CCI-PEIT-RFI-BLN1-01-CIV-0285 Inspection of Beam Rebar - Control Building RD

The document outlines the Request for Inspection (RFI) for the Binalonan Solar Power Plant Project, detailing the inspection of beam rebar at the control building scheduled for January 25, 2024. It notes that Grade 40 rebar was installed instead of the required Grade 60, and specifies the need for remedial works. Additionally, it includes an Inspection Test Plan for various construction activities and materials, ensuring compliance with project specifications and acceptance criteria.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views19 pages

CCI-PEIT-RFI-BLN1-01-CIV-0285 Inspection of Beam Rebar - Control Building RD

The document outlines the Request for Inspection (RFI) for the Binalonan Solar Power Plant Project, detailing the inspection of beam rebar at the control building scheduled for January 25, 2024. It notes that Grade 40 rebar was installed instead of the required Grade 60, and specifies the need for remedial works. Additionally, it includes an Inspection Test Plan for various construction activities and materials, ensuring compliance with project specifications and acceptance criteria.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

113 MWP BINALONAN SOLAR POWER PLANT PROJECT

Brgy. Sta. Catalina, Binalonan, Pangasinan

REQUEST FOR INSPECTION (RFI)


Sub-Contractor Date Package RFI Number
MCC 01/22/2024 EARLY WORKS CCI-PEIT-RFI-BLN1-01-CIV-0285
Nature of works to be inspected:
Goods arrival ✔ Construction / Erection Construction Testing Commissioning Testing Design
Trade:
✔ Civil & Structural Electrical Mechanical Architectural C& I Others:

The following works are ready for inspection as follows:

Location of Works CONTROL BUILDING RD

Date / Time 01/25/2024 1:00 PM

Description of Works INSPECTION OF BEAM REBAR

Attachments:
Sketch Calculation Specification ✔ Drawing(s) Others:

INSPECTION REPORT

Works accepted & allowed to proceed


Remedial works to be completed but no further inspection is required
Remedial works to be completed & further inspection required
Remarks:
1. Grade 40 16mm rebar from Chuangxing were installed at every span of beam. As per approved design calculation, 16mm rebar should be
Grade 60.
Closing-out of corresponding STQ and NCR. 03/31/25

FURTHER INSPECTION
Remedial works has been carried out on / / (date) at am / pm

Remedial works accepted


Remedial works rejected. A new RFI to be issued

Constructed by Noted by Inspected & Approved by Approved by

CONTRACTOR CCI -PMT CCI-PEIT PEIT-MANAGER

Name:JESUSA R. VIRGO Name: Shawn Mayo Name: John Paulo T. Pagaduan Name:
Designation: Designation: Designation: Jr. Civil Supervisor Designation:
QA/QC PMT-CE
Date:01/22/2024
Date: 1/22/2025 Date: 03/31/2025 Date:
Document No:
BLN-PMT-EW-WMS-0012
WORK METHOD STATEMENT Revision:
CONSTRUCTION OF CONTROL BUILDING 00
Date:
May 6, 2024

105 MWP BINALONAN 1


SOLAR POWER PLANT
PROJECT PHILIPPINES

WORK METHOD STATEMENT


CONSTRUCTION OF CONTROL BUILDING

Prepared by MEGAWIDE JESUSA VIRGO

Checked by MCC CCI SHAWN CHARLES MAYO

Reviewed by CSPANG2 AGR

Approved by CSPANG2 AGR

Revision Date Description


00 May 6, 2024 Initial Release

1
113 MWp Binalonan Solar Power Plant Project Document No:
PMT-BLN-ITP-EW-0004
Brgy. Sta. Catalina, Binalonan, Pangasinan
Revision:

INSPECTION TEST PLAN


01
Date:
February 1, 2025

1 1 3 M W P B IN A L O N A N 1
SOLAR POW ER PLANT
P R O J E C T P H IL IP P IN E S
B rg y. S ta. C atalin a, B in alo n an , P an gasin an

IN S P E C T IO N T E S T P L A N
C O N T R O L B U IL D IN G

Prepared by MCC JESUSA VIRGO

Checked by MCC ELWELL LOMA

Reviewed by MCC-CCI SHAWN CHARLES MAYO

Reviewed by PEI MARK CABICAL

Approved by PEI PAUL JAMES MAGMOYAO


INSPECTION AND TEST PLAN

INSPECTION/ INSPECTION/ TEST INSPECTION LEVEL VERIFICATION


ITEM NO. DOCUMENTS/ MATERIAL / ACTIVITY TRADE DETAIL DESCRIPTION REFERENCE DOCUMENTS ACCEPTANCE CRITERIA TOOLS RESPONSIBLE
TEST METHOD FREQUENCY MCC PMT PEIT DOCUMENTS

TECHNICAL DOCUMENTS *

1 For Construction Drawings

Structural details and general arrangement


1.1 Structural plan Review of drawings Design Criteria MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
plan or layout.
Graphic and technical representation of the
1.2 Architectural plan Review of drawings Design Criteria MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
building.
Ductwork layout and dimensions, mechanical
equipment location, damper locations, design
1.3 Mechanical air-delivery rates, diffuser locations, Review of drawings Design Criteria MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
thermostat locations, and supplemental
cooling systems if required.
Electrical requirements, layout, lighting
1.4 Electrical Review of drawings Design Criteria MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
systems, and electrical distribution system
Layout and location of water supply system ,
1.5 Plumbing Review of drawings Design Criteria MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
drainage system , storm water system.
Fire protection lines layout, sprinkler head
1.6 Fire Protection Review of drawings Design Criteria MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
locations including elevations.
Document describing the scope of work, any
Approved RFA/ Material
2 Material Specifications materials that are to be used, the methods of Review of MDS Material Specification MCC-CCI N/A Technical Officer DR DR DR
List
installation
Graphic representation of each service in
3 Combined Shop Drawing two/three dimensions to help identify any Review of drawings FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
clashes.

4 Individual Shop Drawing

Listing of all the parts required (Cut lenght,


4.1 Rebar Shop Dwg Review of drawings Detailed Engineering Design MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
Bend, Size) for reinforcements
Joint detail layout, Arrangement plan and
4.2 Construction Joints Review of drawings FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
Location
Arrangement plan or layout and technical
4.3 Wall Designation Layout Review of drawings FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
representation of Wall
Arrangement plan or layout and technical
4.4 Floor Pattern Layout Review of drawings Archt. FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
representation of floor
Arrangement plan or layout and technical
4.5 Reflected Ceiling Review of drawings Archt. FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
representation of ceiling
Arrangement plan or layout, door schedules
4.6 Doors & Jamb Review of drawings Archt. FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
and door detail
Arrangement plan or layout, handrail
4.7 Metal Works (Hand Rails/Grills) Review of drawings Archt. FCD MCC-CCI N/A Technical Officer DR DR DR Approved RFA/ Plans
schedules and detail
Representation of actual arrangement or as
5 As-Built Dwg built of Structural, Architectural, MEPF Review of drawings MCC-CCI N/A Technical Officer DR DR DR
system.

6 Project Close Out Document Project History, brief summary of how the Review PCR Project Close-out report, PEP Signed by COO N/A Project Manager Handover reports, COCA
project was completed as per records.

MATERIALS

Physical Sampling and Testing per batch 2 Specimen Per Size, per Tape meter / Laboratory Report; Mill
1 Rebars ST Lab Testing Material Specification / ACI / ASTM Certificate ; Lab Testing QC Engr WP WP WP
delivered Batch Delivery Caliper Certificate

Raw material compliance to project per design mix per Thermometer /


2 Concrete Trial Mix ST Comp Test ACI ; ASTM Comp Test Report QC Engr WP DR DR Test Report
requirement and strenght test. submittal
supplier Tape meter

Raw material compliance to project BP Pre-assessment


3 Concrete Batching ST Plant Inspection ACI ; ASTM Calibration Certificates Once N/A QC Engr S S S
requirement and strenght test. checklist

Compressiver Test Thermometer /


RMC physical properties, compliance to Compressive test Report
4 Concrete Delivery on site ST Delivery Weight, Slump ACI ; ASTM Lab Testing, Truck Weight Sample per batch delivery Tape meter / Concrete Engr HP WP WP
project requirements and strenght test truck load weight
Test / Thermometer Weight Scale

Skimcoat physical properties, manufacturing Sample, 1m x 1m


5 Skimcoat AR Material Specification Approved Materials Per batch delivered N/A Finishing Engr DR DR DR
and expiration date, and MSDS. Mockup

Form No. EPC-QAC-FRM-013, Rev. 05 Page 1 of 4


INSPECTION/ INSPECTION/ TEST INSPECTION LEVEL VERIFICATION
ITEM NO. DOCUMENTS/ MATERIAL / ACTIVITY TRADE DETAIL DESCRIPTION REFERENCE DOCUMENTS ACCEPTANCE CRITERIA TOOLS RESPONSIBLE
TEST METHOD FREQUENCY MCC PMT PEIT DOCUMENTS
Waterproofing physical properties,
Sample Board & FLood Delivery Report, MIR/RFI-
6 Waterproofing Materials AR manufacturing and expiration date, and Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
Test Sample IGC
MSDS.
Sealants physical properties, manufacturing Delivery Report, MIR/RFI-
7 Sealant AR Sample Board Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
and expiration date, and MSDS. IGC

Tile, Porcelain or Ceramic physical properties Delivery Report, MIR/RFI-


8 Tiles AR Sample Board Material Specification Approved Materials Per batch delivered Tape meter Warehouse HP DR WP
and compliance to project requirements. IGC
Windows,hinges, and locks physical
Water Pressure Test on
9 Windows AR properties and compliance to project Material Specification Approved Materials Per batch delivered Tape meter Warehouse HP DR WP Delivery Report, MIR, FAT
Mock Up
requirements.
Ceiling physical properties and compliance to Delivery Report, MIR/RFI-
10 Ceiling AR Sample Board Material Specification Approved Materials Per batch delivered Tape meter Warehouse DR DR DR
project requirements. IGC
Verification of physical properties,
Delivery Report, MIR/RFI-
11 Paint AR manufacturing and expiration date, and Sample Board Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
IGC
MSDS.
Cabinetry& Kitchen tops physical properties
12 Kitchen Cabinet & Tops AR Mock Up Material Specification Approved Materials Per batch delivered Tape meter Warehouse HP DR HP Delivery Report, MIR, FAT
and compliance to project requirements.
Mirror Physical Properties and compliance to Delivery Report, MIR/RFI-
13 Facial Mirrors AR Mock Up Material Specification Approved Materials Per batch delivered N/A Warehouse HP DR HP
project requirements. IGC
Doors and Jamb physical properties and
14 Doors and Jambs AR Mock Up Material Specification Approved Materials Per batch delivered Tape meter Warehouse HP DR HP Delivery Report, MIR, FAT
compliance to project requirements.
Valves physical properties and compliance to Caliper Delivery Report, MIR/RFI-
15 Valves ME Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
project requirement Micrometer IGC

Ducting, Vent, & Supports physical properties Caliper Delivery Report, MIR/RFI-
16 Accessories ME Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
and compliance to project requirement Micrometer IGC
CCTV, FCU, Fans and blowers Functionality,
17 Mech'l Equipment ME physical properties and compliance to project Brochure & Spec'n Material Specification Approved Materials Per batch delivered N/A Quality Control HP DR DR Delivery Report, MIR, FAT
requirement
Conduits, Junction & Utility Box physical Caliper
Delivery Report, MIR/RFI-
18 Elec'l Conduits & Junction Box EE/AUX properties and compliance to project Sample Board Material Specification Approved Materials Per batch delivered Micrometer, Tape Warehouse DR DR DR
IGC
requirement Measure
Caliper
Wires, Cables and Bus bar physical Sample Board,
Micrometer, Tape Delivery Report, MIR/RFI-
19 Wires, Cables or Bus Bar EE/AUX properties and compliance to project Continuity Test for cable Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
Measure, Multi IGC
requirement wires
meter
Outlet, receptacle, switches, aux connectors
Delivery Report, MIR/RFI-
20 Wiring Devices EE light control devices physical properties and Sample Board Material Specification Approved Materials Per batch delivered Tape measure Warehouse DR DR DR
IGC
compliance to project requirement
Panel Boards physical properties and Delivery Report, MIR/RFI-
21 Panel Boards EE Sample Board Material Specification Approved Materials Per batch delivered Tape measure Warehouse HP DR HP
compliance to project requirement IGC
HDPE, PVC, GI, BI & Fittings physical
Caliper Delivery Report, MIR/RFI-
22 PVC Pipes & Fitiings MEPF properties and compliance to project Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
Micrometer IGC
requirement
Faucets, Toilets & Sinks physical properties Delivery Report, MIR/RFI-
23 Plumbing Fixtures PS Sample Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
and compliance to project requirement IGC
Sprinkler Heads, HDPE, PVC, GI, BI &
Caliper Delivery Report, MIR/RFI-
24 BI Pipes, Fitiings & Sprinkler Heads FP Fittings physical properties and compliance to Sample Board Material Specification Approved Materials Per batch delivered Warehouse DR DR DR
Micrometer IGC
project requirement
Detectors, control panel, switch device
Delivery Report, MIR/RFI-
25 FDAS Equipment & Devices FP physical properties and compliance to project Brochure & Spec'n Material Specification Approved Materials Per batch delivered N/A Warehouse HP DR HP
IGC
requirement

Fill excavated spaces, trenches, or voids


Delivery Report, MIR/RFI-
26 Backfill Materials ST around structures (like foundation, or retaining Visual & Measurement Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
IGC
walls) after they have been installed

Delivery Report, MIR/RFI-


27 Cement ST/AR Concrete, Mortar and Grout Brochure & Spec'n Material Specification Approved Materials Per batch delivered N/A Warehouse DR DR DR
IGC
Physical Sampling and Testing per batch Compressive Test Compressive test Report
28 CHB AR Material Specification Approved Materials Per Delivery Tape meter QA/QC Engr DR DR DR
delivered

WORKS (Activity)

STRUCTURAL WORKS

Surveying of the property and the building Survey equipment,


1 Lot Surveying AR Visual & Measurement Lot / Site Plan Clients Approval Once Site Mgr HP HP HP Lot Survey
layout . Staking out for the Foundation Tape measure

Survey equipment, RFI, QCC/INSPECTION


2 Excavation ST Excavationas per project requirements Visual & Measurement Stake-out Plan Clients Approval Per Excavation Site Mgr S S S
Tape measure CHECKLIST

Form No. EPC-QAC-FRM-013, Rev. 05 Page 2 of 4


INSPECTION/ INSPECTION/ TEST INSPECTION LEVEL VERIFICATION
ITEM NO. DOCUMENTS/ MATERIAL / ACTIVITY TRADE DETAIL DESCRIPTION REFERENCE DOCUMENTS ACCEPTANCE CRITERIA TOOLS RESPONSIBLE
TEST METHOD FREQUENCY MCC PMT PEIT DOCUMENTS
In-situ density test every 150mm-300mm
Survey equipment,
3 Backfill & Compaction ST (depending on soil property) layer of soil Visual only Soil Embankment Dwgs Clients Approval Per 300mm layer Site Mgr WP DR WP FDT
Tape measure
compacted or as per project requirements
Rebars, Conduits, Junction/Utility box, Stub-
outs, Pipe sleeves, and other embedments in RFI, QCC/INSPECTION
4 Rebar (w/ MEPF Roughing-Ins) ST / MEPF Visual & Measurement Rebar Shop Dwg (Cutting List) ACI Per Pouring Tape measure Site Mgr HP WP HP
concrete prior casting is installed according to CHECKLIST
plan.
FW Enclosure for Columns ; Scaffolding/ Survey equipment, RFI, QCC/INSPECTION
5 Formworks ST Visual & Measurement FW Dwgs Tolerance Handbook Per Pouring Site Mgr WP WP WP
Shorings and Decking for Beam and Slab Tape measure CHECKLIST
Vibration and compaction, layering and rate of Concrete Joints Plan, Approved
6 Concreting Pouring (Placement) ST pouring, cleanouts are in place, ambient Visual only concreting methodology and project ACI Per Pouring N/A Site Mgr HP WP HP Concrete Test
temperature specification
Concrete curing as per methodology, removal Concrete Joints Plan, floor layout
7 Concrete Finish (Post Concreting) ST Visual only ACI Per Pouring N/A Site Mgr HP WP HP Concrete Test
of laitances and layout validation plan

ARCHITECTURAL WORKS
Dimension /
Wall Setting-out Plan, Detailed Tape Measure,
Includes layout, installation, plastering / measurement, Per Floor, Per Area, Per RFI, QCC/INSPECTION
8 Wall Partitions Blockworks AR / MEPF Plans, MEPF ISD, Schedule of Tolerance Handbook Cross line laser, Finishing Supervisor HP WP HP
skimcoating Squareness, Visual, Unit CHECKLIST
Finishes and Specifications Level bar
Surface Levelling
Walls layout by reading the plans and then Dimension /
Tape Measure, RFI, QCC/INSPECTION
8.1 Survey Layout AR reflects the locations of all elements on the measurement, Wall Setting-out Plan Tolerance Handbook Per Floor & Per Unit Survey Engineer WP S HP
Cross line laser CHECKLIST
floors, ceiling and vertical elements. Squareness

Tape Measure,
Casting of Zocallo, Blockworks laying and Surface Levelling, Wall Setting-out Plan / specify docs Finishing Supervisor / RFI, QCC/INSPECTION
8.2 Zocallo, Block Laying, Stiffener and Lintel AR Tolerance Handbook Per Area / Unit Cross line laser, WP S WP
Casting of Stiffener Columns Squareness, Plumbness for stiffener column and beams Engineer CHECKLIST
Level bar

Tape Measure, RFI, QCC/INSPECTION


8.3 Electrical Works (1st Fix) MEPF Roughing-ins Conduit Visual, Measurement MEPF ISD Tolerance Handbook Per Area / Unit MEPF Engineer WP S HP
Cross line laser CHECKLIST

Waterline Sleeves, Vent Pipes and Sanitary Tape Measure, RFI, QCC/INSPECTION
8.4 Plumbing Works (1st Fix) MEPF Visual, Measurement MEPF ISD Tolerance Handbook Per Area / Unit MEPF Engineer WP S HP
Pipes Cross line laser CHECKLIST

Tape Measure, RFI, QCC/INSPECTION


8.5 Mechanical Works (1st Fix) MEPF Sleeving Visual, Measurement MEPF ISD Tolerance Handbook Per Area / Unit MEPF Engineer WP S HP
Cross line laser CHECKLIST

Tape Measure, RFI, QCC/INSPECTION


8.6 Fire Protection (1st Fix) MEPF Sleeving Visual, Measurement MEPF ISD Tolerance Handbook Per Area / Unit MEPF Engineer WP S HP
Cross line laser CHECKLIST

Tape Measure,
Surface Levelling, Wall Setting-out Plan, Wall Finish Finishing Supervisor / RFI, QCC/INSPECTION
8.7 Plaster/ Skimcoat on Wall AR Plastering Application and Surface finish Tolerance Handbook Per Area / Unit Cross line laser, WP S HP
Squareness, Plumbness Schedule Engineer CHECKLIST
Level bar
Window preparation and installation (Surface
Dimension /
Prep, painting, window installation and Tape Measure,
measurement, Finishing Supervisor / RFI, QCC/INSPECTION
9 Aluminum Glass AR Sealant), Windows Installed and Physical Window Detail Dwg ASTM Per Floor level bar; Pressure WP S WP
Squareness, Visual, Engineer CHECKLIST
Properties is as per Plan and Project Washer
Plumbness
Requirements
Surface preparation and application of sealant
Finishing Supervisor / RFI, QCC/INSPECTION
10 Exterior Sealant AR in accordance to Method Statement Pull-out Adhesion Test Elevation Dwg Tolerance Handook Per Elevation / Zone N/A WP S WP
Engineer CHECKLIST
Parameter
Surface preparations and application of
Finishing Supervisor / RFI, QCC/INSPECTION
11 Exterior Painting AR Primer, Patching / putty, Sanding, 1st coat, Visual Elevation Dwg Tolerance Handook Per Elevation / Zone N/A HP WP HP
Engineer CHECKLIST
2nd coat
Continuity, Insulation,
Phase SequenceTest, Tape Measure,
Elec'l Wiring In , FP Piping , Sewer Piping , Pressure Test / Detailed Plans, Codes, and Cross Line Laser & RFI, QCC/INSPECTION
12 MEPF 2nd Fix MEPF Tolerance Handook Per Area / Unit and Floor MEPF Supervisor HP HP HP
Waterline Piping & Mechanical Ducting Hydrostatic Test, Specifications Testers and Equip. CHECKLIST
Gravity Test, Smoke / per trade
Light Test
Tape Measure,
Installed as per project Multimeter, Phase
Installation of Wires per approved Materials Detailed Plans, Codes, and RFI, QCC/INSPECTION
12.1 Wiring In & Testing EE/AUX Continuity, Megger Specification and Per Area / Unit and Floor Rotator, Clamp MEPF Engineer HP WP HP
and Approved wiring layout plan Specifications CHECKLIST
requirements Meter, Insulator
Tester
Installation of Pipes & Fittings, Hydro Tape Measure,
Compliance to Approved
Flushing, Pressure Test and Hydrostatic. Pressure Test/ Detailed Plans, Codes, and Cross line laser RFI, QCC/INSPECTION
12.2 FP Pipe Fitting, Sealing & Painting FP testing Procedure and Per Area / Unit and Floor MEPF Engineer HP WP HP
Application of Fire Stop Sealant Application Hydrostatic Test Specifications and Pressure CHECKLIST
Testing Methodology
and Painting of Pipes guage
Tape Measure,
Compliance to Approved
Installation of pipes and Testing inside the Detailed Plans, Codes, and Cross line laser RFI, QCC/INSPECTION
12.3 Waterline Branch Piping & Testing (Unit) PS Pressure Test testing Procedure and Per Area / Unit and Floor MEPF Engineer HP WP HP
Toilet complete with brackets Specifications and Pressure CHECKLIST
Testing Methodology
guage
Compliance to Approved Tape Measure,
Installation of Ducts, sealing and Testing Detailed Plans, Codes, and RFI, QCC/INSPECTION
12.4 Mech'l Ducting, Sealing & Testing ME Smoke / Light Test testing Procedure and Per Area / Unit and Floor Cross line laser MEPF Engineer HP WP HP
using the Smoke / Light Test Methodology Specifications CHECKLIST
Testing Methodology and Flashlight

Form No. EPC-QAC-FRM-013, Rev. 05 Page 3 of 4


INSPECTION/ INSPECTION/ TEST INSPECTION LEVEL VERIFICATION
ITEM NO. DOCUMENTS/ MATERIAL / ACTIVITY TRADE DETAIL DESCRIPTION REFERENCE DOCUMENTS ACCEPTANCE CRITERIA TOOLS RESPONSIBLE
TEST METHOD FREQUENCY MCC PMT PEIT DOCUMENTS
Surface Preparation, Waterproofing
Tape Measure, Finishing Supervisor / RFI, QCC/INSPECTION
13 Waterproofing (RoofDeck & Toilet) AR Application and Flood Test as per project Leak Test Waterproofing Detail Dwg Specification Per Area / Unit HP S HP
Cross line laser Engineer CHECKLIST
requirements and material specs.

Surface Preparation (Removal Laittance, Tape Measure, Finishing Supervisor / RFI, QCC/INSPECTION
13.1 Surface Preparation AR Surface Levelling Waterproofing Detail Dwg Specification Per Area / Unit HP WP HP
Grinding for levelness) Cross line laser Engineer CHECKLIST

Waterproofing Application and Flood Test as Waterproofing Detail Dwg, Project Finishing Supervisor / RFI, QCC/INSPECTION
13.2 Waterproof Application AR Leak Test Specification Per Area / Unit N/A HP HP HP
per project requirements and material specs. Specification Engineer CHECKLIST

Installlation of Tiles w/ Drain on Toilet.


5 Pt Knocking, Slope Level Bar, Tape Finishing Supervisor / RFI, QCC/INSPECTION
14 Tileworks AR Installation to start from Toilet to Rooms and Floor Tile Layout Tolerance Handbook Per Area / Unit WP WP WP
Test measure Engineer CHECKLIST
Hallways.
Dimension /
Lever Bar, Tape
Ceiling Layout, Frame installation and Board- measurement, Reflected Ceiling Plan Dwg + MEPF RFI, QCC/INSPECTION
15 Dryworks Ceiling AR Specification Per Area / Unit measure, Cross MEPF Supervisor WP S WP
up (Gypsum Board or Acoustic) Squareness, Visual, Detailed Dwg CHECKLIST
Line Laser
Surface Levelling
Ceiling height elevation and layout as per Dimension /
Reflected Ceiling Plan Dwg + MEPF RFI, QCC/INSPECTION
15.1 Layout of Elevation AR plans and then reflects the locations of all measurement, Tolerance Handbook Per Area / Unit Tape Measure Survey Engineer S S S
Detailed Dwg CHECKLIST
elements. Squareness

Finishing Supervisor / RFI, QCC/INSPECTION


15.2 Framing AR Ceiling Frame installation, as per plan layout Visual, Measurement Reflected Ceiling Plan Dwg Tolerance Handbook Per Area / Unit Tape Measure HP HP HP
Engineer CHECKLIST

Ceiling board installation. Framing and MEPF Lever Bar, Tape


Tolerance Handbook, MEPF RFI, QCC/INSPECTION
15.3 Boarding Up & Jointing AR Fix 2 shall be inspected and tested prior to the Visual, Measurement Reflected Ceiling Plan Dwg Per Area / Unit measure, Cross MEPF Supervisor WP WP WP
Specification CHECKLIST
boarding up Line Laser
Surface preparations - Primer, Patching,
Finishing Supervisor / RFI, QCC/INSPECTION
16 Painting AR Sanding. 1st coat, 2nd coat Visual Visual Wall Finishes Schedule Tolerance Handbook Per Unit and Floor N/A WP WP WP
Engineer CHECKLIST
appearance is as per project requirement

Surface preparations - Primer, Patching, Wall Setting-out Plan, Material Finishing Supervisor / RFI, QCC/INSPECTION
16.1 Surface Preparation AR Surface Levelling Tolerance Handbook Per Unit and Floor Level Bar WP WP WP
Sanding and 1st coat Specification Engineer CHECKLIST

Sealant are applied according to Method Wall Setting-out Plan, Material Finishing Supervisor / RFI, QCC/INSPECTION
16.2 Interior Wall Sealant AR Pull-off Adhesion Test Tolerance Handbook Per Unit and Floor N/A WP WP WP
Statements parameter. Specification Engineer CHECKLIST

To be done after installation of Doors, Jambs Material Specification and Schedule Finishing Supervisor / RFI, QCC/INSPECTION
16.3 Final Painting AR Visual Specification Per Unit and Floor N/A HP WP HP
and Hardware of Finishes Engineer CHECKLIST
Appearance, Layout, Squareness and Dimension /
Project Specifications, Cabinet Blow Finishing Supervisor / RFI, QCC/INSPECTION
17 Cabinetery AR installation (Kitchen Cabinets w Sink, Faucet , measurement, Tolerance Handbook Per Unit Tape Measure HP WP HP
up Plans Engineer CHECKLIST
Counter Top & Grease Trap ) Squareness
Installation of Door, Jambs and Hinges in Visual, Measurement, Finishing Supervisor / RFI, QCC/INSPECTION
18 Doors, Jambs & Hardware AR Door Schedule Tolerance Handbook Per Unit Tape Measure HP WP HP
accordance with plans and specification Squareness, Plumbness Engineer CHECKLIST

Installation of Electrical Devices, Plumbing


Visual ; Measurement ; Project specs., AR and MEPF FCD, Tape Measure, RFI, QCC/INSPECTION
19 MEPF Fix 3 MEPF Fixtures, Exhaust and Blowers, and Smoke MEPF Standards Per Unit and Floor MEPF Supervisor WP HP HP
Functionality Material Specifications Cross line laser CHECKLIST
detectors
Installation of Devices, Panel board,
Visual ; Measurement ; Tape Measure, RFI, QCC/INSPECTION
19.1 Electrical Devices EE Switchboards in accordance with the plans / Project and Material Specification MEPF Standards Per Unit and Floor MEPF Supervisor WP WP HP
Functionality Cross line laser CHECKLIST
lay-out
Installation of Faucets, Floor Drains, Valves,
Waterclosets, Kitchen Sink, Grease Trap and Visual ; Measurement ; Tape Measure, RFI, QCC/INSPECTION
19.2 Plumbing Fixtures & Accs PS Project and Material Specification MEPF Standards Per Unit and Floor MEPF Supervisor HP WP WP
accessories in accordance with the plans / Functionality Cross line laser CHECKLIST
lay-out
Installation of CCTV, Exhaust equipment,
Visual ; Measurement ; Tape Measure, RFI, QCC/INSPECTION
19.3 CCTV, Exhaust Fan & Blowers AUX Blowers in accordance with the plans and lay- Project and Material Specification MEPF Standards Per Unit and Floor MEPF Supervisor HP WP HP
Functionality Cross line laser CHECKLIST
out
Installation of Sprinkler Escutcheon, Smoke
Visual ; Measurement ; Tape Measure, RFI, QCC/INSPECTION
19.4 Smoke Detectors and Devices MEPF detectors, devices in accordance with plans Project and Material Specification MEPF Standards Per Unit and Floor MEPF Supervisor HP WP HP
Functionality Cross line laser CHECKLIST
and lay-out
Commissioning test of Electrical Equipments, Project Specification, Codes and Insulation tester, RFI, QCC/INSPECTION
20 Testing and Commissioning MEPF Testing MEPF test requirements Per Area / Unit and Floor MEPF Supervisor HP HP HP
Pumps, Exhaust, and Blowers Standards Multi tester CHECKLIST
Overall appearance of walls, ceilings, floor,
Finishing Supervisor / RFI, QCC/INSPECTION
21 Punchlisting AR fixtures and other furnishes includes and its Visual FCD, Material Specifications Tolerance handbook Per Area / Unit and Floor N/A HP HP HP
Engineer CHECKLIST
functionality.

Form No. EPC-QAC-FRM-013, Rev. 05 Page 4 of 4


CHECKLIST FOR REBARS

ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC) for


113MWp BINALONAN SOLAR POWER PLANT PROJECT

DATE : 01/22/2025

INSPECTION CHECKLIST FOR REBARS INSTALLATION, RFI NO. : CCI-PEIT-RFI-BLN1-01-CIV-02865

REV. No.: 0

INSPECTION DETAILS

LOCATION / GRIDLINE: CONTROL BUILDING


REF. NO.: LEVEL:
RD
INSPECTION METHOD,
ITEM NOS. ITEM DESCRIPTION ACCEPTABILITY FREQUENCY & ALLOWABLE REMARKS
ERRORS

£ Accept Visual, Regular Meeting, No


PPE compliance `
£ Not Accept Errors
1. SAFETY
£ Accept
Proper supervision Inspect, Verify
£ Not Accept

£ Accept Inspect, Verify, Measured by


Diameter (mm)
£ Not Accept caliper

£ Accept
Quantity (pcs) Inspect, Verify
£ Not Accept

£ Accept Inspect, Verify, Measured by steel


Spacing and Arrangement
£ Not Accept tape

£ Accept Inspect, Verify, Measured by steel


Anchorage / Devt. Lengths / Splicing
£ Not Accept tape

£ Accept
Secured and Tied properly Inspect, Verify
£ Not Accept
2. REBARS INSTALLATION
£ Accept Inspect, Verify, Measured by steel
Concrete Cover
£ Not Accept tape

£ Accept Inspect, Verify, Measured by steel


Hooks and Bends
£ Not Accept tape

£ Accept
Anchor Bolts Inspect, Verify
£ Not Accept

£ Accept
Dowels Inspect, Verify
£ Not Accept

£ Accept
Vapor Barriers if Needed Inspect, Verify
£ Not Accept

LEGENDS: Accepted : (/) Rejected: (X) N/A: Not Applicable

PREPARED BY: SUBCON CHECKED BY: CREC APPROVED BY: OE

Name:............................................... Shawn Mayo


Name:............................................... Name:......................................................
JESUSA R. VIRGO

Date:.......01/22/2025......................................... 1/22/2025
Date:................................................ Date:....................................................

Form No.: Rev. No.: Rev. Date:


- 09-09-2024 GROUND FRAMING PLAN Detail Engineering Design
105MWp BINALONAN 1 ROOF DECK FRAMING PLAN

CONSTRUCTION CORPORATION SOLAR POWER PROJECT SLC 09-09-2024 S0-010

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC 1:100mts REV - A
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A1 FOR APPROVAL
- 09-09-2024 SS CB LONGITUDINAL SECTION Detail Engineering Design
105MWp BINALONAN 1 CROSS SECTION

CONSTRUCTION CORPORATION SOLAR POWER PROJECT SLC 09-09-2024 S0-011

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC 1:100mts REV - A
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A1 FOR APPROVAL
- 09-09-2024 SS CB TYPICAL GIRDER DETAIL & SCHEDULE Detail Engineering Design
105MWp BINALONAN 1
CONSTRUCTION CORPORATION SOLAR POWER PROJECT SLC 09-09-2024 S0-013

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC 1:100mts REV - A
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A1 FOR APPROVAL
Document No:
113 MWp Binalonan Solar Power Plant Project PMT-BLN-STQ-EW-CE-0018
Brgy. Sta. Catalina, Binalonan, Pangasinan
Revision:

SITE TECHNICAL QUERY


04
Date:
May 20, 2025

1 1 3 M W P B IN A L O N A N 1
SOLAR POW ER PLANT
P R O J E C T P H IL IP P IN E S
B rgy. S ta. C atalin a, B in alo n an , P an g asin an

S IT E T E C H N IC A L Q U E R Y
R E -C A L C U L A T IO N F O R T H E A D D IT IO N A
S T E E L B A R S F O R C O N T R O L B U IL D IN G

P rep a re d b y MCC JESUSA R. VIRGO

C h ec ke d b y EPC SHAWN CHARLES MAYO

R e v ie w e d b y CCI PEIT JOHN PAULO T. PAGADUAN

A p p ro v ed b y CCI PEIT PAUL JAMES D. MAGMOYAO

R E V IS IO N D a te D e s crip tio n
00 January 17, 2025 For review & approval
01 April 10, 2025 For approval
02 May 3, 2025 For approval
03 May 16, 2025 For approval
04 May 20, 2025 For approval
SITE TECHNICAL QUERRY

Technical Querry Reference Number: PMT-BLN-STQ-EW-CE-0018

Revision No.: 04

Project Name 113MWp Binalonan Solar Power Plant Project

Submission Date: 20-May-25

Submitted to: Engr. Shawn Charles Mayo Position: Civil/Structural Engineer

Company Name: MCC-CCI

TITLE / DESCRIPTION RE-CALCULATION FOR THE ADDITIONAL STEEL BARS FOR CONTROL BUILDING

ENGINEERING DISCIPLINE CIVIL ELECTRICAL MECHANICAL

PROJECT SCHEDULE
PROJECT COST IMPACT YES NO YES NO
IMPACT:

TYPE OF SUBMITTAL

SHOP DRAWINGS & SCHEDULES INSPECTION & TEST REPORTS

APPROVED DRAWINGS METHOD OF STATEMENT & TASK RISK ASSESSMENT

AS-BUILT DRAWINGS OPERATION & MAINTENANCE MANUAL

MATERIALS & PRODUCT DATA CERTIFICATION / PROGRAMME

SAMPLES OTHERS

REFERENCES:

DRAWING, SPECIFICATION & OTHER


CALCULATION FOR THE 16mm GRADE 60 ADDITIONAL BARS
DETAILS

CONTRACTOR'S REVIEW:

Computation of additional steel bars

JESUSA R. VIRGO
(MCC)

PEIT COMMENTS:

John Paulo T. Pagaduan


PEIT ENGINEER

PEIT APPROVAL SUBMITTAL REVIEW STATUS

DATE RECEIVED : May 21, 2025 ✔ APPROVED APPROVED WITH COMMENTS

DATE RELEASED : May 23, 2025 REJECTED NOTED - FOR RECORD ONLY

PEIT MANAGER ACCEPTANCE

Remarks:
Paul James D. Magmoyao - Jr. Project Manager (Civil)
Incorporate to As-Built Drawings
Project: 113 MWp Binalonan Solar Power Plant Project
Location: Binalonan, Pangasinan
1st layer-Grade 60
GENERAL DATA (1pc - 16mm dia.)
fc' = 27.6 MPa 1st layer-Grade 40
Beam width (b) = 300 mm ( 2-16mm dia.)
Beam height (h) = 400 mm
Spaced b/n 1st
and 2nd layer = 25 mm 2nd layer-Grade 40
ɸ= 0.9 ; Assumed tension controlled ( 2-16mm dia.)

ACTUAL BEAM
1. 1st layer (Grade 40) - 2pcs 2. 1st layer (Grade 60) - 1pc 3. 2nd layer (Grade 40) - 2pcs
fy1 = 380 MPa fy2 = 414 MPa fy3 = 380 MPa
clear cover = 40 mm clear cover = 40 mm d3 = 311 mm
d1 = 352 mm d2 = 352 mm No. of reinf. = 2 pcs
No. of reinf. = 2 pcs No. of reinf. = 1 pc Diameter = 16 mm
Diameter = 16 mm Diameter = 16 mm As3 = 402.12 mm^2
As1 = 402.12 mm^2 As2 = 201.06 mm^2

ƩF = 0
C = ƩT
C = T1 + T2 + T3
0.85fc'ab = As1 x fy1 + As2 x fy2 + As3 x fy3

a = [As1 x fy1 + As2 x fy2 + As3 x fy3] / 0.85fc'b


a= 55.25 mm
β= 0.85 ≤ 28MPa
c= 65.00 mm

MnActual = T1 (d1 - a/2) + T2 (d2 - a/2) + T3 (d3 - a/2)


MnActual = As1 x fy1 (d1 - a/2) + As2 x fy2 (d2 - a/2) + As3 x fy3 (d3 - a/2)
MnActual = 119.87 KN-m
ɸMnActual = 107.88 KN-m

Check if tension-controlled:
fs1 = 600 x [(d - c) / c]
fs1 = 600 x [( 352 - 51.56 ) / 51.56]
fs1 = 2649.23 MPa > 1000 Mpa, Therefore Tension controlled

fs2 = 600 x [(d - c) / c]


fs2 = 600 x [( 352 - 51.56 ) / 51.56]
fs2 = 2649.23 MPa > 1000 Mpa, Therefore Tension controlled

fs3 = 600 x [(d - c) / c]


fs3 = 600 x [( 311 - 51.56 ) / 51.56]
fs3 = 2270.77 MPa > 1000 Mpa, Therefore Tension controlled
:. Assumption is correct.

Check for Minimum reinforcement:


ρmin1 = 1.4 / fy = 1.4 / 414 = 0.00338
ρmin2 = √ fc' / 4 x fy = √27.6 / 4 x 414 = 0.00317
:. 0.003380

ρmax = 0.85fc' x β1 x εcu = 0.85 x 27.6 x 0.85 x 0.003 = 0.018062500


fy x (εcu + εt, min) 414 x ( 0.003 + 0.005 )
Note: εcu = 0.003; εt, min = 0.005

ρactual = ∑ (As / bd) = [ 402.12 / (300 x 352) ] + [ 201.06 / (300 x 352) ] + [ 402.12 / (300 x 311) ]
= 0.010022
:. Okay!, Actual reinforcement is greater than the minimum, and lesser than the maximum.
DESIGNED BEAM
1. Grade 60 - 4pcs Grade 60
fy = 414 MPa ( 4-16mm dia.)
clear cover = 40 mm
d= 352 mm
No. of reinf. = 4 pcs
Diameter = 16 mm
As = 804.25 mm^2

ƩF = 0
C=T 2nd layer-Grade 60
0.85fc'ab = As x fy ( 2-16mm dia.)

a = As x fy / (0.85fc'b)
a= 47.31 mm
β= 0.85 ≤ 28MPa
c= 55.66 mm

MnDesigned = T (d - a/2)
MnDesigned = As x fy (d - a/2)
MnDesigned = 109.33 KN-m
ɸMnDesigned = 98.39 KN-m

Check if tension-controlled:
fs = 600 x [(d - c) / c]
fs = 600 x [( 352 - 55.66 ) / 55.66]
fs = 3194.47 MPa > 1000 Mpa, Therefore Tension controlled

RESULTS:
ɸMnActual > ɸMnDesigned
107.88KN-m > 98.39KN-m
:. Actual beam is safe
1 2 3 4

18000

6000 6000 6000

LEGEND:
G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)
A BEAM WITH ADDITIONAL REBAR (GRADE 60)

BEAM WITH THE DESIGNED REBARS

G-1 (300 X 400)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


B G-1 (300 X 400)

G-1 (300 X 400)


6000

S-1 S-1 S-1


(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


C
G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


30000

6000

S-1 S-1 S-1


(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


D
ROOF LINE ABOVE
G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000

S-1 S-1 S-1


(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400) CG-1
E

SG-1
S-1
CG-1 UP
G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000

S-1 S-1 S-1


(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


F

1 ROOF LEVEL ROOF BEAM GRIDLINE 1 (GL A-F)


SC006 NTS

- 03-28-2025 SS CB ROOF DECK FRAMING PLAN As-built


113MWp BINALONAN 1
CONSTRUCTION CORPORATION SOLAR POWER PROJECT DCB 03-28-2025 SC010

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC AS-SHOWN REV - 00
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A3 FOR APPROVAL
A B C

1 ROOF DECK BEAM GRIDLINE 1 (GL A-C)


SC010A NTS

A B C

MATCHLINE - SEE LEFT BELOW


D E

LEGEND:
BEAM WITH ADDITIONAL
REBAR (GRADE 60)
MATCHLINE - SEE RIGHT ABOVE

1 2 3 4

18000

6000 6000 6000

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


A

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


B

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


C

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


30000
6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

2 ROOF DECK BEAM GRIDLINE 2 (GL A-E) D


G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-2 (400 X 600)

G-1 (300 X 400)


SC010A NTS

6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-2 (400 X 600) G-2 (400 X 600) CG-1
E

SG-1
S-1
CG-1 UP

G-1 (300 X 400)

G-1 (300 X 400)

G-2 (400 X 600)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


F

KEYPLAN

- 03-28-2025 CONTROL BUILDING Shop Drawing


113MWp BINALONAN 1 ROOF BEAM CUTTING LIST

CONSTRUCTION CORPORATION SOLAR POWER PROJECT SLC 03-28-2025 SC010A

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC AS-SHOWN REV - 00
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A3 FOR APPROVAL
A B

GRID LINE 4 ALONG GRID LINE A-F


1 ROOF DECK BEAM GRIDLINE 3 (GL A-B)
SC010B NTS
A B C

MATCHLINE - SEE LEFT BELOW


D E F
LEGEND:
BEAM WITH ADDITIONAL
REBAR (GRADE 60)
MATCHLINE - SEE RIGHT ABOVE

1 2 3 4

18000

6000 6000 6000

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


A

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


B

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


C

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


30000
6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


D

G-1 (300 X 400)

G-1 (300 X 400)

G-2 (400 X 600)

G-1 (300 X 400)


ROOF DECK BEAM GRIDLINE 4 (GL A-F)

6000
S-1 S-1 S-1

2 (150mm THK) (150mm THK) (150mm THK)

SC010B NTS E
G-1 (300 X 400) G-2 (400 X 600) G-2 (400 X 600) CG-1

SG-1
S-1
CG-1 UP

G-1 (300 X 400)

G-1 (300 X 400)

G-2 (400 X 600)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


F

KEYPLAN

- 03-28-2025 CONTROL BUILDING Shop Drawing


113MWp BINALONAN 1 ROOF BEAM CUTTING LIST

CONSTRUCTION CORPORATION SOLAR POWER PROJECT SLC 03-28-2025 SC010B

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC AS-SHOWN REV - 00
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A3 FOR APPROVAL
2 3 4

LEGEND:
BEAM WITH ADDITIONAL
1 ROOF DECK BEAM GRIDLINE A (GL 2-4) REBAR (GRADE 60)
SC010C NTS
1 2 3

2 ROOF DECK BEAM GRIDLINE B (GL 1-3)


SC010C NTS
1 2 3

1 2 3 4

18000

6000 6000 6000

3 ROOF DECK BEAM GRIDLINE C (GL 1-3) G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)
A

SC010C NTS

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


2 3

6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


B

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


C

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)

G-1 (300 X 400)


30000
6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)


D

G-1 (300 X 400)

G-1 (300 X 400)

G-2 (400 X 600)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

G-1 (300 X 400) G-2 (400 X 600) G-2 (400 X 600) CG-1
E

SG-1
S-1
CG-1 UP

G-1 (300 X 400)

G-1 (300 X 400)

G-2 (400 X 600)

G-1 (300 X 400)


6000
S-1 S-1 S-1
(150mm THK) (150mm THK) (150mm THK)

4 ROOF DECK BEAM GRIDLINE D (GL 2-3) F G-1 (300 X 400) G-1 (300 X 400) G-1 (300 X 400)

SC010C NTS KEYPLAN

- 10-28-2024 CONTROL BUILDING Shop Drawing


113MWp BINALONAN 1 ROOF BEAM CUTTING LIST

CONSTRUCTION CORPORATION SOLAR POWER PROJECT DCB 10-28-2024 SC010C

ENGINEERING A FIRST-WORLD PHILIPPINES BRGY. STA. CATALINA,


BINALONAN, PANGASINAN SLC AS-SHOWN REV - 00
#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY BLN1-DR-EW-10-CS-04
TELEPHONE NO.: 655-1111 - A3 FOR APPROVAL