This document outlines the detailed scope of work and cost estimates for interior renovations of a 2BHK apartment at Kandivali (W), including civil, plumbing, electrical, carpentry, and painting work. The total estimated cost for the project is broken down into various categories, with civil work amounting to 170,614.07, plumbing work at 38,500, and additional costs for other services. The document serves as a formal offer for turnkey contractor services to the client, Mr. Devang Pancholi.

Uploaded by

devang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views8 pages

Residential Interior Quotation - 06102024

This document outlines the detailed scope of work and cost estimates for interior renovations of a 2BHK apartment at Kandivali (W), including civil, plumbing, electrical, carpentry, and painting work. The total estimated cost for the project is broken down into various categories, with civil work amounting to 170,614.07, plumbing work at 38,500, and additional costs for other services. The document serves as a formal offer for turnkey contractor services to the client, Mr. Devang Pancholi.

Uploaded by

devang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

kalp design studio.

LIVING ROOM
TOTAL RATE PER TOTAL
SCOPE OF WORK SPECIFICATION DIMENSIONS
QUANTITY UNIT AMOUNT
CIVIL WORK (Inclusive of sand & cement & labour work)
1 Removing Old Tiles Flooring tiles Sq.ft 737 33 24321
Common Toilet Wall tiles 4.66 9 Sq.ft 41.94 33 1384.02
4.66 9 Sq.ft 41.94 33 1384.02
7.83 9 Sq.ft 70.47 33 2325.51
5.16 9 Sq.ft 46.44 33 1532.52
above door 2.5 2 Sq.ft 5 33 165
2 Removing Old Skirting Rft 160 33 5280
3 Brick Work Demolition Living room duct entrance 2 3 Sq.ft 6 44 264
Toilet duct wall 2 3 Sq.ft 6 44 264
4 Flooring tile fixing charges Italian FinishVitrified Tiles Sq.ft 737 110 81070
5 Skirting fitting charges Italian Finish Vitrified Tiles Rft 58.4 110 6424
(3" Height)
6 Water Proofing Work Sq.ft 825 28 23100
7 Cement Plaster Single coat 10-12 mm thick Sq.ft 300 77 23100
8 Kitchen Platform alteration
TOTAL 170614.07
PLUMBING WORK (With C-PVC Concealed Materials)
1 Concealed C-PVC line for Excluding all Fixtures and Fitting L.S 38500
Bathroom
TOTAL 38500
P.O.P/GYPSUM
1 False ceiling Saint Gobain Gypsum Board with Sq.ft 570 95 54150
medium G.I Framing
Vertical Surface Rft 65 45 2925
Alumium framing wooden finish Sq.ft 165 60 9900
PVC sheets (Balcony, Toilets, Dry
area) Fitting Charges
2 Light Gala Cutting Nos. 58 100 5800
TOTAL 72775
ELECTRICAL (Includes Polycab Wire, Conceal Pipes for Flooring & Ceiling & Metal box)
1 Per Point Light Point Nos. 70 950 66500
A.C Point Nos. 3 1900 5700
Fan Point Nos. 5 950 4750
Internet Point (LAN/CAT6) Rft 60 70 4200
Plug Point (6 amp) Nos. 15 1480 22200
Plug Point (16 amp) Nos. 6 1925 11550
2.5 mm circuit wire (overall area) Rft 360 125 45000
4 mm circuit wire (overall area) Rft 360 165 59400
2 Electrical Fixtures Fitting Charges LED Panel Light Nos. 26 135 3510
LED Spot Light Nos. 12 135 1620
Strip Light Rft 48 25 1200
Profile Light Rft 95 90 8550
Hanging Pendant Light Nos. 5 325 1625
Fan Ceiling Mounted Nos. 5 325 1625
Driver for Profile lights Per Driver 20 325 6500
D.B Fitting L.S 1 13500 13500
TOTAL 257430
PAINTING
1 Ceiling 2 Coats of Astar with Primer & 3 Sq.ft 570 42 23940
Coats of Asian Royal Paint
2 Wall 2 Coats of Astar with Primer & 3 180 9 Sq.ft 1620 42 68040
Coats of Asian Royal Paint
TOTAL 91980
CARPENTRY WORK (Inclusive of all Required Hardware Fittings & Materials)
1 Wooden Panelling(With ply All in Ply with laminate finish 6.16 9 Sq.ft 55.44 575 31878
frame) at Entrance (2000rs. Per sheet)
2 Shoe/Console unit All in Ply with laminate finish 6.16 2.66 Sq.ft 16.3856 1600
(2000rs. Per sheet) With upto 12"
depth, without drawer and only
openable shutter
3 Tv Unit -Panelling(With ply All in Ply with laminate finish 6.5 9 Sq.ft 58.5 575 33637.5
frame) (2000rs. Per sheet)
4 Tv Unit Console (4 Drawers max.) All in Ply with laminate finish R.ft 6.5 4500 29250
(2000rs. Per sheet) with 2 Drawers

5 Curtain Pelmet Ply and laminate finish 10.5 R.ft 10.5 400 4200
6 Sofa As per selection 6.25 Rft 4500 28125
7 Center Table All in Ply with laminate finish L.S 25000
8 Dining Table All in Ply with laminate finish 5.25 3.25 Sq.ft 17.0625 1200 20475
(2000rs. Per sheet)
9 Dining Chair Wooden chair with cushioned Nos. 2 7500 15000
seating
10 Dining Sofa As per selection 5 Rft 4500 22500
11 Wooden panelling for Hidden All in Ply with laminate finish 7.5 9 Sq.ft 67.5 575 38812.5
door for Dry area (2000rs. Per sheet)
12 Storage Unit besides Dining area All in Ply with laminate finish 5.5 2.66 Sq.ft 14.63 1900 27797
(2000rs. Per sheet) With upto 15" -
18" depth, without drawer and only
openable shutter
13 Storage Unit in passage area All in Ply and Laminate Finish With 2 2.66 Sq.ft 5.32 1600 8512
upto 12" depth, without drawer and
only openable shutter
14 Main Door Removing of Old Laminate & 3.5 7 24.5 400 9800
aplying New Laminate & Handle
Lock & Hardware & Polish Work

15 Safety door 45MM Flush Door With Metal Jaali 3.5 7 Pc 24.5 1200 29400
& Handle Lock & Hardware &
Polish Work
16 Outside panelling All in Ply and Laminate Finish 2 9 Sq.ft 18 575 10350
3.5 2 Sq.ft 7 575 4025
17 Balcony - Lounge Seating High Wooden chair with cushioned Pc 2 7500 15000
18 Floor Covering seating Sq.ft 737 30 22110
TOTAL 375872
As per layout
kalp design studio.

KITCHEN
RATE PER TOTAL
SCOPE OF WORK SPECIFICATION DIMENSIONS TOTAL QUANTITY
UNIT AMOUNT
CARPENTRY WORK (Inclusive of all Required Hardware Fittings & Materials)
1 Platform Storage Below With All in ply and Laminate Finish 11 2.66 Sq.ft 29.26 1250 36575
Shelfs
2 Platform Storage Above With All in ply and Laminate Finish 7 3.5 Sq.ft 24.5 1750 42875
Shelfs (without profile shutter)
3 Kitchen blum / haffle/ hettich Per Basket 6500
brand tandem drawer box fitting
4 Tall Unit All in ply and Laminate Finish 5.6 9 Sq.ft 50.4 2150 108360
(without profile shutter) and upto
24" depth with upto 2 drawers and
openable shutter
5 Wooden Partition All in ply and Laminate Finish 2 6.33 Sq.ft 12.66 575 7279.5
TOTAL 195089.5
As per layout
kalp design studio.

C.TOILET
RATE PER TOTAL
SCOPE OF WORK SPECIFICATION DIMENSIONS TOTAL QUANTITY
UNIT AMOUNT
CARPENTRY WORK (Inclusive of all Required Hardware Fittings & Materials)
1 Door Removing of Old Laminate & 2.5 7 Sq.ft 17.5 400 7000
aplying New Laminate & Handle
Lock & Hardware & Polish Work

2 Basin under storage All in ply and Laminate Finish 2.25 2 Sq.ft 4.5 2150 9675
(without profile shutter) and upto
24" depth with upto 2 drawers
and openable shutter
TOTAL 16675
As per layout
kalp design studio.
C. BEDROOM
TOTAL RATE PER TOTAL
SCOPE OF WORK SPECIFICATION DIMENSIONS
QUANTITY UNIT AMOUNT
CARPENTRY WORK (Inclusive of all Required Hardware Fittings & Materials)
1 Bed All in ply and Laminate 5.5 6.25 Sq.ft 34.375 1750 60156.25
Finish(Without Trolley)
2 Trolley in Bed each 5500
3 Bed-Headboard All in ply and without Leather 9.5 2 Sq.ft 19 550 10450
padding
4 Bed Back Panelling All in ply and Laminate Finish 9.5 9 Sq.ft 85.5 550 47025

5 Side table (2 drawes max.) All in ply and Laminate Finish 2 1.5 Pc 2 7500 15000
6 Wadrobe(24" depth with openable All in ply and Laminate Finish 10.75 9 Sq.ft 96.75 2300 222525
shutters and 4 nos. drawers)

7 Open Niche All in ply and Laminate Finish 1.5 9 Sq.ft 13.5 750 10125
8 Study table counter wall fixed All in ply and Laminate Finish 4.5 1.5 Sq.ft 6.75 1700 11475
(with only 2 drawers )
9 Study table chair Wooden chair with cushioned Nos. 1 7500 7500
seating
10 Door Removing of Old Laminate & 3 7 Sq.ft 21 400 8400
aplying New Laminate & Handle
Lock & Hardware & Polish
Work
11 Curtain Pelmet Ply and laminate finish Rft 10.83 400 4332
TOTAL 396988.25
As per layout
kalp design studio.

M. BEDROOM
RATE PER TOTAL
SCOPE OF WORK SPECIFICATION DIMENSIONS TOTAL QUANTITY
UNIT AMOUNT
CARPENTRY WORK (Inclusive of all Required Hardware Fittings & Materials)
1 Wadrobe(24" depth with All in ply and Laminate Finish 7.5 9 Sq.ft 67.5 2300 155250
openable shutters and 4 nos.
drawers)
2 Study table counter wall fixed All in ply and Laminate Finish 3 1.33 Sq.ft 3.99 1700 6783
(with only 2 drawers )
3 Study table chair Wooden chair with cushioned Pc 1 7500 7500
seating
4 Study Desk above srtorage upto All in ply and Laminate Finish 3 3.5 Sq.ft 10.5 1750 18375
15" depth without drawers and
only openable shutters

5 Thick ledge All in ply and Laminate Finish 3.75 0.75 Sq.ft 2.8125 550 1546.875
6 Bed All in ply and Laminate 5.5 6.25 Sq.ft 34.375 1750 60156.25
Finish(Without Trolley)
7 Trolley in Bed each 5500

8 Bed-Headboard All in ply and without Leather 7 2 Sq.ft 14 550 7700


padding
9 Bed Back Panelling All in ply and Laminate Finish 7 9 Sq.ft 63 550 34650
10 Side table (2 drawes max.) All in ply and Laminate Finish 1.5 1.25 Pc 1 8000 8000
11 Door Removing of Old Laminate & 3 7 Sq.ft 21 400 8400
aplying New Laminate & Handle
Lock & Hardware & Polish Work

12 Curtain Pelmet Ply and laminate finish 10.5 R.ft 10.5 400 4200
TOTAL 312561.125
As per layout
kalp design studio.
A. TOILET

SCOPE OF WORK SPECIFICATION DIMENSIONS TOTAL QUANTITY RATE PER UNIT TOTAL AMOUNT

CARPENTRY WORK (Inclusive of all Required Hardware Fittings & Materials)


1 Door Removing of Old Laminate & 2.5 7 Sq.ft 17.5 400 7000
aplying New Laminate & Handle
Lock & Hardware & Polish Work
2 Basin under storage All in ply and Laminate Finish 5.16 2 Sq.ft 10.32 2150 22188
(without profile shutter) and upto
24" depth with upto 2 drawers and
openable shutter
TOTAL 29188
As per layout
kalp design studio.
Dt- 06.10.2024

To,
MR.DEVANG PANCHOLI,
Kandivali (West)

Dear Sir,

We are Pleased to offer you our Turnkey Contractor service for your 2BHK Apartment at Kandivali
(W) . Herewith we are giving you the scope of interior work with the total approximate estimate.

TOTAL
SCOPE OF WORK
AMOUNT
CIVIL WORK 170614.07
(Inclusive of sand & cement & labour work)
PLUMBING WORK 38500
(Inclusive of sand & cement & labour work)
P.O.P/GYPSUM & ACP WORK 72775
(Inclusive of Material & Labour)
ELECTRICAL 257430
(Includes Polycab Wire, Conceal Pipes for Flooring & Ceiling & Metal box)
PAINTING 91980
(Inclusive of Material & Labour)
CARPENTRY WORK 1326373.42
(Inclusive of Material & Labor)
SWITCH BOARDS & LIGHT FIXTURES 100000
DEBRIS REMOVAL CHARGES 15000
FURNITURE CLEANING 15000
ACP/PVC SHEETS 30000
TILES AND GRANITE 100000
TOTAL 2217672.49
CURTAINS & MATTRESS 90000
TOTAL 2307672.49

Hoping to find everthing in your accordance and order and assuring you of the
best of our services.

Yours Faithfully,