Kura Strategic Plan 2023 2027 August2024
Kura Strategic Plan 2023 2027 August2024
2023-2027
STRATEGIC
PLAN
ii Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan iii
TRANSFORMING
URBAN MOBILITY
iv Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan v
FOREWORD
R
oad infrastructure plays a key role in the economic and social development
of any Country. Upon attaining independence, Kenya embarked on an
ambitious road development program to support the envisioned social-
economic growth. This program outstripped the rate of road maintenance resulting
in deterioration and ultimate loss of road asset and increased vehicle operating
cost. Reforms in the management of roads started in 1990s, through adoption of
World Bank’s Road Management Initiative (RMI) pillared on stable financing,
defined ownership, clear responsibility, and commercialized management.
This was followed by the Sessional Paper No.5 of 2006 on sustainable Management
and Development of the road sector which informed the enactment of the Roads
Act, 2007 that created road agencies to manage national roads.
Kenya Urban Roads Authority was established under the Roads Act, 2007 to
develop, rehabilitate, maintain and manage national urban roads. The Authority
prepared its first Strategic Plan for period 2008-2012, then the second for period
2013-2017 and the third covered 2018- 2022.
In this fourth Strategic Plan (2023-2027), the Authority intends to build on the
gains realized and lessons learnt from the previous plans. This Strategic Plan was
developed through wide consultative and participatory approach that entailed
close working and consultation with staff, management, Board of Directors and
key stakeholders.
The Authority’s Strategic Plan 2023-2027 has been developed in line with the
National Treasury guidelines on preparation of the Fifth-Generation Strategic
This Strategic Plan Plans to conform with Sustainable Development Goals (SDGs); the Constitution
was developed of Kenya 2010, initiatives outlined in the Kenya Vision 2030; Fourth Medium
through wide Term Plan (MTP IV); National Development Agenda; African Union Agenda
2063; East African Community (EAC) Vision 2050 and sector laws and policies.
consultative and The Strategic Plan 2023–2027 provides operational strategies, identifies expected
participatory operational challenges & risks and provides mitigation measures.
approach that
The Board of Directors of KURA commits to the development and
entailed close working operationalization of its institutional frameworks, structures, policies, operational
and consultation with procedures as well as providing linkage with key stakeholders that will enable it
staff, management, realize exemplary performance in targets set in this Plan.
Board of Directors
and key stakeholders. Eng. Charles M. Chiuri, PE, FIEK
Chairman, Board of Directors
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan vii
FOREWORD
K
enya Urban Roads Authority is a State Corporation established under
the Kenya Roads Act, 2007 with the mandate to develop, rehabilitate,
maintain and manage national urban roads. This is the fourth Strategic
Plan for the Authority and is aligned to the Medium Term Plan (MTP) IV.
Cities and Urban Areas are economic power houses of countries worldwide. They
are centres of production and consumption, transport hubs and the nodes of
international trade and commerce which constitute 80% of the world’s economic
output. In Kenya, approximately 70% of the GDP is contributed by urban areas.
According to the Kenya’s Integrated National Transport Policy 2009, over 93%
of the transport demand (freight and passenger travel needs) in Kenya is met
by road. The National Urban Development Policy identifies infrastructure as
crucial for urban areas, which are the major engines of commercial and industrial
production as well as main centers of innovations. In this regard urban areas
require appropriate quantities of quality infrastructure.
This new Strategic Plan will shape the thematic focus, administrative and financial
direction and resource utilization of the Authority so that it fulfils and realizes its
mandate. The strategic direction and priority areas were identified after a detailed
end-term review of the previous Strategic Plans as well as situational analysis of
The Authority internal and external operating environment of the Authority. The Plan addresses
aspires to contribute emergent strategic issues which the Authority will focus on over the Plan period
as inspired by its vision and mission through tactical and operational strategies
towards achieving and interventions.
smart cities and
making human On behalf of the Management, I would like to thank the Board of Directors
for providing strategic direction and guidance during the preparation of this
settlements inclusive, Strategic Plan. May I also thank the Management and entire KURA staff for
safe, resilient and their contribution to the development of this Strategic Plan.
sustainable.
This Plan will be implemented in a participatory manner through collaboration,
consultation and continuous engagement of all stakeholders. The Authority
seeks collaborative support from all stakeholders and commitment by all staff to
achieve the intentions contained in the Strategic Plan 2023-2027.
T
o facilitate the process of developing this Strategic Plan, the Authority constituted a steering committee composed of
strategic key members of staff drawn from all functions and directorates within the Authority. To ensure wide public
participation, all members of staff and key stakeholders were engaged through questionnaires, where they shared
their input and feedback which was considered during preparation of this Strategic Plan.
This Plan is organised into the following chapters: Introduction; Strategic Direction, Situational and Stakeholder Analysis;
Strategic Issues, Goals and Key Result Areas; Strategic Objectives and Strategies; Implementation and Coordination
Framework; Resource Requirements and Mobilization Strategies; Monitoring, Evaluation and Reporting Framework; and
Annexes.
This Strategic Plan was developed and formulated under the guidance of the Board of Directors and the Management Team
led by the Director General. The Secretariat and the Steering Committee was coordinated by the Director Policy, Strategy
and Compliance. Members of staff drawn from all sections and regions also contributed immensely by giving their invaluable
insights and inputs that shaped this Plan under the guidance of the Directorates, Regional Deputy Directors and Heads
of Departments. The contributions and inputs of external key stakeholders including sister agencies, the parent ministry,
strategic partners and donors, professional bodies and associations were valuable in the development of the Authority’s
strategic interventions and setting of targets for delivery of our mandate.
The Authority acknowledges Outlook Solutions Ltd for the tremendous input in undertaking the End Term Review report
of the previous Strategic Plan and collating information incorporated into this Plan.
Through this Strategic Plan, the Authority is expected to further expand its achievements in all county headquarters,
economic zones, cities and urban areas for transformation of urban mobility in Kenya for sustainable economic growth and
development.
Signature Signature
................................... ..........................................
TABLE OF CONTENTS
List of tables�������������������������������������������������������������������������������������������������������������������������������������������������������������������� xi
List of figures������������������������������������������������������������������������������������������������������������������������������������������������������������������ xii
Definition of Concepts and Terminologies�������������������������������������������������������������������������������������������������������������������� xiii
Abbreviations and Acronyms����������������������������������������������������������������������������������������������������������������������������������������� xiv
Executive Summary��������������������������������������������������������������������������������������������������������������������������������������������������������xvi
INTRODUCTION���������������������������������������������������������������������������������������������������������������������������������������������������1
2.1 Mandate������������������������������������������������������������������������������������������������������������������������������������������������������9
2.2 Vision statement������������������������������������������������������������������������������������������������������������������������������������������9
2.3 Mission Statement���������������������������������������������������������������������������������������������������������������������������������������9
2.4 Strategic Goals���������������������������������������������������������������������������������������������������������������������������������������������9
2.5 Core Values������������������������������������������������������������������������������������������������������������������������������������������������10
2.6 Quality Policy Statement���������������������������������������������������������������������������������������������������������������������������10
ANNEXES�����������������������������������������������������������������������������������������������������������������������������������������������������������������������63
LIST OF TABLES
Table 1. 1: Road Sector framework�������������������������������������������������������������������������������������������������������������������������������������9
Table 3. 1:PESTEL Analysis���������������������������������������������������������������������������������������������������������������������������������������������12
Table 3. 2: summary of opportunities and threats�������������������������������������������������������������������������������������������������������������14
Table 3. 3: SWOT analysis�����������������������������������������������������������������������������������������������������������������������������������������������15
Table 3. 4: Summary of Strengths and Weaknesses�����������������������������������������������������������������������������������������������������������16
Table 3. 5: KURA’s key achievements�������������������������������������������������������������������������������������������������������������������������������20
Table 3. 6: KURA’s Stakeholders Analysis�������������������������������������������������������������������������������������������������������������������������22
Table 4. 1: Strategic Issues, Goals and Key Result Areas����������������������������������������������������������������������������������������������������26
Table 5. 1: KRA I Outcomes Projections��������������������������������������������������������������������������������������������������������������������������28
Table 5. 2: KRA II Strategic Objectives and Strategies������������������������������������������������������������������������������������������������������32
Table 5. 3: KRA III Outcome Projections������������������������������������������������������������������������������������������������������������������������37
Table 5. 4: KRA I Strategic Objectives and Strategies�������������������������������������������������������������������������������������������������������39
Table 5. 5: KRA II Strategic Objectives and Strategies������������������������������������������������������������������������������������������������������40
Table 6. 1: Staff Establishment�����������������������������������������������������������������������������������������������������������������������������������������45
Table 6. 2: Skills Set and Competence Development��������������������������������������������������������������������������������������������������������46
Table 6. 3: Risk Management Framework������������������������������������������������������������������������������������������������������������������������49
Table 7. 1: Financial Requirements for Implementing the Strategic Plan (million Kshs)���������������������������������������������������52
Table 7. 2: Resource Gaps (Million Kshs)�������������������������������������������������������������������������������������������������������������������������53
Table 7. 3: Resource Mobilization Strategies (Million Kshs)���������������������������������������������������������������������������������������������54
Table 7. 4: Resource Management������������������������������������������������������������������������������������������������������������������������������������54
Table 8. 1: KRA I Outcome Performance Matrix ............................................................................................................56
Table 8. 2. KRA II Outcome Performance Matrix������������������������������������������������������������������������������������������������������������57
Table 8. 3 KRA II Outcome Performance Matrix�������������������������������������������������������������������������������������������������������������59
Table 8. 4: Quarterly Progress Reporting Template�����������������������������������������������������������������������������������������������������������62
Table 8. 5: Yearly Progress Reporting Template�����������������������������������������������������������������������������������������������������������������62
Table 8. 6: Evaluation Reporting Template�����������������������������������������������������������������������������������������������������������������������62
xii Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
LIST OF FIGURES
Figure 3. 1: Overall implementation status�����������������������������������������������������������������������������������������������������������������������17
Figure 3. 2: Pillar I Implementation Status�����������������������������������������������������������������������������������������������������������������������18
Figure 3. 3: Pillar II Implementation Status����������������������������������������������������������������������������������������������������������������������18
Figure 3. 4: Pillar III Implementation Status��������������������������������������������������������������������������������������������������������������������19
Figure 6. 1: Organizational Structure�������������������������������������������������������������������������������������������������������������������������������44
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan xiii
Outcomes; These are the key activities that the Authority has identified as critical for the realization of key strategies
identified in the Plan.
Non-Motorized Transport; Refers to modes of transportation that do not rely on external sources of energy while using
roads such as walking, bicycling, small-wheeled transport, wheelchair travel, rickshaws, animal-drawn carts, and other
human-powered vehicles.
Bus Rapid Transit; This is a high-quality bus-based transit system that delivers fast and efficient service that may include
dedicated lanes, busways, traffic signal priority, off-board fare collection, elevated platforms, and enhanced stations.
Intelligent Transportation System; Refers to advanced traffic management system that provides integrated traffic flow
management solutions enabling users to make better informed decisions for safe and seamless flow of traffic.
Project Affected Persons; Refers to people who are directly affected by land acquisition for a project through loss of part or
all of their assets. This includes land, houses, other structures, businesses, crops/trees, or other types of assets.
Strategic issues; Refers to problems and opportunities emanating from situational analysis that KURA has to manage in
order to fulfil its mandate and mission.
Key Result Areas; Refers to the broad areas in which KURA will deliver key outcomes and results to achieve its vision and
fulfil its mandate and mission.
Strategic goals; Refers to general qualitative statements on what KURA is hoping to achieve in the long-term and linked
to strategic issues.
EXECUTIVE SUMMARY
T
his Strategic Plan is to be implemented for the period;- FY 2023/2024 to FY 2027/2028. The Plan takes into
consideration the mandate of the Authority, National Development Agenda, Fourth Medium Term Plan (MTP IV),
UN 2030 Agenda, Kenya Vision 2030, Bottom-up Economic Transformation Agenda, East African Community
Vision 2050, African Union Agenda 2063 and Sustainable Development Goals (SDGs). It complies to the Constitution of
Kenya 2010 and other legal and policy documents such as the Kenya Roads Act 2007, The Kenya Roads Board Act 1999
(Amendment 2019), Urban Areas and Cities Act 2011 (Amendment, 2019), Traffic Act 2013, Land Value Act, 2010. The
development of the Plan also considered the following key documents; Road Sector Investment Plan (RSIP), National
Integrated Transport Policy (NITP), National Urban Development Policy (NUDP), Environmental Management and
Sustainability (EMS), National Spatial Plan (2015-2045) and County Integrated Development Plans (CIDP).
The development of this Strategic Plan has been undertaken through a participatory and consultative process involving
brainstorming sessions and workshops with the Steering Committee Members, Management and members of the Board,
administration of questionnaires to both the internal and external stakeholders to seek their input and feedback and
several validation forums. Information obtained has been considered in the development of this Strategic Plan to shape the
Authority’s strategic focus including various strategies and key programs.
To achieve its mandate over the next five years, KURA has established three Key Result Areas to guide its activities:
These Key Result Areas will be supported by the allocation of various resources across the Authority.
To successfully implement this Plan, the Authority requires a total budget of Kshs 359,929,683,992 /=
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan xvii
To ensure successful implementation, the Plan captures a detailed implementation and coordination framework with
a comprehensive Monitoring, Evaluation and Reporting Framework with appropriate implementation indicators to
track performance including reporting and evaluation mechanism has been developed. The Plan also identifies resource
requirements and key mobilization strategies that will guide the Authority to ensure financial sustainability and successful
implementation of key projects and programs.
Ngong Road
xviii Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
01
INTRODUCTION
T
his chapter highlights the importance of strategic
planning in achieving the corporate goals as well
as the context within which the Strategic Plan was
developed, the history of KURA and methodology adopted
in developing the Plan.
Total National Road Network (2008) Condition of Future Goals (2030 and 2050)
183,178 km 35,250 km
paved roads: Paved roads
70% in
by 2030
9% Paved
91% Unpaved good condition
65,700 km Paved roads
by 2050
AU member states and Regional Economic Blocks (RECs) County Governments. As such, the national government is
are required to realign their priorities to include Agenda to manage national trunk roads while county governments
2063 in the following areas; Sustainable and Inclusive manage county roads. The national government implements
Economic Growth; Human Capital Development; its road function through established state corporations
Agriculture/ value addition Agro-business; Industrialization namely; Kenya Urban Roads Authority(KURA), Kenya
/ Manufacturing and value additions to natural resources; National Highways Authority (KeNHA) and Kenya Rural
Employment Generation; Social Protection; Gender / Roads Authority (KeRRA).
Women’s Development and Youth Empowerment; Good
Governance, including capable institutions; Infrastructural This plan has mainstreamed national values and principles
development; Science, Technology and Innovation; Peace of governance that include equity, equality, social justice,
and Security; and Culture, Arts and Sports. inclusiveness etc.
In line with this, the Authority seeks to provide employment 1.2.5. Kenya Vision 2030, Bottom-up Economic
to qualified personnel, be innovative in its activities and Transformation Agenda and Fourth Medium Term Plan
procedures, generate income for locals through youth and
women empowerment programs, increase its road network 1.2.5.1 Vision 2030
through construction of new roads and adopt emerging and Kenya’s Vision 2030 represents the government’s ambitious
modern technologies in all its operations and activities. goal to transform the country into a newly industrializing,
middle-income nation that offers a high quality of life to
1.2.3. East Africa Community Vision 2050 all its citizens by the year 2030. Vision 2030 identifies the
The East African Community (EAC) Vision 2050 is a infrastructure sector as a foundation for economic, social
regional vision for socio-economic transformation and and political pillars and aims to establish cost-effective,
development. It articulates the dreams and aspirations of world-class infrastructure facilities and services. This is
the East African peoples and makes a commitment to what emphasized in various strategic planning frameworks,
they will do to achieve these dreams. The EAC Vision 2050 including the first, second, third, and fourth Medium-Term
lays out a broad perspective in which the region optimizes Plans (MTP), as well as the strategic plans of the Ministry
the utilization of its resources to accelerate productivity and overseeing infrastructure development. To realize these
the social wellbeing of its people. goals, the responsibility for infrastructure development in
the country lies with several state agencies, including the
The East African Community (EAC) also recognizes Kenya Urban Roads Authority (KURA).
infrastructure development as a key stimulus for growth
through the Programme for Infrastructure Development Through strategic investments and effective implementation,
in Africa (PIDA). As part of this initiative, the EAC has the government seeks to create an enabling environment
launched a program to prioritize infrastructure projects that supports the aspirations of Vision 2030 and facilitates
across all sectors, including road networks. In 2008, the the realization of Kenya’s developmental objectives.
region had a total road network of 183,178 km, with High population growth and rapid urbanization requires
91% being unpaved. Additionally, only 70% of its paved KURA to provide adequate and sustainable urban road
roads were classified as being in good condition. By 2030, infrastructure to cater for emerging metropolis, smart cities,
the aim is to have a paved road network of 35,250 km, economic zones etc.
which is projected to increase to 65,700 km by 2050. These
developments are driven by the establishment of transport The Fourth Medium Term Plan (MTP IV) which will
corridors and urban expansion in the region. In line with run for the period 2024-2027 will implement the fourth
this, the Authority in this strategic plan seeks to increase its and second-last phase of Kenya Vision 2030 and will
road network by constructing 1840 KMs of non-motorised set the momentum for transition to the next long term
transport and 920 KMs of motorised transport facilities. development agenda for the country. The Plan will
prioritize implementation of economic recovery strategies
1.2.4. Constitution of Kenya 2010 to re-position the economy on a steady and sustainable
According to the 2010 Constitution, the roads’ function is a growth trajectory. It aims at revitalizing performance in all
shared responsibility between the National Government and economic sectors in order to foster growth, employment
4 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
creation, poverty reduction and ultimately improve In line with BETA principle on management of scarce
livelihood of the economically disadvantaged group. This resources, the Authority will give emphasis to prioritization,
is to be achieved through completion of infrastructure sequencing and seeking alternative financing of road
projects, strengthening policy and institutional framework, projects. These road projects would be implemented as
and enhancing access to quality infrastructure services. quick wins, short term, medium term and long-term
interventions that will ensure sustainable development of
1.2.5.2 BETA Priorities the road network.
The government’s bottom-up economic transformation
agenda recognizes the roads as critical infrastructure in the 1.2.6. Sector Policies and Laws
country. In line with the agenda therefore, the government The Institutional framework in the road sub-sector has
continues to prioritize road construction, upgrading and been designed to ensure that capacities and synergies are
their maintenance. This includes critical national and harnessed and utilized to accelerate the development of
regional trunk roads that have high economic impact. road infrastructure in the country. The road sector in Kenya
is regulated through the following legal framework;
In line with BETA priorities, this plan will address several
issues and challenges as outlined below; a) The Kenya Roads Act, 2007
The Kenya Roads Act, 2007 establishes KURA as a State
• Employment Creation; the Authority shall focus on Corporation under the Ministry of Roads and Transport
implementing key road projects in informal settlement, state department of roads Section 10(1) of the Act confers
employment creation to women and the youth through on KURA the responsibility for management, development,
empowerment programs. rehabilitation and maintenance of all National Urban
Roads. Further, the Roads Act, 2007 defines “urban roads”
• Green Agenda and Climate Change; climate change according to the classification in the First Schedule.
mitigation and resilience through tree planting and Specifically, KURA has responsibility over the following
adoption of environmentally friendly technologies in road classes:
project implementation. The Government seeks to
promote electric mobility (e-mobility) to reduce reliance i) Urban Arterials - Class UA
on fossil fuels in the transport sector, reduce pollution ii) Urban collectors including primary distributors,
and address issues of climate change among others. district distributors – Class UC
The Government seeks to roll out electric vehicle (EV) iii) Urban local roads including minor distributors, local
charging infrastructure in all urban areas and along the streets, residential stand accesses, commercial and
highways. industrial stand accesses, shopping streets – Class
UL.
• Affordable Housing; The Authority will focus on iv) Roads that may be reclassified as urban roads and or
implementing key urban road projects in the designated assigned to the Authority by the Cabinet Secretary in
areas earmarked for affordable housing. charge of roads from time to time.
• Informal Settlements; in response to the ever growing
informal settlements in urban areas, the Authority b) The Kenya Roads Board Act, 1999
will continue to pursue and implement key urban The Act establishes Kenya Roads Board whose mandate is to
roads projects in line with various County Integrated oversee the road network in Kenya and thereby coordinate
Development Plans and County Spatial Plans. its development, rehabilitation and maintenance and to
be the principal adviser to the government on the matters
• Agriculture: In this Strategic Plan, the Authority seeks related thereto. The Roads Board manages the Road
to design integrated urban master plans and construct Maintenance Levy Fund (RMLF). The Act was amended
urban roads that will support key infrastructures such in 2019 to provide for utilisation of 10% of the RMLF for
designated markets and facilities for agricultural produce development of roads. The amendments further give the
and products. Kenya Roads Board power to borrow and leverage on the
Kenya Roads Fund.
• Technology and Innovation; Through adoption of
modern technological advancements, the Authority c) Urban Areas and Cities Act, 2011
will seek to transform urban mobility through use The Act establishes a legislative framework for classification
of Artificial Intelligence and Machine Learning to of areas as urban areas or cities; governance and management
implement Integrated Transport System (ITS) and Traffic of urban areas and cities; participation by the residents in
Management Centre (TMC). The Authority seeks to the governance of urban areas and cities; and for related
establish an Innovation Hub at the HQ that will support purposes. Under section 6 of the Act, the capital city,
implementation of key projects and drive creativity for Nairobi is required to provide infrastructure necessary to
sustainability and growth. sustain efficient transport network connecting to rural areas,
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 5
towns and other local, regional and international cities. g) National Integrated Transport Policy
Moreover, under section 6(5) the two levels of government Kenya’s Transport Policy is elaborated in the Sessional
are required to enter into an agreement regarding the Paper of November, 2020 whose theme is ‘Transport
performance of functions and delivery of services by the for prosperity’. The INTP seeks to enhance Kenya’s
capital city. Additionally, the Act vests the management of development in terms of integrating production, marketing
cities, towns and municipalities in boards created under the and population centres, hence facilitating mobility in rural
Act. and urban areas; national and regional integration; trade
promotions, improving the overall welfare of the people
KURA has been instrumental in establishment of metropolis and Kenya’s competitiveness. The Paper also advocates for
in Kenya with upgrading of Nakuru and Eldoret into enhancing the role of private sector, transport infrastructure
City status through construction of major road networks development and management. The policy recognises the
necessary for city status. The Authority shall continue to importance of Non-Motorised and Intermediate Means of
transform urban mobility in emerging metropolis and Transport (NMIMT) in addressing road safety, the needs
other urban areas through pursuing deliberate strategies in of the poor and improvement of health of the population.
development of critical urban road networks. In this regard, it recommends integration of NMIMT
in the design, development and operation of all modes
d) Traffic Act, 2013 of transport. This Strategic Plan has been designed to
Traffic Act, Cap 403 Laws of Kenya, provides for safety include projects and programs that are aimed at enhancing
measures and enforcement mechanisms such as ensuring NMIMT and Bus Rapid Transport (BRT) the major towns.
that traffic routes in the vicinity of the designated zones are
maintained with safety features. These features include, but h) National Urban Development Policy
are not limited to, wide pavements, footpaths, cycle-tracks, The level of urbanization is projected to be at least 50%
roadside barriers, pedestrian crossings, underpasses, and by 2030. This rapid urban transition is likely to present
footbridges with appropriate signs and markings. potential social and economic opportunities as well as
significant challenges to the country. To address the related
e) Land Value Act, 2010 challenges the Government of Kenya (GoK) prepared the
The act establishes a legislative framework for compulsory National Urban Development Policy (NUDP) in 2016.
land acquisition for use to promote public benefit which Its objectives are to strengthen urban governance and
is considered necessary in the interest of defence, public management, development planning, urban investment
safety, public order, public morality, public health, town and the delivery of social and physical infrastructure in
and country planning or the development or utilization of urban areas throughout the country. NUDP identifies
any property. The Act provides for the assessment of land infrastructure to be crucial for urban areas, which are the
value index in respect of compulsory acquisition of land; major engines of commercial and industrial production
and for connected purposes. It enhances efficiency and as well as main centers of innovations. In this regard
expedites the process of compulsory land acquisition. urban areas require appropriate quantities of quality
infrastructure. The integrated Intelligent Transport System
f ) Road Sector Investment Plan (ITS) program proposed in this strategic plan will be one
The Government has developed the Roads Sector Investment of the key interventions to address the challenges associated
Plan (RSIP) that seeks to guide road development in the with traffic congestion, road safety and management of
country up to the year 2024. The RSIP aims to achieve the mass rapid transportation.
following goals among others:
i) Environmental Management and Sustainability
i) Timely maintenance of roads Part II of the Environmental Management and
Coordination Act (EMCA), 1999, states that every person
ii) Elimination of maintenance backlog through in Kenya is entitled to a clean and healthy and every person
rehabilitation and reconstruction has a duty to safeguard and enhance the environment.
Enabling regulations contain rules relating to the conduct
iii) Increasing length of paved roads to 50% of the of Environmental and Social Impact Assessments. It also
roads network contains rules on environmental impact audits, monitoring,
strategic environmental assessments among others. The
iv) Connecting county headquarters, commercial Authority is cognizant of the positive and negative impacts
centres and special economic zones with paved that road works interventions may have on people and the
roads environment. The Authority will always comply with the
requirements in the relevant statutes.
v) Eliminate urban traffic congestion.
j) National Spatial Plan (2015-2045)
vi) Effective axle load management The National Spatial Policy guides spatial development
6 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
of the country aimed at achieving organized, integrated, k) County Integrated Development Plans (CIDP)
sustainable and balanced development of the country. According to section 108 of the County Governments Act,
The National Spatial Plan (NSP) the long- derived from each county is required to outline its development goals in
the policy term support the implementation of the the form of a CIDP. The CIDP provides overall framework
strategic national projects, specifically the flagship projects for development and is geared towards coordinating
spelt out in Kenya Vision 2030. It is expected that with development between the two levels of government.
rationalization of the NSP and the RSIP, there will be
enhanced integration of land use and transport planning as
well as development of urban areas.
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 7
Summary
1.27: of key
Summary of keyplayers inthe
players in the -Sub
Sub Sector
Sector
Below is the Kenyan Road sector framework:
Table 1.1: Road Sector framework
S/No Institution Nature of Function
Institution
1. The Ministry of Government Provide policy direction for the development and maintenance of sustainable
Roads and Ministry transport and infrastructure to facilitate efficient movement of goods and people.
Transport Develop and enforce regulations and standards to ensure safe, secure and
efficient transport and infrastructure systems in Kenya.
2. State State Provide policy direction for the development and maintenance of sustainable
Department Department road infrastructure to develop and enforce regulations and standards to ensure
for Roads safe, secure and efficient road infrastructure systems in Kenya.
3. Kenya Roads State Oversee the road network in Kenya Coordinate the development, rehabilitation
Board Corporation and maintenance of roads funded by the Road Maintenance Levy Fund (RMLF).
Advice the Cabinet Secretary for Roads on all matters related thereto.
4. Kenya Urban State Manage, develop, rehabilitate and maintain urban national trunk roads of the
Roads Authority Corporation Republic of Kenya.
5. Kenya National State Develop, rehabilitate, manage and maintain all national trunk roads comprising of
Highways Corporation Class S, A, and B roads.
Authority
6. Kenya Rural State Manage, develop, rehabilitate and maintain national rural roads classified as C, D,
Roads Authority Corporation E and others.
1.3. Background of the Organization the use of urban roads as may be necessary for
Kenya has a road network of 162,055 Kms. Approximately efficient forward planning under this Act Roads
44,000km of the network is classified as national trunk Act, 2007.
roads which are maintained, rehabilitated and developed viii) Preparing the road works programs for all urban
by the national Road Agencies established by the National roads.
Government while the remainder of the network is ix) Liaising and coordinating with other road
classified as county roads that are maintained, rehabilitated authorities in planning and on operations in
and developed by respective County Governments. respect of roads.
x) Advising the Minister on all issues relating to
Kenya Urban Roads Authority (KURA) is a State urban roads.
Corporation, established under the Kenya Roads Act, 2007
with the responsibility for the Management, Development, 1.4. Methodology of Developing the Strategic Plan
Rehabilitation and Maintenance of all national urban roads. Strategic plan is an organisational development tool that
produces fundamental decisions and actions that shape and
When a new road classification was gazetted in 2016, guide an organization, what it does, and why it does it. It
KURA roads network was 12,598KMs, the road network requires broad- scale information gathering, an exploration
reduced to 3,923.21KMs of roads. The reclassification was of alternatives, and an emphasis on the future implications
in line with the provision of the constitution that provides of present decisions.
for national and county roads. After reclassification,
KURA’s mandate was expanded to cover all counties in line This Strategic Plan was developed through wide consultative
with Article 6 (3) of the Constitution of Kenya. Currently, and participatory approach that entailed close working and
the Authority has 3,969.27 KM of roads with total paved consultation with staff, management, Board of Directors
roads estimated at 465.92 kilometers and unpaved roads at and key stakeholders. To facilitate the process, the Authority
3,503.35 KM. constituted a Steering Committee composed of strategic key
members of staff drawn from all functions and directorates
The functions and duties of KURA are: within the Authority. To ensure wide public participation,
i) Constructing, upgrading, rehabilitating and all members of staff and key stakeholders were engaged
maintaining roads under its jurisdiction. through questionnaires where they shared their input and
ii) Controlling urban road reserves and access to feedback that was considered during preparation of this
roadside developments. Strategic Plan.
iii) Implementing roads policies in relation to urban
roads. The Authority held several consultation and brainstorming
iv) Ensuring adherence by motorists to the rules and workshops facilitated by the consultant to aid in the
guidelines on axle load control prescribed under development of this new strategic plan by reviewing where
the Traffic Act and under any regulations under the Authority was coming from, the operating environment
this Act Roads Act, 2007. and where it wants to go and how the new Plan will be
v) Ensuring that the quality of road works is in monitored, evaluated and resourced.
accordance with such standards as may be
defined by the Minister in collaboration with the To ensure relevance and enhance impact, this Strategic
Ministry responsible for transport and the Police Plan was validated by Authority’s management in a joint
Department overseeing the management of traffic validation workshop with the steering committee and key
and road safety on urban roads. members of staff, key stakeholders through a stakeholder
vi) Monitoring and evaluating the use of urban roads; validation forum and final Board validation. All comments
planning the development and maintenance of and inputs gathered from the various forums were
urban roads. incorporated in the preparation of the final Strategic Plan.
vii)Collecting and collating all such data related to
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 9
02
STRATEGIC DIRECTION
T
his chapter outlines KURA’s mandate, Vision
Statement, Mission Statement, Strategic Goals,
Core Values and Quality Statement.
2.1. Mandate
Kenya Urban Roads Authority (KURA) is a State
Corporation, established under the Kenya Roads Act, 2007
with the responsibility for the Management, Development,
Rehabilitation and Maintenance of all national urban roads.
Enhance corporate
governance and Goal
institutional capacity. ii
Prudent financial
management and resource
mobilization for financial Goal
sustainability. iii
Professionalism:
We commit to professionally discharge our mandate
and duties to all our stakeholders.
Teamwork: Integrity:
To always maintain a To uphold and promote
culture of teamwork and transparency, accountability,
commitment to duty honesty and ethical
through team synergy. practices in
all our endeavors
Equity: Innovation:
To embrace fairness, diversity Promote and encourage
and inclusiveness for all. creativity for continuous
improvement through use of
modern technologies.
To ensure unity of purpose and to engrain KURA’s vision and aspiration, the Authority will adopt the tag line; “Transforming
urban mobility” as part of its corporate culture.
03
SITUATIONAL AND
STAKEHOLDER ANALYSIS.
T
he chapter details KURA’S operating environment
analysis, end term review of KURA 2018-2022
Strategic Plan, key achievements, implementation
challenges, emerging strategic issues and stakeholder
analysis.
Enabling Legislative Risk of duplication and overlapping Amend the Roads Act to capture National
framework of functions with the county Trunk Roads instead of municipalities and
governments urban roads.
Inadequate funding Incomplete projects and programs Seek alternative sources of funding e.g.
affecting full achievement of commercialization of KURA assets and
KURA’s mandate corridors, offer consultancy services etc.
Economic
Issues
Rapid urbanization Strained and overuse of urban roads Responsive urban roads master plans
infrastructure and assets leading to
fast dilapidation.
Rapid population growth Overuse of facilities and urban roads Responsive urban roads master plans to
infrastructure accommodate population growth.
Encroachment of road Compromised mobility for road Engage stakeholders and install boundary
corridors users and increased accidents and marker posts.
incidents Enhance enforcement
Ethical conduct by public Biasness in service delivery and Digitization of key processes to enhance
Socio Cultural
project implementation.
Digital and modern machinery Risk of having outdated machines Acquire modern digital machines e.g. the
BIV, tree spade for tree relocation, RICS
vehicle and pavement evaluation machine.
Legal Suits from citizens Negative public image and Efficient and timely handling of
tarnishing of KURA’s reputation. grievances and complaints, quick
resettlement and compensation of PAPs
and use of Alternative Dispute Resolution
Mechanisms.
Legal Issues
Emerging legislations and Non compliance with emerging Undertake regular legal audits to identify
government policies regulations and policy guidelines legals gaps and mitigations strategies (eg
Implementation & Institutionalization of
Data Protection Act 2019)
Conflict on KURA’s Duplication and overlapping of Amend the Roads Act to capture National
jurisdiction in the Constitution functions with the county Trunk Roads instead of municipalities and
& the Roads Act. government. urban roads.
Fossil fuel emissions Global warming, air pollution and Tree planting along roads and encourage
adverse climate conditions use of e-vehicles to reduce emissions.
Integration climate change and resilience
Ecological and Environmental
causing poor storm water drainage sustainable waste management system and
solution in urban areas.
Green Agenda Reduction of use fossil fuel vehicles Lobby for enactment of law to shift from
and increase of electric and hybrid Fuel Levy to Road User Levy and review
vehicles limiting reliance on fuel levy of RMLF formula to capture changing
as main source of funding. urban demographics.
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 13
Ngong Road
SWOT ANALYSIS
helps with employee engagement enhancement to nurture the team spirit and a strong
and retention. corporate culture.
Goodwill from Continued support for Continuous engagement and collaboration for
Development implementation of key projects and fulfilment of KURA’s mandate
Partners & fulfilment of mandate
Government
Good Leadership Enhanced accountability and Enhanced reputation and brand image in the sector
& Management prudent management of resources through good corporate governance.
Understaffing Inadequate Human resource for Undertake recruitment to fill vacant positions for
effective implementation of key optimal performance and productivity.
projects and programs.
Inadequate funding Limited financial resources to Seek alternative sources of funding e.g.
Weakness
Alternative sources Possibility to mobilize extra Create legal enabling framework for pursuing
of funding resource to address funding gaps to alternative sources of funding eg Commercialization
achieve KURA’s mandate. of KURA assets and corridors.
Changing and Opportunity to adopt better and Continuous upgrade and acquisition of modern and
Emerging advanced technological solutions in emerging technologies to facilitate service delivery
Opportunities
Conflict on Duplication and overlapping of Lobby for the amendment of Roads Act to capture
Threats
KURA’s functions with the county National Trunk Roads instead of municipalities and
jurisdiction in the government. urban roads.
Constitution & the
Roads Act
Inadequate funding Inadequate capacity to fulfil and Explore alternative funding to close the funding
realize Authority’s mandate. gaps.
16 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
3.1.3.1. Governance and Administrative Structure stakeholder education and engagement was identified as the
During analysis of its internal environment, the Authority Authority’s area of weakness.
examined its governance structures, mechanisms such as
policies, regulations, Board composition and administrative 3.1.3.3. Resources and Capabilities
structures which define the decision making process and For effective realization of this plan, the Authority assessed
reporting mechanisms. The Authority identified good its assets, skills, capabilities and intangibles. Goodwill from
leadership and management as well as having professional development partners, having alternative sources of funds
and competent staff as some of their strengths in the and good leadership and management were identified as
implementation of the strategic plan. Adopting changing some of their major strengths in the implementation of this
and emerging technologies and understaffing were identified plan. Inadequate funding and overreliance on the exchequer
as the weaknesses that face the Authority. for funding of the Authority’s projects were noted as the
major weaknesses. A review of the staffing showed that the
3.1.3.2. Internal Business Processes Authority is understaffed which hinders timely and effective
The Authority conducted an incisive evaluation of its service delivery. Also identified was the rate at which the
systems, processes and standard operating procedures in Authority adopts new and emerging technology in all its
order to identify areas of cost and time efficiencies and activities.
inefficiencies to its strengths and areas of weakness. Team
work among all staff members, having a good corporate 3.1.4. Summary of Strengths and Weaknesses
image and good leadership and management were After analysis of KURA’s internal environment, the
identified as some of the areas of strength while inadequate following strengths and weaknesses were identified;
3.1.5. Analysis of Past Performance ii) Pillar II: Develop and deploy latest technological
An end term evaluation of the just concluded KURA solutions in the planning and design,
Strategic Plan for the period 2018 – 2022 was conducted to construction and management of roads
establish implementation achievements, key challenges and iii) Pillar III: Implement Institutional capacity and
lessons learnt that the new Strategic Plan should take into corporate governance principles that support
consideration. From the assessment done, the Authority execution of KURA strategy.
achieved an overall implementation score of 80% of the
strategic objectives that had been set out in the Plan. The The implementation status for the Key Result Areas and
Authority had identified the following Key Result Areas; inherent strategic goals are as shown below;
89%
79% 80%
70%
Strategic Pillar 1: Planning, Strategic Pillar 2: Develop and Strategic Pillar 3: Implement Overal Implementation
Development and Management deploy latest technological institutional capacity and
of world-class urban roads solutions in the planning, corporate governance principles
and attendance infrastructure design, construction and that support execution of
management of roads KURA’s Strategy
A detailed assessment on the implementation of the pillars Road Register and Enforcement of Axle Load Control.
is as highlighted below. However, the implementation of the following objectives
was not fully realized achieved; Provision and improvement
Strategic Pillar I: Planning, development and of adequate urban road storm water drainage system,
management of world-class urban roads and attendant Harmonization of the PPADA provisions with the Civil
infrastructure Engineering Project Management Standard (FIDIC),
increasing of urban road network coverage and Improving
The overall implementation was assessed at 70%. The aesthetics of existing network due to budget constraints and
Authority achieved 100% implementation on the inadequate internal capacity. The results are as illustrated
following strategic objectives; improving implementation below.
and monitoring of social and environmental safeguards;
Creation of legal certainty for KURA, updating of Urban
18 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Strategic Pillar II: Develop and deploy latest technological solutions in the planning, design, construction and
management of roads.
The overall implementation of Pillar II was assessed at 79%. Adoption of sustainable technology for development and
maintenance of urban roads was achieved at 93%, and enhancement of efficiency and cost optimization in design,
construction and maintenance of urban roads was at 84%. However, review of manuals and specifications for Roads and
Bridges was not fully achieved (20%) due to limitation of KURA’s jurisdiction during implementation since it was noted to
be beyond the scope of the Authority’s mandate.
Strategic pillar III: Implement institutional capacity and corporate governance principles that support execution of
KURA’s Strategy.
The Authority achieved an overall implementation of 89%. The Authority implement fully the following strategic objectives;
Improvement of Accountability and Ethics; Improvement of procurement functions, and Integration of Risk Management
in KURA Projects at 100%. The rest of the strategic objectives under the pillar were largely fulfilled as illustrated below.
Ngong Road
20 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Bridges (No.)
Financial Year
(Lane KM)
Upgrading and
Rehabilitation
Designs
Construction
Footpaths
Maintenance
Maintenance
(KM)
(Lane KM)
(Lane KM)
(Lane KM)
(KM)
Periodic
Routine
New
Ngong Road
The following is the resultant stakeholder’s analysis outlining key stakeholder groups and their respective expectations:
22 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
11 Public institutions • Use of KURA • Suitable and safe roads • Input in road safety designs
road networks • Participation in stakeholder’s
and facilities engagement.
12 Police • Enforcement of • Road furniture for safety and • Enforce road and traffic
road user laws. enforcement rules
• Input in road safety designs
• Participation in stakeholder’s
engagement.
13 Development • Funding of • Proposals for funding • Timely feedback on
Partners Donors KURA key • Proper design and concepts and proposals
projects and implementation of funded shared
programs. roads • Funding support
• Proper utilization of funds
• Continuous Engagements
14 Legislatures • Legislation and • Pass relevant law • Proper utilization of funds
(National Assembly approval of • Appropriate funds • Construct and maintenance
and Senators) budgets. Roads in all urban area
• Participation in stakeholder’s
engagement.
15 Media Practitioners, • Report and • Adequate information from • Balanced coverage and
Journalists, content publicize KURA. positive publicity.
creators and KURA. • Sensitization on Authority’s
influencers. mandate and key projects
and programs.
16 Ministry • Collaboration • Consultation during road • Consultation during road
Departments and with KURA work plan and work plan and
Agencies (MDA)- on key projects implementation. implementation.
KeRRA, KeNHA, and programs. • Relevant approvals
KRB, NEMA, • Provision of relevant data
NAMATA, and information
NTSA, NCA)
• Provision of timely
Exchequer (treasury)
17 County • Collaboration • Engagement in ARWP • Participation in preparation
Government, with KURA (Annual Road Work Plan) of Road work programs
County Assembly on key projects • Ensure road network • Ensure provision of
and programs. under KURA jurisdiction adequate road corridor in the
are done and maintained. CIDP (County Integrated
Development Plan)
18 Utility Service • Use of KURA • Engagements/consultation • Compliance with road
providers (KPLC, road networks • Approvals corridor requirements in
water services , fibre and facilities • Provide space installation ofservices .
optic services etc) • Care of infrastructure
19 Regulatory Bodies • Engineer’s • Application and upholding • Streamlining of industry
(EBK, IEK) registration and of industry code of ethics standards and guidelines to
professional and professional standards address emerging needs.
development
24 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Adoption of sustainable
technology for
development and maintenance
of urban roads was achieved
at 93%, and enhancement of
efficiency and cost optimization
in design, construction and
maintenance of urban
roads was at 84%.
Limuru Road
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 25
04
STRATEGIC ISSUES,
GOALS AND KEY RESULT
AREAS
T
his chapter details the strategic issues that the
Authority will focus on in the implementation
of this Strategic Plan, the strategic goals and Key
Result Areas.
05
STRATEGIC OBJECTIVES
AND STRATEGIES
T
his chapter outlines KURA’s strategic objectives and
strategies that will guide the Authority for the Plan
period.
.
5.1. Strategic Objectives
For effective realization of this SP, the Authority
adopted the Sustainable Balance Scorecard
Perspectives which are: financial performance,
customer focus, internal business process, learning
and growth, social justice and environmental
performance. The outcomes, their indicators and
projections for the plan period are shown below.
(The full projections per year have been annexed.)
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network
Expand ITS in Nairobi by installing ITS Number of intersections installed with ITS 221
infrastructure at 206 intersections
Install and operate Traffic Management Fully operationalTMC in Nairobi 1 TMC
Centre in Nairobi metropolitan area
Implementation of ITS in other major towns Number of automated intersections 75
and metropolis (Mombasa, Kisumu, Nakuru, ( Mombasa, Thika, Kisumu, etc including- e
Eldoret, Naivasha, Thika, etc) Police Camera )
Improve Urban Monitor Urban Roads conditions through Number of RICS vehicles procured 3
Road Networks use of technology
operations Number of Ground penetration Radar Survey 10
through Equipment procured
technology Number of Pavement Evaluation Machines 3
procured
32 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network
Below are the objectives, support activities, outcome indicators and totaloutcomes projections for
effective realisation of key result area II:
5. 2: KRA II Outcomes Projections
KRA II: Corporate Governance and Institutional Capacity
Objectives Outcomes/ Support activities O bservable Verifiable Indicators Total
(OVI)
Increase KURAs Conduct Annual Brand Audits and Brand Audit Reports 5
Visibility and publicity implement recommendations
internally and externally Branding of KURAs Projects, infrastructure, Number of branded publicity boards 300
vehicles, assets and merchandise Number of branded bridges 175
Number of branded bus shelters 250
Number of branded safety parks 20
Number of branded regional offices 20
Review brand manual and brand guidelines Approved brand manual 1
to align with the Authority' s strategic
direction
Brand Manual implementation and Report on implementation and 5
monitoring monitoring
Stakeholder Sensitization forums Number of sensitization forums 20
Enhance integrated media use to showcase Up to date interactive online 20
KURA programs & projects communication platforms
Quarterly podcasts on topical areas 20
Active KURA blog 240
Biannual newsletter 5
Quarterly e- bulletins 20
Annual communication audits Communication Audit Report 5
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 33
Media familiarization tour and visits of No. of stories published by media 250
KURA Projects houses
Identify & Equip Internal panel of experts No. of internal panellist identified & 200
for media engagement ( Brand Ambassadors trained
)
Undertake Media Publicity Campaigns (TV, Number of KURA projects 75
Radios, Social Media & project showcased by the media
documentaries)
Media Monitoring Automated media monitoring 100%
Participate in Shows, Exhibitions, Fairs & Number of shows & exhibitions 100
Other public reforms attended
Host Annual Conference on key thematic Number of Annual Conferences 5
areas
Identify and implement sustainable high Number of CSI projects 60
impact Corporate Social Investment implemented
project(s) and programs
Superior customer Review , implement and monitor KURA Approved service charter 5
service that exceeds service delivery charter
customers’ expectations Create awareness on Authority's service Annual sensitization reports 5
charter
Undertake stakeholder mapping and needs Stakeholder mapping reports 5
assessment
Undertake annual perception surveys & Perception survey reports 5
implement recommendations
Establishing & nurture a Review and Implement a Quality Assurance Reviewed Quality Assurance policy 100%
culture of excellence Framework (Policy, Management Plan). & Quality Assurance Management
Plan
Quality Assurance Technical Audit Number of Quality Assurance 120
Technical Audits
Undertake Annual Quality Assurance Number of Annual Quality 5
Workshops with key project implementation assurance Workshops
team members
Cascading and championing of national and Number of staff sensitized 1,500
core values annually through sensitization. Number of stakeholders sensitized 30,000
Compliance to standards Review criteria and standards for policy Approved policy development and 100%
& statutory requirements development review criteria
Review and update Authority's policies Number of policy's reviewed 21
Develop a central repository for all KURA KURA documents control 5
policies & SOPs (standard operating repository for policies & SOPs
procedures.
Sensitisation and monitoring policies Monitoring and sensitization reports 21
implementation
Identify stakeholder Develop and implement an annual Quarterly Stakeholder engagement 20
needs and expectations stakeholder engagement and communication reports
and implement plan
34 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
measures to address the Automate Customer/ Stakeholder Stakeholder/ Customer Relationship 100%
needs and aspirations Relationship Management Management system
and Policies Review and update existing HR Policies & No. of policies reviewed 10
HR Manual
Periodic ISO Audits ISO Internal Audits reports 15
Periodic ISO surveillance audits ISO Surveillance Audits reports 5
ISO Trainings KEBS trainings ISO 9001 (internal 10
& lead trainings)
Internal ISO Training 10
Periodic ISMS Audits No. of periodic audits 6
ISMS trainings No. of staff trained 10
Obtain ISMS certification Certificate 11
Business Continuity and Develop & operationalize BCP Operational BCP
Risk Management
Monitor and mitigate risks & leverage on Operationalized Risk Management 100%
opportunities Plan
Develop& implement ERMF Operationalized ERMF 100%
To align organizational Lobby for review of organization/staffing Proposed Units in place Full
structure to corporate structure to include a Resource Mobilization implementati
strategy Unit, Emergency Response Unit, Customer on
Response Centres and Environmental and
Social Safeguard Units in Regions
Undertake Job Analysis & skills Audit to Job Analysis and Skills Audit Report 1
inform staff placement
Attract and retain Develop/review HR Policies No. of policies developed/existing 10
competent human policies revised
resources Develop Annual Resourcing Plans Annual Resourcing plans 5
Review Pension Benefits to capture Post- Post- Retirement medical cover rider Full Review
retirement Medical Fund for 5 years
36 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Below are the objectives, support activities, outcome indicators and total outcomes projections for effective
realisation of key result area III:
Below are the objectives, support activities, outcome indicators and total outcomes projections for effective
realisation of key result area III:
KRA III: Prudent F inancial M anagement and Resource M obilization for F inancial Sustainability
Objectives Outcomes / Support activities OVI Total target
Partner with private partners to lease Amount of revenue 30,000,000.00
traffic safety parks. generated by hosting training
services in traffic parks
Generate revenue from survey data, Amount of revenue 90,000,000.00
traffic data, axle load data, completed generated
feasibility reports and designs from
developers, consultants, media houses,
county governments and researchers.
Below are the strategic objectives and strategies for effective realization of KRA II:
Below are the strategic objectives and strategies for effective realization of KRA II:
Outering Road
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 43
06
IMPLEMENTATION
AND COORDINATION
FRAMEWORK.
T
his chapter details how this Strategic Plan will
be implemented, the action plan, annual work
plans and budget, performance contracting, the
coordination framework, institutional framework, staffing
of the Authority, leadership, systems and procedures and
KURA’s risk management framework.
Eastern Bypass
44 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
To effectively implement the Plan, the Authority is guided by the approved organization structure shown below;
6.2.2.2 Skills set and Competence Development training calendar for all staff members to address skills and
The Authority has a Human Resource Manual that guides competence gaps identified.
staff recruitment, training and development. During
recruitment, staff are placed according to their skills and To develop key competencies required for effective
competencies as required by the respective JDEs and entry implementation of this Strategic Plan, the Authority will
requirements. Through annual staff appraisals and annual capture the results of the skills gap audit using the matrix
training needs assessment, the Authority will develop below;
Authority’s quality management system and legal/ support during strategy implementation.
regulatory requirements; formulating research and
innovations strategies for the Authority. ii Enhance partnerships, collaborations and engagements
with all stakeholders that are critical for successful
Directorate of Corporate Services implementation of the Plan.
Responsible for overseeing Finance, HR and Administration
Management and ICT activities in the Authority. iii) Mobilise and avail resources for planned programmes
and activities;
Directorate of Audit Services
Responsible for ascertaining the Authority’s compliance with iv) Ensure annual work plans are properly anchored and
the relevant Internal Audit statutes, policies, administrative linked with the strategic plan and KURA performance
government circulars and guidelines. management framework;
Outering Road
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 51
07
RESOURCE
REQUIREMENTS AND
MOBILIZATION
STRATEGIES.
T
his chapter outlines the financial requirements,
resource gaps and resource management framework
in line with BETA principles for effective realization
of this plan.
Kshs
359,929,683,992
Budget estimate for effective
implementation of each Key Result
Area and operationalization of KURA
Ngong Road
52 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
The following is the breakdown of the financial requirements and proposed funding for the plan period, figures in million
Kshs.
Table 7. 1: Financial Requirements for Implementing the Strategic Plan (million Kshs)
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 53
To support the implementation of the strategic plan, the monitoring and evaluation framework will require to be integrated
with the Plan.
To raise the required financial resources and realize full implementation of this plan, the Authority will mobilise resources
from the Treasury, Kenya Roads Board, Development Partners, PPP engagements and internal sources as detailed below.
08
MONITORING,
EVALUATION AND
REPORTING
FRAMEWORK
T
his chapter outlines the monitoring, evaluation and
reporting framework.
Eastern Bypass
56 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Install and operate Traffic Fully Operational TMC in Undergoing 1 TMC 1 TMC
Management Centre in Nairobi Nairobi metropolitan area
metropolitan area
Implementation of ITS in other Number of automated new 25 75
major towns and metropolis ( intersections ( Mombasa,
Mombasa, Kisumu, Nakuru, Eldoret, Thika, Kisumu, etc)
Naivasha, Thika, etc) including e-Police Camera
Setting up of KURA Regional Number of material testing nil 6 10
Laboratories laboratories setup and
equipped
Eradicate Separation of walkways and cycle KMs of NMT facilities nil 300 500
accidents and track facilities from motorised lanes separated from MT
incidents on urban facilities
road networks Construct NMT grade separation Number of pedestrian nil 12 20
facilities ( Footbridges and grade separation completed
underpasses)
Improve and modernize pedestrian Number of pedestrian nil 5 15
crossing zones for universal access crossing zones improved
(signalised pedestrian crossing, zebra and modernized
crossing, rumble strips, pedestrian
tables etc)
Install street lighting in liaison with KMs of urban roads fitted 13 50 100
county governments with functional street lights
Conduct road safety awareness Number of outreach 1 6 10
programmes (In Safety
Traffic Parks and Media)
Establish an emergency operationalize an New 0 1
response/incident response unit emergency response unit
Integrate Climate Plant and maintain trees Number of trees planted 15994 45,000 100,000
change mitigations along urban roads and
in urban roads other identified areas
Upgrading and rehabilitation of road Kms of urban roads with nil 300 800
drainage systems in urban areas improved and functional
including cities, county headquarters drainage systems
and major towns
Management
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
relevance, accuracy &
(2025/2026)
59
applicability ( Impact
Assessment)
Creativity
KRA &
II - CORPORATE Develop a research
GOVERNANCE AND & INSTITUTIONAL
Research & innovation policy
CAPACITY new 3 5
Innovation
Objective innovation operational
Outcome Annual indicator
Outcome Baseline Value Total Midterm Total End Term
framework & Annual 2018-2022 Target Target (2023 - 2027)
Research and Innovation (2025/2026)
Management plan
relevance, accuracy &
Identify & implement
applicability ( Impact Number of research & nil 6 10
research & innovation
Assessment) innovation proposals/
Creativity & proposals/
Develop concepts&
a research concepts/&projects
Research innovation policy new 3 5
Innovation /projects operational
innovation implemented
Annual
Collaborate&with
framework other
Annual No of partnerships/MoUs nil 3 5
organizations
Research and
and Innovation signed and operationalized
institutions
plan
Identify & implement Number of research & nil 6 10
research & innovation Collaborations
innovation impact
proposals/ nil 3 5
proposals/ concepts assessmentprojects
concepts/ reports
/projects implemented
Collaborate with other No of partnerships/MoUs nil 3 5
organizations and signed and operationalized
institutions
Lease of access and ducts Amount of revenue generated 20,000,000 105,000,000 200,000,000
Lease of Ducts and Road access
Engage the Lobby for adequate Budget % Increase in Budget 7,555,000,000 27,507,755,000 50,736,433,550
National Allocation & timely Allocation
Treasury for Approval to close funding
adequate gaps
resources to
close funding
gaps
Engage the Approval and application Increased RMLF 13,627,085,434 49,616,218,065 91,514,191,211.42
Ministry for of the new RMLF communicated through annual
adequate allocation formular allocation ceilings
funding
Engage Engagement with key Amount Raised from 1,986,000,000 7,231,026,000 13,337,201,460.00
Development development partners Development Partners
Partners for
more funding
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 61
Expected Output Annual Qurter for Year ... Cumulative to Date Remarks Corrective
Output Indicator / OVI Target (A) Intervention
Target Actual Variance Target Actual Variance
(B) (c) (C-B) (E) (F) (F-E)
Key Result Area I- Plan, Design, Develop, Upgrade and Maintain National Urban Road Network
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
KMs of URP&
bypasses D
identified and 20 25 30 35 40 150 1,200 1,500 1,800 2,100 2,400 9,000
designed
KMs of missing URP&
links identified D 5 5 5 5 5 25 25 25 25 25 25 125
and designed
Design of Structures Number of URP&
(Bridges, Box interchanges D 1 2 2 2 3 10 25 50 100 200 600 975
Culverts, designed
Footbridges, Number of URP&
Underpasses, Structures D&
Overpasses, Designed URD
Retaining Walls, 15 15 20 20 25 95 5.25 7.00 7.00 8.75 33.25 61.25
Grade Separated
Intersections &
Viaducts)
Prediction of Traffic flow Traffic flow URP&
Traffic Condition management count surveys D 23 25 40 45 50 183 5.60 6.00 10.00 15.00 15.00 51.60
(Traffic Data
Collection, Number of URP&
Analysis and Junction signals D
Forecasting) Installed/ 20 25 25 50 75 195 19.40 19.00 40.00 60.00 85.00 223.40
Maintained
major towns
KMs of new URD
NMTs 30 34
200 44 560 1840 2,000 3,000 3,400 4,400 5,600 18,400
Constructed 0 0
0
KMs of new URD
bypasses
constructed 5 10 20 25 30 90 1,000 2,000 5,500 6,500 7,500 22,500
(PPP, GOK,
EPC)
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Kms of Roads in URD 2027/28
Urban Informal
Settlements and
Densely
Populated Areas 10
50 60 80 120 410 2,500 3,000 4,000 5,000 6,000 20,500
constructed/upg 0
raded
Number of URD
missing links 2 2 2 2 2 10 240 240 240 240 240 1,200
constructed
Number of URD
Structures
Constructed 10 20 20 25 25 100 250 500 500 625 625 2,500
(Bridges and
Box Culverts)
construction
Construction of KMs of Roads URD
Roads under PPP Constructed 5 10 15 20 30 80 600 1,200 1,800 2,400 3,600 9,600
under PPP
Maintenance of Routine Maintenance KMS of RACM
Existing and New for NMTs and Motorised Road
urban road Motorised Road Networks Under 21 19 17
networks Networks routine 2300 1500 9500 3,450 3,150 2,850 2,550 2,250 14,250
00 00 00
Maintenance
65
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES)) 66
Goals Objectives Strategies Outcomes / Outcome Actor
Support Activities Indicator/ OVI
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
KMS of NMTs RACM
Road Networks
Under routine 52 47 42 262.5 187.5 1,187.5
575 375 2375 287.50 237.50 212.50
Maintenance 5 5 5 0 0 0
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Community No of jobs RACM 2027/28
Empowerment created through
program/ road
employment creation maintenance 10 11 12
(youth, women works projects 1391
9500 45 49 65 58010 9.50 10.45 11.50 12.65 13.92 58.01
associations for contributing to 5
0 5 0
labour based community
maintenance) empowerment
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Install static/virtual Number of new RACM 2 3 3 3 3 14
weigh bridges static/virtual 100.00 150.0 150.00 150.00 150.0 700.00
weigh bridges 0 0
installed
Beacons and
Boundary
pillars)
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Undertake regular Number of EIA URP& 46 48 51 48 46 239 2027/28
environmental conducted D 20.70 21.60 22.95 21.60 20.70 107.55
impact assessment
for motorised road
networks and NMTs
Enhance Optimised Adoption of ITS Carry out feasibility Number of ITS URP& 1 1 1 1 1 5
urban traffic flow studies and detailed feasibility studies D 50.00 50.00 50.00 50.00 50.00 250.00
Mobility in urban designs for major
through road towns( Konza City,
technology networks Kisumu, Mombasa, Number of ITS URP& 1 1 1 1 1 5
Thika, Nakuru, detailed designs D 100.00 100.0 100.00 100.00 100.0 500.00
Eldoret) 0 0
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Install and operate Fully URP& Construc Op ma ma main
Traffic Management Operational D t era int int tain 5,000.0 10.00 10.00 10.00 10.00 5,040.0
Centre in Nairobi TMC in Nairobi te ain ain 0 0
metropolitan area metropolitan
area
Implementation of Number of URP& 0 0 25 25 25 75
ITS in other major automated D - - 550.00 550.00 550.0 1,650.0
towns and intersections ( 0 0
metropolis ( Mombasa,
Mombasa, Kisumu, Thika, Kisumu,
Nakuru, Eldoret, etc) including e-
Naivasha, Thika, etc) Police Camera
Number of URD 0 1 0 0 0 1
Bridge - 40.00 - - - 40.00
Inspection
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Vehicle
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
KMs of urban 2027/28
roads assessed
and monitored
in major towns
(( Nairobi (xx), 15 20
RACM 50 70 300 770 25 35 75 100 150 385
Mombasa (xx), 0 0
Nakuru (xx),
Kisumu (xx),
etc)
Continuously Number of
Monitor Urban bridges
Roads structures inspected and URD 20 40 40 40 40 180 20 40 40 40 40 180
performance using monitored
latest technology
Number of
bridges with
monitoring URD 6 12 12 12 12 54 6 12 12 12 12 54
equipment
installed
Setting up of KURA Number of
Regional material testing
Laboratories laboratories URD 2 2 2 2 2 10 100 100 100 100 100 500
setup and
equipped
Enhance Eradicate Improve NMT Separation of KMs of NMT
safety on accidents network Safety walkways and cycle facilities 10 10 10
urban road and track facilities from separated from URD 100 100 500 1,000 1,000 1,000 1,000 1,000 5,000
0 0 0
networks incidents on motorised lanes MT facilities
urban road
Construct NMT Number of
networks
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Improve and Number of
modernize pedestrian pedestrian
crossing zones for crossing zones
universal access ( improved and
signalised pedestrian modernized
URP&
crossing, zebra 0 0 5 5 5 15 - - 10 10 10 30
D
crossing, rumble
strips, pedestrian
tables etc)
Number of
safety audits
conducted URP&
during 20 30 30 30 30 140 7 7 7 7 7 35
D
construction
(live project)
Number of post
construction
safety audits URP&
40 40 40 40 40 200 10 10 10 10 10 50
conducted D
Number of kms
of urban roads
monitored for
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
quality of road 20 20 20
marking and URPD 0 200 800 6 3 3 3 3 18
0 0 0
Signage after
construction.
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Number of KMs 2027/28
of urban roads
marked for
safety
enhancement for
existing roads URP& 10 10 10
100 100 500 25 25 25 25 25 125
(Including zero D 0 0 0
scrap
environmental
friendly road
infrastructure)
Install street lighting KMs of urban
in liaison with county roads fitted with URP&
governments functional street 15 15 20 25 25 100 100 100 100 150 200 650
D
lights
Maintain and Number of
enhance operation of Traffic Safety
traffic safety parks Parks
constructed ( URP&
Machakos, 0 1 1 1 2 5 - 50 50 50 100 250
D
Meru, Garrissa,
Kericho,
Mombasa)
Number of
Traffic Safety
Parks
maintained (
Nairobi,
URP&
Nakuru, Nyeri, 32 32 32 32 32 160 20 20 20 20 20 100
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
D
Embu,
Kakamega,
Kisumu, Kisii,
Eldoret)
73
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES)) 74
Goals Objectives Strategies Outcomes / Outcome Actor
Support Activities Indicator/ OVI
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Conduct road safety Number of
awareness outreach
programmes (In
URP&
Safety Traffic 2 2 2 2 2 10 20.00 20.00 20.00 20.00 20.00 100.00
D
Parks and
Media)
D
tree spade
Procure tree URP &
spade - 1 - - - 1 - 20 - - - 20
D
Undertake tree
inventory and URP &
impact 1 1 1 1 1 1 2.5 2.5 2.5 2.5 2.5 12.5
D
assessment
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Undertake pilot
URP & 10 2027/28
tree relocation - - - - 100 - - 0.5 - - 0.5
D 0
Undertake
upscale tree URP & 1,0
- - - 2,000 3000 - - - 5 10 15
relocation D 00
s and requirements
75
Key Result Area II.
Corporate Governance and Institutional Capacity
76
Key Result Area II- Corporate governance and Institutional capacity
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES))
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Stakeholder Number of
Sensitization sensitization forums PS&C 4 4 4 4 4 20 3 3 3 3 4 16
forums
Enhanced Enhance Upto date interactive
Authority’s integrated media online
integrated use to showcase communication PS&C 4 4 4 4 4 20 30 30 30 30 30 150
communic KURA programs platforms
ation & projects
platforms Quarterly podcasts
PS&C 4 4 4 4 4 20 1 1 1 1 1 5
on topical areas
Active KURA blog
PS&C 48 48 48 48 48 240 1 1 1 1 1 5
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES))
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Biannual newsletter 2027/28
PS&C 1 1 1 1 1 5 1 1 1 1 1 5
Quarterly e-bulletins PS&C 4 4 4 4 4 20 1 1 1 1 1 3
Annual Communication
communication Audit Report PS&C 1 1 1 1 1 5 2 2 2 2 2 10
audits
Review Approved
communication communication PS&C 1 0 0 0 0 1 2 - - - - 2
strategy & policy strategy & policy
Develop, approved work plan
implement and & implementation
monitor Annual reports PS&C 1 1 1 1 1 5 1 1 1 1 1 3
communication
plans
Effective Develop a media Updated media
media database and database and
engagemen build media quarterly media
PS&C 4 4 4 4 4 20 2 2 2 2 2 8
t strategy capacity on forums
KURA's mandate
and programs
Media No. of stories
familiarization published by media
PS&C 50 50 50 50 50 250 1 1 1 1 1 5
tour and visits of houses
KURA Projects
Identify & Equip No. of internal
Internal panel of panellist identified &
experts for media trained
PS&C 30 35 40 45 50 200 2 2 2 2 2 10
engagement (
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Brand
Ambassadors )
Undertake Media Number of KURA
Publicity projects showcased
Campaigns (TV, by the media
PS&C 5 10 15 20 25 75 35 35 35 35 35 175
Radios, Social
Media & project
documentaries)
Media Monitoring Automated media
monitoring PS&C 50% 50% 100% 100% 100% 100% 2 2 0 0 0 5
77
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES))
78
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Participate in Number of shows &
Shows, exhibitions attended
Exhibitions, PS&C 20 20 20 20 20 100 8 8 8 8 8 40
Fairs & Other
public reforms
Host Annual Number of Annual
Conference on Conferences
PS&C 1 1 1 1 1 5 15 15 15 15 15 75
key thematic
areas
Engageme Identify and Number of CSI
nt in implement projects implemented
Corporate sustainable high
Social impact Corporate PS&C 5 10 10 10 25 60 5 5 10 10 10 40
Investment Social Investment
(CSI) project(s) and
programs programs
Superior Monitor Review, Approved service
customer impact of implement and charter
service service monitor KURA PS&C 1 1 1 1 1 5 1 1 1 1 1 5
that delivery service delivery
exceeds standards charter
customers Create awareness Annual sensitization
’ on Authority's reports PS&C 1 1 1 1 1 5 3 3 3 3 3 15
expectatio service charter
ns
Undertake Stakeholder mapping
stakeholder reports
PS&C 1 1 1 1 1 5 3 3 3 3 3 15
mapping and
needs assessment
Undertake annual Perception survey
perception reports
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Quality Number of Quality 2027/28
Assurance Assurance Technical
Technical Audit Audits PS&C 18 21 24 27 30 120 5 6 7 8 9 36
Authority's
policies
Develop a central KURA documents
repository for all control repository for
KURA policies & policies & SOPs
PS&C 1 1 1 1 1 5 0.5 0.5 0.5 0.5 0.5 2.5
SOPs (standard
operating
procedures.
Sensitisation and Monitoring and
monitoring sensitization reports
policies PS&C 0 8 8 5 0 21 - 2.5 2.5 1.2 - 6.2
implementation
79
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES)) 80
Goals Objective Strategies Outcomes / Outcome
s Support Indicator/ OVI
Total
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Enhance Identify Establish Develop and Quarterly
Stakeholders stakeholde and implement an Stakeholder
Engagement r needs implement annual engagement reports
s and a stakeholder PS&C 4 4 4 4 4 20 0.5 0.5 0.5 0.5 0.5 2.5
expectatio stakeholder engagement and
ns and engagemen communication
implement t plan
measures framework Automate Stakeholder/
to address Customer/ Customer Develo review
review review
the needs Stakeholder Relationship p the functi
PS&C and functio 2.5 2.5 - 0.5 0.5 6
and Relationship Management system applicati onalit
upgrade nality
aspiration Management on y
s
Carry out Quarterly reports on
stakeholders stakeholders needs
needs assessment assessment PS&C 4 4 4 4 4 20 8 8 8 8 8 40
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Enhance Enhance Develop Identify areas of No. of strategic
KURAs seamless stakeholder collaboration and partners engaged
DG 4 4 4 4 4 20 6 6 6 6 6 30
Collaboration collaborati collaborati relevant strategic
with strategic on on on partners
partners, key core framework Undertake Number of meetings
stakeholders mandate collaboration
and research with meetings and
institutions regulatory share work-plans
agencies,
other road
DG 4 4 4 4 4 20 8 8 8 8 8 40
agencies
and
county
governme
nts.
Total
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
with emergence
of electric
vehicles)
Corporate Enhance Complianc Board Capacity Number of Trainings DG,
DD(LS)
4 4 4 4 4 20 5 5 5 5 5 25.1
Governance corporate e to Building Carried Out
and governanc Chapter (Induction, Number of board
Leadership e through Six of the Training) members trained DG,
DD(LS)
10 10 10 10 10 50 - - - - - -
an CoK
Effective
& Adherence Annual Board Board Performance SCAC,
Efficient to Performance Evaluation Report DG, 1 1 1 1 1 5 0.2 0.2 0.2 0.2 0.2 1.0
Board Mwongozo Evaluation DD(LS)
Code of Review Board Number of Reviewed DG,
Ethics Charter Charters DD(LS)
5 5 5 5 5 25 0.2 0.2 0.2 0.2 0.2 1.0
Management Number Trained
Training on DD(HR
MA)
5 5 5 5 5 25 1 1 1 1 1 5
governance and
leadership
Implemen Institution Review & Number of reviewed
t Quality alize Implement Policies & SOPs D(PSC), Finalize Impleme Imple Imple
Managem Policies & Authority Policies MR
review 100% 3 - - - 3 6
review nt ment ment
ent Standard & SOPs
Processes Operating Review and No. of policies
and Procedures update existing reviewed DD(HR
Policies (SOPs) MA)
2 2 2 2 2 10 1 1 1 1 1 5
HR Policies &
HR Manual
Maintain Periodic ISO ISO Internal Audits
ISO Audits reports QMR 3 3 3 3 3 15 6 6 6 6 6 30
Certificatio Periodic ISO ISO Surveillance
n surveillance audits Audits reports QMR 1 1 1 1 1 5 0.5 0.5 0.5 0.5 0.5 2.5
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
ISMS trainings No. of staff trained DD 2027/28
ICT,IS
MS 2 2 2 2 2 10 2 2 2 2 2 10
Team
Leader
Obtain ISMS Certificate DD
certification ICT,IS
MS 3 2 2 2 2 11 4 2 2 2 2 12
Team
Leader
Business Implement Develop & Number of staff
Continuity Business operationalize sensitized
DCS 64 64 64 64 64 320 5 5 5 5 5 25
and Risk Continuity BCP by sensitize
Managem Plan (BCP) all staff
ent Develop Monitor and Operationalized Risk Oper
Operati Opera Operati
and mitigate risks & Management Plan Operatio ationa
onal tional onal
implement leverage on DD nal risk l risk
risk risk risk
an Annual opportunities ERM/B manage mana 100% 0.1 0.1 0.1 0.1 0.1 0.5
PR manage manag manage
Risk ment geme
ment ement ment
Manageme Plan nt
Plan Plan Plan
nt Plan Plan
Implement Develop& Operationalized
Enterprise implement ERMF DG, Revie
Risk ERMF D(PSC), Operati
w
Manageme DD(ER onalize 100% - - 1.5 - - 1.5
M&BPR frame
nt ERMF
) work
Framework
(ERMF)
Align To align Additional Lobby for review Proposed Units in
Human organizati department of place as per approved
capital to onal s/units organization/staff structure
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Safeguard Units
in Regions
employee
Identify and List of professional
update a database bodies relevant to
DD(HR
of professional KURA MA)
100% 100% 100% 100% 100% 100% 0.1 0.1 0.1 0.1 0.1 0.5
bodies relevant to
KURA
Support No of employees
employees in supported with
DD(HR
professional membership renewal MA)
100% 100% 100% 100% 100% 100% 50 50 50 50 50 250
membership and every year
training
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES))
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Implement Implementation plan 2027/28
DD(HR
mentoring and MA)
20% 20% 20% 20% 20% 100% 1 1 1 1 1 5
coaching policy
Performan Undertake annual Percentage of staff DG,
ce staff performance performance DCS,
DD(HR
100% 100% 100% 100% 100% 100% 0.1 0.1 0.1 0.1 0.1 0.5
manageme appraisal for all appraisal
nt & staff staff MA)
reward Reward staff for No of staff rewarded DG,
performance and DCS,
DD(HR
35 40 45 50 55 225 1 1 1 1 1 5
innovation
MA)
Pension Conduct pension Market survey report DG,
manageme contribution DCS,
DD(HR
1 0 0 0 0 1 5 - - - - 5
nt market survey
MA)
Lobby for review Employer
of pension contribution to
contribution pension DG,
DCS, 31
(from 7.5% - 10% DD(HR
5% 5% 5% 5% 5% 5% 16.4 212 261 368 1.319
3
employee and MA)
from 15% - 20%
employer)
Review Pension Post-Retirement
Benefits to medical cover rider DG,
DCS,
capture Post- for 5 years DD(HR
- - - - - -
retirement MA)
Medical Fund
Employee Undertake No of ESS Reports
Engageme Employee DG,
DCS,
nt Satisfaction DD(HR
1 0 0 0 1 2 5 - - - 5 10
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Performa Plan Annual Departmental
nce through Performance Performance reports
Culture Performan monitoring and DG,
ce reporting of DCS,
DD(HR
4 4 4 4 4 20 5 5 5 5 5 25
Manageme departmental
MA)
nt work plans
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Enhance Create a Work Undertake staff Audit & 2027/28
work Conduciv environme work recommendations
DCS,
environment e and safe nt and environment implementation
DD(HR 1 - 1 - 1 3 2 - 2 - 2 6
working facilities survey & Report MA)
environm Audits implement
ent recommendations
Undertake Audit &
Facilities recommendations
mainstreaming implementation
audit ( Report DCS,
accessibility, DD(HR 1 1 2 - 2 - 2 - 4
PWDs, gender MA)
etc) and
implement
recommendations
Establish nursing Functional lactation DCS,
room for mothers room DD(HR 1 - - - - - -
MA)
Conduct OSH Annual Audits &
Audits and Fire audit DCS,
Safety Audits and recommendations DD(HR 20% 20% 20% 20% 20% 100% 5 5 5 5 5 25
implement Implementation MA)
recommendations Matrices
Employee Develop & Operational policy
Relations implement 1
DCS, 1 policy
and Staff Psycho-social Revie
DD(H develop - - - 1 1.5 - - 1.5 - 3
Engageme interventions w
RMA) ed
nt policy & Policy
strategies
Staff Team Departmental and 2 2 2 2 2
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
DCS,
building & cross functional team DD(HR Initiativ Initiative Initiat Initiati Initiativ 10 5 5 5 5 5 25
bonding sessions building sessions MA) es s ives ves es
DG stakeholder Quarterly AD
Forums Stakeholder meetings Corpora
te 4 4 4 4 4 16 0.5 0.5 0.5 0.5 0.5 2.5
Commu
nication
Enhance Enhance Institution Develop /review Updated and DG, 100% 100% 100%
Customer customer alize ICT and update ICT upgraded systems DCS, 100%
DD(ICT
Impleme 100% Revie Implem 100% 1 1 1 1 1 5
Service focus and Policies Policies & and processes review
) ntation w entation
Delivery Procedures
87
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES)) 88
Total
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
excellence Implement Manage and track Status of DG, 100% 100%
100%
for all Help Desk interactions with implementation DCS, Imple Imple
DD(ICT
nil Implem 100% - 1.2 - - - 1.2
Ticketing customers ment menta
) entation
system ation tion
Implement Manage and track Status of
Customer interactions with implementation DG, 100% 100%
100%
Relationshi customers DCS, Imple Imple
DD(ICT
nil Implem 100% - - 5 - - 5
p ment menta
) entation
Manageme ation tion
nt (CRM)
Establish Develop & Implementation DCS/D 100% 100%
and implement EDMs Report D 100%
Imple Imple
Maintain & KURIMs (HRMA nil Implem 100% - 20 - - - 20
)/DD(I ment menta
Electronic entation
CT) ation tion
Records
Implement Integrate E- operational E-
E- procurement with procurement DG,
procureme KURA ERP modules DCS,
DD(ICT
- - - - - -
nt system and
procurement )
procedures
Sensitize No. of sensitization
contractors on workshops
DCS 2 2 2 2 2 10 4 4 4 4 4 20
procurement
processes
Track contractor performance reports
DCS 1 1 1 1 1 5 0.5 0.5 0.5 0.5 0.5 2.5
performance
Digitize Onboard Functional HR DCS/D
HR & enhanced HR & modules on the ERP D
Administra Admin services (HRMA 100% 100% - 0.5 - - - 0.5
tion on ERP system )/DD(I
CT)
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
services
Accommo Train Staff in sign No. of trained staff DCS/D
dation of language D
(HRMA
5 5 5 5 5 25 1 1 1 1 1 5
differently interpretation
)
abled
Upgrade/update customer friendly
persons
KURA website to website DCS/D
D(ICT)
5% 5% 5% 5% 5% 25% 1 - - 1 - 2
be disability
friendly
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES))
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Enhance Leverage Develop Develop & Annual
DG, 100% 100% 100%
KURA's on ICT an ICT implement ICT implementation 100%
DCS, 1 ICT imple imple Review
processes best Strategy Strategy report of the ICT DD(ICT
impleme 100% 3 - - - 1.5 4.5
strategy ment menta the
practices for the strategy ) ntation
and systems ation tion strategy
to authority
enhance Revamp Improve ICT Robust
business and network and infrastructure,
operation Enhance storage dynamic Disaster
Authority’s infrastructure and Recovery site 100% 100%
DCS, 100% 100%
ICT formulate policy Imple Imple
DD(ICT 1 policy Impleme Implem 100% 15 20 15 15 15 80
infrastruct and framework ) ment menta
ntation entation
ure for disaster ation tion
record upgrade
servers, UPS ,
AC, Computers)
Secure ICT Develop and Reduced successful 100% 100%
100%
system and implement cyber attacks on the ICT staff Imple
Imple
Cyber security strategy systems, shorter awarene ment 1
DCS, 1 ment
security periods of ss Audit Review
DD(ICT security Audit - 12 10 10 10 42
strategy downtimes (MTTBF) ) training reco the
audit recom
on mme strategy
mend
cyber ndati
ations
security ons
Data Develop data Action plan in place,
Protection management Data analytics and BI 1 100% 100%
DCS, 100%
and policy, tools and reports Approve Imple Imple
DD - Implem - 1.5 0.5 0.5 0.5 3.0
security system (ICT) d action ment menta
entation
manageme plan ation tion
nt
Modifying Improvement in No of modified and
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Enhance Devolve Set up satellite Number of offices
9 10
KURA services to offices in set up DG, 7 8 satelli satellit 11 35
presence the county counties to D(RAC 35. 35. 35.
M),
satellite satellite te e satellite satellite 35.8 35.8 179.1
in level facilitate 8 8 8
DCS offices offices office office offices offices
counties devolving of
s s
services
Establish Set up 4 new New regional offices 4
DG, 4
new regional offices set up regio
D(RAC 4 region 4 region region 4 region 4 21. 21. 21.
regions M),
n 21.7 21.7 108.4
offices offices office offices regions 7 7 7
DCS office
s
s
Provide Develop a Develop Framework
1
One-Stop- Resource operational developed
DG, Ds framew 1 0.5 - - - - 0.5
Shop for Centre Framework &
ork
road Guidelines
infrastruct Operationalize & Operational resource 100% 100%
Operate 100%
ure equip the center maint maint
DG, Ds and mainten 100% 3 2 1 1 1 8
services Resource Centre enanc enanc
equip ance
e e
Enhance Efficient Develop Develop Knowledge
D(PSC), 1-
Knowledge Knowledg institutiona knowledge management
DCS, Policy
Management e l management operational D(RAC
1 policy 0 1 1.5 - - 0.5 - 2
Revie
, Research Managem knowledge operational framework M) w
and ent manageme framework
Innovation nt Identify, Impact Assessment
framework document, Report
analyze & review
D(PSC), 1
knowledge for 1
DCS, Progres 2
relevance, D(RAC
Baseline - 2 - 2 - 4
s reports
accuracy & M) report
Report
applicability
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
(Impact
Assessment)
Knowledge up to date repository
sharing, securing D(PSC), Develo Upda Updat Update
Update
& storage DCS, p& te and e and and
D(RAC
and 100% 2 0.5 0.5 0.5 0.5 4
(Knowledge populat maint maint maintai
M) maintain
Management e ain ain n
Repository)
KRA II- Corporate Governance and Institutional Capacity Total target Budget (Millions (KES))
Actor
Activities
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
Enhance Establish Develop and STI & Research 2027/28
Creativity an review a Science, Strategy 1 STI &
1
& innovation Technology, Researc
D(PSC) Revie 1 2 1 - - - 3
Innovatio hub Innovation (STI) h
w
n and Research strategy
Strategy
Develop research Research &
& innovation innovation policy
operational Annual
framework & D(PSC) 1 1 1 1 1 5 0.5 0.5 0.5 0.5 0.5 2.5
Annual Research
and Innovation
plan
Identify & Number of research
implement & innovation
research & proposals/
innovation concepts/ projects D(PSC) 2 2 2 2 2 10 2 2 2 2 2 10
proposals/ implemented
concepts
/projects
Reward Annual initiatives
innovative recognition and D(PSC) 2 2 2 2 2 10 2 2 2 2 2 10
initiatives rewards
Develop Collaborate with No of
strategic other partnerships/MoU
D(PSC) 1 1 1 1 1 5 0.5 1 1.5 2 2.5 7.5
partnership organizations and signed and
s institutions operationalized
Collaborations
impact assessment D(PSC) 1 2 3 4 5 5 0.2 0.4 0.8 1 1.2 3.6
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
reports
91
Key Result Area III- Resource mobilization and financial sustainability 92
KRA III: Resource Mobilization & Financial Sustainability Target Budget (Millions (KES))
Actor
OVI
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
1)Prudent Financial Management 2027/28
Prudent Prudent Enhance Preparation of Annual Approved
Financial Financial Financial Budgets Annual D-CS 1 1 1 1 1 5 0.8 0.8 0.8 0.8 0.8 4
Manageme management Management Budget
nt of Resources Systems for Preparation of Annual Approved
for sustainability DG
procurement plan Annual
/SC 1 1 1 1 1 5 - - - - - -
Sustainability Procurement M
Plan
Financial Performance Quarterly
Indicators tracking Reports
(absorption of funds & D-CS 4 4 4 4 4 20 - - - - - -
trend analysis, MTP
process)
Financial
Statements
2.) Resource Generation
(a) Operational Develop and Engage consultant to Resource
Alternative resource operationalize develop resource Mobilization
sources of mobilization resource mobilization strategy Strategy in DG 1 - - - - 1 - - - - -
funding for strategy mobilization place
strategy
sustainabili Mobilize Public Private Establish a PPP Operational
ty Additional Partnerships Function PPP Function DG 1 - - - - 1 - - - - -
Financial (PPP) Establish PPP PPP
Resources to operational framework engagement
Bridge for collaboration with framework DG 1 1
Financing other stakeholders and
Gaps Partner
Identify Viable PPP No. of PPP
projects & Engage Agreements DG 2 2 2 3 3 12 - - - - - -
potential partners
Project implementation PPP project
through PPP as per implementatio DG 600 1,200 1,800 2,400 3,600 9,600 - - - - - -
signed MOU/MOA n value
Social Impact Develop Concept No. project
D-
Bonds papers, design, drafting proposals PSC
proposals on social initiated D- 1 1 1 2 2 7 - - - - - -
issues along corridors URP
D
Amount D-
generated PSC
through social D- 500 - 500 1,000
impact Bond URP
D
Green Fund/ Develop Concept No. project D-
Climate papers, design, Drafting proposals PSC
Proofing proposals on Climate initiated D- 1 1 1 2 2 7 - - - - - -
URP
funds proofing initiatives D
along corridors Amount D-
generated PSC
through Green D- 500 - 500 1,000
/Climate URP
Proofing Fund D
Provision of Offer technical Number of
Consultancy expertise to Counties, consultancies D-CS
D-
1 2 3 4 4 14 - - - - - -
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
Key Result Area I- Plan, Design, Develop, Upgrade and Maintain National Urban Road Network
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Key Result Area I- Plan, Design, Develop, Upgrade and Maintain National Urban Road Network
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
Key Result Area I- Plan, Design, Develop, Upgrade and Maintain National Urban Road Network
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
road networks
Develop detailed KMs new NMTs URP&
D
60 80 90
designs for NMTs Designed 600 1000 3900 5 5 5 5 5 25
0 0 0
and Motorised Road
Networks KMs of new URP&
Road Network D 30 40 45
300 500 1950 10 10 10 10 10 50
Designed 0 0 0
99
ANNEXES 100
9.1 Implementation Matrix
Key Result Area I- Plan, Design, Develop, Upgrade and Maintain National Urban Road Network
KRA I: Plan, Design, Develop, Maintain and Manage National Urban Road Network Target Budget (Millions (KES))
Total
Total
2023/24
2024/25
2025/26
2026/27
2027/28
2023/24
2024/25
2025/26
2026/27
2027/28
road networks
Develop detailed KMs new NMTs URP&
D
60 80 90
designs for NMTs Designed 600 1000 3900 5 5 5 5 5 25
0 0 0
and Motorised Road
Networks KMs of new URP&
Road Network D 30 40 45
300 500 1950 10 10 10 10 10 50
Designed 0 0 0
Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan 101
ANNEX II:
CONSULTATION WORKSHOPS & STAKEHOLDER
VALIDATION.
i) Steering Committee and Management inception meeting held on 6th March 2023 at KURA boardroom, Barabara Plaza
ii) Board and Management consultation workshop held on 15th-16th March 2023 at Aberdare Country Club, Nyeri.
iii) Steering Committee Brainstorming workshop held on 11th – 15th April at Grand Winston Hotel, Nakuru.
iv) 1st Draft SP Management validation workshop held on 24th – 25th May 2023 at the Auditorium, Barabara Plaza.
v) 2nd Draft SP Board Validation held on 8th -10th June, 2023 at Sawela Resort, Naivasha.
vi) Stakeholder Validation workshop held on 7th September 2023 at Radisson Blue Hotel, Nairobi.
vii) Final Board validation and Approval 5th October 2023 at Four Point by Sheraton Hotel, JKIA, Nairobi.
102 Kenya Urban Roads Authority | 2023 - 2027 Strategic Plan
BOARD OF
DIRECTORS
Eng. Charles M. Chiuri, PE, FIEK Eng. Silas M. Kinoti, Basil N. Nyagah
Board Chairman MBS, FIEK Director Representing
Institute of Engineers of Kenya Director General Matatu Welfare Association
& Board Secretary
Mr. Joseph G. Kiarii Eng. Luka Kimeli Mr. Joseph L.O Muganda
Director Representing Director Representing Director Representing
PS. The National Treasury PS. State Department for Kenya Association of
Roads Manufacturers
TOP
MANAGEMENT
Eng. Silas M. Kinoti, Eng. Wilfred R. Oginga, PE
MBS, FIEK Director, Urban Roads Planning & Design.
Director General &
Board Secretary MSc. (Construction Management)
BSc (Civil Engineering)
MBA (Corporate Member - IEK, EBK
Management)
BSc (Civil Engineering)
Member - IEK, EBK