification and instruction.
(Mangalam, Panchakanya ,
Prince,Supreme or Equivalent. ) rm 125.88 800.00 100,704.00 - - - - - - 125.88
Providing and fixing PVC water
tank- brand Nepatop/Hilltake/
Panchakanya or equivalent, of
capacity 2000 ltrs. finished in
170.0
perfect line, level along with all
necessary accessories all
complete as per design, drawing,
specification and instruction nos 2.00 35,000.00 70,000.00 - - - - - - 2.00
PLANTATION WORKS - - -
Planting dubo grass on site
including digging, planting hole
171.0
10-20 cm depth using a metal rod
or hardwood peg. sqm 2,800.00 600.00 1,680,000.00 - - - - - - 2,800.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Planting rooted tree stump
cutting and bare root seedlings,
including pitting, transplanting,
composting and mulching, pit
size 10cm diameterx depth
compost volume of pit mix with
original soil.
- - -
LED strip light warm white
220V with soft bending
diffuser, philips
equivalent, 72 LED per
meter or equivalent for
174.0
bright and uniform
lighting, complete set with
fitting components and
installation, with junction rm 45.00 2,000.00 90,000.00 - - - - - - 45.00
box if necessary
LUMINAIRES ( FIXTURES) Outdoor
LED based Luminaries set all
complete. LEGERO, GE, Philips or
equivalent
7W Garden Spike, Anthracite,
175.0
Warm White,Floor Lamp, 220V,
warm white, IP 65 or above,
complete set with fitting
components and installation, with
junction box if necessary set 18.00 1,500.00 27,000.00 - - - - - - 18.00
30W LED outdoor wall washer
(Tubelight for indirect lighting),
176.0 3000K, IP 65 and above, 220 V,
complete set with fitting
components and installation set 16.00 1,500.00 24,000.00 - - - - - - 16.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
LUMINAIRES ( FIXTURES) Outdoor
LED based Luminaries set all
complete. LEGERO, GE, Philips or
equivalent,
6W 800lm Sleek small LED Track
177.0
Lighting, 220V, warm white, IP 65
or above, complete set with
fitting components and
installation, with junction box if
necessary set 24.00 1,500.00 36,000.00 - - - - - - 24.00
Up down Sconce light 10W
equivalent IP 65 and
above,2700K/3000K warm white,
178.0
complete set with fitting
components and installation, with
junction box if necessary set 4.00 1,500.00 6,000.00 - - - - - - 4.00
Wall recessed 12 inch to 24 inch
length, 10W equivalent (600-
800lm) LED warm white light,
179.0 220V, IP 65 or above, complete
set with fitting components and
installation, with junction box if
necessary set 61.00 2,000.00 122,000.00 - - - - - - 61.00
Street Light / Flood Light Philips
BGP704 equivalent 220V, 10000
lumens, warm white luminaires
with mount and all other
180.0
components complete set with
fitting components and
installation, with junction box if
necessary set 2.00 2,000.00 4,000.00 - - - - - - 2.00
12W ceiling recessed Warm white
luminaire set, 220V, complete set
181.0 with fitting components and
installation, with junction box if
necessary set 1.00 3,500.00 3,500.00 - - - - - - 1.00
9W directional LED ceiling
recessed light track light, all
182.0
complete,with junction box if
set 2.00 3,500.00 7,000.00 - - - - - - 2.00
necessary
Floor recessed (ground well) LED
luminaire 12 W, Warm white
183.0 220V, IP 65 or above, complete
set with fitting components and
installation set 14.00 1,500.00 21,000.00 - - - - - - 14.00
Post top LED warm white
luminaire 30W, 220V with
heritage style cast iron lamp post
of minimum 7 feet height from
184.0 ground level (to be bought in
consultation with architecture),
complete set with fitting
components and installation, with
junction box if necessary set 14.00 2,000.00 28,000.00 - - - - - - 14.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Street Light Philips BGP704
equivalent 220V, 10000 lumens,
warm white luminaires with
185.0
mount and all other components
complete set with fitting
components and installation set 2.00 3,000.00 6,000.00 - - - - - - 2.00
Installation, testing and
commissioning of 10 sq mm 2C,
armored copper cable from
existing point to distribution
186.0
board, underground via 32 mm
HDPE pipe, complete set with
fitting components and
installation Rm 40.00 1,200.00 48,000.00 - - - - - - 40.00
Electrical Outdoor distribution
box, Waterproof sealed with IP
rating of IP66 or above, made
with stainless steel with stand
187.0 kept 2 feet above ground level,
embedded door with required
copper bush, installation and
fitting cost of MCB ans switches
all included set 1.00 60,000.00 60,000.00 - - - - - - 1.00
Installation, testing and
188.0
comissioning of 16 way SPN DB set 1.00 5,000.00 5,000.00 - - - - - - 1.00
Installation testing and
189.0 commissioning of 6 A SP MCB, all
complete set 12.00 600.00 7,200.00 - - - - - - 12.00
Installation testing and
190.0 commissioning of 16 A SP MCB,
all complete set 2.00 600.00 1,200.00 - - - - - - 2.00
Installation testing and
191.0 commissioning of 32 A DP MCB,
all complete set 1.00 600.00 600.00 - - - - - - 1.00
Installation testing and
192.0 comissioning of 32 A DP Switch,
set 1.00 2,000.00 2,000.00 - - - - - - 1.00
all complete
Weatherproof Outdoor Junction
Box, IP 68 or above rated, JB with
193.0
option for sealing the incoming
and outgoing 2c wire set 30.00 2,000.00 60,000.00 - - - - - - 30.00
3*3 metal (Stainless Steel)
194.0 junction box with rubber gasket
for weather proofing set 10.00 3,500.00 35,000.00 - - - - - - 10.00
9m Pole for electric lighting single
195.0
arm set 2.00 75,000.00 150,000.00 - - - - - - 2.00
9m double arm pole for electrc
196.0
lighting set 1.00 15,000.00 15,000.00 - - - - - - 1.00
Installation, testing, and
commissioning of 2.5 sq mm 2C,
armored copper cable from the
197.0
distribution board to, light points
underground via 32 mm HDPE
pipe, all complete Rm 1,220.00 800.00 976,000.00 - - - - - - 1,220.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
किताबको ठेक्कामा
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
Chemical Earthing
Supply, Installation, testing and
commissioning of Chemical
198.0
Earthing System with including all
material and accessories to all
complete the works nos 1.00 50,000.00 50,000.00 - - - - - - 1.00
Supply , installation & testing of 8
199.0 SWG bare copper conductor from
Main panel to earth test pit Rm 10.00 800.00 8,000.00 - - - - - - 10.00
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः 3.00
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः 65,676.00
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः 66,414.00
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः -
नापी किताब नं 4 काम सम्पन्न भएको मितिः -
सार्वजनि
क नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम कैफियत
निर्माण
किताबको ठेक्कामा
कार्य मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम बाँकी परिमाण
सम्पन्न
१ २ 3 4.00 5.00 6.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१० 16.00 17.00
भइसकेपछि
प्रत्येक
क. जम्मा रकम 35,093,919.49 16,690,861.00 14,581,414.31 2,109,446.69
ठेकदारबा
ट यही ख. 13% मु.अ.कर 4,562,209.53 2,169,811.93 1,895,583.86 274,228.07
ढाँचामा ग.Provisional Sum Amount 155,000.00 120,000.00 105,000.00 15,000.00
बिल घ. कुल जम्मा (क+ख) 39,811,129.03 18,980,672.93 16,581,998.17 2,398,674.76
प्रस्तुत
गराउनुप (16,690,861.00)
र्दछ ।
यो बिलबमोजिम काम भएको जम्मा रूः हाल काम भएको बाँकी 2,398,674.76 यस बिल बमोजिम गरिएको भुक्तानी
ठेकेदार
अघिल्लो बिलसम्म भुक्तानी भएको रूः कट्टा गर्नु पर्ने रू भौचर नं:
ले गरेकाभुक्तानी बिलको क्रम सङ्ख्याः
अघिल्लो क. मोबिलाइजेसन पेस्की रूः भुक्तानी मिति:
काममा
अघिल्लो र भुक्तानी बिलको भौ.नं. ख. मालसामानको पेस्की रूः भुक्तानी रकम रू
सो बापत ग. मेसिनरी औजारको बहाल रूः
ठेकदारला
घ. अग्रीम आय कर रकम रूः
र्इ भएको
ङ. धरौटी रकम रूः
हिसाब
समेत गरी च. अन्य कट्टी गर्ने पर्ने रकम रूः
अभिलेख खुद दिनु पर्ने रकम रूः
राख्न यो
फाराम तयार गर्नेको सहीः जाँच गर्नेको सहीः स्वीकृत गर्नेको सहीः
तर्जुमा निर्माण व्यवसायीको सही: नाम नाम नाम
गरिएको नाम: दर्जाः दर्जाः दर्जाः
हो । पदः मितिः मितिः मितिः
निर्माण मितिः
कार्यको
ठेक्काको
उद्देश्य यो बिलबमोजिम जम्मा रू .....................अक्षरमा .................................................................................... को चेक नं: ........................बुझिलिए ।
बिल तयार
गर्नु
बिराटनगर महानगरपालिका
नगर कार्यापालिकाको कार्यालय
कार्यालय कोड नं.:
ठेक्का सम्बन्धी बिल-FIFTH
योजनाको नामः Construction of Aarati Site at Hanuman Mandir बिलको क्रम सङ्ख्याः
योजना कार्यान्वयन हुने स्थानः Ward no.-2, Biratnagar कार्य आदेश मितिः
निर्माण व्यवसायीको नामः ABHIYAN / DIBISHA JV काम सम्पन्न गर्नु पर्ने मितिः
ठेक्का पट्टाको सङ्केतः BMC/MOR/NCB/W-16/2079/080 म्याद थप/भेरिएसन मितिः
नापी किताब नं 5 काम सम्पन्न भएको मितिः
ठेक्का सम्बन्धी बिल-Fifth
नापी कामको विवरण परिमाण सूची (BOQ) बमोजिमको भेरिएसन भएकोमा सो बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको हाल भएको काम
किताबको ठेक्कामा स्वीकृत
मुख्य र सहायक क्रियाकलाप
पाना नं एकाइ परिमाण स्वीकृत दर जम्मा रकम परिमाण दर जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम परिमाण जम्मा रकम
१ २ 3 4.00 5.00 6.00 7.00 8.00 9.00 10.00 ११=५x१० 12.00 १३=५x१२ १४=१०-१२ १५=८-१०
A Provisional Sum
General works:Provide Insurance
of works, materials,construction
1.0
equipments against accident to
workforce including third party PS 1.00 100,000.00 100,000.00 - 1.00 100,000.00 1.00 100,000.00 - -
Provide & Maintain protective
safety Equipments including Hats,
2.0 Gloves, Googles, Dust mask, First
Aid Kit with medicine for work
force PS 1.00 15,000.00 15,000.00 - 1.00 15,000.00 1.00 15,000.00 - -
Lab test of the construction
3.0 materials as rebar cement, brick,
as per specified by site incharge PS 1.00 40,000.00 40,000.00 - 1.00 5,000.00 1.00 5,000.00 - -
Total Provisional Sum 155,000.00 120,000.00 120,000.00 -
2 CONSTRUCTION WORK
Provide & Installation of Project
Information Board 1.2*0.9m Size
1.0 No.
as to Complete the work
Specified 1.00 10,000.00 10,000.00 - 1.00 10,000.00 1.00 10,000.00 - -
- - - -
LED strip light warm white
220V with soft bending
diffuser, philips
equivalent, 72 LED per
meter or equivalent for
174.0
bright and uniform
lighting, complete set with
fitting components and
installation, with junction rm 45.00 2,000.00 90,000.00 - - - - - -
box if necessary
LUMINAIRES ( FIXTURES) Outdoor
LED based Luminaries set all
complete. LEGERO, GE, Philips or
equivalent
7W Garden Spike, Anthracite,
175.0
Warm White,Floor Lamp, 220V,
warm white, IP 65 or above,
complete set with fitting
components and installation, with
junction box if necessary set 18.00 1,500.00 27,000.00 - - - - - -
30W LED outdoor wall washer
(Tubelight for indirect lighting),
176.0 3000K, IP 65 and above, 220 V,
complete set with fitting
components and installation set 16.00 1,500.00 24,000.00 - - - - - -
4.00
10/23/2079
10/30/2081
-
-
का सम्बन्धी बिल-Fifth
कैफियत
बाँकी परिमाण
16.00 17.00
बाँकी परिमाण
16.00 17.00
(0.00)
1.01
बाँकी परिमाण
16.00 17.00
(0.00)
0.01
बाँकी परिमाण
16.00 17.00
0.00
(0.00)
0.60
बाँकी परिमाण
16.00 17.00
0.01
0.01
बाँकी परिमाण
16.00 17.00
0.01
6.00
बाँकी परिमाण
16.00 17.00
(0.00)
बाँकी परिमाण
16.00 17.00
(0.00)
बाँकी परिमाण
16.00 17.00
43.18
43.18
1.09
(27.95)
बाँकी परिमाण
16.00 17.00
43.24
43.24
0.88
0.00
बाँकी परिमाण
16.00 17.00
0.83
0.00
बाँकी परिमाण
16.00 17.00
0.00
0.00
0.66
बाँकी परिमाण
16.00 17.00
(0.00)
0.00
बाँकी परिमाण
16.00 17.00
0.00
0.00
7.00
0.00
0.00
बाँकी परिमाण
16.00 17.00
बाँकी परिमाण
16.00 17.00
1.09
36.15
बाँकी परिमाण
16.00 17.00
36.18
36.18
42.30
36.18
बाँकी परिमाण
16.00 17.00
10.48
बाँकी परिमाण
16.00 17.00
बाँकी परिमाण
16.00 17.00
5.82
0.91
बाँकी परिमाण
16.00 17.00
77.62
1.36
बाँकी परिमाण
16.00 17.00
2.27
7.00
2.29
77.62
बाँकी परिमाण
16.00 17.00
0.08
8.24
21.29
21.29
55.80
बाँकी परिमाण
16.00 17.00
77.62
55.80
बाँकी परिमाण
16.00 17.00
77.62
77.62
9.24
बाँकी परिमाण
16.00 17.00
3.96
0.00
0.00
बाँकी परिमाण
16.00 17.00
(0.00)
बाँकी परिमाण
16.00 17.00
(0.00)
0.01
7.85
बाँकी परिमाण
16.00 17.00
(0.00)
7.00
(0.00)
बाँकी परिमाण
16.00 17.00
0.00
0.00
13.72
16.00
बाँकी परिमाण
16.00 17.00
16.00
12.73
27.73
बाँकी परिमाण
16.00 17.00
11.02
13.72
8.20
बाँकी परिमाण
16.00 17.00
2.84
29.87
36.00
बाँकी परिमाण
16.00 17.00
0.00
0.01
बाँकी परिमाण
16.00 17.00
(0.01)
बाँकी परिमाण
16.00 17.00
0.00
0.01
बाँकी परिमाण
16.00 17.00
(0.00)
7.00
(0.00)
बाँकी परिमाण
16.00 17.00
0.00
0.00
13.72
9.00
9.00
18.00
बाँकी परिमाण
16.00 17.00
27.73
बाँकी परिमाण
16.00 17.00
11.02
13.72
8.20
2.84
16.26
36.00
बाँकी परिमाण
16.00 17.00
143.42
0.04
6.75
18.10
330.30
23.32
386.90
बाँकी परिमाण
16.00 17.00
(8.43)
943.50
बाँकी परिमाण
16.00 17.00
79.41
(1.10)
(189.12)
5.64
बाँकी परिमाण
16.00 17.00
0.00
16.30
बाँकी परिमाण
16.00 17.00
1.82
1,571.32
857.51
2.35
230.24
बाँकी परिमाण
16.00 17.00
112.45
38.08
1,123.24
1,668.10
183.41
13.36
बाँकी परिमाण
16.00 17.00
463.64
6.94
6.94
82.00
बाँकी परिमाण
16.00 17.00
1.97
1,165.71
29.16
8.00
5.00
2.00
बाँकी परिमाण
16.00 17.00
1.00
3.00
10.00
6.00
4.27
6.93
बाँकी परिमाण
16.00 17.00
30.74
30.74
बाँकी परिमाण
16.00 17.00
745.43
186.69
0.00
2.60
6.00
3.00
125.88
2.00
2,800.00
बाँकी परिमाण
16.00 17.00
147.00
1.00
45.00
18.00
16.00
बाँकी परिमाण
16.00 17.00
24.00
4.00
61.00
2.00
1.00
2.00
14.00
14.00
2.00
बाँकी परिमाण
16.00 17.00
40.00
1.00
1.00
12.00
2.00
1.00
1.00
30.00
10.00
2.00
1.00
1,220.00
1.00
10.00
बाँकी परिमाण
16.00 17.00
7 RCC Works
Concrete Works for RCC (1:1.5:3) M20 on landscape
and drainage works in perfect line and level with
proper compaction and curing for at least 15 days
including supply of materials all complete as per
design, drawing, specification and satisfaction to site
engineer.
2.000 2.100 0.900 0.300 cum 1.13
1.000 4.300 0.900 0.250 cum 0.97
2.000 1.050 0.900 0.250 cum 0.47
9.000 0.300 0.300 0.750 cum 0.61
2.000 0.300 0.600 1.100 cum 0.40
1.000 43.240 0.100 cum 4.32
column 0.3x0.3 12.00 0.3x0.3 7.00 1.30 8.00 72.80 0.89 64.61
column 0.6x0.3 12.00 0.6x0.3 2.00 1.50 12.00 36.00 0.89 31.95
15 MS STEEL WORKS
Providing and placing structural steel tested grade Fe-
250 equivalent NS, for structural work including
transportation, cutting, connecting and placing in
position,treated with two coat of anticorrosive paints,
all complete as per drawings, specifications and
instruction.
90mmx90mm 4.00 2.35 14.00 kg 131.60
9.00 2.58 14.00 kg 325.08
30 RCC Works
Concrete Works for RCC (1:1.5:3) M20 on landscape
and drainage works in perfect line and level with
proper compaction and curing for at least 15 days
including supply of materials all complete as per
design, drawing, specification and satisfaction to site
engineer.
Grid 3-4 footing 2.000 0.900 0.900 0.300 cum 0.49
Wall footing 1.000 5.000 1.150 0.250 cum 1.44
concrete pedestal-single post 8.000 0.300 0.300 0.750 cum 0.54
concrete pedestal-double post 2.000 0.300 0.600 1.100 cum 0.40
RCC SLAB 1.000 36.180 0.100 cum 3.62
Concrete band 2.000 4.196 0.450 0.100 cum 0.38
6.86 Total= cum 6.86 0.00 16000.00 0.00
Combined footing P2 12.00 4.9*.9 1.00 5.05 6.00 30.30 0.89 26.89
1.00 1.05 33.00 34.65 0.89 30.75
38 MS STEEL WORKS
Providing and placing structural steel tested grade Fe-
250 equivalent NS, for structural work including
transportation, cutting, connecting and placing in
position,treated with two coat of anticorrosive paints,
all complete as per drawings, specifications and
instruction. Kg/m
100mmx100mmx 4mm post 12.000 2.775 11.730 kg 390.61
100mmx100mmx 4mm beam 1.000 15.764 11.730 kg 184.91
100mmx100mmx 4mm beam 6.000 1.987 11.730 kg 139.85
100mmx100mmx 4mm beam 4.000 1.363 11.730 kg 63.95
75mmx75mmx 4mm bench 1.000 7.650 8.590 kg 65.71
50mmx50mmx 3.6mm bench 2.000 2.100 4.930 kg 20.71
7% for nuts, bolts, plates 60.6016 kg 60.60
926.34 Total= Kg 926.34 0.00 250.00 0.00
67 Panipatti
Providing and laying 20mm. thick Cement Water Bead
(Pani Patti) finished perfectly smooth including
0.00
necessary scaffolding, raking the joint, wetting the
surface and curing all complete work 0.0 rm 0.0 0.00 400.00
68 Flooring works
82 Roofing works
Providing and placing waterproof plywood for roofing
including transportation, cutting, connecting and
placing in position with nails, hooks, etc. all complete
as per drawings, specifications and instruction.
4.000 6.932 27.73
27.7 sqm. 27.73 0.00 700.00 0.00
for RT Walls (From North To South) 1.00 3.70 0.90 0.15 cum. 0.50
1.00 2.00 0.90 0.15 cum. 0.27
1.00 6.75 0.90 0.15 cum. 0.91
1.00 4.00 0.90 0.15 cum. 0.54
1.00 3.80 0.90 0.15 cum. 0.51
1.00 8.80 0.90 0.15 cum. 1.19
1.00 4.75 0.90 0.15 cum. 0.64
1.00 1.10 0.90 0.15 cum. 0.15
1.00 11.30 0.90 0.15 cum. 1.53
2.00 1.00 0.90 0.15 cum. 0.14
1.00 4.45 0.90 0.15 cum. 0.60
1.00 3.40 0.90 0.15 cum. 0.46
1.00 4.75 0.90 0.15 cum. 0.64
for RS Walls (From North To South) -2nd step 1.00 3.80 0.85 0.15 cum. 0.48
1.00 5.50 0.85 0.15 cum. 0.70
1.00 5.20 0.85 0.15 cum. 0.66
1.00 5.90 0.85 0.15 cum. 0.75
1.00 3.00 0.60 0.15 cum. 0.27
1.00 1.50 0.60 0.15 cum. 0.13
1.00 1.30 0.60 0.15 cum. 0.12
1.00 2.50 0.60 0.15 cum. 0.22
1.00 1.20 0.60 0.15 cum. 0.11
1.00 2.10 0.60 0.15 cum. 0.19
1.00 5.30 0.60 0.15 cum. 0.48
1.00 4.60 0.60 0.15 cum. 0.41
for RS Walls (From North to South) -3rd step 1.00 2.30 0.60 0.15 cum. 0.21
1.00 1.65 0.60 0.15 cum. 0.15
1.00 2.10 0.60 0.15 cum. 0.19
1.00 1.30 0.60 0.15 cum. 0.12
1.00 3.00 0.60 0.15 cum. 0.27
1.00 13.50 0.60 0.15 cum. 1.21
for RS Walls (From North to South) -4th step 1.00 15.00 0.60 0.15 cum. 1.35
Outer wall 1.00 17.10 0.60 0.15 cum. 1.54
First step 1.00 10.40 0.60 0.15 cum. 0.94
center 1.00 8.04 0.60 0.15 cum. 0.72
for RT Walls (From North To South) 1.00 2.90 0.75 0.15 cum. 0.33
Contractor Prepared By Checked By Approved By
Pages -220 of 333
FIFTH MEASUREMENT SHEET
अघिल्लो यस हालसम्म
नापी नापीबाट परिमाण सूची
काम/सेवाको विवरण यस नापीको मापनको आयाम अध्यावधिक
क्र.सं. किताबमा कायम (BoQ) मा जम्मा रकम
काम भएको
चढेको भएको उल्लिखित दर
क्रियाकलाप परिमाण संख्या लम्बाइ चौडाइ उचाइ ईकाई परिमाण परिमाण
१ २ ३ ४ ५ ६ ७ ८ ९ १० ११ १२=१०*११
1.00 9.40 0.75 0.15 cum. 1.06
1.00 6.80 0.75 0.15 cum. 0.76
1.00 6.90 0.75 0.15 cum. 0.78
1.00 8.40 0.75 0.15 cum. 0.95
1.00 5.20 0.75 0.15 cum. 0.59
1.00 7.10 0.75 0.15 cum. 0.80
1.00 8.80 0.75 0.15 cum. 0.99
East side 1.00 6.50 0.90 0.15 cum. 0.88
South east side 1.00 2.20 0.90 0.15 cum. 0.30
South side 1.00 28.50 0.90 0.15 cum. 3.85
River bank wall 1.00 8.50 2.00 0.15 cum. 2.55
1.00 9.50 2.00 0.15 cum. 2.85
1.00 6.50 1.75 0.15 cum. 1.71
1.00 4.45 1.75 0.15 cum. 1.17
1.00 6.43 1.75 0.15 cum. 1.69
1.00 0.80 1.75 0.15 cum. 0.21
1.00 5.10 1.75 0.15 cum. 1.34
1.00 2.32 1.75 0.15 cum. 0.61
1.00 3.30 1.75 0.15 cum. 0.87
1.00 11.10 1.75 0.15 cum. 2.91
1.00 1.45 1.75 0.15 cum. 0.38
1.00 3.95 1.75 0.15 cum. 1.04
1.00 7.50 1.75 0.15 cum. 1.97
1.00 1.80 1.75 0.15 cum. 0.47
RO Base 1.00 31.00 1.50 0.20 cum. 9.30
RE 1.00 33.80 1.50 0.20 cum. 10.14
RE 1.00 13.00 1.50 0.20 cum. 3.90
RE 1.00 4.30 1.00 0.20 cum. 0.86
RE 1.00 9.00 1.00 0.20 cum. 1.80
RC 3.00 3.50 5.30 0.20 cum. 11.13
RS1 1.00 20.00 0.75 0.20 cum. 3.00
RS2 1.00 19.50 0.75 0.20 cum. 2.93
RS3 1.00 19.50 0.75 0.20 cum. 2.93
RS4 1.00 23.90 0.75 0.20 cum. 3.58
RE 1.00 13.00 0.40 0.20 cum. 1.04
1.00 29.70 0.40 0.20 cum. 2.38
1.00 24.70 0.40 0.20 cum. 1.98
1.00 11.50 0.40 0.20 cum. 0.92
1.00 10.40 0.40 0.20 cum. 0.83
1.00 13.90 0.40 0.20 cum. 1.11
1.00 10.90 0.40 0.20 cum. 0.87
1.00 11.50 0.40 0.20 cum. 0.92
1.00 5.50 0.40 0.20 cum. 0.44
1.00 28.00 0.40 0.20 cum. 2.24
1.00 24.70 0.40 0.20 cum. 1.98
1.00 11.90 0.40 0.20 cum. 0.95
RCC 1.00 6.30 1.15 0.20 cum. 1.45
7 RCC Works
Concrete Works for RCC (1:1.5:3) M20 on landscape
and drainage works in perfect line and level with
proper compaction and curing for at least 15 days
including supply of materials all complete as per
design, drawing, specification and satisfaction to site
engineer.
2.000 2.100 0.900 0.300 cum 1.13
1.000 4.300 0.900 0.250 cum 0.97
2.000 1.050 0.900 0.250 cum 0.47
9.000 0.300 0.300 0.750 cum 0.61
2.000 0.300 0.600 1.100 cum 0.40
1.000 43.240 0.100 cum 4.32
15 MS STEEL WORKS
Providing and placing structural steel tested grade Fe-
250 equivalent NS, for structural work including
transportation, cutting, connecting and placing in
position,treated with two coat of anticorrosive paints,
all complete as per drawings, specifications and
instruction.
90mmx90mm 4.00 2.35 14.00 kg 131.60
9.00 2.58 14.00 kg 325.08
30 RCC Works
Concrete Works for RCC (1:1.5:3) M20 on landscape
and drainage works in perfect line and level with
proper compaction and curing for at least 15 days
including supply of materials all complete as per
design, drawing, specification and satisfaction to site
engineer.
Grid 3-4 footing 2.000 0.900 0.900 0.300 cum 0.49
Wall footing 1.000 5.000 1.150 0.250 cum 1.44
concrete pedestal-single post 8.000 0.300 0.300 0.750 cum 0.54
concrete pedestal-double post 2.000 0.300 0.600 1.100 cum 0.40
RCC SLAB 1.000 36.180 0.100 cum 3.62
Concrete band 2.000 4.196 0.450 0.100 cum 0.38
Total= cum 6.86 6.86 16000.00 109682.24
38 MS STEEL WORKS
Providing and placing structural steel tested grade Fe-
250 equivalent NS, for structural work including
transportation, cutting, connecting and placing in
position,treated with two coat of anticorrosive paints,
all complete as per drawings, specifications and
instruction. Kg/m
100mmx100mmx 4mm post 12.000 2.775 11.730 kg 390.61
100mmx100mmx 4mm beam 1.000 15.764 11.730 kg 184.91
100mmx100mmx 4mm beam 6.000 1.987 11.730 kg 139.85
100mmx100mmx 4mm beam 4.000 1.363 11.730 kg 63.95
75mmx75mmx 4mm bench 1.000 7.650 8.590 kg 65.71
50mmx50mmx 3.6mm bench 2.000 2.100 4.930 kg 20.71
7% for nuts, bolts, plates 60.6016 kg 60.60
Total= Kg 926.34 926.34 250.00 231584.71
67 Panipatti
Providing and laying 20mm. thick Cement Water Bead
(Pani Patti) finished perfectly smooth including
44640.00
necessary scaffolding, raking the joint, wetting the
surface and curing all complete work rm 111.6 111.60 400.00
68 Flooring works
82 Roofing works
Providing and placing waterproof plywood for roofing
including transportation, cutting, connecting and
placing in position with nails, hooks, etc. all complete
as per drawings, specifications and instruction.
4.000 6.932 27.73
sqm. 27.73 27.73 700.00 19410.03
-
Total= 7.00 7.00 7.00 25000.00 175000.00
Providing, fabricating & fixing salwood(agrath) wooden
beams, meths, etc. fixing in pillar with joint properly
polished and finished in perfect line, level along with all
104
necessary accessories along with wood primer all
complete as per design, drawing, specification and
instruction
MB beam 10.000 4.000 0.075 0.100 cum. 0.30
IB beam 24.000 0.576 0.075 0.075 cum. 0.08
IB1 beam 4.000 4.000 0.075 0.075 cum. 0.09
CB beam 10.000 5.153 0.075 0.075 cum. 0.29
diagonal struts 4.000 2.300 0.050 0.050 cum. 0.02
truss 4.000 6.435 0.050 0.050 cum. 0.06
truss 4.000 4.092 0.075 0.075 cum. 0.09
purlin 4.000 13.084 0.075 0.075 cum. 0.29
Total= Cum 1.23 1.23 250000.00 307856.56
105 Roofing works
Providing and placing waterproof plywood for roofing
including transportation, cutting, connecting and
placing in position with nails, hooks, etc. all complete
as per drawings, specifications and instruction.
4.000 6.932 27.73
- 27.73 27.73 700.00 19410.03
Providing and placing ikotile for roofing including
106 transportation, cutting, connecting and placing in 69321.56
position with nails all complete as per drawings,
specifications and instruction. sqm. - 27.73 27.73 2500.00
4.000 6.932 27.73
107 Plastering and Painting Works
Providing and laying 12.5mm thick plaster upto
required line and perfect smooth level as per site
condition in 1:4 cement sand mortar on brick walls
including necessary scaffolding , cleaning & wetting 8232.00
the surface, packing of joints and proper curing for 15
days as per drawing, specification and instruction all
complete. sqm. - Sqm 13.72 600.00
Steps 1.000 24.000 0.150 3.600
Steps 1.000 20.480 0.150 3.070
Steps 1.000 18.080 0.150 2.710
Steps 1.000 15.680 0.150 2.350
Steps 1.000 13.280 0.150 1.990
for RT Walls (From North To South) 1.00 3.70 0.90 0.15 cum. 0.50
1.00 2.00 0.90 0.15 cum. 0.27
1.00 6.75 0.90 0.15 cum. 0.91
1.00 4.00 0.90 0.15 cum. 0.54
1.00 3.80 0.90 0.15 cum. 0.51
1.00 8.80 0.90 0.15 cum. 1.19
1.00 4.75 0.90 0.15 cum. 0.64
1.00 1.10 0.90 0.15 cum. 0.15
1.00 11.30 0.90 0.15 cum. 1.53
2.00 1.00 0.90 0.15 cum. 0.14
1.00 4.45 0.90 0.15 cum. 0.60
1.00 3.40 0.90 0.15 cum. 0.46
1.00 4.75 0.90 0.15 cum. 0.64
for RS Walls (From North To South) -2nd step 1.00 3.80 0.85 0.15 cum. 0.48
1.00 5.50 0.85 0.15 cum. 0.70
1.00 5.20 0.85 0.15 cum. 0.66
1.00 5.90 0.85 0.15 cum. 0.75
1.00 3.00 0.60 0.15 cum. 0.27
1.00 1.50 0.60 0.15 cum. 0.13
1.00 1.30 0.60 0.15 cum. 0.12
1.00 2.50 0.60 0.15 cum. 0.22
1.00 1.20 0.60 0.15 cum. 0.11
1.00 2.10 0.60 0.15 cum. 0.19
1.00 5.30 0.60 0.15 cum. 0.48
1.00 4.60 0.60 0.15 cum. 0.41
for RS Walls (From North to South) -3rd step 1.00 2.30 0.60 0.15 cum. 0.21
1.00 1.65 0.60 0.15 cum. 0.15
1.00 2.10 0.60 0.15 cum. 0.19
1.00 1.30 0.60 0.15 cum. 0.12
1.00 3.00 0.60 0.15 cum. 0.27
1.00 13.50 0.60 0.15 cum. 1.21
for RS Walls (From North to South) -4th step 1.00 15.00 0.60 0.15 cum. 1.35
Outer wall 1.00 17.10 0.60 0.15 cum. 1.54
First step 1.00 10.40 0.60 0.15 cum. 0.94
center 1.00 8.04 0.60 0.15 cum. 0.72
for RT Walls (From North To South) 1.00 2.90 0.75 0.15 cum. 0.33
1.00 9.40 0.75 0.15 cum. 1.06
1.00 6.80 0.75 0.15 cum. 0.76
1.00 6.90 0.75 0.15 cum. 0.78
Contractor Prepared By Checked By Approved By
Pages -295 of 333
MEASUREMENT SHEET
यस हालसम्म
काम/सेवाको विवरण यस नापीको मापनको आयाम नापीबाट अध्यावधिक परिमाण सूची
क्र.सं. कायम काम भएको (BoQ) मा जम्मा रकम
भएको उल्लिखित दर
क्रियाकलाप संख्या लम्बाइ चौडाइ उचाइ ईकाई परिमाण परिमाण
१ २ ४ ५ ६ ७ ८ ९ १० ११ १२=१०*११
1.00 8.40 0.75 0.15 cum. 0.95
1.00 5.20 0.75 0.15 cum. 0.59
1.00 7.10 0.75 0.15 cum. 0.80
1.00 8.80 0.75 0.15 cum. 0.99
East side 1.00 6.50 0.90 0.15 cum. 0.88
South east side 1.00 2.20 0.90 0.15 cum. 0.30
South side 1.00 28.50 0.90 0.15 cum. 3.85
River bank wall 1.00 8.50 2.00 0.15 cum. 2.55
1.00 9.50 2.00 0.15 cum. 2.85
1.00 6.50 1.75 0.15 cum. 1.71
1.00 4.45 1.75 0.15 cum. 1.17
1.00 6.43 1.75 0.15 cum. 1.69
1.00 0.80 1.75 0.15 cum. 0.21
1.00 5.10 1.75 0.15 cum. 1.34
1.00 2.32 1.75 0.15 cum. 0.61
1.00 3.30 1.75 0.15 cum. 0.87
1.00 11.10 1.75 0.15 cum. 2.91
1.00 1.45 1.75 0.15 cum. 0.38
1.00 3.95 1.75 0.15 cum. 1.04
1.00 7.50 1.75 0.15 cum. 1.97
1.00 1.80 1.75 0.15 cum. 0.47
RO Base 1.00 31.00 1.50 0.20 cum. 9.30
RE 1.00 33.80 1.50 0.20 cum. 10.14
RE 1.00 13.00 1.50 0.20 cum. 3.90
RE 1.00 4.30 1.00 0.20 cum. 0.86
RE 1.00 9.00 1.00 0.20 cum. 1.80
RC 3.00 3.50 5.30 0.20 cum. 11.13
RS1 1.00 20.00 0.75 0.20 cum. 3.00
RS2 1.00 19.50 0.75 0.20 cum. 2.93
RS3 1.00 19.50 0.75 0.20 cum. 2.93
RS4 1.00 23.90 0.75 0.20 cum. 3.58
RE 1.00 13.00 0.40 0.20 cum. 1.04
1.00 29.70 0.40 0.20 cum. 2.38
1.00 24.70 0.40 0.20 cum. 1.98
1.00 11.50 0.40 0.20 cum. 0.92
1.00 10.40 0.40 0.20 cum. 0.83
1.00 13.90 0.40 0.20 cum. 1.11
1.00 10.90 0.40 0.20 cum. 0.87
1.00 11.50 0.40 0.20 cum. 0.92
1.00 5.50 0.40 0.20 cum. 0.44
1.00 28.00 0.40 0.20 cum. 2.24
1.00 24.70 0.40 0.20 cum. 1.98
1.00 11.90 0.40 0.20 cum. 0.95
RCC 1.00 6.30 1.15 0.20 cum. 1.45
RCC 1.00 4.45 1.00 0.20 cum. 0.89
RCC 1.00 3.10 1.10 0.20 cum. 0.68
RCC 1.00 1.20 2.50 0.20 cum. 0.60
PCC At Aarati Side 1.00 5.40 4.80 0.20 cum. 5.18
1.00 4.55 1.95 0.20 cum. 1.77
1.00 2.10 3.47 0.20 cum. 1.46
B Road works
Dimantling of existing
1 DoR-2.4 (ii) B
structures
brick masonry works
drain inner portion 2 350.00 0.25 0.50 cum. 87.50
cum. 87.50 87.50 1853.57 162,187.37
2 DoR-10.8 Stone soling
Providing and laying of hand pack
Stone soling with 150 to 200 mm
thick stones and packing with
smaller stone on prepared surface
as per Drawing and Technical
Specifications.
Unit = cum [For 5 cum]
trench filling 2 350.00 0.60 0.50 cum. 210.00
drain bed 2 350.00 1.00 0.10 cum. 70.00
cum. 280.00 280.00 7689.92 2,153,178.58
3 DoR - 20.2 A Concreting work.
PCCM15with screen river aggregate
and approved level, lines abd
dimension and curing all complete
as per specification and instruction
of engineer
(A) Bed PCC M15 2 350.00 1.00 0.100 cum. 70.00
(B) Wall top PCC M15
drain wall-inner 2 350.00 0.38 0.050 m3 13.30
drain wall-outer 2 350.00 0.25 0.050 m3 8.75
tick drain 2 350.00 0.20 0.075 m3 10.50
cum. 102.55 102.55 10669.15 1,094,121.13
4 DoR-25.1D Brick masonry works
Brick work (1:6) in with approved
quality of first class bricks in perfct
line and level, finished including
wetting the bricks packing the joints
and curing the complete in all types
and thickness of walls as per
specification and instruction of
engineer
drain wall-inner 2 350.00 0.38 0.80 m3 212.80
drain wall-outer 2 350.00 0.25 0.40 m3 70.00
m3 282.8000 282.80 14298.82 4043706.13
Total
SN Description of work Nos Length Breadth Height Unit Quantity Rate Amount Remarks
Quantity
Dimantling of existing
1
structures
brick masonry wrks
drain inner portion 2 350.00 0.25 0.50 cum. 87.50
cum. 87.50 87.50 1015.00 88,812.50
2 Gravelling filling
Gravel filling in bed of excavated
material trench with approved
quality in layers not exceeding
15cm at a time and with adequate
watering till full consolidation as per
instruction of engineer
trench filling 2 350.00 0.60 0.80 cum. 336.00
drain bed 2 350.00 1.00 0.10 cum. 70.00
cum. 406.00 406.00 2534.25 1,028,905.50
3 Concreting work.
PCC(1:3:6) with screen river
aggregate and approved level, lines
abd dimension and curing all
complete as per specification and
instruction of engineer
(A) Bed PCC (1:3:6) 2 350.00 1.00 0.100 cum. 70.00
cum. 70.00 70.00 8183.01 572,810.70
Brick work (1:6) in with approved
quality of first class bricks in perfct
line and level, finished including
wetting the bricks packing the joints
4
and curing the complete in all types
and thickness of walls as per
specification and instruction of
engineer
drain wall-inner 2 350.00 0.38 0.80 m3 212.80
drain wall-outer 2 350.00 0.25 0.40 m3 70.00
m3 282.80 282.80 11580.15 3274866.42
12mm thick plaster (1:4) cement
sand plaster on wall of good finish,
including raking the joints, cleaning
5
and wetting the surface and curing
the works all the complete as per
instruction of engineer.
drain wall-inner 2 350.00 0.80 m2 560.00
drain wall-outer 2 350.00 0.40 m2 280.00
m2 840.00 840.00 269.27 226186.80
Punning work: Cement punning of
6 3mm thick cement slurry on
plastered surface
drain wall-inner 2 350.00 0.80 m2 560.00
drain wall-outer 2 350.00 0.40 m2 280.00
m2 840.00 840.00 252.59 212175.60
7 PCC 1:2:4 works
wall
drain wall-inner 2 350.00 0.38 0.050 m3 13.30
drain wall-outer 2 350.00 0.25 0.050 m3 8.75
tick drain 2 350.00 0.20 0.075 m3 10.50
m3 32.55 32.55 9,354.71 304495.81
Total
SN Description of work Nos Length Breadth Height Unit Quantity Rate Amount Remarks
Quantity
8 Grader work
Sub-grade ( Existing pitch, gravel &
side shoulder cutting ), preparation
for designed road formation level
with grader machine.
road stretch 1 350.00 8.00 m2 2,800.00
350.00 m2 2,800.00 2,800.00 16.51 46228.00
9 Preparation of Sub Base Work
Supplying and constrcution of sub-
base with watering and rolling by 8-
10 ton roller in layersnot exceeding
15cm at a time and with adequate
watering til full consolidation as per
instruction of engineer
road stretch 1 350.00 8.00 0.150 m3 420.00
portion 1 150.00 6.00 0.300 m3 270.00
m3 690.00 690.00 2,534.25 1748632.50
10 Preparation of base course
Supplying, Laying & grading of
crusher run material base course of
mentioned thickness and watering,
proper levelling and cambering of
road including compaction with
roller & haulling up to 10 m
distance , as per the instruction of
Engineer's all complete
road stretch 1 350.00 7.00 0.10 m3 245.00
350.00 m3 245.00 245.00 3665.81 898123.45
11 Prime Coat
Providing and spraying bituminious
prime coat of 60:40 including
cleaning the road surface using wire
brushes, broom etc. on base course
before applying prime coat
including supply of materials all
complete.
road stretch 1 350.00 7.00 m2 2,450.00
350.00 lit 2,450.00 2450.00 127.69 312840.50
12 Tack coat
Providing and spraying bituminious
tack coat including cleaning the
road surface using wire brushes,
broom etc. on the surface before
applying tack coat including supply
of materials all complete.
road stretch 1 350.00 7.00 m2 2,450.00
350.00 lit 1,225.00 1225.00 119.27 146105.75
Total
SN Description of work Nos Length Breadth Height Unit Quantity Rate Amount Remarks
Quantity
14 Steel Reinforcement Work
Steel reinforcement bar including
stringtening,cutting, bending,
binding with 20 SWG wire and fixing
in positions as per drawings,
specifications, and complete work
as per instruction of engineer.
for cover slab :
10mm dia main bar @ 5" c/c 8760 1.00 0.617 kgs 5407.41 1752
No. of
15768 0.40 0.395 kgs 2491.73 cover
8mm dia distribution bar @ 6" c/c slabs
kgs 7899.14 7899.14 108.20 854687.03
15 Form work
Centering and shuttering with
wooden/plywood formworks for RCC
works including all necessary
propping, scaffolding, staging
supporting etc. all complete as per
specification and instruction of
engineer.
for cover slab : 1752 2.80 0.10 m2 490.56
m2 490.56 122.64 782.51 95967.03
16 P.C.C for R.C.C (1:2:4)
PCC (1:2:4) for R.C.C work
including mixing, laying, finishing to
approved level, lines and dimension
and curing all complete as per
specification and instruction of
engineer.
for cover slab : 1752 1.00 0.40 0.10 m3 70.08
m3 70.08 70.08 9354.71 655578.08
17 Site Clearance
Clearing of exisitng drain free from
debris, mud , stone , waste and
Depositing of outcasted debris to
site and dumping yard and site LS 15000.00
clearance after completion of work,
with all work complete
Sub-Total 10681300.10
Overhead @ 15% 1602195.02
Sub-Total 12283495.12
VAT @ 13% 1596854.37
Sub-Total 13880349.48
Contingencies @ 3% 416410.48
Grand Total 14296759.97