QA QC FORMAT
QA QC FORMAT
Client
EIC
Contractor
( IS 2386 Part - I )
40 100
20 85 - 100
10 0 - 20
4.75 0 -5
PAN
Remarks:-
Client
EIC
Contractor
( IS 2386 Part - I )
12.5 100
10 85 - 100
4.75 0 - 20
2.36 0 -5
PAN
Remarks:-
Client
EIC
Contractor
Tests of Bricks
As Per IS :1077-1972
Remarks :-
SAMPLE No.
OBSERVATIONS
01 02 03 04 05
SAMPLE No.
OBSERVATIONS
01 02 03 04 05
AVERAGE
Area in (cm2)
Load (Kg)
Client
EIC
Contractor
0.600 15 - 34 35 - 59 60 - 79 80 - 100
0.150 0 -10 0 - 10 0 - 10 0 - 15
PAN
FM :- 2 to 3.5
Remarks :
Contractor’s Representative Engineer-in-Charge’s Representative
Project Name
Client
EIC
Contractor
Container No.
Remarks :-
Client
EIC
Contractor
DESCRIPTION 1 2 3 Avg.
A Water Temperature oC
REMARKS :
Client
EIC
Contractor
DESCRIPTION 1 2 3 AVG.
REMARKS :
Client
EIC
Contractor
Average %
5
REMARKS :
Client
EIC
Contractor
4 Average %
Client
EIC
Contractor
Date of Testing
Structure Identification
( Location of Formate ) Age of cube (days)
Volume of Density Of
Wt. of Failure Load Compressive Strength Average Strength
S.N. Cube No. cube (mm x cube
Cube (gm) in KN (N/mm2) N/mm2
mm x mm) (gm/cc)
PMC SIGN :-
PMC SIGN :-
PMC SIGN :-
PMC SIGN :-
Remarks:
Client
EIC
Contractor
FINENESS OF CEMENT
( IS : 4031 - Part - 1 ) 1996
2 10% Max.
Remarks :
Client
EIC
Contractor
Sampled by : Tested by :
(W3/W1) X
4 Aggregate Impact Value
100 , (%)
Remarks:-
Client
EIC
Contractor
Source Sampled by
Aggregates
Total Weight of Fractions for material Passing on flaky gauge (sample Weight of Non Flaky aggregates Weight of aggregates retained on
Passing Retained
sieved passing through each retained on flaky gauge Elongation gauge
gauge)
63 50
50 40
40 31.5
31.5 25
25 20
20 16
16 12.5
12.5 10
10 6.3
Total
Flakiness % W=(W2/W1)*100
Elongation % w=(W4/W3)*100
Remarks :
W4(gms)
s Representative
Project Name
Client
EIC
Contractor
Water added
Penetration of Duration Of Time
Sr. No. Sample Taken (gm) Remarks
needle (mm) (minutes)
% ml
Remarks :-
Client
EIC
Contractor
Date
Structural Component:
W/C Ratio
Cement (kg) 20mm Agg (kg) 10mm Agg (kg) Sand (kg) Water Admixture (kg)
concrete quantity
Transit mixer no
dispatched
Concrete Temperature
Remarks :
Pouring card
Concrete pouring
Time of start of pouring
method
Remarks: