4.0 RW11 - Typical Design Sections 2
4.0 RW11 - Typical Design Sections 2
0.50
0.50
1.10
0.50
Road Level
0.50
0.50
2.00
1.70
0.50
2.00
2.00
2.00
2.50
3.50
Engineering Fill
Engineering Fill
2.50
H=(11.20-13.10)m
H=(9.20-11.20)m
3.00
13.10
11.20
4.50
5.00
3.00
Foundation Soil
3.00
6.00
Foundation Soil
7.00
UPVC pipe 6'' (8 Bar) each 30.0m.
2.00
UPVC pipe 6'' (8 Bar) each 30.0m.
Waterway Level
2.00
Waterway Level
7.50
1.80
1.80
Engineering Fill 0.30 Top half perforated UPVC pipe 6''(8 Bar)
Covered With Geotextile
1.80
1.80
8.50
0.50
B.O.W
0.50
7.50
7.80
8.50
Cross Section 05
Cross Section 06
Key Plan:
Road Level
0.50
0.50
Road Level
1.15
0.50
0.50
0.50
1.00
0.50
2.00
2.00
2.00
2.00
2.50
2.00
3.00
3.00
Engineering Fill
Engineering Fill
2.50
3.00
H=(15.50-16.65)m
5.50
H=(13.10-15.50)m
6.00
16.65
15.50
3.00
3.00
7.00
8.00 00 9-Mar-25 First issue for approval Eng. M.S
Index Date Description By
Revision Table
3.00
Owner:
3.00
Foundation Soil
8.50
9.50
Foundation Soil
UPVC pipe 6'' (8 Bar) each 30.0m.
Akam ALRAJHI
UPVC pipe 6'' (8 Bar) each 30.0m.
2.00
2.00
Waterway Level
Waterway Level Project Title:
D.O.S.E, North Coast, Egypt
Engineering Fill
2.20
2.20
10.00
Engineering Fill
2.20
2.20
Top half perforated UPVC pipe 6''(8 Bar) 11.00 Top half perforated UPVC pipe 6''(8 Bar)
0.30 Covered With Geotextile
0.30 Covered With Geotextile
B.O.W Geotechnical Consultant:
0.50
B.O.W
0.50
10.00
10.30
11.00
Prof. Khalid M. El Zahaby
11.30
Plain Concrete
Plain Concrete
Golden Engineering Company
Foundation Soil
Foundation Soil Foundation Soil
Foundation Soil
Contractor: