Bhadrak SLIP
Bhadrak SLIP
BHADRAK
Bhadrak
As per the 2011 census, the population of
Bhadrak Municipal Corporation is 1.07 lakh.
The decadal growth rate of the city is @
16.16%The average floating population is
about 10,000. Both horizontal and vertical
growth of the city is observed during the
recent years. The city has grown along the
both sides of the Salandi river. The central
part of the city is high density zone with
major land use under residential and
commercial activities.
Bhadrak is primarily centre of agriculture,
trade and commerce activities with few
industrial units. The Municipality areas do
not have many industrial units excluding
some small scale and HH industries along
NH5 and SH9. There are few rice mills and
pulse mills with in municipal unit along NH5.
After the construction of railway line from
Howrah to Madras, the town developed as
an important transport node for the
surrounding region. The transport gained
momentum with the construction of SH9
and Number of Major District roads. Due to
its location in the core of cyclonic tract in
the Bay of Bengal and causing natural hazards in the costal tract, its growth could not sustain and town
remained static till the turn of the Century.
In the Service Level Improvement Plan (SLIP) for Bhadrak, sector-wise projects identified and the estimated
costs are: water supply-8 nos./Rs. 107.16 Cr.; sewerage/Septage- 5 nos./ Rs. 221.95 Cr.; storm water
drainage- 5 nos/ Rs. 277.26 Cr.; urban transport – 8 nos. / Rs. 30.80 Cr.; and parks – 6 nos./ Rs. 1.98 Cr. In
total 32 nos of projects have been identified with a total estimated cost of Rs. 639.11 Crore.
Water Supply
Mission Management Information System
Question: What kind of baseline information is available for water supply system of the
city? Detail out the data, information, plans, reports etc related to sector. Is zone wise
information available? (75words)
Ans. As per census 2011 the population of the town is 1,07,463. The city is completely
dependent on ground source with 20 nos. of production wells and 86.33 km pipeline. There are
1,064 house connections and 102 nos. of stand posts are available. The water is available for 8
hours for the consumer. All information are available ward wise. Consumer and asset database
is maintained which are updated annually.
Question: Have you collected census 2011 data? Are you aware of baseline survey
data of MoUD? Have you correlated data from these and other sources? (75words)
Ans. The data regarding census 2011 has been collected. We have correlated the data with
other sources before preparing the proposal
Question: What are existing service levels for water supply in the city? What is the coverage of
water supply Connections? What is per capita supply of water? How much is the extent of
metering? How much is non-revenue water? Provide information in table
Table: Status of Water Supply service levels
TABLE 1.1 : Status of Water Supply Service
Sr.
Indicators Present status MOUD Benchmark Reliability Level
No.
Question: Is there any treatment provided to water from these sources? How much
water is required to be treated daily? What is the treatment capacity installed in the
city?
Ans. As the water is ground water, only disinfection in the form of chlorination through bleaching
powder is being done to the water supply system. There are 4 nos. of Bleaching dosing pumps
are operating in the system.
Question: What per capita water supply in LPCD (liter per capita per day) comes out,
if you divide total water supply by the total population?
Ans: The per capita water supply is 45.25 LPCD after deduction of 15% towards losses from the
total production.
DISTRIBUTIONZONES
Please provide information in 150 words on the above responding to (however not
limited to) following questions.
Question: Provide details of total no of Households (HH) in each zone, no of HH with and
without water tap connections in the Table
Table: Zone Wise Coverage of Households
TABLE 1.2: Zone wise coverage of household
Households Households
Zone No Total No of Households with direct without direct
water supply Connection water supply connections
DISTRIBUTION NETWORK
Please provide information in 150 words on the above responding to (however not
limited to) following questions.
Question: What is the total length of water supply distribution pipe line laid in the city?
Ans. 86.33 KM.
Question: What is the total road length in the city? Is the pipe lines are laid in all
streets? Is the objective of universal coverage of water supply pipe line is achieved?
Ans. The total road length in the city is 313.78 KM. Pipelines are not laid in all streets.
The objective of universal coverage of water supply pipe line is not achieved.
Question :What are the kind of pipe materials used in distribution lines?
Ans. The pipe materials used in distribution lines are generally CI & PVC.
Question: Provide zone wise details of street length with and without water
distribution lines in the Table?
TABLE 1.3: Zone wise length of distribution network
Street length with water Street length without water
Zone No Total Street Length (m)
distribution pipe line (m) distribution pipe line (m)
1 50,630 17,573 33,057
2 83,160 24,670 58,490
3 1,30,120 32,817 97,303
4 49,870 11,270 38,600
Total 3,13,780 86,330 2,27,450
INSTITUTIONAL FRAMEWORK
Please provide information in 150 words on the above responding to (however not
limited to) following questions.
Question: Define role and responsibilities in terms of O&M, policy planning, funding,
service provision in table
Table: Functions, roles, and responsibilities Planning and Design
NIL
Question: How much the existing system will able to address the existing gap in water
supply system? Will completion of above will improve the coverage of network and
collection efficiency? If yes, how much. (100 words)
Ans: The gaps are being addressed in a small incremental way with business as usual
Question: Does the city require additional infrastructure to improve the services?
What kind of services will be required to fulfill the gap?
Ans: Yes. Additional infrastructures are required to address the demand gap. New WTP, feeder
main, storage and distribution are needed to the bridge the gap and attain the benchmark
levels.
Question: How does the city visualize to take the challenge to rejuvenate the projects
by changing their orientation, away from expensive asset replacement programs, to
focusing on optimum use of existing assets?
Ans: Gaps have been computed after optimally utilizing the existing assets. Replacements are
proposed only for the sections which are affecting the service levels.
Question: Has city conducted assessment of Non Revenue Water? If yes, what is the
NRW level? Is city planning to reduce NRW?
Ans: City has conducted assessment of Non-Revenue Water through indirect methods
which is approximately 87.00%. Yes the city has plans to reduce NRW by way of
introduction of HH level metering, reducing illegal connections and reducing technical
losses.
Question: Based on assessment of existing infrastructure and ongoing / sanctioned
projects, calculate existing gaps and estimated demand by 2021 for water supply pipe
network, number of household to be provided with tap connections, and required
enhancement in capacity of water source/ treatment plant (MLD). Gaps in water
supply service levels be provided as per Table
TABLE 1.5: Gaps in water supply service levels
2015 2021
Component Ongoing
Present Total Demand Gap
projects
OBJECTIVES
Based on above, objectives will be developed to bridge the gaps to achieve universal
coverage. While developing objectives following question shall be responded so as to
arrive at appropriate objective.
Please provide List out objectives to meet the gap in not more than 100 words.
Question: Does each identified objectives will be evolved from the outcome of
assessment?
Ans. : Each of the objective have been evolved from the outcome assessment.
Which can be listed as follows
1. Ensure quality to water
2. Universal household level access with adequate water
3. Reduce NRW thereby increase the coverage & cost recovery
Question: Does each objective meet the opportunity to bridge the gap?
Ans: Yes each of the objective meets the opportunity to bridge the gaps
4. Citizen Engagement
ULBs will organize and conduct city level citizen consultation and receive feedback on
the suggested alternatives and innovations. Each alternative will be discussed with
citizens and activities to be taken up will be prioritized to meet the service level gaps.
ULB will prioritize these activities and their scaling up based on the available
resources. (AMRUT Guidelines; Para 6.6, 6.7 & 7.2). Please explain following
questions in not more than 200 words detailing out the needs, aspirations and wishes
of the local people.
6.Conditionalities
Describe in not more than 300 words the Conditionalities of each project in terms of
availability of land, environmental obligation and clearances, required NOC, financial
commitment, approval and permission needed to implement the project.
Ans: Lands is available for the proposed infrastructures. Environmental clearances are not
required proposed project. Power availability has been discussed with NESCO and agreed
upon. The funding shall be tied up with AMRUT scheme
7. Resilience
Required approvals will be sought from ULBs and competent authority and resilience
factor would be built in to ensure environmentally sustainable water supply scheme.
Describe in not more than 300 words regarding resilience built in the proposals.
Ans. The proposal has taken into consideration disaster resilience into consideration
8.FinancialPlan
Total No of Projects identified is 8 nos with an estimated cost of Rs. 107.16 Cr. is required to
achieve universal coverage as envisaged under AMRUT. The completion period of this project
is planned by 2019-20. The water supply system is under parastatal agency i.e. Public Health
Engineering Organization (Urban). The ULB own generated fund is not able to cover the
operational requirements of ULB and has been depending upon the state grant for the same.
Therefore, all infrastructure development projects are required to be funded by Centre/ State
grants or loan funds by state agencies. Accordingly the present investment on the projects is
planned based on 50% fund as grant from Centre and 50% fund to be met by state grant and
some limited funds from ULB/ soft loans from financial agency like OUIDF. At the planning
stage, it is not possible to identify the breakup of funding pattern for state 50 % share of fund
and it is considered that this fund shall be made available from state resources. Based on the
above financial plan the specific responses to the questionnaires given in the template are as
under:
How the proposed finance plan is structured for transforming and creating infrastructure
projects?
The financial plan is made considering 50 % Central grant and 50% state grant. Since the ULB
do not have the financial capability, no share has been considered from ULBs.
List of individual project which is being financed by various stakeholders?
All the projects listed are planned under AMRUT on the basis of 50 % Central grant and 50%
state grant. Soft loan from funding agencies will be explored which will form part of ULB
contribution. However, the state share will not be less than 20%.
Has financial plan prepared for identified projects based on financial convergence and
consultation with funding partners?
Yes, the project identified here does not include the ongoing projects which are covered under
other scheme. Therefore, financial convergence from other schemes has not been planned for
projects listed under this scheme. Since all the identified projects are funded under AMRUT on
50: 50 basis. Consultation with other funding partners is not required. However, consultation for
involving other funding partners will be explored to achieve the objective of the mission.
Is the proposed financial structure is sustainable? If so then whether project has been
categorized based on financial considerations?
Yes, the financial structure proposed is sustainable. The state govt. is committed to contribute
required funds for completing the projects. However, the O&M cost for these projects will be met
from internal resources including collection of user charges. The projects have been categorized
based on gap analysis identified for universal coverage as required under AMRUT scheme.
Have the financial assumptions been listed out?
Yes, the financial assumption has been listed to work out the operational sustainability.
Does financial plan for the complete life cycle of the prioritized development?
Yes, the financial plan takes care of apart from infrastructure cost, the O&M requirement of
project life cycle. It will be possible to be sustained throughout the life cycle.
Does financial plan include percentage share of different stakeholders (Centre, State,
ULBs and)
Yes, the initial sharing of financial plan is based on 50 % Central grant and 50% state grant.
Does it include financial convergence with various ongoing projects?
Yes, it includes various ongoing projects under different schemes supported by both Central &
State grant.
Does it provide year-wise milestones and outcomes?
Yes, it has been provided as per detailed furnished at table 2.1.
Details in financial plan shall be provided as per table 8.1, 8.2, 8.3, 8.4 and 8.5.
These tables are based on amrut guidelines tables 2.1, 2.2, 2.3.1, 2.3.2, and 2.5.
TABLE 2.1: Master Plan of Water Supply Projects for Mission period
Year in which Year in which Estimated
Sr. Priority
Project Name & code to be proposed to be Cost
No. number
implemented completed (Cr. Rs.)
Improvement of WS to Bhadrak -Rehabilitation P1
1 1 15-16 16-17 6.12
(AMRUT/OD/BHADRAK/WS/01)
Improvement of WS to Bhadrak -New Z1
6 5 16-17 18-19 11.59
(AMRUT/OD/BHADRAK/WS/05)
Improvement of WS to Bhadrak -New Z2
7 6 16-17 18-19 20.26
(AMRUT/OD/BHADRAK/WS/06)
Improvement of WS to Bhadrak -New Z3
8 7 16-17 18-19 27.38
(AMRUT/OD/BHADRAK/WS/07)
Improvement of WS to Bhadrak -New Z4
9 8 16-17 18-19 10.60
(AMRUT/OD/BHADRAK/WS/08)
Improvement of WS to Bhadrak - Headworks P1
12 3 16-17 17-18 2.52
(AMRUT/OD/BHADRAK/WS/03)
Improvement of WS to Bhadrak - Headworks P2
13 4 16-17 18-19 23.69
(AMRUT/OD/BHADRAK/WS/04)
Improvement of WS to Bhadrak - Headworks P3
14 2 17-18 18-19 5.00
(AMRUT/OD/BHADRAK/WS/02)
Grand Total 107.16
TABLE 2.3.1a:Total Fund Sharing Pattern for water supply projects during mission period
The first step is to assess the existing situation and service levels gaps for Storm Water Drainage
(AMRUT Guidelines; para 3 & 6). This will also include existing institutional framework for the
sector. AMRUT is focused on improvement in service levels. The zone wise data shall be used in
identifying the gaps. These zone-wise gaps will be added to arrive at city level service gaps.
While assessing service level gap reply following questions not more than word indicated against
each question.
1.1 . What kind of baseline information is available for storm water drainage system of the
city? Detail out the data, information, plans, reports etc related to sector.Is zone wise
information available? (75 words)
The base line information of urban population(ward wise) is available in Census-2011,
rainfall data and climatic data with significance of catchment area is received from metrological
department, information about length of roads& drains (ward wise by CDP), maps (GIS by CDP),
City Development Plan 2015.
Yes, zone wise information for Storm Water Drainage (SWD) is available.
1.2.Have you collected data from census other sources? Are you aware of baseline survey
data of MoUD? Have you correlated data from these and othersources?(75 words)
Yes, the data are collected from population Census 2011, District Statistics Office, slum
population from IHSDP& IIHL.
Yes, the above information relating to baseline survey data of MoUD are ascertained from CDP
for Bhadrak City-2040.
Yes, all the data above are correlated as per availability of different sources.
1.3 What is existing service levels for storm water drainage in the city? What is the
coverage of drains? What are the no of incidence of sewerage mixing in the drains? How
many times water logging incidence happens in the city? Provide comparative
information of service levels (in tabulated form) with respect to the service level bench
marks prescribed by MoUD and sustainable standards for service levels under the
National Mission on Sustainable Habitat (NMSH) in table 1.1
Red
Sustainable Black (Caution for Present
Sr. No. Indicators (Immediate action
standards improvement) Status
for improvement)
Coverage of Storm water
1 100% <75% <50% 10.5%
drainage network
Incidence of sewerage
2 0% <25% <50% 1%
mixing in the drains1
Incidence of water logging 2
3 0 <25 <50 12
(in nos. per year)
1.4: What is the gap in these service levels with regard to benchmarks prescribed by
MoUD and sustainable standards for service levels under the National Mission on
Sustainable Habitat (NMSH)?(75 words)
1
Incidence of sewerage mixing in the drains are ratio of no of households discharging wastewater directly into the drains to the total
no of households.
2
No of times water logging is reported in a year, at flood prone points in the city
The coverage area of drain is achieved only by 10.5% w.r.t. road length. So there is an gap of
89.5%. Further, There are 36nos. of water logging spots are identified within the city. The water
logging happens approximately 10-12 times a year.
1.5 What are major challenge facing the city in regard to achieving these service level
benchmarks?
The challenges faced by the city to achieve SLB are as follows
1. Lack of proper drainage network
2. Encroachment & obstacles
3. Due to maximum opening of the Hadgadh Dam during rainy seasons because of low
intake capacity and high catchment area.
4. Choking of drains by solid waste
5. Silting of drains
6. Uncovered Drainages
1.6: Identify gaps in capacity in managing the services efficiently and also provide an
innovative solution for efficiently managing these services.
The challenges faced by the city to achieve SLB are as follows
1. Existing drain should be covered
2. Kutcha drains need to be converted to RCC/pukka.
3. Raising & widening of existing culverts and drains.
4. Renovation and retrofitting of old stone masonary drains
5. Encroachment of drains needs to be checked
6. Construction of roads with drains.
1.7: Brief the ongoing drainage projects in the city. The components included in these
projects, how and up to what extent it will support to the drainage system of the city.
Weather it address all the issues related to drainage?
No, there is no existing drainage project.
2.1:Describe how at present, the storm water of City is drained off? How many natural and
manmade drains are exists and their coverage with respect to road network?
There exist a network of kutch of total length 210 km and pucca 33 km drains finally leading
to natural drain of 25.72 km which finally leads to Mahanadi River.
There are ten drains but there is one major natural drains named Nazor Nala of 10 km with
the discharge point at Icchapur is around total of 13 km. This compared to 313kms of road
network provides an coverage 10.5% on storm water drainage sector with consideration of
only manmade drains.
2.2 What is the capacity and condition of these drains? Is sufficient to carry the peak flow
of the catchment/water shed?
Presently the existing Pucca drains are in depilated condition and are uncovered as it is
approximately 5 years old. These SWD are not repaired and maintained since last two years.
No, the existing SWD network is not sufficient to carry the peak flow of the catchment/water
shed which leads to flooding at 36 places.
2.3 Does city have separate storm water drainage network? If no, provide the information
regarding locations of gray water mixes with the existing drains in table 1.2. In case of
mixed drainage how it works in peak rainy days?
There is no separate SWD network prevailing in the city. All households in the city dispose
their gray water to the existing SWD.
All households/all zone/ward in the town outlet their gray water to the existing drains.
Table 1.2: Detail of Locations where storm water get mixed with sewer
Table 1.2: Detail of Locations prone to chocking of drains due to solid waste
5.3 Shall the implementation of project be done by Municipal Corporation? If no, weather
resolution has been passed by the Municipal Corporation and accordingly, a tripartite
Memorandum of Understanding (MoU) between State Government, Municipal
Corporation and Parastatal has been signed? Please refer para 8.1 of AMRUT
guidelines.
YES. The projects shall be implemented by the ULB concerned with due weightage to MoUD and
AMRUT mission with the help of technical experts, designers and stakeholders. But presently the
SWD system is being maintained by the ULB in traditional process.
Once the gap between the existing Service Levels is computed, based on initiatives undertaken
in different ongoing programs and projects, objectives will be developed to bridge the gaps to
achieve universal coverage. (AMRUT Guidelines; para 6.2 & 6.3, Annexure-2; Table 2.1). Each
of the identified objectives will be evolved from the outcome of assessment and meeting the
opportunity to bridge the gap.
1.1 List out initiatives undertaken in different ongoing programs and projects to address
these gaps. For this provide details of ongoing projects being carried out for sector
under different schemes with status and when the existing projects are scheduled to
be completed? Provide information in Table
Status
S. Month of
Name of Project Scheme Name Cost (as on ddmm
No. Completion
2015)
Nil Nil Nil Nil Nil Nil
Table 1.4: Status of Ongoing/ Sanctioned
1.2 How much the existing system will able to address the existing gap in storm water
drainage system? Will completion of above improve the coverage of network;
eliminate the chocking of drains and water stagnation problem? If yes, how much. (100
words)
The existing system is able to cover only 10.5% of the road length and as there is no further
project in the SWD sector so there is no further gap being bridged.
1.3 Does the city require additional infrastructure to improve the services? What kind of
services will be required to fulfill the gap?
Yes, the city would require additional asset creation and renovation of the existing one to
achieve the 100 % universal coverage necessary to improve the SWD system.
The city needs 100% SWD coverage with covered drains and which would need proper
maintenance of the existing infrastructure and new system.
1.4 How does the city visualizes to take the challenge to rejuvenate the projects by
changing their orientation, away from expensive asset replacement programs, to
focusing on optimum use of existing assets?
The existing network of kuccha and dilapidated pucca drains could be retrofitted and
rejuvenated to bring down the cost of the total new asset creation.
1.5 Has city conducted assessment of O&M cost of drains and potable pumps? if yes,
what is it? Is city planning to reduce it?
There is no assessment done in maintenance of the drains and the pumps. However there
are maintenance as in when required.
1.8 Whether these gaps presented in measurable/ executionable ways considering all the
ongoing projects? (75 words)
As there are no existing projects available.
2.0 Objectives
Based on above, objectives will be developed to bridge the gaps to achieve universal coverage.
While developing objectives following question shall be responded so as to arrive at appropriate
objective.
2.1 Does each identified objectives will be evolved from the outcome of assessment?
Yes, the objective has been evolved from the SLB assessment which tries to fill the gap
in order to achieve the 100% universal coverage.
2.2 Does each objective meet the opportunity to bridge the gap?
Yes, all the objectives has been derived keeping in mind the existing opportunities which
would probably try to bridge the existing gap in order to achieve the 100% universal
coverage.
2.3 Does objectives clearly address all these gaps /solution to all the problems related
to storm water drainage of the city?
Yes, each of the objective has been formulated in order to bridge the existing gap and
find solution to all the problems related to storm water drainage of the city.
Please provide List out objectives to meet the gap in not more than 150 words.
The objective will lead to explore and examine viable alternatives options available to address
these gaps. These will include out of box approaches. (AMRUT Guidelines; Para 6.4 & 6.8 &
6.9).This will also include review of smart solutions. The cost estimate with broad source of
funding will be explored for each. While identifying the possible activities, also examine the
ongoing scheme and its solutions including status of completion, coverage and improvement in
O&M. Please provide information on the above responding to (however not limited to) following
questions.
1.1 Does all these gaps clearly identified and addressed? (75 words)
Yes, The detail estimate with source of funding have been identified in respect of Bhadrak
City with respect to SWD which can some extent improvise the present scenario with an
expectation of greater utility.
1.2 What are the possible activities and source of funding for meeting out the
objectives? (75 words)
The construction kuccha drains, retrofitting, renovation of the necessary pucca drains and lining
of the left out natural drains could be constructed under the state and ULB funding. (Annual
cleaning of Drainage is also from state / ULB fund)
The possible activities are as follows:
1) Construction of RCC kuccha drains with cover slabs
2) Covering of existing puccaa drains
3) Desilting/ retrofitting, renovation of exsting puccaa drains
4) Lining of the left out natural drains
5) Frequent Cleaning of SWD channel.
The major funding of the above sector has been three folded that is central, state and ULB.
1.3 How can the activities be converged with other programme like JICA/ ADB
funded/SBM/Smart city mission projects in the city etc.? (i.e. convergence with
other schemes)(100 words)
The convergence of the activity can’t be done for the city as the city is not covered in any of the
major mission like JICA/ ADB funded/Smart city. However, the SBM is taken up by the
municipality. So we could propose the action necessary to avoid choking of the drainage through
the SBM. Which indirectly helps in improving the SWD of the city.
1.4 What are the options (financial alternatives) of completing the ongoing activities
specially on going JnNURM projects? (75 words)
As Bhadrak city is not covered under the JNNURM/UDISSMT etc. So there are no other mission
which would cater as a financial alternative. Further there is no major ongoing activity on the
sector for the city.
1.5 What are the lessons learnt during implementation of similar projects? (100 words)
There has been an issue related to execution of the similar project. There exists local and site
specific issues. Further there are also encroachment & eviction of the property adjacent to the
SWD.
Also there are various service lines like cable line/ service lines/ phone line laid with the SWD
which creates an unnecessary delay in O&M and also renovation of the SWD. Also, there has
been shortage of staff, lack of skilled personnel, training. The ULB also need proper capacity
building for the staffs and the service providers who can improvise the day to day activities.
1.6 Have you analyzed best practices and innovative solutions in sector? Is any of the
practice be replicated in the city?(75 words)
Certain of cities of Kerala and cuttack is seen to be the best practice and many of the issues
related to the flooding and storm water network could be resolved by looking at those city.
However there are no similarity in geographical features of the Cuttack and Bhadrak.
1.7 What measures may be adopted to recover the O&M costs?(100 words)
Presently there is only holding tax being imposed in the City so by imposing property tax the
sector could achieve the required financial from the government would help at least for the
maintenance.
1.8 Whether reduction in O&M cost by energy efficient pumps etc be applied?(75
words)
Yes, as the ULB uses pumps in the city to take off the flooding water so it is necessary to
considered energy efficient pumps.
1.9 Are different options of PPP such as Design-build-Operate-Transfer (DBOT), Design
Built Finance Operate and Transfer (DBFOT) are considered?(100 words)
There are no PPP mode used in any of the plan or project in Bhadrak city.
Sr. Financing
Objective Activities
No. Source
The alternative activities to meet these activities are defined as per Table 1.6
ULBs will organize and conduct city level citizen consultation and receive feedback on the
suggested alternatives and innovations. Each alternative will be discussed with citizens and
activities to be taken up will be prioritized to meet the service level gaps. ULB will prioritize these
activities and their scaling up based on the available resources. (AMRUT Guidelines; Para 6.6,
6.7 & 7.2). Please explain following questions in not more than 200 words detailing out the
needs, aspirations and wishes of the local people.
1.6 Has alternative taken up for discussions are prioritized on the basis of
consultations?
As no alternatives has been received so it hasn’t been taken up for discussion.
1.7 What methodology adopted for prioritizing the alternatives?
Our approach has been taken up with the consideration of prioritizing the more problematic area
with less problematic area as the city is flood affected.
V. Prioritize Projects
Based on the citizen engagement, ULB will prioritize these activities and their scaling up based
on the available resources to meet the respective objectives. While prioritizing projects, please
reply following questions in not more than 200 words.
1.2 Has projects been converged with other program and schemes?
Yes. But partly and indirectly with the SWM, for choking of the drains
Our approach has been taken up with the consideration of prioritizing the more problematic area
with less problematic area as the city is flood affected.
1.4 Has the universal coverage approach indicated in AMRUT guidelines followed for
prioritization of activities?
Yes, we have taken up approach to completely solve (Universal coverage that is 100%
coverage) the problem of SWD.
VI. Conditionalties
Describe in not more than 300 words the Conditionalties of each project in terms of
availability of land, environmental obligation and clearances, required NOC, financial
commitment, approval and permission needed to implement the project. ** (Plz : attach
pages)
As the project is for Storm Water Drainage so no major land is required. However, it is necessary
for the pump house. There is requirement of environmental clearance and the NOC for the outfall
points.
The financial commitment, approval and permission is needed to be implement for the project
from the necessary department.
VII. Resilience
Required approvals will be sought from ULBs and competent authority and resilience
factor would be built in to ensure environmentally sustainable storm water drainage
scheme. Describe in not more than 300 words regarding resilience built in the proposals.
** (Plz : attach pages)
The BOD and the COD of the storm should be lowered down to the necessary level such that it
doesn’t affect the nearby environment.
Once the activities are finalized and prioritized after consultations, investments both in
terms of capital cost and O&M cost has to be estimated. (AMRUT Guidelines; para 6.5)
Based on the investment requirements, different sources of finance have to be identified.
Financial Plan for the complete life cycle of the prioritized development will be prepared.
(AMRUT Guidelines; para 4, 6.6, 6.12, 6.13 & 6.14). The financial plan will include
percentage share of different stakeholders (Centre, State and City) including financial
convergence with various ongoing projects. While preparing finance plan please reply
following questions in not more than 250 words
How the proposed finance plan is structured for transforming and creating
infrastructure projects?
The financial plan is made considering 50 % Central grant and 50% state grant. Since the
ULB do not have the financial capability, no share has been considered from ULBs.
List of individual projects which are being financed by various stakeholders?
All the projects listed are planned under AMRUT on the basis of 50 % Central grant and
50% state grant. Soft loan from funding agencies will be explored which will form part of
ULB contribution. However, the state share will not be less than 20%.
Has financial plan prepared for identified projects based on financial convergence
and consultation with funding partners?
Yes, the project identified here does not include the ongoing projects which are covered
under other scheme. Therefore, financial convergence from other schemes has not been
planned for projects listed under this scheme. Since all the identified projects are funded
under AMRUT on 50: 50 basis. Consultation with other funding partners is not required.
However, consultation for involving other funding partners will be explored to achieve the
objective of the mission.
Is the proposed financial structure is sustainable? If so then whether project has
been categorized based on financial considerations?
Yes, the financial structure proposed is sustainable. The state govt. is committed to
contribute required funds for completing the projects. However, the O&M cost for these
projects will be met from internal resources including collection of user charges. The
projects have been categorized based on gap analysis identified for universal coverage
as required under AMRUT scheme.
Have the financial assumptions been listed out?
Yes, the financial assumption has been listed to work out the operational sustainability.
Does financial plan for the complete life cycle of the prioritized development?
Yes, the financial plan takes care of apart from infrastructure cost, the O&M requirement
of project life cycle. It will be possible to be sustained throughout the life cycle.
Does financial plan include percentage share of different stakeholders (Centre,
State, and ULBs)
Yes, the initial sharing of financial plan is based on 50 % Central grant and 50% state
grant.
Does it include financial convergence with various ongoing projects?
Yes, it includes various ongoing projects under different schemes supported by both
Central & State grant.
Does it provide year-wise milestones and outcomes?
Yes, it has been provided as per detailed furnished at table 1.7
Details in financial plan shall be provided as per Table 1.7,1.8,1.9,1.10 and 1.11. These
tables are based on AMRUT guidelines tables 2.1, 2.2,2.3.1,2.3.2, and 2.5.
Table 1.7 Master Plan of Storm Water Drainage Projects for Mission period(As per Table
2.1of AMRUT guidelines)
Master Plan of Storm Water Drainage Projects for Mission period
Year in which Year in which
Estimated
Sr. No Project Name Priority number to be proposed to be
Cost
implemented completed
Augmentation of SWD in Bhadrak
1 town in zone 4 1 2015-16 2016-17 72.15
AMRUT/OD/BHADRAK/SWD/04
28.86
Augmentation of SWD in Bhadrak town in
1 14.43 14.43
zone 4 AMRUT/OD/BHADRAK/SWD/04
Total
Question: What kind of baseline information is available for sewerage system of the city? Detail out
the data, information, plans, reports etc related to sewerage available with city? Is zone wise
information available? Have you correlated your data with census 2011 data? (100 words)
Ans. Census 2011, Draft CDP, are available and have been correlated with
census 2011 data.
Question: What are existing service levels for sewerage for coverage of sewerage
network services, efficiency of collection of sewerage and efficiency in treatment. Provide
information in table
Table 2.1 : Status of sewerage network and Service l evels
coverage of latrines
1 62% 100%
( individual or community)
Question: What is the gap in these service levels with regard to benchmarks
prescribed by MoUD? (75 words)
Ans: There is no sewerage network & hence no collection & no treatment. The septage disposal
is irregular and mostly to open drains. Hence the gap in these service level with regard to
benchmarks prescribed by MoUD is 100% .
Question: Does city has separate drainage system or sewer lines take care of storm
water? (50 words)
Ans: Yes, the city is having partly separate drainage system.
Coverage of latrines (individual or community), Please provide information in
Table 2.2 A
1 4498 0 0
2 8298 0 0
3 7325 0 0
Question: Are there any areas where sewer lines have been laid but still
households are not connected to sewer lines? Are there any areas where
toilets may be connected to sewer lines but kitchen or bathroom waste are not
connected to sewerage system? (75 words)
Ans: Such condition does not arise.
Question: Is there any systematic and organized method to collect and treat waste from
septic tanks? What is the duration of cleaning of septic tanks (monthly, quarterly,
semiannually or annually)? Indicate status of overflows of septic tanks, either in the
nearby drains /open fields/ sewerage lines etc? (75 words)
Ans: At present there is no systematic and organized method to collect and treat waste
from septic tanks. Only 1 (one ) nos. of Cess Pool emptier are available which is not sufficient for
systematic and organized cleaning. As there is no organized method of collection in
many of the cases, the septic tanks overflow either into nearby drains /open fields
etc.
Question: What is the situation of O&M of the existing sewerage system? Does the city
has routine maintenance system or breakdown maintenance system? What is the
duration of cleaning of sewer lines (monthly, quarterly, semiannually or annually)?
Indicate infrastructure available for O&M of the sewerage system i.e sewer jetting
machines etc? (100 words)
Question: Does city has Sewage Treatment Plant (STP)? Which areas are covered under
each of the STPs? Provide details in Table 2.3
1 NIL
2 NIL
3 NIL
Question: Does decentralized waste treatment system exists or planned in the city? If
yes, provide details (75 words)
Question: How much of sewerage is generated in the city? How much of this sewerage
generated reaches the STPs? What is the Biological Oxygen Demand (BOD) of incoming
and outgoing sewage of each STP? (100 words)
Ans: NIL. Since there is no sewer collection & treatment system, no sewage reaches the STP.
Question: Is treated sewage being reused or recycled? Is treated water being used for
irrigation or industrial purpose? Does the option of power generation being explored? (75
words)
Ans: No.
INSTITUTIONAL RAMEWORK
Question: Define role and responsibilities in terms of O&M, policy planning, funding,
service provision in table
Planning and
Construction/Implementation O&M
Design
Planning and design Project team headed by divisional PE OWSSB supported by
O & M team headed by Municipal
Cell in Ms of , PMU and PDMC . There will be MuU between Municipality
Engineer of Bhadrak Municipality.
OWSSB and State Govt/ OWSSB for implementation.
Question: Please also detail that how city is planning to execute projects. Shall the
implementation of project be done by Municipal Corporation or any parastatal body?
(75 words)
Ans: Implementation of project will done by Orissa Water Supply & Sewerage Board
2. Bridge the Gap
Once the gap between the existing Service Levels is computed, based on initiatives
undertaken in different ongoing programs and projects, objectives will be developed to
bridge the gaps to achieve universal coverage. (AMRUT Guidelines; para 6.2 & 6.3,
Annexure-2; Table 2.1). Each of the identified objectives will be evolved from the outcome
of assessment and meeting the opportunity to bridge the gap.
Question: List out initiatives undertaken in different ongoing programs and projects to
address these gaps. For this provide details of ongoing projects being carried out for
sewerage system under different schemes with status and when the existing projects
are scheduled to be completed? Provide information in Table
Total 0
Question: How much the existing system will able to address the existing gap in
sewerage system? Will completion of above will improve the coverage of network and
collection efficiency? If yes, how much. (100 words)
Ans: The existing system will be able to address the existing gap by 0%. Since no on going
scheme, ongoing/ sanctioned system will be able to improve 0% network and collection
efficiency.
Question: Does the city require additional infrastructure to improve the services? What
kind of services will be required to fulfill the gap?
Ans: Yes, the city require additional infrastructure to improve the services. It needs
sewerage system and treatment.
Question: How does the city visualize to take the challenge to rejuvenate the projects by
changing their orientation, away from expensive asset replacement programs, to
focusing on optimum use of existing assets?
Table 2.6: Demand Gap Assessment.
2015 2021
Component Ongoing
Existing Total Demand Gap
projects
No of Households covered
under sewerage system 0 0 0 23119 23119
(2021 demand)
Sewerage treatment plant
0 0 0 9.8 9.8
MLD (2030 demand)
Note: The demand gap will be fulfilled as per requirement of CPHEEO Mannual.
Based on assessment of existing infrastructure and ongoing / sanctioned projects,
calculate existing gaps and estimated demand by 2021 for sewerage network, number
of household to be provided with connections, and required enhancement in capacity of
STP (MLD), area to be covered under septage management. Based on the demand and
gap assessment, evolve objectives to achieve bridging this gap.
Question: Does each identified objectives will be evolved from the outcome of
assessment?
Ans: Yes
Question: Does each objective meet the opportunity to bridge the gap?
Please provide List out objectives to meet the gap in not more than 100 words.
Ans: Yes, each objective meets the opportunity to bridge the gap.
3. Examine Alternatives and Estimate Cost
The objective will lead to explore and examine viable alternatives options available to
address these gaps. These will include out of box approaches. (AMRUT Guidelines;
Para 6.4 & 6.8 & 6.9). This will also include review of smart solutions. The cost estimate
with broad source of funding will be explored for each alternative. While identifying the
possible activities, also examine the ongoing scheme and its solutions including status of
completion, coverage and improvement in O&M. Please reply following questions in not
more than 200 words.
Question: What are the possible activities and source of funding for meeting out the
objectives?
Ans: The activities are sewer net work, treatment and house connection to meet the objective for
universal coverage of sewerage system.
Question: How can the activities be converged with other programmes like JICA/ ADB
funded projects in the city etc?
Ans: here does not arise. But done Through State Govt and other funding.
Question: How to address the bottlenecks in the existing project and lessons learnt
during implementation of these projects?
Ans: The bottlenecks that is disposal arrangements, reuse of treated waste water etc learnt have
been addressed and shall be taken care during implementation of these projects under
AMRUT.
Ans: Yes.
Question: What measures may be adopted to recover the O&M costs? Can the option of
sale of treated wastewater be applicable to recover the O&M cost.
Ans: Options for STP methodology and innovation that is reuse of treated waste water explored
in achieving objectives.
Question: How the recycle and reuse of waste water will be done? How much quantity of
treated water may be reused?
Ans: Does not arise.
Question: Have you analysed best practices and innovative solutions in sewerage
sector? Is any of the practice be replicated in the city?
Ans: Yes.
Question: Have you identified the areas for decentralized waste treatment system? Explore
the approaches for septage management i.e People Public Private Partnership (PPPP)
model or replacing septic tanks by bio-digesters, bioremediation etc.
The alternative activities to meet these activities be defined as per Table 2.7
4. Citizen Engagement
Each alternative will be discussed with citizens and activities to be taken up will be
prioritized to meet the service level gaps. ULB will prioritize these activities and their
scaling up based on the available resources. (AMRUT Guidelines; Para
6.6, 6.7 & 7.2). Please reply following questions in not more than 200 words.
Question: Has all stakeholders involved in the consultation?
Ans: Yes
Ans: Yes
Question: Has alternative taken up for discussions are prioritized on the basis of
consultations?
Ans: Yes.
Ans: Keeping in mind how the house holds can be well covered under sewerage facilities
opted for achieving early coverage of the gap assessed under AMRUT.
5. Prioritize Projects
Based on the citizen engagement, ULB will prioritize these activities and their scaling up
based on the available resources to meet the respective objectives. While prioritizing
projects, please reply following questions in not more than 200 words.
Question: Has projects been converged with other program and schemes?
Ans: Yes
Question: Has projects been prioritized based on “more with less” approach?
Ans: Yes.
Question: Has the universal coverage approach indicated in AMRUT guidelines followed for
prioritization of activities?
Ans: Yes.
6. Conditionalities
Describe the Conditionalities of each project in terms of availability of land, environmental
obligation and clearances, required NOC, financial commitment, approval and permission
needed to implement the project. Please reply following questions in not more than 100 words.
Ans: Govt land has been identified and available. Envoronmental clearance applied and other
clearances / NOC are under process.
7. Resilience
Required approvals will be sought from competent authority and organisations. The resilience
factor would be built in to ensure environmentally sustainable sewerage scheme. Please reply
following questions in not more than 100 words.
Ans: The proposed project under AMRUT and ongoing/ sanctioned would be builtin to ensure
environmentally sustainable sewerage scheme. Also Odisha State Pollution Board requirements
shall be adhered to.
8. Financial Plan
Once the activities are finalized and prioritized after consultations, investments both in terms of
capital cost and O&M cost has to be estimated. (AMRUT Guidelines; para 6.5) Based on the
investment requirements, different sources of finance have to be identified. Financial Plan for the
complete life cycle of the prioritized development will be prepared. (AMRUT Guidelines; para 4,
6.6, 6.12, 6.13 & 6.14). The financial plan will include percentage share of different stakeholders
(Centre, State and City) including financial convergence with various ongoing projects. While
preparing finance plan please reply following questions in not more than 200 words
Does financial plan for the complete life cycle of the prioritized development?
Yes, projects proposed include O&M for 5 years. O&M shall be integral part of the execution
contract so that the agency/contractor who develops the assets shall be responsible for post
asset creation O&M for 5 years. The O&M cost for Water Supply shall be borne by the
OWSSB (Odisha Water Supply and Sewerage Board).
Does financial plan include percentage share of different stakeholders (Centre, State,
ULBs and)
Yes, the financial plan is based on 50 % Central grant and 50% state grant.
Yes, it includes convergence with various ongoing projects under different schemes
supported by both Central & State grant.
Details in financial plan shall be provided as per Table 8.1, 8.2, 8.3, 8.4 and 8.5. These
tables are based on AMRUT guidelines tables 2.1, 2.2, 2.3.1, 2.3.2, and 2.5.
Total 221.91
Total 3.35
Table 8.4: Annual Fund Sharing Break-up for Sewerage Projects
Convergence
Sr. State ULB
Others
Total in
Project GoI
Others
14thFC
14th Cr
No. Others Total Total
FC
Under AMRUT Mission, Urban Transport components which are admissible are; Side- walks, Foot-
over bridges, Non-motorized transport (NMT), Buses, BRTS, Multi-level parking, Waterways Ferry
vessels Ferries and Waterways. (AMRUT Guidelines; para3).
Assess the existing transportation situation and service levels gaps for indicators urban to achieve
service level benchmarks. (AMRUT Guidelines Table.1.4 & Table2.5). Service Level gaps will be
analyzed as per indicators prescribed in Service Level Benchmarks (SLBs) for urban transport of
MoUD, GoI. Please provide information in200 words responding to the following questions;
Question: What is the baseline information available for improvement city transportation? Whether
City has prepared City Mobility Plan? If yes then, Does CMP includes NMT, Ferries, water ways?
Answer:
A City Development Plan (CDP) has been prepared and is in the finalization process. A Detailed
Project Report (DPR) for City bus services has been prepared which elucidates the future
requirement of the city bus fleet and all other infrastructure required. The present rolling stock
structure for the City has been identified through the DPR. There is no other respective document
that studies the city transportation situation. There is a proposal for preparing a City Mobility Plan
(CMP) in the near future which includes the study of NMT but not the study of Waterways or
ferries..
There are four Levels of Services (LOS) which will be calculated considering various indicators as
LOS1, LOS2, LOS3 and LOS4 correspond to adequacy and quality of city’s available transportation
services. The summary of the service level gap and performance should be presented as per
illustrative Table
Present
Levels of Service as per SLB,
Sl. No Indicators Service
MoUD
Level
Level of
Range
Service Service
Coverage of 1 >=1
1 urban 4
2 0.7-1
transport in
the city 3 0.3-0.7
4 <0.3
Level of
Availability of Range
Service
urban
2 transport per 1 >=0.6 4
1000 2 0.4-0.6
population 3 0..2-0.4
4 <=0.2
Question: Have level of services (LOS) been calculated based on the indicators prescribed in the
SLB for urban transport by Ministry of Urban Development? As per MoUD SLB for urban transport,
there are four Levels of Services (LOS) which will be calculated considering various indicators as
LOS1, LOS2, LOS3 and LOS4 correspond to adequacy and quality of city’s available transportation
services.
Answer:Yes
Question: While assessing the above indicators, also analyze following aspects as an outcome of
the broad components of urban transport under AMRUT;
1. % of network covered
Answer:
Answer: Bonth Chakk, New Bus Stand, Charampa (Near Kailash Talkies), Burma Bye-pass, Front
of Tehsil Office, Budhwar Hut, Kodumbeda (Old Veterinary Office), Haldidua Square
Question: Have specific issues for the city been identified and addressed including issues with the
existing traffic, NMT, parking / transport environment?
Answer:
81% of the roads in the city are surfaced; the road widths in the central areas of the city are much
lesser at 8-10 feet with medium density with concentration of residential population and commercial
and institutional activities on both sides. Condition of pucka roads is very poor at many of the
places and water logging is a common phenomenon. The major roads in city are O.T Road,
Katchari Road, Purna Bazar etc. comprised of commercial activities. Encroachment, concentration
of informal activities and high pedestrian population is also high on the roads in core.
Traffic Congestion: O.T Road, Katchari Road, Purna Bazar are the key congested areas in
Bhadrak.
Road Accidents: The number of traffic accidents reported in Bhadrak till June 2014 was135.
Numbers of accidents are increasing every year with average annual growth rate of 41%. The
continuous increase in accidents in Bhadrak city can be attributed to the growing vehicular traffic,
faulty public transportation and lack of pedestrian facilities. Major accident prone areas are NH and
bypass road.
Few important issues are: Lack of grade separation at railway crossings, Narrow width of internal
roads, Parking issue, Congestion at Major Junctions, Lack of public transport facilities, Lack of
traffic, enforcement rules, Lack of footpath, Encroachments on roads, Shortage of street lights
Question: Do you think city roads are safe for pedestrians? If no then, which section of roads
needs immediate attention?
Answer:
Question: What type of Non-Motortised Vehicle (NMV) infrastructure available in the city?
Question: Has budget provision for NMT included in the transportation projects in the city?
Answer:No
Answer:No
Question: What kind of public transport is available in the city? Please mentionNumber of public
transport vehicles operating in the city.
Question: What is the total length of public transport corridor in the city limits?
Answer:Around 30 kms
Multi-level parking
Question: Whether city has designated parking spaces? If yes, provide list of
Answer:
Autrorised:None
Unauthorized: BonthChakk, New Bus Stand, Charampa (Near Kailash Talkies), Burma Bye-pass,
Front of Tehsil Office, Budhwar Hut, Kodumbeda (Old Veterinary Office), Haldidua Square
Question: What is the total available on street paid parking spaces on Arterial, sub arterial roads?
Answer: None
Question: Whether parking supply inventory is available for the city including; Types of on-road
and off road parking restrictions (time of day, duration, private etc)
Answer: On road &Off road parking restriction has been imposed by the police only in market
areas.
Question: Whether parking facilities available for bicycles, auto rickshaw, goods delivery.
Answer:No
Answer: NESCO (front), Kacheri Chhak area upto DSP House, Banka Chhak, Kali Mandir Chhak,
Bondh Chhak (East, South, North zone), Old Bus Stand (East Side), Market Area
Answer:No
Answer:No
Answer:No
Institutional Set Up
Describe the institutional framework including role and responsibilities in terms; administration and
Policy making, planning, Vehicle Registration, public transportation operators including Private
operators and overall traffic management.
Role and Responsibilities of all the agencies shall be provided in the illustrative table No. 2
Question: Is there enough provisions for enforcement of traffic rules for pedestrian safety on
roads?
Question: How are you planning for execution of transport related projects for AMRUT, whether,
present role and responsibilities lying with these organizations is capable to implement projects
under AMRUT?
Answer:Yes
Critically examine the existing and ongoing projects for improvement of urban transport as to be
filled in illustrative Table No.3
Question: Whether ongoing scheme and projects has been critically reviewed? Please explain
what is the extent of convergence to bridge the gaps?
Answer: Yes
Despite the fact, non-motorized modes and public transit account for a significant proportion of
travel activity of a city. The city needs to pursue different strategies and programs for bridging the
gap on transportation facilities where the city is and where it wishes to go in future.
Question: What steps can be taken to bridge these gaps? Please explain in 200 words,
Answer: Provision of one way traffic in the main roads, construction of fly over bridges extension
of road width including footpaths, development of parking places , etc are required to be improved.
Whether present level gaps as identified through SLB indicators will be achievable by 2021 as
compare with the present level of gap and demand?. (Table)
Demand/
Sl. Present Service
Benchmark Levels of Service as per SLB, MoUD Current Gap Target by
No Level
2011
Level of
Range
Service
Service Coverage of 1 >=1
1 4
urban transport in the city 2 0.7-1
3 0.3-0.7
4 <0.3
Level of
Range
Service
Availability of urban
2 transport per 1000 1 >=0.6 4
population 2 0.4-0.6
3 0..2-0.4
4 <=0.2
Other indicators
Percentage of City
3 Covered by footpaths -
wider than 1.2m
Non Motorised Transport
4
Facilities including;
a) % of network covered -
Encroachment on NMT
b) roads by vehicle parking -
(%)
NMT parking facilities at
c) -
interchanges (%)
Level of
Range
Service
Availability of On-street
5 paid public parking spaces 1 >=75 4
(%) 2 50-75
3 25-50
4 <25
6 Water ways and Ferries -
3. Objectives
The objective will lead to explore and examine viable alternatives options available to address
these gaps. These will include out of box approaches. (AMRUT Guidelines: para 6.4 & 6.8 & 6.9).
Question: How will you define your overall goal to improve city transport?
Answer: Appropriate planning is required after proper survey & identifying the needs of the Town.
Question: What possible strategies envisaged to achieve various LoS to improve the
transportation components under AMRUT?
Answer:
Question: How well does goals and objective for developing efficient urban transportation facilities
can articulate the use of NMT options and parking facilities to improve the quality of life of local
citizens?
Answer: As Above
Question: How identified each objective can evolve considering bridging the gap with present level
of services as to achieve SLB indicators.
Answer:if another 6 buses will be given under AMRUT Mission ,this Municipality can improve the
level of services.
Question: How objectives can be framed ensuring sustainable mobility solutions and creating city-
wide NMT facilities for pedestrians and cyclists.
Answer:
1. By widening the road and implementing cycle tracks and pedestrian walkways .
2. By acquisition of more city buses for better accessibility.
Question: Howe objectives for improvement of NMT facilities integrate with other modes of
transport.
Answer:
The objectives need to be framed in such a manner so to provide safe and secure way to promote
walkability and mobility to citizens. Improving main road structure and enforcing the most
congested and crowded zones of the city such as markets, mandis, old city areas, railway station
etc to convert them to NMT zones.
Sl.
Objectives Possible Activities Financing Source
No
Pedestrian walkways, footpaths, cycle tracks,
1 NMT PWD(R&B), Municipality
parks and open spaces
2 Widening of roads Widening of RoW for Sub Arterial roads State Govt.
Proper co-ordination between responsible
3 Integration of Governance State Govt.
authorities
4 City Mobility Plan DPR State Govt & AMRUT
There should be proper arrangement of traffic State Govt & AMRUT
5 Signalisation, Junction Design, Widening of roads
for flow of traffic.
6 Parking Multi level parking Municipality
Question: How realistic and feasible urban transport strategies are to be evolved to address key
challenges, priorities as an outcome of the citizen consultation
Answer: With respect to the citizen and stakeholder consultation, there are several actions that
need to be addressed to improve the city wide transportation scenario. Mostly
improving/widening/up-gradation of roads, improved network of CBS, installation of NMT facilities
at congested areas, development of truck terminal, parking areas and rickshaw areas etc
Question: What alternative innovative solution can be adopted for improving the service delivery
by creating
a: Citizen friendly provision of barrier free pedestrian facilities including, footpaths, road marking
and signages
b: pathways
c: Parking
Answer: Multilevel parking spaces, Zoning near the congested areas to promote NMT
Answer: Vehicle tracking System, Surveillance System, GIS based traffic analysis
Answer: Special Purpose Vehicles (SPVs), Traffic Management Committees or agencies etc
appointed to overlook and undertake the specific tasks related to the transport criteriasuch as
widening the roads, Creating path way, Proper traffic arrangement
Question: Whether alternative modes of transport such as cycling can be provided in major roads
Answer: Yes. From Mahta Chhak to Charampa (ROW-30 mts, Length – 4 kms),
Question: Whether non-Motorised Transport (NMT) facilities corridor suggested with dedicated
NMV, Cycle track and Signalized Intersection count.
Answer:No
Question: How innovative solutions for alternative modes of transport including NMT such as
cycling, pedestrian and public transportation system will address the overall transportation issue of
the city?
Answer:this would shape the future city transportation in such a way to improve mobility of the city
with barrier free pedestrian movement and enhanced levels of safety and security
Answer:No
5. Citizen Engagement
Each alternative will be discussed with citizens and activities to be taken up will be prioritized to
meet the service level gaps. The section will summarize the Citizens priorities for adoption of
alternate solution of urban mobility, drawing on SLIPpreparation.
Question: Have all stakeholders including residents (RWAs), Transporters, RTOs,Traffic Police
attended the citizen consultation?
Answer: Yes.
Answer: The most important criteria for citizens is enhancing the public transport which can cater
to almost all the areas of the city. Secondly, to designate various parking spaces so to decongest
the main roads.
Question: Has alternative taken up for discussions are prioritized on the basis of consultations?
Answer: Yes
Answer: Studying the entire area and identifying the loopholes in the service provision.
Question: How citizen has been exposed best practices and smart solutions in order to generate
citizen-driven solutions for urban mobility?
Question: Please examine whether identified solutions are addressing citizens requirement
Answer: Yes
Question: Whether ULB have adequate resources to implement prioritized alternate solutions?
Answer: No.
Question: How innovative alternate options of NMT facilities examined and shared with citizens?
Question: Are innovative solution prioritized based on the available resources and demand of
citizens?
Answer:Yes
Answer:Yes
Question: Whether project has been prioritized considering last mile connectivity?
Answer:No
Priority Financing
Project Cost (in Cr.)
No Source
1 Road Improvements 72.24 State/AMRUT
2 Augmentation of CBS 10.00 State/AMRUT
3 Over Bridges 6.00 State/AMRUT
4 DPR on City Mobility Plan 0.50 State/AMRUT
5 Parking spaces identified 0.50 State/AMRUT
6 Cycle parking near Bus Stand 0.03 State/AMRUT
7 Upgradation of Bus Depots 0.50 State/AMRUT
8 Development of Transport Nagar 10.00 State/AMRUT
9 Foot Over Bridges 3.00 State/AMRUT
Construction of Non Motorised Transport facilities (Footpaths &
10 6.000 State/AMRUT
Cycle Tracks & Cycle Parking )
Question: What are the out of box thinking on alternative and new innovativesolutions for the
following;
a: Citizen friendly provision of barrier free pedestrian facilities including, footpaths, road marking
and signages,
Answer: Escalators and underpasses for pedestrian movement, solar lighting and panels for
signages and road marking.
b: pathways
Answer: Escalators and travelators, automated Subway Systems for pedestrian movement
c: parking
Answer: Automated Valet System, Mobile integrated citizen info systems, parking line alarms,
Question: Whether solution provided to improve the safety of vulnerable groups such as old
age/handicapped/children
Answer:Yes
Question: Whether described the conditionalities of each project in terms ofavailability of land
parking, widening of roads for pedestrian, cycle tracks and hawkers zone?
Answer: Yes, Regarding land parking, this Municipality has selected five to six places & proposals
have been sent to Govt. for alienation. For widening of roads, the matter has been taken up with
PWD.
Question: How these projects will be funded? Are projects being implemented through own
sources or borrowing then which is the commitment in this regard.
Question: Has environmental obligation such as clearances and NOC required? Please suggest
action and initiatives need to be taken in this regards
9. Financial Plan
Prepare Financial Plan for the complete life cycle of the prioritized development. The financial plan
will include percentage share of different stakeholders (Centre, State, ULBs and) including financial
convergence with various ongoing projects. Describe briefly the institutional arrangement),
leveraging potential partnerships, convergence with other Government Schemes, monitoring and
evaluation and also provide year-wise milestones and outcomes.
How the proposed finance plan is structured for transforming and creating infrastructure
projects? Explain in 200 words how these institutional arrangements are leveraging
partnership and converge with government scheme and provide list of individual projects
which is being financed by various stakeholders.
The financial plan is made considering 50 % Central grant and 50% state grant. Since the ULB do
not have the financial capability, no share has been considered from ULBs.
Has financial plan prepared for identified projects based on financial convergence and
consultation with funding partners?
Yes, the project identified here does not include the ongoing projects which are covered under
other scheme. Therefore, financial convergence from other schemes has not been planned for
projects listed under this scheme. Since all the identified projects are funded under AMRUT on 50:
50 basis. Consultation with other funding partners is not required. However, consultation for
involving other funding partners will be explored to achieve the objective of the mission.
What are the different sources of funding being tapped for this project.(75 words)
Own Source, PPP mode and CSR source of funding will be tapped
Is the proposed financial structure is sustainable? If so then whether project has been
categorized based on financial considerations (100 words)
Yes, the financial structure proposed is sustainable. The state govt. is committed to contribute
required funds for completing the projects. However, the O&M cost for these projects will be met
from internal resources including collection of user charges. The projects have been categorized
based on gap analysis identified for universal coverage as required under AMRUT scheme.
Have the financial assumptions been listed out? Please provide the list. (100 words)
Yes, the financial assumption has been listed to work out the operational sustainability.
Question: Discuss Draft Master Service Level Improvement Plan with citizen. Based on the final
citizen consultations, prepare final Master Service Level Improvement Plan. Annual Plan will be
prepared as an application for monitoring the improvement in achieving the service level indicators
as targeted in the Service level improvement plan. (AMRUT Guideline; Table 2.1, 2.2, 2.3., 2.4 and
2.5) and Annual Plan (AMRUT Guidelines; Annexure-2, 3, 4, 5& 6)
Answer:
Details in financial plan shall be provided as per table 8.1, 8.2, 8.3, 8.4 and 8.5. These tables are
based on amrut guidelines tables 2.1, 2.2, 2.3.1, 2.3.2, and 2.5.
ANNUALFUNDSHARINGPATTERNFORSEWERAGE PROJECTS
(As per Table 2.3.1 of AMRUT guidelines) (Amount in Rs. Cr)
Notice: Undefined index: table7_sno in
State ULB
Sl. No Project GoI Convergence Others Total
14th FC Others Total 14th FC Others Total
Construction of Street Parking
1 0.25 0.25 0.50
(AMRUT/OD/BHADRAK/UT/01)
Preparation of DPR on City Mobility Plan (CMP)
2 0.25 0.25 0.50
(AMRUT/OD/BHADRAK/UT/02)
Augmentation of City Bus fleet
3 5.00 5.00 10.00
(AMRUT/OD/BHADRAK/UT/03)
Construction of Cycle parking near Bus Stand
4 0.15 0.15 0.30
(AMRUT/OD/BHADRAK/UT/04)
Upgradation of Bus Depots
5 0.25 0.25 0.50
(AMRUT/OD/BHADRAK/UT/05)
Development of Transport Nagar
6 5.00 5.00 10.00
(AMRUT/OD/BHADRAK/UT/06)
Construction of Foot Over Bridges
7 1.50 1.50 3.00
(AMRUT/OD/BHADRAK/UT/07)
Construction of Non Motorised Transport facilities
8 3.00 3.00 6.00
(AMRUT/OD/BHADRAK/UT/08)
Total 15.40 15.40 30.80
YEAR WISE PLAN FOR SERVICE LEVELS IMPROVEMENTS
Annual Targets
Sl. Project Indicat Baselin (Increment from the Baseline Value)
Proposed Projects FY 2016
No Cost or e FY FY FY FY
H1 H2 2017 2018 2019 2020
Construction of Street Parking
1 0.50
(AMRUT/OD/BHADRAK/UT/01)
Preparation of DPR on City Mobility Plan
2 (CMP) 0.50
(AMRUT/OD/BHADRAK/UT/02)
Augmentation of City Bus fleet
3 10.00
(AMRUT/OD/BHADRAK/UT/03)
Construction of Cycle parking near Bus
4 0.30
Stand, (AMRUT/OD/BHADRAK/UT/04)
Upgradation of Bus Depots
5 0.50
(AMRUT/OD/BHADRAK/UT/05)
Development of Transport Nagar
6 10.00
(AMRUT/OD/BHADRAK/UT/06)
Construction of Foot Over Bridges
7 3.00
(AMRUT/OD/BHADRAK/UT/07)
Construction of Non Motorised Transport
8 6.00
facilities, (AMRUT/OD/BHADRAK/UT/08)
Total 30.80
Urban Transport
Mission Management Information System
The objective of this template is to assist ULBs in preparation of SLIP for Green Space and Parks
component for rejuvenation of at least one park in each of the 500 Urban Local Bodies (ULBs)
involving creation and upgradation of basic elements, especially for the youth, children and the
elderly. Rejuvenation also includes involving local citizens and groups in the maintenance and
upkeep of the park in order to make the development sustainable. Cost of this component will be met
from the 2.5 per cent annual allocation for development of parks under the Mission and used in
accordance with its Guidelines. (Refer AMRUT Guidelines: Section 5.1 Sr.No.6, 6.7 & Annexure-1
Sr.No.4) SLIP would involve write up on following sections:
Please respond to the questions given below (Word Limit: 800 words).
Question: What are the available data sources/ plans/ reports/ schemes that exist as regards
development and maintenance of parks?
Bhadrak municipality has done elementary tabulation of the existing parks such as name of the park,
area, O&M costs and brief description about the parks apart from this there is a CDP report
mentioning about this sector in the Land use Pattern. But the existing parks are developed with the
help of state government and maintenance of the parks is covered in the municipal expenditure
Question: Review the recommendation on open/ green space as per Master Plan/
Development Plan and map existing green cover against the same. Identify the areas where
there is deficiency of open/green space
There is a CDP which provide the landuse 7.51% and stating that green spaces have to be
developed in the city but there is no document where the deficiency of open/green spaces identified
to fill the gap and there is a map showing the existing green space locations for the city.
Question: Does the ULB follow URDPFI Guidelines to categorize its organized greens/ parks/
open space or follow its own categorization? If ULB follow its own categorization, what is the
rationale and how well they are interlinked to development of parks?
Bhadrak municipality does not categorize the parks and open spaces as per the hierarchy of
organized green spaces based on population and area criteria as prescribed by URDPFI guidelines it
only categorizes parks in developed and undeveloped category .
Question: What is the per person open space availability in the city in general and within
built-up areas?
0.75 acres is the cumulative area of developed parks in the Bhadrak town and open spaces and
playgrounds spread over the city for children’s to play and elders to take a fresh walk in the morning
but these play grounds and not equipped with any amenities.
Source: URDPFI–2014&AnalysisofULBLevelData
Question: Have the ULB/ City prepared park wise inventory of facilities and amenities? (ULB
should identify some of the quick-win parks, which could be developed with minimal
intervention that can attract good number of citizens)
Bhadrak municipality has done elementary tabulation of the existing parks such as name of the park,
area, O&M costs and brief description about the parks apart from this they identified few parks for
renovation which can attract a lot of people to use the parks and enhancing children friendly features
identified by the municipality will make tem quick-win parks.
Question: How is the physical condition of parks in the city? Do they have boundary wall,
fenced area, facilities of public conveniences, tube well, dustbins etc. (Mention in
proportions, if possible)
Park in Bhadrak municipality are in good physical condition overall , nevertheless the CHACHA
NEHRU PARK needs renovations for lack of toilet facility and park furniture is not in a good shape .
Question: Whether parks have well planned play area encouraging physical activity? Are
they equipped with child friendly play equipment, snack/ ice cream parlors/ kiosks etc.
(Mention in proportions, if possible?)
CHA CHA NEHRU PARK has child friendly equipment but they need renovations. Snack/ ice
cream parlors/ kiosks need to be established.
Question: How well aesthetics component have been built in parks of your city? Are they
well illuminated, landscaped – manicured with water bodies/ fountains etc. wherever
possible? (Mention proportions, if possible)
Park in Bhadrak municipality are in decent aesthetic condition overall, nevertheless CHA CHA
NEHRU PARK has shortage of landscape and park furniture is not in a good shape.
Question: Are there some running schemes/ projects – Central/ State/ Donor funded in the
city as regard development of parks/ open spaces? Or else ULB is funding park
development of parks/ green space out of its own budget?
Development of open spaces, green spaces and parks in Bhadrak are done with the help of state
government and maintenance of the parks is covered by the municipal fund
Question: Explain the process how a park/ open space is normally shortlisted for
development? Does the city have rationale for park selection for development or it is done
on ad-hoc basis.
Bhadrak municipality shortlists the parks/open spaces in a unique process as follows
1. Identification of government lands in the city
2. Gap analysis based on the existing parks coverage
3. Initial prioritization based on the size and coverage of the park
4. Stakeholder consultation by the municipal engineers
5. Citizen consultation and enlightening them with the facts
6. Finally considering all the above aspects the chairperson and counsellors shortlists parks
for development
Question: List the organizations/ authorities/ private sector firms etc. and describe their
roles and responsibilities in development of city parks/ open space along with green area
under their jurisdiction.
No such private sector firms /organizations are involved in the development or maintenance of
any park in the city, all the parks are under the municipal authority and they operate and
maintain.
Question: Where can new parks be developed in the future; how much space may be
available.
Bhadrak municipality has identified few government lands in the municipal jurisdiction where
there is a need for parks but the land is under the state body which has to be transferred to the
municipality so that they can plan and execute the projects.
Question: How much is allocated under Parks/ Open/ Recreational space as per the DP or
Master Plan for new areas?
DP which provide the land use 7.51% and stating that green spaces have to be developed in the
city but there is no allocated under Parks/ Open/ Recreational space as per the DP or Master
Plan for new areas.
Question: Who manages the parks in the city? How much delegation of responsibility has
been given to RWAs and/or NGOs?
Parks are undertaken by the municipality, no NGO’s delegation of responsibility has been given.
Question: Which parks have uneasy accessibility issues or get flooded/water logged etc.?
All the existing parks are easy to access and there is no such problem of flooding/water logging
etc transpired in the parks.
Question: Does the ULB have any guidelines for providing safe and secure access to
parks for children and elders?
Private architects are hired for designing the parks and then the plans are reviewed by the
internal technical experts with regard to safety, security and universal accessibility measures
taken in the design and then finalize the plan for execution which makes parks in Bhadrak safe
and secure for all age groups.
Question: Is there a system for preventing the entry of animals into parks?
Existing park in the BHADRAK municipality are with the boundary wall so there is not even a
single event occurred in the past few years that the animals entering the parks.
Question: Does the city have any guidelines for horticulture; types of trees and plants,
etc?
City has not specifically followed any guidelines for horticulture or selecting type of trees or
plants .the plan given by the landscape architect is followed and implemented on field because
of shortage if capacity in that sector.
2 Development Authority 0 0
Private Ownership -
3 Corporate/NGO's 0 0 0
As per para 5.1 (Sr.No.6) of AMRUT guidelines all projects involving development of green
spaces & parks shall have to make special provision for child friendly components and establish
a system of maintenance with local residents participation. At least one park from each of the
500 ULBs under AMRUT would be taken up for developing facilities for Children, Youth and
Elderly.
Assessment of the current status of City parks/ open spaces would clearly bring out the gap/
dearth of open spaces in terms of area allocation, having inadequate citizen friendly features and
issues pertaining to its maintenance. And these will lead to formulation of three broad objectives.
Please respond to the following questions in not more than 500 words
Question: Have the city took physical assessment of city parks? (ULB’s may refer Annex-
1 indicative procurement of this document)
Question: Explain how the city plans to fill the gap in green cover and progressively
enhance green cover within City to 15% over next 5 years. ?
Bhadrak municipality has done elementary tabulation of the existing parks and decided to
construct a park every year and renovate the existing facilities so that they can fill the gap in
green cover and within next decade green cover in te city will be close to 15 %.
Question: Assess and describe, if requisite provisions as per Master Plan and other
State legislation have already been made?
No requisite provisions as per Master Plan and other State legislation have already been made
Question: Explain the city’s action plans to make special provisions for installing child
friendly components in the city parks as per AMRUT Guidelines. ?
The Cha Cha Nehru Park in the Bhadrak municipality is built exclusively for Children and well
equipped with child friendly components.
Question: Provide details of the initiatives undertaken in different ongoing programs and
projects to address the gaps in enhancing the green cover and rejuvenation/ development
of parks. Provide information in Table 4.
There are no ongoing projects in this sector as the city is concerned
Tabel4:StatusofOngoing/Sanctioned/Committed Projects
OBJECTIVES
Based on above, objectives will be developed to bridge the gaps. While developing
objectives following question shall be responded so as to arrive at appropriate objective.
Question: Please provide a set of 2-3 objectives to meet the gap in not more than 100
words.
1. Installation of child friendly equipment
2. Image of wild life to be conserved
3. Urban greenery in prioritization through plantation on both sides of all pivot routes
4. Identification of huge vacant lands in the city to build parks
3. Examine Alternatives and Estimate Cost
Suggest alternatives/ options to complete the ongoing projects pertaining to developing
parks and green spaces. Identify quick-win parks and open space which can also have
play area and associated facilities for Children, Youth & Elderly. Also identify & describe
the prevailing models of parks development & maintenance in your city? Any new model
your city wishes to adopt? (Word Limit: 200 Words)
City is trying to incorporate the industries surrounded by to take reasonability and develop parks
as part of corporate social responsibility to compensate the pollution created by tm in the city
.these are in the stages of discussion but under implementation
As per AMRUT guidelines half of Rs. Cr. may be sought from Government of India under the
scheme and balance could be explored and converged from other sources like 14th Finance
Commission, State Government (Park Development Fund) and CSR Activities of Corporate
Groups active in the City.
4. Citizen Engagement
ULBs will organize and conduct city level citizen consultation and receive feedback on the
suggested alternatives and innovations. Each alternative pertaining to development and
maintenance models for parks will be discussed with citizens and activities to be taken up will be
prioritized to meet the service level gaps. ULB will prioritize these activities and their scaling up
based on the available resources. (Refer AMRUT Guidelines; Para 6.6, 6.7 & 7.2). Please
explain following questions detailing out the needs, aspirations and wishes of the local people.
(Word Limit: 250 Words)
Question: Has all relevant stakeholders groups been involved in the consultation?
Private architects are hired for designing the parks and then the plans are reviewed by the
internal technical experts and then the discussions are carried out to the all relevant stakeholders
groups
Question: Explore option for O&M Contracts including PPPP with (RWAs/ Citizens
Groups/ Corporate Groups – CSR, Selling advertisement rights etc.).
City is trying to incorporate the industries surrounded by to take reasonability and develop parks
as part of corporate social responsibility to compensate the pollution created by tm in the city
.these are in the stages of discussion but under implementation
Question: Explain how the city plans to establish a system of maintenance with active
citizen’s engagement as per AMRUT Guidelines.
Question: Has ward/ zone level consultations held in the city
Ward level consultations are done after the stakeholder consultation and they are used for
prioritization of the projects
Question: Has alternatives explored are crowd sourced?
No
Question: What is feedback on the suggested alternatives and innovations?
3 times consultation programs were held under the chairmanship of collector Bhadrak for
development of Bhadrak town all the feedbacks and suggestions are considered in planning the
parks
Question: Has alternative taken up for discussions are prioritized on the basis of
consultations?
No it is not done based on consultation initially, all the technical aspects are considered by
engineers & the chair person
Question: What methodology adopted for prioritizing the alternatives?
Bhadrak municipality prioritizes the parks/open spaces in an exclusive process as follows
1. Gap analysis based on the existing parks coverage
2. Initial prioritization based on the size and coverage of the park
3. Citizen consultation and enlightening them with the facts and ask their priorities
4. Finally considering all the above aspects the chairperson and counsellors prioritizes parks
for development
5. Prioritize Projects
Based on the citizen engagement, ULB will prioritize these activities and their scaling up based
on the available resources to meet the respective objectives. While prioritizing projects, please
reply following questions (Word Limit: 100 Words)
Question: What are the sources of funds?
The funds are divided into three parts
1. Construction of parks 50% from AMRUT(GOI)
2. Construction of parks 50% from STATE GOVERNMENT
3. O&M cost by ULB 100%
Question: Has projects been converged with other program and scheme
No
Question: Has projects been prioritized based on “more with less” approach?
YES the projects undertaken are prioritized based on “more with less” approach in such a way
that we spend less money and coverage is more
6. Conditionalities
1.1 Describe the Conditionality’s of each project in terms of availability of land,
environmental & social obligation and clearances, required NOC, financial commitment,
approval and permission needed to implement the project. Required approvals will be
sought from competent authority and organizations. (Word Limit: 100 words)
Bhadrak municipality has identified few government lands in the municipal jurisdiction where
there is a need for parks but the land is under the state body which has to be transferred to the
municipality so that they can plan and execute the projects if provided funds on time by the state
& central government, and approval of DPR by the apex committee
7. Resilience
The resilience factor would be built in to ensure environmentally sustainable, safe and secured
park development schemes. Ensure use of rust free sturdy steel structures for child and elderly
friendly features. (Word Limit: 100 words)
Plans are reviewed by the internal technical experts with regard to safety, security and universal
accessibility measures taken in the design and then finalize the plan for execution which makes
parks in Bhadrak safe and secure for all age groups. And the materials used considering there
sustainability in mind
8. Financial Plan
Once the activities are finalized and prioritized after consultations, investments both in terms of
capital cost and O&M cost has to be estimated. (AMRUT Guidelines; para 6.5) Based on the
investment requirements, different sources of finance have to be identified. Financial Plan for the
complete life cycle of the prioritized development will be prepared. (AMRUT Guidelines; para 4,
6.6, 6.12, 6.13 & 6.14). The financial plan will include percentage share of different stakeholders
(Centre, State and City) including financial convergence with various ongoing projects. While
preparing finance plan please reply following questions (Word Limit: 100 words)
How the proposed finance plan is structured for transforming and creating
infrastructure projects?
The financial plan is made considering 50 % Central grant and 50% state grant.
List of individual project which is being financed by various stakeholders?
All the projects listed are planned under AMRUT on the basis of 50 % Central grant and
50% state grant.
Has financial plan prepared for identified projects based on financial convergence
and consultation with funding partners?
Yes, the project identified here does not include the ongoing projects which are covered
under other scheme. Therefore, financial convergence from other schemes has not been
planned for projects listed under this scheme. Since all the identified projects are funded
under AMRUT on 50: 50 basis. Consultation with other funding partners is not required.
However, consultation for involving other funding partners will be explored to achieve the
objective of the mission.
Is the proposed financial structure is sustainable? If so then whether project has
been categorized based on financial considerations?
Yes, the financial structure proposed is sustainable. The state govt. is committed to
contribute required funds for completing the projects. However, the O&M cost for these
projects will be met from internal resources including collection of user charges. The
projects have been categorized based on gap analysis identified for universal coverage as
required under AMRUT scheme.
Have the financial assumptions been listed out?
Yes, the financial assumption has been listed to work out the operational sustainability.
Does financial plan for the complete life cycle of the prioritized development?
Yes, the financial plan takes care of both CAPEX and OPEX costs to ensure sustenance
throughout the life cycle of all projects identified in SLIP.
Does financial plan include percentage share of different stakeholders (Centre,
State, ULBs and)?
Yes, the financial plan is based on 50 % Central grant and 50% state grant.
Does it include financial convergence with various ongoing projects?
Yes, it includes financial and physical convergence with various ongoing projects under
different schemes supported by both Central & State grant.
Does it provide year-wise milestones and outcomes?
Yes, it has been provided
Details in financial plan shall be provided as per Table 2.7, 2.8, 2.9, 2.10 and 2.11. These tables
are based on AMRUT guidelines tables 2.1, 2.2, 2.3.1, 2.3.2, and 2.5.
MASTERSERVICELEVELSIMPROVEMENTSDURINGMISSION PERIOD
(AsperTable2.2ofAMRUTguidelines) (Amount in Rs. Cr)
(Amount in Rs. Cr)
ANNUAL FUND SHARING BREAK_UP FOR PARKS and PLAY GROUND PROJECTS
(As per Table 2.3.2 of AMRUT guidelines)
State ULB
Sr. Converg other
Project GOI 14th Other Tota 14th Other Tota Total
No ence s
Fc s l Fc s l
Construction of Park in
1 Bhadrak near Revenue
Village, Baralpokhari -
AMRUT/OD/Bhadrak/PR/01 0.20 0.20 0.39
Construction of Park in
2 Bhadrak near Garadapur -
AMRUT/OD/Bhadrak/PR/02 0.13 0.13 0.25
Construction of Park in
3 Bhadrak near to salandi
River -
AMRUT/OD/Bhadrak/PR/03 0.22 0.22 0.44
Construction of Park in
Bhadrak near to
4 Dakshineshwar Kali
Mandhir -
AMRUT/OD/Bhadrak/PR/04 0.24 0.24 0.47
Construction of Park in
5 Bhadrak near Mirzapur
(Bidyadhar Adi Adi) -
AMRUT/OD/Bhadrak/PR/05 0.20 0.20 0.4
YEAR WISE PLAN FOR SERVICE LEVELS IMPROVEMENTS
(As per Table 2.5of AMRUT guidelines)
Annex-1: Indicative Assessment Tools for Parks (Indicative – ULBs can have its own assessment
tool as per the requirement or customize this tool to suit its need)