The document provides a detailed report on the availability and status of locomotives at the BZA shed as of May 14, 2025. It includes information on ready locos, dispatched locos, maintenance schedules, and any abnormalities or safety concerns noted. Additionally, it summarizes the completion of various inspections and checks performed on the locomotives.

Uploaded by

Pratap Yedla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views10 pages

Fts Bza 6 O' Clock Position

The document provides a detailed report on the availability and status of locomotives at the BZA shed as of May 14, 2025. It includes information on ready locos, dispatched locos, maintenance schedules, and any abnormalities or safety concerns noted. Additionally, it summarizes the completion of various inspections and checks performed on the locomotives.

Uploaded by

Pratap Yedla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

SHED FTS/BZA DATE 14-05-25 TIME 06:00

Available WAP-7 WAP-7


WAP-4 WAG-9 WAG-7 WAG-5 MU WAG9 MU-WAG7 MU WAG5 WAG-12 Total
locos AT NON-HOG HOG
6 'O' CLOCK
- - - 3 1 - 1 1 - - 8

SCHEDULES/SPECIAL ATTENTIONS:

Remarks of Critical or
Propulsion / HLC 1/2 SIV make Sch
Ready Type of Minor/ Major MPFDS make non working safety related
SI. Loco Hq Arrival date Time Time Stand alone Working & (1 cubicle/ Due /
Date Sch Sch due date & Ver. HLC and abnormality
IGBT/GTO Make 2cubicle) Done
attention reported

Schedules planned

1 28366 - - TI IB 25-06-25 NA NA MEDHA V3 AAL C1 TI/TI NA NIL

GTL MU 14-05-25 2:45

2 28660 - - TI IB 25-06-25 NA NA MEDHA V3 AAL C1 TI/TI NA NIL

3 38078 - - GC IC 05-08-25 IGBT BHEL NA NA NA GC/GC NA NIL

BZAD
14-05-25 5:00
MU
BZAD
14-05-25 5:00
MU

4 43949 - - GC IA 05-08-25 IGBT BHEL NA NA NA GC/GC NA NIL

5 32669 BZA 14-05-25 2:35 - - TI IC 25-05-25 IGBT MEDHA NA NA NA TI/TI NA NIL

ODS locos

6 38000 KZJ 06-05-25 15:15 06-05-25 18:00 TI IA 19-04-25 IGBT MEDHA NA NA NA TI/TI NA NIL
Home shed /ELS.BZA/Firm attention loco

NIL

Ready Locos

7 28441 GTL 13-05-25 19:00 13-05-25 21:30 GC IB 13-05-25 NA NA MEDHA V3 SIEMENS C1 GC/GC NA NIL

GTO SR-CG
8 31522 DDU 13-05-25 13:35 14-05-25 0:25 TI IB 25-06-25 NA NA NA TI/TI NA NIL
BUR-BT

Dead/ Light Engine locos.

NIL

Dispatched Locos.

1 38241 IT IB 02-06-25 IGBT BHEL NA NA NA IT/IT NA NIL

BZAD
12-05-25 19:50 14-05-25 2:45
MU
BZAD
12-05-25 19:50 14-05-25 2:45
MU

2 38105 IT IB 02-06-25 IGBT BHEL NA NA NA IT/IT NA NIL

3 22746 BZA 13-05-25 2:00 Ready loco from ELS BZA dispatched. IC schedule is completed on 12-05-25.

4 39393 BZA 13-05-25 5:35 Ready loco from ELS BZA dispatched. IB schedule is completed on 12-05-25.

WKG
5 39139 BZA 13-05-25 15:05 13-05-25 20:00 GC IB 17-06-25 IGBT MEDHA NA NA GC/GC NIL NIL
SIEMENS

FTS/BZA LOCO DETAILS ON Dt. 13-05-25


Description
TI Done 1
IT Done 2
TI & IT Cum.of month 28
GC Done 2
GC Cum.of month 9
U/Truck Checked by JE/SSE/TS 5
Roof Checked by JE/SSE/TS 3
Joint Roof Check with TRD 3
Joint Roof Check cum. month 28
Wheel measurements
No. of Locos checked 3
Abnormalities Noticed in locos 0
HLC Loco details
No. of HLC Loco received : 1

No. of HLC Air flows measured and filters cleaning done: 1

No of abnormal HLC locos : 0


Golden safety check list details:
Total no. of Golden safety check done 5
Remarks for
non
Attention
Logbook Remark attention/
paid
Loco's send
dead

RTIS not working Under checking NIL

1. Hand brake
locking pin
defective. Under attention NIL
2. PVCD not
working properly.

Cab-1 ALP side


Under attention NIL
door lock defective.
1. Auxiliary
converter-3
isolated. 2.
Fault message
F1901P1 SS19
IB Sch done recently
train bus
on 7/5/2025. AC3
communication W/F DLS/BZA
perminently isolating.
disturbance. 3. staff
Requires DLS/BZA
F1301P1, SS-13,
attention
Cab-1 disturbance
in processor RBU2.
3. F1101P1 SS-01
main power
isolated.

1. Cab-2 BPCS
indication lamp not
glowing. 2. Fault Same trouble
message " previously attended
F0103P1 & by ELS/BZA at ELS. W/F ELS/BZA
F0104P1. Low Same trouble staff
pressure panto/ repeated. Requires
faulty panto" ELS/BZA Attention.
appearing
frequently.

Under warranty. KBI


staff checked pn. As per home
circuit and ERCP shed ODS
valve defective. loco to be sent
Same O/H done. And to ELS BZA
proveded, given for schedule
BP not charging. ready. But while attention. As
shunting same per PPO/BZA
trouble experienced. Loco will be
ERCP valve will be taken for IA
replaced on schedule sch on
day at ELS/BZA by tomorrow.
KBI
1. Window lock
replaced. 2.
Checked AC manual
1. Cab-2 ALP side mode working
window lock normally, but auto
NIL
defective. 2. Cab-2 mode not working,
AC not working. required home shed
attention. GC done,
loco ready to
dispatch.

Horn switch replaced.


Cab-2 LP side horn
TI done, loco ready NIL
switch defective.
to dispatch.

NIL IT done.

MU locos
dispatched
“ACI2: Inverter fault MU locos
and ICP1: Life sign dispatched
from ACI3 missing”
1. Auxiliary
messages recorded.
converter-2&3
Auxiliary converter-3
isolated. 2.
ACI-3 card replaced
Main power off.
by DLS BZA staff.
Loco working
normally. IT done.

1. Window glasses
1. Cab-2 both sides
with lock provided.
of window glasses
2. SPM tested at
are not available.
ELS BZA, found NIL
2. Cab-1 SPM
working normally. GC
digital display not
done loco
working.
dispatched.