NCC23 - 1.6.2022
NCC23 - 1.6.2022
RINA
Via Corsica, 12 - 16128 Genova - Italy
Tel. +39 01053851 - Fax: +39 0105351000
E-MAIL [email protected] - WEB www.rina.org
GENERAL CONDITIONS OF THE RULES effective from 1/1/2021
Definitions: require the constant and continuous presence of the Surveyor. The
"Rules" in these General Conditions means the documents below Society may also commission laboratory testing, underwater
issued by the Society: inspection and other checks to qualified service suppliers, who
- Rules for the Classification of Ships or other special units; will carry out these duties under their responsibility. Survey prac-
- Complementary Rules containing the requirements for certifica- tices and procedures are selected by the Society based on its expe-
tion of products, plants, systems and other or containing the rience and knowledge and according to generally accepted
requirements for the assignment of additional class notations; technical standards in the sector.
- Rules for the application of statutory rules, containing the rules to Article 3
perform the duties delegated by Administrations; 3.1. - The class assigned to a Ship, like the reports, statements, cer-
- Guides to carry out particular activities connected with Services; tificates or any other document or information issued by the Soci-
- Any other technical document, as for example rule variations or ety, reflect the discretionary opinion of the Society concerning
interpretations. compliance, at the time the Service is provided, of the Ship or
“Services” means the activities described in Article 1 below, ren- product subject to certification, with the applicable Rules (given
dered by the Society upon request made by or on behalf of the the intended use and within the relevant time frame).
Interested Party. The Society is under no obligation to make statements or provide
“Society” or “RINA” means RINA Services S.p.A. and/or all the information about elements or facts which are not part of the spe-
companies in the RINA Group which provide the Services. cific scope of the Service requested by the Interested Party or on its
“Surveyor” means technical staff acting on behalf of the Society in behalf.
performing the Services. 3.2. - No report, statement, notation on a plan, review, Certificate
“Interested Party” means the party, other than the Society, having of Classification, document or information issued or given as part
an interest in or responsibility for the Ship, product, plant or sys- of the Services provided by the Society shall have any legal effect
tem subject to classification or certification (such as the owner of or implication other than a representation that, on the basis of the
the Ship and his representatives, the ship builder, the engine checks made by the Society, the Ship, structure, materials, equip-
builder or the supplier of parts to be tested) who requests the Ser- ment, machinery or any other item covered by such document or
vices or on whose behalf the Services are requested. information meet the Rules. Any such document is issued solely
“Owner” means the registered Owner, the ship Owner, the man- for the use of the Society, its committees and clients or other duly
ager or any other party with the responsibility, legally or contractu- authorised bodies and for no other purpose. Therefore, the Society
ally, to keep the ship seaworthy or in service, having particular cannot be held liable for any act made or document issued by
regard to the provisions relating to the maintenance of class laid other parties on the basis of the statements or information given by
down in Part A, Chapter 2 of the Rules for the Classification of the Society. The validity, application, meaning and interpretation
Ships or in the corresponding rules indicated in the specific Rules. of a Certificate of Classification, or any other document or infor-
“Administration” means the Government of the State whose flag mation issued by the Society in connection with its Services, are
the Ship is entitled to fly or under whose authority the Ship is governed by the Rules of the Society, who is the sole subject enti-
authorised to operate in the specific case. tled to make such authentic interpretation. Any disagreement on
"Ship" means ships, boats, craft and other special units, as for technical matters between the Interested Party and the Surveyor in
example offshore structures, floating units and underwater craft. the carrying out of his functions shall be raised in writing as soon
"Client" means the Interested Party and any other party who as possible with the Society, which will settle any divergence of
requires the Services. opinion or dispute.
3.3. - The classification of a Ship, or the issuance of a certificate or
Article 1 other document connected with classification or certification and
1.1. - The purpose of the Society is, among others, the classifica- in general with the performance of Services by the Society shall
tion and certification of ships and the certification of their parts have the validity conferred upon it by the Rules of the Society at
and components. the time of the assignment of class or issuance of the certificate; in
The Society: no case shall it amount to a statement or warranty of seaworthi-
- sets forth and develops Rules; ness, structural integrity, quality or fitness for a particular purpose
- publishes the Register of Ships; or service of any Ship, structure, material, equipment or machin-
- issues certificates, statements and reports based on its survey ery inspected or tested by the Society.
activities. 3.4. - Any document issued by the Society in relation to its activi-
1.2. - The Society also takes part in the implementation of national ties reflects the condition of the Ship or the subject of certification
and international rules and standards as delegated by various Gov- or other activity at the time of the check.
ernments. 3.5. - The Rules, surveys and activities performed by the Society,
1.3. – The Society carries out technical assistance activities on reports, certificates and other documents issued by the Society are
request and provides special services outside the scope of classifi- in no way intended to replace the duties and responsibilities of
cation, which are regulated by these General Conditions, unless other parties including, without limitation, Governments, design-
expressly excluded in the particular contract. ers, ship builders, manufacturers, repairers, suppliers, contractors
or sub-contractors, Owners, operators, charterers, underwriters,
Article 2 sellers or intended buyers of a Ship or other product or system sur-
2.1. - The Rules developed by the Society reflect the level of its veyed.
technical knowledge at the time they are published. Therefore, the These documents and activities do not relieve such parties from
Society, though committed, also through its research and develop- any fulfilment, warranty, responsibility, duty or obligation (also of a
ment services, to continuous updating, does not guarantee they contractual nature) expressed or implied or in any case incumbent
meet state-of-the-art science and technology at the time of publi- on them, nor do they confer on such parties any right, claim or
cation or that they meet the Society's or others' subsequent techni- cause of action against the Society. With particular regard to the
cal developments. duties of the ship Owner, the Services undertaken by the Society
2.2. - The Interested Party is required to know the Rules on the do not relieve the Owner of his duty to ensure proper maintenance
basis of which the Services are provided. With particular reference of the Ship and ensure seaworthiness at all times. Likewise, the
to Classification Services, special attention is to be given to the Rules, surveys performed, reports, certificates and other docu-
Rules concerning class suspension, withdrawal and reinstatement. ments issued by the Society are intended neither to guarantee the
In case of doubt or inaccuracy, the Interested Party is to promptly buyers of the Ship, its components or any other surveyed or certi-
contact the Society for clarification. fied item, nor to relieve the seller of the duties arising out of the
The Rules for Classification of Ships are published on the Society's law or the contract, regarding the quality, commercial value or
website: www.rina.org. characteristics of the item which is the subject of transaction.
2.3. - The Society exercises due care and skill: In no case, therefore, shall the Society assume the obligations
- in the selection of its Surveyors incumbent upon the above-mentioned parties, even when it is
- in the performance of its Services, taking into account the level of consulted in connection with matters not covered by its Rules or
its technical knowledge at the time the Services are performed. other documents.
2.4. - Surveys conducted by the Society include, but are not lim- In consideration of the above, and within the limits of liability
ited to, visual inspection and non-destructive testing. Unless other- under art. 5 below, the Interested Party undertakes to relieve and
wise required, surveys are conducted through sampling hold harmless the Society from any third party claim, as well as
techniques and do not consist of comprehensive verification or from any liability in relation to the latter concerning the Services
monitoring of each component of the Ship or of the items subject rendered, where these are attributable to the Interested Party.
to certification. The surveys and checks made by the Society, either Insofar as they are not expressly provided for in these General
on board ships or with remote techniques, do not necessarily Conditions, the duties and responsibilities of the Owner and Inter-
ested Parties with respect to the services rendered by the Society from the date on which the Services were performed or THREE
are described in the Rules applicable to the specific Service ren- MONTHS from the date on which the damage was discovered.
dered. Failure to comply with the above deadline will constitute an abso-
Article 4 lute bar to the pursuit of such a claim against the Society.Article 6
4.1. – Any request for the Society's Services shall be submitted in 6.1. - Any dispute arising from or in connection with the Rules or
writing and signed by or on behalf of the Interested Party. Such a with the Services of the Society, including any issues concerning
request will be considered irrevocable as soon as received by the responsibility, liability or limitations of liability of the Society, will
Society and shall entail acceptance by the applicant of all relevant be determined in accordance with Italian Law and settled through
requirements of the Rules, including these General Conditions. arbitration assigned to a board of three arbitrators who will pro-
Upon acceptance of the written request by the Society, a contract ceed in compliance with the Rules of the Chamber of National
between the Society and the Interested Party is entered into, which and International Arbitration of Milan. Arbitration will take place
is regulated by the present General Conditions. in Genoa, Italy.
4.2. – In consideration of the Services rendered by the Society, the 6.2. - However, for disputes concerning non-payment of the fees
Interested Party and the person requesting the service shall be and/or expenses due to the Society for Services, the Society shall
jointly liable for the payment of the relevant fees and costs, even if have the right to submit any claim to the jurisdiction of the Courts
the service is not concluded for any cause not pertaining to the of the place where the registered or operating office of the Inter-
Society. In the latter case, the Society shall not be held liable for ested Party or of the applicant who requested the Service is
non-fulfilment or partial fulfilment of the Services requested. In the located.
event of late payment, interest at the legal current rate increased In the case of actions taken against the Society by a third party
by 2% shall be paid. before a judicial Court, the Society shall also have the right to
4.3. - The contract for the classification of a Ship or for other Ser- summon the Interested Party or the subject who requested the Ser-
vices may be terminated and any certificates revoked at the vice before that Court, in order to be relieved and held harmless
request of one of the parties, subject to at least 30 days' notice to according to art. 3.5 above.
be given in writing. Failure to pay, even in part, the fees due for Article 7
Services carried out by the Society will entitle the Society to imme- 7.1. - All plans, specifications, documents and information pro-
diately terminate the contract and suspend the Services. vided by, issued by, or made known to the Society, in connection
The Society may withhold, suspend or withdraw any certificate, with the performance of its Services, will be treated as confidential
report or service in the event of non-payment of fees due to any and will not be made available to any other party other than the
member of the RINA Group by the Client in relation to the entire Owner without authorisation of the Interested Party, except as pro-
business relationship between any member of the RINA Group vided for or required by any applicable international, European or
and the Client or by any other companies belonging to the same domestic legislation, Charter or other IACS resolutions, or order
group as the Client. This also applies when the obligation to pay from a competent authority. Information about the status and
rests with a builder or with the Ship's previous Owner. validity of class and statutory certificates, including transfers,
For every case of termination or suspension of the contract, the changes, suspensions, withdrawals of class, conditions of class,
fees for the activities performed until the time of the termination or operating conditions or restrictions issued against classed ships
of the suspension shall be owed to the Society as well as the and other related information, as may be required, may be pub-
expenses incurred in view of activities already programmed; this is lished on the website or released by other means, without the prior
without prejudice to the right to compensation due to the Society consent of the Interested Party.
as a consequence of the termination or of the suspension. Information about the status and validity of other certificates and
With particular reference to Ship classification and certification, statements may also be published on the website or released by
unless decided otherwise by the Society, termination of the con- other means, without the prior consent of the Interested Party.
tract implies that the assignment of class to a Ship is withheld or, if 7.2. - Notwithstanding the general duty of confidentiality owed by
already assigned, that it is suspended or withdrawn; any statutory the Society to its clients in clause 7.1 above, the Society's clients
certificates issued by the Society will be withdrawn in those cases accept that the Society will participate in the IACS Early Warning
where provided for by agreements between the Society and the System which requires each Classification Society to provide other
flag State. involved Classification Societies with relevant technical informa-
Article 5 tion on serious hull structural and engineering systems failures, as
5.1. - In providing the Services, as well as other correlated infor- defined in the IACS Early Warning System (but not including any
mation or advice, the Society, its Surveyors, servants or agents drawings relating to the ship which may be the specific property of
operate with due diligence for the proper execution of the activity. another party), to enable such useful information to be shared and
However, considering the nature of the activities performed (see used to facilitate the proper working of the IACS Early Warning
art. 2.4), it is not possible to guarantee absolute accuracy, correct- System. The Society will provide its clients with written details of
ness and completeness of any information or advice supplied. such information sent to the involved Classification Societies.
Express and implied warranties are specifically disclaimed. 7.3. - In the event of transfer of class, addition of a second class or
Therefore, subject to what provided for in paragraph 5.2 below, withdrawal from a double/dual class, the Interested Party under-
and also in the case of activities carried out by delegation of Gov- takes to provide or to permit the Society to provide the other Clas-
ernments, neither the Society nor any of its Surveyors will be liable sification Society with all building plans and drawings, certificates,
for any loss, damage or expense of whatever nature sustained by documents and information relevant to the classed unit, including
any person, in tort or in contract, derived from carrying out the its history file, as the other Classification Society may require for
Services. the purpose of classification in compliance with the applicable
5.2. – Notwithstanding the provisions in paragraph 5.1 above, legislation and relative IACS Procedure. It is the Owner's duty to
should any user of the Society's Services prove that he has suffered ensure that, whenever required, the consent of the builder is
a loss or damage due to any negligent act or omission of the Soci- obtained with regard to the provision of plans and drawings to the
ety, its Surveyors, servants or agents, then the Society will pay new Society, either by way of appropriate stipulation in the build-
compensation to such person for his proved loss, up to, but not ing contract or by other agreement.
exceeding, five times the amount of the fees charged for the spe- In the event that the ownership of the ship, product or system sub-
cific services, information or opinions from which the loss or dam- ject to certification is transferred to a new subject, the latter shall
age derives or, if no fee has been charged, a maximum of one have the right to access all pertinent drawings, specifications, doc-
hundred thousand Euro. Where the fees charged are related to a uments or information issued by the Society or which have come
number of Services, the amount of the fees will be apportioned for to the knowledge of the Society while carrying out its Services,
the purpose of the calculation of the maximum compensation, by even if related to a period prior to transfer of ownership.
reference to the estimated time involved in the performance of the
Service from which the damage or loss derives. Any liability for Article 8
indirect or consequential loss, damage or expense is specifically 8.1. – RINA shall not be obliged to perform any obligation towards
excluded. In any case, irrespective of the amount of the fees the Client (including, without limitation, obligation to (a) perform,
charged, the maximum damages payable by the Society will not deliver, accept, sell, purchase, pay or receive money to, from or
be more than 1 million Euro. Payment of compensation under this through a person or entity, or (b) engage in any other act) if this
paragraph will not entail any admission of responsibility and/or would be in violation of, inconsistent with or expose RINA to
liability by the Society and will be made without prejudice to the punitive measures under any United Nations resolutions and/or
disclaimer clause contained in paragraph 5.1 above. under any laws, regulations, decrees, ordinances, orders,
demands, requests, rules or requirements of EU, United Kingdom,
5.3. - Any claim for loss or damage of whatever nature by virtue of and/or United States of America and which relate to foreign trade
the provisions set forth herein shall be made to the Society in writ- controls, export controls, embargoes or international boycotts
ing, within the shorter of the following periods: THREE MONTHS
(applying, without limitation, to the financing, payment, insur- pretation of the Rules); art. 4.2., (as far as the payment of the fees is
ance, transportation, delivery or storage of product and/or ser- also due for services not concluded due to causes not attributable
vices) hereinafter referred to as "Trade Sanctions". to the Interested Party); art. 5.1. (as far as the exclusion of liability
Recurring the above circumstances during the performance of the is concerned); art. 5.2.; art. 5.3.; and art. 6.1. (as far as the jurisdic-
contract, RINA shall be entitled at its sole and absolute discretion: tion of a Board of Arbitrators based in Genoa is concerned).
I) to immediately suspend payment or performance of the Services Article 11
which are the object of the contract until such time as the Trading 11.1. – RINA and the Interested Party shall promote safety, protect
Sanctions are in force; and/or human health and environment and create safe working condi-
II) to a full disengagement from the obligation affected by the tions for their personnel.
Trading Sanctions, in the event that the inability to fulfill the said 11.2. – The Interested Party shall guarantee that the working envi-
obligation persists until the term provided for the fulfilment here- ronment in which RINA’s Surveyor will be required to work is ade-
under, provided that where the relevant obligation relates to pay- quate, safe and in all respect compliant with the applicable
ments for activities and/or Services which have already been legislation and Rules and shall adopt all necessary measures to
delivered, the affected payment obligation shall remain only sus- mitigate and/or control any relevant risk.
pended until such time as the Trading Sanctions no longer apply to 11.3. – Furthermore, in accordance with the applicable legislation
the payment ; and/or and Rules, the Interested Party shall provide RINA with complete
III) to terminate the contract, without prejudice of the RINA’s rights and detailed information relevant to any actual or potential spe-
pursuant to article 4.3. cific risk existing in the work areas where the Surveyor will be
Article 9 required to operate and relevant to the performance of the Services
9.1. – Should any part of these General Conditions be declared as well as with any specific safety measure that RINA Surveyor is
invalid, this will not affect the validity of the remaining provisions. requested to comply with.
11.4. – RINA reserves not to commence and/or to suspend the Ser-
Article 10 vices and/or to terminate the contract, claiming compensation for
10.1. – When the Society provides its Services to a consumer - i.e. any damage occurred, if it considers that the safety requirements
a natural person who does not act within the scope of his business listed in this article are not satisfactorily met.
or professional activity - the following provisions do not apply: art.
3.2. (as far as the Society is solely entitled to the authentic inter-
RULES FOR TESTING AND CERTIFICATION
OF MARINE MATERIALS AND EQUIPMENT
Chapters 1 2 3 4 5 6 7
Chapter 1 General
CHAPTER 1 GENERAL
Table A : Glossary
WORDING DEFINITION
Acceptance criteria The set of values or criteria which a design, product, service or process is required to conform with in order
to be accepted
Accepted The status of a design, product, service or process which has been found to conform with specific accept-
ance criteria
Alteration A change to design, product, service or process
Alternative testing Certification procedure based on a manufacturing survey arrangement between RINA and the Manufacturer
scheme
Applicant A party who applies for a RINA service. It may be a Manufacturer, a Representative, an Importer, etc.
Approval The examination and acceptance by the Society of documents, designs, products, procedures, services and
other items related to classification and statutory certification, verifying solely their compliance with the rel-
evant Rule requirements, or other applicable references (see also Rules Chapter 1, Section 1, [1.2.1])
Approved type Product representative of continuous production to which it is granted permission for use based upon a sat-
isfactory appraisal (see also Rules Chapter 1, Section 1, [1.2.1])
Assemble To fit together the components or parts of equipment or a system
Assess To determine the degree of conformity of a design, product, service, process, system or organisation with
identified specifications, rules, standards or other normative documents
Audit A planned systematic and independent examination to determine that the activities relative to a process are
documented, that these activities are actually performed in conformance with what is stated in the docu-
mentation and that they are properly recorded and such as to reach the contemplated objectives
Calibration The set of operations that establish, under specified conditions, the relationship between values indicated
by a measuring instrument or measuring system and the corresponding values of a measurement standard
that is traceable to a National or International Standard of Measurement
Certificate Formal document attesting compliance of a design, product, service or process with the specified require-
ments
Certification Procedure whereby a design, product, service or process is approved in association with specified require-
ments
Class notation Attestation that the relevant components and materials have been certified in accordance with the applica-
ble Rules of the Classification Society for specific features (see Rules Chapter 1, Section 2, [6]
Code of practice Document that recommends practices or procedures for the design, manufacture, utilisation, installation,
operation and maintenance of equipment, systems, structures or products
NOTE: a code of practice may be a Standard, a part of a Standard or independent of a Standard
Competent person Person deemed qualified to undertake work in a specific area by virtue of appropriate knowledge and expe-
rience
Component Part / member of equipment or system
Conformance Status of conformity
Conformity Compliance of a design, product, process or service with its specific requirements
Customer Party who purchases or receives goods or services from another
Design All relevant plans, documents and calculations describing the performance, installation and manufacturing
of a product
Design appraisal The verification and evaluation performed by a competent Organisation. In general, it includes the drawing
approval and may include a type test witnessed by an inspector
Design approval The process whereby permission is granted for the design to be used for a stated purpose under specific
conditions. It comprises design appraisal and validation, as applicable
Documentation All written data (including drawings, procedures, specifications, etc.) necessary to describe a design, a pro-
cess, a product or a service
Equipment Part of a system assembled from components
Equivalent An acceptable, not less effective alternative to specified criteria
Evaluation Systematic examination of the extent to which a design, product, service or process satisfies specified crite-
ria
Examination Assessment by a competent person to determine compliance with requirements
WORDING DEFINITION
Existing Built before a date given by a national or international Standard in order to establish the start of its applica-
bility
Fabricate To construct or build by fitting parts together
Final test All tests performed to accept a material, product, equipment or plant
Inspection Examination of a design, product, service or process by an inspector in order to ascertain its compliance
with specified standards or specifications
Inspector A person competent to perform inspections
Installation The assembling and final placement of components, equipment and sub-systems to permit operation of the
system, which it is part of
International instru- The international conventions, resolutions and circulars of the International Maritime Organisation (IMO)
ments and international testing standards
Manufacturer The company that produces and or assemblies the final product, and takes the whole responsibility for the
final product.
If the company owns more than one production site, the word “Manufacturer” means each production site.
Sub-suppliers (if any) are considered as Manufacturers as far as the supplied materials, preliminary worked
items or products are concerned.
Manufacturer’s affidavit A certificate or a statement of fact issued by a Manufacturer on his sole responsibility as a result of self-
inspections
Manufacture Process of producing a product
Manufacturing process Systematic series of processes intended to manufacture a product
Manufacturing process Approval of the manufacturing process adopted by the Manufacturer during production of the specific
approval product
Marine product Product that has been designed, constructed and tested for use in a marine application
Marinisation The process whereby a product that has been designed, constructed and tested for use in a non-marine
application is altered or enhanced for use in a marine environment
Materials Raw materials that will require further forming or manufacturing before becoming a product
Measurement The process of determining the performance, size, quantity or value of a product or system
Modification Limited change that does not affect the current approval
Mutual recognition Result of an agreement between two or more bodies who consider that an approval or a certification
granted by one of them, under specific conditions, is acceptable to the other(s)
New Not “existing”
Notified Body An Organisation authorised by the competent National Administration of a European Community Member
State to perform certification activities on their behalf
Performance test Technical operation where a specific performance characteristic is determined and recorded
Process A systematic series of planned actions
Produce See “Manufacture”
Product Result of the manufacturing process
Product verification Production control scheme mainly consisting of testing samples randomly taken from the production line
Production Quality Production control scheme consisting of a verification of the Quality Assurance/Control System applied by
assurance the Manufacturer to the process for manufacturing and testing the product
Prototype A piece of equipment selected among a batch of equipment of the same type (or specially manufactured)
considered as being representative of that type
Quality control plan List of tasks of inspection to be performed during the fabrication of a product by the Manufacturer and/or by
second and third party inspectors
Raw material Material not subjected to a manufacturing process
Repair To restore to original or near original condition the results of decay or damage
Refurbish To restore to original or nearly original condition the results of normal wear and tear. To overhaul, refit, ren-
ovate or make a product usable again
Reject Not to accept a project, product, service or process that has not been recognised as conforming with speci-
fied acceptance criteria
Requirements Specified characteristics used for evaluation purposes
WORDING DEFINITION
Revision Alteration of one or more particulars of a design
Rework Change that takes place after a design revision
Sample Representative taken from a certain number / group of materials, outfitting products, equipment, etc. for
testing/inspection
Self-inspection Inspection delegated to the Manufacturer, provided some conditions are fulfilled: in particular, works and
quality system are approved, and respective responsibilities are identified
Service notation See Rules Chapter 1, Section 2, [4]
Specifications Technical data/particulars which determine the design and/or manufacturing and testing procedures and
define the quality requirements
Specimens Pieces taken from structural materials (such as forged steels, rolled steels, etc.) for various testing, such as
mechanical strength tests
Statement of fact An attestation as to the condition of a design, system, product or service
Sub-supplier One who contracts to supply materials to another supplier or Manufacturer
Supplier One who contracts to furnish materials or a design, product, service or process to a customer or user
Surveillance The process of monitoring a product, procedure or service to ensure it continues to conform with the
approved criteria
Survey Activity carried out by a RINA Surveyor with free and random access to building facility at defined or occa-
sional intervals, consisting of one or more inspections and/or surveillance to verify the compliance of a
product, design, service, process or plant (including ships or offshore installations or parts thereof) with spe-
cific requirements (see also Rules Chapter 1, Section 1, [1.2.1])
(RINA) Surveyor Competent person (appointed by RINA) to perform surveys (see also Rules Chapter 1, Section 1, [1.2.1])
System A plant composed of a number of components suitably interfaced to each other
Test A technical operation that consists of the determination of one or more characteristics or performance of a
given product, material, equipment, organism, physical phenomenon, process or service according to a
specified procedure
Traceability Ability to follow back through the design and manufacturing process to the origin
Type approval The process at the end of which a Type Approval Certificate is issued (see also Rules Chapter 3, Section 1,
[1.2])
Type tests Tests carried out on a prototype to validate the design and to ascertain the conformance of the finished
product with the design (they may be destructive tests)
User A person, company or organisation intending to use a specific product
Validation Last step in the design process, to verify the effectiveness of the design in fulfilling the established purpose.
Usually, this is done by a re-check of drawings and calculations and/or by extensive prototype testing (even
destructive tests, if necessary) carried out by a person not involved in the design performance or in the nor-
mal routine inspection
Vendor A party who sells or delivers a design, product, service or process to another
Witness To be present at a test and to be able to give evidence about its outcome
Workmanship The quality of a product which is the result of the art or skill of a workman and/or the degree of skill and
care expended in carrying out a task related to the production and/or finish of a product
b) alternative inspection scheme, dealt with in [4] 2.1.5 Where, upon completion of the examination, the
documentation is found to be satisfactory, RINA forwards to
c) type approval schemes, dealt with in Chapter 3. the Manufacturer an approval letter in which the conditions
of the approval (if any) are stated and returns the approved
The applicable scheme(s) is(are) defined in the Rules and in
drawings (if any) appropriately stamped.
the following Chapter 6 and 7.
2.2 Type tests
1.2.2 Upon satisfactory completion of all the applicable
reviews and inspections, RINA issues a certificate stating 2.2.1 The purpose of type tests is to validate the design of
that the product has been designed and ured in accordance the prototype. Accordingly, the type tests are generally
with the Rules and/or RINA recognised Standards. more extensive than those required for the normal produc-
tion testing and may include destructive tests.
2 Technical documentation review and 2.2.2 Whenever required by the Rules, the test procedures
are to be submitted to RINA for approval or information, as
inspection procedures applicable.
the applicable Rules. RINA may consider accepting on a sumables have been suitably certified, and the intermediate
case-by-case basis tests carried out by independent labora- sampling and testing are correctly performed.
tories and not witnessed by a RINA Surveyor.
2.6 Final inspection at workshop
2.2.5 Where one or more tests have been not carried out
in the presence of RINA Surveyors, the relevant complete 2.6.1 In general final inspection of a product at workshops
test reports are to be submitted to RINA, which reserves the includes, as far as applicable for the specific product:
right to require the repetition of those tests for which the
documentation is incomplete or, in any event, unaccept- a) document review,
able. b) visual examination,
c) verification of compliance with approved plans,
2.2.6 At the end of the tests attended by a RINA Surveyor,
the latter issues a report on the tests carried out and/or d) dimensional checks,
endorses the test laboratory’s report. e) non-destructive examination.
2.3 Manufacturer and manufacturing pro- 2.6.2 The visual examination and the dimensional checks,
which are to be performed on all products before delivery,
cess approval
are carried out by the Manufacturer acting on his own
2.3.1 Whenever the Rules require the approval of the responsibility.
manufacturing process, the Manufacturers and their individ- 2.6.3 Unless otherwise specified, the visual examination is
ual workshops, where the process is carried out, are to be also to be performed by the Surveyor on each item for prod-
approved by RINA. ucts tested individually and on an adequate number of sam-
ples taken randomly from a production lot for products built
2.3.2 The criteria and the requirements relative to the
in large series.
approval of Manufacturers and manufacturing processes are
indicated in detail in the RINA “Rules for the approval of 2.6.4 The dimensional checks and the verification of com-
manufacturers of materials”. pliance with approved plans are carried out by the Surveyor
solely for those parts of the products which are subject to
2.4 Material testing the approval or for which there are specific requirements in
the Rules.
2.4.1 Material testing is to be performed in accordance
with the requirements of the Rules and the Standards appli- 2.6.5 Non-destructive tests are to be performed by skilled
cable to the material and the product which is intended to and qualified personnel using adequate and properly cali-
be built. In general, material testing certificates are to be brated instrumentation and, when required, in the presence
made available to the Surveyor. of the RINA Surveyor.
2.4.2 Whenever required by the Rules, the RINA Surveyor 2.7 Final testing at workshop
attends the material testing.
2.7.1 In general, final testing at the workshop may include,
2.4.3 The testing and measuring equipment is to be prop- as far as applicable:
erly calibrated and kept in good condition. Records of cali-
bration are to be kept and made available to the Surveyor, a) final testing of a completed product (for instance hydro-
whenever requested. static test of a pressure vessel),
b) performance test (for instance a reduction gear running
2.4.4 The chemical composition of the materials is to be test),
determined and certified by the raw material supplier, using
c) collection of data (for instance performance data for an
ladle-sampling analysis. The laboratory that performs the
engine),
analysis is to be adequately equipped and the analysis is to
be performed by qualified personnel. depending on the type and complexity of the product, as
required by the Rules or by the applicable Standards.
2.4.5 The chemical analyses of the Manufacturer are gen-
erally accepted. However, they are subject to occasional 2.8 Installation on board
checks, where required by the Surveyor.
2.8.1 Installation on board of products and their assembly
2.5 Attendance at workshop into plants and systems are to be surveyed in a similar way
to that indicated in [2.5] and [2.6] for the attendance and
2.5.1 During the fabrication, RINA Surveyors are to have final inspection at the workshop.
free access to all departments involved in production, col-
lection of test samples, internal control and, in general, all 2.9 Testing on board
operations concerning the inspection, in order to ascertain
whether the quality of the workmanship is satisfactory, the 2.9.1 Testing on board of equipment and materials is to be
product is fabricated in accordance with the approved performed, in a similar way to that indicated in [2.7] for
drawings and specifications, the materials and welding con- testing at workshops, in connection with the testing and tri-
als of the installations which the products or materials are presence of a RINA Surveyor may be arranged in two
part of. versions with regard to traceability:
b) A CA with a Manufacturer is to define the handling of h) the Manufacturers (and designers, if producing under
subcontracted parts (those that require RINA or work license) commit themselves to involve RINA when
certificates, or in any other way are addressed in the changes to the design, manufacturing process or testing
RINA's Rules). are made as well as when any major production prob-
lems or any major product delivery problems have
c) The sub-supplier may be included in the CA of the Man-
occurred.
ufacturer or have his own CA or deliver parts that are
inspected and certified by RINA according to the CT
certification scheme. 4.1.7 The alternative certification scheme applies to the
testing operations carried out at the Manufacturer’s work-
d) A CA that permits the Manufacturer to carry out all or shop. Drawing approval prototype tests and initial approval
parts of required inspection and testing without the tests, when required, are to be carried out by RINA.
4.3.1 Upon examination of the admission application, 4.4.4 At the time of such controls, the RINA Surveyor may
including the enclosed documentation, and subject to its require tests and checks of components of particular impor-
completeness, an initial audit is to be carried out to the tance selected at random from those in stock or being pro-
Manufacturer's workshop in order to: cessed or assembled.
a) verify that the manufacture of the product and the rele- 4.4.5 During the period of validity, the admission to the
vant controls are performed in accordance with the doc- alternative certification scheme may be extended to other
uments submitted and in compliance with the types of products manufactured at the same premises with
requirements of the applicable Rules, the same fabrication and test procedures which have been
b) check the actual organisation of the workshop, its accepted, upon satisfactory review of the technical docu-
departments and relevant connections and the global mentation and, if necessary, performance of a type test.
manpower,
4.4.6 On expiry of its validity, admission to the alternative
c) be acquainted with the main equipment used for manu- certification scheme can be renewed for an additional five
facturing the product, years upon the satisfactory outcome of a new audit of the
Manufacturer's workshop.
d) verify the conformity of the Quality System with the ref-
erence documents, The scope of the renewal audit is to:
e) witness the performance of inspections and tests carried • verify the conditions of the CA are still met;
out by the Manufacturer on products being manufac- • verify that the current products and processes are appro-
tured. priately controlled.
4.4.7 Upon satisfactory completion of the required checks 4.6 Suspension or withdrawal
and verification, a statement of renewal of the admission to
the alternative testing system is issued. 4.6.1 RINA may suspend or withdraw admission to the
alternative certification scheme in the following cases:
4.5 Conditions for maintenance of CA a) non-compliance with the conditions mentioned in [4.5]
above,
4.5.1 During the period of validity of the admission to the
b) repeated unsatisfactory results of tests, checks and
alternative certification scheme, the Manufacturer is to keep
inspections carried out on the product or on its main
unaltered the initial conditions ascertained during the
components,
assessment.
c) objective evidence of in service repeated breakdowns
4.5.2 The Manufacturer is to allow RINA Surveyors free on the products due to causes that may be attributed to
access to workshops and in particular to Quality Control the Manufacturer. In such cases, the admission will be
Department at any time, for the purpose of verifying that the suspended until the Manufacturer provides a reliable
manufacturing control procedures of the product and of its and proven corrective action to eliminate the causes of
main components are the same as those ascertained during the breakdown,
the first audit. d) modification of the RINA Rules relevant to the testing of
products,
4.5.3 The Manufacturer is to inform RINA of any modifica-
tion relevant to: e) non-payment of RINA fees by the Manufacturer.
a) design characteristics of the product,
b) manufacturing and control procedures of the main com-
ponents,
c) suppliers of the main components.
In relation to such modifications RINA may require an addi-
tional assessment.
1.2 Applicants other than Manufacturers 2.2.3 Type Approval of software (1/7/2021)
specific requirements of the Standard used as a reference 3.3.2 At least the following information is to be included
for the certification, the validity period may be different. in the report:
The validity period starts from the date indicated on the cer- a) description and identification of the product;
tificate.
b) identification of the testing specifications;
The validity of a TA Certificate is also subject to the issue
c) description of testing equipment and measuring instru-
and maintenance of a Production Quality Assurance Certifi-
ments (for the instruments the identification numbers
cate covering the production of the certified product.
and the last calibration date are to be indicated);
The certificate is renewed at the end of its validity period. In
d) environmental conditions during test execution;
general, the repetition of the type test is not requested for
the renewal of the certificate if the product has not changed e) test results, including any negative results.
and the applicable requirements have remained the same as
in the first approval. However, RINA reserves the right to 3.3.3 The report is to be signed by the laboratory manager
request the repetition of all or part of type tests, whenever (or his deputy) and by the RINA Surveyor who attended the
this is provided for by the reference Standard or dictated by tests.
case-by-case considerations. 3.3.4 (1/7/2021)
Upon receipt of the report, stating the satisfactory results of
2.5 Variations of a certified product the tests, in the case of TA certification scheme, an initial
audit and system evaluation of the Manufacturer's produc-
2.5.1 (1/7/2021)
tion site is to be scheduled.
If the Manufacturer intends to modify a certified product,
RINA is to be informed of all the contemplated modifica- 3.3.5 Should the outcome of the drawing review or proto-
tions. If such alterations are such as to affect the conform- type tests be negative, the Applicant cannot apply again for
ance of the product with the main characteristics of the type certification until the product has been modified in such a
test prototypes, a new certification procedure will be con- way as to correct the causes of the deficiencies detected.
sidered by RINA for the modified product.
2.5.2 (1/6/2022) 4 Production quality assurance
If the modifications do not affect those aspects which are
ruled by the Standards applied for the certification, the Type 4.1 General
Approval or the Prototype Design Assessment Certificate
may be reissued including the modifications with no addi- 4.1.1 (1/7/2021)
tional design approval and/or prototype tests. In order for this scheme to be applied, the Manufacturer is
to have implemented a Quality Management System com-
pliant with ISO 9001.
3 Design approval process
4.2 Quality Management System
3.1 Application
3.1.1 (1/7/2021) 4.2.1 All Manufacturers' programs, working procedures
and instructions are to be documented in writing. This writ-
The Applicant is to submit an application to RINA for a Type ten documentation is to be such as to permit a uniform
Approval Certificate or for a Prototype Design Assessment interpretation of programs, planning, manuals and other
Certificate specifying the full information necessary to iden- quality documents.
tify the Manufacturer and its production sites, and the type
of certification requested. 4.2.2 (1/7/2021)
The Quality System documentation is to include an ade-
3.1.2 (1/6/2022)
quate description of:
The application is to include the technical documentation
related to the product listed in Chapter 2, [2.1.3] and a) the quality objectives, organisation charts, managers’
[2.1.4]. and heads’ responsibilities and powers in matters that
may affect the final product quality;
are to be certified in accordance with the requirements of 7.3 Scope of the activity
the RINA “Rules for the certification of marine equipment in
accordance with European Directive 2014/90/EU and sub- 7.3.1 The activities consist of the following:
sequent amendments”. a) identification of the components of the program consid-
ered for certification and associated information;
5.2 Equivalence between MED type b) review of the documentation related to the program;
approval and RINA type approval c) description of the tests to be carried out on the program
5.2.1 (1/6/2022) and its components;
All certificates issued by RINA for products in compliance d) review of the input, use of the program and control of
with European Directive 2014/90/EU and the applicable the output to verify that it meets the requirements of the
implementing Regulation are considered equivalent to certification requested;
RINA Type Approval, unless otherwise indicated for specific
e) documentation of the tests carried out and associated
products.
results.
7.5.2 Tests If a new version of the software is released during the period
In the light of the above, the activities proposed are the fol- of validity of the certificate, the Applicant is to inform RINA,
lowing: which reserves the right to carry out further tests and
- review of the documentation related to the software request additional documentation related to the modified
- review of the input, use of the program and control of part of the program in order to issue a certificate renewal.
the output for the series of test cases foreseen. The out-
put is to be essentially the same as that expected. Any change made to the software without prior communi-
cation to RINA will automatically lead to suspension of the
RINA reserves the right to require any additional tests if certificate.
considered necessary for the assessment.
7.6 Issue and validity of Type Approval Cer- 7.7 Renewal of Type Approval Certificate
tificate
7.7.1 To renew the Type Approval certificate, the docu-
7.6.1 Once the checks and tests required have been satis- mentation in [7.5] is to be sent to RINA with any modifica-
factorily completed, RINA will issue a Type Approval Certif- tions compared to that submitted for the previous approval.
icate valid for the software system tested.
The Type Approval Certificate issued is valid for the soft- On the basis of the review of this documentation, RINA will
ware version tested for five years from the date of issue of establish the tests and checks necessary to renew the Type
the certificate. Approval Certificate.
1.3
I
R
Products subjected to an alternative 1.6
[RI]
Particular cases
testing scheme
1.6.1 The diamond stamp indicated in Figure 4 is substi-
1.3.1 In the case of admission to alternative testing sys- tuted for the round stamp (by special RINA brands) in the
tems, the marking with the Society’s stamp may be dele- following cases:
gated to the Manufacturer, who will be supplied, for this - Products for which RINA has agreed to dispense with
purpose, with a special brand. some of the required tests.
Figure 6
I
R RI
[RI] GA
For materials manufactured in large quantities and tested by 2.5.2 In any event, RINA Surveyors have the right either to
heats or by lot, the Manufacturer is to further state for the reject products with documentation missing or of dubious
individual supplies that the material has been produced origin, or to demand further checks, such as the determina-
according to the Rules. tion of the chemical composition on the product.
1.1.1 This Chapter supplies the criteria for the acceptance a) they are mechanical tests which do not require sophisti-
of testing reports produced by laboratories others than cated control/monitoring equipment (for instance, ten-
RINA's, for the use of RINA Surveyors in connection with sile tests, impact tests, bend tests, etc.);
the performance of their activities. b) they are electrical tests that may be performed with
common equipment (voltage, current resistance meas-
ures, etc.);
1.2 Field of application
c) they are hydraulic tests carried out with normal instru-
1.2.1 This Chapter applies both to tests carried out by lab- ments (pressure gauges, flow rate gauges, etc.);
oratories in the presence of RINA Surveyors and to tests for d) they are dimensional measures performed with com-
which the Rules do not require the presence of the Surveyor mon instruments (callipers, micrometers, angle gauges,
during their performance. thickness gauges, etc.);
e) they are performance tests where the functioning
1.3 Calibration certificates parameters are easy to evaluate;
f) they are simulation tests where all input and output
1.3.1 The calibration certificates relative to the instruments
parameters are easily evaluated;
and equipment used for testing are to be made available to
RINA Surveyors. g) they are sophisticated tests which are supported by
detailed manuals explaining the inputs and outputs and
the means to check the accuracy of the tests, as well as
2 Criteria for the acceptance of test the methodology to perform sample testing in the pres-
laboratories that perform tests ence of the Surveyor.
attended by RINA Surveyors
2.2.2 However, for any of the above cases, it is always to
be possible for the surveyor to check that the instruments
2.1 Premise are calibrated against national or international Standards,
that the instruments and testing machines are kept in good
2.1.1 In general, the Rules have no specific requirements order and that testing is properly performed using instru-
on the characteristics and qualifications of laboratories ments adequate to the accuracy required by the measure.
where tests requiring the attendance of RINA Surveyors are
performed, as it is presumed that the Surveyor's attendance
2.3 Tests requiring sophisticated proce-
can in most cases guarantee the reliability of the tests that
are necessary for the certification of materials, machinery
dures or equipment
and equipment for which there are specific Rule require-
2.3.1 Where the tests to be performed require the use of
ments. However, this presumption is not always correct
sophisticated equipment, technology and/or technical
when the tests require sophisticated equipment and tech-
knowledge not provided for by any of the cases listed in
nologies. For the acceptance of tests and reports of labora-
[2.2.1], it will not be possible to accept tests performed by
tories other than RINA's, it is therefore necessary to
laboratories which are not approved and certified by RINA
consider two cases, as specified in [2.2] and [2.3].
in accordance with the “Rules for recognition of test labora-
tories” or considered acceptable in accordance with criteria
2.2 Tests not requiring sophisticated proce- similar to those indicated in [3.1].
dures or equipment
2.4 Reporting
2.2.1 For the scope of this paragraph the word "laboratory"
is used not only for an equipped laboratory (either inde- 2.4.1 In the cases indicated in [2.2] the testing reports may
pendent or owned by the Manufacturer) but also for a sim- be prepared either directly by the RINA Surveyor or by the
ple testing machine used in the field to perform tests or laboratory and endorsed by the RINA Surveyor who
trials required by the applicable RINA Rules. attended the tests.
2.4.2 In the cases indicated in [2.3] the testing reports are certification of marine equipment in accordance with Euro-
to be prepared by the laboratory in accordance with the cri- pean Directive 2014/90/EU”.
teria laid down in [3.2] and are to be endorsed by the RINA
Surveyor who attended the tests. 3.2 Acceptance of testing reports
3.2.1 Whenever provided for and allowed by the applica-
3 Criteria for the acceptance of test
ble Rules, testing reports issued by laboratories complying
laboratories that perform tests not with the conditions laid down in [3.1] may be accepted
attended by RINA Surveyors subject to the following.
a) The testing reports are to be complete and clear in full
3.1 Characteristics of laboratories compliance with the applicable Standards and are to be
signed by a technician in charge of the testing labora-
3.1.1 Testing laboratories complying with any of the fol- tory;
lowing conditions may be accepted by RINA whenever the b) In general, the testing reports are to be compiled and to
tests or types of tests carried out may be accepted without include the information in accordance with the criteria
the presence of RINA Surveyors: stated in ISO Standard 17025, or in other equivalent
a) they are recognised by RINA in accordance with the Standards;
“Rules for recognition of test laboratories”; c) The testing reports are to include a copy of the Accredi-
b) they are accredited and/or recognised by: tation Certificate of the Laboratory or other documenta-
- an Organisation which is a full term member of ILAC tion clearly showing the Accreditation Body that issued
(International Laboratory Accreditation Co-opera- the accreditation as well as its expiry date.
tion); In general, testing reports are not acceptable if they are
issued by Laboratories not satisfying the conditions laid
- USCG (United States Coast Guard);
down in [3.1] or satisfying them only for types of testing
- an IACS (International Association of Classification other than that performed and reported in the specific case
Societies) member; or by laboratories with expired accreditation.
- a State Administration which is a signatory of IMO
(International Maritime Organisation) conventions. 3.3 Acceptance procedure
c) they have implemented a certified Quality Assurance
3.3.1 Unless the laboratory is acceptable to RINA as per
System in accordance with ISO 9000 Standards that
[3.1.1], the acceptance of its testing reports will be recon-
covers the types of tests necessary for the certification of
sidered by RINA on a case-by-case basis as indicated in
the product.
[3.1.2].
3.1.2 Laboratories not complying with any of the above In such cases, one testing report issued by a laboratory does
conditions will be evaluated by RINA on a case-by-case not constitute a precedent for the acceptance of another
basis, provided the documentation submitted and the testing report issued by the same laboratory.
results of a possible audit demonstrate that their level of
experience and reliability is not less than that of the labora- 3.4 Derogation
tories accepted on the basis of [3.1.1]. This evaluation may
also be based on records of historical performance. 3.4.1 RINA may establish different criteria for the accept-
ance of testing laboratories with respect to the requirements
3.1.3 Laboratories which perform unattended tests on indicated above for those categories of products which, due
equipment subject to the European MED Directive are to to their peculiarity, cannot be dealt with as prescribed in
comply with the requirements of the RINA “Rules for the this Chapter.
31
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Aluminium alloy bars for rivets C CT or CA X
2 Aluminium alloy plates, profiles and structural
C CT or CA X (1) X X X X
pipes
3 Bimetallic joints for connection of aluminium
C CT or CA X (1) X X X X
structures to steel structures
4 Cast or forged steel for engine foundation plates C CT or CA X X X
5 Cast or forged steel for stem, sternpost, rudder
C CT or CA X X X X X
horn, rudder frames, shaft brackets, hawsepipes
6 Propeller nozzles C CT X X X X X
7 Steel plates, profiles and structural pipes C CT or CA X (1) X X X X
8 Welded profiles C CT or CA X (1) X X X
(1) Not required for limited supplies with CT when additional tests are carried out
Table B (Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10 11 12
NDT
MENT
TESTING
MATERIAL
APPROVAL
FINAL TESTS
VERIFICATION
MANUFACTURER
ING FABRICATION
FINAL INSPECTION
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
AND/OR CONFORMITY
AND/OR MANUFACTUR-
ING PROCESS APPROVAL
32
Chapter 6
Table B (Sheet 2 of 2)
33
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
MENT
TESTING
MATERIAL
APPROVAL
FINAL TESTS
VERIFICATION
MANUFACTURER
ING FABRICATION
FINAL INSPECTION
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
AND/OR CONFORMITY
AND/OR MANUFACTUR-
ING PROCESS APPROVAL
(1) With verification of the disassembled parts after the test, as applicable
(2) Drop and hammering test on cast anchors may be omitted subject to preliminary agreement and additional tests.
(3) Proof load and breaking strength test per lots
(4) If and when requested by RINA Surveyor
(5) To be in accordance with a recognised Standard, otherwise design is to be approved
(6) Hose tests
(7) Proof load test
(8) Hydrostatic test on sample products randomly selected plus other particular tests as required by the Rules
(9) Breaking strength test
(10) Hydrostatic test
(11) when required by the Rules
(12) Approval of drawings is not required if the equipment is made in accordance with a recognised industry standard (e.g. ISO)
(13) Proof load test is not required if the equipment is made in accordance with a recognised industry standard
(Sheet 1 of 2)
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Actuators C CT or CA X X X X X (1)
4 ITEM DELETED
5 Pintles C CT X X X X
8A Rudder components:
• Blades
• Stocks
• Couplings C CT X X X X
• Bolts and nuts (excluded hydraulic nuts, see item
8B)
• Trunks (where fitted)
8B Rudder components:
• Hydraulic nuts itended for mounting of cone cou-
plings C CT X XM X
• Stock liners
• Flap pivots, hinge rings and bushes
34
Chapter 6
(Sheet 2 of 2)
35
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
(1) Hydrostatic test of components subject to pressure
(2) It may be performed at the shipyard
(3) Hydrostatic test on complete rudder
Table D (Sheet 1 of 6)
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Welded bedplate XM (1) XM (3)
C CT or CA X X (5) X (6) X
(2) (4)
2 Cast steel bearing transverse girders XM (1) XM (3)
C CT or CA X
(2) (4)
3 Welded frame box XM (1) XM (3)
C CT or CA X (5) X (6) X
(2) (4)
4 Gray cast iron cylinder block for engines having a XM (16)
C MA XM
power per cylinder greater than 400 kW/cyl (7)
5 Spheroidal graphite cast iron cylinder block for
XM (16)
engines having a power per cylinder greater than C MA XM
(7)
400 kW/cyl
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
6 Welded cylinder frames for crosshead engines XM (1) XM (3)
C CT or CA X (5) X (6) X
(2) (4)
7 Gray cast iron engine block for engines having a XM (16)
C MA XM
power per cylinder greater than 400 kW/cyl (7)
8 Spheroidal graphite cast iron engine block for en-
XM (16)
gines having a power per cylinder greater than 400 C MA XM (2) XM
(7)
kW/cyl
9 Cylinder liner for engines having cylinder bore XM (16)
C MA XM (1) (2) XM
greater than 300 mm (7)
10 Gray cast iron cylinder head for engines having cyl- XM (16)
C MA
inder bore greater than 300 mm (7)
11 Spheroidal graphite cast iron cylinder head for en- XM (16)
C MA
gines having cylinder bore greater than 300 mm (7)
12 Cast steel cylinder head for engines having cylinder XM (1) XM (3) XM (16)
C CT or CA X X
bore greater than 300 mm (2) (4) (7)
13 Forged cylinder head for engines having cylinder XM (1) XM (3) XM (16)
C CT or CA X X
bore greater than 300 mm (2) (4) (7)
14 Cast steel piston crown for engines having cylinder XM (1) XM (3)
C CT or CA X X
bore greater than 400 mm (2) (4)
15 Forged piston crown for engines having cylinder XM (1) XM (3)
C CT or CA X X
bore greater than 400 mm (2) (4)
16 Crankshaft (made in one piece) XM (3)
C CT or CA X X X (1) (2) XM (8) X (9)
(4)
17 Semi-built crankshaft (Crank throw, forged main XM (3)
C CT or CA X X X (1) (2) XM (8) X (10)
journal and journals with flange) (4)
18 ITEM DELETED
19 ITEM DELETED
36
Chapter 6
Table D (Sheet 3 of 6)
37
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
20 Exhaust gas valve cage for crosshead engines XM (16)
C MA
(7)
21 Piston rod for crosshead engines having cylinder XM (3)
C CT or CA X (1) (2) X (11)
bore greater than 400 mm (4)
22 Cross head for crosshead engines XM (3)
C CT or CA X (1) (2) X (11)
(4)
23 Connecting rod with cap XM (3)
C CT or CA X (1) (2) XM X(17)
(4)
24 Coupling bolts for crankshaft XM (3)
C CT or CA X (1) (2) XM X (18)
(4)
25 Bolts and studs for main bearings for engines having XM (1) XM (3)
C MA
cylinder bore greater than 300 mm (2) (4)
26 Bolts and studs for cylinder heads for engines hav- XM (1) XM (3)
C MA
ing cylinder bore greater than 300 mm (2) (4)
27 Bolts and studs for connecting rods for engines hav- XM (1) XM (3)
C MA XM (12)
ing cylinder bore greater than 300 mm (2) (4)
28 Tie rod for crosshead engines XM (1) XM (3)
C CT or CA XM (12) X (11)
(2) (4)
29 High pressure fuel injection pump body for engines XM (1) XM (16)
C MA
having cylinder bore greater than 300 mm (2) (7)
30 High pressure fuel injection pump body for engines XM (1) XM (15)
C MA
having cylinder bore not greater than 300 mm (2) (7)
31 High pressure fuel injection valves (only for those
XM (16)
not auto-fretted) for engines having cylinder bore C MA
(7)
greater than 300 mm
32 High pressure fuel injection valves (only for those
XM (15)
not auto-fretted) for engines having cylinder bore C MA
(7)
not greater than 300 mm
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
33 High pressure fuel injection pipes including com- XM
XM (1)
mon fuel rail for engines having cylinder bore great- C MA (14)(16)
(2)
er than 300 mm (7)
34 High pressure fuel injection pipes including com-
XM XM (14)
mon fuel rail for engines having cylinder bore not C MA
(1)(2) (15) (7)
greater than 300 mm
35 High pressure common servo oil system for engines XM (1) XM(16)
C MA
having cylinder bore greater than 300 mm (2) (7)
36 High pressure common servo oil system for engines XM (1) XM(15)
C MA
having cylinder bore not greater than 300 mm (2) (7)
37 Cooler, both sides (13), for engines having cylinder XM (1) XM (16)
C MA
bore greater than 300 mm (2) (7)
38 Accumulator (only for accumulators with capacity XM (1) XM(16)
C MA
greater than 0,5 l) (2) (7)
39 Piping, pumps, actuators, etc. for hydraulic drive of
XM (1) XM(16)
valves for engines having a power per cylinder C MA
(2) (7)
greater than 800 kW/cyl
40 Engine driven pumps (oil, water, fuel, bilge), other
than pumps referred to in item 29, 30 and 39, for
C MA XM (16)
engines having a power per cylinder greater than
800 kW/cyl
41 Bearings for main, crosshead, and crankpin for en-
XM (1) XM (4)
gines having a power per cylinder greater than 800 C MA XM (8)
(15) (15)
kW/cyl
42 Diesel engines (complete) for non-essential service
and diesel engines for essential auxiliary service of C MA
less than 110 kW
38
Chapter 6
Table D (Sheet 5 of 6)
39
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
43 - Diesel engines (complete) intended for main pro-
pulsion, or
- Diesel engines (complete) developping a power of
110 kW and over intended for:
C CT or CA TA X X
a) driving electrical generator;
b) other auxiliary services essential for safety and
navigation;
c) driving cargo pumps in tankers;
44 Diesel engine control panels SEE TABLE E
45 Elastic couplings for electric generator groups C CT or CA XM X
46 Electric power generating sets SEE TABLE N
47 Injection plants for diesel engines intended for:
- propulsion
SEE TABLE E
- power generation and other essential auxiliary
services of 110 KW or greater
48 ITEM DELETED
49 Chocking resins (pourable compounds for founda-
C TA
tion chocking)
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
(1) Chemical composition
(2) Mechanical properties
(3) Crack detection by MPI or liquid penetrant test
(4) Ultrasonic testing
(5) Approval of WPS
(6) Fit up + post welding
(7) Hydrostatic pressure test as required by the applicable rules
(8) Dimensional inspection, including surface condition
(9) Random check of fillets and oil bores
(10) Random check of fillets and shrink fittings
(11) Random check
(12) Manufacturer Test Report of thread making
(13) Charge air coolers need only be tested on the water side
(14) Required for those injection pipes that are not autofretted
(15) Review of Manufacturer Test Report
(16) Review of Manufacturer Work Certificate
(17) Random check of all surfaces, in particular those shot peened
(18) Random check of interference fit
40
Chapter 6
Table E : Workshop Inspections - Auxiliary Components and Accessories for Engines
41
Table E (Sheet 1 of 2)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Air, water and oil coolers FOR PRESSURE PARTS SEE TABLE J
2 Clutches SEE TABLE H
3 Control, monitoring and alarm systems SEE TABLE Q
4 Cooling water, lubricating oil, fuel oil injection and
C CT or CA X (1) X
fuel oil transfer pumps
5 Ejectors for bilge in machinery spaces C CT or CA X (1)
6 ITEM DELETED
7 Electric panels and apparatus SEE TABLE N
8 Fuel oil and lubricating oil non-structural tanks C CT or CA XM X X (1)
9 Fuel oil and lubricating oil purifiers C CT or CA X X (1) X
10 Injectors, buster pumps and injection pipes C CT o CA XM X X (1)
10A Oil mist detector C TA X X
11 Piping systems SEE TABLE K
12 Pressure filters FOR PRESSURE PARTS SEE TABLE J
13 ITEM DELETED
14 ITEM DELETED
15 Crankcase explosion relief valves for diesel engines
C TA
(4)
16 Scavenge air main FOR PRESSURE PARTS SEE TABLE J
17 Scavenging pumps C CT or CA X X (1) X
18 Starting air compressors C CT or CA X X (1) X
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
19 Starting motors – electrical SEE TABLE N
20 Starting motors – hydraulic or pneumatic C CT o CA X X (1)
21 Turbochargers (Category A and B) C MA (3)
22 Turbochargers (Category C) C CT or CA TA X X X X (1) (5) X
23 Electronic speed governors and their actuators C TA
(1) Hydrostatic test
(2) For Category B the manufacturer is to adhere to a quality system designed to ensure that the designer's specifications are met, and that manufacturing is in accordance with
the approved drawings.
(3) Overspeed and balancing tests on completed rotor
(4) When required by the Rules
42
Chapter 6
Table F : Workshop Inspections - Steam Turbines and Condensers
43
Table F (Sheet 1 of 2)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Assembled rotor C CT or CA X X (1)
4 Circulation pumps C CT or CA XM X
11 Ejectors C MA
13 Extraction pumps C CT or CA XM X
18 Shafts C CT or CA X X X
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
20 Turbines (complete) C CT or CA X X X X (5) X
(1) Overspeed, balancing and thermal stability tests for turbines with service temperature over 400 °C (for turbines with service temperature over 400 °C)
(2) Ultrasonic tests or X-ray examinations and magnetic particle or liquid penetrant tests on samples
(3) On samples
(4) As agreed with RINA Surveyor
(5) Hydrostatic test
(6) May be XM in case of auxiliary turbines with steam inlet temperature of up to 250°C.
(7) Welding procedures
(8) X for bolts diameter greater than 40 mm
44
Chapter 6
Table G : Workshop Inspections - Gas Turbines
45
Table G (Sheet 1 of 2)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Assembled rotor C CT or CA X X (1)
12 ITEM DELETED
14 Shafts C CT or CA X X X
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
19 Welded structures C CT or CA X (7) XM X X X
46
Chapter 6
Table H : Workshop Inspections - Reduction and Reverse Gears
47
Table H (Sheet 1 of 2)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Casings of reduction and reverse gears for propul-
sion transmitting 220 kW power and above and for
C CT or CA X (1) X (2) X X (3) X
essential auxiliaries transmitting 110 kW power and
above
2 Clutches C CT or CA X X X X (4)
3 Control, monitoring and alarm systems SEE TABLE Q
4 Couplings of reduction and reverse gears for propul-
sion transmitting 220 kW power and above and for
C CT or CA X (10) X X (5) X
essential auxiliaries transmitting 110 kW power and
above
5 Pinions and wheels of reduction and reverse gears
for propulsion transmitting 220 kW power and
C CT or CA X X X X X X (6)
above and for essential auxiliaries transmitting 110
kW power and above
6 Plates and profiles for steel welded cases of reduc-
tion and reverse gears for propulsion transmitting
C CT or CA X X (11)
220 kW power and above and for essential auxilia-
ries transmitting 110 kW power and above
7 Reduction and/or reverse gears for propulsion trans-
mitting 220 kW and above power and for essential C CT or CA X (8) X X (9)
auxiliaries transmitting 110 kW power and above
8 Reduction and/or reverse gears others than those in-
C MA
dicated in item 7
9 Shafts of reduction and reverse gears for propulsion
transmitting 220 kW power and above and for es-
C CT or CA X X X X (5) X
sential auxiliaries transmitting 110 kW power and
above
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
10 Valves, pipes, pump coolers FOR PRESSURE PARTS SEE TABLES J AND K
(1) Only for welded casings
(2) Welding procedures
(3) Only for welded joints
(4) Hydrostatic tests for hydraulic and pneumatic clutches
(5) Not required for shaft of less than 250 mm diameter
(6) Verification of teeth accuracy, balancing, meshing test
(7) It may be TA at Manufacturer’s request
(8) Tooth meshing test t is to be performed at a load sufficient to ensure tooth contact
(9) Only for main structural plates and profiles and if intended for propulsion
48
Chapter 6
Table I : Workshop Inspections - Propellers, Main Shafting and Thrusters
49
Chapter 6
Table I (Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Bearing sleeves and bushing (other than sterntube
C CT or CA XM (6) X
bushes)
2 Cardan shafts (flanges, crosses, shafts, yokes) C CT or CA X X (1) X XM (5) X
3 Clutches SEE TABLE H
4 Control, monitoring and alarm systems SEE TABLE Q
5 Controllable pitch propeller and built-up propeller
C CT or CA X X X X X X (2)
blades
6 Controllable pitch propeller and built-up propeller
C CT or CA X X X
connecting bolts/studs
7 Controllable pitch propeller and built-up propeller
C CT or CA X X X X X XM (3)
hubs
8 Controllable pitch propeller hydraulic control sys-
SEE TABLE L
tem
9 Controllable pitch propeller mechanism (mechani-
C CT or CA XM X X
cal parts)
10 Coupling bolts or studs for couplings C CT or CA X XM XM
11 Coupling keys C CT or CA X XM X
12 Elastic coupling C CT or CA X (7) XM X
13 Forgings for tailshafts C CT or CA X X X (4)
14 Hydraulic couplings C CT or CA X X X XM (3)
15 Intermediate shafts C CT or CA X X XM (5) X
16 Propeller nuts C CT or CA XM
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
17 Propellers (solid) C CT or CA X X X X X X (2)
18 ITEM DELETED
19 Sterntube bushes, (oil lubricated, water lubricated,
C CT or CA X XM (6) X X
grease lubricated)
20 Sterntube sealing C CT or CA X X
21 Sterntubes C CT or CA X XM X X XM (3)
22 Propeller shaft liners C CT or CA X XM X XM (3)
23 Propeller shafts C CT X X XM (5) X
24 Teeth coupling C CT or CA X X X X
25 Thrust shafts C CT X X XM (5) X
26 Thrust sliding blocks (frame only) C CT or CA XM X
27 Thrusters (propulsion and steering thrusters, trans-
C CT or CA X X X X X
verse thrusters, podded propulsors, water-jets)
(1) Welding procedures
(2) Balancing test
(3) Hydrostatic tests
(4) Not required for shafts with diameter less than 100 mm
(5) Not required for shafts with diameter less than 250 mm
(6) Verification of anti-friction material
(7) Only for propulsion couplings
50
Chapter 6
Table J : Workshop Inspections - Boilers, Pressure Vessels and Heat Exchangers
51
Table J (Sheet 1 of 3)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Boilers C CT or CA X X (1) X (2) X (3) X X X (4)
2 Cast or forged parts for boilers, steam generators, oil
fired thermal oil heaters, exhaust gas thermal oil C CT or CA X X X (6) X
heaters and class 1 pressure vessels
3 Cast or forged parts for class 2 pressure vessels C CT or CA XM X (6) X
4 Cast or forged parts for class 3 pressure vessels C MA XM
5 Class 1 pressure vessels and heat exchangers C CT or CA X X (1) X (2) X (3) X X X (4)
6 ITEM DELETED
7 Class 2 pressure vessels and heat exchangers C CT or CA X X (1) X (9) X (3) X X X (4)
8 ITEM DELETED
9 Class 3 pressure vessels and heat exchangers C CT or CA X (6) X XM X (12) X (4)
10 Condensers AS REQUIRED DEPENDING ON THE CLASS OF THE PRESSURE VESSEL
11 Control, monitoring and alarm systems SEE TABLE Q
12 Cylinders for hydraulic plants SEE TABLE L
13 Drums for watertube boilers C CT or CA X X (1) X (2) X (3) X X (4)
14 Flanges and nozzles for boilers, steam generators,
oil fired thermal oil heaters, exhaust gas thermal oil C CT or CA X (1) X X (3) X
heaters and class 1 pressure vessels
15 Flanges and nozzles for class 2 pressure vessels C CT or CA X (1) XM X (3) X
16 ITEM DELETED
17 Flanges and nozzles for class 3 pressure vessels C MA XM
18 Level indicators C CT or CA X X (8) X X X (4)
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
19 Oil fired thermal oil heaters, exhaust gas thermal oil
C CT or CA X X (1) X (2) X (3) X X X (4)
heaters
20 Pipes and valves SEE TABLE K
21 Plates, profiles and tubesheets for boilers, steam
generators, oil fired thermal oil heaters, exhaust gas C CT or CA X X X (6) X
thermal oil heaters and class 1 pressure vessels
22 Plates, profiles and tubesheets for class 2 pressure
C CT or CA (5) X XM X (6) X
vessels
23 Plates, profiles and tubesheets for class 3 pressure
C MA XM
vessels
24 ITEM DELETED
25 Safety valves SEE TABLE K
26 Seamless bottles C CT or CA X X X (8) X X X (10)
27 Steam heated generators or steam generators heat-
C CT or CA X X (1) X (2) X (3) X X X (4)
ed by another fluid
28 Steel bars for stays of boilers C CT or CA X X
29 Steering gear actuators SEE TABLE C
30 Tubes for class 3 heat exchangers C MA XM
31 Tubes for boilers, steam generators, oil fired ther-
mal oil heaters, exhaust gas thermal oil heaters and C CT or CA X (11) X X (6) X (4)
class 1 pressure vessels
32 Tubes for class 2 heat exchangers C CT or CA X (11) XM X (6) X (4)
33 Welded bottles C CT or CA X X X (8) X X X (10)
52
Chapter 6
Table J (Sheet 3 of 3)
53
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
(1) Welding procedures
(2) Including testing on welded joint production samples, as required by the Rules
(3) On the welded joints for the extension required by the Rules
(4) Hydrostatic test – as required by the Rules
(5) Document review in lieu of CT or CA for limited supplies
(6) As required by the applicable Rules
(7) It may be scheme II for small mass produced products
(8) XM for class 2 and 3
(9) Limited to tests on welded joint production samples, as required by the Rules
(10) Burst test on prototypes and hydrostatic tests on production as required by the Rules
(11) Only for welded tubes and for seamless tubes in low alloy steel
(12) Review of conformity certificate issued by the manufacturer
Table K (Sheet 1 of 3)
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Centrifugal separators C CT or CA XM X X (1) X
3 ITEM DELETED
54
Chapter 6
Table K (Sheet 2 of 3)
55
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
13 Flexible hoses – Metallic C CT or CA TA XM X (4) X X (1)
15B Hold, ballast, dry space water level detection system S-C CT or CA X X X X
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
25 Safety valves C CT or CA X (5) X (9) X (4) X X (1)
56
Chapter 6
57
Table L : Workshop Inspections - Hydraulic Plants
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Actuators (1) C CT or CA XM X (3) X
2 Accumulators and oleodynamic cylinders C CT or CA X X (5) X (2) X X X (3) X
3 Control, monitoring and alarm systems SEE TABLE Q
4 Flexible hoses SEE TABLE K
5 Hydraulic motors C CT or CA X (3)
6 Hydraulic motors and pumps for propulsion C CT or CA XM X X (3) X
7 Oleodynamic packages C CT or CA X X (4) X (4) X X (3) X
8 Piping, including valves, fittings and filters SEE TABLE K
9 Pressure filters and air coolers SEE TABLE J
10 Pumps – Hydraulic SEE TABLE K and C
11 Starters, switchboards and electric motors SEE TABLE N
(1) For steering gear actuators see Table C
(2) It may be XM for plants intended for embarkation ramps, hatch covers, mobile decks and similar structures not subject to OIL certification
(3) Hydrostatic tests
(4) Depending on the classes of pressure components
(5) For accumulators as required by the Rules
(Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10 11 12
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Ballast water treatment system S-C TA (5) X X X X
1A Equipment using other equivalent methods to CT (1) or CA (1) TA
C (1) S X (1) X (1) X (1)
reduce on board emissions (5)
1B Equipment using other technological methods to
C (1) S TA (1) (3)
limit emissions
2 Garbage disposal systems C (1) CT (1) or CA (1) X (1) X (1) X (1) X (1)
2A NOx analyser permanently placed on board and MED (1) - TA (1)
C (1) S
for use on board as per Technical Code 2008 (3)
3 Oil content meters S-C (1) MED (2) -TA (1) (3)
4 Oil discharge monitoring and control system for oil
S-C (1) MED (2) -TA (1) (3)
tanker
5 Oil/water interface detectors S-C (1) MED (2) -TA (1) (3)
6 Oil filtering equipment (for an oil content of the
S MED (2) -TA (3)
effluent not exceeding 15 p.p.m.)
7 On board exhaust gas cleaning system C (1) CT (1) or CA (1) X (1) X (1) X (1)
8 On board Nox
On board NOx analysers using a measurement
S TA (5)
method other than the Direct Measurement and
Monitoring Method of the Technical Code 2008
9 ITEM DELETED
10 Process units intended for attachment to existing
oily water separating equipment (for an oil content S-C (1) TA (1)
of the effluent not exceeding 15 p.p.m.)
11 Sewage treatment plants S-C (1) MED (2) -TA (1) (3) X (1) X (1) X (1) X (1)
12 Shipboard incinerators S-C (1) MED (2) -TA (1) (3) X (1) X (1) (4) XM X (1) X (1) X (1) X (1) X (1)
58
Chapter 6
(Sheet 2 of 2)
59
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
(1) For ships with “clean” class notation
(2) For ships flying European Community Administration flags
(3) For ships flying non-European Community Administration flags, whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their behalf
(4) Welding procedures
(5) For ships flying flags whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their behalf
Table N (Sheet 1 of 4)
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Batteries for essential and/or emergency services C MA
1C Fuel cells C CT or CA TA X X X
60
Chapter 6
Table N (Sheet 2 of 4)
61
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
8 Distribution panels and single starters of voltage
C CT X X
greater than 1000 V
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
22 Semiconductor converters having nominal power
C CT or CA X X (1) X
of 50 kVA and over
62
Chapter 6
Table N (Sheet 4 of 4)
63
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
34 Busbar trunking system (outside of switchboards,
C CT TA X X
distribution boards)
35 Harmonic filters C CT or CA X X X
Table O (Sheet 1 of 3)
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 "A" and "B" class divisions, fire integrity:
a) 'A' class division S MED (1) – TA (2)
b) 'B' class division
2 Bedding components (5) S MED (1) – TA (2)
3 "C " class divisions S MED (1) - TA (2)
4 fire door control systems components (5) S MED (1) – TA (2)
5 ITEM DELETED
6 Devices to prevent the passage of flame into the
cargo tanks in oil tankers:
a) P/V valves
S MED (1) – TA (2)
b) flame arresters
c) detonation flame arresters
d) high velocity vent valves
7 Draperies, curtains and other suspended textile mate-
S MED (1) – TA (2)
rials and films
8 Electrical cables and apparatus for hazardous areas SEE TABLE N
9 Fire dampers S MED (1) – TA (2)
10 Fire dampers for high speed craft S MED (1) – TA (2)
11 Fire doors S MED (1) – TA (2)
12 Fire doors for high speed craft S MED (1) – TA (2)
13 Fire-resisting divisions for high speed craft S MED (1) – TA (2)
14 Fire restricting materials (except furniture) for high
S MED (1) – TA (2)
speed craft
64
Chapter 6
Table O (Sheet 2 of 3)
65
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
15 Fire restricting materials for furniture for high speed
S MED (1) – TA (2)
craft
16 Low-location lighting systems (components only) (5) S MED (1) – TA (2)
17 Materials other than steel for pipes conveying oil or
fuel oil:
a) Plastic pipes and fittings
b) Valves B MED (1) – TA (2) X (3)
c) Flexible pipe assemblies and compensators
d) metallic pipe components with resilient and elasto-
meric seals
18 ITEM DELETED
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
25 Surface materials and floor coverings with low flame
spread characteristics:
a) Decorative veneers
b) Paint systems
c) Floor coverings S MED (1) – TA (2)
d) Pipe insulation covers
e) Adhesive used in the construction of “B” & “C”
class divisions
f) Combustible ducts membrane
26 Upholstered furniture:
a) complete piece of furniture (including cover mate-
rial, filling material and non-flammable rack)
b)cover material for any filling material
S MED (1) – TA (2)
c) cover material for flame-retardant filling material
(tested in specific combination as intended for further
application)
d) flame-retardant filling material
27 “A” and “B” class fire proof windows and sidescuttles B MED (1) – TA (2) X (4)
28 Evacuation guidance systems used as an alternative to
S MED (1) – TA (2)
low-location lighting systems
(1) For ships flying European Community Administration flags
(2) For ships flying non-European Community Administration flags, whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their behalf
(3) Flexible hoses to be Type Approved and individually tested according to Pt C, Ch 10 of RINA Rules for the Classification of Ships.
(4) Glass panes and frames to be tested according to Pt D, Ch 4, Sec 1 of RINA Rules for the Classification of Ships
(5) Watertight Cable Transits are to be additionally type approved by RINA (see Table B)
(6) Review of TA/MED certificates for components (class divisions, surface materials, coverings, penetrations, etc.)
66
Chapter 6
67
Table P : Workshop Inspections - Active Fire Protection
Table P (Sheet 1 of 7)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Compressed air line breathing apparatus S MED (1) – TA (2)
1A Compressed airline breathing apparatus (High
S TA (4)
Speed Craft)
1B Fire alarm devices (sounders) S MED (1) – TA (2)
Nozzles for equivalent watermist fire extinguish-
2 ing systems for machinery spaces and cargo B MED (1) – TA (2)
pump rooms
3 Cold weather starting of generator sets (starting
B TA (4)
devices)
4 Concentrate for fixed high expansion foam fire-
extinguishing systems for machinery spaces and S MED (1) – TA (2)
cargo pump rooms
5 Nozzles for deep-fat cooking equipment fire-
S MED (1) – TA (2)
extinguishing systems (automatic or manual type)
6 ITEM DELETED
7 Dual purpose type nozzles (spray/jet type):
a) Hand-held branch pipes for fire service use -
Combination branch pipes PN 16
S MED (1) - TA (2)
b) Hand-held branch pipes for fire service use -
Smooth bore jet and/or one fixed spray jet angle
branch pipes PN 16
8 Electric safety lamp S ITA(4) – TA (2)
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
9 Emergency escape breathing devices (EEBD):
a) self-contained open-circuit compressed air
breathing apparatus with full mask or mouthed
piece assembly for escape
S MED (1) – TA (2)
b) self-contained open-circuit compressed air
breathing apparatus with a hood for escape
c) self-contained closed-circuit compressed air
breathing apparatus
10 Equivalent fixed gas fire-extinguishing system
components (extinguishing medium, head valves
S MED (1) – TA (2)
and nozzles) for machinery spaces and cargo
pump rooms
11 Equivalent fixed gas fire-extinguishing systems for
S MED (1) – TA (2)
machinery spaces (aerosol systems)
12 Expansion foam for fixed fire-extinguishing sys-
S MED (1) - TA (2)
tems for chemical tankers
13 Fire-fighting hoses
- non-percolating lay flat firefighting hoses (range S MED (1) – TA (2)
of the inside diameter from 25 mm to 52 mm)
14 Fixed firefighting hose systems:
S MED (1) - TA (2)
- hose reels with semi-rigid hose
15 Fire-fighter’s outfit:
protective clothing (close proximity clothing):
a) protective non reflective clothing for firefighting
S MED (1) – TA (2)
b) reflective clothing for specialised fire-fighting
c) protective clothing with a reflective outer sur-
face
16 Fire-fighter’s outfit:
S MED (1) – TA (2)
boots
68
Chapter 6
Table P (Sheet 3 of 7)
69
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
17 Fire-fighter’s outfit:
S MED (1) – TA (2)
gloves
18 Fire-fighter’s outfit:
S MED (1) – TA (2)
helmet
19 Fire-fighter’s outfit:
S MED (1) – TA (2)
lifeline
20 Fixed oxygen analysis and gas detection equip-
ment
S MED (1) - TA (2)
a) category 4: (safe area)
b) category 3: (explosive gas atmospheres)
21 Fixed fire detection and fire alarm systems com-
ponents for control stations, service spaces,
accommodation spaces, cabin balconies,
machinery spaces and unattended machinery
spaces
a) control and indicating equipment
b) power supply equipment
c) heat detectors - point detectors S MED (1) - TA (2) (3)
d) smoke detectors: point detectors using scat-
tered light, transmitted light or ionization
e) flame detectors: point detectors
f) manual call points
g) short circuit isolators
h) input/output devices
i) cables
22 ITEM DELETED
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
24 ITEM DELETED
70
Chapter 6
Table P (Sheet 5 of 7)
71
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
34 Fixed water-based fire-fighting systems for roro
spaces, vehicle spaces and special category
spaces:
a) prescriptive-based systems as per IMO S MED (1) – TA (2)
MSC.1/Circ.1430
b) performance-based systems as per IMO
MSC.1/Circ. 1430
35 Nozzles for fixed pressure water-spraying fire-
extinguishing systems for machinery spaces and S MED (1) - TA (2)
cargo pump rooms
35A Nozzles for fixed pressure water-spraying fire-
S MED (1) - TA (2)
extinguishing systems for cabin balconies
36 Portable oxygen analysis and gas detection equip-
ment:
B MED (1) – TA (2)
a) category 1: (safe area)
b) category 2: (explosive gas atmospheres)
37 ITEM DELETED
38 Portable fire extinguishers S MED (1) – TA (2)
39 Portable fire extinguishers for lifeboats and rescue
S MED (1) – TA (2)
boats
40 Portable foam applicator units S TA (4)
41 Pressure bottles and vessels SEE TABLE J
42 Protective clothing resistant to chemical attack S TA (4)
43 Pumps and compressors for fixed fire extinction
SEE TABLE K
systems
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
44 Sample extraction smoke detection system com-
ponents :
control and indicating equipment. Electrical
S MED (1) – TA (2)
installations in ships
b) power supply equipment
c) aspiring smoke detectors
45 Self-contained compressed-air-operated breathing
S MED (1) – TA (2)
apparatus
46 Self-contained compressed-air-operated breathing
S MED (1) - TA (2)
apparatus for entry and work in gas-filled space
47 Sprinkler systems (limited to sprinkler heads (6) S MED (1) – TA (2)
48 Sprinkler systems components for accommoda-
tion spaces, service spaces and control stations
S MED (1) – TA (2)
equivalent to that referred to in SOLAS 74 Reg. II-
2/12 (limited to nozzles and their performance)
49 Dry chemical powder extinguishing systems S MED (1) – TA (2)
50 Fixed hydrocarbon gas detection system S MED (1) – TA (2)
51 Mobile water monitor for ships constructed on or
after 1 January 2016 designed to carry five or
S MED (1) – TA (2)
more tiers of containers on or above the weather
deck
52 Fire-fighting hoses: — semi-rigid hoses for fixed
S MED (1) – TA (2)
systems
53 Fixed firefighting hose systems — hose systems
S MED (1) – TA (2)
with lay-flat hose
54 Paint lockers and flammable liquid lockers fire
S TA (4)
extinguishing systems components (5)
72
Chapter 6
Table P (Sheet 7 of 7)
73
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
55 Gaseous Fuel Systems Used for Domestic Pur-
S TA (4)
poses (components) (5)
56 Fixed Gas Fire Extinguishing Systems (CO2) com-
S TA (4)
ponents (5)
57 Water Spraying Hand Operated System S TA (4)
58 Fire hoses with diameter > 52 mm S TA (4)
(1) For ships flying European Community Administration flags
(2) For ships flying non-European Community Administration flags, whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their
behalf
(3) For ships flying the Italian flag
(4) For ships flying flags whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their behalf
(5) Applicable to a single component or a group of components or a whole system which needs to be tested to ensure that the applicable requirements are fulfilled.
(6) Nozzles for fixed sprinkler systems, for high speed craft (HSC) are included under this item
(7) Inside/Outside air high expansion foam systems for the protection of machinery spaces, cargo pump rooms, vehicle and ro-ro spaces, special category spaces and cargo spaces
shall be tested with the approved concentrate to the satisfaction of the Administration.
(Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10 11 12
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Actuators (electrical/electronic) C TA
2 Alarm system (complete) C CT X X X (1) X (1)
3 Computers of Category II, III C TA
3A Computers of Category I C MA
4 Consoles C CT X X X (1) X (1)
5 Control devices to computers of Category II, III C TA
5A Control devices to computers of Category I C MA
6 Control system (complete) C CT X X X (1) X (1)
7 Electrical cables and apparatus SEE TABLE N
8 Hydraulic system SEE TABLE L
8A Pneumatic system SEE TABLE K
9 Loading instruments B TA X (1)
10 Indicators, Instruments to computers of Category II, III C TA
10A Indicators, Instruments to computers of Category I C MA
11 Monitoring system (complete) C CT X X X (1) X (1)
12 Peripherals to computers of Category II, III (keyboard,
C TA
mouse, VDU, etc.)
12A Peripherals to computers of Category I (keyboard,
C MA
mouse, VDU, etc.)
13 Sensors C TA
14 Software C CT TA X (1) (2)
74
Chapter 6
(Sheet 2 of 2)
75
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
(1) May be performed on board
(2) Review of software validation documentation and functional test of the whole system
(3) For ships whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their behalf
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Automatically self-righting liferafts:
a) inflatable S MED (1) - TA (2)
b) rigid
1A Buoyant apparatus S ITA
2 Buoyant smoke signals (pyrotechnics) S MED (1) - TA (2)
3 Canopied reversible liferafts S MED (1) - TA (2)
4 Daylight signal mirrors S ITA
4A Distress Signals S ITA (5)
5 ITEM DELETED
76
Chapter 6
Table R (Sheet 2 of 5)
77
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
12 Immersion suits and anti-exposure suits designed
to be worn in conjunction WITH a life jackets:
a) immersion suit without inherent insulation S MED (1) - TA (2)
b) immersion suit with inherent insulation
c) anti-exposure suits
12A Immersion suits and anti-exposure suits designed
to be worn in conjunction WITHOUT a life jackets:
a) immersion suit without inherent insulation S MED (1) - TA (2)
b) immersion suit with inherent insulation
c) anti-exposure suits
13 Inflatable liferafts S MED (1) - TA (2)
14 Inflated rescue boats S MED (1) - TA (2)
15 ITEM DELETED
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
24 ITEM DELETED
25 ITEM DELETED
26 ITEM DELETED
32 ITEM DELETED
78
Chapter 6
Table R (Sheet 4 of 5)
79
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
39 Release mechanism for:
a) lifeboats and rescue boats (launched by a fall or
falls) S MED (1) - TA (2)
b) liferafts (launched by a fall or falls)
c) for lifejackets
40 Rescue boat propulsion engine – Outboard engines S MED (1) - TA (2)
41 Retro-reflective materials S MED (1) - TA (2)
42 Rigid liferafts S MED (1) - TA (2)
43 Rigid rescue boats S MED (1) - TA (2)
43A Rigid-infilated rescue boats S MED (1) - TA (2)
44 Rocket parachute flares (pyrotechnics) S MED (1) - TA (2)
45 Searchlight for use in lifeboats and rescue boats S MED (1) - TA (2)
46 Thermal protective aids S MED (1) - TA (2)
46A Water de-salting apparatus for lifeboats S ITA
47 ITEM DELETED
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
48 Winches for survival crafts and rescue boats:
a) davit launched lifeboats
b) free-fall lifeboats
S MED (1) - TA (2)
c) liferafts
d) rescue boats
e) fast rescue boats
(1) For ships flying European Community Administration flags
(2) For ships flying non-European Community Administration flags, whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their
behalf
(3) For ships flying flags whose Administrations recognise the certificates issued by RINA or authorise RINA to issue certificates on their behalf
(4) Testing of steel ropes is required ( see item 9 Table U)
(5) These “Distress Signals” are the “illustrated table” mentioned under reg. V/16 of SOLAS 74 as amended for which it can be used what is available on the market
(6) Upon authorisation from the Italian Administration, this equipment can be considered as part of the general approval of the lifeboat in accordance with the MED
80
Chapter 6
Table S : Workshop Inspections - Navigating Equipment
81
Table S (Sheet 1 of 4)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Search and rescue locating devices (SRLD) - 9 GHz SAR
S MED (1) - TA (2)
transponder (SART)
1A Bridge Navigational Watch Alarm System (BNWAS) S MED (1) - TA (2)
2 ITEM DELETED
3 ITEM DELETED
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
10A GNSS Equipment Incorporating one or more of the fol-
lowing elements:
- GPS equipment
- GLONASS equipment
S MED (1) - TA (2)
- DGPS Equipment
- DGLONASS Equipment
- Galileo Equipment
- Beidou (BDS)
11 GPS equipment S MED (1) - TA (2)
12 Gyrocompass S MED (1) - TA (2)
13 Gyrocompass for high speed craft S MED (1) - TA (2)
14 Heading control system (HCS) S MED (1) - TA (2)
14A Heading control system for high speed craft S MED (1) - TA (2)
15 ITEM DELETED
18 ITEM DELETED
82
Chapter 6
Table S (Sheet 3 of 4)
83
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
21A Pilot ladder S MED (1) - TA (2)
22 Pitch indicator S MED (1) - TA (2)
23 Propeller revolution indicator S MED (1) - TA (2)
24 ITEM DELETED
25 ITEM DELETED
26 ITEM DELETED
27 ITEM DELETED
28 Radar equipment:
- CA 1
- CAT 2
S MED (1) - TA (2)
- CAT 3
- CAT 1H
- CAT 2H
29 Radar reflector - passive type S MED (1) - TA (2)
30 Radar target enhancer S MED (1) - TA (2)
31 Rate-of-turn indicator S MED (1) - TA (2)
32 Rudder angle indicator S MED (1) - TA (2)
32A Search and rescue locating devices (SRLD) - AIS SART
S MED (1) - TA (2)
equipment
33 Searchlight for high speed craft S MED (1) -TA (2)
33A Simplified voyage data recorde (S-VDR) S MED (1) - TA (2)
34 Sound reception system S MED (1) - TA (2)
35 Speed and distance measuring equipment (SDME) S MED (1) - TA (2)
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
36 Thrust indicator S TA (2)
37 Track control system S MED (1) - TA (2)
37A Track control system for high-speed craft S TA (4)
38A Track control system (working at ship’s speed from 30
S TA (4)
knots and above)
38 Transmitting heading device THD (GNSS method) S MED (1) - TA (2)
39 Transmitting heading device THD (gyroscopic method) S MED (1) - TA (2)
40 Transmitting heading device THD (magnetic method) S MED (1) - TA (2)
41 ITEM DELETED
42 ITEM DELETED
84
Chapter 6
Table T : Workshop Inspections - Radio-Communications Equipment
85
Table T (Sheet 1 of 2)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 406 MHz EPIRB (COSPAS-SARSAT) S MED (1) (2)
2 Aeronautical two-way WHF radiotelephone appa-
S MED (1) (2)
ratus
3 ITEM DELETED
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
14A Ship Earth station for use in the GMDSS - Inmarsat
S MED (1) (2)
C equipment
15 VHF DCS watchkeeping receiver S MED (1) (2)
16 VHF radio capable of transmitting and receiving
S MED (1) (2)
DSC and radiotelephony
(1) For ships flying European Community Administration flags
(2) RINA is not authorised to issue MED certificates for radio-communications equipment
86
Chapter 6
87
Table U : Workshop Inspections - Cargo Handling and Other Lifting Appliances
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
VERIFICATION
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
FINAL INSPECTION
TURING PROCESS
FUNCTIONING TESTS
SHOP ATTENDANCE
AND/OR MANUFAC-
TYPE OF CERTIFICATE
AND/OR CONFORMITY
DRAWING OR DESIGN
DURING FABRICATION
1 Cargo gear accessories (blocks, rings, hooks, collars, swivels,
O CT or CA X (1) XM (6) X X (2)
terminals, etc.)
8 Steel plate sections, forgings and castings for cargo masts, posts,
O CT or CA X X X
derricks, cranes, cargo lifts, movable decks and elevators
9 Steel ropes for rigging O CT or CA X (3) X (5) (4)
No. PRODUCT
NDT
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
VERIFICATION
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
DURING FABRICATION
AND/OR CONFORMITY
1 Cast iron or steel evaporator and condenser casings SEE TABLE J (3)
2 Coils SEE TABLE K (3)
3 Complete refrigerating units C (1) CT or CA X X X (2) X
4 Compressor coupling, connecting and piston rods C (1) CT or CA X (4) X X
5 Compressor liners, cylinder heads and other parts subject to pres-
C (1) CT or CA X (4) X X X (2)
sure
6 Compressors C (1) CT or CA X X (2) X
7 Compressor crankshaft C (1) CT or CA X (4) X X
8 Condensers and evaporators SEE TABLE J (3)
9 Control, monitoring and alarm systems SEE TABLE Q
10 Electrical apparatus SEE TABLE N
11 Material for refrigerated chamber insulation C (1) MA
12 Oil separators, intermediate receivers and pressure vessels SEE TABLE J (3)
13 Piping for refrigerating system, brine system, air system, defrosting
SEE TABLE K (3)
system, etc.
14 Refrigerant C (1) MA
15 Regulating valves SEE TABLE K (3)
16 Thermometers SEE TABLE Q
(1) For ships with “REF” class notation
(2) Hydrostatic test and leak test
(3) For ships with “REF”class notation, in addition to the tests required in Tables J and K, the leak test is also to be carried out as required by the Rules
(4) XM for compressors having power not exceeding 100 kW
88
Chapter 6
Table W : Workshop Inspections - Air Conditioning and Ventilation Plants
89
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Air treatment units C (1) CT or CA X X X (2) X
2 Control, monitoring and alarm systems (1) SEE TABLE Q
3 Duct penetrations SEE TABLE O
4 Ducts SEE TABLE K
5 Electrical apparatus SEE TABLE N
6 Fans C (1) (3) CT or CA X X(5)
7 Filters SEE TABLE J
8 Heat exchangers SEE TABLE J
9 Insulation C (1) MA
10 Refrigerating unit C (1) CT or CA X X X (2) X
11 Thermal unit C (1) CT or CA X X X (2) X
(1) For ships with “ COMF-AIR ” class notation
(2) Hydrostatic test of pressure parts
(3) Applicable to fans used in essential services such as:
• machinery spaces of category A,
• spaces containing the emergency source of power,
• safe areas (for SRtP condition purposes),
• hazardous spaces.
(4) 20% over speed and dynamic balance
1 2 3 4 5 6 7 8 9 10 11 12
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Car S (1) CT or CA X X
2 Fireproof doors SEE TABLE O
3 Guides S (1) CT or CA X X X
4 Hydraulic plant SEE TABLE L
5 Lift (complete) S (1) CT X X
6 Plates and profiles for car and frames S (1) CT or CA X
7 Starters and switchboard SEE TABLE N
8 Steel ropes S (1) CT or CA X (2)
(1) Only for Italian flag ships
(2) Breaking strength test
90
Chapter 6
Table Y : Workshop Inspections - Installations for Oil Carriers and Chemical Carriers
91
Table Y (Sheet 1 of 2)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Cargo piping SEE TABLE K
7 Devices to prevent the passage of flame into cargo tanks SEE TABLE O
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
18 Stainless steel plates and profiles for cargo tanks C CT or CA X (5) X X (6) X X
92
Chapter 6
Table Z : Workshop Inspections - Installations for Ships Carrying Liquefied Gas
93
Table Z (Sheet 1 of 3)
Chapter 6
1 2 3 4 5 6 7 8 9 10 11 12
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Aluminium alloy plates and profiles for independent
C CT or CA X (1) X X (2) X X
cargo tanks
5 ITEM DELETED
94
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
16 ITEM DELETED
18 Cargo compressors C CT or CA X X X X X X
22 ITEM DELETED
28 Safety valves, valves and fittings for cargo piping C CT TA (5) X X (3) X X X (4) X
30 ITEM DELETED
31 ITEM DELETED
32 ITEM DELETED
95
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
33 Stainless steel for plates for membrane tanks C CT or CA X (1) X X (2) X X
34 Steel plates and profiles for independent cargo tanks C CT or CA X (1) X X (2) X X
(1) The acceptance of products supplied by unapproved Manufacturers may be considered for limited supplies and additional tests may be required
(2) As required by the Rules
(3) XM when the diameter is less than 50 mm
(4) Hydrostatic test
(5) Type test for pumps and valves with minimum working temperature below -55° C
Table Z -1 (Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10 11 12
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
1 Aluminium alloy plates and profiles for independent
C CT or CA X (1) X X (2) X X
fuel tanks
16 Fuel compressors C CT or CA X X X X X X
96
Chapter 6
Table Z -1 (Sheet 2 of 2)
97
1 2 3 4 5 6 7 8 9 10 11 12
Chapter 6
No. PRODUCT
NDT
TION
TESTING
MATERIAL
APPROVAL
APPROVAL
FINAL TESTS
REQUIREMENT
ORIGIN OF THE
MANUFACTURER
TURING PROCESS
ITY VERIFICATION
DURING FABRICA-
FINAL INSPECTION
SHOP ATTENDANCE
AND/OR MANUFAC-
AND/OR CONFORM-
TYPE OF CERTIFICATE
FUNCTIONING TESTS
DRAWING OR DESIGN
18 Insulation material for fuel tanks C CT or CA TA X
25 Safety valves, valves and fittings for fuel piping C CT or CA TA (5) X X (3) X X X (4) X
26 Safety valves for fuel tanks and interbarrier spaces C CT or CA TA X X X (2) X X (4) X
28 Steel plates and profiles for independent fuel tanks C CT or CA X (1) X X (2) X X
31 Valve remote control system for fuel and ballast system SEE TABLE Q
(1) The acceptance of products supplied by unapproved Manufacturers may be considered for limited supplies and additional tests may be required
(2) As required by the Rules
(3) XM when the diameter is less than 50 mm
(4) Hydrostatic test
(5) Type test for pumps and valves with minimum working temperature below -55° C
1 General - COLUMN 4:
indicates whether the Rules require the verification
1.1 Purpose against approved drawings
- COLUMN 5:
1.1.1 The following tables list the equipment and the
materials that require the completion of inspection and test- indicates whether the Rules require the verification of
ing during and/or after installation on board. conformity before installation on board. This verifica-
tion may consist of an examination of the documents
1.1.2 These tables are not to be considered as an alterna- relative to the tests carried out at the workshop, a check
tive or substitute for the applicable Rule requirements. They of the marks or, for type approved products, a test to ver-
are intended to summarise in one document a large number ify the conformity of the product with the approved pro-
of requirements located in various parts of various docu- totype
ments. In the event of discrepancy between the content of - COLUMN 6:
the tables and the applicable Rules or Standards, the latter
indicates whether the Rules require that fabrication and
are to be considered valid.
installation on board are attended by a RINA Surveyor
1.1.3 Products which are not considered in the following - COLUMN 7:
tables are to be dealt with as indicated in the applicable indicates whether the Rules require that all or some of
Rules and/or using the criteria stipulated in the tables for the welds executed on board during installation are sub-
similar equipment, as agreed with the Society. jected to NDT in the presence of the RINA Surveyor or
under his control
2 Content of the tables - COLUMN 8:
indicates whether the Rules require that the prod-
2.1 Columns uct/equipment is examined by the RINA Surveyor after
completion of its installation on board
2.1.1 The following tables have 10 columns, as follows:
- COLUMN 9:
- COLUMN 1:
indicates whether the Rules require that final tests are
supplies an identification number for the equipment or
carried out in the presence of a RINA Surveyor after
material considered
installation on board (see Chapter 2 [2.9])
- COLUMN 2:
- COLUMN 10:
supplies a description of the equipment considered indicates whether the completed equipment is to be
- COLUMN 3: subjected to a functioning and/or performance test or
indicates whether the certification of the product is trial in the presence of the RINA Surveyor after installa-
required for the classification of the ships by RINA Rules tion on board (see Chapter 2, [2.9]).
or by different requirements.
99
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Connections of aluminium structures to steel struc-
C X (1) X (2) X
tures
2 Fixed propeller nozzles C X X (1) X (2) X
3 Machinery foundations C X X
4 Main engine foundations C X X (1) X (2) X
5 Shafting line bearing supports C X
6 Welded divisional non-structural bulkheads and
C X
decks
7 Welded strength structures C X X (1) X (2) X
8 Welding for cast or forged steel for stem, stern post,
rudder horn, rudder frames, shaft brackets, hawse- C X X (1) X (2) X
pipes
(1) Including welding procedures
(2) When required by the Rules and/or by RINA Surveyors
Table B (Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Anchor windlasses C X X X X (2) X X (4)
5 Gangways C X
10 Scuppers C X X X
11 Securing devices for hatch covers and shell doors B X X X (1) X (2) X X (2) X
Chapter 7
100
Table B (Sheet 2 of 2)
101
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
12 Sidescuttles and deadlights B X X X
15 Tow hooks C X X X X
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Actuators for steering gears C X X X X X (1)
2 Electric motors and electrical apparatus C SEE TABLE N X (1)
3 Hydraulic plant C SEE TABLE K-L X (1)
4 Rudders C X X (2) X X X (2) X (1)
5 Steering gears C X X (2) X X X (3) X (1)
(1) Sea trials
(2) For complete products or for components if the item is fabricated on board
(3) Hydrostatic tests as applicable for pressure parts
Chapter 7
102
Table D - E : Shipboard and Shipyard Inspections - Diesel Engines and Accessories
103
Table D -E (Sheet 1 of 2)
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Air, water and oil coolers C SEE TABLE J X (1)
2 Clutches C SEE TABLE H-I X (1)
3 Control, monitoring and alarm systems C SEE TABLE Q X (1)
4 Cooling water, lubricating oil, fuel oil injection and
C X X (2) X (1)
fuel oil transfer pumps
5 - Diesel engines (complete) intended for main pro-
pulsion, or
- Diesel engines (complete) developping a power of
110 kW and over intended for:
C X X X X (1)
a) driving electrical generator;
b) other auxiliary services essential for safety and
navigation;
c) driving cargo pumps in tankers;
6 Diesel engines for non-essential service and engines
C X (1)
for essential service of less than 110 kW
7 Ejectors C X X (1)
8 ITEM DELETED
9 Electrical apparatus C SEE TABLE N X (1)
10 Fuel oil and lubricating oil purifiers C X X X (2) X (1)
10A Oil mist detector C TA X X (1)
11 Piping systems SEE TABLE K-L
12 Power generation sets C SEE TABLE N X (1)
13 Pressure filters C X X X (2) X (1)
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
14 Scavenging pumps C X X (2) X (1)
15 Silencers C X X (2) X (1)
16 Starting air compressors C X X (1)
17 Starting motors – electric C X (3) X (1)
18 Starting motors – hydraulic or pneumatic C X (3) X (1)
19 Turbocharger(Category A and B) C X X (1)
20 Turbocharger (Category C) C TA X X X (1)
21 ITEM DELETED
104
Table F : Shipboard and Shipyard Inspections - Steam Turbines
105
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Clutches C SEE TABLE H-I X (1)
2 Control, monitoring and alarm systems C SEE TABLE Q X (1)
3 Couplings C SEE TABLE H-I X (1)
4 Dump condenser C X (2) X X X X X (1)
5 Electrical apparatus C SEE TABLE N X (1)
6 Main condensers C X (2) X X X X X (1)
7 Piping systems SEE TABLE J
8 Safety valves C X X X (1)
9 Turbines (complete) C X (2) X X X X
(1) Sea trials
(2) As far as installation is concerned
1 2 3 4 5 6 7 8 9 10
NDT
FICATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
CONFORMITY VERI-
FUNCTIONING TEST
106
Table H - I : Shipboard and Shipyard Inspections - Reduction and Reverse Gears, Propellers, Main Shafting and Thrusters
107
Table H - I (Sheet 1 of 2)
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Cardan shafts C X X X X
2 Clutches C X X X (1)
3 Control, monitoring and alarm systems C SEE TABLE Q X (1)
4 Controllable pitch propeller and built-up propeller C X X X X X X (1)
5 Controllable pitch propeller hydraulic control system C SEE TABLE K-L X (1)
6 Couplings C X X X X
7 Elastic coupling C X (2) X X X (1)
8 Hydraulic couplings C X (2) X X X (1)
9 Intermediate shafts C X X X
10 Propeller nuts C X X
11 Propellers (solid) C X X X X
12 ITEM DELETED
13 Reduction and/or reverse gears for propulsion trans-
mitting 220 kW power and above and for essential C X (2) X X X X (1)
auxiliaries transmitting 110 kW power and above
14 Reduction and/or reverse gears others than those indi-
C X (1)
cated in item 13
15 Sterntube bushes (oil lubricated, water lubricated,
C X X X
grease lubricated)
16 Sterntube sealing C X X X
17 Tailshaft liners C X X X X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
18 Tailshafts C X X X
19 Teeth coupling C X (2) X X X (1)
20 Thrust shafts C X X X
21 Thrust sliding-blocks C X X
22 Thrusters (propulsion and steering thrusters, trans-
C X (2) X X X X (1)
verse thrusters, podded propulsors, water-jets)
(1) Sea trials
(2) As far as installation is concerned
Chapter 7
108
Table J : Shipboard and Shipyard Inspections - Boilers, Pressure Vessels and Heat Exchangers
109
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Boilers C X (1) X X (2) X (3) X X (4) X (4)
2 Bottles C X
3 Class 1 pressure vessels and heat exchangers C X X X (4)
4 ITEM DELETED
5 Class 2 pressure vessels and heat exchangers C X X X (4)
6 ITEM DELETED
7 Class 3 pressure vessels and heat exchangers C X X (4)
8 Condensers C X (1) X X X (4) X (4)
9 Control, monitoring and alarm systems C SEE TABLE Q X (4)
10 Cylinders for hydraulic plants C X (1) X X X (4) X (4)
11 Oil fired thermal oil heaters, exhaust gas thermal oil
C X (1) X X (2) X (3) X X (4)
heaters
12 ITEM DELETED
13 Safety valves C X X X
14 Steam heated generators or steam generators heated
C X (1) X X (2) X (3) X X (4) X (4)
by another fluid
(1) As far as installation is concerned
(2) Welding procedures for parts welded on board
(3) On welds whenever required by the Rules or by RINA Surveyors
(4) As part of the plant which the item is part of
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Actuators C X X X X X (1)
2 Centrifugal separators C X X X (2) X (1)
3 Compressors (complete) C X X X (1)
4 Control, monitoring and alarm systems C SEE TABLE Q X (1)
5 Electrical apparatus C SEE TABLE N X (1)
6 Hydraulic motors C X X X (2) X (1)
7 Hydraulic motors for propulsion C X X X X (2) X (1)
8 Prime movers (diesel engines) C SEE TABLE D-E X (1)
9 Prime movers (electric motors) C SEE TABLE N X (1)
10 Pumps (complete) C X X X (2) X (1)
11 Safety valves C X X X
12 Systems (complete) C X X (3) X (4) X (5) X X (2) X (1)
(1) Sea trials
(2) Hydrostatic test of the whole plant
(3) For components
(4) Including welding procedures
(5) Whenever required by the Rules and/or by RINA Surveyors
Chapter 7
110
Table M : Shipboard and Shipyard Inspections - Marine Pollution Prevention
111
(Sheet 1 of 2)
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Equipment using other equivalent methods to
C (1) X (1) (2) X (1) X (1) X (1)
reduce on board NO x emissions
2 Garbage disposal systems C (1) X (1) (2) X (1) X (1) X (1)
3 Oil content meters S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X (3) (5)
4 Oil discharge monitoring and control system for
S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X (3) (5)
an oil tanker
5 Oil/water interface detectors S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X (3) (5)
6 Oil-filtering equipment (for an oil content of the
S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X (3) (5)
effluent not exceeding 15 p.p.m.)
7 On board exhaust gas cleaning system C (1) X (2) (1) X (1) X (1) X (1)
8 NO x analyser permanently placed on board and S (3) (4) - C
X (2) (5) X (5) (6) X (3) (5) X (3) (5)
for use on board as per NO x Technical Code 2008 (1)
9 Equipment using other technological methods to S (3) (4) - C
X (2) (5) X (5) (6) X (3) (5) X (3) (5)
limit SO x emissions (1)
10 Process units intended for attachment to existing
oily water separating equipment (for an oil con- S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X (3) (5)
tent of the effluent not exceeding 15 p.p.m.)
11 Sewage treatment plants S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X (3) (5)
12 Shipboard incinerators S (3) (4)-C (1) X (2) (5) X (5) (6) X (3) (5) X X (3) (5)
13 On board NO x analysers using a measurement
method other than the Direct Measurement and
C (1) X (1) (2) X (1) X (1) X (1)
Monitoring Method of the NO x Technical Code
2008
14 Ballast water treatment system S-C X X X X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
(1) For ships with “clean” class notation
(2) As far as the installation is concerned
(3) For ships flying European Community Administration flags subject to the MED Directive
(4) For ships flying non-European Community Administration flags, on behalf of which RINA issues statutory certificates
(5) For ships with “clean”class notation and for ships flying the flag of a State not belonging to the European Community on behalf of which RINA issues statutory certificates
(6) For products covered by MED directive requirements, Type Approval (Module B), Production Control Certificates (Module D/E, F or G) and EU DoC are to be verified by the Surveyor
Chapter 7
112
Table N : Shipboard and Shipyard Inspections - Electrical Installations
113
Table N (Sheet 1 of 3)
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Batteries for essential and/or emergency services C X
1A Batteries for battery powered ships C X X X X
1B Control, monitoring and alarm system for battery
SEE TABLE Q
powered ships
1C Fuel cells C X X X X
1D Control, monitoring and alarm system for fuel cells SEE TABLE Q
2 Battery chargers C X X
3 Circuit-breakers, contactors, disconnectors, etc., with
C X X X
nominal current greater than 100 A
4 Circuit-breakers, contactors, disconnectors, etc., with
C X
nominal current of 100 A or less
5 Cold weather starting of generator sets (starting devic-
C X
es)
6 Complete power generation sets C X X X X
7 Distribution panels and single starters of voltage
C X X X X
greater than 1000 V
8 Electrical cables C X X X X X
9 Electric motors intended for propulsion C X X
10 Electric safety lamps SEE TABLE O-P
11 Electrical appliances for hazardous areas SEE TABLE O-P
11A Miscellaneous electric equipment (lighting fittings,
heating and cooking appliances, plug and socket C X X
connection, accessories)
12 Electronic components and computers C X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
12A Electronic devices for alarm, safety and control of
SEE TABLE Q
electrical convertors for primary essential services
13 Low voltage distribution panels and single starters
X X
having nominal current greater than 100 A
14 Low voltage distribution panels and single starters
having nominal current of 100 A or less except those C X X X X X
intended for steering gear motors
15 Low-locating lighting systems C X
16 Main and emergency switchboards C X X X X X
17 Navigation equipment C X X X X X
18 Navigation lights S X X
19 Navigation light switchboards S X X X
20 Rotating machines for essential services of 100 kW
C X X X X X
and over (100 kVA for generators)
21 Rotating machines for essential services of less than
C X X X
100 kW (100 kVA for generators)
22 Semiconductor converters C X
23 Sound signal appliances C X X X
24 Starters for steering gear motors B X X X
25 Switchboards and panels related to alarm systems C X X X X X
26 Switchboards for watertight door, side door and fire
C X X X X X
door control, monitoring and alarm
27 Transformers for essential services of 100 kVA (60
C X
kVA for single phase transformers) and above
28 Transformers for essential services of less than 100
C X X X X
kVA (60 kVA for single phase transformers)
Chapter 7
114
Table N (Sheet 3 of 3)
115
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
28A Uninterruptible power system (UPS) units of 50 kVA
C X X X X
and over
29 Cable trays/protective casings of plastic materials C X X
30 Busbar trunking system (outside of switchboards, dis-
C X X X X
tribution boards)
31 Harmonic filters C X X X
32 HVSC (high voltage shore connection, cold ironing,
C X X X
shore side electricity)
33 Internal communication device (automatic exchange
telephone, common battery telephone, sound pow- B X X
ered telephone)
34 Engine telegraph B X X
Table O - P (Sheet 1 of 8)
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
1 Class divisions, fire integrity:
a) 'A' class division
S (1) (2) X X (3) X X
b) 'B' class division
c) 'C' class division
2 Air supplied breathing apparatus for use with a smoke
S (1) (2) X (3) X
helmet or smoke mask
2A Fire alarm devices (sounders) S (1) (2) X (3)
3 Alternative arrangements for halon fire-extinguishing
system components in machinery spaces and pump
B (1) (2) X (3)
rooms - equivalent water-based fire-extinguishing sys-
tem components (6)
4 Bedding components S (1) (2) X (3)
5 ITEM DELETED
6 Cold weather starting of generator sets (starting devices) B (1) (5) X X
7 Concentrate for fixed high expansion foam fire-extin-
guishing systems for machinery spaces and cargo pump S (1) (2) X (3)
rooms
8 Deep-fat cooking equipment fire-extinguishing systems
S (1) X X X X X
(automatic or manual type)
9 Nozzles for deep-fat cooking equipment fire- extin-
S (1) (2) X (3)
guishing systems (automatic or manual type)
10 ITEM DELETED
Chapter 7
116
Table O - P (Sheet 2 of 8)
117
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
11 Devices to prevent the passage of flame into the cargo
tanks in oil tankers:
a) P/V valves
S (1) (2) X (3) X
b) flame arresters
c) detonation flame arresters
d) high velocity vent valves
12 Draperies, curtains and other suspended textile materials
S (1) (2) X (3)
and films
13 ITEM DELETED
14 Dual purpose type nozzles (spray/jet type) S (1)(2) X (3)
15 Electric safety lamps S (1) X
16 Electrical cables and apparatus for hazardous areas SEE TABLE N
17 Emergency escape breathing devices (EEBD) S (1) (2) X (3) X
18 Equivalent fixed gas fire-extinguishing systems for ma-
S (1) (2) X X (3) X X X X
chinery spaces (aerosol systems)
19 ITEM DELETED
20 Equivalent fixed gas fire-extinguishing systems for cargo
S (1) X X X X X
pump rooms
21 Equivalent fixed gas fire extinguishing system com-
ponents (extinguishing medium, head valves and
S (1) (2) X (3)
nozzles) for machinery spaces and cargo pump
rooms
22 Expansion foam for fixed fire-extinguishing systems for
S (1) (2) X (3)
chemical tankers
23 ITEM DELETED
24 Fire dampers S (1) (2) X X (3) X X
25 Fire dampers for high speed craft B (1) (2) X X (3) X X
26 Fire doors S (1) (2) X X (3) X X X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
27 Fire doors control systems S (1) X X X X X
28 Fire doors control systems – Components (6) S (1) (2) X (3)
29 Fire doors for high speed craft B (1) (2) X X (3) X X X
30 Fire hoses S (1) (2) X (3) X
31 Fire hoses (reel type) S (1) (2) X (3) X
32 Fire-resisting divisions for high speed craft B (1) (2) X X (3) X X
33 Fire restricting materials (except furniture) for high speed
B (1) (2) X (3)
craft
34 Fire restricting materials for furniture for high speed craft B (1) (2) X (3)
35 Fireman’s outfit:
S (1) (2) X (3)
protective clothing (close proximity clothing)
36 Fireman’s outfit:
S (1) (2) X (3)
boots
37 Fireman’s outfit:
S (1) (2) X (3)
gloves
38 Fireman’s outfit:
S (1) (2) X (3)
helmet
39 Fireman’s outfit:
S (1) (2) X (3)
lifelines
40 Fixed oxygen analysis and gas detection equipment S (1) (2) X (3) X
41 Fixed fire detection and fire alarm systems for control sta-
tions, service spaces, accommodation spaces, machinery S (1) (2) X (3) X X X X
spaces and unattended machinery spaces
42 Fixed fire detection and fire alarm systems for control sta-
tions, service spaces, accommodation spaces, machinery
S (1) (2) X (3)
spaces and unattended machinery spaces – Components
(6)
43 Fixed high expansion foam fire-extinguishing systems S X X X X X
Chapter 7
118
Table O - P (Sheet 4 of 8)
119
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
44 Fixed high expansion foam fire-extinguishing systems -
S X
Components (6)
45 Fixed high expansion foam fire-extinguishing systems for
S (1) X X X X X
machinery spaces and cargo pump rooms
46 Fixed low expansion foam fire-extinguishing systems for
S (1) X X X X X
tanker deck protection
47 Fixed low expansion foam fire-extinguishing systems for
machinery spaces and tanker deck protection - Compo- S (1) (2) X (3)
nents (6)
48 Fixed sprinkler systems for high speed craft B (1) X X X X X
49 Fixed sprinkler systems for high speed craft – Compo-
B (1) (2) X (3)
nents (6)
50 Fixed water based local application fire-fighting system
B (1) X X X X X
for use in category "A" machinery spaces
51 Fixed water based local application fire-fighting system
for use in category "A" machinery spaces - Components B (1) (2) X (3)
(6)
52 Flame detectors S (1) (2) X (3) X
53 Galley exhaust duct fixed fire-extinguishing systems S (1) X X X X X
54 Galley exhaust duct fixed fire-extinguishing systems -
S (1) (2) X (3)
Components (6)
55 Heat detectors S (1) (2) X (3) X
56 Helicopter deck fire-extinguishing systems S (1) X X X X X
57 Helicopter facility foam fire-fighting appliances S (1) (2) X (3)
58 Inert gas systems B (1) (2) X X (3) X X X X
59 Inert gas systems – Components (6) B (1) (2) X (3)
59A Inside air high expansion foam system for the protection
S (1) (2) X (3)
of machinery spaces and cargo pump rooms
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
60 Low-location lighting systems S (1) X X X X
61 Low-location lighting systems – Components (6) S (1) (2) X (3)
62 Manual call points S (1) (2) X (3)
63 Materials other than steel for pipes conveying oil or fuel
oil:
a) Plastic pipes and fittings
b) Valves B (1) (2) X (3)
c) Flexible pipe assemblies and compensator
d) metallic pipe components with resilient and elas-
tomeric seals
64 ITEM DELETED
64A Medium expansion foam fire extinguishing systems com-
S (1) (2) X (3)
ponents fixed deck foam for tankers
65 Non-portable and transportable extinguishers S (1) (2) X (3) X
66 Non-combustible materials S (1) (2) X (3)
67 Non-conventional material flexible hoses and expansion
C X X
joints for all types of fluid
68 Nozzles for fixed pressure water-spraying fire-extinguish-
ing systems for special category spaces, ro-ro cargo spac- S (1) X
es, other ro-ro spaces and vehicle spaces
68A Nozzles for fixed pressure water-spraying fire-extinguish-
S (1) (2) X (3)
ing systems for cabin balconies
69 Nozzles for fixed pressure water-spraying fire-extinguish-
S (1) (2) X (3)
ing systems for machinery spaces and cargo pump rooms
70 Oxygen analysis and gas detection equipment B (1) (2) X (3)
71 Paint locker and flammable liquid locker fire-extinguish-
S (1) X X X X X
ing systems
72 Paint lockers and flammable liquid lockers fire extin-
S (1) X X
guishing systems components
Chapter 7
120
Table O - P (Sheet 6 of 8)
121
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
73 Penetrations through “A” class divisions
a) electrical cable transits S (1) (2) X (3) X (8) X
b) pipe, duct, trunk, etc. penetrations
74 Penetrations through “B” class divisions
a) electrical cable transits S (1) (2) X (3) X (8) X
b) pipe, duct, trunk, etc. penetrations
75 Penetrations through “C” class divisions
a) electrical cable transits S (1) X X (8) X
b) non-combustible duct penetrations
76 Penetrations through fire-resisting divisions on high
speed craft
B (1) (2) X (3) X (8) X
a) Electrical cable transits
b) Pipe, duct, trunk, etc. penetrations
77 Portable fire extinguishers S (1) (2) X (3) X
78 Portable fire extinguishers for lifeboats and rescue boats S (1) (2) X (3)
79 Portable foam applicator units S (1) X X
80 Pressure bottles and vessels SEE TABLE J
81 Primary deck coverings S (1) (2) X (3) X X
82 Protective clothing resistant to chemical attack S (1) X
83 Pumps and compressors for fixed fire extinction systems C X X X X
84 Sample extraction smoke detection systems S (1) X X X X X
85 Sample extraction smoke detection systems – Com-
S (1) (2) X (3)
ponents (6)
85A Sanitary boxes C X X X
86 Self-contained compressed-air-operated breathing appa-
S (1) (2) X (3) X
ratus
87 Smoke detectors S (1) (2) X (3) X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
88 Sprinkler systems (limited to sprinkler heads and to the
methods of automatic sprinkling and signalling e.g. flow S (1) (2) X (3)
switches, alarm panels)
89 Sprinkler systems equivalent to that referred to in SOLAS
S (1) X X X X
74 Regulation II-2/12
90 Sprinkler systems components for accommodation
spaces, service spaces and control stations equiva-
S (1) (2) X (3)
lent to that referred to in SOLAS 74 Reg. II-2/12 (lim-
ited to nozzles and their performance)
91 Surface materials and floor coverings with low flame-
spread characteristics:
a) Decorative veneers
b) Paint systems
c) Floor coverings S (1) (2) X (3)
d) Pipe insulation covers
e) Adhesives used in the construction of “B” & “C” class
divisions
f) Combustible ducts
92 Upholstered furniture S (1) (2) X (3)
93 Ventilation systems C X (7) X (7) X (7) X (7)
94 ‘A’ and ‘B’ class fire proof windows and sidescuttles B (1) (2) X (3) X X
95 Evacuation guidance systems used as an alternative
S (1) (2) X (3)
to low-location lighting systems
96 Dry chemical powder extinguishing systems S (1) (2) X (3) X X
97 Fixed hydrocarbon gas detection system S (1) (2) X (3) X X
98 Mobile water monitor for ships constructed on or
after 1 January 2016 designed to carry five or more S (1) (2) X (3) X X
tiers of containers on or above the weather deck
99 Fire-fighting hoses: — semi-rigid hoses for fixed sys-
S (1) (2) X (3)
tems
Chapter 7
122
Table O - P (Sheet 8 of 8)
123
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
FUNCTIONING TEST
CONFORMITY VERIFI-
INSPECTIONS DURING
100 Fixed firefighting hose systems — hose systems with
S (1) (2) X (3) X X
lay-flat hose
101 Gaseous Fuel Systems Used for Domestic Purposes
S (1) X X X X
(components) (6)
102 Fixed Gas Fire Extinguishing Systems (CO2) compo-
S (1) X X
nent (6)s
103 Water Spraying Hand Operated System S (1) X X X X
104 Fire hoses with diameter > 52 mm S (1) X X
(1) For ships flying flags of States not belonging to the European Community: if RINA issues the statutory certificates, the requirements are established on a case-by-case basis depending on the
agreements with the flag Administration.
(2) Products subject to the MED Directive
(3) For ships for which RINA issues statutory certificates, both the Type Approval Certificate (Module B or G) and the Production Certificate (Module D, E, F or G) are to be verified. In particular
cases, as an alternative, a comprehensive Manufacturer's declaration of conformity may also be accepted
(4) For products covered by MED directive requirements, Type Approval (Module B), Production Control Certificates (Module D/E, F or G) and EU DoC are to be verified by the Surveyor
(5) It is to be type approved by an Administration of the European Community
(6) Applicable to a single component or a group of components or a whole system which needs to be tested to ensure that the applicable requirements are fulfilled.
(7) Limited to damping operations
(8) Only applicable to Watertight Cable Transits
(Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Actuators C X X X (1)
2 Alarm systems (complete) C X X (2) X
3 Computers of Category II, III C TA X X (1)
3A Computers of Category I C X (1)
4 Consoles C X X (2) X X X
5 Control devices to computers of Category II, III C TA X X (1)
5A Control devices to computers of Category I C X (1)
6 Control systems (complete) C X X (2) X
7 Electrical cables and apparatus SEE TABLE N
8 Hydraulic systems SEE TABLE L
8A Pneumatic systems SEE TABLE K
9 Loading instruments C X X X (1)
10 Indicators, Instruments to computers of Category II, III C X X (1)
10A Indicators, Instruments to computers of Category I C X (1)
11 Monitoring systems (complete) C X X X X
12 Peripherals to computers of Category II, III (keyboard,
C X X (1)
mouse, VDU, etc.)
12A Peripherals to computers of Category I (keyboard,
C X (1)
mouse, VDU, etc.)
13 Sensors C X X (1)
Chapter 7
124
(Sheet 2 of 2)
125
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
14 Software C X (1)
15 Wireless data communication equipment C X (3)
(1) As a component of the systems being tested
(2) As far as components are concerned
(3) To demonstrate electromagnetic compatibility
Table R (Sheet 1 of 4)
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Automatically self-righting liferafts:
a) inflatable S (1) (2) X (3) (4) X (4)
b) rigid
2 Buoyant smoke signals (pyrotechnics) S (1) (2) X (3) (4)
2A Buoyant apparatus S (5) X
3 Canopied reversible liferafts S (1) (2) X (3) (4) X (4)
4 Daylight signal mirrors S (5) X (4)
4A Distress Signals S (5) X
5 ITEM DELETED
126
Table R (Sheet 2 of 4)
127
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
12 Immersion suits and anti-exposure suits designed to
be worn in conjunction WITH a jackets:
a) immersion suit without inherent insulation S (1) (2) X (3) (4)
b) immersion suit with inherent insulation
c) anti-exposure suits
Immersion suits and anti-exposure suits designed to
be worn WITHOUT a lifejacket:
12A a) immersion suit without inherent insulation S (1) (2) X (3) (4)
b) immersion suit with inherent insulation
c) anti-exposure suits
13 Inflatable liferafts S (1) (2) X (3) (4) X (4)
14 Inflated rescue boats S (1) (2) X (3) (4) X (4)
15 ITEM DELETED
16 Launching appliances for free-fall lifeboats S (1) (2) X (3) (4) X (4) X (4)
17 Launching appliances using fall (davits) S (1) (2) X (3) (4) X (4) X (4)
18 Life jackets S (1) (2) X (3) (4) X (4)
19 Lifeboat and rescue boat propulsion engine S (1) (2) X (3) (4) X (4)
20 Lifeboats:
a) Davit-launched lifeboats:
- partially enclosed S (1) (2) X (3) (4) X (4)
- totally enclosed
b) Free-fall lifeboats
20A Lifeboat canopies S (5) X
21 Lifebuoys S (1) (2) X (3) (4) X (4)
22 Lifebuoys' self-activating smoke signals S (1) (2) X (3) (4)
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
23 Liferaft launching appliances (davits) S (1) (2) X (3) (4) X (4) X (4)
24 Position-indicating lights for life-saving appliances:
a) for survival craft and rescue boats
S (1) (2) X (3) (4)
b) for lifebuoys
c) for lifejackets
25 ITEM DELETED
31 ITEM DELETED
128
Table R (Sheet 4 of 4)
129
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
38 Release mechanism for lifeboats:
a) lifeboats and rescue boats (launched by a fall or
falls) S (1) (2) X (3) (4) X (4) X (4)
b) liferafts (launched by a fall or falls)
c) free fall lifeboats
39 Rescue boat propulsion engine – Outboard engines S (1) (2) X (3) (4) X (4)
40 Rigid liferafts S (1) (2) X (3) (4) X (4)
41 Rigid rescue boats S (1) (2) X (3) (4) X (4)
42 Rocket parachute flare (pyrotechnics) S (1) (2) X (3) (4)
43 Searchlight for use in lifeboats and rescue boats S (1) (2) X (3) (4) X (4) X (4)
44 Thermal protective aids S (1) (2) X (3) (4)
44A Water de-salting apparatus for lifeboats S (5) X
45 ITEM DELETED
Table S (Sheet 1 of 4)
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Search and rescue locating devices (SRLD) - 9 GHz
S (1) (2) X (3) (4) X (4)
SAR transponder (SART)
2 ITEM DELETED
3 ITEM DELETED
130
Table S (Sheet 2 of 4)
131
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
15 ITEM DELETED
16 Integrated navigation system B (1) (2) (5) X (5) X (3) (4) (5) X (4) (5) X (4) (5)
17 ITEM DELETED
18 ITEM DELETED
21 Night vision equipment for high speed craft S (1) (2) X (3) (4)
22 Pitch indicator S (1) (2) X (3) (4) X (4)
23 Propeller revolution indicator S (1) (2) X (3) (4) X (4)
24 ITEM DELETED
25 ITEM DELETED
26 ITEM DELETED
27 ITEM DELETED
28 ITEM DELETED
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
33A Simplified voyage data recorder (S-VDR) S (1) (2) X (3) (4) X (4)
34 Sound reception system S (1) (2) X (3) (4) X (4)
35 Speed and distance measuring equipment (SDME) S (1) (2) X (3) (4) X (4)
36 ITEM DELETED
42 ITEM DELETED
132
Table S (Sheet 4 of 4)
133
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
51 GNSS Equipment Incorporating one or more of the
following elements:
— GPS equipment
— GLONASS equipment
S (1) (2) X (3) (4) X (4)
— DGPS Equipment
— DGLONASS Equipment
— Galileo Equipment
— Beidou (BDS)
52 Radar equipment:
— CAT 1
— CAT 2
S (1) (2) X (3) (4) X (4)
— CAT 3
— CAT 1H
— CAT 2H
53 Track control system for high-speed craft S (4) X (4) X (4)
54 Track control system (working at ship’s speed from 30
S (4) X (4) X (4)
knots and above)
55 Electronic Inclinometer S (4) X (4) X (4)
56 Nautical publications in digital form as defined by
S (4) X (4) X (4)
SOLAS V 27
(1) For ships flying flanges of States not belonging to the European Community:
- If RINA issues the statutory certificates, the requirements are established on a case-by-case basis depending on the agreements with the flag Administration
- No requirements if RINA does not issue statutory certificates
(2) Products subject to the MED Directive
(3) For products covered by MED directive requirements, Type Approval (Module B), Production Control Certificates (Module D/E, F or G) and EU DoC are to be verified by the Surveyor
(4) For ships for which RINA issues statutory certificates
(5) For ships with “SYS-NEQ” class notation
(6) Only for the Italian Administration
Table T (Sheet 1 of 2)
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 406 MHz EPIRB (COSPAS-SARSAT) S (1) X (2) (3) X (3)
2 Aeronautical two-way WHF radiotelephone appara-
S (1) X (2) (3) X (3)
tus
3 ITEM DELETED
4 ITEM DELETED
5 ITEM DELETED
12 ITEM DELETED
134
Table T (Sheet 2 of 2)
135
1 2 3 4 5 6 7 8 9 10
Chapter 7
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
17 Portable survival craft two-way VHF radiotelephone
S (1) X (2) (3) X (3)
apparatus
18 Radio reserve source of energy S X (3) X (3)
19 VHF DCS watchkeeping receiver S (1) X (2) (3) X (3)
20 ITEM DELETED
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Chains and gall chains for rigging O X X
2 Cranes, bridge cranes, motored hoists, elevators and
B X X X (1) X (2) X X X
ramps of movable decks
3 Machinery for lifting appliances O X X X X
4 Masts, posts and derricks O X X (1) X (2) X
5 Steel ropes for rigging O X X
6 Various accessories (blocks, rings, hooks, collars,
O X X
swivels, terminals, etc.)
7 Winches for cargo crane B X X (4) X
7A Winches for fishing nets B X X X X (2) X X (3) X
(1) Including welding procedures
(2) Whenever required by the Rules and/or by RINA Surveyors
(3) Overload test is required for SWL greater than 2 t and it is carried out during the test of the fishing net system
(4) Final test of winches for cargo crane is carried out during the overload crane test
Chapter 7
136
Table V : Shipboard and Shipyard Inspections - Refrigerating Installations
137
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Coils C (1) X X (2)
2 Complete refrigerating units C (1) X X X (2) X
3 Compressors C (1) X X
4 Condensers and evaporators C (1) X X (2) X
5 Control, monitoring and alarm systems SEE TABLE Q
6 Electrical apparatus SEE TABLE N
7 Insulation of refrigerated chamber insulation C (1) X X X
8 Oil separators, intermediate receivers and pressure
SEE TABLE J
vessels
9 Piping for refrigerating system, brine system, air sys-
SEE TABLE K
tem, defrosting system, etc.
10 Regulating valves C (1) X X
11 Thermometers C (1) X X
(1) For ships with “REF” class notation
(2) Hydrostatic tests
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Air conditioning plant C (1) X X X
2 Air treatment units C (1) X X X (2) X
3 Chamber insulation C (1) X X X
4 Control, monitoring and alarm systems SEE TABLE Q
5 Duct penetrations C (1) X
6 Ducts C (1) X X
7 Electrical apparatus SEE TABLE N
8 Fans (3) C X(4) X (5) X (6)
9 Heat exchangers SEE TABLE J
10 Refrigerating unit C (1) X X X (2) X
11 Thermal unit C (1) X X X (2) X
(1) For ships with “ COMF-AIR ” class notation
(2) Hydrostatic test
(3) Applicable to fans used in essential services such as:
• machinery spaces of category A,
• spaces containing the emergency source of power,
• safe areas (for SRtP condition purposes),
• hazardous spaces.
(4) Review of workshop testing documentation and verification of identification marking
(5) Verification of good installation, fixing on foundations, vibro-stops connections, ducts sealing against air leaks, appropriate construction of ducts in case of ventilation in high fire risk
areas (galley hoods, ro- ro spaces, flammable liquids storage, etc.)
(6) Running test at nominal speed
Chapter 7
138
Table X : Shipboard and Shipyard Inspections - Lifts
139
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Car S (1) X X X X
2 Fireproof doors SEE TABLE O-P
3 Guides S (1) X X X X
4 Hydraulic plant SEE TABLE K-L
5 Lift (complete) S (1) X X X X X
6 Machinery S (1) X X
7 Starters and switchboard SEE TABLE N
8 Steel ropes S (1) X X X
(1) Only for Italian flag ships
1 2 3 4 5 6 7 8 9 10
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Cargo piping C X X X (1) X (2) X X (3) X
2 Cargo pumps C X X X
3 Cargo pump prime movers C SEE TABLES D-E, N AS APPLICABLE
4 Coatings for cargo tanks C X X X
5 Control, monitoring and alarm systems SEE TABLE Q
6 Crude oil washing system C X X X (3) X
7 Devices to prevent the passage of flame into cargo
SEE TABLE O-P
tanks
8 Emergency towing arrangements on tankers C X X X (1) X (2) X X
9 Fans in cargo area C X X X
10 Inert gas generators C X X X X
11 Inert gas plant SEE TABLE O-P
12 Penetrations through gas-tight bulkheads of motor
C X X
shafts
13 Pressure vacuum valves C X X X
14 Safety valves C X X X
(1) Including welding procedures
(2) Whenever required by the Rules and/or by RINA Surveyors
(3) Hydrostatic test
Chapter 7
140
Table Z : Shipboard and Shipyard Inspections - Installations for Ships Carrying Liquefied Gases
141
Table Z (Sheet 1 of 2)
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Boil-off warm-up heaters C X X X
2 Cargo piping insulation C X X (1) X X
3 Cargo pumps (main, stripping and emergency) C X X X
4 ITEM DELETED
5 Control valves for glycol heating system and inert gas
C X X X
system
6 Cryogenic cargo hoses C X
7 Custody transfer system C X X (1) X
8 Emergency shutdown system C X X (1) X
9 Emergency towing arrangements on tankers SEE TABLE Y
10 Forcing vaporiser C X X X
11 Gas detection system C X X (1) X
12 Gas vaporisers C X X X
13 Heat exchangers C X X X
14 Cargo compressors C X X X
15 Independent cargo tanks C X X (2) X (3) X X
16 Inert gas generator C X X X
17 Inert gas plant SEE TABLE O-P
18 Insulation of cargo tanks C X X (1) X X
19 Level gauge for cargo tanks C X X X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
20 ITEM DELETED
21 Nitrogen generator C X X X
22 Piping for cargo lines C X X (1) X (2) X (3) X X (4) X
23 Piping for cofferdam heating system C X X (1) X (2) X (3) X X (4) X
24 Piping for insulation space pressurisation C X X (1) X (2) X (3) X X (4) X
25 Refrigerating units C X X X
26 Safety valves for cargo piping C X X X
27 Safety valves for cargo tanks and insulation spaces C X X X
28 Secondary insulation space water drain system C X X X X (4) X
29 Spray system for cargo tank cooling-down C X X (1) X X (4) X
30 Structural supports for independent tanks C X X (2) X (3)
31 Temperature and pressure sensors installed in sec-
ondary insulation space, cofferdams, ballast tanks, C X
etc.
32 Valve remote control system for cargo system and in-
C X X (1) X
ert gas plant
33 Water detector in insulation space C X
34 Water spray system C X X (1) X X X (4) X
(1) For components
(2) Including welding procedures
(3) Whenever required by the Rules and/or by RINA Surveyors
(4) Hydrostatic test
Chapter 7
142
Table Z-1 : Shipboard and Shipyard Inspections - Installations for Ships Carrying Liquefied Gases
143
Table Z -1 (Sheet 1 of 2)
Chapter 7
1 2 3 4 5 6 7 8 9 10
No. PRODUCT
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
1 Boil-off warm-up heaters C X X X
2 Fuel piping insulation C X X (1) X X
3 Fuel pumps (main, stripping and emergency) C X X X
4 Control valves for glycol heating system and inert gas
C X X X
system
5 Cryogenic cargo hoses C X
6 Custody transfer system C X X (1) X
7 Emergency shutdown system C X X (1) X
8 Emergency towing arrangements on tankers SEE TABLE Y
9 Forcing vaporiser C X X X
10 Gas detection system C X X (1) X
11 Gas vaporisers C X X X
12 Heat exchangers C X X X
13 Fuel compressors C X X X
14 Independent fuel tanks C X X (2) X (3) X X
15 Inert gas generator C X X X
16 Inert gas plant SEE TABLE O-P
17 Insulation of fuel tanks C X X (1) X X
18 Level gauge for fuel tanks C X X X
19 Nitrogen generator C X X X
NDT
CATION
FINAL TEST
DRAWINGS
REQUIREMENT
INSTALLATION
ORIGIN OF THE
WITH APPROVED
INSPECTION AFTER
CORRESPONDENCE
INSPECTIONS DUR-
ING INSTALLATION
FUNCTIONING TEST
CONFORMITY VERIFI-
20 Piping for fuel lines C X X (1) X (2) X (3) X X (4) X
21 Piping for cofferdam heating system C X X (1) X (2) X (3) X X (4) X
22 Piping for insulation space pressurisation C X X (1) X (2) X (3) X X (4) X
23 Refrigerating units C X X X
24 Safety valves for fuel piping C X X X
25 Safety valves for fuel tanks and insulation spaces C X X X
26 Secondary insulation space water drain system C X X X X (4) X
27 Spray system for fuel tank cooling-down C X X (1) X X (4) X
28 Structural supports for independent tanks C X X (2) X (3)
29 Temperature and pressure sensors installed in sec-
ondary insulation space, cofferdams, ballast tanks, C X
etc.
30 Valve remote control system for fuel system and inert
C X X (1) X
gas plant
31 Water detector in insulation space C X
32 Water spray system C X X (1) X X X (4) X
(1) For components
(2) Including welding procedures
(3) Whenever required by the Rules and/or by RINA Surveyors
(4) Hydrostatic test
Chapter 7
144