JSD 6000
multipurpose dp3 vessel
for PIPELAYING (J-LAY and s-lay)
jsd 6000
multipurpose dp3 vessel
for PIPELAYING (J-LAY and s-lay)
FLEXIBILITY CAPACITY STABILITY
ABILITY TO PERFORM A COMPLETE HIGH J-LAYING CAPACITY (UP TO 2000 DP3 VESSEL WITH 55.7 MW POWER
OFFSHORE FIELD DEVELOPMENT T HOLD TENSION AND 36” PIPES OD), CAPACITY AND A 8-POINTS MOORING
S-LAYING CAPACITY (UP TO 900 T SYSTEM
HOLD TENSION AND 60” PIPES OD)
AND LIFTING CAPACITY (UP TO 5200 T)
TECHNICAL SPECIFICATIONS
MAIN FEATURES CLASSIFICATION Modular stinger from 94 m to 190 m,
Length overall: 215.08 m DP Class 3 operated by a patented stinger handling
Length, perpendicular: 197.36 m system
Length, overall: 199.10 m MAIN CRANE CAPACITY
Breadth (molded): 49.00 m 5,200 t lifting capacity ACCOMMODATIONS
Depth at side (molded): 22.40 m 399 PoB high standard
Depth, freeboard (molded): 14.70 m AUXILIARY CRANES
Draft, min. operational: 8.08 m 2 x 50 t (knuckle boom) FIRING LINE
Draft, max. operational: 10.83 m 1 x 35 t (knuckle boom) Double line for quad-joint prefabrication
Draft, for transit: 8.20 m 2,200 m water depth / Active
Speed: 11.80 kn Heave compensated WELDING SYSTEM
1 x 25 t (telescopic boom) Fully equipped with last generation
CLASSIFICATION Saipem automatic Welding Systems
Built under Lloyd’s Register survey for J-LAY TOWER
derrick pipelay vessel. LR notations: HOC: holding capacity 1,500 t nominal and ROV (FUTURE)
✠ 100 A1, pipe laying, Helicopter up to 2,000 t in accidental flooded 2x work class ROVs located
Landing Area, LA, IWS, LI, ECO (IHM), conditions at vessel stern
Ice Class 1C, FS, WDL (15 t/m2) TRAC: capacity 1,500 t in regular
✠ LMC,BWTS, UMS, DP(AAA), CAC3, conditions and up to 1,800 t in accidental DECK LOADING CAPACITY
ShipRight ACS(B) flooded conditions 2,100 m2 large deck for equipment
PIPELINE ABANDONMENT: 2 x 600 t A/R storage (all pipelay deck equipment
POWER winches, in tandem can provide up to are removable) with 15 t/m2 bearing
6 x 9,300 kW main diesel generators 1,200 t lowering capacity capacity
1 x 1,550 kW emergency generator Those winches are also designed for
S-Lay A/R operation and deep-water DECK LOADING CAPACITY
PROPULSION AND DP module handling Starboard side overboarding platform
2 x 6,500 kW aft propellers azimuthing Designed to lay pipes from 5” to 36” with 2 sheaves to allow deep water
6 x 3,800 kW retractable azimuthing lowering works
thrusters S-LAY SYSTEM Capability to accommodate chain laying
2 x 2,500 kW tunnel thrusters 4 x tensioners of max. 175 t nominal equipment
tension each, peak-hold tension 225 t Possibility to install a removable
MOORING Max. nominal laying capacity of 700 t carousel or large reel handing system
8-points mooring systems Designed to lay pipes from 5” to 60” on deck
(including coating) by means of 4 Possibility to install an umbilical
tensioners and flexible laying equipment
Multipurpose DP3 vessel for pipelaying in S-Lay and J-Lay mode,
and heavy lifting useful to offshore projects such as decommissioning and windfarm.
J-Lay system of 1,500 t laying capability and 2,000 t holding capacity for laying
quadruple and triple joints.
S-Lay system of 900 t holding capacity in accidental conditions, featuring a modular
stinger operated by a patented handling system.
JSD 6000 is also equipped with a full revolving heavy lifting crane of 5,200 ton capacity.
SAIPEM.COM