0% found this document useful (0 votes)
26 views1 page

Marking Room List 1814 J Lyt A 00009 05 - Ground Floor

The document contains a detailed layout and specifications for various types of skirting and coving finishes, including different materials and heights. It also includes references to specific areas and equipment within a facility, such as tanks, process areas, and utility buildings. The information is structured in a way that outlines the requirements for installation and materials used in construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Marking Room List 1814 J Lyt A 00009 05 - Ground Floor

The document contains a detailed layout and specifications for various types of skirting and coving finishes, including different materials and heights. It also includes references to specific areas and equipment within a facility, such as tanks, process areas, and utility buildings. The information is structured in a way that outlines the requirements for installation and materials used in construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

A B C D E F G H J

DO NOT SCALE SKIRTING FINISH/ WALL TILE LEGEND TRUE


NORTH

46.
S1 - HOMOGENOUS TILES SKIRTING 100 HIGH
S1A - ACID RESISTANCE HOMOGENOUS TILES SKIRTING 100 HIGH
N

25
S2 - HOMOGENOUS NON-SLIP TILES SKIRTING 100 HIGH PLANT
S3 - EPOXY COVING OVER EPOXY SCREED- 75MM RADIUS
NORTH
S3A - EPOXY SKIRTING- 100MM HIGH
S4 - CONCRETE COVING
S5 - PU COVING OVER EPOXY SCREED-75MM RADIUS WATER METER STAND

34A
WEIGH
BRIDGE
35A

100 1

195

S6 - VINYL COVER OVER WALL AS SKIRTING-100 HIGH


DS-WAREHOUSE AREA 9A MAT. ENT.
GUARD HOUSE 17A 200
95 5
1a TANK FARM
105

9 AREA 30A
BIN CENTER
BIO WASTE
205
190

90 10
110

7 7
185

S6A - ANTI-STATIC VINYL COVER OVER WALL AS SKIRTING-100


PROCESS
39A 210

N3
AIR NaOH SOLVENT DAY
BUFFER 22 SOLVENT 85 15

2.0 M. FORK LIFT PATH


P1 P1 P1 P1

TANK STORAGE TANKS SOLVENT RECOVERY 20


PLANT 115
(FERMENTERS) DRUM SOLVENT
DS-PROCESS AREA PROPOSED PROCESS AIR BUFFER TANK 22A 3A FFL 98.550
STORAGE DRUM 180

MANIFOLD
REGULATING
24
3,000Nm/hr 3,000Nm/hr

STORAGE
VAPORISER VAPORISER

215
1 FGL 98.100 18 80 20
OXYGEN TANK
50,000 L
OXYGEN OXYGEN

18A 120
AMMONIA
EQUIPMENT ERECTION BAY
SKID 2.0 M. FORK LIFT PATH 175
26A FOR
CHEM. CHEM.

HIGH
FERMANTER 220
PROCESS PROPOSED DS BUILDING SOLVENT RECOVERY PLANT DRUM DRUM 124 75 25
FREE SPACE FOR EQUIP. SOLVENT

FFL 100.000
ERECTION & MAINTENANCE KILL
TANK
DRAIN
TANK
RECOVERY 37 STORAGE 19A
STORAGE
AMMONIA
FGL 99.550 PROCESS SKID 25A 1A 20A
CONTROL
ROOM 19 40A PARKING
KILL DRAIN FOR 21A AREA

PROPOSED DS BUILDING
TANK
TANK FERMENTER
GAS
12 HYDRANT TANK-1
225
125 74 26
21 25 26 32A CYLINDER
STORAGE
POTABLE WATER STORAGE TANK

23
SCHEDULE 38A
HYDRANT 31TANK-2 WASTE 170
EQUIPMENT

S7 - VINYL COVER OVER CONCRETE COVING/EPOXY MORTAR


ERECTION BAY
SOLVENT DAY 13 PROCESS
230
130
70 30
STORAGE TANK COOLING
14 SPRINKLER TANK-1 WATER
UTILITY
3 AUDIT BLOCK
TOWER
FIRE
36
TANK
8A BLDG 165
WATER
PUMP SPRINKLER TANK-2
27
ENTRY HOUSE 235 65 35
HYDROGEN 135
PSA N2 PROCESS
CYLINDER
AREA WATER TANK
STORAGE COOLING TOWER IA WET
AIR
RECEIVER
IA DRY
AIR
RECEIVER
COOLING TOWER ON TERRACE 160
ON TERRACE OF UTILITY BUILDING
15

COVING
27A EQUALIZATION
TANK
240 60 40
11KV SUB. 13A 140

ROAD
N2
RECEIVER
EQUALIZATION
DS-LAB AREA STATION UTILITY BLDG N2
PSA-N2 PSA-N2
TANK
11KV SUB.
RECEIVER

PROPOSED 155
2 15A

POTABLE WATER
MAINTENANCE OFFICE
1b

STORAGE TANK
28 LANDSCAPE STATION 8
AREA 2A 23A 245 145
55 45
Kill Tank - 1 Kill Tank - 2 Caustic Lye Tank 40A 28 1

150
W 30
51 50

S7A - ANTI-STATIC VINYL COVER OVER CONCRETE COVING/EPOXY


L2 40
20
10
U
250
15
11 46

254

FFL 100.000

MOTORCYCLE
FGL 99.550

PARKING
CANOPY ABOVE

MORTAR COVING
4 WORKSHOP

R&D CENTRE 39A

7a

11

S8 - CONCRETE SKIRTING

OPEN TO SKY
DP WAREHOUSE EXPANSION PROVISION FOR FUTURE EXPANSION

5B
DP-PROCESS DP-WAREHOUSE

FACILITY BLDG. 5 5a
6

S9 - GRANITE SKIRTING 100 HIGH FFL 100.000


FGL 99.550

6.0 M. WIDE ROAD


WATERBODY

28 FFL 98.550

OPEN TO SKY
S10 - COMPRESSED MARBLE SKIRTING 100 HIGH
10 FGL 98.100
5 FFL 100.000 FFL 100.000
FGL 99.550 FGL 99.550 MAIN ELECTRIC SUBSTATION
LAND.
AREA 4 3 2 1

BULK DIESEL
SPACE FOR
LOW HEIGHT
BOUNDARY
WALL
16
29

EXTERNAL PLATFORM RAMP UP A

S11 - MARBLE SKIRTING 100 HIGH


7 7b P1
6.0 M. WIDE ROAD

2.0M WIDE
PATHWAY

S12 - WOODEN SKIRTING


S12A- LAMINATED WOOD
WASTE STAGING
FC1 3500 WASTE EXIT FC1 3500 F8 S8 S13 - CARPET SKIRTING OVER CONCRETE SKIRTING KEY PLAN
0WG544 SORTING F9 S5 WF5 CORRIDOR F9 S5 WF5
FC1 3500 0WG543 0WG542 - - - S14 - Z' PROFILE ALUMINIUM SKIRTING
F10 S5 WF5
- - - UP NOTES :-
- - - S15 - METALLIC COVING (BY CLEAN ROOM VENDOR) WALL TO
REJECTS (6 CEILING 1. ALL DIMENSIONS ARE IN MILIMETERS AND LEVELS ARE IN METER U.N.O.
- 12000
PALLET EXCHANGE PALLETS @7 F28 S5 WF4 WAREHOUSE
0WG541 HIGH=42NOS) S15A -SS METALLIC COVING (BY CLEAN ROOM VENDOR) WALL
PALLET STAGING 0WG536
- - - 0WG533 2. DO NOT SCALE THIS DRAWING, WORK TO WRITTEN DIMENSIONS ONLY.
- 4800 0WG537
- 14500
TO CEILING
F9 S5 WF5
- 4800 F28 S5 WF4
CF5 - -
F9 S5 WF5 ACID DISPENSING & - - -
S16 -PLASTER COVING (WALL/CEILING) 3. OIL BOUND DISTEMPER TO BE CONSIDERED FOR WALLS AND CEILINGS
- - -
A/L PALLET CLEAN PALLET
STORAGE
0WG523 S17 -METALLIC COVING (BY CLEAN ROOM VENDOR) WALL TO WALL ABOVE FALSE CEILING.
0WG501A
WASH/DRYING
0WG539
0WG540
FC3 3000 FC6 2700
4. READ THIS DRAWING ONLY FOR FINISHING SCHEDULE.
- 4800
UNLOADING AREA
FC5 3000 FC5 3000 F17 WT3 WF1
BATTERY - -
F18 S7 -
S17A -SS METALLIC COVING (BY CLEAN ROOM VENDOR) WALL TO
F10 - WF5 F9 S5 WF4 CHARGING AREA F28 S5 WF4
0WG501
- - -
F9 S5 WF4
- - -
CF1 - -
0WG535 - S15 S17 WALL 5. CONTRACTOR SHALL SUBMIT SAMPLE FINISHES AND METHOD STATEMENT TO
- 4800
F10 S5 WF5 UNCLEAN PALLET
S18 -PLASTER COVING (WALL/WALL) CLIENT FOR APPROVAL.
FC5 3000 FC3 3500 FC6 2700
CF5 - - 0WG538 PASSAGE
SH FC5 2700
F9 S5 WF4
0WG534 F9 S5 WF4 F18 S7 - S19 -SILICON COVING 6. CONTRACTOR TO PROVIDE SHOP DRAWING OF COVING, TRANSITION STRIPS
- - - CF4 - - - S15 S17
0WG510 F16 WT2 WF4
6 -
S23 - CARPET ROLL SKIRTING MDF/ALUMINIUM SKIRTING FOR CARPET FLOORING, ARRANGEMENT OF COVING 6
A/L
0WG525 DEEP FREEZER FC8 3000 A/L A/L WT1 & WT1_b - HOMOGENOUS TILES- 2100 MM HIGH FOR VINYL FLOORS AND ITS TERMINATIONS ETC. FOR APPROVAL.

0WG517
0WG531 0WG532

SHAFT-05
FC1 2700 F20 S19 -

0WG519
0WG506
FC1 2700

A/L-1
FEMALE TOILET-02 FC1 3000 ROOM

A/L-1
FC1 2700
RECV./OFFICE 0WG505
MALE TOILET-02 F16 S2 WF5 F16 S2 WF5 F9 S5 WF4 0WG524 - - - FC5 3000 - 4800 WT2- HOMOGENOUS NON SLIP WALL TILE- 2100MM HIGH
F15 S1 WF5
- - -
0WG502
0WG507 - -- -- - A/L
UPSTREAM CLEAN
DISPENSING SAMPLING - - - DS COLD ROOM DS FG COLD ROOM F10 S5 WF4 F10 - WF4 7. APPROVAL TO BE TAKEN FOR ALL THE FINISHING WORKS ON SAMPLES LAID
FC5 2700 0WG514 0WG516 0WG522 RM COLD ROOM 2 2-8°C LPLC RESINS -18° TO -25°C - - - - - - WT2A- HOMOGENOUS TILES -600MM ABOVE COUNTER TOP
FC5 2700 SH DAY STORAGE
DRIVER TOI.
F16 WT1b WF5
F16 WT1b WF5
SHOE
0WG512
UTILITY ROOM
0WG515 FC6 3000
TO 8°C 0WG527 0WG528 AT SITE FROM CLIENT/CONSULTANT PRIOR TO START OF WORK. ALL WORK

0WG520
0WG514A

0WG518
F9 S5 WF4
- - - CHANGE (F) FC6 3000 0WG526

3000

A/L-2
WT3 -ACID AND ALKALI RESISTANT WALL TILE - 1500MM HIGH

A/L-2
0WG503

-
FC5 2700 F18 S7 -
F16 WT2 WF5 UP - - - 0WG508 CHANGE ROOM(M) FC5
0WG513
2700
- 4800
FC3 3000 F18 S7 -
- S15 S17 FC8 3000 FC8 3000 FC8 3000 HAS TO BE DONE AS PER APPROVED SAMPLES AND TO THE FULL
F16 WT2 WF4 F9 S5 WF4 - S15 S17 F20 S19 - F20 S19 - VESTIBULE 2-8

CF4 -
- - -
FC1 2700 - - -
F9 S5 WF4
CF4 - -
F20 S19 -
- - - - - - 0WG529 DISPATCH ROOM WT4- GLAZED CERAMIC TILES -2100 HIGH SATISFACTION OF ENGINEER IN-CHARGE.

FC3
- - - - - - -
COMMON LOBBY FC1 2700
F10 - F16 S2 WF5 WASH FC8 3000 0WG530
0WG504 F16 S2 WF5
- - - SHOE CH.(M)
FC1 2700
F16 S2 WF5 0WG521 F20 S19 -
FC5 3000
WT7 - HOMOGENOUS TILES NON SLIP- 1500MM HIGH 8. ALL M.S STEEL MEMBERS SHOULD BE PROPERLY FINISHED WITH
- -- -- - - -
0WG511 - F10 S5 WF4
- - - ANTI-RUST PAINT OF APPROVED SHADE.
A/L
0PG501A
LOBBY
FC6 2700 FC7 3000 FC6
F18 S7
2700
- 2.4M WIDE FC3 2700 FC3 2700 WALL FINISH LEGEND
FC1 2700 0PG501
FC3 2700 F18 S7 -
- S15 S17
F9 S5 -
- S15A S17A - S15 S17 CORRIDOR F18 S7 WF4 F18 S7 WF4 9. CONTRACTOR SHALL CROSS CHECK THE SCHEDULE OF QUANTITIES OF
F16 S2 WF5 F18 S7 WF4 CF4 -- --
-- -- CF4 - -
0PG505 CF4 -- --
WF1- ACID RESISTANT PAINT FINISHES FROM THE FINAL CONSTRUCTION PLAN DRAWING AND IN CASE OF
WF2- EPOXY PAINT ANY DISCREPANCY, INFORM THE CONSULTANT/CLIENT BEFORE EXECUTION.
LIFT-4 LIFT-5 HUB RM
A/L
0PG503 0PG504
0PG506 MAT. A/L
TECH SPACE
0PG575
PACKING ROOM 0PG579
BLENDER ROOM
0PG580 MATERIAL A/L WF3- SKIM COAT 10. CONTRACTOR SHALL CROSS CHECK THE PHYSICAL MEASUREMENTS OF ALL
- - - - 0PG583 0PG578 0PG581
FC3 2700
F24
-
-
-
-
-
F24
-
- -
F18 S7 WF4 FC6 2700
FC6 3000 FC6 3500 FC6 3000 FC6 2700 WF4- PU PAINT THE ROOMS & INFORM BACK TO THE CONSULTANT/CLIENT IN CASE OF ANY
CF4 - - F18 S7 -
F9E S5 WF4 F18 S7 - FC1 3000 F18 S7 - F18 S7 - UP
- S15 S17
- S15 S17 - S15 S17 F15 S1 WF5 - S15 S17 - S15 S17 WF5- ACRYLIC EMULSION PAINT MAJOR DISCREPANCY IN THE WRITTEN ROOM DIMENSIONS BEFORE START
STAIRCASE-05 - - - S15 S17
0PG502 F24 - - WF6- WEATHER RESISTANT PAINT OF FINISHES WORK.
- - - CIP (CNC) DHS PACKING ROOM
0PG507 0PG576 0PG577 A/L IN OUT FC6 3000 WF9A-STONE CLADDING AROUND LIFT 11. CONTRACTOR SHALL ENSURE THE THICKNESS OF GRANOLITHIC/ SUB-BASE
- 18000
- 4800
LYOPH LOADING-01 LYOPH LOADING-02 0PG570 F18 S7 - - 18000
F8A - WF6 0PG573 0PG574 FC6 3500 F8A - WF6
FC6 3000 STAIRCASE-06
CF5 - -
F18 S7 WF4
F18 S7 -
F18 S7 - - S15 S17 FOR ALL KINDS OF FLOOR TOPS, WHICH SHOULD BE KEPT IN SUCH A WAY
CF4 - - FC6 3500 FC6
F18 S7
3500
- - S15 S17
- S15 S17
0PG582 CF5
FALSE CEILING LEGEND
F18 S7 -
HVAC, ELECT.& - S15 S17 - S15 S17 AUTOCLAVE SO THAT ALL FLOOR FINISHING TOPS ARE IN SAME LEVEL @ ± 2MM
UNLOADING
INST. SHAFT-04 MEDIA PREP. (CNC) 0PG569 FC1- PRE FINISHED MINERAL FIBER BOARD TILE (600X600MM TOLERANCE UNLESS OTHERWISE SPECIFIED. REFER FLOOR DRAINAGE
0PG509 0PG508 FC7 2700 FC6 3000
-- 18000 F9A S5 - FC6 3000 FC6 3000 CLEAN SUPPLY
FC6 3000
F18 S7 -
EXPOSED GRID) DRAWING FOR SLOPES IN FLOOR. WAREHOUSE VNA FLOOR SHOULD BE
- 4800 F18 S7 - FC6 3000 F9E S5 -
F10 - WF3 - S15 S17 F18 S7 - CORRIDOR CLOSET GRADE C - S15 S17
- -- --
F18 S7 WF4 - S15 S17 F18 S7 - - S15 S17 2.5M WIDE 0PG565
- S15 S17 FC2- PRE FINISHED ACOUSTICAL TILES LAID WITH "0" LEVEL DIFFERENCE STRICTLY AS PER THE SPECIFICATION OF
CF4 - - - S15 S17 0PG571 TECH. SPACE
AUTOCLAVE FC7 2700
GARMENT 0PG568 (600X600MM EXPOSED GRID) VNA MHE VENDOR APPROVED FLOORING.
LOADING AUTOCLAVE
ENTRY TO WASH AREA

0PG513
F9A S5 - GOWNING A/L

TECH.
UNLOADING 0PG514 LOADING
0PG511 - S15 S17 GRADE C 0PG562 0PG564 0PG566
0PG567
FC3- GYPSUM BOARD FALSE CEILING SEAMLESS
FC7 2700 0PG561 FC6 3000
FC6 3000 12. THE ENTIRE PRODUCTION FLOOR TO BE KEPT IN SAME LEVEL
5 GARMENT A/L
F9A S5
- S15 S17
-
FC6 3000
GOWNING
FC6
F18 S7
3000 F18 S7
-
-
- S15 S17
F9 S5 -
FC6
F18 S7
3000
- FC4- GYPSUM BOARD FALSE CEILING TILES WITHOUT ANY SLOPE AND IN "NO CASE" THE SLOPE OF FLOOR SHOULD
5
STORAGE 0PG512 F18 S7 - - S15 S17 - S15 S17
- S15 S17
0PG563
0PG510 - S15 S17
FC7
F9A S5
2700
- FC7 2700
FC5- MOISTURE RESISTANT CALCIUM SILICATE FALSE CEILING BE IN DEFERENT DIRECTION FROM THE LOCATION OF THE FLOOR
FC3 2700 CORRIDOR FC5 2700
- S15 S17 F18 S7 WF4 F9E S5 - PASSAGE TRAPS (DST). AS PER DRAINAGE DRAWING.
CF4 - -
2.7M WIDE - S15 S17
F18 S7 WF4
COLUMN 0PG586 CENTRIFUGE ROOM FC6- PRE FINISHED WALKABLE CLEAN ROOM CEILING PANEL
0PG515 - - - 0PG560
MAINTENANCE FC6 3000 FC6 3000
ROOM F12 S7A - F18 S7 - FC6 3500 FC6A- PRE FINISHED WALKABLE GRP CLEAN ROOM CEILING PANEL 13. IN CASE OF FLOOR TERMINATION BETWEEN DIFFERENT FLOOR FINISHES -
HVAC/PIPING/ELEC./ 0PG559 - S15 S17 - S15 S17 F12 S7A -
THE LINE OF TERMINATION BETWEEN TWO DIFFERENT FLOOR FINISHES
STAIRCASE-04 FC7- PRE FINISHED NON-WALKABLE CLEAN ROOM CEILING PANEL
INSTRU. SHAFT-03 CLEAN - S15 S17

0PG516
0PG518 SUPPLY
FC15 19000 CLOSET FC8- PRE FINISHED COLD ROOM INSULATED CEILING PANELS SHOULD BE STRAIGHT AND WITHOUT ANY GAPS AND SEALED WITH
F10 - WF3 0PG517 MAL
- - - UP APPROVED SEALANT OF EPOXY/PU MATERIAL AND USING TRANSITION STRIP
0PG558
FC6 3000 PURIFICATION-5 FC15-CALCIUM SILICATE BOARD (2HR FIRE RATED)
F12 S7A - GRADE C BETWEEN GRANITE AND CARPET AS PER MANUFACTURER'S SPECIFICATION.
- S15 S17 0PG557
- 9800 FC6 3000 COLD RM. 2°-8°
F10 - WF5 F12 S7A - 51NOS. 100LT.
A/L CEILING FINISH LEGEND 14. FOR AREAS ABOVE NON- WALKABLE FALSE CEILING SHALL NOT TO BE
CF4 - - 0PG555
- S15 S17 CARBOY
0PG556 FC6 3500 PAINTED U.N.O.
F12 S7A - F8 S2 WF6 CF1- ACID RESISTANT PAINT
FC8 2700 - S15 S17 15. VERTICAL FLUSH TYPE SKIRTING TO BE PROVIDED AT NON-CLASSIFIED/
F20 S19 -
- - -
CF2- EPOXY PAINT OFFICE AREAS ONLY. ALL CLASSIFIED AREAS, CNC AREA AND PROCESS
CF3- SKIM COAT TECHNICAL AREAS INCLUDING AHU ROOMS/FLOORS SHOULD HAVE
CF4- PU PAINT COVING MADE OF EPOXY MORTAR AND FINISHED SAME AS FLOOR .
PURIFICATION-4
GRADE D
0PG554
CF5- ACRYLIC EMULSION PAINT 16. EXTERNAL STAIRCASE RAILINGS TO BE PAINTED WITH BLACK ENAMEL
FC6 3500 CF6- RAW FINISH PAINT WITH ANTI DUST COAT.
F12 S7A -
- S15 S17 CF7- OIL BOUND DISTEMPER
2.5M WIDE
RETURN
FERMENTATION CORRIDOR
AREA (CNC) 0PG537
0PG519
FLOOR FINISH LEGEND

- S15 S17
2700
F12 S7A -
- 4800 A/L
F18 - WF4 0PG553
CF4 - - PURIFICATION-3 F1 NON-SLIP EPOXY ( 1MM TOP COAT+3MM

FC6
FC6 3500
F12 S7A - GRADE D
- S15 S17 0PG552 SCREED) (TOTAL - 4MM THK.)
FC6 3500
F12 S7A -
- S15 S17 F2 SELF LEVELED EPOXY ( 1MM TOP COAT +
4 3MM SCREED) (TOTAL - 4MM THK.) 4

F3 SELF LEVELED EPOXY ( 2MM TOP COAT+


A/L OUT 3MM SCREED) (TOTAL - 5MM THK.)
0PG551
COLD RM. 2°-8° 74
TECH FC6 3500
NOS. 100LT. CARPET TILES
SPACE-2 CARBOY
F12 S7A - F6
0PG549 - S15 S17
0PG550
FC6 6300 FC8 2700
F9E S5 - F20 S19 -
- S15 S17 - - -
IN-SITU ROUGH CONCRETE WITH GROOVING
F8
(BROOMED FINISH)
EMPTY CARBOY
STAIRCASE-03

LIFT-3 100 LT 05
IN-SITU ROUGH CONCRETE WITH SCREED
0PG522

0PG521 0PG548
HVAC/ PIPING/ FC15 19000 PURIFICATION-2
INSTRU. SHAFT-02 F10 - WF3 - - GRADE D F8A
0PG520 - - -
- - - FC6 3000 0PG547 (BROOMED FINISH)
- - - F12 S7A -
- S15 S17 FC6 3500
F12 S7A -
- 14800 - S15 S17 F9 PU FLOOR WITH SCREED (TOTAL-8MM THK.)
F10 - WF5
CF5 - -

F9A PU FLOOR WITH SCREED (TOTAL-6MM THK.)

F9C PU FLOOR WITH SCREED INSULATION BELOW


A/L
0PG546 (TOTAL -8MM THK.) (-20 DEGREE COLD ROOM)
FC6 3500
CORRIDOR F12 S7A -
2.5M WIDE - S15 S17 REACTION F9E ANTI STATIC PU FLOOR WITH SCREED (6MM
CELL SEPERATION (GRADE D) GRADE-D
CRYSTAL STORE
AREA (CNC) 0PG527 0PG545
-15°-25° WALK-IN
THK.)
0PG523 FC6 3500 0PG544
- 18000
F10
2700

F12 S7A -
PU BRUSH BOND FINISH
-
F12 S7A -

BOARD ROOM F8A - WF6 - 4800 FC8 2700


- S15 S17
0AG002 CF5 - - F18 S7 WF4 F20 S19 - ANTE ROOM
-

TOILET CF4 - - - - - 0PG543 A/L


FC6

0AG003 0PG542
-

FC6 3500
F12 S7A -
F12 ANTI-STATIC VINYL FLOORING SEAMLESS JOINTS ON
3 TECH SPACE-1
FC8 2700
F20 S19 - - S15 S17
EXTERNAL
TOP OF GRANOLITHIC FLOOR 1814-J-DOC-A-02003-01
ROOM WISE FINISH SCHEDULE
JACOBS
VISITORS - - -
STAIRCASE-02 0PG540 -
CORRIDOR 05
0PG584
1.8M WIDE FC6 6300
CRYSTAL STORE "CNC & NC" AREA-400MM DARK GRAY WITH 1814-J-LYT-A-00021-03 & 00022-03 GROUND FLOOR PLAN JACOBS
F9E S5 -
0PG526 -15° TO -25°
- S15 S17
WALK-IN SKIRTING ANG LIGHT GRAY BASE
F15 S1/S7 WF5

RECEPTION DRAWING NO. TITLE REMARKS


2700

0PG541
-

0AG001 FC8 2700


UP PANTRY F20 S19 -
-

0AG004 FC7 2700 - - - "D" AREA-400MM DARK BLUE BORDER WITH REFERENCE DRAWINGS
FC7

F9 S5 WF4 PURIFICATION-1 RAMP UP


-

- S15 S17 GRADE-D SKIRTING AND LIGHT BLUE BASE


0PG539
FC6 3500
CABIN CABIN F12 S7A - "C" AREA-400MM DARK GREEN BORDER ISSUED FOR APPROVAL/ ENGINEERING/ CONSTRUCTION
RECORD ROOM FC1 2700
0LG511 0LG512 WASH - S15 S17
DOCUMENT F15 S1 WF5
DISINFECTANT

/COPIER 0PG524 A/L WITH SKIRTING AND LIGHT GREEN BASE


0AG005 FC1 2700 FC1 2700 COMPACTOR 2400 - TRANSFORMER-03
0PG525

0PG538 FC6 3000


ROOM

F6 S12 WF5 F6 S12 WF5 FILES - 22000 FC7 2700 ss-0CG504


F9 S5 - FC6 3500 F9 S5 -
- - 0LG513 F10 - WF3
AUDI-1 F12 S7A - - S15 S17
0AG006 CF3 - - - S15 S17
- S15 S17 F14 CONCRETE FLOOR WITH HARDNER
AUDIT EXTERNAL
MALE TOILET-01 -
PREP.ROOM-1 0LG516
0AG007 FC6 3000 CLEAN STAGING A/L WASH AREA
SHAFT-01

FC5 2700 OPERATOR 0PG530 HOMOGENOUS TILES (TILE SIZE - 600 X


0LG515

QA-WORKSTATION FEMALE TOILET-01


F16 WT1b WF5
F12 S7A -
- S15 S17 CONTROL ROOM FC6 3000
0PG531
0PG533 F15
- - - WASTE D.WT.
0LG510 0LG514 0PG529 F9 S5 - TECH AREA FC6 3000 FIT LAB 0LG550 600MM)
- S15A S17A 0PG532 F9 S5 - (DOWNSTREAM)
FC2 2700
F6 S12 WF5 - S15A S17A 0PG534 A/L
- - - FC5 2700 FC5 2700 CORRIDOR
FC6 2700
F12 S7A -
FC6
F9 S5
3000
FC6 3000 0PG535
F16 NON-SLIP HOMOGENOUS TILES (TILE
F16 WT1b WF5 F16 WT7 WF5 0PG527A F18 S7 -
AUDIT PREP. - - - - - -
- S15 S17 - S15 S17
- S15 S17 SIZE-600X600MM)
ROOM-2 ELEC.RM A/L FC7 2700 FC5 2700 CLEAN SUPPLY
- 18000 05 IFC AS MKD. 05 BHATS NV KD 10.08.2023
0AG008 FC1 2700 STORE FC7 2700 FC6 2700
0LG519 0LG541 FC7 2700 F18 S7 - F18 S7 - F16 WT2 WF4 CLOSET F18 S7 -
F8A - WF6
F17 ACID/CHEMICAL RESISTANT
F15 S1 WF5
FC15 JANITOR
0LG518 F18 S7 -
- S15 S17 - S15 S17 - 0LG547 - S15 S17
CF5 - -
04 REV.AS/CLIENT MAIL DT.2-JUN/IFC BHATS NV KD 19.07.2023
0LG517
- S15 S17 (SIZE - 300 X 300MM)
DEG-2
SEC. CHANGE SH MALE PRAYER 03 ISSUED FOR CONSTRUCTION BHATS NV KD 03.05.2023
0LG537

MALE CHANGE
GW-1

FEMALE PRAYER
0LG539
0LG538

0LG540

0LG544 0LG548 ROOM


GW-3
GW-2

GW-4

FC1 2700 A/L LOBBY ROOM ROOM


CORRIDOR DEG-1 ISSUED FOR C21 PACKAGE ADabas NV KD
0LG506
F15 S1 WF5 0LG542 0LG543
0LG546 0LG549
FC7
F18 S7
2700
-
0LG526
0LG523 F18 VINYL FLOORING JOINT FREE OR SEAMLESS JOINTS 02 21.11.2022
- - - FC7 2700 FC2 2700
FC7 2700 FC7 2700 F18 S7 -
FC7
F18 S7
2700
-
- S15 S17 F6 S12 WF5 FC2 2700 01 ISSUED FOR APPROVAL/SIGN-OFF AGautam SD KD 12.03.2021
AUDIT-2 MEETING ROOM 1 LIFT-2 SEC. CH. F6 S12 WF5
CORRIDOR

F18 S7 F18 S7 - S15 S17 - - - HT PANEL ROOM


0LG520

0AG009 0LG508 (GOWN. AREA) - S15 S17 - - -


0LG505 - S15 S17 - S15 S17 ss9CG501
"CNC & NC" AREA-400MM DARK GRAY WITH REVISION DESCRIPTION
SHOE CHANGE

0LG536 LOBBY
FC2 2700 - --
F16 WT2 WF4
2700
0LG527

LOBBY
-

ABLUTION

0LG524
ABLUTION

F6 S12 WF5 TRAINING ROOM-1 HUB RM. TRANSFORMER-01


F20B - - JANITOR STORE SHOE CH. FEMALE CHANGE FC7 2700 IT OFFICE SKIRTING ANG LIGHT GRAY BASE
0LG522

UP
0LG525

0LG502 CLEAN ROOM FC5 2700


0LG530

- - - 0LG507 - 0LG534 0LG533 0LG532 F18 S7 - 0LG529 0LG528 FC2 2700 ss9CG502
ROOM
-
SH

GARMENT F16 WT2 WF4


FC2 2700 FC2 3000 0LG531 - S15 S17 F15 S1 WF4 THIS DRAWING AND/OR ITS CONTENTS, INFORMATION, AND PRINCIPLES OF DESIGN ARE THE
2 2
FC5

MEETING ROOM 2 - -- 0LG535 - - -


F20B S9 WF5 "D" AREA-400MM DARK BLUE BORDER WITH EXCLUSIVE PROPERTY OF JACOBS SOLUTIONS INDIA PRIVATE LIMITED AND IS SUBMITTED TO YOU WITH THE
-

F6 S12 WF5 -
0LG509 - - F20B - - AG REEME NT TH AT IT IS NOT TO BE REPR ODUCED IN ANY MANNER, COPIED, OR MODIFIED, NOR IS
- - - FC7 2700 CORRIDOR FC2 2700 FC5 2700
FC2 2700 - FC7 2700 FC7 2700
F6 S12 WF5 STAIRCASE-1 LIFT-1 F18 S7 - F9 S5 - F18 S7 0LG520 F15 S1 WF5 F16 WT2 WF4 LOBBY FC2 2700 SKIRTING AND LIGHT BLUE BASE IT TO BE RELAYED IN PART OR IN WHOLE TO ANY OTHER FIRM OR INDIVIDUAL FOR
0LG503 0LG521 F15 S1 WF4 ANY OTHER PROJECT EXCEPT BY WRITTEN AGREEMENT WITH JACOBS SOLUTIONS INDIA PRIVATE LIMITED
- 0LG504 - S15 S17 - S15 S17 - S15 S17 - - - -
- - - ACCEPTANCE OF THIS DRAWING WILL BE CONSTRUED AS AN AGREEMENT TO THIS STATEMENT.
"C" AREA-400MM DARK GREEN BORDER
EXTERNAL
MAIN ENTRANCE
FC7 2700 - FC1 2700 FC1 2700 FC7 2700 WITH SKIRTING AND LIGHT GREEN BASE
- 18000
VESTIBULE F15 S6 F15 S1 WF5 F18 S7 - F18 S7 -
0LG501A
F10 - WF5 F20B 0LG501 - S15 S17 FC15 - - - - S17 - S15 S17 05
FC2 3000
F20 GRANITE FLOOR 20MMTHK. NON SLIP
CF5 - -
F20B S9 WF5
0
F20B S9 WF6
Biocon Sdn.Bhd.
- - -
- (FOR COLD ROOM). Plot No.6872-6880, Mukim Nusajaya,
NOTES :-
Johor Darul Takzim,

1.
2.
ALLNOT
DO DIMENSIONS
SCALE THIS
AREDRAWING,
IN MILIMETERS
WORKAND
TO WRITTEN
LEVELS ARE
DIMENSIONS
IN METERONLY.
U.N.O.

3.
OIL BOUND DISTEMPER TO BE CONSIDERED FOR WALLS AND CEILINGS

4.
ABOVE
READ THIS
FALSEDRAWING
CEILING.
ONLY FOR FINISHING SCHEDULE.

5. CLIENT
CONTRACTOR
FOR APPROVAL.
SHALL SUBMIT SAMPLE FINISHES AND METHOD STATEMENT TO

6. MDF/ALUMINIUM
CONTRACTOR TO SKIRTING
PROVIDEFOR
SHOP
CARPET
DRAWING
FLOORING,
OF COVING,
ARRANGEMENT
TRANSITIONOFSTRIPS
COVING

FOR VINYL FLOORS AND ITS TERMINATIONS ETC. FOR APPROVAL.

7.
APPROVAL
AT SITE FROM
TO CLIENT/CONSULTANT
BE TAKEN FOR ALL THE
PRIOR
FINISHING
TO START
WORKS
OF WORK.
ON SAMPLES
ALL WORK
LAID

HAS TO BE DONE
SATISFACTION OFAS
ENGINEER
PER APPROVED
IN-CHARGE.
SAMPLES AND TO THE FULL

8.
ALL M.S STEEL
ANTI-RUST PAINT
MEMBERS
OF APPROVED
SHOULD
SHADE.
BE PROPERLY FINISHED WITH

9. CONTRACTOR
FINISHES FROM
SHALL
THECROSS
FINAL CONSTRUCTION
CHECK THE SCHEDULE
PLAN DRAWING
OF QUANTITIES
AND IN OF
CASE OF

ANY DISCREPANCY, INFORM THE CONSULTANT/CLIENT BEFORE EXECUTION.

10. CONTRACTOR
THE ROOMS & SHALL
INFORMCROSS
BACK CHECK
TO THETHE
CONSULTANT/CLIENT
PHYSICAL MEASUREMENTS
IN CASE OF
OFANY
ALL

MAJOR
OF FINISHES
DISCREPANCY
WORK. IN THE WRITTEN ROOM DIMENSIONS BEFORE START

11. CONTRACTOR
FOR ALL KINDSSHALL
OF FLOOR
ENSURE
TOPS,
THEWHICH
THICKNESS
SHOULD
OFBE
GRANOLITHIC/
KEPT IN SUCHSUB-BASE
A WAY

SO THAT ALLUNLESS
TOLERANCE FLOOR FINISHING
OTHERWISETOPS
SPECIFIED.
ARE IN SAME
REFER
LEVEL
FLOOR
@ ±DRAINAGE
2MM

DRAWING
LAID WITH FOR
"0" LEVEL
SLOPES
DIFFERENCE
IN FLOOR. STRICTLY
WAREHOUSEAS PER
VNA THE
FLOOR
SPECIFICATION
SHOULD BE OF

VNA MHE VENDOR APPROVED FLOORING.

12. THE
WITHOUT
ENTIRE
ANY
PRODUCTION
SLOPE AND FLOOR
IN "NO CASE"
TO BE THE
KEPTSLOPE
IN SAME
OF LEVEL
FLOOR SHOULD

TRAPS
BE IN DEFERENT
(DST). AS PER
DIRECTION
DRAINAGE
FROM
DRAWING.
THE LOCATION OF THE FLOOR

13. IN CASE OF FLOOR TERMINATION BETWEEN DIFFERENT FLOOR FINISHES -

THE LINEBE
SHOULD OFSTRAIGHT
TERMINATION
AND BETWEEN
WITHOUT ANY
TWOGAPS
DIFFERENT
AND SEALED
FLOORWITH
FINISHES

APPROVEDGRANITE
BETWEEN SEALANTAND
OF CARPET
EPOXY/PU
ASMATERIAL
PER MANUFACTURER'S
AND USING TRANSITION
SPECIFICATION.
STRIP

14. PAINTED
FOR AREAS
U.N.O.
ABOVE NON- WALKABLE FALSE CEILING SHALL NOT TO BE

15. OFFICE
VERTICAL
AREAS
FLUSHONLY.
TYPEALL
SKIRTING
CLASSIFIED
TO BEAREAS,
PROVIDED
CNCAT
AREA
NON-CLASSIFIED/
AND PROCESS

TECHNICAL
COVING MADE
AREAS
OF EPOXY
INCLUDING
MORTAR
AHUAND
ROOMS/FLOORS
FINISHED SAME
SHOULD
AS FLOOR
HAVE.

16. PAINT
EXTERNAL
WITHSTAIRCASE
ANTI DUST RAILINGS
COAT. TO BE PAINTED WITH BLACK ENAMEL

F20A CORIAN FLOORING JB79200,Malaysia.


F1
FLOOR FINISH NON-SLIP
LEGEND EPOXY ( 1MM TOP COAT+3MM WALL FINISH LEGEND CEILING FINISH LEGEND FALSE CEILING LEGEND

SCREED) (TOTAL - 4MM THK.) WF1-EPOXY


WF2-ACID RESISTANT
PAINT PAINT CF1-EPOXY
CF2-ACID RESISTANT
PAINT PAINT FC1-PRE FINISHED
EXPOSED GRID) MINERAL FIBER BOARD TILE (600X600MM

F2 SELF SCREED)
3MM LEVELED (TOTAL
EPOXY -( 4MM
1MM THK.)
TOP COAT + WF4-SKIM
WF3-PU PAINT
COAT CF4-SKIM
CF3-PU PAINT
COAT FC2-PRE FINISHED
(600X600MM EXPOSEDACOUSTICAL
GRID) TILES

F3 SELF LEVELED EPOXY ( 2MM TOP COAT+ WF5-ACRYLIC EMULSION PAINT CF5-ACRYLIC EMULSION PAINT FC3-GYPSUM BOARD FALSE CEILING TILES
FC4- SEAMLESS

F6 3MM SCREED)
CARPET TILES (TOTAL - 5MM THK.) WF6-WEATHER CLADDING
WF9A-STONE RESISTANTAROUND
PAINT LIFT CF6-OIL
CF7-RAW BOUND
FINISH DISTEMPER FC5-MOISTURE RESISTANT CALCIUM SILICATE FALSE CEILING

FC6-PRE PRE
FC6A- FINISHED
FINISHED
WALKABLE
WALKABLE
CLEAN
GRP
ROOM
CLEAN
CEILING
ROOMPANEL
CEILING PANEL

SKIRTING FINISH/ WALL TILE LEGEND F8 IN-SITU ROUGH


(BROOMED FINISH)
CONCRETE WITH GROOVING FC7-PRE FINISHED COLD
FC8- NON-WALKABLE
ROOM INSULATED
CLEAN ROOM
CEILING
CEILING
PANELSPANEL

S1 - HOMOGENOUS TILES SKIRTING 100 HIGH F8A IN-SITU ROUGH


(BROOMED FINISH)
CONCRETE WITH SCREED FC15- CALCIUM SILICATE BOARD (2HR FIRE RATED)

S1A -
S2 ACID RESISTANCE
HOMOGENOUS NON-SLIP
HOMOGENOUS
TILES SKIRTING
TILES SKIRTING
100 HIGH
100 HIGH F9 PU FLOOR WITH SCREED (TOTAL-8MM THK.)

S3 -
S3A EPOXY SKIRTING-
COVING OVER
100MM
EPOXY
HIGH
SCREED- 75MM RADIUS

S4
S5 - CONCRETE
PU COVING COVING
OVER EPOXY SCREED-75MM RADIUS F9A PU FLOOR WITH SCREED (TOTAL-6MM THK.)

S6 -
S6A VINYL COVER VINYL
ANTI-STATIC OVER COVER
WALL AS
OVER
SKIRTING-100
WALL AS SKIRTING-100
HIGH F9C PU FLOOR
(TOTAL -8MM
WITHTHK.)
SCREED
(-20INSULATION
DEGREE COLD
BELOW
ROOM)

HIGH
S7 - VINYL COVER OVER CONCRETE COVING/EPOXY MORTAR F9E ANTI STATIC PU FLOOR WITH SCREED (6MM
THK.)

COVING
S7A - ANTI-STATIC VINYL COVER OVER CONCRETE COVING/EPOXY F10 PU BRUSH BOND FINISH

MORTAR
S8 - COVING
CONCRETE SKIRTING F12 ANTI-STATIC VINYL FLOORING SEAMLESS JOINTS ON

S9 - GRANITE SKIRTING 100 HIGH TOP OF GRANOLITHIC FLOOR

S10 -
S11 COMPRESSED
MARBLE SKIRTING
MARBLE
100 SKIRTING
HIGH 100 HIGH "CNC & NC"
SKIRTING ANG AREA-400MM
LIGHT GRAY BASE
DARK GRAY WITH

S12 -
S12A- WOODEN SKIRTING
LAMINATED WOOD "D" AREA-400MM DARK BLUE BORDER WITH

S13 -
S14 CARPET
Z' PROFILE
SKIRTING
ALUMINIUM
OVER SKIRTING
CONCRETE SKIRTING SKIRTING
"C" AREA-400MM
AND LIGHT
DARK
BLUE
GREEN
BASE BORDER

S15 - METALLIC COVING (BY CLEAN ROOM VENDOR) WALL TO


CEILING WITH SKIRTING AND LIGHT GREEN BASE

S15A - SS CEILING
TO METALLIC COVING (BY CLEAN ROOM VENDOR) WALL F14 CONCRETE FLOOR WITH HARDNER

S16
S17 -PLASTER COVING
-METALLIC COVING (WALL/CEILING)
(BY CLEAN ROOM VENDOR) WALL TO WALL F15 HOMOGENOUS TILES (TILE SIZE - 600 X
600MM)

S17AWALL
-SS METALLIC COVING (BY CLEAN ROOM VENDOR) WALL TO F16 NON-SLIP HOMOGENOUS TILES (TILE

S18
S19 -PLASTER COVING
-SILICON COVING (WALL/WALL) ACID/CHEMICAL RESISTANT
SIZE-600X600MM)

S23 -
WT1 CARPET
& WT1_b - ROLL
HOMOGENOUS
SKIRTING TILES- 2100 MM HIGH F17 (SIZE - 300 X 300MM)

WT2-HOMOGENOUS
WT2A- HOMOGENOUS
NON TILES
SLIP WALL
-600MM
TILE-
ABOVE
2100MM
COUNTER
HIGH TOP F18 VINYL FLOORING JOINT FREE OR SEAMLESS JOINTS

WT3 -ACID AND ALKALI RESISTANT WALL TILE - 1500MM HIGH "CNC & NC" AREA-400MM DARK GRAY WITH

WT4-GLAZED
WT7 - HOMOGENOUS
CERAMIC TILES
TILES-2100
NON SLIP-
HIGH 1500MM HIGH SKIRTING
"D" AREA-400MM
ANG LIGHT
DARK
GRAY
BLUE
BASE
BORDER WITH

SKIRTING AND LIGHT BLUE BASE

"C" AREA-400MM
WITH SKIRTING ANDDARK
LIGHTGREEN
GREENBORDER
BASE

F20 GRANITE
(FOR COLD
FLOOR
ROOM).
20MMTHK. NON SLIP

F20A CORIAN FLOORING

F20B GRANITE(NON
FLOOR / LOCALLY
SLIP) 20MM
AVAILABLE
THK. STONE

F21

COMPRESSED MARBLE

F24 SS CHEQUERED PLATE

F28 VNA FLOORING

05
F20B GRANITE / LOCALLY AVAILABLE STONE
FLOOR (NON SLIP) 20MM THK.
S8 F20

F21
COMPRESSED MARBLE
RAMP UP JACOBS SOLUTIONS INDIA PRIVATE LIMITED
PLATINUM TOWER, PLOT NO. 184, UDYOG VIHAR
F24 SS CHEQUERED PLATE PHASE-I, GURGAON, - 122 016. (HARYANA), INDIA
TEL. +91-124-3317000 FAX. +91-124-3372999.
05
F28 VNA FLOORING A MEMBER OF THE JACOBS ENGINEERING GROUP, INC.

PROJECT:

1 1
PROPOSED DRUG SUBSTANCE BUILDING
GROUND FLOOR - ROOM FINISHES

ROOM FINISHES-GROUND FLOOR


1 1 : 200
87AE3200 1814-J-LYT-A-00009-05

1814-J-LYT-A-00009-05 A0 1/200 1:1

AO A B C D E F G H J

You might also like