BG-0923 PLT Interpretation Results
(Reservoir Flow Assessment)
Field: BURGAN Well: BG-0923 GC:19
SENERGY OILFIELD SOLUTIONS 27-Feb-2025
2 BG-0923 Main Information and PLT Objectives
PRODUCT ION ST RING SCHEMAT IC (Current ) WELL NO. : BG-0923
OPEN Thick- SQZ UTM COORDINATES
PERF ness PERF NO. NO. QTY DESCRIPTION E: 797096.302 M
N: 3212665.28 M
Well Information
(SPF) (FT) (SPF)
SPUD DATE: 15-Jan-14 SURFACE DETAILS
LAST WELL WORK WO#2 KBE to subsea (ft) = 299.15
DATE COMPLETED: 13-Dec-22 GL to subsea (ft) = 269.15
DATE REVISED: 15-Dec-22 KBE to Tbg Hanger (ft) = 30.00
o Well is in (GC-19).
Well Head Type
GC : 11
Flowline length (ft) =
KBE Flowline I.D. (in) =
30.00 (ft) CAPACITIES
o It is producing by ESP from “BG3SU’’.
TBG Hanger
Tubing (bbls) =
Casing (bbls) = (below prod. pkr.)
Tbg-Csg Annulus (bbl ) = (above top pkr)
Flowline (bbls) = O.D. I.D. SETTING
o Production casing is 9 ⅝” with 40ppf weight
18-5/8", 87.5 #/ft, K-55, Csg @ 220' DD Max. Min. LENGTH DEPTH
inch inch feet feet-MD
13-3/8", 68#/ft, K-55, Csg @ 4235' DD SUSPENDED_OFF_BOTTOM 377.10 4378.90
TUBING 2.88 9.50 4369.40
MOTOR_BASE_PLUG 5.13 0.50 4368.90
DMT 4.5 1.83 4367.07
(nominal ID ~ 8.835”)
MOTOR 5.62 15.50 4351.57
SEAL_ASSEMBLY 5.13 11.90 4339.67
INTAKE 5.13 3.20 4336.47
GAS_HANDLER 5.13 6.30 4330.17
ESP 5.38 21.80 4308.37
DISCHARGE HEAD 5.35 0.73 4307.64
DISCHARGE HEAD 5.13 0.80 4306.84
PUMP_SUB 3.5 10.25 4296.59
TOOL_BLOCK 8.25 1.41 4295.18
TOOL_EXTENSION 3.5 6.28 4288.90
4420' MD TUBING 3.5 2.86 4258.69 30.21
CROSS_OVER 3.5 2.86 1.61 28.60
TUBING_HANGER 11 2.86 0.80 27.80
WS RT TO TOP OF TUBING HANGER 27.80 0.00
4577 MD
MA
PLT Objectives & String 4608' MD
4642 - 4648 5 4 10
o Determine the source of production.
4686 - 4706 5 20 10
4710 - 4716 5 6 10
4718 - 4732 5 14 10
4732 - 4752 5 20
o Identify the source of water. TOC : 4756'
o Check if there is any leak or crossflow. 3SU
CASING DETAILS TUBING DETAILS
3-1/2", Tbg
18-5/8", 87.5 #/ft, K-55, Csg @ 220' DD
o Tool String: FBS, PRESS, TEMP, CWH, DES
13-3/8", 68#/ft, K-55, Csg @ 4235' DD O/W CONTACT
9-5/8", 40#/ft, L-80, Csg @ 5027' DD
4757' MD 4810' MD
1 Annular Fluid :
9-5/8"x3-1/2" - Treated B/Water
4760 - 4772 5 12
and GR-CCL
W IRELINE DETAILS
3SM
4975'
3SL
4940'
9-5/8", 40#/ft, L-80, Csg @ 5027' DD
NOTE : ALL DEPTHS IN FT-DD
TD @ 5,027 SCHEMATIC NOT TO SCALE
3 Executive Summary
o Rig up with PLT Logging tool string.
o Logging interval was from 4,622 to 4,755ft.
o Up and down passes were recorded across the perforation intervals during shut-in conditions.
o Start the pump and wait for flowing stabilization at 4,620ft.
o Up and down passes were recorded across the perforation intervals during flowing conditions.
o Stations ( 5 mins ) were recorded at required depths.
o POOH and rig down.
4 PLT RIH Shut-in Data
Fluid Level
GRCH
GROH
No Sign of
temperature or
End of Tubing spinner anomaly
5 PLT Combined Shut-in Data
GR-CH
No evidence of cross flow during shut-in based on spinner and temperature data
3SU
3SU
Avg density
3SU ~ 1.1 g/cc SBHP @ 4,748 ft
1,971 psia
GR-OH
SBHT @ 4,748 ft
~143.6 F
7 Stabilization at 4,620ft
Average Pressure is ~ 1,643 psi
Pressure (psi)
Spinner(rps)
Average spinner reading is ~ 13.6 rps
Time (hr) Time (hr)
8 PLT Combined Flowing Data
GRCH
3SU
3SU
GROH
3SU
FBHP @ 4,748 ft
FBHT @ 4,748 ft 1,721 psia
~144 F
No entry
9 Downhole Flow Contribution Profile
Total rate
3,935 bpd
3SU
18%
10%
3SU
33%
13%
26%
3SU
10 Downhole Flow Contribution Summary
Water Rate Oil Rate Liquid Rate
Perf Zone Status WC,% Con, %
bpd bpd bpd
4,642 4,648 3SU Open - - - - -
4,686 4,697 - - - - -
3SU Open
4,697 4,706 539 161 700 77% 18%
4,710 4,716 3SU Open 218 171 389 56% 10%
4,718 4,724 0 0 0 - -
3SU Open
4,724 4,732 943 369 1312 72% 33%
4,732 4,741 346 163 509 68% 13%
3SU Open
4,741 4,752 442 573 1015 44% 26%
2488 1437 3925 63% 100%
o The SBHP and FBHP at 4,475 ft are ~ 1,971 and 1,720psia.
o Pressure DD is 251psi.
o Calculated rate from PLT is 3,925 bpd.
o Calculated well PI is 15.6 bpd/psi.
11 Results
o The major production contribution is from perforation in BG3SU (4,732-4,752) ft, with total
contribution of 39%.
o The SBHP and FBHP at 4,380ft are ~ 1,971 and 1,720 psia; the average pressure DD is ~ 251psi.
o Calculated rate based on PLT data is ~3,925bpd with 63%wc, so the well productivity index (PI) is
~ 15.6bpd/psi.
o Average density of produced water is ~ 1.1 g/cc.
o No sign of crossflow during shut-in based on temperature and spinner data.
APPENDIX
13 Data Quality
o Data quality of the log is good in general. All the tools appear to be reading normally and showed good
repeatability. Spinner showed good calibration at different intervals shut-in and flowing.
o Pressure and temperature showed good repeatability between different passes and overlapping
between passes and stations which is reflecting the stable pump performance and the withdrawal from
formation.
o The following are the data used in interpretation:
• Fullbore Spinner CFB
• Wellbore Pressure QP
• Wellbore Temperature TEMP
• Cable Speed LSPD
• Gamma Ray GR
• Tension LTEN
14 Spinner Calibration Plot
FLOWING SHUT-IN
14 PGOR Summary
BG-0923T
UNIT No. GSWT08
BURGAN
Pump Co. SCHLUMBERGER Type ESP Model: S4000N Opt.Range 833 - 5001
26 February 2025 GC-19 Contract Number: 21056156
Ticket No. Service Company Representative: Faisal Al Ajmi
Supervisor Robin Lanuzo
Main Results Contact No. 50151401
E-mail Address
[email protected] Koc Representative Ahmed Al Rashidi
Start End Test Choke Casing Critical Separator Separator CO2 H2S
WHP WHT FLP
Flow Period Date Time Date Time Duration LL+RR Status Flow Temp. Pressure (in Gas) (in Gas)
yyyy.mm.dd hh:mm yyyy.mm.dd hh:mm hrs /64" psig deg F psig Y/N deg F psig % ppm
1 2025/02/27 01:00 2025/02/27 06:00 5:00 64+00 GC 291 125 210 N 65 222 3.0 0
Total Liquid Water SG Oil
Oil Q Water Q Gas Q GOR 1 GOR 2 Total GOR BS&W Shrinkage Factor SG Gas
Flow Period Rate Salinity SG API
BBL/Day BBL/Day BBL/Day MMSCF/day SCF/BBL SCF/BBL SCF/bbl % PPM g/cc Deg API (1-Shr) (air = 1)
1 3971 1399 2572 0.239 171 71 242 65 160,000 0.886 28.2 0.967 0.820
Downstream Gas Inj. Injection Total Formation Lift Type ESP
Gas Inj. Rate Total GOR Pi Pd Ti Tm
Flow Period Inj.Pressure Temp. GLR GLR GLR Frequency Voltage Current
MMSCF/Day psig deg F SCF/BBL SCF/BBL SCF/BBL SCF/BBL psia psia deg F deg F Hz Volt Am
1 60 1545 2136 145 240 53 N/A 48
Well excisting condition: ESP pump shut down, Synergy Wireline rigging up their pressure equipment
Started flow period #1: through fixed choke (64+00)/64"(T)
General Comments
The flow period been achieved during the PLT job
At 06:00hrs End of PGOR test and bypass separator. Main Results are average of each flow period.
(Well Flowing side RHS) adjustable choke are clear, Well area condition are clean
After completing the PLT flowing survey the ESP pump manually shut down
Senergy Oilfield Solutions
Plot 42, Eastern Plaza, Block 8, East Ahmadi,
P.O. Box 9377, Ahmadi-61004, Kuwait.
Office: + 965 2397 0000
Fax: + 965 2387 0001