CCI-PEIT-RFI-BLN1-01-CIV-0285 Inspection of Beam Rebar - Control Building RD
CCI-PEIT-RFI-BLN1-01-CIV-0285 Inspection of Beam Rebar - Control Building RD
Attachments:
Sketch Calculation Specification ✔ Drawing(s) Others:
INSPECTION REPORT
FURTHER INSPECTION
Remedial works has been carried out on / / (date) at am / pm
Name:JESUSA R. VIRGO Name: Shawn Mayo Name: John Paulo T. Pagaduan Name:
Designation: Designation: Designation: Jr. Civil Supervisor Designation:
QA/QC PMT-CE
Date:01/22/2024
Date: 1/22/2025 Date: 03/31/2025 Date:
Document No:
BLN-PMT-EW-WMS-0012
WORK METHOD STATEMENT Revision:
CONSTRUCTION OF CONTROL BUILDING 00
Date:
May 6, 2024
1
113 MWp Binalonan Solar Power Plant Project Document No:
PMT-BLN-ITP-EW-0004
Brgy. Sta. Catalina, Binalonan, Pangasinan
Revision:
1 1 3 M W P B IN A L O N A N 1
SOLAR POW ER PLANT
P R O J E C T P H IL IP P IN E S
B rg y. S ta. C atalin a, B in alo n an , P an gasin an
IN S P E C T IO N T E S T P L A N
C O N T R O L B U IL D IN G
TECHNICAL DOCUMENTS *
6 Project Close Out Document Project History, brief summary of how the Review PCR Project Close-out report, PEP Signed by COO N/A Project Manager Handover reports, COCA
project was completed as per records.
MATERIALS
Physical Sampling and Testing per batch 2 Specimen Per Size, per Tape meter / Laboratory Report; Mill
1 Rebars ST Lab Testing Material Specification / ACI / ASTM Certificate ; Lab Testing QC Engr WP WP WP
delivered Batch Delivery Caliper Certificate
Ducting, Vent, & Supports physical properties Caliper Delivery Report, MIR/RFI-
16 Accessories ME Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
and compliance to project requirement Micrometer IGC
CCTV, FCU, Fans and blowers Functionality,
17 Mech'l Equipment ME physical properties and compliance to project Brochure & Spec'n Material Specification Approved Materials Per batch delivered N/A Quality Control HP DR DR Delivery Report, MIR, FAT
requirement
Conduits, Junction & Utility Box physical Caliper
Delivery Report, MIR/RFI-
18 Elec'l Conduits & Junction Box EE/AUX properties and compliance to project Sample Board Material Specification Approved Materials Per batch delivered Micrometer, Tape Warehouse DR DR DR
IGC
requirement Measure
Caliper
Wires, Cables and Bus bar physical Sample Board,
Micrometer, Tape Delivery Report, MIR/RFI-
19 Wires, Cables or Bus Bar EE/AUX properties and compliance to project Continuity Test for cable Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
Measure, Multi IGC
requirement wires
meter
Outlet, receptacle, switches, aux connectors
Delivery Report, MIR/RFI-
20 Wiring Devices EE light control devices physical properties and Sample Board Material Specification Approved Materials Per batch delivered Tape measure Warehouse DR DR DR
IGC
compliance to project requirement
Panel Boards physical properties and Delivery Report, MIR/RFI-
21 Panel Boards EE Sample Board Material Specification Approved Materials Per batch delivered Tape measure Warehouse HP DR HP
compliance to project requirement IGC
HDPE, PVC, GI, BI & Fittings physical
Caliper Delivery Report, MIR/RFI-
22 PVC Pipes & Fitiings MEPF properties and compliance to project Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
Micrometer IGC
requirement
Faucets, Toilets & Sinks physical properties Delivery Report, MIR/RFI-
23 Plumbing Fixtures PS Sample Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
and compliance to project requirement IGC
Sprinkler Heads, HDPE, PVC, GI, BI &
Caliper Delivery Report, MIR/RFI-
24 BI Pipes, Fitiings & Sprinkler Heads FP Fittings physical properties and compliance to Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
Micrometer IGC
project requirement
Detectors, control panel, switch device
Delivery Report, MIR/RFI-
25 FDAS Equipment & Devices FP physical properties and compliance to project Brochure & Spec'n Material Specification Approved Materials Per batch delivered N/A Warehouse HP DR HP
IGC
requirement
WORKS (Activity)
STRUCTURAL WORKS
ARCHITECTURAL WORKS
Dimension /
Wall Setting-out Plan, Detailed Tape Measure,
Includes layout, installation, plastering / measurement, Per Floor, Per Area, Per RFI, QCC/INSPECTION
8 Wall Partitions Blockworks AR / MEPF Plans, MEPF ISD, Schedule of Tolerance Handbook Cross line laser, Finishing Supervisor HP WP HP
skimcoating Squareness, Visual, Unit CHECKLIST
Finishes and Specifications Level bar
Surface Levelling
Walls layout by reading the plans and then Dimension /
Tape Measure, RFI, QCC/INSPECTION
8.1 Survey Layout AR reflects the locations of all elements on the measurement, Wall Setting-out Plan Tolerance Handbook Per Floor & Per Unit Survey Engineer WP S HP
Cross line laser CHECKLIST
floors, ceiling and vertical elements. Squareness
Tape Measure,
Casting of Zocallo, Blockworks laying and Surface Levelling, Wall Setting-out Plan / specify docs Finishing Supervisor / RFI, QCC/INSPECTION
8.2 Zocallo, Block Laying, Stiffener and Lintel AR Tolerance Handbook Per Area / Unit Cross line laser, WP S WP
Casting of Stiffener Columns Squareness, Plumbness for stiffener column and beams Engineer CHECKLIST
Level bar
Waterline Sleeves, Vent Pipes and Sanitary Tape Measure, RFI, QCC/INSPECTION
8.4 Plumbing Works (1st Fix) MEPF Visual, Measurement MEPF ISD Tolerance Handbook Per Area / Unit MEPF Engineer WP S HP
Pipes Cross line laser CHECKLIST
Tape Measure,
Surface Levelling, Wall Setting-out Plan, Wall Finish Finishing Supervisor / RFI, QCC/INSPECTION
8.7 Plaster/ Skimcoat on Wall AR Plastering Application and Surface finish Tolerance Handbook Per Area / Unit Cross line laser, WP S HP
Squareness, Plumbness Schedule Engineer CHECKLIST
Level bar
Window preparation and installation (Surface
Dimension /
Prep, painting, window installation and Tape Measure,
measurement, Finishing Supervisor / RFI, QCC/INSPECTION
9 Aluminum Glass AR Sealant), Windows Installed and Physical Window Detail Dwg ASTM Per Floor level bar; Pressure WP S WP
Squareness, Visual, Engineer CHECKLIST
Properties is as per Plan and Project Washer
Plumbness
Requirements
Surface preparation and application of sealant
Finishing Supervisor / RFI, QCC/INSPECTION
10 Exterior Sealant AR in accordance to Method Statement Pull-out Adhesion Test Elevation Dwg Tolerance Handook Per Elevation / Zone N/A WP S WP
Engineer CHECKLIST
Parameter
Surface preparations and application of
Finishing Supervisor / RFI, QCC/INSPECTION
11 Exterior Painting AR Primer, Patching / putty, Sanding, 1st coat, Visual Elevation Dwg Tolerance Handook Per Elevation / Zone N/A HP WP HP
Engineer CHECKLIST
2nd coat
Continuity, Insulation,
Phase SequenceTest, Tape Measure,
Elec'l Wiring In , FP Piping , Sewer Piping , Pressure Test / Detailed Plans, Codes, and Cross Line Laser & RFI, QCC/INSPECTION
12 MEPF 2nd Fix MEPF Tolerance Handook Per Area / Unit and Floor MEPF Supervisor HP HP HP
Waterline Piping & Mechanical Ducting Hydrostatic Test, Specifications Testers and Equip. CHECKLIST
Gravity Test, Smoke / per trade
Light Test
Tape Measure,
Installed as per project Multimeter, Phase
Installation of Wires per approved Materials Detailed Plans, Codes, and RFI, QCC/INSPECTION
12.1 Wiring In & Testing EE/AUX Continuity, Megger Specification and Per Area / Unit and Floor Rotator, Clamp MEPF Engineer HP WP HP
and Approved wiring layout plan Specifications CHECKLIST
requirements Meter, Insulator
Tester
Installation of Pipes & Fittings, Hydro Tape Measure,
Compliance to Approved
Flushing, Pressure Test and Hydrostatic. Pressure Test/ Detailed Plans, Codes, and Cross line laser RFI, QCC/INSPECTION
12.2 FP Pipe Fitting, Sealing & Painting FP testing Procedure and Per Area / Unit and Floor MEPF Engineer HP WP HP
Application of Fire Stop Sealant Application Hydrostatic Test Specifications and Pressure CHECKLIST
Testing Methodology
and Painting of Pipes guage
Tape Measure,
Compliance to Approved
Installation of pipes and Testing inside the Detailed Plans, Codes, and Cross line laser RFI, QCC/INSPECTION
12.3 Waterline Branch Piping & Testing (Unit) PS Pressure Test testing Procedure and Per Area / Unit and Floor MEPF Engineer HP WP HP
Toilet complete with brackets Specifications and Pressure CHECKLIST
Testing Methodology
guage
Compliance to Approved Tape Measure,
Installation of Ducts, sealing and Testing Detailed Plans, Codes, and RFI, QCC/INSPECTION
12.4 Mech'l Ducting, Sealing & Testing ME Smoke / Light Test testing Procedure and Per Area / Unit and Floor Cross line laser MEPF Engineer HP WP HP
using the Smoke / Light Test Methodology Specifications CHECKLIST
Testing Methodology and Flashlight
Surface Preparation (Removal Laittance, Tape Measure, Finishing Supervisor / RFI, QCC/INSPECTION
13.1 Surface Preparation AR Surface Levelling Waterproofing Detail Dwg Specification Per Area / Unit HP WP HP
Grinding for levelness) Cross line laser Engineer CHECKLIST
Waterproofing Application and Flood Test as Waterproofing Detail Dwg, Project Finishing Supervisor / RFI, QCC/INSPECTION
13.2 Waterproof Application AR Leak Test Specification Per Area / Unit N/A HP HP HP
per project requirements and material specs. Specification Engineer CHECKLIST
Surface preparations - Primer, Patching, Wall Setting-out Plan, Material Finishing Supervisor / RFI, QCC/INSPECTION
16.1 Surface Preparation AR Surface Levelling Tolerance Handbook Per Unit and Floor Level Bar WP WP WP
Sanding and 1st coat Specification Engineer CHECKLIST
Sealant are applied according to Method Wall Setting-out Plan, Material Finishing Supervisor / RFI, QCC/INSPECTION
16.2 Interior Wall Sealant AR Pull-off Adhesion Test Tolerance Handbook Per Unit and Floor N/A WP WP WP
Statements parameter. Specification Engineer CHECKLIST
To be done after installation of Doors, Jambs Material Specification and Schedule Finishing Supervisor / RFI, QCC/INSPECTION
16.3 Final Painting AR Visual Specification Per Unit and Floor N/A HP WP HP
and Hardware of Finishes Engineer CHECKLIST
Appearance, Layout, Squareness and Dimension /
Project Specifications, Cabinet Blow Finishing Supervisor / RFI, QCC/INSPECTION
17 Cabinetery AR installation (Kitchen Cabinets w Sink, Faucet , measurement, Tolerance Handbook Per Unit Tape Measure HP WP HP
up Plans Engineer CHECKLIST
Counter Top & Grease Trap ) Squareness
Installation of Door, Jambs and Hinges in Visual, Measurement, Finishing Supervisor / RFI, QCC/INSPECTION
18 Doors, Jambs & Hardware AR Door Schedule Tolerance Handbook Per Unit Tape Measure HP WP HP
accordance with plans and specification Squareness, Plumbness Engineer CHECKLIST
DATE : 01/22/2025
REV. No.: 0
INSPECTION DETAILS
£ Accept
Quantity (pcs) Inspect, Verify
£ Not Accept
£ Accept
Secured and Tied properly Inspect, Verify
£ Not Accept
2. REBARS INSTALLATION
£ Accept Inspect, Verify, Measured by steel
Concrete Cover
£ Not Accept tape
£ Accept
Anchor Bolts Inspect, Verify
£ Not Accept
£ Accept
Dowels Inspect, Verify
£ Not Accept
£ Accept
Vapor Barriers if Needed Inspect, Verify
£ Not Accept
Date:.......01/22/2025......................................... 1/22/2025
Date:................................................ Date:....................................................
1 1 3 M W P B IN A L O N A N 1
SOLAR POW ER PLANT
P R O J E C T P H IL IP P IN E S
B rgy. S ta. C atalin a, B in alo n an , P an g asin an
S IT E T E C H N IC A L Q U E R Y
R E -C A L C U L A T IO N F O R T H E A D D IT IO N A
S T E E L B A R S F O R C O N T R O L B U IL D IN G
R E V IS IO N D a te D e s crip tio n
00 January 17, 2025 For review & approval
01 April 10, 2025 For approval
02 May 3, 2025 For approval
03 May 16, 2025 For approval
04 May 20, 2025 For approval
SITE TECHNICAL QUERRY
Revision No.: 04
TITLE / DESCRIPTION RE-CALCULATION FOR THE ADDITIONAL STEEL BARS FOR CONTROL BUILDING
PROJECT SCHEDULE
PROJECT COST IMPACT YES NO YES NO
IMPACT:
TYPE OF SUBMITTAL
SAMPLES OTHERS
REFERENCES:
CONTRACTOR'S REVIEW:
JESUSA R. VIRGO
(MCC)
PEIT COMMENTS:
DATE RELEASED : May 23, 2025 REJECTED NOTED - FOR RECORD ONLY
Remarks:
Paul James D. Magmoyao - Jr. Project Manager (Civil)
Incorporate to As-Built Drawings
Project: 113 MWp Binalonan Solar Power Plant Project
Location: Binalonan, Pangasinan
1st layer-Grade 60
GENERAL DATA (1pc - 16mm dia.)
fc' = 27.6 MPa 1st layer-Grade 40
Beam width (b) = 300 mm ( 2-16mm dia.)
Beam height (h) = 400 mm
Spaced b/n 1st
and 2nd layer = 25 mm 2nd layer-Grade 40
ɸ= 0.9 ; Assumed tension controlled ( 2-16mm dia.)
ACTUAL BEAM
1. 1st layer (Grade 40) - 2pcs 2. 1st layer (Grade 60) - 1pc 3. 2nd layer (Grade 40) - 2pcs
fy1 = 380 MPa fy2 = 414 MPa fy3 = 380 MPa
clear cover = 40 mm clear cover = 40 mm d3 = 311 mm
d1 = 352 mm d2 = 352 mm No. of reinf. = 2 pcs
No. of reinf. = 2 pcs No. of reinf. = 1 pc Diameter = 16 mm
Diameter = 16 mm Diameter = 16 mm As3 = 402.12 mm^2
As1 = 402.12 mm^2 As2 = 201.06 mm^2
ƩF = 0
C = ƩT
C = T1 + T2 + T3
0.85fc'ab = As1 x fy1 + As2 x fy2 + As3 x fy3
Check if tension-controlled:
fs1 = 600 x [(d - c) / c]
fs1 = 600 x [( 352 - 51.56 ) / 51.56]
fs1 = 2649.23 MPa > 1000 Mpa, Therefore Tension controlled
ρactual = ∑ (As / bd) = [ 402.12 / (300 x 352) ] + [ 201.06 / (300 x 352) ] + [ 402.12 / (300 x 311) ]
= 0.010022
:. Okay!, Actual reinforcement is greater than the minimum, and lesser than the maximum.
DESIGNED BEAM
1. Grade 60 - 4pcs Grade 60
fy = 414 MPa ( 4-16mm dia.)
clear cover = 40 mm
d= 352 mm
No. of reinf. = 4 pcs
Diameter = 16 mm
As = 804.25 mm^2
ƩF = 0
C=T 2nd layer-Grade 60
0.85fc'ab = As x fy ( 2-16mm dia.)
a = As x fy / (0.85fc'b)
a= 47.31 mm
β= 0.85 ≤ 28MPa
c= 55.66 mm
MnDesigned = T (d - a/2)
MnDesigned = As x fy (d - a/2)
MnDesigned = 109.33 KN-m
ɸMnDesigned = 98.39 KN-m
Check if tension-controlled:
fs = 600 x [(d - c) / c]
fs = 600 x [( 352 - 55.66 ) / 55.66]
fs = 3194.47 MPa > 1000 Mpa, Therefore Tension controlled
RESULTS:
ɸMnActual > ɸMnDesigned
107.88KN-m > 98.39KN-m
:. Actual beam is safe
1 2 3 4
18000
LEGEND:
G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)
A BEAM WITH ADDITIONAL REBAR (GRADE 60)
6000
G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400) CG-1
E
SG-1
S-1
CG-1 UP
G-1 (300 X 400)
A B C
LEGEND:
BEAM WITH ADDITIONAL
REBAR (GRADE 60)
MATCHLINE - SEE RIGHT ABOVE
1 2 3 4
18000
6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)
G-1 (300 X 400) G-2 (400 X 600) G-2 (400 X 600) CG-1
E
SG-1
S-1
CG-1 UP
KEYPLAN
1 2 3 4
18000
6000
S-1 S-1 S-1
SC010B NTS E
G-1 (300 X 400) G-2 (400 X 600) G-2 (400 X 600) CG-1
SG-1
S-1
CG-1 UP
KEYPLAN
LEGEND:
BEAM WITH ADDITIONAL
1 ROOF DECK BEAM GRIDLINE A (GL 2-4) REBAR (GRADE 60)
SC010C NTS
1 2 3
1 2 3 4
18000
3 ROOF DECK BEAM GRIDLINE C (GL 1-3) G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)
A
SC010C NTS
6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)
G-1 (300 X 400) G-2 (400 X 600) G-2 (400 X 600) CG-1
E
SG-1
S-1
CG-1 UP
4 ROOF DECK BEAM GRIDLINE D (GL 2-3) F G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)