0% found this document useful (0 votes)
4 views1 page

4.0 RW11 - Typical Design Sections 2

The document contains detailed engineering drawings and specifications for road construction, including various levels such as road and waterway levels, as well as materials like engineering fill and UPVC pipes. It outlines cross-sections and foundation soil details, along with design notes and approval information. The project is titled 'D.O.S.E, North Coast, Egypt' and includes contributions from various engineers and consultants.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

4.0 RW11 - Typical Design Sections 2

The document contains detailed engineering drawings and specifications for road construction, including various levels such as road and waterway levels, as well as materials like engineering fill and UPVC pipes. It outlines cross-sections and foundation soil details, along with design notes and approval information. The project is titled 'D.O.S.E, North Coast, Egypt' and includes contributions from various engineers and consultants.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Road Level

0.50

0.50
1.10
0.50
Road Level

0.50

0.50

2.00
1.70
0.50
2.00

2.00

2.00
2.50
3.50

Engineering Fill

Engineering Fill

2.50

H=(11.20-13.10)m
H=(9.20-11.20)m

3.00
13.10
11.20

4.50

5.00

3.00
Foundation Soil

3.00
6.00
Foundation Soil
7.00
UPVC pipe 6'' (8 Bar) each 30.0m.

2.00
UPVC pipe 6'' (8 Bar) each 30.0m.

Waterway Level

2.00
Waterway Level
7.50
1.80

1.80

Engineering Fill 0.30 Top half perforated UPVC pipe 6''(8 Bar)
Covered With Geotextile

B.O.W Engineering Fill

1.80

1.80
8.50
0.50

Top half perforated UPVC pipe 6''(8 Bar)


0.30 Covered With Geotextile

B.O.W

0.50
7.50

7.80
8.50

Plain Concrete 8.80

Foundation Soil Plain Concrete


Foundation Soil
Foundation Soil
Foundation Soil

Cross Section 05
Cross Section 06

Key Plan:

Road Level

0.50

0.50
Road Level

1.15
0.50

0.50

0.50
1.00

0.50

2.00
2.00
2.00

2.00

2.50
2.00

3.00
3.00

Engineering Fill
Engineering Fill
2.50

3.00
H=(15.50-16.65)m
5.50
H=(13.10-15.50)m

6.00

16.65
15.50

3.00

3.00
7.00
8.00 00 9-Mar-25 First issue for approval Eng. M.S
Index Date Description By

Revision Table
3.00

Owner:

3.00
Foundation Soil
8.50
9.50
Foundation Soil
UPVC pipe 6'' (8 Bar) each 30.0m.
Akam ALRAJHI
UPVC pipe 6'' (8 Bar) each 30.0m.
2.00

2.00
Waterway Level
Waterway Level Project Title:
D.O.S.E, North Coast, Egypt
Engineering Fill
2.20

2.20

10.00
Engineering Fill
2.20

2.20
Top half perforated UPVC pipe 6''(8 Bar) 11.00 Top half perforated UPVC pipe 6''(8 Bar)
0.30 Covered With Geotextile
0.30 Covered With Geotextile
B.O.W Geotechnical Consultant:
0.50

B.O.W

0.50
10.00

10.30
11.00
Prof. Khalid M. El Zahaby
11.30

Plain Concrete
Plain Concrete
Golden Engineering Company
Foundation Soil
Foundation Soil Foundation Soil
Foundation Soil

Contractor:

Cross Section 07 Cross Section 08 Drawing Title:

RW11 Typical Design Sections

Drawing No. Scale: Index Sheet No.

Project No. Date Drawn By:


09-Mar-2025 Eng. M.S.
Designed By: Revised By: Approved By:
Eng. A.G Prof. T.T Prof. Khalid M. El Zahaby

You might also like