0% found this document useful (0 votes)
4 views2 pages

ATE-ODC-MF-009 Rev 00 Pinhole & Holiday Detection Report

The document is a Pinhole & Holiday Detection Report for Al Turki Enterprises L.L.C., detailing inspection results for a specific project. It includes information on the purchase order, location, drawing number, paint system, and testing method used. The report captures voltage settings, results, and final remarks, along with signatures from relevant personnel.

Uploaded by

Devam Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views2 pages

ATE-ODC-MF-009 Rev 00 Pinhole & Holiday Detection Report

The document is a Pinhole & Holiday Detection Report for Al Turki Enterprises L.L.C., detailing inspection results for a specific project. It includes information on the purchase order, location, drawing number, paint system, and testing method used. The report captures voltage settings, results, and final remarks, along with signatures from relevant personnel.

Uploaded by

Devam Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

AL TURKI ENTERPRISES L.L.C.

PINHOLE & HOLIDAY DETECTION REPORT


Report No.:
Contract No.: Contract/Project:
Date:

Purchase Order No. : Location :

Drawing No. : ISO Line No. :

Paint System : Method : Wet Sponge/High Volt.Detector

Equip. Sr.no/Validity :

Job Description :

Pipe TDFT Voltage Setting


Date Result Remarks
Spool No. Size (Micron) Volt KV

Final Remarks:

ATE PDO

Signature : Signature :

Name : Name :

Designation : Designation :

ATE-ODC-MF-009 REV 00 Page 1 of 2


Date : Date :

ATE-ODC-MF-009 REV 00 Page 2 of 2