DRAWING SCHEDULE:
NUMBER TITLE P1 19.03.2025 80% DD ISSUE
1 MULBERRY LANE
DELIVERY, PUTTING INTO SERVICES, PREPARATION OF SHOP DRAWINGS, SITE
PS GAS METER
FW FLOOR WASTE PRESSURE SWITCH PAINTING, IDENTIFICATION, LABELLING, TESTING, COMMISSIONING, CERTIFICATIONS,
HOT WATER RETURN
DEFECTS LIABILITY, WARRANTIES, MAINTENANCE AND AS BUILT DRAWINGS FOR THE
BTFW BASKET TRAP FLOOR WASTE STRAINER FILTER HYDRAULIC SERVICES.
GAS
SMH SEWER MANHOLE PUMP 3. THE WORKS UNDER THE CONTRACT SHALL INCLUDE ALL THOSE MINOR WORKS NOT
FLUE GAS FLUE EXPLICITLY SPECIFIED AND WHICH ARE REASONABLY OBVIOUSLY NECESSARY AS
PART OF THE WORKS.
ORG OVERFLOW RELIEF GULLY BUTTERFLY VALVE
FH FIRE HYDRANT
4. PRIOR TO SUBMITTING TENDER THE CONTRACTOR SHALL INSPECT THE SITE TAKING
IPMF INDUCT PIPE MICA FLAP FLOAT VALVE
INTO ACCOUNT ANY CONDITION LIKELY TO AFFECT THIS CONTRACT.
FS FIRE SERVICE
CONTRACTOR SHALL INCLUDE PROVISIONS OF ANY ALTERATIONS / ADJUSTMENTS TO
SIP SEWER INSPECTION PIT (SEALED) PRESSURE LIMITING VALVE
THE HYDRAULIC SERVICES AS REQUIRED TO SUIT THE BASE BUILDING SYSTEM
PO PUMP OUT INCLUSIVE OF EXISTING STRUCTURAL PENETRATIONS (IF ANY) AND OTHER TENANCY
CP CONTROL PANEL PRESSURE REDUCTION VALVE
WORKS. FORMING PART OF THE TENDER SUBMISSION, CONTRACTOR SHALL ADVISE IN
RW RAINWATER WRITING ANY ALTERATIONS / ADJUSTMENTS REQUIRED TO THE HYDRAULIC SERVICES
DTU DRAINAGE TURN UP BACKFLOW PREVENTION
INSTALLATIONS.
O/F OVERFLOW BALANCING VALVE 5. INCORPORATE ALL COSTS AND ALLOWANCE FOR THE WORKS, ANY CUTTING IN,
CONNECTIONS, ALTERATIONS TO THE EXISTING HYDRAULIC SERVICES SYSTEMS
EXISTING PIPEWORK TMV THERMOSTATIC MIXING VALVE INCLUSIVE OF TESTING AND COMMISSIONING WHICH MAY BE REQUIRED TO BE
UNDERTAKEN OUTSIDE NORMAL WORKING HOURS OR ON WEEKENDS.
MISCELLANEOUS HOSE TAP
6. UNDERTAKE ALL REQUIRED SITE INDUCTIONS AS PER BUILDING MANAGEMENT
EAWM EXISTING AUTHORITIES WATER MAIN WATER METER REQUIREMENTS. LIAISE WITH THE BUILDING MANAGEMENT PRIOR TO COMMENCEMENT
H001 DRAWING CONTINUATION OF WORK.
COLD WATER POINT
ES EXISTING AUTHORITIES SEWER MAIN
7. PRIOR TO ISOLATING ANY SYSTEMS, NOTIFY THE BUILDING MANAGEMENT AND OBTAIN
XXX SERVICES IDENTIFIER - NON-DIRECTIONAL HOT AND COLD WATER POINTS THE RELEVANT PERMIT TO COMPLETE THE ISOLATION. THE SYSTEM SHALL BE
EAGM EXISTING AUTHORITIES GAS MAIN XX RETURNED TO NORMAL OPERATIONAL STATUS ON COMPLETION. BUILDING
Project Number:
REDUCED PRESSURE ZONE DEVICE MANAGEMENT MUST BE INFORMED IN ADVANCE AND ANY CONDITIONS IMPOSED BY
EASWM EASWM EXISTING AUTHORITIES STORMWATER MAIN XXX THE BUILDING MANAGEMENT SHALL BE MET BY THE CONTRACTOR AT THEIR EXPENSE. 24170
SERVICES IDENTIFIER - DOWNWARD FLOW
XX ABBREVIATIONS, SYMBOLS AND LINETYPES IN THE LEGEND Drawing Number:
MAY NOT APPEAR ELSEWHERE ON THE DRAWINGS. 8. NO WORK THAT INVOLVES THE ISOLATION OR DISRUPTION OF THE HYDRAULIC
XXX SERVICES IDENTIFIER - UPWARD FLOW THIS LEGEND SHOULD BE USED AS A GUIDE ONLY SERVICES MAY TAKE PLACE UNTIL THE BUILDING MANAGEMENT HAS GIVEN WRITTEN H000
XX MISCELLANEOUS APPROVAL.
Revision:
SERVICE TYPE
PIPE RISER 9. ALL SYSTEMS AND EQUIPMENT SHALL BE FULLY TESTED IN ACCORDANCE WITH THE P1
XXX
XX RELEVANT STANDARDS, CODES AND THE REQUIREMENTS OF THE LOCAL SUPPLY
ABBREVIATIONS SERVICE SIZE AUTHORITY. ANY OTHER TESTS DEEMED NECESSARY SHALL BE CARRIED OUT.
PIPE DROPPER
1 PIPE TEE 10. AFTER COMPLETION OF ALL THE TESTS AND CHECKS, PROVIDE STANDARD
AAV AIR ADMITTANCE VALVE Lt LITRE DETAIL TAG
AFFL ABOVE FINISHED FLOOR LEVEL NTS NOT TO SCALE - CERTIFICATES OF COMPLIANCE FOR BUILDING SAFETY SERVICES AS REQUIRED BY
AD AERIAL DRAINAGE NPCW NON POTABLE COLD WATER THE PRINCIPAL CERTIFYING AUTHORITY FOR THE PROVISION OF CERTIFICATES OF
PIPEWORK CONTINUATION
B BASIN OFG OVERFLOW GULLY OCCUPANCY.
A REVISION TAG
BTH BATH OSD ONSITE DETENTION
BT BOUNDARY TRAP PD PLANTER DRAIN FLOW DIRECTION 11. TENDERER SHALL TAKE SPECIAL NOTICES OF THE LOCATION OF THE PROPOSED
CICL CAST IRON CEMENT LINED PG PLANTER GRATE WORKS WITH THE DELIVERY AND ACCESS FOR DELIVERIES.
CO CLEAROUT RPZD REDUCED PRESSURE ZONE DEVICE NEW TEE IN EXISTING PIPEWORK Sydney: (02) 9052 6460
CW COLD WATER RV RELIEF VENT Newcastle: (02) 9052 6461
12. VARIATION SUBMISSIONS RESULTING FROM THE FAILURE TO ADEQUATELY ASSESS
DB DISABLED BASIN RWT RAINWATER TANK NEW CONNECTION TO EXISTING PIPEWORK THE EXISTING INSTALLATION DURING THE TIME OF TENDER SHALL BE REJECTED.
DWC DISABLED WATER CLOSET RWO RAINWATER OUTLET
DDCV DOUBLE DETECTOR CHECK VALVE S STACK SYSTEM
DP DOWNPIPE SK KITCHEN SINK FIRE HOSE REEL
FE FIRE EXTINGUISHER SHR SHOWER Sydney : Suite 1, 401 Pacific Hwy
FH FIRE HYDRANT SST SOIL STACK FIRE HYDRANT Artarmon, NSW 2064
FHR FIRE HOSE REEL STW STORMWATER Newcastle : Suite 4, 102 Glebe Road
FW FLOOR WASTE TMV THERMOSTATIC MIXING VALVE FE The Junction, NSW 2291
FIRE EXTINGUISHER
GAVP GREASE ARRESTOR VENT PIPE TV TEMPERING VALVE
H/L HIGH LEVEL TD TUNDISH
1 NODE POINT
HT HOSE TAP TTD TRAP TUNDISH
[email protected]
HWF HOT WATER FLOW TW TRADE WASTE www.centricengineers.com
HWR HOT WATER RETURN TWV TRADEWASTE VENT PENETRATION
HW HOT WATER UR URINAL
HWU HOT WATER UNIT VP VENT PIPE
PIPE END SECTION
IPMF IN-PIPE MICAFLAP WC WATER CLOSET
LT LAUNDRY TUB WM WASHING MACHINE
W/M WATER METER
WP WATER POINTS
© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.
1. THESE DRAWINGS ARE A GUIDE ONLY FOR THE LOCATION AND LAYOUT OF THE SERVICE PIPES. 1. THE RAINWATER WILL BE COLLECTED FROM THE ROOF AND STORED IN A WATER TANK AS SHOWN
1. PROVIDE FIRE RATED PENETRATIONS FOR SERVICES PASSING THROUGH EACH FIRE RATED 2. PROVIDE IDENTIFICATION TO ALL SERVICE PIPES AND CONDUITS EXPOSED TO VIEW OR IN
CONTRACTOR TO EXAMINE SITE CONDITIONS AND ROUTE PIPEWORK TO MOST APPROPRIATE ON THE DRAWINGS. RAINWATER WILL BE PRESSURISED INTO A DEDICATED RAINWATER REUSE
ELEMENT. FIRE RATED PENETRATIONS SHALL ACHIEVE THE SAME RATING AS THE BUILDING ACCESSIBLE LOCATIONS SUCH AS DUCTS AND CEILING SPACES AND ALL EQUIPMENT.
LOCATION ON SITE. PIPE SYSTEM.
ELEMENT PENETRATED. SEAL PENETRATIONS WITH A SYSTEM CONFORMING TO AS4072.1.
3. ALL PIPES SHALL BE ADEQUATELY SUPPORTED AND SECURELY FIXED IN ACCORDANCE WITH THE
PASSIVE FIRE ENGINEER AND NCC. 2. IDENTIFY ALL RAINWATER PIPEWORK AND EQUIPMENT WITH THE FOLLOWING:
2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS,
SPECIFICATIONS AND DRAWINGS. FOR THE FINAL LOCATION OF FIXTURES AND FITTINGS REFER 2. WHEREVER OR WHENEVER THE PROPOSED WORKS REQUIRE THE PENETRATION OF AN ELEMENT
DRAWINGS AND TO THE SATISFACTION OF THE SI. SUCH SUPPORTING AND FIXING TO BE CARRIED
OUT WITHOUT CAUSING ANY DISTORTION, DAMAGE OR STRESS ON THE PIPES OR PIPE JOINTS. - “WARNING RECYCLED / RECLAIMED / RAINWATER REUSE WATER - DO NOT DRINK”. 80%
TO ARCHITECTURAL SCHEDULE AND DRAWING PACKAGE. HAVING A FIRE RESISTANCE RATING, THE CONTRACTOR SHALL ENSURE THAT ANY PERSON
RESPONSIBLE FOR THE INSTALLATION OF ANY SYSTEM USED TO PROTECT/REINSTATE THE FRL
PIPES SHALL BE SUPPORTED SPECIFIED IN “PRELIMINARIES” SECTION.
4. FIXTURE TRAPS:
3. THE CONTRACTOR IS TO SUPPLY AND INSTALL A RAINWATER RE-USE TANK AS PER CIVIL ISSUE
ENGINEER/ARCHITECTS' REQUIREMENTS.
3. THE HYDRAULIC SERVICES WORK SHALL BE CARRIED OUT UNDER THE DIRECT SUPERVISION OF A OF THE PENETRATION; - SINKS - 50mm TWO-PART UNIVERSAL PATTERN. 4. THE CONTRACTOR IS TO SUPPLY AND INSTALL A RAINWATER RE-USE PUMP AND ASSOCIATED
LICENSED PLUMBER, DRAINER AND GAS FITTER IN STRICT ACCORDANCE WITH THE NSW CODES - HOLDS AN APPROPRIATE LICENSE
OF PRACTICE PLUMBING AND DRAINAGE, NATIONAL CONSTRUCTION CODE, RELEVANT
AUSTRALIAN STANDARDS, COUNCIL REGULATIONS, FIRE ENGINEERING REPORT WHERE
- PROVIDES AN INSTALLATION STATEMENT IN THE FORMAT PRESCRIBED BY AS4072.1 TO
DESCRIBE THE PENETRATION, ITS LOCATION AND METHOD OF TREATMENT;
- BASIN - 40mm CP COPPER TWO-PART S OR P TRAP WITH 40mmCP EXTENSION RISER.
FILTERS, BACKFLOW PREVENTION AND SWITCHOVER DEVICES AS PER HYDRAULIC DRAWINGS.
HYDRAULIC
APPLICABLE AND TO THE SATISFACTION OF THE CONTROLLING AUTHORITIES. - THE CONTRACTOR SHALL FURNISH A COPY OF THE INSTALLATION STATEMENT AS PROVIDED
IN ABOVE TO THE INSPECTING OFFICER PRIOR TO REQUESTING AN INSPECTION FOR
5. TERMINATE ALL VENTS THROUGH ROOF WITH A VENT COWL. FINISH VENTS 300mm ABOVE
NON-TRAFFICABLE ROOFS AND 3m ABOVE TRAFFICABLE ROOFS, 6 METRES CLEAR OF OPENINGS
GAS SERVICES:
1. SUPPLY, INSTALL, TEST AND COMMISSION THE GAS SERVICE FROM THE POINT OF CONNECTION
SERVICES
4. THIS SET OF DRAWINGS IS DIAGRAMMATIC ONLY. THE CONTRACTOR SHALL CO-ORDINATE WITH 'SUBSTANTIAL COMPLETION'. AND FRESH AIR INTAKES AS REQUIRED BY THE LOCAL AUTHORITY AND AS INDICATED ON THE TO ALL GAS POINTS. EXTEND AS SPECIFIED SUPPLYING ALL METERS, REGULATORS, FILTERS,
OTHER TRADES AND SET OUT ALL WORKS TO SUIT ACTUAL ON-SITE CONDITIONS. DRAWINGS. PIPEWORK AND SUNDRY ITEMS TO COMPLETE THE SYSTEM TO COMPLY TO THE LOCAL GAS Project North
3. PROVIDE ACCESS TO PASSIVE FIRE PROTECTION DEVICES FOR INSPECTION IN ACCORDANCE 6. INSTALL INSPECTION OPENINGS IN ACCESSIBLE LOCATIONS SO THAT EACH SECTION OF AUTHORITIES' REGULATIONS.
5. THIS SET OF DRAWINGS IS ISSUED FOR TENDER STATUS FOR THE WORKS WHICH DOES NOT WITH AS1851.
CONSTITUTE AS THE INSTALLATION DRAWINGS. THE CONTRACTOR SHALL DEVELOP THE PIPEWORK CAN BE CLEANED. INSPECTION OPENING SIZES SHALL BE IN ACCORDANCE WITH 2. CARRY OUT THE GAS INSTALLATION IN ACCORDANCE WITH THE REQUIREMENTS OF THE
INFORMATION CONTAINED ON THIS SET OF DRAWINGS INTO A COMPLETE SET OF FULLY DETAILED AUTHORITIES' REQUIREMENTS. INSTALL INSPECTION OPENINGS AS PER AS3500.2. REGULATORY AUTHORITIES AND RELEVANT GAS STANDARDS.
4. CONTRACTOR TO ENSURE THAT A QUALIFIED PASSIVE FIRE PROTECTION COMPANY IS ENGAGED
INSTALLATION DRAWINGS FOR CONSTRUCTION. TO CERTIFY THE FINAL INSTALLATION OF ANY INSTALLED PASSIVE FIRE PROTECTION MEASURES 7. SUPPLY AND INSTALL UPVC TUNDISHES IN AREAS REQUIRED FOR MECHANICAL DRAINAGE. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO APPLY FOR THE GAS APPLICATION AND PAY ALL
THAT ARE PART OF THIS SCOPE OF WORKS. TUNDISHES TO BE CHROME PLATED WHERE EXPOSED AND TO COMPLY TO "MATERIALS" SECTION. FEES ASSOCIATED. ASCERTAIN THE DEPTH, POSITION AND SUITABILITY OF THE GAS CONNECTION
6. CONFIRM LOCATION, SIZES AND DEPTHS OF STRUCTURAL BEAMS, ALL OTHER SERVICES, CEILING POINTS PRIOR TO THE COMMENCEMENT. INSTALL GAS PATH VALVE 225MM FROM BOUNDARY FOR
8. SUPPORTING AND FIXING TO BE CARRIED OUT WITHOUT CAUSING ANY DISTORTION, DAMAGE OR
VOID AND CEILING HEIGHT PRIOR TO INSTALLATION. DETERMINE EXACT SIZES AND LOCATIONS THERMAL INSULATION OF PIPEWORK GAS AUTHORITY CONNECTION. TO COMPLY WITH GAS AUTHORITY.
STRESS ON THE PIPES OR PIPE JOINTS.
OF STRUCTURAL PENETRATIONS ON SITE IN ACCORDANCE WITH THE STRUCTURAL
REQUIREMENTS. OBTAIN APPROVAL FROM STRUCTURAL ENGINEER PRIOR TO DRILLING ANY 4. CARRY OUT THE REQUIRED TESTS IN THE PRESENCE OF THE SUPERINTENDENT AND AN
1. THERMAL INSULATION SHALL COMPLY IN ALL RESPECTS WITH AS/NZS3500.4.
CORE HOLES AND PENETRATING STRUCTURE. AUTHORISED REPRESENTATIVE OF THE RELEVANT AUTHORITY. SUPPLY THE APPARATUS AND
COLD WATER SERVICE: MATERIALS NECESSARY. SUBMIT THE TEST RESULTS IN WRITING. REPLACE AND RETEST
2. FOR INSULATED PIPING, COMPLETELY COVER THE PIPE WITH INSULATION FITTED TIGHTLY TO THE
7. DISTURBED AREAS ARE TO BE REINSTATED TO THE ORIGINAL CONDITION. TRENCHES THROUGH COMPONENTS, IF ANY, WHICH FAIL THE REQUIRED TEST.
PIPE SURFACE AND SECURED AS PER MANUFACTURES REQUIREMENTS. INSTALL INSULATION SO
EXISTING ROAD AND CONCRETE SHALL BE FILLED AND COMPACTED AS PER STRUCTURAL 1. SUPPLY, INSTALL, TEST AND COMMISSION ALL DOMESTIC COLD WATER PIPES FROM THE
THAT IT IS READILY REMOVABLE AT UNIONS AND COUPLERS. 5. ON COMPLETION OF INSTALLATION AND TESTING, TURN ON ISOLATING AND CONTROL VALVES,
ENGINEER'S REQUIREMENTS. AUTHORITY'S MAIN TO ALL FIXTURES, FITTINGS AND FAUCETS REQUIRING DOMESTIC COLD
AND PURGE AND CHARGE THE INSTALLATION. HAND OVER THE INSTALLATION FULLY CHARGED
WATER. INCLUDE FOR ALL PIPEWORK, BENDS, OFFSETS, BRACKETS, PUMPS, TAPS AND FAUCETS
3. PROVIDE METAL SHEATHING TO INSULATION WHERE PIPEWORK IS IN PLANT ROOMS AND, WITH GAS.
8. OBTAIN APPROVALS, PERMITS AND FINAL CERTIFICATES FROM CONTROLLING AUTHORITIES AND SUNDRY EQUIPMENT REQUIRED FOR THE INSTALLATION. REFER TO 'MATERIALS' SECTION
EXTERNAL LOCATIONS. METAL SHEATHING INSTALLED TO MANUFACTURES REQUIREMENTS. 6. LPG INSTALLATION SHALL BE AS PER AS1596 AND RELEVANT GAS SUPPLIER REQUIREMENTS.
PRIOR TO THE COMPLETION OF WORKS. FOR PIPING SCHEDULE.
4. PROVIDE THERMAL INSULATION TO ALL DOMESTIC WATER PIPEWORK, INCLUDING COLD WATER.
2. APPLY TO WATER AUTHORITY FOR THE SUPPLY OF ALL METERS, TAKE DELIVERY FROM
9. PAY ALL APPLICABLE FEES AND CHARGES INCLUDING AREA CONTRIBUTION IN ACCORDANCE ENSURE COLD WATER PIPEWORK IS CONTINUOUSLY VAPOUR PROOFED INSULATED.
AUTHORITY'S STORE AND INSTALL ON SITE, COMPLETE WITH ALL VALVES AND FITTINGS Client:
WITH CONTROLLING AUTHORITIES CURRENT FEE SCALES. SUBMIT DETAILED HYDRAULIC
CALCULATIONS WITH ISOMETRIC DIAGRAMS FOR THE HYDRAULIC SERVICES SYSTEMS FOR REQUIRED. Architect: ARACON PROJECTS
ACOUSTIC TREATMENT OF PIPEWORK
REVIEW PRIOR TO INSTALLATION.
3. EXCAVATE, LOCATE, AND CONNECT TO THE EXISTING AUTHORITIES WATER MAINS FOR THE Project Number: 24170
1. ACOUSTIC REDUCTION TREATMENT SHALL BE PROVIDED IN AREAS REQUIRED BY THE NCC. ALL
10. TECHNICAL SUBMISSION INCLUDING SHOP DRAWINGS, MATERIAL / EQUIPMENT SCHEDULES WITH HYDRAULIC PIPES SHALL BE ACOUSTICALLY TREATED WHERE REQUIRED.
SERVICES AS REQUIRED AND EXTEND TO THE RETICULATION. CONTRACTOR TO APPLY, MAKE ALL Drawing Number: H001
RELEVANT APPLICATIONS AND PAY ALL ASSOCIATED FEES.
TECHNICAL INFORMATION, HYDRAULIC CALCULATIONS, BMS SCHEDULES AND SAMPLES SHALL BE Revision: P1
SUBMITTED TO CENTRIC FOR REVIEW PRIOR TO INSTALLATION.
O AND M MANUALS/COMMISSIONING: 4. PROVIDE A WATER PRESSURE TEST OF 1500 KPA FOR A PERIOD OF TWO HOURS. DISCONNECT
ANY EQUIPMENT CONNECT TO THE SERVICE NOT RATED TO THE TEST PRESSURE BEFORE Drawn by: NS
11. ALL HYDRAULIC SERVICES PIPEWORK SHALL BE LOCATED IN CEILINGS, WALLS, DUCTS OR UNDER
BENCHES. PIPEWORK INSTALLED OTHER THAN NOTED SHALL BE APPROVED BY THE 1. PRIOR TO PRACTICAL COMPLETION PROVIDE FULLY COMPREHENSIVE SET OF OPERATING AND TESTING COMMENCES. Designed by: NS
SUPERINTENDENT BEFORE WORK IS INSTALLED. MAINTENANCE MANUALS. THE CONTENT OF THE MANUALS SHALL MINIMALLY COMPRISE THE Approved by: JA
FOLLOWING: 5. HYDRAULICS SHALL FLUSH OUT, REMOVE ALL FOREIGN MATTER, AND CLEAN ALL THE SYSTEMS.
- LOCAL AUTHORITIES CERTIFICATE OF FINAL INSPECTION & APPROVAL. WATER SYSTEMS SHALL BE FLUSHED OUT WITH CLEAN WATER. Scale: NTS @ A1
LEVELS:
- OPERATING INSTRUCTIONS FOR SPECIFIC PLANT THAT REQUIRES DAY TO DAY OPERATIONS
BY PERSONNEL. 6. PROVIDE AND INSTALL HOSE TAPS WITH ANTI-VANDAL HEADS. (WHERE REQUIRED) 1 MULBERRY LANE
1. VERIFY THAT ALL INVERT LEVELS, SURFACE LEVELS AND CLEARANCES ARE CORRECT AND
OBTAINABLE PRIOR TO COMMENCING WORKS. - MAINTENANCE INSTRUCTION AS RECOMMENDED BY THE EQUIPMENT SUPPLIER FOR 1 MULBERRY LANE, GLENORIE
EQUIPMENT AND PLANT THAT IS LIABLE TO FAILURE WITHOUT SUCH MAINTENANCE. 7. ALL PIPES SHALL BE ADEQUATELY SUPPORTED AND SECURELY FIXED IN ACCORDANCE WITH NSW 2157
2. ALL LEVELS ARE SHOWN IN METRES AHD. UNLESS NOTED OTHERWISE. - MANUFACTURES BROCHURES, PROVIDING VISUAL RECOGNITION OF EACH COMPONENT OF AS3500.1
ASSEMBLY AS WELL AS NAME OF MANUFACTURER AND ADDRESS FOR PROCUREMENT.
- MANUALS ARE TO BE FULLY BOUND IN BOOK FORM COMPRISING OF A4 SHEETS OR A3
REGULATIONS:
SHEETS SUITABLY FOLDED. LARGER SHEETS OR DRAWINGS ARE TO BE ENCLOSED IN CLEAR
1. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH NSW CODES OF PRACTICE, NATIONAL
VINYL SLEEVES. SHEETS AND SLEEVES ARE TO BE PUNCHED AND CONTAINED IN QUALITY HEATED WATER SERVICE: HYDRAULIC SPECIFICATIONS
VINYL FOLDERS LABELLED ON THE OUTSIDE FRONT COVER AND ON THE SPINE TO INDICATE
CONSTRUCTION CODE, RELEVANT AUSTRALIAN STANDARDS, COUNCIL REGULATIONS, AND 1. SUPPLY, INSTALL, TEST AND COMMISSION THE DOMESTIC HOT WATER SERVICE AND WARM
THE NAME OF THE PROJECT, CLIENT AND THE SERVICES DESCRIBED THEREIN.
WHERE APPLICABLE AND TO THE SATISFACTION OF THE CONTROLLING AUTHORITIES. WATER SERVICE FROM THE HOT WATER HEATERS TO THE FIXTURES AND APPLIANCES. INCLUDE
- COPIES OF WARRANTY REGISTRATION CERTIFICATES FOR EACH ITEM OF EQUIPMENT.
- LOG SHEET FOR RECORDING; THE TESTING OF BACK FLOW PREVENTION DEVICES, FOR ALL PIPING, FITTINGS, SUPPORTS, INSULATION, HOT WATER HEATERS, VALVES, CIRCULATING
2. WORKS SHALL BE CONSTRUCTED & INSTALLED BY SUITABLY QUALIFIED, LICENSED, AND PUMPS AND OTHER SUNDRY ITEMS OF EQUIPMENT REQUIRED FOR THE INSTALLATION.
COMPETENT TRADES PERSONNEL. TEMPERING VALVES AND THERMOSTATIC MIXING VALVES, THE LOG SHEET DETAIL AND THE
TEST PROCEDURES AND MAINTENANCE OF ALL VALES, THE LOG SHEET DETAIL, AND THE
TEST PROCEDURES AND MAINTENANCE OF ALL VALVES, ALONG WITH LIST OF FUTURE TEST 2. PROVIDE A WATER PRESSURE TEST OF 1500 KPA FOR A PERIOD OF TWO HOURS. DISCONNECT
3. ALL WORKS RELATING TO NSW EDUCATION SHALL BE IN ACCORDANCE WITH THE EFSG ANY EQUIPMENT CONNECTED TO THE SERVICE NOT RATED TO THE TEST PRESSURE BEFORE
GUIDELINES. DATES.
- ORIENTATE AND ADJUST HYDRAULIC SERVICES TO SUIT FINAL LAYOUTS OF THE AMENITIES, TESTING COMMENCES.
2. WHERE PE, PEX, PPR, PB AND COMPOSITE PLASTIC PIPEWORK MATERIALS ARE NOMINATED, THE SITE IN CONJUNCTION WITH ALL OTHER DISCIPLINES TO ENSURE ADEQUATE COORDINATION OF
NOMINAL DIAMETER SHALL BE TAKEN AS THE INTERNAL DIAMETER OF THE PIPEWORK AND NOT ALL SERVICES AND ELEMENTS. COORDINATION SHALL BE CARRIED OUT PRIOR TO ANY SETTING
THE OUTSIDE DIAMETER. FOR NOMINAL DIAMETERS UP TO DN50, REFER TO AS/NZS3500.1. OUT, EXCAVATION AND PIPE INSTALLATION TAKING PLACE.
[email protected]
www.centricengineers.com
Scale Bar
EAW
M
EAW
M
EAW
M APPROXIMATE LOCATION OF EXISTING 100mm WATER MAIN
.65%
REFER TO WASTE WATER MANAGEMENT REPORT FOR EAW
M
@1
DETAILS INFORMATION.
80%
100
ISSUE
EAW
M
H
CO EAW
M HYDRAULIC
SERVICES
1
H10
EAW
M
Project North
PROPOSED EFFLUENT MANAGEMENT AREA FOR SECONDARY EAW
M
DWELLING. PROPOSED EFFLUENT MANAGEMENT AREA OF
342m² FOR FOR SUBSURFACE DRIP IRRIGATION FIELD BY
M
COUNCIL APPROVED WATER TREATMENT CONTRACTOR EAW
EAW
M
M
EAW
CO
Client:
Architect: ARACON PROJECTS
100 @ 1.65%
PROPOSED EFFLUENT MANAGEMENT AREA FOR PRIMARY DWELLING. Project Number: 24170
Ø25
PROPOSED EFFLUENT MANAGEMENT AREA OF 428m² FOR FOR Drawing Number: H002
POOL BACKWASH ABSORPTION TRENCH. REFER TO WASTE SUBSURFACE DRIP IRRIGATION FIELD BY COUNCIL APPROVED WATER
WATER MANAGEMENT REPORT FOR DETAILS INFORMATION.
Revision: P1
CO TREATMENT CONTRACTOR
TRENCH DIMENSION 4.8X 0.6X 0.6
100 @ 1.65% Drawn by: NS
Designed by: NS
Ø25
CO
Approved by: JA
Ø25 Scale: 1:200 @ A1
100
1 MULBERRY LANE
H200
@1
.65
% 1 MULBERRY LANE, GLENORIE
H100
NSW 2157
CONNECTION FOR POOL PLANT BACK WASH FILTER SYSTEM. SITE SERVICES
FINAL LOCATION OF POOL PLANT EQUIPMENT TO BE
CONFIRMED WITH POOL CONTRACTOR PRIOR
CONSTRUCTOR COMMENCEMENT.
HYDRAULIC CONTRACTOR TO LOCATE EXTEND AND
CONNECT DRAINAGE TO TRENCH.
APPROXIMATE LOCATION OF RAINWATER RE-USE TANK. RECOMMENDATION FROM RURAL FIRE RESCUE.
H200
REFER CIVIL DRAWINGS FOR FINAL TANK DETAILS REQUIRE WRITTEN APPROVAL FROM RURAL FIRE RESCUE AND COUNCIL Sydney : Suite 1, 401 Pacific Hwy
TO REMOVE THE TANK REQUIREMENT. Artarmon, NSW 2064
Newcastle : Suite 4, 102 Glebe Road
DIAMETER: 2570mm The Junction, NSW 2291
HEIGHT: 2440mm
www.centricengineers.com
100 @ 1.65%
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.
ASW100
ASW100
BTH
FW
CO CO
B B
80%
ASW100
ASW100
ISSUE
100 @ 1.65%
HYDRAULIC
SERVICES
Project North
SHR
FW
B
WC
100 @ 1.65% 100 @ 1.65%
B WC
CO CO CO CO
FW
100 @ 1.65%
SHR
SHR
100 @ 1.65%
100 @ 1.65%
100 @ 1.65%
WC
FW
B Client:
100 @ 1.65% WC SHR Architect: ARACON PROJECTS
CO CO
Project Number: 24170
SK FW
Drawing Number: H100
SK SK B Revision: P1
FW BTH
DOUBLE BOWL CONNECTOR AND TRAP Drawn by: NS
FW NS
IN VP CO (TYPICAL ON ALL KITCHEN SINK) Designed by:
WALL 65 Approved by: JA
Scale: 1:100 @ A1
SHR
1 MULBERRY LANE
1 MULBERRY LANE, GLENORIE
DRAINAGE POINT FOR SPA
NSW 2157
100 @ 1.65%
ASW100
ASW100
ASW100
ASW100
ASW100
SHR ASW100
FW ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
WC CO
ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
[email protected]
VP IN www.centricengineers.com
65 WALL
Scale Bar
0 2 4 6 8 10 m
1:100 @ A1
© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.
80%
ISSUE
2
H0 0
HYDRAULIC
SERVICES
Project North
CO
100
@1
.65%
CO 100
@ 1.65
%
Client:
Architect: ARACON PROJECTS
100
@ 1.65 Project Number: 24170
%
CO Drawing Number: H101
.65%
Revision: P1
@1
100
Drawn by: NS
CO
Designed by: NS
Approved by: JA
Scale: 1:100 @ A1
.65%
@1
1 MULBERRY LANE
.65%
100
B 65mm PIPEWORK CAST IN SLAB FOR 1 MULBERRY LANE, GLENORIE
COLD AND HOT WATER PIPE
@1
WC RETICULATION FOR ISLAND BENCH
NSW 2157
100
FW SK (TYPICAL)
SHR
SECONDARY DWELLING FLOOR
SANITARY DRAINAGE LAYOUT
B
WM
FW
LT
GULLY FOR HOT WATER UNIT TPR
VALVE DRAINAGE WC
SHR
VP IN VP IN
50 WALL 50 WALL
[email protected]
www.centricengineers.com
Scale Bar
0 2 4 6 8 10 m
1:100 @ A1
DELETE THIS
HT
Ø25
TO THE LATEST
HT Ø25
PLANS ON FILE
SENT TO THE
Ø25
20mm CONNECTION FOR GAS BBQ TEAM.
BTH
ASW100
ASW100
RW BBQ
HT
80%
ASW100
ASW100
RW
B B
Ø20
PIPEWORK TO DROP IN WALL TO ISLAND
Ø25
BENCH KITCHEN SINK
RAINWATER SUPPLY FOR IRRIGATION AND
GARDEN HOSE TAP SUPPLY HYDRAULIC
RW
RW
Project North
RW
RW
Ø20
PIPEWORK IN GROUND
Ø20
RW
B WC SHR
B WC
Ø20 SHR
Ø20
RW
RW
SHR
32 @ 2.75kPa
Ø20
Ø25
WC
RW
B
Client:
RW
Ø20
Ø20
WC SHR Architect: ARACON PROJECTS
Ø20
SK Project Number: 24170
HT Ø20 Drawing Number: H200
RW
SK Ø20 SK Revision: P1
Ø20
Ø20
RW
GCT HWU
Ø20
Ø20
LT
HWU B BTH Drawn by: NS
40mm GAS CONNECTION FOR SPA GAS HEATER.
SHR Designed by: NS
CONTRACTOR TO LOCATE EXTEND AND CONNECT TO SPA Approved by: JA
RW
HEATER. FINAL LOCATION OF SPA HEATER TO BE CONFIRMED Ø20 Scale: 1:100 @ A1
40 @ 2.75kPa
RW
RW
RW
40 @ 2.75kPa
40 @ 2.75kPa
RW
OUTLET HERE
RW
40 @ 2.75kPa
HT
RW
RW
RW
ASW100
RW
HT
ASW100
ASW100
ASW100
ASW100
ASW100
RW
ASW100
RW
ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
RW
ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
ASW100
Ø25
RW RW RW RW RW RW RW RW RW RW RW
RW
50 @ 2.75kPa
RW
RW
H002
ADD HOSE TAP
OUTLET HERE THERES A
BATHROOM HERE
ALLOW FOR HOT
H002
RW
HERE Newcastle: (02) 9052 6461
OUTLET HERE
HT
RW RW RW RW RW RW RW RW
[email protected]
www.centricengineers.com
Scale Bar
0 2 4 6 8 10 m
1:100 @ A1
© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.
80%
ISSUE
HYDRAULIC
ADD HOSE TAP SERVICES
OUTLET
Project North
Client:
Architect: ARACON PROJECTS
Project Number: 24170
Drawing Number: H201
Revision: P1
Drawn by: NS
Designed by: NS
Approved by: JA
Scale: 1:100 @ A1
B 1 MULBERRY LANE
WC 1 MULBERRY LANE, GLENORIE
SHR SK H0
02 NSW 2157
Ø20 RW
RW SECONDARY DWELLING FLOOR
RW
WATER AND GAS LAYOUT
RW
RW HT PIPEWORK TO DROP IN WALL TO ISLAND
B WM
BENCH KITCHEN SINK
LT
RW WC
RW - Ø20 65mm PIPEWORK CAST IN SLAB FOR COLD AND HOT
RW - Ø20 HW - Ø20
HW - Ø20 RW SHR WATER PIPE RETICULATION FOR ISLAND BENCH
RW
APPROXIMATE LOCATION OF RAINWATER RE-USE TANK. REFER CW - Ø20
CW - Ø20 (TYPICAL)
Ø25
CIVIL DRAWINGS FOR FINAL TANK DETAILS
Ø25
KING SPAN EVOLUTION MKIII PUMP RAINWATER RE-USE SYSTEM. HT
Ø25