0% found this document useful (0 votes)
5 views3 pages

Daily Ps a2b 08 Agustus 2025

The document outlines the daily maintenance schedule for PT Pamapersada Nusantara, detailing the actual service performed on August 7, 2025, and the tentative plans for August 9 and 10, 2025. It includes information on equipment downtime, actions taken, and backlogs for various machinery. Each entry specifies the equipment identification, estimated downtime, service actions, and any parts required or issues noted.

Uploaded by

ghanisandriono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views3 pages

Daily Ps a2b 08 Agustus 2025

The document outlines the daily maintenance schedule for PT Pamapersada Nusantara, detailing the actual service performed on August 7, 2025, and the tentative plans for August 9 and 10, 2025. It includes information on equipment downtime, actions taken, and backlogs for various machinery. Each entry specifies the equipment identification, estimated downtime, service actions, and any parts required or issues noted.

Uploaded by

ghanisandriono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

INTERNAL USE #

DAILY PLAN SCHEDULE MAINTENANCE


PT PAMAPERSADA NUSANTARAA1:V34
MINING CONTRACTOR - BEKB
Issue Date : Jumat,08 Agustus 2025
ACTUAL SERVICE YESTERDAY Kamis, Agustus 7, 2025
PLAN ACTUAL

No TOTAL EST. DOWNTIME (hrs) Washing & Service Action Backlog Qty MP
PS Start Total Actual
C/N HM HM Actual
TYPE Breakdown Downtime
Washing & PS BL & FUI Start time LOKASI Finish Time Actual Start time Finish Time Actual Mech.

1 EX1287 SCM #VALUE! 08.30 02.00 LAPANGAN #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! CONTINUE ACTION PS & BACKLOG FUI

2 EX1781 64.500 500 09.00 3:00 13.00 WS 03.00 03.00 03.00 00.00 03.00 CONTINUE ACTION PS & BACKLOG FUI

3 DZ1330 7.000 1000 07.00 4:00 02.00 WS 04.00 04.00 04.00 00.00 04.00 CONTINUE ACTION PS & BACKLOG FUI

4 DZ554 35.750 750 07.00 2:00 10.00 WS 02.00 02.00 02.00 00.00 02.00 CONTINUE ACTION PS & BACKLOG FUI

5 DR106 29.750 750 07.00 2:00 10.00 WS 02.00 02.00 02.00 00.00 02.00 CONTINUE ACTION PS & BACKLOG FUI

6 DT5305 14.500 500 07.00 3:00 09.00 WS 03.00 03.00 03.00 00.00 03.00 CONTINUE ACTION PS & BACKLOG FUI

7 DT5642 10.000 2000 14.00 4:00 08.00 WS 04.00 04.00 04.00 00.00 04.00 CONTINUE ACTION PS & BACKLOG FUI

8 GR628 7.500 500 08.00 3:00 07.00 WS 03.00 03.00 03.00 00.00 03.00 CONTINUE ACTION PS & BACKLOG FUI

9 DT4017 64.250 250 07.00 2:00 08.00 WS 02.00 02.00 02.00 00.00 02.00 CONTINUE ACTION PS & BACKLOG FUI

10 DT5901 3.750 750 07.00 2:00 04.00 WS 02.00 02.00 02.00 00.00 02.00 CONTINUE ACTION PS & BACKLOG FUI

11 DT2722 59.500 500 07.00 3:00 07.00 WS 03.00 03.00 03.00 00.00 03.00 CONTINUE ACTION PS & BACKLOG FUI

12 DT5442 12.250 250 07.00 2:00 06.00 WS 02.00 02.00 02.00 00.00 02.00 CONTINUE ACTION PS & BACKLOG FUI

Jumat, Agustus 8, 2025


TOTAL EST. DOWNTIME WR
HM BY EWACS MO
(hrs) PS & BACKLOG
PS Start DETAILS ACTIVITIES
C/N HM DEVIASI LOKASI PS
TYPE Breakdown Washing & RESERVASI RESERVASI
07-Agu-25 BL & FUI Washing & PS BL & FUI
PS SERVICE BACKLOG

BL :
1 EX1236 07.00 02.00
- FOLLOW UP FUEL RATE HIGH

BL :
77558 FUI : ATTACHMENT :
2 EX1847 14.000 2000 09.00 14.026 26 4:00 12.00 10054336 10170150 224732 - NO PART BACKLOG RFU
DONE PR PO - -
- REPLACE SENSOR HYDRAULIC

BL :
- REPLACE FINAL DRIVE RH
10166533 218732 219828 FUI : ATTACHMENT :
3 DZ1236 30.250 250 09.00 30.311 61 2:00 22.00 10165630 - MIDLIFE INJECTOR
10166539 DONE PR PO 219842 - -
- COVER LAMPU DEPAN LOOSEN
- BLADE WIPER WORN OUT
FUI : IA ( 84 % )
- WASHING RADIATOR OPEN GRILL
BL : - EGT MAX LR HIGH ATTACHMENT :
4 DT3974 13.250 250 07.00 13.373 123 2:00 04.00 WS 10070790 10166625 99036 220010 - FOOT STEP A FRAME RH BRAKE - CHECK VOLTAGE EGT LR -
- UKUR TEMPERATURE EGT LR KONDISI STALL P MODE COOLANT TEMP 70
- RESAMPLE REAR AXLE OIL

BL : REPLAN
FUI : IA ( 100 % )
10163188 63965 215570 -REPLACE BOLT A FRAME ATTACHMENT :
5 DT5641 10.000 2000 07.00 10.102 102 4:00 08.00 WS 10044552 - CHECK BOLT A FRAME
10163262 DONE PR PO 215618 - REPLACE OIL SUSPENSI -
- CHECK FUNGSI FECO DAN PLM
- REPLACE RPS SENSOR

FUI : IA ( 100 % )
BL : - CHECK BOLT A FRAME ATTACHMENT :
6 DT4635 39.000 1000 07.00 39.126 126 4:00 08.00 WS 10166881 220099 - NO PART BACKLOG - CHECK FUNGSI FECO DAN PLM -
- UKUR BLOWBY PRESSURE BY MONITOR PANEL DAN MANUAL

FUI :
- CATAT DAN RESET ERROR CODE TRANSMISI
BL :
10051193 10169823 224204 - UKUR CIRCLE CLEARANCE ATTACHMENT :
8 GR607 10.750 750 09.00 10.808 58 2:00 10.00 WS 223811 - HOSE BLADE LIFT CYL CRACK
(10169534 ) 10169824 224206 - TREND Si INCREASE Fe INCREASE -
- HOSE BLADE SHIFT CYL CRACK
- RESAMPLE HYD OIL
- CHECK INDIKASI KEBOCORAN CYLINDER HYDRAULIC DAN CLEANING BREATHER

FUI : IA ( 100 % )
BL :
10166544 219846 - CHECK BOLT A FRAME ATTACHMENT :
9 DT5714 8.500 500 20.00 8.513 13 3:00 04.00 WS 10057209 81612 - FOOT STEP BROKEN
10166611 219977 - CHECK FUNGSI FECO DAN PLM -
- BLADE WIPPER WORNT
- UKUR BLOWBY PRESSURE BY MONITOR PANEL DAN MANUAL
INTERNAL USE #

TENTATIVE PLAN SERVICE TOMORROW Sabtu, Agustus 9, 2025

TOTAL EST. DOWNTIME RESERVASI


No HM BY EWACS MO
(hrs) PS & BACKLOG
PS Start DETAILS ACTIVITIES
C/N HM DEVIASI LOKASI PS
TYPE Breakdown
Washing & RESERVASI RESERVASI
07-Agu-25 BL & FUI Wasing & PS BL & FUI
PS SERVICE BACKLOG

10048433 BL : FUI :
1 15.250 250 15.292 42 2:00 WS ATTACHMENT :
EX1219 08.30 10169181 223488 - NO PART BACKLOG RFU - -
(MANUAL )

10023747 BL : FUI :
2 33.500 500 33.473 -27 3:00 11.00 WS ATTACHMENT :
EX2371 15.00 10169188 223498 - NO PART BACKLOG RFU - -
(MANUAL )

10032127 BL : FUI :
3 11.000 1000 11.136 136 4:00 WS ATTACHMENT :
DZ1305 07.00 10169362 10169556 223498 223726 - WIPER BLADE BROKEN>223726 - -
(MANUAL)

BL : FUI : IA ( 100 % )
4 5.750 750 5.772 22 2:00 WS 10057218 10169593 223804 - BOLT VENDER RH LOST - CHECK BOLT A FRAME ATTACHMENT :
DT5884 07.00 223594
(10169368 ) 10169601 224034 - SCREW COVER FILTER LOST - CHECK FUNGSI FECO DAN PLM -

FUI : IA ( 94 % )
10166850 220311 BL : - CHECK BOLT A FRAME
5 60.750 750 60.770 20 2:00 WS 10044410 - BLADE WIPER BROKEN - PAP REAR AXLE OIL CAUTION ATTACHMENT :
DT3679 07.00 10169602 223603 224039
(10169472 ) - HOSE FRONT B/C RIT OUTPUT CRACK - CHECK MAGNETIC PLUG RATING KEAUSAN -
10169606 224042
- RESAMPLE OIL

BL : FUI : IA ( 100 % )
6 10.000 2000 10.019 19 4:00 WS 10054266 10169811 224189 - BOOT BATTERY LOST - CHECK BOLT A FRAME ATTACHMENT :
DT5646 07.00 223696
(10169406 ) 10169818 224191 - BRAKE COOLING RETURN CRACK - CHECK FUNGSI FECO DAN PLM -

BL : FUI : IA ( 100 % )
10121334 - SIGHT GLASS OIL LEVEL TRANSMISION BROKEN
4 38.250 250 38.186 -64 2:00 05.00 WS 10022320 - WASHING RADIATOR OPEN GRILL ATTACHMENT :
DT4597 13.00 10121336 224305 - BLADE WIPER WORNOUT
(10169870) - CHECK FUNGSI FECO DAN PLM -
10121490 - BOLT COVER FILTER AC LOOSEN - CHECK BOLT A FRAME

FUI : IA ( 100 % )
10048335 BL : - CHECK BOLT A FRAME ATTACHMENT :
8 DT5433 13.000 1000 20.00 13.016 16 4:00 WS 223705
(10169410) MIDELIFE DAMPER - CHECK FUNGSI FECO DAN PLM -
- UKUR BLOWBY PRESSURE BY MONITOR PANEL DAN MANUAL

TENTATIVE PLAN SERVICE AFTER TOMORROW Minggu, Agustus 10, 2025


TOTAL EST. DOWNTIME RESERVASI
No HM BY EWACS MO
(hrs) PS & BACKLOG
PS Start DETAILS ACTIVITIES
C/N HM DEVIASI LOKASI PS
TYPE Breakdown Washing & RESERVASI RESERVASI
07-Agu-25 BL & FUI Washing & PS BL & FUI
PS SERVICE BACKLOG

BL :
FUI : ATTACHMENT :
1 EX1176 37.500 500 37.510 10 3:00 10048431 - STRAIGHT TRAVEL LEAKS (ORING KURANG 2)
- -
- HOUSING STRAINER PTO LEAKS (FILTER ASSY KURANG 1)

FUI : ATTACHMENT :
2 DZ1329 8.250 250 08.00 8.310 60 2:00 04.00 WS 10059973 BL :
- -

BL : FUI : ATTACHMENT :
3 DZ570 34.750 750 15.00 34.691 -59 2:00 08.00 10044609 - RUBBER MOUNTING RADIATOR WEAR - -

FUI : ATTACHMENT :
4 DT4975 33.750 750 07.00 33.757 7 2:00 10057163 BL :
- -

FUI : ATTACHMENT :
DT4641 32.250 250 07.00 32.226 -24 2:00 10057142 BL :
- -

FUI : ATTACHMENT :
DT5879 5.750 750 07.00 5.726 -24 2:00 10068414 BL :
- -

FUI : ATTACHMENT :
DT5458 12.500 500 07.00 12.464 -36 3:00 10068391 BL :
- -

FUI : ATTACHMENT :
LD827 25.250 250 08.00 25.295 45 2:00 10007495 BL :
- -
INTERNAL USE #

Senin, Agustus 11, 2025

TOTAL EST. DOWNTIME RESERVASI


No HM BY EWACS MO
(hrs) PS & BACKLOG
PS Start DETAILS ACTIVITIES
C/N HM DEVIASI LOKASI PS
TYPE Breakdown
Washing & RESERVASI RESERVASI
07-Agu-25 BL & FUI Washing & PS BL & FUI
PS SERVICE BACKLOG

FUI : ATTACHMENT :
EX1267 6.000 2000 07.00 5.962 -38 4:00 BL :
- -

FUI : ATTACHMENT :
DZ1233 33.500 500 09.00 33.558 58 3:00 BL :
- -

FUI : ATTACHMENT :
DT5436 13.250 250 07.00 13.205 -45 2:00 BL :
- -

FUI : ATTACHMENT :
DT5889 5.750 750 07.00 5.703 -47 2:00 BL :
- -

FUI : ATTACHMENT :
DT5899 5.250 250 07.00 5.189 -61 2:00 BL :
- -

FUI : ATTACHMENT :
DT4305 60.500 500 07.00 60.443 -57 3:00 BL :
- -

FUI : ATTACHMENT :
GR595 14.250 250 09.00 14.128 -122 2:00 BL :
- -

FUI : ATTACHMENT :
LD805 24.500 500 08.00 24.420 -80 3:00 BL :
- -

FUI : ATTACHMENT :
LD754 33.500 500 07.00 19.885 -13.615 3:00 WS BL :
- -

FUI : ATTACHMENT :
GR609 10.500 500 09.00 10.459 -41 3:00 10068497 BL :
- -

Engineering Dept Production Dept Plant Dept. Head Planner

M. Agus Habibullah Herman Sukoco Holis A. H. Arya Adhi Subrata

You might also like