Minutes of Meeting
Purpose: Sustainability Progress Doc. No 07-NNNNNN-NNNNNNNN-XXX-
Meeting SUS-MOM-0000XX
Date: 02-July-2025 Location: MS Teams
Minutes Issued: 03-July-2025 Minutes by: Shoaib Ijaz
Contract No. Package 1 4800001162, Package 2- 4800001192
Contract Description: Package 1 - Lake Perimeter and Relax, Wet & Dry Utilities (4800001162)
Package 2 - Gateway, Fun and Discover Clusters and Wet & Dry Utilities (4800001191)
Contractor: KSJV (Kolin Insaat Turizm Sanayi ve Ticaret A.S. & Saudi Structures Contracting Company
Joint Venture)
No. Name Company Position E-mail address Attendance
1 Hyuk Soo Son ENOWA Sustainability Lead [email protected] No
Sr. Sustainability
2 Kathirvel Chinnasamy IPMT
[email protected] Yes
Specialist
Sustainability
3 Shoaib Ijaz KSJV
[email protected] Yes
Manager
KSJV Sustainability
4 Neeraj Sharma
[email protected] No
(Secondee) Manager
Assistant
KSJV
5 Prasanna Narayanan Sustainability
[email protected] Yes
(Secondee)
Manager
KSJV Sustainability
6 Haripriya R
[email protected] Yes
(Secondee) Coordinator
KSJV Sustainability
7 Saipriya P
[email protected] Yes
(Secondee) Engineer
Item Description Action Action Status
no. by Due date
1 Certification Approach
Refer previous MoM dated 28-05-2025
14-May-25: IPMT informed that the Proponent is looking for
combined Envision certification for both Roads and Utilities
IPMT Info
Combining Packages 1 & 2. A Combined Envision scorecard and
coversheets will be submitted for Packages 1 & 2, whereas the
deliverables will be submitted separately for each package. Official
confirmation from the NEOM proponent is awaited.
2 Scorecard Evaluation & Credit assessment
Refer previous MoM dated 28-05-2025
21-May-2025: KSJV mentioned that the scorecard was issued but
IPMT and the proponent have not received. KSJV will follow up with
the document control team to resolve the issue. KSJV Open
28-May-2025: Preliminary score card submitted and will be revised
accordingly based on the assessment
04-June-2025:IPMT and Proponent mentioned that the preliminary
score card will be reviewed
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 1 of 8
Item Description Action Action Status
no. by Due date
3 Meeting minutes and Action Item tracking Process
Refer previous MoM dated 28-05-2025
21-May-2025: IPMT suggested to update the actual submission
date in the ENOWA action item tracker based on the date the
documents are submitted to NEOM via Aconex through workflow,
not the date they are provided to the document controller.
KSJV Open
28-May-2025: Include the planned date of KOLIN for addressing
the comment in due date column of action tracker. The clarification
of the comments can be discussed in the meeting.
04-June-2025: IPMT advised KSJV that the MoM should be signed
by IPMT.
4 Data Requirements and clarifications
Refer previous MoM dated 28-05-2025
30-April-25: IPMT discussed on the requirement of data related to
temporary assets. Discussed regarding the clarification on design,
specifically water fixtures in Sewage Pumping Station.
04-June-2025: KSJV clarified that the Lake Filling Pipeline (LFP) KSJV Open
construction scope is under discussion and not yet signed with
NEOM. 3D stage design is under review, but KSJV has not
received the document. IPMT will notify the design team regarding
this via email.
5 Embodied Carbon Assessment discussion
Refer previous MoM dated 28-05-2025
28-May-2025: The BOQ was segregated, major material is
concrete of 89%, reinforced steel (3%) and asphalt (7.65%) by
weight. It was discussed to procure steel from Western steel, KSJV Open
Wataniya steel, Al shared steel.
04-June-2025: EPD follow-up for UBCC concrete is ongoing, and
asphalt EPD is being discussed with the Construction Manager.
6 Integrated Development Plan
Refer previous MoM dated 28-05-2025
28-May-2025: The Comment Response Sheet (CRS) of Integrated
Development Plan (IDP) received and it will revised by Kolin based
on the comments.
KSJV Open
04-June-2025: The proponent recommended KSJV to prepare the
OPR to include in the Annexure of IDP.
11- June-2025: Reviewed OPR and IPMT gave necessary
comments
7 Sustainability Compliance Report
08-May-25: KSJV mentioned that the sustainability compliance
report is under preparation and shall be submitted.
04-June-2025: KSJV mentioned that the sustainability compliance KSJV Open
report is under preparation and shall be submitted after updating
the changes in Envision score card and detailed assessment.
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 2 of 8
Item Description Action Action Status
no. by Due date
8 Sustainability and Supply Chain Plan (SSCP)
Refer previous MoM dated 28-05-2025
14-May-25: SSCP package 1 based on the new template has been
KSJV Open
completed and will be submitted by KSJV through Aconex.
02-July-25: IPMT Mentioned that SSCP Package 2 CRS Issued.
9 Sustainability Monthly Progress Report
Refer previous MoM dated 18-06-2025
28-May-2025: The Comment Response Sheet (CRS) of Monthly
Progress Report (MPR) March month received and it will revise by
Kolin based on the comments
04-June-2025:Ongoing KSJV Open
18-June-2025: The revised Monthly Progress Report (MPR) March
month based on the Comment Response Sheet (CRS) was reviewed
by IPMT and gave necessary comments. Asked KSJV to submit draft
of MPR via mail.
10 Operational Energy assessment report
Refer previous MoM dated 28-05-2025
28-May-2025: Some of the utilities and roads are descoped and not
applicable from the project and the discussion with design team is
still ongoing, follow up has been carried out. The assessment shall
KSJV Open
be completed after the receival of pending documents.
04-June-2025:Ongoing
18-June-2025: IPMT advised KSJV to submit energy assessment
report with existing evidence. It shall be revised after the finalization
of assets under the package 1&2.
11 Operational Water Assessment Report
Refer previous MoM dated 28-05-2025
21-May-2025: Awaiting the confirmation from the design team
KSJV Open
regarding the Sewage Pumping Station plumbing layout.
04-June-2025:Ongoing
12 Sustainability Management Plan
18-June-2025: The revised Sustainability Management Plan (SMP)
based on the Comment Response Sheet (CRS) was reviewed by
KSJV Closed
IPMT and queries was addressed. The sample sustainability
organizational chart shall be shared by IPMT and KSJV will update
accordingly.
13 Envision certification: Credit assessment
21-May-2025: Credit assessment is in progress, detailing each
criterion, required evidence, and responsible teams. Coordination is
ongoing with various teams, including Design, Environmental, and
Construction, to gather necessary inputs.
KSJV Open
IPMT requested to conduct workshop with other departments to
identify required documents both periodic (e.g., reports, trackers,
schedules) and one-time submissions (e.g., plans). Discussions will
be held with relevant teams to ensure sustainability integration into
project plans as per Envision requirements.
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 3 of 8
Item Description Action Action Status
no. by Due date
28-May-2025: :The credit assessment was reviewed based on the
criteria, supporting evidence, document status, responsible
department, and required information
04-June-2025:Ongoing
14 Next meeting Agenda
KSJV
Review of the sustainability deliverables Open
Attachment
1. Action Item tracker – Action list
Notes:
1. These minutes do not provide any formal direction/instruction under the above referenced contract and are issued
for information purposes only. Employer reserves all its rights under the Contract, and nothing stated in this
document shall constitute a waiver of such rights and/or a change to the Contract.
2. These minutes will stand as issued unless comments to the contrary are received within two (2) business days from
the issuance.
Distribution:
Name Company Position
Darren O’Regan IPMT Employer’s Representative
Iain Vitty Proponent Development Director
Mohamed Feda IPMT Cluster Project Director
Lorraine Savage IPMT Cluster Commercial Director
Scott Muir Proponent PMO Construction
Xavier Farrington Proponent PMO Cost & Commercial Director
Manoj Barsagade IPMT Contracts Manager
All Attendees
Signatures:
Name Entity Designation Signature
Mohammed Feda Employer Employer’s Representative
Jerry Merrit IPMT Commercial Director
Kenneth Pitts IPMT Director, Contracts
Vicknayson Thevendran IPMT Executive Director
Mesut Tasar Contractor Contractor’s Representative
Annexure: Action Item Tracker –Action list
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 4 of 8
WEEKLY SUSTAINABILITY MEETING - Trojena TRO Sitewide Package 1&2 Water
ENOWA Water Action List (11-06-2025)
Actual
# Theme Responsible Role Due Date Status Additional Comments
Date
1 Sustainability Requirements
15-May-
KOLIN SI 15-May-25 Completed Preliminary score card submitted
25
2 Envision Self Evaluation Scorecard
ENOWA HS Completed Send the ENOWA Water template
KOLIN SI 26-Feb-25 Completed Requirements for IDP was prepared
KOLIN SI 5-Mar-25 Completed Received documents to prepare IDP
20-Mar- The Proponent and IPMT checked the
Integrated Development Plan- KOLIN SI Completed
25 overall content and suggested updation
Package 1
KOLIN SI 2-Apr-25 Completed Updated as per existing evidences
KOLIN SI 16-Apr-25 15-Apr-25 Completed Submitted in Aconex, awaiting for review
KOLIN SI 27-May-25 Completed Received CRS on 27-May-25
3
KOLIN SI 10-Jun-25 In Progress Updation of IDP as per CRS
ENOWA HS Completed Send the ENOWA Water template
KOLIN SI 26-Feb-25 26-Feb-25 Completed Requirements for IDP was prepared
KOLIN SI 5-Mar-25 5-Mar-25 Completed Received documents to prepare IDP
Integrated Development Plan-
Package 2 20-Mar- The Proponent and IPMT checked the
KOLIN SI 20-Mar-25 Completed
25 overall content and suggested updation
KOLIN SI 2-Apr-25 2-Apr-25 Completed Updated as per existing evidences
KOLIN SI 16-Apr-25 15-Apr-25 Completed Submitted in Aconex, awaiting for review
22-May-
KOLIN SI TBD In Progress
25
Sustainability Compliance report-
Package 1
4 22-May-
KOLIN SI TBD In Progress
25
Sustainability Compliance report-
Package 2
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 5 of 8
KOLIN SI 26-Feb-25 Completed Requirements for sBOD was prepared
KOLIN SI 5-Mar-25 Completed Received documents to prepare sBOD
20-Mar- The Proponent and IPMT checked the
KOLIN SI Completed
25 overall content and suggested updation
KOLIN SI 2-Apr-25 Completed Updated as per existing evidences
SBOD-Package 1
KOLIN SI 16-Apr-25 15-Apr-25 Completed Attached in IDP and Submitted in Aconex
KOLIN SI 27-May-25 Completed Received CRS on 27-May-25
Updation of sBOD attached in IDP as per
KOLIN SI 10-Jun-25 In Progress
CRS
5 ENOWA HS Completed Send the ENOWA Water template
KOLIN SI 26-Feb-25 Completed Requirements for sBOD was prepared
KOLIN SI 5-Mar-25 Completed Received documents to prepare sBOD
20-Mar- The Proponent and IPMT checked the
KOLIN SI Completed
25 overall content and suggested updation
SBOD-Package 2 KOLIN SI 2-Apr-25 Completed Updated as per existing evidences
KOLIN SI 16-Apr-25 15-Apr-25 Completed Attached in IDP and Submitted in Aconex
KOLIN SI 27-May-25 Completed Received CRS on 27-May-25
Updation of sBOD attached in IDP as per
KOLIN SI 10-Jun-25 In Progress
CRS
ENOWA HS Completed Send the ENOWA Water template
KOLIN SI 26-Feb-25 24-Feb-25 Completed Submitted in Aconex
Sustainability Management Plan- 27-May-
KOLIN SI Completed Received CRS on 27-May-25
Package 1 25
6 KOLIN SI 9-Jun-25 In Progress Updation of SMP as per CRS
Sustainability Management Plan- ENOWA HS Completed Send the ENOWA Water template
Package 2 KOLIN SI 26-Feb-25 24-Feb-25 Completed Submitted in Aconex
ENOWA HS 10-Jun-25 Completed Send the OPR Template
Owner Project Requirement KOLIN SI 12-Jun-25 In Progress
7
ENOWA HS Not Started
Owner Project Requirement KOLIN SI Not Started
Reveiwed operational energy assessment
KOLIN SI 16-Apr-25 Completed
calculation
24-May- Reveiwed operational energy assessment
KOLIN SI In Progress
25 calculation. Design documents are pending.
Energy Assessment Report-Package
1
8 Follow up with design team regarding the
KOLIN SI 2-Jun-25 In Progress
pending documents
Energy Assessment Report-Package Reveiwed operational energy assessment
KOLIN SI 16-Apr-25 Completed
2 calculation
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 6 of 8
24-May- Reveiwed operational energy assessment
KOLIN SI In Progress
25 calculation. Design documents are pending.
Design team is awaiting confirmation from
KOLIN SI 8-May-25 Not Completed NEOM regarding the Sewage Pumping
Water Consumption Assessment Station
Report-Package 1
KOLIN SI TBD In Progress
9
Design team is awaiting confirmation from
KOLIN SI 8-May-25 Not Completed NEOM regarding the Sewage Pumping
Water Consumption Assessment Station
Report-Package 2
TBD In Progress
12-Mar-
ENOWA HS Completed NEOM material baseline received
25
19-Mar-
KOLIN SI Completed Conducted Embodied carbon assessment
25
26-Mar-
KOLIN SI Completed Embodied carbon assessment updation
25
KOLIN SI 23-Apr-25 Completed Embodied carbon assessment updation
Embodied Carbon Assessment Awaiting Confirmation regarding reinforced
Report-Package 1 KOLIN SI 8-May-25 Not Completed
steel
19-May- Received 3D Stage BOQ, and New Template
KOLIN SI Completed
25 Received
10 Awaiting confirmation regarding
KOLIN SI TBD In Progress
procurement of concrete and asphalt
12-Mar-
ENOWA HS Completed NEOM material baseline received
25
19-Mar-
KOLIN SI Completed Reveiwed Embodied carbon assessment
Embodied Carbon Assessment 25
Report-Package 2 26-Mar-
KOLIN SI Completed Embodied carbon assessment updation
25
KOLIN SI TBD In Progress Awaiting for 3D Stage BOQ
KOLIN SI 26-Feb-25 Completed Submitted in Aconex
Updated as per ENOWA template and
KOLIN SI 16-Apr-25 Completed
submitted in Aconex
Received CRS for SSCP as per old
KOLIN SI 21-Apr-25 Completed
template(which was submitted previously)
Sustainability Supply Chain Plan-
Package 1 SSCP CRS can be updated only after
KOLIN SI 25-Apr-25 Completed reviewing the updated BOQ and asphalt
12 details
SSCP updated based on the comments and
KOLIN SI 26-Apr-25 29-May-25 Completed
submitted along with CRS
14-May-
KOLIN SI 13-May-25 Completed Submitted for review
25
26-Mar-
ENOWA HS Completed Send the ENOWA Water template
Sustainability Supply Chain Plan- 25
Package 2 Updated as per ENOWA template and
KOLIN SI 16-Apr-25 Completed
submitted in Aconex
KOLIN SI 10-Apr-25 16-Apr-25 Completed Submitted for review
KOLIN SI 21-Apr-25 21-Apr-25 Completed Received Comments for MPR
Sustainability Monthly Progress
15 Updated as per the comments, require
Report - MAR 2025-Package 1 KOLIN SI 25-Apr-25 29-Apr-25 Completed
attendees signature for MoM
KOLIN SI 30-Apr-25 5-May-25 Completed Updated and submitted
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 7 of 8
Received CRS, comment updation in
6-Jun-25 In Progress
progress
Sustainability Monthly Progress
KOLIN SI 10-Apr-25 16-Apr-25 Completed Submitted for review
Report - MAR 2025-Package 2
16-May-
KOLIN SI 16-May-25 Completed
25
Sustainability Monthly Progress KOLIN SI
Report - APR 2025-Package 1
KOLIN SI
15 KOLIN SI
16-May-
KOLIN SI 16-May-25 Completed
25
Sustainability Monthly Progress
Report - APR 2025-Package 2
16 Cover sheets QL2.1, .
17 Cover sheets QL 2.2
17 Cover sheets NW1.3
SASO DRAFT 2663-0000.pdf
Doc. No.: 07-NNNNNN-NNNNNNNN-XXX-SUS-MOM-0000XX Page 8 of 8