R4G-40-EP-GEN-PR-035 - Guideline For Deployment of 4th Sector On GBM

This document provides guidelines for the deployment of 4" sector antennas on 25M and 30M GBM sites by Reliance JIO Infocomm LTD. It outlines the purpose, scope, background, infrastructure requirements, electrical power specifications, and important notes regarding the implementation. The document also includes site details and references for further information.

Uploaded by

badri1969revanth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
24 views8 pages

R4G-40-EP-GEN-PR-035 - Guideline For Deployment of 4th Sector On GBM

This document provides guidelines for the deployment of 4" sector antennas on 25M and 30M GBM sites by Reliance JIO Infocomm LTD. It outlines the purpose, scope, background, infrastructure requirements, electrical power specifications, and important notes regarding the implementation. The document also includes site details and references for further information.

Uploaded by

badri1969revanth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 8
Reliance JIO Infocomm LTD OSP Engineering @ Guideline for deployment of 4" Sector antenna on GBM R4G-40-EP-GEN-PR-035 \ \ won Ly _\\ we oe 7, We all a 2H oo | 20Feb | issued for NRO feat jee tenc soda | 2017 _| Implementation Rev. Date | Reason for Issue Prepared by Reviewed by Approved by Amendment Record / Control Sheet (ACS) a anes Details of "| Date Reason Rs Reviewed by | Approved by | Amendments / No. for Issue by Revisions ‘Akshayesh oo | 20-Feb- | Issuedfor | jiknit | phalgunisen/ | Chaturvedi/ | New document. 2017 implementation! Bhagwat | Balkrishna Gole| _ Dhananjay Ozarkar Reliance Jio Infocomm Ltd. Rev.00 Page 20f8 INDEX Sr.No. Content Page No. 1 | Purpose 4/8 2 | Scope 4/8 3 | Background 4/8 4 | GBM Infrastructure (Pole mount & cable opening) 5/8 5 | GBM Utility (Electrical power & rack space) 5/8 6 | Important Notes $8 7 | site details 8 8 | References 8/8 Reliance lo Infocomm Ltd Rev.00 Page 3 of 8 1. Purpose: Purpose of this document is to provide detailed guidelines to Circle teams for Implementation of 4” sector antenna on 25M & 30M GEM sites. 2. Scope: ‘This documentis restricted to OSP infra (structure & electrical) side implementation guidelines. The document is applicable for 25M & 30M GBMs. 3, Background (On GBM sites, current Approved Antenna loading is as follows isting antenna loading RE Antenna loading 3xMulticband antenna ~0.35 x 1.4 x 0.13 (WxHxD), Wt 17.5 ke '3x850 MHz antenna ~0.3 x 1.6 x 0.15 (WxHxD), Wt 15 kg ‘MW Antenna loading 2x06 dia MW antenna + 1x0.3 dia MW antenna To provide capacity relief, RF team had proposed additi Proposed antenna loading RE Antenna loading 2xMult-band antenna ~0.35 x 1.4 x 0.13 (WxHxD), We 17.5 ke 2x850 MHz antenna —0.3 x 1.6 x 0.15 (WxtixD), Wt 15 kg, AxBi-sector antenna ~ 0.35 x 2.2 x 0.14 (WxHxD), Wt 37 kg AxPenta-band antenna ~ 0.4 x 1.65 x 0.18 (WxHxD), Wt 34 kg, MW Antenna loading (unchanged) 2x0.6 dia MW antenna + 170.3 dia MW antenna Reliance Jio Infocomm Ltd, Rev.00 Bi-sector antenna on GBM sites. Page 4 of 8 4. GBM Infrastructure (Pole mount & cable opening) + 6 Pole mounts of 2 meter length are available on GBMs for RF antenna installation. No additional pole mount is required. + Asper RF decision, one sector Multi-band, 850 Mhz antenna & associated RRU shall be un- installed. After uninstallation of existing antennas, 1x bi-sector antenna & 1x penta-band antenna shall be installed along with associated RRU. The RRUs shall be installed such that they are behind the RF antenna. + The power cable & CPRI cable shall be taken through Cable opening available below the GBM ‘top platform. The cables shall be installed with loop. + The cable opening shall be closed with Cable canopy to avoid water ingress. 5. GBM Utility (Electrical power & rack space) Electrical Power For Sites with 12 kW DCPS ‘+ 25AMCB from SMPS DC distribution allotted for BBU:2 Spare 168 MCB allotted for ‘RRH 84 R1’. © Ref drawing no. 10070-F51-XX-XXX-XXXX-ENB-000-204 Reliance Jio Infocomm Ltd. Rev.00 Page 5 of 8 For Sites with 16 KW DCPS. ‘+ Replacement of 63A MCB to 32A MCB from non-critical DC MCB which will be allotted for BBU-2 ‘+ Spare 168 MCB allotted on DCDB (non-critical DC load), ‘RRH B4 RI’. ‘© Ref drawing no. 10070-E51-XX-XXXX-XXX-ENB-000-212 Rack Space ‘= Refer drawing 10070-ESK-XX-3000-XXXK-ENB-000-520 for placement of additional BBU inside Gem ‘+ Install add-on BBU vertically & connect DC power 2s explained above. 6. Important notes 1. Only One Bi-sector antenna+Penta-band antenna to be considered for 4 sector deployment in- place of existing Mult-band antenna‘850 Miz antenna. 2. Only GBNIs which are 20 kms away from the coast are to be considered for 4" sector deployment. 3. No additional loading will be allowed further on these GBMs ‘4, 25M 8& 30M GBM in SOm/s windzone are NOT TO BE upgraded with 4" Sector deployment. Alternate RF solutions shall be identifed. 5. Foundation of GBMs where 4" sector deployment i being implemented, are to be checked by Non-destructive test (ile integrity testing for Mult-pile/ micro-plle & Core test for Raft foundation). 6. Special design monopoles like 30M DDA Monopole, 25M Railtel monopole, 25M Lotus Monopole for Chandigarh are designed considering Multi-operator co-location and higher RF antenna loading. These Monopoles are suitable for 4% Sector up-gradation, Reliance Jio Infocomm Ltd. Rev.00 Page 6 of 8 7. Site details ‘As GBM is being subjected to higher antenna load than design, itis decided to allow Bi-sector antenna addition only in GBM sites which are away from Coast (> 20km from coast). {As per available list from RF, below are the qualifying GBM sites st City Name Mind sreea aren st Sen Grand Total (gS 39-aam/s | 47m/s 1 [Aanmedabod 39 m/s 274 27 2 | Bangalore 39 m/s 34 oa 3 | enoPAL 39m/s 3 a @_| Chandigarh arms E 6 1s 5 | COIMBATORE 39 m/s 37 * 37 % | Dein aT m/s : 254 a4 7 ‘| Hyderabad 44 m/s 55 a 55 8 | INDORE 39 m/s & 47 m/s 7 37 108 9 47 m/s : 305 305 10 | Kanpur AT m/s - 35, 35 ii | Lucknow a m/e 700 100 32 | Mumba aml ET} : 29 33 | Nagpur amis 7 5 a 1a | Pune 35m/5 a et Is | surat amis Zi z 16 | Vadodara 3a m/s ii 5 Ta Grand Total 841 946 1787 Note : Above table is as per Status updated in GIS however same shall be re-verified before actual implementation. Reliance Jio Infocomm Ltd. Rev.00 Page 7 of 8 8. References Drawing no: 10070-£51-XX-XXXX-XXXX-ENB-000-212 (SLD for GBM with 16 kW DCPS) Drawing no: 10070-£51-XX-XXXX-X8XX-ENB-000-204 (SLD for GBM with 12 kW DCPS) ‘Drawing no: 10070-ESK-XX-XXXX-XXXX-ENB-000-580 (GBM internal layout) Document no: R4G-70-TWC-GEN-PR-027 (Core testing guidelines) Document no: R4G-40-EP-GEN-PR.008 (File intogrity testing guidelines) awe Reliance Jio Infocomm Ltd. Rev.00 Page 8 of 8