(Draft) p2c4 MRW DD St03 ZZ DWG S 01500 RC Details Bbs
(Draft) p2c4 MRW DD St03 ZZ DWG S 01500 RC Details Bbs
DULE ROOF SLAB BOTTOM REINFORCEMENT SCHEDULE COUPLER REINFORCEMENT SCHEDULE COLUMN REINFORCEMENT SCHEDULE
BAR BAR
BAR MARK BAR DESCRIPTION REMARKS BAR MARK BAR DESCRIPTION REMARKS
BAR MARK BAR DESCRIPTION SHAPE REMARKS BAR MARK BAR DESCRIPTION SHAPE REMARKS BAR MARK BAR DESCRIPTION SHAPE REMARKS SHAPE SHAPE
T12 @135 c/c 000 T25 @ 135 000 T32 @ 135 3rd LAYER
000 T32 @135 c/c 2nd LAYER 000 T32 @135 c/c 2nd LAYER 000
T12 @270 c/c
000 T20 @ 135 000 T20 @ 135 2nd LAYER
T12 @135 c/c 000 T32 @ 135 000 T40 @ 135 2nd LAYER
000 T32 @135 c/c 000 T32 @135 c/c 000
T12 @270 c/c
000 T40 @ 135 000 TO 000 NOT USED
T12 @135 c/c 000 T32 @ 135 000 T20 @ 135 2nd LAYER
000 T25 @135 c/c 000 T25 @135 c/c 000
T12 @270 c/c
000 T16 @ 135 000 T32 @ 135 2nd LAYER
000 T32 @135 c/c 2nd LAYER 000 T32 @135 c/c 2nd LAYER 000 T20 @ 135 000 TO 000 NOT USED
T32 @135 c/c T32 @135 c/c 000 T40 @ 135 000 T12 @ 135
000 000
000 T40 @135 c/c 2nd LAYER 000 T40 @135 c/c 2nd LAYER
000 T40 @ 135 2nd LAYER
000 T25 @135 c/c 000 T25 @135 c/c 000 T25 @ 135
0 2500 5000
mm
1:100
REFERENCE DRAWING/ NOTES REVISIONS NO OBJECTION FROM CMRL LEAD DESIGN CLIENT PACKAGE NO
DETAIL DESIGN CONSULTANT
1.
2.
ALL DIMENSIONS ARE IN MILLIMETERS.
ALL LEVELS ARE IN METERS, INDICATING 'TOP OF CONCRETE' OF SLABS.
The design and drawings as certified and submitted by the designer have been reviewed and proof checked. CHECKER CERTIFICATION P2C4/04
No Objection subjected to Revision and Resubmission Required
No Objection DRG.ISSUE RECORD STATUS
3. CONCRETE TO BE GRADE M40 MINIMUM. comments as noted subjected to comments as noted DRAWING TITLE
4. REINFORCEMENT TO BE HIGH YIELD, WITH A MINIMUM CHARACTERISTIC
YIELD STRENGTH OF 500 N/mm² FOR REBARS AND 415 N/mm² FOR STIRRUPS. CHECKED BY REVIEWED BY APPROVED BY DATE Concept Design
5. CONTRACTOR NEED TO CHECK SIZE AND LOCATION REQUIREMENT FOR ST03 - KUTCHERY ROAD STATION Preliminary Design
TEMPORARY OPENING.
6. MINIMUM COVER SHALL BE 45 mm IN ALL SLABS EXCEPT FOR BOTTOM OF
BASE SLAB WHERE IT SHALL BE 80 mm. PROJECT TITLE TYPICAL REINFORCEMENT DETAILS Definitive Design
7. FOR DETAILS OF CAP BEAM, PLEASE REFER TO TYPICAL DRAWING By Detail Design Consultant Construction Reference UG KD 8
P2C4-MRW-CR-ST03-ZZ-DWG-S-04010. Chennai Metro Rail Detail Design Consultancy FOR COULMNS
8. FOR LAP LENGTHS AND ANCHORAGE LENGTHS, PLEASE REFER TO DESIGNED BY CHECKED BY APPROVED BY DATE Phase-2 Corridor-4 / Package-04 Good for Construction
GENERAL NOTES P2C4-MRW-CR-XXXX-XX-DWG-S-01010/01020.
For the works and Services of the Detailed Design and Drawings for the Alignment, DRAWING NUMBER SCALE REV
9. FOR REINFORCEMENTS OF D-WALL , PLEASE REFER TO 01 09-09-2020 MA DRAFT - FOR REVIEW JS RN Civil,Structural,Architectural, MEP,TVS,VAC & Track Works Covering the Alignment
P2C4-MRW-CR-ST03-ZZ-DWG-S-07010/07020/07030/07040.
REV DATE BY DESCRIPTION CHEKD APPRD SR JS RN 09-09-2020 and Underground Stations from Lighthouse to Meenakshi college in Corridor 4 of
Phase-II of Chennai Metro Rail Project. P2C4-MRW-CR-ST03-RL-DWG-S-01500 AS SHOWN 01