John Sir Safety: VJ-49 VJ-47 VJ-50
John Sir Safety: VJ-49 VJ-47 VJ-50
Procedure to get ism certi cates both DOC and SMC VJ-49
Audits done to maintain ism certi cation VJ-47
Procedure to get ISPS certi cates VJ-50
Who make SSP,SSA.
Who all are exempted from BWM, Nox .
Regulations to get IOPP certi cates.
Noise code- type of level, A and C weightning lters and their use, types of noise measuring
instruments. VJ-77
IG system, why need water inside scrubber tower, from where the ue gas getting pressure to
pass through the scrubber water.Where the Blowers located.
1. Types of starter
2. Avr working (zener diode working)
3. Why HV system is earthed
4. How low voltage system earthing done
5. DC generator paralleling Conditions
6. How rotating magnetic eld created in single phase motor
7. DC motor speed control method and explaination
8. What is interpoles
9. Voltmeter and ammeter construction
10. Rms value of alternator
11. What is short circuit and short circuit level ( asked by new surveyor)