QA QC FORMAT

The document contains various testing reports for construction materials, including sieve analysis for coarse and fine aggregates, tests for bricks, compressive strength of concrete, and determination of moisture content. Each section includes details on sampling, testing methods, and results, adhering to relevant IS standards. The reports are signed by representatives from the contractor and engineer-in-charge, ensuring accountability and compliance.

Uploaded by

selva kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1 views17 pages

QA QC FORMAT

The document contains various testing reports for construction materials, including sieve analysis for coarse and fine aggregates, tests for bricks, compressive strength of concrete, and determination of moisture content. Each section includes details on sampling, testing methods, and results, adhering to relevant IS standards. The reports are signed by representatives from the contractor and engineer-in-charge, ensuring accountability and compliance.

Uploaded by

selva kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Project Name

Client

EIC

Contractor

SIEVE ANALYSIS FOR COARSE AGGREGATES (20MM)

( IS 2386 Part - I )

Report No Date of Sampling


:…………………………………………….. :…………………………………….
Description of
Date of Testing
Sample
:…………………………………………….. :…………………………………….

Sample Location Tested by


:…………………………………………….. :…………………………………….

Proposed Use Weight of sample


:…………………………………………….. :…………………………………….

GRADATION OF 20MM AGGREGATES


Cumulative Percentage Percentage Specification
I.S. Sieve (mm) Weight Retained (gm) Cumulative Weight Retained (gm)
Retained(%) Passing (%) Limits

40 100

20 85 - 100

10 0 - 20

4.75 0 -5

PAN

Remarks:-

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

SIEVE ANALYSIS FOR COARSE AGGREGATES (10MM)

( IS 2386 Part - I )

Report No Date of Sampling


:…………………………………………………………….... :…………………………………….
Description of
Date of Testing
Sample
:…………………………………………….. :…………………………………….

Sample Location Tested by


:…………………………………………….. :…………………………………….

Proposed Use Weight of sample


:…………………………………………….. :…………………………………….

GRADATION OF 10MM AGGREGATES


Cumulative Weight Retained Cumulative Percentage Percentage
I.S. Sieve (mm) Weight Retained (gm) Specification Limits
(gm) Retained(%) Passing (%)

12.5 100

10 85 - 100

4.75 0 - 20

2.36 0 -5

PAN

Remarks:-

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

Tests of Bricks
As Per IS :1077-1972

REPORT NO :………………………………………………………………………… DATE OF SAMPLING :...............................................

LOT INDENTIFICATION (MAKE) :...................................................................... SAMPLED BY :...............................................

NO.OF BRICKS SELECTED :............................................................................. TESTED BY :...............................................

A) DIMENTIONAL CHECK DATE OF TESTING

DIMENTIONS OBSERVATIONS TOLERANCE(CL.6.2 OF IS:1077)

Overall Length in MM 4600±80

Overall Width in MM 2200±40

Overall Height in MM 1400±40

Remarks :-

B) WATER ABSORPTION DATE OF TESTING

SAMPLE No.
OBSERVATIONS
01 02 03 04 05

Dry Weight (W1)Gms. AVERAGE

Weight after 24hrs.soaking (W2) Gms

% of Water Absorption 100*(W2-W1)/W1


:-…………………….
Remarks :-

C) COMPRESSIVE STRENGTH DATE OF TESTING

SAMPLE No.
OBSERVATIONS
01 02 03 04 05

AVERAGE
Area in (cm2)

Load (Kg)

Compressive Strength (Kg/cm 2)


:-…………………….
Remarks :-

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

SIEVE ANALYSIS FOR FINE AGGREGATE


As Per IS: 383 - 1970

Report No :…………………………………… Date of Sampling :…………………………….

Source of Materials :…………………………………… Date Testing :…………………………….

Loction of sample :…………………………………… Sampled by :…………………………….

Weight of Sample :…………………………………. Tested by :…………………………….

Percentage Passing (%)


I.S. Requirement for
Cumulative
Weight Cumulative Weight Percentage
I.S. Sieve (mm) Percentage
Retained (gm) Retained (gm) Passing (%)
Retained (%) Zone-I Zone-II Zone-III Zone-IV

10 100 100 100 100

4.75 90 - 100 90 - 100 90 - 100 95 - 100

2.36 60 -95 75 - 100 85 - 100 95 - 100

1.18 30 - 70 55 - 90 75 - 100 90 - 100

0.600 15 - 34 35 - 59 60 - 79 80 - 100

0.300 5 -20 8 -30 12 -40 15 - 50

0.150 0 -10 0 - 10 0 - 10 0 - 15

PAN

FM :- 2 to 3.5

Remarks :
Contractor’s Representative Engineer-in-Charge’s Representative
Project Name

Client

EIC

Contractor

DETERMINATION OF MOISTURE CONTENT

(IS : 2720 , PART 2)

Report No :………………………………….. Date of Sampling :………………………………..

Sample Location :………………………………….. Date of Testing :………………………………..

Source of Materials :………………………………….. Tested By :………………………………..

Description of Sample :………………………………………. Proposed Use :………………………………..

Sample description 20 mm / 10 mm / SAND


Sl No

Container No.

1 Weight Wet Sample (gm)

2 Weight of Oven Dry Sample (gm)

3 Mass of Water = 1 - 2 (gm)

4 Moisture Content = 3 /2 x 100 (%)

5 Average Moisture Content ( %)

Remarks :-

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

Specific Gravity & Water Absorption Of Aggregate larger than 10 mm Size

IS: 2386 (P- 3) - 1963

Report No :…………………………………………………………………………… Date of Sampling :………………………………………………..

Source / Location :…………………………………………………………………………… Date of Testing :………………………………………………..

Description of Material :…………………………………………………………………………… Sampled by :………………………………………………..

Proposed use :…………………………………………………………………………… Tested by :………………………………………………..

DESCRIPTION 1 2 3 Avg.

A Water Temperature oC

B Weight of Basket in water gm

C Weight of Basket + Sample in water gm

D Weight of S.S.D. sample in air gm

E Weight of sample in water, (C - B), gm

F Weight of oven dry sample gm

G Water Absorption ( D-F)/F X100, %


(0.1 - 2%)

H Oven Dry Bulk Specific Gravity F/(D - E)

I S.S.D.Bulk Specific Gravity D/(D - E)


2.5-3.0

J Apparent Specific Gravity F/(F - E)

REMARKS :

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

Specific Gravity & Water Absorption of Aggregates less Than 10 mm Size


IS: 2386 (P- 3) - 1963

Report No : Date of Sample :

Location : Date of Testing :

Description of Material : Sampled By :

Proposed use : Tested By :

DESCRIPTION 1 2 3 AVG.

A Weight of saturated surface dry sample gm

Weight of pycnometer containing sample &


B gm
filled with water

C Weight of pycnometer filled with water gm

D Weight of oven dried sample gm

E Water Absorption (A-D)/D)X100, %

F Oven Dried Specific Gravity (D/(A-(B-C)))

G SSD Bulk Specific Gravity A/(A-(B-C))

H Apparent Specific Gravity D/(D-(B-C))

REMARKS :

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

DETERMINATION OF SILT CONTENT (BY WEIGHT)


IS: 2386 (P- I) - 1963

Report No : Date of Sample ;

Source/Location : Date of Testing :

Description of Material : Sampled By :

Proposed use : Tested By :

SL. No. DESCRIPTION 1 2 3

Initial Weight of dried sample W1 (gm)


1
Weight of Dried Sample wash through
W2 (gm)
2 0.075mm Sieve & Retained Weight taken

Loss of Weight W3=(W1-W2) ,gm


3

% Silt Content (W3/W1) x100


4

Average %
5

Specified Limit % 3.0 Max.


6

REMARKS :

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

DETERMINATION OF SILT CONTENT (BY VOLUME)

CPWD APPENDIX ‘C’ (Clause 3.1.3.2)

Report No : Date of Sample :

Source/Location : Date of Testing :

Description of Material : Sampled By :

Proposed use : Tested By :

SL. No. DESCRIPTION 1 2 3

1 Vol. of Silt Layer V1 (ml)

2 Vol. of Sand Layer V2 (ml)

3 % Silt Content (V1/V2) x100

4 Average %

5 Specified Limit % 8.0 Max.


REMARKS :

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

COMPRESSIVE STRENGTH OF CONCRETE /MORTAR CUBES


As per IS 516

Report No Date of Casting

Date of Testing
Structure Identification
( Location of Formate ) Age of cube (days)

Grade Of Concrete Brand & Grade of Cement

Cement Content (Kg/ cum) Tested By

Water Cement Ratio Admixture

Volume of Density Of
Wt. of Failure Load Compressive Strength Average Strength
S.N. Cube No. cube (mm x cube
Cube (gm) in KN (N/mm2) N/mm2
mm x mm) (gm/cc)

PMC SIGN :-

PMC SIGN :-

PMC SIGN :-

PMC SIGN :-

Remarks:

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

FINENESS OF CEMENT
( IS : 4031 - Part - 1 ) 1996

Report No. Date of Sampling

Brand & Grade of Cement Date of Testing

Batch No. of Manufacturing Sampled by

Room Temperature Tested by

Wt. Of Sample Wt of sample Retained on Fineness of Cement


Taken (gm) 90 micron sieve (gm) (%) Average % of
Trial. No. Fineness of cement Specified limit
(%)
A B (B/A) x 100

2 10% Max.

Remarks :

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

AGGREGATE IMPACT VALUE


[ IS : 2386 ( Part - IV ) ]

Report No : Date of Sampling :

Location : Date of Testing :

Sampled by : Tested by :

Description of Material : Proposed use :

Sr. No. Description Sample 1 Sample 2 Sample 3

Total Wt. of oven dry sample passing 12.5 mm


1 W1( gm)
sieve and retained on 10 mm sieve

2 Wt. of portion retained on 2.36 mm sieve W2(gm)

3 Wt. of portion passing on 2.36 mm sieve W3(gm)

(W3/W1) X
4 Aggregate Impact Value
100 , (%)

5 Aggregate Impact mean Value (%) %

Remarks:-

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

COMBINED FLAKINESS AND ELONGATION INDEX


(IS 2386 PART I)

Report No Date of Sampling

Location Date of Testing

Type of Sample Tested by

Source Sampled by

IS Sieve Size FLAKINESS INDEX ELONGATION INDEX

Aggregates
Total Weight of Fractions for material Passing on flaky gauge (sample Weight of Non Flaky aggregates Weight of aggregates retained on
Passing Retained
sieved passing through each retained on flaky gauge Elongation gauge
gauge)

mm mm W1(gms) W2(gms) W3(gms) W4(gms)

63 50

50 40

40 31.5

31.5 25

25 20

20 16

16 12.5

12.5 10

10 6.3

Total

Flakiness % W=(W2/W1)*100

Elongation % w=(W4/W3)*100

Combined Flakiness & Elongation Index = (W+w)

Remarks :

Contractor's Representative Engineer-in-Charge’s Representative


GATION INDEX

Weight of aggregates retained on


Elongation gauge

W4(gms)

s Representative
Project Name

Client

EIC

Contractor

NORMAL CONSISTENCY , INITIAL & FINAL SETTING TIME OF CEMENT


As Per IS:4031, PART- 4 & 5

Report No. : Date of Sampling :

Brand & Grade of Cement : Date of Testing :

Batch No. of Manufacturing : Sampled by :

Room Temperature : Tested by :

Water added
Penetration of Duration Of Time
Sr. No. Sample Taken (gm) Remarks
needle (mm) (minutes)
% ml

Normal Consistency of cement:

Initial Setting Time:

Final Setting Time:

Remarks :-

Contractor's Representative Engineer-in-Charge’s Representative


Project Name

Client

EIC

Contractor

CONCRETE DELIVERY AND POURING CARD


Delivery Card

Date
Structural Component:
W/C Ratio

Concrete grade Admixture type

Cement Type Maximum Agg. Size

Cement (kg) 20mm Agg (kg) 10mm Agg (kg) Sand (kg) Water Admixture (kg)

Material per Cum of concrete (KG)

Material per batch of concrete (KG)

Concrete Quantity per Batch No of Batches Carried

Starting time Finishing time

Slump at batching plant Time of dispatch

concrete quantity
Transit mixer no
dispatched

Concrete Temperature

Remarks :

Contractor's Representative Engineer-in-Charge’s Representative

Pouring card
Concrete pouring
Time of start of pouring
method

Transit mixture arrival


Time of completion
time

Slump at pouring site No.of cubes taken

Weather condition Concrete Temperature

Remarks:

Contractor's Representative Engineer-in-Charge’s Representative