6 U.S (1)
6 U.S (1)
5'-9"
5'-9"
8) d = DIA OF MAIN BAR.
R.C.C SLAB AT P.L
5'-6"
10) Ds = OVERALL DEPTH OF SLAB.
5'-9" 6'-3" 11) T = EDGE THICKNESS OF SLAB.
6'-3" 6'-3" 6'-4" 5'-9" 12) Ld = EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
3'
3'
G 13) LAP LENGTH > Ld OR 30 TIMES BAR DIA, WHICHEVER IS MORE.
14) Ldt= EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
X X S X X 15) Ldc = EFFECTIVE DEVELOP. LENGTH CONSIDERING COMPRESSION 33X BAR
7'-10" DIA.
6'-10"
6'-10"
16) SIDE FACE REINFORCEMENT IN BEAMS = 0.1% OF WE AREA EQUALLY
DISTRIBUTED ON BOTH FACES WHERE DEPTH OF WEB > 750 FOR STRAIGHT
BEAMS IN FLEXURE ONLY @ <300S c/c OR WEB THICKNESS, WHICHEVER IS
LESS.
F 17) SIDE FACE REINFORCEMENT IN BEAMS RESISTING TORSION AND HAVING
DEPTH OF CROSS SECTION > 450 SHALL BE SAME AS IN NOTE (14 ).
6'-9"
6'-9"
6'-9"
6'-9"
S PB S S S PB S 18) ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. AMBIGUITY, IF ANY,
5'-5"
5'-5"
5'-9" SHALL BE BROUGHT TO THE NOTICE OF THE SE ( M ) B.P.B.C.C. PATNA.
19) GRID LINE SHOWS CL OF WALLS.
S S
20) THIS DRAWING SHALL BE READ WITH ARCHITECTURAL DRAWINGS No. 501,
2'-9"
Sl.No.-500, DATED-14-12-2010.
E
2'-9"
S S
R.C.C SLAB AT P.L
49'-7"
2) LOAD -G+2
3) SEISMIC ZONE - V
12'-4"
12'-4"
50'-5"
S S S1 S1 S S
D
7'-3"
7'-3"
PB PB
CF3
5'-5"
5'-5"
5'-9"
5'-9" BIHAR POLICE BUILDING CONSTRUCTION
S
2'-9"
2'-9"
S S S
7' 7'-3" 7'-3"
JOB TITLE :
9'-8"
9'-8"
7'
TIe beam SHEET TITLE :
S S1 At P.L
B
5'-9" S 5'-9"
X CF1 X
CF1 CF2 S1
4'-5"
4'-5"
6'
6'
2'-6"
2'-6"
A S.L NO. -
SHEET NO. - 1 / 9
5'-9"
5'-9"
X S1 S1 S X S1 FAHAD NAQUI
ARCH. D'Man SCALE:- NOT TO SCALE
M. SAHU
STR.CONSULTANT.
S. E. CHIEF ENGINEER
ARCHITECT
4''Th.R.C.C. BAND AT P.L.
P.L. 4''Th.R.C.C. BAND AT P.L. 4''Th.R.C.C. BAND AT P.L. 4''Th.R.C.C. BAND AT P.L.
P.L. P.L. P.L.
NOTES & INSTRUCTIONS:-
AS PER SITE AS PER SITE AS PER SITE
AS PER SITE 1) NOTES AND INSTRUCTIONS INDICATED BELOW SHALL BE FOLLOWED WITH DUE RESPONSIBILITY BY
ENGINEER IN -CHARGE DURING EXECUTION OF THE PROJECT.
G.L. G.L. G.L. G.L. 2) THE ENGINEER IN -CHARGE SHALL STUDY IN DEPTH THE ARCHITECTURAL/ STRUCTURAL DRAWINGS OF
THE BUILDING BEFORE EXECUTION AND AMBIGUITY IF ANY NOTICED BY HIM SHALL BE REPORTED TO
C.E./SR. ARCHITECT/SR.STRU.ENGR.FOR NECESSARY ACTION.
3) ALL DIMENSIONS ARE IN mm
4) ALL DESIGN MIX CONCRETE SHALL BE OF GRADE M20 HAVING MINIMUM CEMENT CONTENT 300 kg/m3, Max
W/C = 0.5 FOR COARSE AGGREGATE 20 mm SIZE.
# 10@7"c/c (Dist.) #10 @ 7" c/c 5) # INDICATES HYSD BARS OF GRADE Fe 500, CONFORMING TO I.S. 1786.
6) ALL CONCRETE SHALL BE MACHINE MIXED AND COMPACTED PROPERLY USING MECHANICAL
6'-6" #12 @ 5" c/c #10@7" c/c #10@8" c/c
14" #12 @ 5" c/c (Main) 14'' #12 @ 6" c/c #12 @ 7" c/c
VIBRATORS.
7) DURATION OF CURING SHALL BE NOT LESS THAN SEVEN DAYS.
6'-6"4'' 6'-6" 6'-6"
4" 12'' 10'' 8) NOMINAL COVER (i.e. CLEAR CONCRETE COVER TO ALL REINFORCEMENTS, INCLUDING LINKS) FOR
2" FOUNDATION = 50, COLUMN = 40, BEAM = 30 AND SLAB = 30mm.
10'' 14" R.C.C. M20 14'' R.C.C. M20 3"
9) d = DIA OF MAIN BAR.
10'' 12'' R.C.C. M20 10'' R.C.C. M20 10) Ld = EFFECTIVE DEVELOP LENGTH.
9'' 8''
11) LAP LENGTH > Ld OR 30 TIMES BAR DIA, WHICHEVER IS MORE.
3'' 3" Brick Flat Soling 3" 3" Brick Flat Soling 3" 3" Brick Flat Soling 3" 3" Brick Flat Soling 12) Ldt= EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
13) Ldc = EFFECTIVE DEVELOP. LENGTH CONSIDERING COMPRESSION 39X BAR DIA FOR M20.
6'' 6" Local Sand Filling 6" 6" Local Sand Filling 6" 6" Local Sand Filling 6" 6" Local Sand Filling 14) SIDE FACE REINFORCEMENT IN BEAMS = 0.1% OF WEB AREA EQUALLY DISTRIBUTED ON BOTH FACES
WHERE DEPTH OF WEB > 750 FOR STRAIGHT BEAMS IN FLEXURE ONLY
7'-9'' 7'-3"/7'-0'' 6'-9" 5'-9"/6'-0" @ <300S c/c OR WEB THICKNESS, WHICHEVER IS LESS.
15) SIDE FACE REINFORCEMENT IN BEAMS RESISTING TORSION AND HAVING DEPTH OF CROSS SECTION > 450
SECTION OF SECTION OF SECTION OF SECTION OF SHALL BE SAME AS IN NOTE (17 ).
16) ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED AMBIGUITY, IF ANY, SHALL BE BROUGHT TO THE
WALL FOOTING 4 - #10 Thr. WALL FOOTING WALL FOOTING WALL FOOTING NOTICE OF THE SR. ARCHITECT / SR. STRU. ENG. ( M ) B.P.B.C.C. PATNA FOR NECESSARY ACTION.
17) THE FORM WORK FOR CONCRETING SHALL BE SUCH THAT IT MAY REMAIN
SUFFICIENTLY RIGID DURING PLACING AND COMPACTION OF CONCRETE AND SHALL BE SUCH AS TO
# 8 @ 4" 4''Th. PREVENT LOSS OF CEMENT / SLURRY FROM THE CONCRETE.
P.L. SIZE - 10"X10" (S) to 6"c/c P.L. 18) THE FROM WORKS FOR (SPAN >3.5m) BEAMS & SLAB SHALL BE SO ASSEMBLED AS TO PROVIDE CAMBER
250 R.C.C. AS FOLLOWERS:-
AS PER SITE #8@4''to6''c/c # 8 @ 4" to 6"c/c 4''Th.R.C.C. BAND AT P.L. 4''Th.R.C.C. BAND AT P.L. BAND a) CAMBER FOR BEAMS/SLAB SHALL BE 1 IN 250 OF THE SPAN OR 4MM/ METER OF SPAN AT THE CENTRAL
POINT.
P.L. P.L. AS PER SITE
G.L.
#12-4 Nos. 5 - #10 Thr. AT P.L. b) FOR CANTILEVER BEAMS /SLAB CAMBER AT THE FREE END SHALL BE SPAN /50 OF THE PROJECTED
4 - #10 Thr. G.L. LENGTH.
250 AS PER SITE AS PER SITE 19) a) REMOVAL OF PROPS UNDER R.C.C. SLAB SHALL NOT BE ALLOWED BEFORE 14 DAYS (MINIMUM).
b) REMOVAL OF PROPS UNDER BEAMS & ARCH. SPANNING UP TO 6m SHALL NOT BE ALLOWED BEFORE 14
Main Rein.of Corresponding G.L. G.L. DAYS (MINIMUM).
6'-6" D Footing both way SECTION OF TB 5" c) REMOVAL OF PROPS UNDER BEAMS & ARCH. SPANNING OVER 6m SHALL NOT BE ALLOWED BEFORE 21
DAYS.
D R.C.C. M20 20) IN FRAME STRUCTURE ALL EXTERNAL & STAIR WALL SHALL BE 10" THICK AND INTERNAL WALL SHALL
D 2 - #10 Thr.+
3" 3" Brick Flat Soling # 8 - 6 Nos.(Dist.) # 8 - 6 Nos.(Dist.) BE 125 THICK EXCEPT MENTIONED.
2 - #10 extra 21) EXPANSION JOINT SHALL BE PROVIDED AS PER DRG. NO.-357, SL NO.-356, DT- 24-07-2015, COMMUNICATED
6" 6" Local Sand Filling 6'-6" 8" #10 @ 7" c/c (Main) 6'-6" #10 @ 7" c/c (Main) 6'-6" VIDE C.E.'S LETTER NO.-3650 DT-25-07-2015 AS PER LOCATION MARKED IN THE ARCH./STRU. DRG.
5 - #10 Thr. 2" 22) PARAPET WALL SHALL BE STIFFENED WITH STIFFENER/ COLUMN PROJECTING FROM
# 8 @ 4" 8" R.C.C. M20 R.C.C. M20 6"
ROOF AND BY PROVIDING A R.C.C. BAND 3" THICK AT THE TOP OF PARAPET WALL.
DETAILS OF STIFFNER (S ) 6" 23) THIS DRAWING SHALL BE READ WITH ARCHITECTURAL DRAWING No.- ------ Sl. No. ----------
(SECTION - K -K) 250 to 6"c/c 2'-7" 6" 6"
3"
DATE - ----------
3" 3" Brick Flat Soling 3" 3" Brick Flat Soling
6" 6" Local Sand Filling 6" 6" Local Sand Filling 6" B) DESIGN PARAMETERS
4 - #10 Thr. 3'-0" 2'-9"
width of footing 250 2'-6''
SECTION OF R.C.C
#12 @ 6" c/c C OF
L COL.
SLAB AT P.L
SECTION OF SECTION OF SECTION OF
Bothways
SECTION OF PB WALL FOOTING WALL FOOTING WALL FOOTING
Section at-xx
BAR ALONG THIS LINE
AS PER WIDTH OF
BAR ALONG THIS LINE
FOOTING
K K
G.F.C.
CL OF COL.
STRUCTURAL
L L
FOOTING
CL OF COL.
S1 S1 S1 S1 S1 S1
AS PER WIDTH OF CORRESPONDING
FOOTING
TYPICAL DETAILS OF FOOTING (S1) DETAILS OF FOOTING CF1(10'-4"x7'-0") DETAILS OF FOOTING CF2(10'-4"x7'-3") DETAILS OF FOOTING CF3(10'-4"x7'-3")
ARCHITECT S. E. CHIEF ENGINEER
1 2 3 4 5 6 7 8 9 10 11 1) NOTES AND INSTRUCTIONS INDICATED BELOW SHALL BE FOLLOWED WITH
DUE RESPONSIBILITY BY ENGINEER IN -CHARGE DURING EXECUTION OF
THE PROJECT
63'-8" 2) THE ENGINEER IN -CHARGE SHALL STUDY IN DEPTH THE ARCHITECTURAL/
13'-4" 2'-3" 8'-4" 3'-7" 3'-11" 3'-11" 3'-7" 8'-4" 2'-3" 13'-4" STRUCTURAL DRAWINGS OF THE BUILDING BEFORE EXECUTION AND
AMBIGUITY IF ANY NOTICED BY HIM SHALL BE REPORTED TO S.E./SR.
ARCHITECT/SR. STR.ENGR.FOR NECESSARY ACTION.
3) ALL DIMENSIONS ARE IN mm
S1 S S1 S1 S S1 4) ALL DESIGN MIX CONCRETE OF GRADE M25 HAVING MINIMUM CEMENT
CONTENT 300 kg/m3, Max W/C = 0.5 FOR COARSE AGGREGATE 20 mm SIZE.
H 5) # INDICATES HYSD BARS OF GRADE Fe 500.
6) ALL CONCRETE SHALL BE MACHINE MIXED AND VIBRATED.
5'-6"
INCLUDING LINKS) FOR FOUNDATION = 50, COLUMN = 40, BEAM = 30 AND
SLAB = 30.
8) d = DIA OF MAIN BAR.
G 9) D = OVERALL DEPTH OF BEAM, d = EFFECTIVE DEPTH OF BEAM / SLAB
10) Ds = OVERALL DEPTH OF SLAB.
S 11) T = EDGE THICKNESS OF SLAB.
12) Ld = EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
6'-10"
6'-10"
13) LAP LENGTH > Ld OR 30 TIMES BAR DIA, WHICHEVER IS MORE.
14) Ldt= EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
15) Ldc = EFFECTIVE DEVELOP. LENGTH CONSIDERING COMPRESSION 33X BAR
DIA.
F 16) SIDE FACE REINFORCEMENT IN BEAMS = 0.1% OF WE AREA EQUALLY
S PB S S S PB S DISTRIBUTED ON BOTH FACES WHERE DEPTH OF WEB > 750 FOR STRAIGHT
BEAMS IN FLEXURE ONLY @ <300S c/c OR WEB THICKNESS, WHICHEVER IS
5'-5"
5'-5"
LESS.
17) SIDE FACE REINFORCEMENT IN BEAMS RESISTING TORSION AND HAVING
DEPTH OF CROSS SECTION > 450 SHALL BE SAME AS IN NOTE (14 ).
49'-7"
12'-4"
12'-4"
50'-5"
S S S1 S1 S S
D
PB PB
5'-5"
5'-5"
C S
S S S
BIHAR POLICE BUILDING CONSTRUCTION
CORPORATION, B.M.P. - 5, PATNA
9'-8"
9'-8"
JOB TITLE :
TIe beam
S S1 At P.L S1
B S 5'-9"
X SHEET TITLE :
4'-5"
4'-5"
S1 R.C.C SLAB AT P.L S R.C.C SLAB AT P.L
S1
A DRG. NO. - DATE -
5'-9"
X S
S1 S1
SHEET NO. - 3 / 9
S.L NO. -
FAHAD NAQUI
ARCH. D'Man SCALE:- NOT TO SCALE
4- #12 Thr. 8- #12 Thr.
# 8 @ 4" # 8 @ 4"
10" to 6"c/c to 6"c/c M. SAHU
12" STR.CONSULTANT.
10" 10"
STIFFENER (S) STIFFENER (S1) ARCHITECT
S. E. CHIEF ENGINEER
3- #10 Thr.
1 2 3 4 5 6 7 8 9 10 11
63'-8" #8@6"c/c
6"
13'-4" 2'-3" 8'-4" 3'-7" 3'-11" 3'-11" 3'-7" 8'-4" 2'-3" 13'-4"
H 3- #10 Thr.
10"
AT Lintel Level
AT Lintel Level
L7 L6 L7 L6
5'-6"
SECTION AT L1/L6 / L7
LB2
G 2 - #12 Thr.+
2 - #12 extra
6'-10"
R.C.C SLAB
R.C.C SLAB
15"
F #10 @ 5"c/c
5"
L4 L1 L1 LB2 LB2 L1 L1 L4 L5
L5
5'-5"
#8 @ 3Nos
4- #12 Thr.
10"
2'-7"
E SECTION AT -LB1
L3 L3 With Chajjah
Lintel Level
Lintel Level
12'-4"
50'-5"
# 8 @ 4" to 6"c/c
R.C.C SLAB AT
R.C.C SLAB AT
5 - #10 Thr.
9' 5"
D
LB2-10"x12" LB2-10"x12" 5 - #10 Thr.
L7 L7
5'-5"
L5 L5
2'-7"
L4 UP L4
C SECTION OF R.C.C SLAB
L3 L3
AT LINTEL LEVEL.
L6 L6
9'-8"
12"
4'-5"
7'
Z
R.C.C SLAB AT Lintel Level LB1-10"x15" R.C.C SLAB AT Lintel Level
A 4- #12 Thr.
SHEET TITLE:
LB1-10"x15" 10"
Z SECTION AT -LB2
LINTEL & LINTEL BEAM PLAN DRG. NO. - DATE -
Bar of Floor Slab
2- #10 Thr. 10'-6" level.
2- #10 Thr. SHEET NO. - 4 / 9
S.L NO. -
FAHAD NAQUI
9"
#8 @ 3Nos ARCH. D'Man SCALE:- NOT TO SCALE
3- #8
6"
6"
Floor Beam
15"
#10@ 5"C/C #10 @ 100c/c
BEAM
2- #10 Thr. 3- #10 Thr. Level 8'-6" M. SAHU
5" 10" 10" STR.CONSULTANT
#8 @ 3Nos
SECTION AT L3 / L4 SECTION AT L5 Details of Chajjah TRIPICAL BEAM SECTION
SECTION AT Z-Z
W1 S5 S5 W1
SLAB = 30.
8) d = DIA OF MAIN BAR.
9) D = OVERALL DEPTH OF BEAM, d = EFFECTIVE DEPTH OF BEAM / SLAB
10) Ds = OVERALL DEPTH OF SLAB.
F 11) T = EDGE THICKNESS OF SLAB.
SUNKEN SUNKEN
10"x10"
10"x10"
12) Ld = EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
6"x18"
6"x18"
FB3
FB3
SLAB FB2 SLAB
FB2
13) LAP LENGTH > Ld OR 30 TIMES BAR DIA, WHICHEVER IS MORE.
5'-5"
14) Ldt= EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
S6 S6 15) Ldc = EFFECTIVE DEVELOP. LENGTH CONSIDERING COMPRESSION 33X BAR
DIA.
E 16) SIDE FACE REINFORCEMENT IN BEAMS = 0.1% OF WE AREA EQUALLY
FB1-10"x18" FB1-10"x18" DISTRIBUTED ON BOTH FACES WHERE DEPTH OF WEB > 750 FOR STRAIGHT
BEAMS IN FLEXURE ONLY @ <300S c/c OR WEB THICKNESS, WHICHEVER IS
S1 S1 LESS.
17) SIDE FACE REINFORCEMENT IN BEAMS RESISTING TORSION AND HAVING
DEPTH OF CROSS SECTION > 450 SHALL BE SAME AS IN NOTE (14 ).
12'-4"
D 2 - #12 extra
SUNKEN SUNKEN 1) TYPE OF STR.- LOAD BEARING
6"x18"
6"x18"
10"x10"
10"x10"
FB3
FB3
SLAB
5'-5"
SLAB
18"
8mm@4"to6"c/c 2) LOAD -G+2
FB2
FB2
S6 UP S6 3) SEISMIC ZONE - V
4) NET ALLOWABLE B.P= 10 T/m AT A DEPTH OF 2.0 M
C
FB1-10"x18" FB1-10"x18"
S4 S4 10"
3- #16 Thr.
9'-8"
S2 S2 SECTION AT -FB1
2 - #10 Thr.+
B 2 - #10 extra
4'-5"
Z S5 7'
S5
10"
W1
A W1
8mm@4"to6"c/c
Z
4- #10 Thr.
10"
SECTION AT -FB2
10'-6" level.
2 - #12 Thr.
9"
18"
8mm@4"to6"c/c
15"
2- #12 Thr.
TYPICAL SECTION OF SLAB TRIPICAL BEAM SECTION 6"
SECTION AT Z-Z
SECTION AT -FB3
1 2 3 4 5 6 7 8 9 10 11
63'-8" 1) NOTES AND INSTRUCTIONS INDICATED BELOW SHALL BE FOLLOWED WITH
DUE RESPONSIBILITY BY ENGINEER IN -CHARGE DURING EXECUTION OF
13'-4" 2'-3" 8'-4" 3'-7" 3'-11" 3'-11" 3'-7" 8'-4" 2'-3" 13'-4"
THE PROJECT
2) THE ENGINEER IN -CHARGE SHALL STUDY IN DEPTH THE ARCHITECTURAL/
STRUCTURAL DRAWINGS OF THE BUILDING BEFORE EXECUTION AND
H AMBIGUITY IF ANY NOTICED BY HIM SHALL BE REPORTED TO S.E./SR.
ARCHITECT/SR. STR.ENGR.FOR NECESSARY ACTION.
5'-6"
W1 S5 S5 W1
SLAB = 30.
8) d = DIA OF MAIN BAR.
9) D = OVERALL DEPTH OF BEAM, d = EFFECTIVE DEPTH OF BEAM / SLAB
10) Ds = OVERALL DEPTH OF SLAB.
F 11) T = EDGE THICKNESS OF SLAB.
SUNKEN SUNKEN
10"x10"
10"x10"
12) Ld = EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
6"x18"
6"x18"
FB3
FB3
SLAB FB2 SLAB
FB2
13) LAP LENGTH > Ld OR 30 TIMES BAR DIA, WHICHEVER IS MORE.
5'-5"
14) Ldt= EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
S6 S6 15) Ldc = EFFECTIVE DEVELOP. LENGTH CONSIDERING COMPRESSION 33X BAR
DIA.
E 16) SIDE FACE REINFORCEMENT IN BEAMS = 0.1% OF WE AREA EQUALLY
FB1-10"x18" FB1-10"x18" DISTRIBUTED ON BOTH FACES WHERE DEPTH OF WEB > 750 FOR STRAIGHT
BEAMS IN FLEXURE ONLY @ <300S c/c OR WEB THICKNESS, WHICHEVER IS
S1 S1 LESS.
17) SIDE FACE REINFORCEMENT IN BEAMS RESISTING TORSION AND HAVING
DEPTH OF CROSS SECTION > 450 SHALL BE SAME AS IN NOTE (14 ).
12'-4"
D 2 - #12 extra
SUNKEN SUNKEN 1) TYPE OF STR.- LOAD BEARING
6"x18"
6"x18"
10"x10"
10"x10"
FB3
FB3
SLAB
5'-5"
SLAB
18"
8mm@4"to6"c/c 2) LOAD -G+2
FB2
FB2
S6 UP S6 3) SEISMIC ZONE - V
4) NET ALLOWABLE B.P= 10 T/m AT A DEPTH OF 2.0 M
C
FB1-10"x18" FB1-10"x18"
S4 S4 10"
3- #16 Thr.
9'-8"
S2 S2 SECTION AT -FB1
2 - #10 Thr.+
B 2 - #10 extra
4'-5"
Z S5 7'
S5
W1
A
10"
W1
8mm@4"to6"c/c
Z
4- #10 Thr.
10"
SECTION AT -FB2
10'-6" level.
2 - #12 Thr.
9"
18"
8mm@4"to6"c/c
15"
2- #12 Thr.
TYPICAL SECTION OF SLAB TRIPICAL BEAM SECTION 6"
SECTION AT Z-Z
SECTION AT -FB3
1 2 3 4 5 6 7 8 9 10 11
63'-8" 1) NOTES AND INSTRUCTIONS INDICATED BELOW SHALL BE FOLLOWED WITH
DUE RESPONSIBILITY BY ENGINEER IN -CHARGE DURING EXECUTION OF
13'-4" 2'-3" 8'-4" 3'-7" 3'-11" 3'-11" 3'-7" 8'-4" 2'-3" 13'-4"
THE PROJECT
2) THE ENGINEER IN -CHARGE SHALL STUDY IN DEPTH THE ARCHITECTURAL/
STRUCTURAL DRAWINGS OF THE BUILDING BEFORE EXECUTION AND
H AMBIGUITY IF ANY NOTICED BY HIM SHALL BE REPORTED TO S.E./SR.
ARCHITECT/SR. STR.ENGR.FOR NECESSARY ACTION.
5'-6"
W1 S5 S5 W1
SLAB = 30.
8) d = DIA OF MAIN BAR.
9) D = OVERALL DEPTH OF BEAM, d = EFFECTIVE DEPTH OF BEAM / SLAB
10) Ds = OVERALL DEPTH OF SLAB.
F 11) T = EDGE THICKNESS OF SLAB.
10"x10"
10"x10"
12) Ld = EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
FB2
FB2
13) LAP LENGTH > Ld OR 30 TIMES BAR DIA, WHICHEVER IS MORE.
5'-5"
14) Ldt= EFFECTIVE DEVELOP. LENGTH CONSIDERING TENSION 49X BAR DIA.
15) Ldc = EFFECTIVE DEVELOP. LENGTH CONSIDERING COMPRESSION 33X BAR
DIA.
E 16) SIDE FACE REINFORCEMENT IN BEAMS = 0.1% OF WE AREA EQUALLY
DISTRIBUTED ON BOTH FACES WHERE DEPTH OF WEB > 750 FOR STRAIGHT
BEAMS IN FLEXURE ONLY @ <300S c/c OR WEB THICKNESS, WHICHEVER IS
S1 S1 LESS.
17) SIDE FACE REINFORCEMENT IN BEAMS RESISTING TORSION AND HAVING
DEPTH OF CROSS SECTION > 450 SHALL BE SAME AS IN NOTE (14 ).
12'-4"
D
3 - #12 Thr. 1) TYPE OF STR.- LOAD BEARING
10"x10"
10"x10"
5'-5"
2) LOAD -G+2
FB2
FB2
FB 3) SEISMIC ZONE - V
4) NET ALLOWABLE B.P= 10 T/m AT A DEPTH OF 2.0 M
C
10"
8mm@4"to6"c/c
S4 S4
3- #12 Thr.
9'-8"
10"
S2 S2
SECTION AT -FB2
B
4'-5"
Z S5 7'
S5
W1
A W1
10'-6" level.
#8-2L @ 4"
12"
#8@200c/c to 6"C/C
Landing Floor Slab 21
2'-
0" 4 -#12 +Thr.
19 10"
6"
13
2'- 10"
#8@4"c/c
0"
6"
(Dist) #8@8"c/c
11
12"
#8@8"c/c
(Dist) LB2
2'-0"
#10@4"c/c #10@100c/c
(Main) LB1
A
1- #10
#8@12"c/c
10"
#10@4"c/c #8@8"c/c
12
12"
#8@8"c/c 0 "
2'-
5"
2'-0" LB2
eq
#10-1
A LB1
#10@4"c/c
T=as/arch.
R=as/arch eq
#8@8"c/c
eq eq
#10@4"c/c
(Main)
0"
2'-
#8@8"c/c
6"
(Dist)
1
support
#10@4"c/c
(Main)
12"
#8-2L @ 4"
PB1(10"x12") to 6"C/C
#8-3NOS Thr.
1'-6"
12"
750 FOR STRAIGHT BEAMS IN FLEXURE ONLY @ <300S c/c OR WEB
3) LOAD -G+1
4) SEISMIC ZONE - V G.F.C
6" BIHAR POLICE BUILDING CONSTRUCTION
CORPORATION, B.M.P. - 5, PATNA
MB2-250x400 #8-3NOS Thr. JOB TITLE
B
in Top Layer
#8@6"c/c
#12-3 Thr.
10" A.E. DESIGN A.E. DESIGN
M. SAHU
STR.CONS.