0% found this document useful (0 votes)
19 views7 pages

Glenorie - Hydraulic

This document contains hydraulic services drawings and specifications for a project located at 1 Mulberry Lane, Glenorie NSW 2157. It outlines the layout and requirements for various hydraulic systems, including sanitary drainage, water, and gas services, and emphasizes the contractor's responsibilities for site investigations and compliance with relevant standards. Additionally, it includes general notes on fire-rated penetrations, rainwater reuse systems, and the need for proper documentation and testing of all systems installed.

Uploaded by

Metzemog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views7 pages

Glenorie - Hydraulic

This document contains hydraulic services drawings and specifications for a project located at 1 Mulberry Lane, Glenorie NSW 2157. It outlines the layout and requirements for various hydraulic systems, including sanitary drainage, water, and gas services, and emphasizes the contractor's responsibilities for site investigations and compliance with relevant standards. Additionally, it includes general notes on fire-rated penetrations, rainwater reuse systems, and the need for proper documentation and testing of all systems installed.

Uploaded by

Metzemog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

1 MULBERRY LANE

1 MULBERRY LANE, GLENORIE NSW 2157


© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or
in part without the written permission of Centric Building

HYDRAULIC SERVICES
Services Pty Limited. The elements shown on this drawing are
prototypical design only. The contractor shall produce
workshop drawings for construction purposes. The contractor
shall not scale from this drawing and all measurements shall be
c a r r i e d o u t o n s i t e .

DRAWING SCHEDULE:
NUMBER TITLE P1 19.03.2025 80% DD ISSUE

H000 COVERSHEET, LEGEND AND DRAWING SCHEDULE


H001 HYDRAULIC SPECIFICATIONS
H002 SITE SERVICES
H100 GROUND FLOOR SANITARY DRAINAGE LAYOUT
H101
H200
SECONDARY DWELLING FLOOR SANITARY DRAINAGE LAYOUT
GROUND FLOOR WATER AND GAS LAYOUT
HYDRAULIC
H201 SECONDARY DWELLING FLOOR WATER AND GAS LAYOUT SERVICES

1 MULBERRY LANE, GLENORIE NSW 2157


PIPEWORK DRAINAGE COLD & HOT WATER SERVICE GAS SERVICE DBYD CLAUSE
CONTRACTOR IS RESPONSIBLE TO DETERMINE EXACT LOCATION OF THE SERVICE MAINS &
SANITARY DRAINAGE TD TUNDISH STOP VALVE TAKE EXTRA CARE DURING EXCAVATION TO ENSURE THE PREVENTION OF DAMAGE TO
R GAS REGULATOR ANY UNDERGROUND ELECTRICAL,COMMUNICATION, WATER, GAS MAIN & DRAINAGE MAINS.
RV REFLUX VALVE IN PIT PATH VALVE GG REVIEW AND FOLLOW ALL DBYD PLANS.
STORMWATER
GAS GUARD
S
VENT RV REFLUX VALVE SOLENOID VALVE GENERAL REQUIREMENTS
GAS STOP VALVE
CIS
PIPEWORK CAST IN SLAB AAV AIR ADMITTANCE VALVE CHECK VALVE 1. THE HYDRAULIC CONTRACTOR SHALL ALLOW FOR ALL SITE INVESTIGATIONS AND
GAS BALL VALVE INSTALLATION OF COMPLETE AND COMPLIANT HYDRAULIC SERVICES SYSTEMS.
COLD WATER BT BOUNDARY TRAP REFLUX VALVE IN PATH BOX
GAS BAYONET 2. THE WORKS SHALL COMPRISE THE SITE INVESTIGATIONS, DESIGN, INSTALLATION,
HOT WATER CO CLEAR OUT FILTER CONSTRUCTION, DETAILING AND DOCUMENTATION, CO-ORDINATION, SUPPLY

1 MULBERRY LANE
DELIVERY, PUTTING INTO SERVICES, PREPARATION OF SHOP DRAWINGS, SITE
PS GAS METER
FW FLOOR WASTE PRESSURE SWITCH PAINTING, IDENTIFICATION, LABELLING, TESTING, COMMISSIONING, CERTIFICATIONS,
HOT WATER RETURN
DEFECTS LIABILITY, WARRANTIES, MAINTENANCE AND AS BUILT DRAWINGS FOR THE
BTFW BASKET TRAP FLOOR WASTE STRAINER FILTER HYDRAULIC SERVICES.
GAS

SMH SEWER MANHOLE PUMP 3. THE WORKS UNDER THE CONTRACT SHALL INCLUDE ALL THOSE MINOR WORKS NOT
FLUE GAS FLUE EXPLICITLY SPECIFIED AND WHICH ARE REASONABLY OBVIOUSLY NECESSARY AS
PART OF THE WORKS.
ORG OVERFLOW RELIEF GULLY BUTTERFLY VALVE
FH FIRE HYDRANT
4. PRIOR TO SUBMITTING TENDER THE CONTRACTOR SHALL INSPECT THE SITE TAKING
IPMF INDUCT PIPE MICA FLAP FLOAT VALVE
INTO ACCOUNT ANY CONDITION LIKELY TO AFFECT THIS CONTRACT.
FS FIRE SERVICE
CONTRACTOR SHALL INCLUDE PROVISIONS OF ANY ALTERATIONS / ADJUSTMENTS TO
SIP SEWER INSPECTION PIT (SEALED) PRESSURE LIMITING VALVE
THE HYDRAULIC SERVICES AS REQUIRED TO SUIT THE BASE BUILDING SYSTEM
PO PUMP OUT INCLUSIVE OF EXISTING STRUCTURAL PENETRATIONS (IF ANY) AND OTHER TENANCY
CP CONTROL PANEL PRESSURE REDUCTION VALVE
WORKS. FORMING PART OF THE TENDER SUBMISSION, CONTRACTOR SHALL ADVISE IN
RW RAINWATER WRITING ANY ALTERATIONS / ADJUSTMENTS REQUIRED TO THE HYDRAULIC SERVICES
DTU DRAINAGE TURN UP BACKFLOW PREVENTION
INSTALLATIONS.
O/F OVERFLOW BALANCING VALVE 5. INCORPORATE ALL COSTS AND ALLOWANCE FOR THE WORKS, ANY CUTTING IN,
CONNECTIONS, ALTERATIONS TO THE EXISTING HYDRAULIC SERVICES SYSTEMS
EXISTING PIPEWORK TMV THERMOSTATIC MIXING VALVE INCLUSIVE OF TESTING AND COMMISSIONING WHICH MAY BE REQUIRED TO BE
UNDERTAKEN OUTSIDE NORMAL WORKING HOURS OR ON WEEKENDS.
MISCELLANEOUS HOSE TAP
6. UNDERTAKE ALL REQUIRED SITE INDUCTIONS AS PER BUILDING MANAGEMENT
EAWM EXISTING AUTHORITIES WATER MAIN WATER METER REQUIREMENTS. LIAISE WITH THE BUILDING MANAGEMENT PRIOR TO COMMENCEMENT
H001 DRAWING CONTINUATION OF WORK.
COLD WATER POINT
ES EXISTING AUTHORITIES SEWER MAIN
7. PRIOR TO ISOLATING ANY SYSTEMS, NOTIFY THE BUILDING MANAGEMENT AND OBTAIN
XXX SERVICES IDENTIFIER - NON-DIRECTIONAL HOT AND COLD WATER POINTS THE RELEVANT PERMIT TO COMPLETE THE ISOLATION. THE SYSTEM SHALL BE
EAGM EXISTING AUTHORITIES GAS MAIN XX RETURNED TO NORMAL OPERATIONAL STATUS ON COMPLETION. BUILDING
Project Number:
REDUCED PRESSURE ZONE DEVICE MANAGEMENT MUST BE INFORMED IN ADVANCE AND ANY CONDITIONS IMPOSED BY
EASWM EASWM EXISTING AUTHORITIES STORMWATER MAIN XXX THE BUILDING MANAGEMENT SHALL BE MET BY THE CONTRACTOR AT THEIR EXPENSE. 24170
SERVICES IDENTIFIER - DOWNWARD FLOW
XX ABBREVIATIONS, SYMBOLS AND LINETYPES IN THE LEGEND Drawing Number:
MAY NOT APPEAR ELSEWHERE ON THE DRAWINGS. 8. NO WORK THAT INVOLVES THE ISOLATION OR DISRUPTION OF THE HYDRAULIC
XXX SERVICES IDENTIFIER - UPWARD FLOW THIS LEGEND SHOULD BE USED AS A GUIDE ONLY SERVICES MAY TAKE PLACE UNTIL THE BUILDING MANAGEMENT HAS GIVEN WRITTEN H000
XX MISCELLANEOUS APPROVAL.
Revision:
SERVICE TYPE
PIPE RISER 9. ALL SYSTEMS AND EQUIPMENT SHALL BE FULLY TESTED IN ACCORDANCE WITH THE P1
XXX
XX RELEVANT STANDARDS, CODES AND THE REQUIREMENTS OF THE LOCAL SUPPLY
ABBREVIATIONS SERVICE SIZE AUTHORITY. ANY OTHER TESTS DEEMED NECESSARY SHALL BE CARRIED OUT.
PIPE DROPPER

1 PIPE TEE 10. AFTER COMPLETION OF ALL THE TESTS AND CHECKS, PROVIDE STANDARD
AAV AIR ADMITTANCE VALVE Lt LITRE DETAIL TAG
AFFL ABOVE FINISHED FLOOR LEVEL NTS NOT TO SCALE - CERTIFICATES OF COMPLIANCE FOR BUILDING SAFETY SERVICES AS REQUIRED BY
AD AERIAL DRAINAGE NPCW NON POTABLE COLD WATER THE PRINCIPAL CERTIFYING AUTHORITY FOR THE PROVISION OF CERTIFICATES OF
PIPEWORK CONTINUATION
B BASIN OFG OVERFLOW GULLY OCCUPANCY.
A REVISION TAG
BTH BATH OSD ONSITE DETENTION
BT BOUNDARY TRAP PD PLANTER DRAIN FLOW DIRECTION 11. TENDERER SHALL TAKE SPECIAL NOTICES OF THE LOCATION OF THE PROPOSED
CICL CAST IRON CEMENT LINED PG PLANTER GRATE WORKS WITH THE DELIVERY AND ACCESS FOR DELIVERIES.
CO CLEAROUT RPZD REDUCED PRESSURE ZONE DEVICE NEW TEE IN EXISTING PIPEWORK Sydney: (02) 9052 6460
CW COLD WATER RV RELIEF VENT Newcastle: (02) 9052 6461
12. VARIATION SUBMISSIONS RESULTING FROM THE FAILURE TO ADEQUATELY ASSESS
DB DISABLED BASIN RWT RAINWATER TANK NEW CONNECTION TO EXISTING PIPEWORK THE EXISTING INSTALLATION DURING THE TIME OF TENDER SHALL BE REJECTED.
DWC DISABLED WATER CLOSET RWO RAINWATER OUTLET
DDCV DOUBLE DETECTOR CHECK VALVE S STACK SYSTEM
DP DOWNPIPE SK KITCHEN SINK FIRE HOSE REEL
FE FIRE EXTINGUISHER SHR SHOWER Sydney : Suite 1, 401 Pacific Hwy
FH FIRE HYDRANT SST SOIL STACK FIRE HYDRANT Artarmon, NSW 2064
FHR FIRE HOSE REEL STW STORMWATER Newcastle : Suite 4, 102 Glebe Road
FW FLOOR WASTE TMV THERMOSTATIC MIXING VALVE FE The Junction, NSW 2291
FIRE EXTINGUISHER
GAVP GREASE ARRESTOR VENT PIPE TV TEMPERING VALVE
H/L HIGH LEVEL TD TUNDISH
1 NODE POINT
HT HOSE TAP TTD TRAP TUNDISH
[email protected]
HWF HOT WATER FLOW TW TRADE WASTE www.centricengineers.com
HWR HOT WATER RETURN TWV TRADEWASTE VENT PENETRATION
HW HOT WATER UR URINAL
HWU HOT WATER UNIT VP VENT PIPE
PIPE END SECTION
IPMF IN-PIPE MICAFLAP WC WATER CLOSET
LT LAUNDRY TUB WM WASHING MACHINE
W/M WATER METER
WP WATER POINTS
© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.

P1 19.03.2025 80% DD ISSUE

GENERAL NOTES: FIRE RATED PENETRATIONS RAINWATER REUSE SYSTEM:

1. THESE DRAWINGS ARE A GUIDE ONLY FOR THE LOCATION AND LAYOUT OF THE SERVICE PIPES. 1. THE RAINWATER WILL BE COLLECTED FROM THE ROOF AND STORED IN A WATER TANK AS SHOWN
1. PROVIDE FIRE RATED PENETRATIONS FOR SERVICES PASSING THROUGH EACH FIRE RATED 2. PROVIDE IDENTIFICATION TO ALL SERVICE PIPES AND CONDUITS EXPOSED TO VIEW OR IN
CONTRACTOR TO EXAMINE SITE CONDITIONS AND ROUTE PIPEWORK TO MOST APPROPRIATE ON THE DRAWINGS. RAINWATER WILL BE PRESSURISED INTO A DEDICATED RAINWATER REUSE
ELEMENT. FIRE RATED PENETRATIONS SHALL ACHIEVE THE SAME RATING AS THE BUILDING ACCESSIBLE LOCATIONS SUCH AS DUCTS AND CEILING SPACES AND ALL EQUIPMENT.
LOCATION ON SITE. PIPE SYSTEM.
ELEMENT PENETRATED. SEAL PENETRATIONS WITH A SYSTEM CONFORMING TO AS4072.1.
3. ALL PIPES SHALL BE ADEQUATELY SUPPORTED AND SECURELY FIXED IN ACCORDANCE WITH THE
PASSIVE FIRE ENGINEER AND NCC. 2. IDENTIFY ALL RAINWATER PIPEWORK AND EQUIPMENT WITH THE FOLLOWING:
2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS,
SPECIFICATIONS AND DRAWINGS. FOR THE FINAL LOCATION OF FIXTURES AND FITTINGS REFER 2. WHEREVER OR WHENEVER THE PROPOSED WORKS REQUIRE THE PENETRATION OF AN ELEMENT
DRAWINGS AND TO THE SATISFACTION OF THE SI. SUCH SUPPORTING AND FIXING TO BE CARRIED
OUT WITHOUT CAUSING ANY DISTORTION, DAMAGE OR STRESS ON THE PIPES OR PIPE JOINTS. - “WARNING RECYCLED / RECLAIMED / RAINWATER REUSE WATER - DO NOT DRINK”. 80%
TO ARCHITECTURAL SCHEDULE AND DRAWING PACKAGE. HAVING A FIRE RESISTANCE RATING, THE CONTRACTOR SHALL ENSURE THAT ANY PERSON
RESPONSIBLE FOR THE INSTALLATION OF ANY SYSTEM USED TO PROTECT/REINSTATE THE FRL
PIPES SHALL BE SUPPORTED SPECIFIED IN “PRELIMINARIES” SECTION.
4. FIXTURE TRAPS:
3. THE CONTRACTOR IS TO SUPPLY AND INSTALL A RAINWATER RE-USE TANK AS PER CIVIL ISSUE
ENGINEER/ARCHITECTS' REQUIREMENTS.
3. THE HYDRAULIC SERVICES WORK SHALL BE CARRIED OUT UNDER THE DIRECT SUPERVISION OF A OF THE PENETRATION; - SINKS - 50mm TWO-PART UNIVERSAL PATTERN. 4. THE CONTRACTOR IS TO SUPPLY AND INSTALL A RAINWATER RE-USE PUMP AND ASSOCIATED
LICENSED PLUMBER, DRAINER AND GAS FITTER IN STRICT ACCORDANCE WITH THE NSW CODES - HOLDS AN APPROPRIATE LICENSE
OF PRACTICE PLUMBING AND DRAINAGE, NATIONAL CONSTRUCTION CODE, RELEVANT
AUSTRALIAN STANDARDS, COUNCIL REGULATIONS, FIRE ENGINEERING REPORT WHERE
- PROVIDES AN INSTALLATION STATEMENT IN THE FORMAT PRESCRIBED BY AS4072.1 TO
DESCRIBE THE PENETRATION, ITS LOCATION AND METHOD OF TREATMENT;
- BASIN - 40mm CP COPPER TWO-PART S OR P TRAP WITH 40mmCP EXTENSION RISER.
FILTERS, BACKFLOW PREVENTION AND SWITCHOVER DEVICES AS PER HYDRAULIC DRAWINGS.
HYDRAULIC
APPLICABLE AND TO THE SATISFACTION OF THE CONTROLLING AUTHORITIES. - THE CONTRACTOR SHALL FURNISH A COPY OF THE INSTALLATION STATEMENT AS PROVIDED
IN ABOVE TO THE INSPECTING OFFICER PRIOR TO REQUESTING AN INSPECTION FOR
5. TERMINATE ALL VENTS THROUGH ROOF WITH A VENT COWL. FINISH VENTS 300mm ABOVE
NON-TRAFFICABLE ROOFS AND 3m ABOVE TRAFFICABLE ROOFS, 6 METRES CLEAR OF OPENINGS
GAS SERVICES:
1. SUPPLY, INSTALL, TEST AND COMMISSION THE GAS SERVICE FROM THE POINT OF CONNECTION
SERVICES
4. THIS SET OF DRAWINGS IS DIAGRAMMATIC ONLY. THE CONTRACTOR SHALL CO-ORDINATE WITH 'SUBSTANTIAL COMPLETION'. AND FRESH AIR INTAKES AS REQUIRED BY THE LOCAL AUTHORITY AND AS INDICATED ON THE TO ALL GAS POINTS. EXTEND AS SPECIFIED SUPPLYING ALL METERS, REGULATORS, FILTERS,
OTHER TRADES AND SET OUT ALL WORKS TO SUIT ACTUAL ON-SITE CONDITIONS. DRAWINGS. PIPEWORK AND SUNDRY ITEMS TO COMPLETE THE SYSTEM TO COMPLY TO THE LOCAL GAS Project North
3. PROVIDE ACCESS TO PASSIVE FIRE PROTECTION DEVICES FOR INSPECTION IN ACCORDANCE 6. INSTALL INSPECTION OPENINGS IN ACCESSIBLE LOCATIONS SO THAT EACH SECTION OF AUTHORITIES' REGULATIONS.
5. THIS SET OF DRAWINGS IS ISSUED FOR TENDER STATUS FOR THE WORKS WHICH DOES NOT WITH AS1851.
CONSTITUTE AS THE INSTALLATION DRAWINGS. THE CONTRACTOR SHALL DEVELOP THE PIPEWORK CAN BE CLEANED. INSPECTION OPENING SIZES SHALL BE IN ACCORDANCE WITH 2. CARRY OUT THE GAS INSTALLATION IN ACCORDANCE WITH THE REQUIREMENTS OF THE
INFORMATION CONTAINED ON THIS SET OF DRAWINGS INTO A COMPLETE SET OF FULLY DETAILED AUTHORITIES' REQUIREMENTS. INSTALL INSPECTION OPENINGS AS PER AS3500.2. REGULATORY AUTHORITIES AND RELEVANT GAS STANDARDS.
4. CONTRACTOR TO ENSURE THAT A QUALIFIED PASSIVE FIRE PROTECTION COMPANY IS ENGAGED
INSTALLATION DRAWINGS FOR CONSTRUCTION. TO CERTIFY THE FINAL INSTALLATION OF ANY INSTALLED PASSIVE FIRE PROTECTION MEASURES 7. SUPPLY AND INSTALL UPVC TUNDISHES IN AREAS REQUIRED FOR MECHANICAL DRAINAGE. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO APPLY FOR THE GAS APPLICATION AND PAY ALL
THAT ARE PART OF THIS SCOPE OF WORKS. TUNDISHES TO BE CHROME PLATED WHERE EXPOSED AND TO COMPLY TO "MATERIALS" SECTION. FEES ASSOCIATED. ASCERTAIN THE DEPTH, POSITION AND SUITABILITY OF THE GAS CONNECTION
6. CONFIRM LOCATION, SIZES AND DEPTHS OF STRUCTURAL BEAMS, ALL OTHER SERVICES, CEILING POINTS PRIOR TO THE COMMENCEMENT. INSTALL GAS PATH VALVE 225MM FROM BOUNDARY FOR
8. SUPPORTING AND FIXING TO BE CARRIED OUT WITHOUT CAUSING ANY DISTORTION, DAMAGE OR
VOID AND CEILING HEIGHT PRIOR TO INSTALLATION. DETERMINE EXACT SIZES AND LOCATIONS THERMAL INSULATION OF PIPEWORK GAS AUTHORITY CONNECTION. TO COMPLY WITH GAS AUTHORITY.
STRESS ON THE PIPES OR PIPE JOINTS.
OF STRUCTURAL PENETRATIONS ON SITE IN ACCORDANCE WITH THE STRUCTURAL
REQUIREMENTS. OBTAIN APPROVAL FROM STRUCTURAL ENGINEER PRIOR TO DRILLING ANY 4. CARRY OUT THE REQUIRED TESTS IN THE PRESENCE OF THE SUPERINTENDENT AND AN
1. THERMAL INSULATION SHALL COMPLY IN ALL RESPECTS WITH AS/NZS3500.4.
CORE HOLES AND PENETRATING STRUCTURE. AUTHORISED REPRESENTATIVE OF THE RELEVANT AUTHORITY. SUPPLY THE APPARATUS AND
COLD WATER SERVICE: MATERIALS NECESSARY. SUBMIT THE TEST RESULTS IN WRITING. REPLACE AND RETEST
2. FOR INSULATED PIPING, COMPLETELY COVER THE PIPE WITH INSULATION FITTED TIGHTLY TO THE
7. DISTURBED AREAS ARE TO BE REINSTATED TO THE ORIGINAL CONDITION. TRENCHES THROUGH COMPONENTS, IF ANY, WHICH FAIL THE REQUIRED TEST.
PIPE SURFACE AND SECURED AS PER MANUFACTURES REQUIREMENTS. INSTALL INSULATION SO
EXISTING ROAD AND CONCRETE SHALL BE FILLED AND COMPACTED AS PER STRUCTURAL 1. SUPPLY, INSTALL, TEST AND COMMISSION ALL DOMESTIC COLD WATER PIPES FROM THE
THAT IT IS READILY REMOVABLE AT UNIONS AND COUPLERS. 5. ON COMPLETION OF INSTALLATION AND TESTING, TURN ON ISOLATING AND CONTROL VALVES,
ENGINEER'S REQUIREMENTS. AUTHORITY'S MAIN TO ALL FIXTURES, FITTINGS AND FAUCETS REQUIRING DOMESTIC COLD
AND PURGE AND CHARGE THE INSTALLATION. HAND OVER THE INSTALLATION FULLY CHARGED
WATER. INCLUDE FOR ALL PIPEWORK, BENDS, OFFSETS, BRACKETS, PUMPS, TAPS AND FAUCETS
3. PROVIDE METAL SHEATHING TO INSULATION WHERE PIPEWORK IS IN PLANT ROOMS AND, WITH GAS.
8. OBTAIN APPROVALS, PERMITS AND FINAL CERTIFICATES FROM CONTROLLING AUTHORITIES AND SUNDRY EQUIPMENT REQUIRED FOR THE INSTALLATION. REFER TO 'MATERIALS' SECTION
EXTERNAL LOCATIONS. METAL SHEATHING INSTALLED TO MANUFACTURES REQUIREMENTS. 6. LPG INSTALLATION SHALL BE AS PER AS1596 AND RELEVANT GAS SUPPLIER REQUIREMENTS.
PRIOR TO THE COMPLETION OF WORKS. FOR PIPING SCHEDULE.
4. PROVIDE THERMAL INSULATION TO ALL DOMESTIC WATER PIPEWORK, INCLUDING COLD WATER.
2. APPLY TO WATER AUTHORITY FOR THE SUPPLY OF ALL METERS, TAKE DELIVERY FROM
9. PAY ALL APPLICABLE FEES AND CHARGES INCLUDING AREA CONTRIBUTION IN ACCORDANCE ENSURE COLD WATER PIPEWORK IS CONTINUOUSLY VAPOUR PROOFED INSULATED.
AUTHORITY'S STORE AND INSTALL ON SITE, COMPLETE WITH ALL VALVES AND FITTINGS Client:
WITH CONTROLLING AUTHORITIES CURRENT FEE SCALES. SUBMIT DETAILED HYDRAULIC
CALCULATIONS WITH ISOMETRIC DIAGRAMS FOR THE HYDRAULIC SERVICES SYSTEMS FOR REQUIRED. Architect: ARACON PROJECTS
ACOUSTIC TREATMENT OF PIPEWORK
REVIEW PRIOR TO INSTALLATION.
3. EXCAVATE, LOCATE, AND CONNECT TO THE EXISTING AUTHORITIES WATER MAINS FOR THE Project Number: 24170
1. ACOUSTIC REDUCTION TREATMENT SHALL BE PROVIDED IN AREAS REQUIRED BY THE NCC. ALL
10. TECHNICAL SUBMISSION INCLUDING SHOP DRAWINGS, MATERIAL / EQUIPMENT SCHEDULES WITH HYDRAULIC PIPES SHALL BE ACOUSTICALLY TREATED WHERE REQUIRED.
SERVICES AS REQUIRED AND EXTEND TO THE RETICULATION. CONTRACTOR TO APPLY, MAKE ALL Drawing Number: H001
RELEVANT APPLICATIONS AND PAY ALL ASSOCIATED FEES.
TECHNICAL INFORMATION, HYDRAULIC CALCULATIONS, BMS SCHEDULES AND SAMPLES SHALL BE Revision: P1
SUBMITTED TO CENTRIC FOR REVIEW PRIOR TO INSTALLATION.
O AND M MANUALS/COMMISSIONING: 4. PROVIDE A WATER PRESSURE TEST OF 1500 KPA FOR A PERIOD OF TWO HOURS. DISCONNECT
ANY EQUIPMENT CONNECT TO THE SERVICE NOT RATED TO THE TEST PRESSURE BEFORE Drawn by: NS
11. ALL HYDRAULIC SERVICES PIPEWORK SHALL BE LOCATED IN CEILINGS, WALLS, DUCTS OR UNDER
BENCHES. PIPEWORK INSTALLED OTHER THAN NOTED SHALL BE APPROVED BY THE 1. PRIOR TO PRACTICAL COMPLETION PROVIDE FULLY COMPREHENSIVE SET OF OPERATING AND TESTING COMMENCES. Designed by: NS
SUPERINTENDENT BEFORE WORK IS INSTALLED. MAINTENANCE MANUALS. THE CONTENT OF THE MANUALS SHALL MINIMALLY COMPRISE THE Approved by: JA
FOLLOWING: 5. HYDRAULICS SHALL FLUSH OUT, REMOVE ALL FOREIGN MATTER, AND CLEAN ALL THE SYSTEMS.
- LOCAL AUTHORITIES CERTIFICATE OF FINAL INSPECTION & APPROVAL. WATER SYSTEMS SHALL BE FLUSHED OUT WITH CLEAN WATER. Scale: NTS @ A1
LEVELS:
- OPERATING INSTRUCTIONS FOR SPECIFIC PLANT THAT REQUIRES DAY TO DAY OPERATIONS
BY PERSONNEL. 6. PROVIDE AND INSTALL HOSE TAPS WITH ANTI-VANDAL HEADS. (WHERE REQUIRED) 1 MULBERRY LANE
1. VERIFY THAT ALL INVERT LEVELS, SURFACE LEVELS AND CLEARANCES ARE CORRECT AND
OBTAINABLE PRIOR TO COMMENCING WORKS. - MAINTENANCE INSTRUCTION AS RECOMMENDED BY THE EQUIPMENT SUPPLIER FOR 1 MULBERRY LANE, GLENORIE
EQUIPMENT AND PLANT THAT IS LIABLE TO FAILURE WITHOUT SUCH MAINTENANCE. 7. ALL PIPES SHALL BE ADEQUATELY SUPPORTED AND SECURELY FIXED IN ACCORDANCE WITH NSW 2157
2. ALL LEVELS ARE SHOWN IN METRES AHD. UNLESS NOTED OTHERWISE. - MANUFACTURES BROCHURES, PROVIDING VISUAL RECOGNITION OF EACH COMPONENT OF AS3500.1
ASSEMBLY AS WELL AS NAME OF MANUFACTURER AND ADDRESS FOR PROCUREMENT.
- MANUALS ARE TO BE FULLY BOUND IN BOOK FORM COMPRISING OF A4 SHEETS OR A3
REGULATIONS:
SHEETS SUITABLY FOLDED. LARGER SHEETS OR DRAWINGS ARE TO BE ENCLOSED IN CLEAR
1. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH NSW CODES OF PRACTICE, NATIONAL
VINYL SLEEVES. SHEETS AND SLEEVES ARE TO BE PUNCHED AND CONTAINED IN QUALITY HEATED WATER SERVICE: HYDRAULIC SPECIFICATIONS
VINYL FOLDERS LABELLED ON THE OUTSIDE FRONT COVER AND ON THE SPINE TO INDICATE
CONSTRUCTION CODE, RELEVANT AUSTRALIAN STANDARDS, COUNCIL REGULATIONS, AND 1. SUPPLY, INSTALL, TEST AND COMMISSION THE DOMESTIC HOT WATER SERVICE AND WARM
THE NAME OF THE PROJECT, CLIENT AND THE SERVICES DESCRIBED THEREIN.
WHERE APPLICABLE AND TO THE SATISFACTION OF THE CONTROLLING AUTHORITIES. WATER SERVICE FROM THE HOT WATER HEATERS TO THE FIXTURES AND APPLIANCES. INCLUDE
- COPIES OF WARRANTY REGISTRATION CERTIFICATES FOR EACH ITEM OF EQUIPMENT.
- LOG SHEET FOR RECORDING; THE TESTING OF BACK FLOW PREVENTION DEVICES, FOR ALL PIPING, FITTINGS, SUPPORTS, INSULATION, HOT WATER HEATERS, VALVES, CIRCULATING
2. WORKS SHALL BE CONSTRUCTED & INSTALLED BY SUITABLY QUALIFIED, LICENSED, AND PUMPS AND OTHER SUNDRY ITEMS OF EQUIPMENT REQUIRED FOR THE INSTALLATION.
COMPETENT TRADES PERSONNEL. TEMPERING VALVES AND THERMOSTATIC MIXING VALVES, THE LOG SHEET DETAIL AND THE
TEST PROCEDURES AND MAINTENANCE OF ALL VALES, THE LOG SHEET DETAIL, AND THE
TEST PROCEDURES AND MAINTENANCE OF ALL VALVES, ALONG WITH LIST OF FUTURE TEST 2. PROVIDE A WATER PRESSURE TEST OF 1500 KPA FOR A PERIOD OF TWO HOURS. DISCONNECT
3. ALL WORKS RELATING TO NSW EDUCATION SHALL BE IN ACCORDANCE WITH THE EFSG ANY EQUIPMENT CONNECTED TO THE SERVICE NOT RATED TO THE TEST PRESSURE BEFORE
GUIDELINES. DATES.
- ORIENTATE AND ADJUST HYDRAULIC SERVICES TO SUIT FINAL LAYOUTS OF THE AMENITIES, TESTING COMMENCES.

TESTING AND INSPECTION TENANCY PLANS AND PLANTS.


3. MAKE ADEQUATE PROVISION FOR EXPANSION AND CONTRACTION BY THE PROVISION OF
2. ALL EQUIPMENT AND APPLIANCES SHALL BE INSTALLED TO THE MANUFACTURERS CLIPS/BRACKETS WITH WOODEN EXPANSION BLOCKS SO THAT UNDER ALL WORKING CONDITIONS
1. THE CONTRACTOR SHALL PAY ALL COSTS FOR TESTING OF HYDRAULIC SERVICES. ALL TESTING NO STRAIN IS IMPOSED ON PIPEWORK OR FITTINGS,
PROCEDURES TO BE UNDERTAKEN AS PER THE RELEVANT AUSTRALIAN STANDARD AND OR REQUIREMENTS.
AUTHORITY REQUIREMENTS. 4. PROVIDE AIR RELIEF VALVES WITH TO PIPELINES AT THE TOP OF CIRCULATION LOOPS (FLOW AND
OCCUPATIONAL HEALTH AND SAFETY:
RETURN) THAT DO NOT HAVE AN OUTLET AT THE HIGHEST POINT IN THE LOOP. EXTEND A 15MM
2. THE CONTRACTOR SHALL ARRANGE INSPECTIONS WITH THE APPROPRIATE AUTHORITIES PRIOR DRAIN PIPELINE FROM THE VALVE TO A DRAINAGE POINT OR TUNDISH.
TO SEALING OF SERVICES AT EACH STAGE WHERE REQUIRED. 1. FOR RESIDUAL RISKS IDENTIFIED FROM THE DESIGN PROCESS, REFER TO THE PROJECT RISK
REGISTER.
5. SUPPLY AND INSTALL AN ADJUSTABLE TEMPERING VALVE SET AT 50*C TO ALL BASINS AND
EXISTING SERVICES SHOWERS OR AREAS OF ABOLITION.
2. CHANGES TO HYDRAULIC SERVICES DESIGN SHALL BE REVIEWED AGAINST THE PROJECT RISK
1. ALL EXISTING SERVICES MADE REDUNDANT FROM THESE WORKS AND EXISTING REDUNDANT REGISTER AND MAY REQUIRE FURTHER RISK ASSESSMENT.
6. SUPPLY AND INSTALL THERMOSTATIC MIXING VALVES TO ALL ACCESSIBLE TOILETS AND ALL
SERVICES SHALL BE REMOVED OR SEALED OFF IN ACCORDANCE WITH THESE DRAWINGS, SANITARY FIXTURES, AS INDICATED ON THE DRAWINGS SET AT 45OC.
CONTRACT DOCUMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY. PLUMBING AND DRAINAGE:
7. SUPPLY, INSTALL AND FIX HOT WATER HEATERS IN THE LOCATIONS INDICATED ON THE
1. SUPPLY, INSTALL, TEST AND COMMISSION ALL SEWER DRAINAGE FROM SOIL AND WASTES AND DRAWINGS. INSTALLATION OF HOT WATER HEATERS AS PER AS3500.4. TEMPERATURE PRESSURE
PIPE DIAMETERS RELIEF VALVE TO BE DIRECTED TO TUNDISH.
FIXTURES TO THE SEWER CONNECTION. PROVIDE ALL NECESSARY PIPES, JUNCTIONS, BENDS,
1. ALL PIPE DIAMETERS DETAILED ON THESE DRAWINGS ARE SHOWN AS NOMINAL DIAMETERS(DN). PITS, FLOOR WASTES, EXCAVATION, SUPPORTS, BACKFILLING, TESTING, AND SUNDRY
EQUIPMENT REQUIRED FOR THE INSTALLATION. PIPELINE POSITIONS SHALL BE DETERMINED ON 8. SUPPLY AND INSTALL BOILING WATER UNITS AS PER ARCHITECTURAL DOCUMENTATION.

2. WHERE PE, PEX, PPR, PB AND COMPOSITE PLASTIC PIPEWORK MATERIALS ARE NOMINATED, THE SITE IN CONJUNCTION WITH ALL OTHER DISCIPLINES TO ENSURE ADEQUATE COORDINATION OF
NOMINAL DIAMETER SHALL BE TAKEN AS THE INTERNAL DIAMETER OF THE PIPEWORK AND NOT ALL SERVICES AND ELEMENTS. COORDINATION SHALL BE CARRIED OUT PRIOR TO ANY SETTING
THE OUTSIDE DIAMETER. FOR NOMINAL DIAMETERS UP TO DN50, REFER TO AS/NZS3500.1. OUT, EXCAVATION AND PIPE INSTALLATION TAKING PLACE.

Sydney: (02) 9052 6460


Newcastle: (02) 9052 6461

Sydney : Suite 1, 401 Pacific Hwy


Artarmon, NSW 2064
Newcastle : Suite 4, 102 Glebe Road
The Junction, NSW 2291

[email protected]
www.centricengineers.com

Scale Bar
EAW
M

EAW
M

EAW
M APPROXIMATE LOCATION OF EXISTING 100mm WATER MAIN

APPROXIMATE LOCATION OF EXISTING STREET FIRE HYDRANT


EAW
M

© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD


PROPOSED LOCATION OF NSW HEALTH APPROVED 1500LPDAERATED This drawing is the property of Centric Building Services PTY
PROPOSED LOCATION OF NSW HEALTH APPROVED EAW Limited and must not be used, reproduced or copied wholly or in
1500LPDAERATED WASTE WATER TREATMENT SYSTEM M WASTE WATER TREATMENT SYSTEM (AWTS) WITH WATER PUMP, AIR part without the written permission of Centric Building Services Pty
(AWTS) WITH WATER PUMP, AIR PUMP, ALARM PANE FOR PUMP, ALARM PANE FOR PRIMARY DWELLING IN ACCORDANCE WITH Limited. The elements shown on this drawing are prototypical
WASTE WATER MANAGEMENT REPORT. design only. The contractor shall produce workshop drawings for
PRIMARY DWELLING IN ACCORDANCE WITH WASTE WATER construction purposes. The contractor shall not scale from this
EAW drawing and all measurements shall be carried out on site.
MANAGEMENT REPORT. M
CO REFER TO MANUFACTURERS & LOCAL COUNCIL REQUIREMENTS FOR
REFER TO MANUFACTURERS & LOCAL COUNCIL INSTALLATION & CONFIGURATION.
P1 19.03.2025 80% DD ISSUE
REQUIREMENTS FOR INSTALLATION & CONFIGURATION. EAW
M NOTE:THE WATER LEVEL STARTS FROM THE INVERT LEVEL OF THE INLET.
NOTE:THE WATER LEVEL STARTS FROM THE INVERT LEVEL OF
THE INLET. AWTS LOCATION SHOWN FOR INFORMATION ONLY.
EAW
M
AWTS LOCATION SHOWN FOR INFORMATION ONLY. CONTRACTOR TO COORDINATE THE EXACT LOCATION ON-SITE PRIOR TO
CONSTRUCTION COMMENCEMENT.
CONTRACTOR TO COORDINATE THE EXACT LOCATION EAW REFER TO WASTE WATER MANAGEMENT REPORT FOR DETAILS
M
ON-SITE PRIOR TO INFORMATION.
CONSTRUCTION COMMENCEMENT.

.65%
REFER TO WASTE WATER MANAGEMENT REPORT FOR EAW
M

@1
DETAILS INFORMATION.
80%

100
ISSUE
EAW
M

H
CO EAW
M HYDRAULIC
SERVICES

1
H10
EAW
M
Project North
PROPOSED EFFLUENT MANAGEMENT AREA FOR SECONDARY EAW
M
DWELLING. PROPOSED EFFLUENT MANAGEMENT AREA OF
342m² FOR FOR SUBSURFACE DRIP IRRIGATION FIELD BY
M
COUNCIL APPROVED WATER TREATMENT CONTRACTOR EAW
EAW
M

M
EAW

CO

32mm NEW MAINS TAP IN FOR WATER METERS. CONTRACTOR TO MAKE


APPLICATION FOR A NEW INDIVIDUAL METERS FOR EACH DWELLING AND
PAY ALL ASSOCIATED FEES PRIOR CONSTRUCTION COMMENCEMENT.

PROPOSED LOCATION FOR 2X 20mm SYDNEY WATER METERS FOR THE


H20 DEVELOPMENT.
1

Client:
Architect: ARACON PROJECTS

100 @ 1.65%
PROPOSED EFFLUENT MANAGEMENT AREA FOR PRIMARY DWELLING. Project Number: 24170
Ø25
PROPOSED EFFLUENT MANAGEMENT AREA OF 428m² FOR FOR Drawing Number: H002
POOL BACKWASH ABSORPTION TRENCH. REFER TO WASTE SUBSURFACE DRIP IRRIGATION FIELD BY COUNCIL APPROVED WATER
WATER MANAGEMENT REPORT FOR DETAILS INFORMATION.
Revision: P1
CO TREATMENT CONTRACTOR
TRENCH DIMENSION 4.8X 0.6X 0.6
100 @ 1.65% Drawn by: NS
Designed by: NS
Ø25
CO
Approved by: JA
Ø25 Scale: 1:200 @ A1
100
1 MULBERRY LANE

H200
@1
.65
% 1 MULBERRY LANE, GLENORIE

H100
NSW 2157

CONNECTION FOR POOL PLANT BACK WASH FILTER SYSTEM. SITE SERVICES
FINAL LOCATION OF POOL PLANT EQUIPMENT TO BE
CONFIRMED WITH POOL CONTRACTOR PRIOR
CONSTRUCTOR COMMENCEMENT.
HYDRAULIC CONTRACTOR TO LOCATE EXTEND AND
CONNECT DRAINAGE TO TRENCH.

SURFACE MOUNTED RAINWATER REUSE PUMP CAPABLE OF


DELIVERING 0.5L/S AT 450kPa COMPLETE WITH AUTOMATIC
RAINWATER/ POTABLE WATER CHANGE-OVER DEVICE AND
DCV ON POTABLE WATER BACK-UP SUPPLY

PUMP SHALL BE MOUNTED WITH ANTI VIBRATION


SUPPRESSION MOUNTS & WEATHERPROOF COVER.
H200

Sydney: (02) 9052 6460


PROPOSED LOCATION OF STEEL 10,000L STATIC BUSH FIRE WATER TANK Newcastle: (02) 9052 6461
WITH ; 65mm STORZ OUTLE AND BALL VALVE IS FITTED TO THE OUTLET.

NOTE: PROPOSED IS IN ACCORDANCE WITH DA CONSENT AND


RW

APPROXIMATE LOCATION OF RAINWATER RE-USE TANK. RECOMMENDATION FROM RURAL FIRE RESCUE.
H200

REFER CIVIL DRAWINGS FOR FINAL TANK DETAILS REQUIRE WRITTEN APPROVAL FROM RURAL FIRE RESCUE AND COUNCIL Sydney : Suite 1, 401 Pacific Hwy
TO REMOVE THE TANK REQUIREMENT. Artarmon, NSW 2064
Newcastle : Suite 4, 102 Glebe Road
DIAMETER: 2570mm The Junction, NSW 2291
HEIGHT: 2440mm

[email protected]
R

www.centricengineers.com

PROPOSED LOCATION FOR 2x 210kg LPG GAS TANKS AND


REGULATOR ON A CONCRETE PLINTH AND CAGE TO COMPLY 65mm STORZ OUTLE AND BALL VALVE IS FITTED TO THE OUTLET WITHIN
WITH GAS SUPPLIERS DETAIL AND AS/NZS 5601 4m OF HARDSTAND.
Scale Bar
LPG REGULATOR SET AT 2.75kPa
0 4 8 12 16 20 m

NOTE : WOULD REQUIRE ACCESS FOR GAS BOTTLE REFILL FROM


1:200 @ A1
DRIVEWAY.
H002
ADD NOTE;
REFER TO STORMWATER ENGINEERS DRAWINGS FOR ALL
EXTERNAL FLOOR WASTE LOCATIONS.

© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD

100 @ 1.65%
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.

P1 19.03.2025 80% DD ISSUE

ASW100

ASW100
BTH
FW
CO CO
B B
80%

ASW100

ASW100
ISSUE

100 @ 1.65%
HYDRAULIC
SERVICES
Project North

SHR
FW
B
WC
100 @ 1.65% 100 @ 1.65%
B WC
CO CO CO CO
FW
100 @ 1.65%

SHR
SHR

100 @ 1.65%

100 @ 1.65%

100 @ 1.65%
WC
FW
B Client:
100 @ 1.65% WC SHR Architect: ARACON PROJECTS
CO CO
Project Number: 24170
SK FW
Drawing Number: H100
SK SK B Revision: P1
FW BTH
DOUBLE BOWL CONNECTOR AND TRAP Drawn by: NS
FW NS
IN VP CO (TYPICAL ON ALL KITCHEN SINK) Designed by:
WALL 65 Approved by: JA
Scale: 1:100 @ A1
SHR
1 MULBERRY LANE
1 MULBERRY LANE, GLENORIE
DRAINAGE POINT FOR SPA
NSW 2157

65mm PIPEWORK CAST IN SLAB FOR COLD


AND HOT WATER PIPE RETICULATION FOR
GROUND FLOOR
ISLAND BENCH (TYPICAL) SANITARY DRAINAGE LAYOUT

100 @ 1.65%
ASW100

ASW100

ASW100

ASW100

ASW100

SHR ASW100

FW ASW100

ASW100

ASW100

ASW100
ASW100
ASW100
ASW100
WC CO

ASW100
ASW100
ASW100

ASW100

ASW100
ASW100

ASW100

Sydney: (02) 9052 6460


Newcastle: (02) 9052 6461

Sydney : Suite 1, 401 Pacific Hwy


Artarmon, NSW 2064
Newcastle : Suite 4, 102 Glebe Road
The Junction, NSW 2291

[email protected]
VP IN www.centricengineers.com
65 WALL

Scale Bar

0 2 4 6 8 10 m

1:100 @ A1
© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.

P1 19.03.2025 80% DD ISSUE

80%
ISSUE

2
H0 0
HYDRAULIC
SERVICES
Project North

CO

100
@1
.65%

CO 100
@ 1.65
%
Client:
Architect: ARACON PROJECTS
100
@ 1.65 Project Number: 24170
%
CO Drawing Number: H101

.65%
Revision: P1

@1
100
Drawn by: NS
CO
Designed by: NS
Approved by: JA
Scale: 1:100 @ A1

.65%
@1
1 MULBERRY LANE

.65%
100
B 65mm PIPEWORK CAST IN SLAB FOR 1 MULBERRY LANE, GLENORIE
COLD AND HOT WATER PIPE

@1
WC RETICULATION FOR ISLAND BENCH
NSW 2157

100
FW SK (TYPICAL)
SHR
SECONDARY DWELLING FLOOR
SANITARY DRAINAGE LAYOUT
B
WM
FW
LT
GULLY FOR HOT WATER UNIT TPR
VALVE DRAINAGE WC

SHR

VP IN VP IN
50 WALL 50 WALL

Sydney: (02) 9052 6460


Newcastle: (02) 9052 6461

Sydney : Suite 1, 401 Pacific Hwy


Artarmon, NSW 2064
Newcastle : Suite 4, 102 Glebe Road
The Junction, NSW 2291

[email protected]
www.centricengineers.com

Scale Bar

0 2 4 6 8 10 m

1:100 @ A1
DELETE THIS

HT

THERES A ZIP TAP


H002 HERE ALLOW FOR
COLD WATER
25mm CONNECTION WITH RPZD FOR POOL
SUPPLY
PLANT EQUIPMENT. FINAL LOCATION TO BE © CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
COORDINATED WITH POOL PLANT This drawing is the property of Centric Building Services PTY
CONTRACTOR. Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.
NEED HOT AND
PIPEWORK IN GROUND
COLD WATER TO
P1 19.03.2025 80% DD ISSUE
BBQ AREA. REFER

Ø25
TO THE LATEST
HT Ø25
PLANS ON FILE
SENT TO THE

Ø25
20mm CONNECTION FOR GAS BBQ TEAM.
BTH
ASW100

ASW100

RW BBQ
HT

80%

ASW100

ASW100
RW
B B

PIPEWORK AT HIGH-LEVEL IN CEILING SPACE


ISSUE

Ø20
PIPEWORK TO DROP IN WALL TO ISLAND

Ø25
BENCH KITCHEN SINK
RAINWATER SUPPLY FOR IRRIGATION AND
GARDEN HOSE TAP SUPPLY HYDRAULIC
RW

65mm PIPEWORK CAST IN SLAB FOR COLD


AND HOT WATER PIPE RETICULATION FOR HT
ISLAND BENCH (TYPICAL)
HWU
SERVICES
25 @ 2.75kPa

RW
Project North
RW

PIPEWORK AT HIGH-LEVEL IN CEILING SPACE ADD HOSE TAP


OUTLET HERE

RW
Ø20
PIPEWORK IN GROUND
Ø20
RW

B WC SHR
B WC
Ø20 SHR
Ø20

RW
RW

SHR

32 @ 2.75kPa

Ø20
Ø25
WC

RW
B
Client:
RW

Ø20
Ø20
WC SHR Architect: ARACON PROJECTS
Ø20
SK Project Number: 24170
HT Ø20 Drawing Number: H200

RW
SK Ø20 SK Revision: P1

Ø20
Ø20
RW

GCT HWU

Ø20
Ø20
LT
HWU B BTH Drawn by: NS
40mm GAS CONNECTION FOR SPA GAS HEATER.
SHR Designed by: NS
CONTRACTOR TO LOCATE EXTEND AND CONNECT TO SPA Approved by: JA

RW
HEATER. FINAL LOCATION OF SPA HEATER TO BE CONFIRMED Ø20 Scale: 1:100 @ A1
40 @ 2.75kPa
RW

WITH SPA CONTRACTOR


1 MULBERRY LANE
1 MULBERRY LANE, GLENORIE
NSW 2157

RW
RW

40 @ 2.75kPa
40 @ 2.75kPa

RINNAI GAS INSTANTANEOUS GAS HOT


GROUND FLOOR
WATER UNIT MOUNTED ON WALL OR
RECESSED WITH A WALL BOX, UNIT SET WATER AND GAS LAYOUT
ADD HOSE TAP AT 50°C (TYPICAL) MODEL INFINITY 26
TOUCH

RW
OUTLET HERE
RW

40 @ 2.75kPa
HT

RW
RW

PIPEWORK TO DROP DOWN IN WALL TO GROUND.

RW
ASW100
RW

HT
ASW100

ASW100

ASW100

ASW100

ASW100

RW
ASW100

RW
ASW100

ASW100

ASW100
ASW100
ASW100
ASW100
RW

ASW100
ASW100
ASW100

ASW100

ASW100
ASW100

ASW100
Ø25
RW RW RW RW RW RW RW RW RW RW RW
RW
50 @ 2.75kPa

RW
RW
H002
ADD HOSE TAP
OUTLET HERE THERES A
BATHROOM HERE
ALLOW FOR HOT
H002

AND COLD WATER Sydney: (02) 9052 6460


RW

ADD HOSE TAO

RW
HERE Newcastle: (02) 9052 6461
OUTLET HERE
HT

RW RW RW RW RW RW RW RW

Sydney : Suite 1, 401 Pacific Hwy


NOTE:
RAINWATER SUPPLY FOR IRRIGATION AND GARDEN HOSE TAP SUPPLY Artarmon, NSW 2064
ALL PIPE SHALL BE IN COPPER TO COMPLY WITH BUSHFIRE PROTECTION REPORT Newcastle : Suite 4, 102 Glebe Road
The Junction, NSW 2291

[email protected]
www.centricengineers.com

Scale Bar

0 2 4 6 8 10 m

1:100 @ A1
© CENTRIC BUILDING SERVICES ENGINEERS PTY LTD
This drawing is the property of Centric Building Services PTY
Limited and must not be used, reproduced or copied wholly or in
part without the written permission of Centric Building Services Pty
Limited. The elements shown on this drawing are prototypical
design only. The contractor shall produce workshop drawings for
construction purposes. The contractor shall not scale from this
drawing and all measurements shall be carried out on site.

P1 19.03.2025 80% DD ISSUE

80%
ISSUE

HYDRAULIC
ADD HOSE TAP SERVICES
OUTLET
Project North

Client:
Architect: ARACON PROJECTS
Project Number: 24170
Drawing Number: H201
Revision: P1
Drawn by: NS
Designed by: NS
Approved by: JA
Scale: 1:100 @ A1

B 1 MULBERRY LANE
WC 1 MULBERRY LANE, GLENORIE
SHR SK H0
02 NSW 2157

Ø20 RW
RW SECONDARY DWELLING FLOOR
RW
WATER AND GAS LAYOUT

RW
RW HT PIPEWORK TO DROP IN WALL TO ISLAND
B WM
BENCH KITCHEN SINK
LT
RW WC
RW - Ø20 65mm PIPEWORK CAST IN SLAB FOR COLD AND HOT
RW - Ø20 HW - Ø20
HW - Ø20 RW SHR WATER PIPE RETICULATION FOR ISLAND BENCH

RW
APPROXIMATE LOCATION OF RAINWATER RE-USE TANK. REFER CW - Ø20
CW - Ø20 (TYPICAL)

Ø25
CIVIL DRAWINGS FOR FINAL TANK DETAILS
Ø25
KING SPAN EVOLUTION MKIII PUMP RAINWATER RE-USE SYSTEM. HT

Ø25

PIPEWORK TO DROP DOWN IN WALL TO GROUND.

EXTERNAL RINNAI 300L ELECTRIC HEAT PUMP STORAGE HOT


WATER UNIT FOR DWELLING 2 COMPLETE WITH TEMPERING VALVE.
NOTE:
ALL PIPE SHALL BE IN COPPER TO COMPLY WITH BUSHFIRE PROTECTION REPORT
HOT WATER UNIT SUBJECT TO BASIX APPROVAL.

Sydney: (02) 9052 6460


Newcastle: (02) 9052 6461

Sydney : Suite 1, 401 Pacific Hwy


Artarmon, NSW 2064
Newcastle : Suite 4, 102 Glebe Road
The Junction, NSW 2291

[email protected]
www.centricengineers.com

Scale Bar

0 2 4 6 8 10 m

1:100 @ A1