0% found this document useful (0 votes)
16 views13 pages

NDMC (2)

Uploaded by

Christopher Paul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views13 pages

NDMC (2)

Uploaded by

Christopher Paul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

GENERAL NOTES:

PARKING CALCULATIONS LANDSCAPED CALCULATIONS Revisions in Sanction 1. All dimensions are in mm unless mentioned otherwise.

REQUIRED PARKING SPACE = 2 ECS NET AREA OF THE PLOT = 18,986.65 SQ.M. 2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00
Road Level.
FOR EVERY 100.0 SQ.M. FAR AREA TOTAL GROUND FLOOR Revision No Item Length( m) Breadth(m) Total Area( Sq.m.) 3. The Building is mechanically ventilated and artificially lighted as per
TOTAL FAR AREA = 10,931.919 SQ.M. COVERED AREA= 4188.106 SQ.M NBC.

= 10,931.919 SQ.M.X(2/100 ) = 218.6CARS AREA REQUIRED FOR LANDSCAPING 6 Fellow flats -A 8.00 3.00 24.00
4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016, as
applicable to this category of this plot size, as per clause no. 10.2 of
SAY = 219 CARS = 50% OF OPEN AREA UBBL- 2016 shall be installed at the site.
= 14798.544 X 50/ 100 = 7399.272 SQM. 7 KD Block -Kitchen Extn. 4.02 3.50 14.07 5. All service equipment should be camouflaged appropriately (in terms of
TOTAL SPACE REQUIRED FOR PARKING OPEN AREA = PLOT AREA - 8 Lounge Pantry 5.10 3.14 16.02 the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment
= 219 X 23.00 SQ.M. = 5037 SQ.M. (COVD. AREA AT GR. FL. + CAR PARKING AREA)
and Approval) of DUAC.

= 18,986.65 - (4188.106 + 5168.137) 9 Lift near Library block 2.1 2.4 5.04 6. The entire proposal shall be adhere to all the applicable statutory
PROPOSED CAR PARKING SPACE = 5168.137 sq.m. provisions, and norms/regulations of the prevailing Lutyens Bungalow
= 18,986.65 - 9356.197 = 9630.453 SQM. Zone (LBZ) guidelines.
TOTAL PROPOSED CAR PARKING = (5168.137 / 23) AREA LEFT FOR LANDSCAPING = (Note* : Point Nos. 3, 4, 5 & 9. To be excused as per UBBL 2016) 7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion
7645.998 SQM. for Project Assessment and Approval) of DUAC shall be installed at site.
STRUCTURE STABILITY CERTIFICATE

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


To be Constructed APPROVAL SATISFY THE SAFETY REQUIREMENTS AS STIPULATED
UNDER THE BUILDING BYE-LAWS 2016, AND THE INFORMATION
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF OUR
KNOWLEDGE.

IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN INCLUDING


SAFETY FROM NATURAL HAZARDS BASED ON SOIL CONDITIONS
2624

900
HAS BEEN DULLY INCORPORATED IN THE DESIGN OF THE
2860

Section
BUILDING AND THESE PROVISIONS SHALL BE ADHERED TO
2164 2400
DURING THE CONSTRUCTION.
Elevation Feature Steel Truss Roofing
WATER HARVESTING CERTIFICATE

2400
2860

2624
2164
False

3930
Door Lift

Ceiling with CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR

Corridor
3104

Plan
3030

1100
Lift
UP lights APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
LOUNGE PANTRY WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
Total Ground Coverage = 22.058% LOUNGE PANTRY 1100
TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
Door Corridor

ETC.

TOTAL F.A.R. PROPOSED FOR REVISED SANCTION 3104 Plan

CERTIFICATE

TOTAL GROUND FLOOR COVERED AREA = 4148.432 SQ.M


Lift Top Level

0 +15.2 M THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED ON


WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE THE
TOTAL FIRST FLOOR COVERED AREA = 3319.974 SQ.M
R-8: Part Plan, Elevation &
1000 mm high

1500

1500
parapet wall

1000
Terrace LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
TOTAL SECOND FLOOR COVERED AREA = 2327.075 SQ.M
Terrace Level
+13.2 m BE BORNE BY THE OWNER OF THE PLOT.

TOTAL BASEMENT FOR FAR CALCULATION = 1,136.438 SQ.M Section DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE
OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
TOTAL = 10,931.919 SQ.M
1100

LESS THAN 8FT. IN HEIGHT FROM THE GROUND LEVEL WHICH IS

4500

4500
TO BE PAINTED TO AVOID UNPLEASANT LOOK FROM THE ROAD
= 57.577% SIDE. IN ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE

2200

2100
1000 mm high
parapet wall
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE BUILDING
TO ENSURE THAT ANY FALLING MATERIAL REMAINS WITHIN THE

1000
corridor

PROTECTED AREA.
TOTAL F.A.R. (SANCTIONED)
S. Floor Level
+9.2m

724

724
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
TOTAL GROUND FLOOR COVERED AREA = 4,609.60 SQ.M CONSTRUCTION AT NIGHT AFTER 10 P.M.

15200
15200
TOTAL FIRST FLOOR COVERED AREA = 3,461.60 SQ.M LABOUR HUTMENT CERTIFICATE
TOTAL SECOND FLOOR COVERED AREA = 2,234.49 SQ.M 1100

TOTAL AREA FOR PARKING = 5168.137 SQ.M THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED WITHIN

4400

4400
TOTAL BASEMENT FOR FAR CALCULATION
= 1,568.47 SQ.M THE PREMISES ALONG WITH THE TOILET FACILITY AND LABOUR

Lift well
TOTAL ECS = 225 CARS HUTMENT SHALL BE REMOVED BEFORE OCCUPYING THE

2200

2100
1000 mm high
PROPOSED BUILDING.
TOTAL = 11,874.16 SQ.M = 1,27,765.96 SQ.FT
parapet wall

1000
BASEMENT AREA FOR FAR CALCULATION (SANCTIONED)
corridor
F.Floor Level
+4.0 m
Site Location Plan
= 64.39 % = EXTENSION OF PROGRAMME BLOCK + CONFERENCE BLOCK
1100

= 232.87 SQ.M + 723.07 SQ.M.

3350

3350
STP

= 955.94 SQ.M

2200

2100
8.2
1000 mm high
EN
GARD

0
parapet wall

1000
corridor LODI
Stilt Level
+0.65m
PROPOSED TOILET UNDER SWACHH

650

650

650
Ground Level
+/-0.00
BHARAT ABHIYAN SCHEME 5330 X 4130 = 22.012 SQM Lift

1000
Pit
3.66 INDIA INTERNATION CENTRE

.3 8 C.B

450
65 Ø
200
ELECTRICAL PANEL ROOM

GOVT. QUARTERS
INLET C.B

R-9: Additional Lift


.
2.0M DIA .C.C
(4.20X3.14 = 13.19 SQM) 200
ØR

C.C.
C.B

200ØR.
UNDER UBBL 2016 NON F.A.R

30.90
11

Part Plan, Elevation & Section


C.B C.B
A FORD FOUNDATION
IPE
.C.P 0
C.B
R.C
48.5

Ø
FIN. GROUND LVL. FIN. GROUND LVL. 150 AREA = 997 SQM.

C.B F
INLET C.B 4020

9.0
C.B FFHQ

0
WB

MAX MUELLER MARG


S K 14.25
EN OC
COARSE SAND 1.5 TO 2MM
A RD CE
BL
IG N C.B PLAZA
RE
DH
IIC

3500
FE Section
GRAVELS 5 TO 10MM LO 40
R- 7
3 -C
ON
PLAN
ITE
20
00
IICC CM
S
35 WWF
' 4"

BOULDERS 5-20MM
= 820
M
.00

EN
250

12
POND RD
GA 683.00

SLOPE 1:10
CK LODI ROAD

16298
300 DIA BORE FILLER WITH RO 2000 M H/L
POOL-2= 124.35 SQM.
GRAVELS 3-6MM G13
C.B. C.B. 150Ø
100MM DIA M.S. PIPE 796.27 Sq.m. 9300
LOCATION PLAN

Elevation
RAMP UP

3800
SLOTTED PIPE 3MM SLOT SIZE R- 6 11605
230mm High Peripheral Wall
E
PIP
OW EXIST. BLOCK FIRST FLR.
FL
G14
OV
ER
2000
LVL +3850 MM

G
500.95 Sq.m. 12677
EXIST. BLOCK GUARD 6.0 SQM

MAX MUELLER MAR


3000
ROOM
SECTION THROUGH RAIN WATER HARVESTING PIT SITE4 - M H/L
GU
SECOND EST ROOMS

19306
685.88 9665 5983
CB CHAMBER
FL. G12
Kitchen
223.377 Sq.m.
15947

150Ø 14

12150
EXIST. BLOCK

CB 13 DRAWN CHKD APPD.

CB Ø EXIST. BLOCK EXIST. BLOCK


PLINTH LVL. +450 Owner
150
R793

148.00 M = 484'0"
76

INDIA INTERNATIONAL
02
51
GROUND LVL ±00
31

ELEVATION SECTION
40

150

R-8 150Ø
Ø

CB

WIDENING
CENTRE
PROPOSED SEWER

08
46 CB
9.0

150Ø

R-7, Part Plan,


7269
G11
0

POND
CB 10 790.68 Sq.m.
40, Max Mueller Marg, Lodhi Estate,
AREA FOR ROAD
+ 00

POOL-3= 569.86 SQM. CB

GOVT. QUARTERS
EXIST. BLOCK New Delhi
Elevation & Section
90

EXIST. BLOCK

150Ø
R691
00

53

21429

20
G5
EXIST. BLOCK

POOL-1= 190.0 SQM. G10


Owner's Signature
FIRE TANK CB 376.423 Sq.m. 248.85 Sq.m.
CAPACITY
G15 37.92 Sq.m. 553.239 Sq.m.
2385

LIFT
50,000 LTR
MH
2126

Elevation Section
17100
PLANTER

PLANTER 6750
34938
PROPOSED FIRE EXIT 7600
STAIR CASE :
MH
HARVESTING WELL 61.54 Sq.m. R- 5 4000 19
4500

4529

MH M H G16 MH
UP

4"Ø S.W.P 4"Ø S.W.P 150.93 Sq.m.


12009
MH G6
G9
3047

318.464 Sq.m.
11900

262.022 Sq.m.
MUMTY

3800
G1
ROOM
18.20

1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK 9


FIRE TANK /POND Architect
32.00 M = 103' 0"

SITE1 - CAP:1,00,000 lts.


PROGRAMME
Anuj Srivastava
16230

BLOCK
R-9

PLAN
GATE
5017

Design Consultants
2624

LIFT
29.50 MH
MH MH
2851 Setback line at 12m from boundary 26713
R-3
4200

DG/ Elec. Panel

DG/ Elec. Panel

L-321, Delta-2, Greater Noida 201310


1350

9300
40.14 EXISTING SEWER
12002

BOARD
230mm High Peripheral Wall
6972

DN
14285

29.26 PHONE : +91-8826272227


14077

17
19169 MH 7 16 6
3.89

4444

11382

EXIST. MUMTY 15 389.32 Sq.m.


EXISTING STAFF FACILITY
20875
1023 14659
email : [email protected]
FIRST FLR.
9000

6.STAFF 3500 18
7598

5260
9.0

4800
34243
GUARD 6"Ø S.W.P
3460

KITCHEN 9.0 SQM 113.91 Sq.m.


4.40

HOUSE
3880
4353

2500

27553

LVL +3850 MM Architect's Signature


3300

8 GUARD RM. 6.0 SQM 5320

EXISTING SEWER TOILET UNDER SWACHH MH EXISTING SEWER


N
4 WAY FIRE BRIGADE SUB STATION 2 NOS. GUARD ROOM 4 WAY FIRE BRIGADE BHARAT ABHIYAN SCHEME 5180 X 3880
OUT LET CONNECTION 1000KVA EACH 3500 X 2500 INLET CONNECTION
4 WAY FIRE BRIGADE
INLET CONNECTION
SANCTIONED DATED 24-1-2008
9500

9.5
9.5
9500
9.5
9500
9.5
9500
9556

9.5

G7
1 2 3 4 5 1678.751 Sq.m.
46542 19959
46101 14792

212.00 M / 695' 2" 26641

PLINTH LVL. +450


For Revised Sanction
SITE PLAN GROUND LVL ±00
ELEVATION SECTION
FORD FOUNDATION
3.66 Site Plan & Area Charts
Scale: 1 : 400 @ A-0

R-6: EXTN. IN FELLOW FLATS


REV.
DWG. No.
Date:
Drawn by: Christopher Paul 01
Part Plan, Elevation & Section 05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

14 Envelope Area 2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00

34
Shaft, lifts & cut outs
79

86
Road Level.
Des. No. Length Breadth Nos Formula Area Des. No. Length Breadth Nos Formula Area
1 70.623 11.270 1.000 Rectangle 795.921 i 0.950 1.080 1.000 Rectangle 1.026 3. The Building is mechanically ventilated and artificially lighted as per
R-7 2 3.709 3.140 0.500 Semi-circle 21.598 ii 2.610 1.032 1.000 Rectangle 2.694 NBC.

77
3 5.547 19.215 0.500 Triangle 53.293 iii 0.938 1.226 1.000 Rectangle 1.150
4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016,

59
9
815 4 10.120 19.215 1.000 Rectangle 194.456 iv 1.557 1.808 1.000 Rectangle 2.815
as applicable to this category of this plot size, as per clause no. 10.2 of
5 8.857 19.215 2.990 Trapezium 41.968 v 1.227 0.920 3.000 Rectangle 3.387
UBBL- 2016 shall be installed at the site.
6 6.315 1.227 1.000 Rectangle 7.749 vi 2.147 2.147 1.000 Rectangle 4.610
1 49
57
7 3.430 1.227 1.000 Rectangle 4.209 vii 2.147 0.383 1.000 Rectangle 0.822 5. All service equipment should be camouflaged appropriately (in
8 16.530 8.390 1.000 Rectangle 138.687 viii 1.124 0.728 5.000 Rectangle 4.091 terms of the point nos. 10, 11 & 12 of the CPAA (Criterion for Project

48

46
1894

34
75
9 2.908 2.363 1.000 Rectangle 6.872 ix 1.124 0.935 5.000 Rectangle 5.255 Assessment and Approval) of DUAC.
10 4.186 14.981 0.500 Triangle 31.355 x 1.656 3.749 0.500 Triangle 3.104
2524
11 8.713 14.981 1.000 Rectangle 130.529 xi 1.669 3.718 0.500 Triangle 3.103 6. The entire proposal shall be adhere to all the applicable statutory

1317
9300
12 12.472 8.390 0.500 Triangle 52.320 xii 1.650 3.739 0.500 Triangle 3.085 provisions, and norms/regulations of the prevailing Lutyens Bungalow

18
3564 0.500 Triangle Triangle Zone (LBZ) guidelines.

96
13 4.482 7.075 15.855 xiii 1.894 1.317 0.500 1.247

914
3739
BEDROOM
14 4.896 4.482 6.463 Trapezium 30.305 xiv 0.914 0.914 2.000 Rectangle 1.671
1650 3.7 x 6.8
R6 7. Sustainability features shall be as per point no. 7 of the CPAA

3800

7203
15 79.376 69.153 30.200 Sector 399.967 xv 0.341 0.497 0.500 Triangle 0.085

2401
(Criterion for Project Assessment and Approval) of DUAC shall be
TOILET
1.5 x2.1

16 1.413 5.140 0.500 Triangle 3.631 xvi 2.165 2.400 1.000 Rectangle 5.196
914 installed at site.
0.500 Triangle

13020
1669
17 5.714 5.245 14.985 Sub - Total 43.339 STRUCTURE STABILITY CERTIFICATE

3718
4572 18 2.173 6.400 0.500 Triangle 6.954
19 3.527 6.064 1.000 Rectangle 21.388 SERVICES & Non FAR CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
914 Des. No. Length Breadth Nos Formula Area APPROVAL SATISFY THE SAFETY REQUIREMENTS AS

7164
20 83.873 67.927 27.660 Sector 583.987
1.000 Rectangle Rectangle STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND THE

5217
B
21 3.016 12.802 38.611 A 5.499 5.651 1.000 31.075

3749

914
341
1656 22 3.886 2.732 1.000 Rectangle 10.617 B 1.281 4.670 1.000 Rectangle 5.982 INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT TO
23 2.732 8.521 0.500 Triangle 11.640 C 0.579 4.520 1.000 Rectangle 2.617 THE BEST OF OUR KNOWLEDGE.
3527 27.71° 24 7.611 8.809 0.500 Triangle 33.523
BALCONY 8 16694 9369 8364 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN

497
3 25 2.524 4.572 7.203 Trapezium 25.556
13 INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON SOIL
09 26 8.364 5.217 1.000 Rectangle 43.635
BALCONY
88
CONDITIONS HAS BEEN DULLY INCORPORATED IN THE DESIGN

43
BED ROOM 27 9.369 7.164 1.000 Rectangle 67.120 Sub - Total 39.674 OF THE BUILDING AND THESE PROVISIONS SHALL BE ADHERED

64
SNACK BAR BED ROOM

6064
2

76
28 2.401 3.564 1.000 Rectangle 8.557 TO DURING THE CONSTRUCTION.

55
3

21
11

75
4
1.000 Rectangle

85
29 16.694 13.020 217.356
5
BALCONY 27 0.500 Triangle WATER HARVESTING CERTIFICATE
SHAFT 6 32 30 4.634 8.159 18.904
SHAFT
31 7.759 8.159 1.000 Rectangle 63.306
7
32 7.914 3.486 1.000 Rectangle 27.588 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
1124 SHAFT 112
4 APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS
GUES
8
2147 BALCONY 33 9.490 3.068 1.000 Rectangle 29.115

728
T RO AS WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE

935
SHAFT

OM

86
STORE 34 18.945 3.858 1.000 Rectangle 73.090
SHAFT
S 9
WATER AND THE INFORMATION GIVEN THEREIN IS FACTUALLY

38
RECEPTION SHAFT

383
35 2.860 2.625 1.000 Rectangle 7.508
A.C.DUCT
SHAFT CORRECT TO THE BEST OF OUR KNOWLEDGE AND
16
WAITING
10
AREA
R-6 9.3 3.8 1 Rectangle 35.340
UNDERSTANDING. THE RECYCLE WATER SHALL BE USED FOR

2147
BED ROOM BED ROOM
89
LIFT
(Taken in #32 above) Rectangle
20 19 SHAFT R-7 HORTICULTURE PURPOSE ETC.
BUILDING ABOVE
18 SHAFT
SHAFT
17 R-8 5.102 3.14 1 Rectangle 16.020
5140 16
DN

CERTIFICATE
FLOWER BED

a 21.980 1.227 1.000 26.969


15

1413
b 6.069 1.227 1.000 7.447
45
SHAFT 14 SHAFT

52 THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED

96

2
UP

80
13

65
ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE
B

12
02 7
A Sub - Total 3317.927

6400
31

27.73°
51 122 THE LOCAL BODY SHALL REMOVE THE MULBA AND THE COST
UP
12

920
40

Deductions
R-8 SHALL BE BORNE BY THE OWNER OF THE PLOT.

57
11 PANTRY C Shafts, Lifts & Cut-outs 43.339

41
8587 SHAFT D NON FAR : Services, corridors etc 39.674
30 F
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF
2173 16 Total
THE OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE
64

Ground
64

Cover F= A-C 3274.588 OFF THE MAIN ROADS BY MEANS OF ERECTING A SCREEN
G Total FAR WALL NOT LESS THAN 8FT. IN HEIGHT FROM THE GROUND
on GF G= F-D 3234.914 LEVEL WHICH IS TO BE PAINTED TO AVOID UNPLEASANT LOOK
UP

FROM THE ROAD SIDE. IN ADDITION TO THIS, A NET OR SOME


OTHER PROTECTIVE MATERIAL SHALL BE HOISTED AT THE
12643

4186 82 FACADES OF THE BUILDING TO ENSURE THAT ANY FALLING


44
14981

MATERIAL REMAINS WITHIN THE PROTECTED AREA.


DINING
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
70

To be Constructed
7

CONSTRUCTION AT NIGHT AFTER 10 P.M.


5

8713
LOUNGE

LABOUR HUTMENT CERTIFICATE


14

34
1557 79 THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED

86
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY AND
BUILDING ABOVE

LABOUR HUTMENT SHALL BE REMOVED BEFORE OCCUPYING


6331
32
2908

1808

THE PROPOSED BUILDING.


R7

77
59
00 59
35 81
4 2363
16530

31
KEY PLAN
2

46
8390 10120 1894

34
LIBRARY
30
UP
8 1

GOVT. QUARTERS
S
21980 6315 6069 2524 N
E

1317
D
R
1227
13 22 A
3
xiii G

M A R G
9300
1227

1227

1227

1032
938

I
TROLLY
3564 H
POND

25

914
3739
O
1650 L
4596

2610 xii

3800
R6 4

7203

R
2401
1226
28
DOWN TO BASEMENT TOILET

TOILET

M U E L L E
UP

RISER=160
914

13020
COLLECTION TREAD=280
POND

29
UP
INDIA AND HIMALAYAN

1669

GOVT. QUARTERS
3718
2660 950 3025 4572
6370 PROGRAM BUILDING xi
LEV=-810
STORE
LEV=-810 LIBRARY
1080
11270

11270

19215
AUDITORIUM 5547

M A X
914 1 2
27

7164
26

5217
3749
xiv

914
HI=3110
TECHNICAL ROOM
5881

5731

x
HI=3110

2990 1656
ELECTRICAL ROOM

341
16694
xv
LEV=-650

3527
FHI=2330
FHI=2400 SERVER ROOM
FHI=2400 DEEP FREEZZER

FORD FOUNDATION
9369 8364

497
R3
70
24 09
9 88
2624
2164

LIFT 27.66°
19

6064

76
2400
23

21
viii

11

85
2860
A 27
3 2

DN

112
4 22
5° 2147

728
70623 27.6

935

6
vii F

8
38
383
ix

5213
1124

2147
vi 20
3 15 4944

GROUND FLOOR PLAN

1412
21
DRAWN CHKD APPD.

16
52
65 Owner

2
80
02 17

12
7

6478
51 122
INDIA INTERNATIONAL
31

R-8

56
40

18
920

98
CENTRE
SCALE 1:200
8587
v 30
96 16
48
64

2173
40, Max Mueller Marg, Lodhi Estate,
63

14
New Delhi
12472

4186 8 2
44
Owner's Signature
14981

10 11 13
12
70
75

GROUND FLOOR AREA DIAGRAM


8713
8390

1557

SCALE 1:200
6331
2908

1808

iv
9
2363 Architect
16530

8
Anuj Srivastava
8390 10120
Design Consultants
21980 6069 L-321, Delta-2, Greater Noida 201310
6315
3430
PHONE : +91-8826272227
1227

iii a ii 6 b email : [email protected]


1227

1227

938

7
Architect's Signature
1227

2610
1032

1226 N
C
579

4520
5547
1281

950
12497

B
1080

5 4 3
11270

11270

19215
8857

4670 1

i
5651

2990
A
5499
For Revised Sanction
2
Ground Floor Plan: Main Block
70623
R3
70
9
xvi
2624
2164

9490 Scale: 1 : 200 @ A-0


35 2400 DWG. No.
REV.
2860 Date:
33 34 02
3068

3858

Drawn by: Christopher Paul

18945

05-08-2025
GENERAL NOTES:

92 1. All dimensions are in mm unless mentioned otherwise.


56

34
8
2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00

6
Envelope Area Services & Corridors : No GC & Non FAR
Road Level.

-59
NO
OM
RO
Des. No. Length Breadth Nos Formula Area Des. No. Length Breadth Nos Formula Area 3. The Building is mechanically ventilated and artificially lighted as per

T
AF
SH
NBC.

-59
Rectangle Rectangle

77
1 45.600 12.497 1.000 569.863 A 5.468 2.725 1.000 14.900

NO
OM
CB

RO

59
59 2 25.022 3.140 1.000 Rectangle 78.569 B 3.560 4.241 1.000 Rectangle 15.098
81 4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016,

B
E.D
3 0.339 3.240 1.000 Rectangle 1.098 as applicable to this category of this plot size, as per clause no. 10.2 of

-60
NO
4 4.720 0.681 1.000 Rectangle 3.214 UBBL- 2016 shall be installed at the site.

OM
RO
7 Rectangle
4 95 8 15.304 8.390 1.000 128.401
5. All service equipment should be camouflaged appropriately (in

48

46
1894 9 2.908 2.363 1.000 Rectangle 6.872

75

34
terms of the point nos. 10, 11 & 12 of the CPAA (Criterion for Project
10 4.186 14.981 0.500 Triangle 31.355 Sub - Total 29.998 Assessment and Approval) of DUAC.
2524
11 8.713 14.981 1.000 Rectangle 130.529

1317
12 12.643 8.390 0.500 Triangle 53.037 6. The entire proposal shall be adhere to all the applicable statutory

18
provisions, and norms/regulations of the prevailing Lutyens Bungalow

96
13 4.482 7.075 0.500 Triangle 15.855 Zone (LBZ) guidelines.

3739

914
1650 Trapezium DEDUCTION : Shaft, lifts & cut outs
14 4.896 4.573 6.488 30.717

7203
15 79.376 69.153 30.180 Sector 399.702 Des. No. Length Breadth Nos Formula Area 7. Sustainability features shall be as per point no. 7 of the CPAA
914 (Criterion for Project Assessment and Approval) of DUAC shall be
Triangle Rectangle

13020
16 1.413 5.140 0.500 3.631 i 0.950 1.080 1.000 1.026 installed at site.
1669

3718
4572
17 5.714 5.245 0.500 Triangle 14.985 iii 0.733 1.063 1.000 Rectangle 0.779 STRUCTURE STABILITY CERTIFICATE
18 2.173 6.400 0.500 Triangle 6.954 iv 1.557 1.808 1.000 Rectangle 2.815
914
Rectangle CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
20 83.873 67.927 27.660 Sector 583.987 v 1.227 0.920 3.000 3.387

6090
APPROVAL SATISFY THE SAFETY REQUIREMENTS AS

5217
3749

914
1656 21 3.016 12.802 1.000 Rectangle 38.611 vi 2.147 2.147 1.000 Rectangle 4.610 STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND THE
341
16694 22 3.886 2.732 1.000 Rectangle 10.617 vii 2.147 0.383 1.000 Rectangle 0.822 INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT TO
27.66° 23 2.732 8.521 0.500 Triangle 11.640 viii 1.124 0.728 5.000 Rectangle 4.091 THE BEST OF OUR KNOWLEDGE.
BALCONY 9369 8364

497
24 7.611 8.809 0.500 Triangle 33.523 ix 1.124 0.935 5.000 Rectangle 5.255 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
09 25 2.524 4.572 7.203 Trapezium 25.556 x 1.656 3.749 0.500 Triangle 3.104 INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON SOIL
BALCONY
88
ROOM BED ROOM BED ROOM
CONDITIONS HAS BEEN DULLY INCORPORATED IN THE DESIGN

76
1 2
BED ROOM
26 8.364 5.217 1.000 Rectangle 43.635 xi 1.669 3.718 0.500 Triangle 3.103

11
3 OF THE BUILDING AND THESE PROVISIONS SHALL BE ADHERED

21
4 27 9.369 6.090 1.000 Rectangle 57.057 xii 1.650 3.739 0.500 Triangle 3.085
TO DURING THE CONSTRUCTION.

85
5
BALCONY 27 29 16.694 13.020 1.000 Rectangle 217.356 xiii 1.894 1.317 0.500 Triangle 1.247
SHAFT 6 32
30.18°
SHAFT
30 4.634 8.159 0.500 Triangle 18.904 xiv 0.914 0.914 2.000 Rectangle 1.671 WATER HARVESTING CERTIFICATE
BALCONY 7
BALCONY 1124 SHAFT 112 31 7.759 8.159 1.000 Rectangle 63.306 xv 0.341 0.497 0.500 Triangle 0.085
4 8 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
2147
GUES
BALCONY
Rectangle Rectangle

728
32 5.692 3.486 1.000 19.842 xvi 2.400 2.164 1.000 5.194 APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS

935
SHAFT

T RO

86
STORE

OM
SHAFT 9 Rectangle AS WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE
S

38
BED ROOM SHAFT 33 2.860 2.624 1.000 7.505 Sub - Total 40.273

383
BED ROOM 1
2
A.C.DUCT
SHAFT
10 Sub - Total 2606.321 WATER AND THE INFORMATION GIVEN THEREIN IS FACTUALLY
16

2147
3
LIFT
BED ROOM BED ROOM 89 CORRECT TO THE BEST OF OUR KNOWLEDGE AND
20 19
18 SHAFT
SHAFT UNDERSTANDING. THE RECYCLE WATER SHALL BE USED FOR
A 2606.321
4
SHAFT
5140 17
DN HORTICULTURE PURPOSE ETC.
16

15
Deductions

1413
C Shafts, Lifts & Cut-outs 40.273 CERTIFICATE
45
SHAFT 14 SHAFT
BALCONY 5
52
DN

96

2
80
GALLERY UP
13 D NON FAR : Services, Corridors etc 29.998
30.18°

65
THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED

12
6400
E

R71956
UP
12
ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE

115

R69275
BED ROOM

F 2566.048 THE LOCAL BODY SHALL REMOVE THE MULBA AND THE COST

57
6
11 PANTRY Total Ground Cover F= A-B-C

14
8587 96 SHAFT G Total FAR on FF G= F-D 2536.050 SHALL BE BORNE BY THE OWNER OF THE PLOT.
48 28.03°
30
2173 16
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF
64
64

R69

THE OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE


OFF THE MAIN ROADS BY MEANS OF ERECTING A SCREEN
153

DN

WALL NOT LESS THAN 8FT. IN HEIGHT FROM THE GROUND


82
UP

44 LEVEL WHICH IS TO BE PAINTED TO AVOID UNPLEASANT LOOK


FROM THE ROAD SIDE. IN ADDITION TO THIS, A NET OR SOME
12643

4186 OTHER PROTECTIVE MATERIAL SHALL BE HOISTED AT THE


14981

FACADES OF THE BUILDING TO ENSURE THAT ANY FALLING


CONFERENCE ROOM 1

MATERIAL REMAINS WITHIN THE PROTECTED AREA.


7616

AHU
70
5595

75

NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO

FIRST FLOOR PLAN


8713 CONSTRUCTION AT NIGHT AFTER 10 P.M.

LABOUR HUTMENT CERTIFICATE


1557 4000
THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
6331 WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY AND
2908

SCALE 1:200
1808

LABOUR HUTMENT SHALL BE REMOVED BEFORE OCCUPYING


LIFT

2
THE PROPOSED BUILDING.
569

34
PRIVATE DINING HALL

86
15304

2363
32

To be Constructed KEY PLAN

77
8390

59
59
30 23
81
34364

GOVT. QUARTERS
35 44 31 E
N
S

DN D
3240 R
1227

A
3
733

G
339

M A R G
9

46
I
1894 8 15 H
POND

34
4241

4596

681 D
30
BHI=2250
LEDISE TOILET
FHI=2570
DIRECTOR
DEEP FREZZERS O
MEDICAL ROOM GENTS TOILET
MAINTENANCE HEAD
2908

1063 L
SECURITY HEAD MANAGER CATERING HONORARY TREASURER
BOARD ROOM
AHU ROOM

2524 4

R
TREADE=280
RISER=170

1317

M U E L L E
UP

UP DN

4585
PROJECTION ROOM

950 5184 3560 3025 xiii


4720

POND
12497

2.1 M WIDE CORRIDOR 2.1 M WIDE CORRIDOR


2725 LOBBY

GOVT. QUARTERS
DEEP FREZZERS
1080
11270

25

3739

914
AUDITORIUM BELOW
1650
xii

7203
2450

M A X
1 2
914
5468

DN
DEEP AHU ROOM CONFERENCE ROOM
FREZZERS RECEPTION

13020
29
DEEP
3669

PRESIDENT
1669

3718
FREZZERS
4572
STAIRCASE
TOILET
xi
FORD FOUNDATION
914
27

6090
26

5217
25022 45600

3749
xiv

914
1656 x
164

2624

LIFT 341
24002 16694
2860
27.66° xv
9369 8364

497
24 09
88
DN

76
3

11
23

87

21
viii

R83

85
27
32
30.18°

2130
2147
1124 112
4 22

728
935

6
vii F

8
38
383
DRAWN CHKD APPD.
ix
Owner

2147
vi 20
R79

15 4944
INDIA INTERNATIONAL
376

1412 16 21
52
65
CENTRE

2
80
17

12
227 40, Max Mueller Marg, Lodhi Estate,

6478
1
56

18 New Delhi
920

98

927
8587 96
48 v 30

R67
16
64

2173
88

R69

14
Owner's Signature
153

73
45
12643

4186
14981

10 11 13
12
70
77

8713

6331
1557

FIRST FLOOR AREA DIAGRAM Architect


2908

iv
1808

9 SCALE 1:200 Anuj Srivastava


Design Consultants
15304

2363
8 L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
8390

34364 Architect's Signature N


iii
3240 3
1227

733
339

B
4241

681

950 3560
For Revised Sanction
4720
12497

2725
1080
11270

2 1

i A 4
First Floor Plan: Main Block
5468

Scale: 1 : 200 @ A-0 REV.


2858 DWG. No.
25022 45600 Date:
xvi 03
2624

Drawn by: Christopher Paul


2164

2400

05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00


Envelope Area Road Level.
Services & Corridors : Non FAR
3. The Building is mechanically ventilated and artificially lighted as per
NBC.
Des. No. Length Breadth Nos Formula Area Des. No. Length Breadth Nos Formula Area
4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016,
1 61.563 11.270 1.000 Rectangle 693.815 A 3.478 1.672 1.000 Rectangle 5.815 as applicable to this category of this plot size, as per clause no. 10.2 of
UBBL- 2016 shall be installed at the site.
2 6.315 1.227 1.000 Rectangle 7.749 B 1.913 5.215 1.000 Rectangle 9.976
7 1.281 1.422 0.500 Triangle 0.911 5. All service equipment should be camouflaged appropriately (in
terms of the point nos. 10, 11 & 12 of the CPAA (Criterion for Project
8 16.531 8.390 1.000 Rectangle 138.695 Assessment and Approval) of DUAC.

9 2.908 2.363 1.000 Rectangle 6.872 6. The entire proposal shall be adhere to all the applicable statutory
provisions, and norms/regulations of the prevailing Lutyens Bungalow
10 12.390 6.166 5.384 Trapezium 49.953 Zone (LBZ) guidelines.
11 12.390 7.198 4.428 Trapezium 43.368 7. Sustainability features shall be as per point no. 7 of the CPAA
12 12.643 8.390 0.500 Triangle 53.037 Sub - Total 15.792 (Criterion for Project Assessment and Approval) of DUAC shall be
installed at site.
13 4.482 7.075 0.500 Triangle 15.855 STRUCTURE STABILITY CERTIFICATE
14 4.896 4.482 6.464 Trapezium 30.310 DEDUCTION : Shaft, lifts & cut outs CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
27.66°
15 79.376 69.155 30.190 Sector 399.761 STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND THE
BALCONY
16 1.413 5.140 0.500 Triangle 3.631 Des. No. Length Breadth Nos Formula Area INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT TO
THE BEST OF OUR KNOWLEDGE.
BED ROOM
BALCONY 17 5.714 5.245 0.500 Triangle 14.985 i 1.000 2.600 1.000 Rectangle 2.600
PANTRY
1 2
BED ROOM
IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
3 18 2.173 6.400 0.500 Triangle 6.954 iv 1.557 1.808 1.000 Rectangle 2.815 INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON SOIL
4

5
Rectangle Rectangle CONDITIONS HAS BEEN DULLY INCORPORATED IN THE DESIGN
SHAFT 6
BALCONY 19 6.837 5.137 1.000 35.122 v 1.227 0.920 3.000 3.387 OF THE BUILDING AND THESE PROVISIONS SHALL BE ADHERED
8° SHAFT
TO DURING THE CONSTRUCTION.
30.1 20 83.873 74.793 27.660 Sector 347.575 vi 2.147 2.147 1.000 Rectangle 4.610
BALCONY 7
BALCONY SHAFT 112
4 8
BALCONY 21 3.016 9.010 1.000 Rectangle 27.174 vii 2.147 0.383 1.000 Rectangle 0.822 WATER HARVESTING CERTIFICATE

728
BED ROOM 2147 SHAFT 9
22 2.624 2.860 1.000 Rectangle 7.505 viii 1.124 0.728 5.000 Rectangle 4.091 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR

383
BED ROOM 1
A.C.DUCT
2
10
Triangle APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS
Sub - Total 1883.271 ix 1.649 1.091 0.500 0.900

2147
3
LIFT AS WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE
SHAFT

x 2.164 2.400 1.000 Rectangle 5.194 WATER AND THE INFORMATION GIVEN THEREIN IS FACTUALLY
SHAFT
4
5140 TERRACE
CORRECT TO THE BEST OF OUR KNOWLEDGE AND
A 1883.271 Sub - Total 24.418 UNDERSTANDING. THE RECYCLE WATER SHALL BE USED FOR

1413
BALCONY 5
SHAFT
45 DN
HORTICULTURE PURPOSE ETC.
52 Deductions
DN

96
GALLERY UP

65
B NON FAR : Services, Corridors etc CERTIFICATE
15.792

6400

10
BED ROOM

90
57
6
PANTRY C Shafts, Lifts & Cut-outs 24.418 THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED

14
9 6 SHAFT ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE
16

48 E
30 THE LOCAL BODY SHALL REMOVE THE MULBA AND THE COST
49

16
TERRACE

2173
TERRACE

64

SHALL BE BORNE BY THE OWNER OF THE PLOT.


F Total Coverage
64

91 F= A-C 1858.853
AC

10
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF
AC

14
DN

G Total FAR on SF G= F-D 1843.061 THE OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE
81

5384 22 UP
12

82 OFF THE MAIN ROADS BY MEANS OF ERECTING A SCREEN


44
WALL NOT LESS THAN 8FT. IN HEIGHT FROM THE GROUND
12643
TERRACE

LEVEL WHICH IS TO BE PAINTED TO AVOID UNPLEASANT LOOK


12390
6166

7198

CONFERENCE ROOM 2 FROM THE ROAD SIDE. IN ADDITION TO THIS, A NET OR SOME
CANTROL ROOM

OTHER PROTECTIVE MATERIAL SHALL BE HOISTED AT THE


70

FACADES OF THE BUILDING TO ENSURE THAT ANY FALLING


75

SECOND FLOOR PLAN


4428 MATERIAL REMAINS WITHIN THE PROTECTED AREA.

NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO


TERRACE

CONSTRUCTION AT NIGHT AFTER 10 P.M.


TERRACE

1557
LABOUR HUTMENT CERTIFICATE

SCALE 1:200
2908

1808
LIFT

THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED


WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY AND
LABOUR HUTMENT SHALL BE REMOVED BEFORE OCCUPYING
THE PROPOSED BUILDING.
2363 Dining Hall
16531

8390
KEY PLAN
6315
35
2600
1913

44
1227
AHU

DN
DW

1000

GOVT. QUARTERS
5075 S
N
E
1441

D
5215
4596

R
G
A
3

M A R G
3309

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE G.TOILET L.TOILET STORE
I POND

H
ELECTRIC ROOM D
DN O
L
1672

3478 6555 3016 4

R
CORRIDOR

M U E L L E
11270

11270

TERRACE
POND

2450

GOVT. QUARTERS
STORE OFFICE OFFICE OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RECEPTION OFFICE OFFICE

M A X
2
3669

61563 OFFICE OFFICE OFFICE OFFICE


OFFICE 1
TOILET

FORD FOUNDATION
2164
2624

LIFT

27.66°
2400
2860

R83873
To be Constructed
DN

viii
20
8
30.1

2130
5137 112
4
R79376

19

728
vii

R74793
2147 F
383

2147
6837

vi DRAWN CHKD APPD.

15 4944 Owner
1412

16 65 21 INDIA INTERNATIONAL

50
52

50
17
CENTRE
7
6478

122

10
R69155

90
56

18
920

ix
98

96 40, Max Mueller Marg, Lodhi Estate,


16

48 v 30
49

16
New Delhi
64

2173
7
64

91
10
14
14
81

5384 22
Owner's Signature
12

82
44
12643

10
12390
6166

7198

11 13
12
70
75

4428

1557

SECOND FLOOR AREA DIAGRAM


2908

iv
1808

Architect
9
2363 Anuj Srivastava
16531

8390
SCALE 1:200 Design Consultants
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
6315
B 2600
2
1913

1227

i Architect's Signature N
1000

5075

5215

A
1672

3478
12497
11270

11270

1
For Revised Sanction

Second Floor Plan: Main Block


61563

Scale: 1 : 200 @ A-0 REV.


x
2624
2164

DWG. No.
2400 Date:
22 2860
Drawn by: Christopher Paul 04

05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the

4071
ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.
TERRACE FLR.
LVL +10250 MM
3. The Building is mechanically ventilated and artificially lighted
LVL +8700MM
as per NBC.

3325
LVL +8050MM

13463
SECOND FLR.
LVL +7150 MM
4. The Provisions of Green Buildings as per chapter 10 of
UBBL 2016, as applicable to this category of this plot size, as
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.

3325
LVL +4900MM

FIRST FLR.
LVL +3850 MM
5. All service equipment should be camouflaged appropriately
(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion

3325
PLINTH LVL. +450
for Project Assessment and Approval) of DUAC.

150
ELEVATION 1
GROUND LVL ±00
6. The entire proposal shall be adhere to all the applicable
statutory provisions, and norms/regulations of the prevailing
R-7 : KD Block -Kitchen Extn.
R-8: Proposed Lounge Lutyens Bungalow Zone (LBZ) guidelines.
Pantry
SCALE 1:400 7. Sustainability features shall be as per point no. 7 of the
CPAA (Criterion for Project Assessment and Approval) of
DUAC shall be installed at site.

STRUCTURE STABILITY CERTIFICATE

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND
THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
TO THE BEST OF OUR KNOWLEDGE.

IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN


INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
TERRACE FLR.
SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
LVL +10250 MM DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
LVL +8700MM BE ADHERED TO DURING THE CONSTRUCTION.
LVL +8050MM

SECOND FLR. WATER HARVESTING CERTIFICATE


LVL +7150 MM

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


LVL +4900MM
APPROVAL SATISFY THE WATER HARVESTING
FIRST FLR.
LVL +3850 MM
REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
DISCHARGE OF WASTE WATER AND THE INFORMATION
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
PLINTH LVL. +450
WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
GROUND LVL ±00

CERTIFICATE

ELEVATION 2 THE MULBA DURING THE CONSTRUCTION WILL BE

SCALE 1:400
REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
AND THE COST SHALL BE BORNE BY THE OWNER OF THE
PLOT.

DURING CONSTRUCTION, IT IS MANDATORY ON THE PART


OF THE OWNER TO PROPERLY SCREEN THE
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
R-9: Proposed Lift ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN
ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
BUILDING TO ENSURE THAT ANY FALLING MATERIAL
REMAINS WITHIN THE PROTECTED AREA.
TERRACE FLR.
LVL +10250 MM NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
LVL +8700MM CONSTRUCTION AT NIGHT AFTER 10 P.M.
LVL +8050MM

SECOND FLR. LABOUR HUTMENT CERTIFICATE


LVL +7150 MM

THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED

9013
LVL +4900MM
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
FIRST FLR.
LVL +3850 MM
AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
OCCUPYING THE PROPOSED BUILDING.
4645

900mm Ht Parapet

PLINTH LVL. +450

GROUND LVL ±00

ELEVATION 3

GOVT. QUARTERS
S
N
E
D
R

SCALE 1:400
G
A
3

M A R G
I POND

H
D
O
L
4

R
M U E L L E
POND

GOVT. QUARTERS
M A X
1 2

FORD FOUNDATION

KEY PLAN

To be Constructed
VAULTED ROOF
VAULTED ROOF

TERRACE FLR. +10225


TERRACE FLR. LVL ++10225MM TERRACE
LVL +10250 MM

PROPOSED
GLAZING

3325
LVL +8700MM
VAULTED ROOF
LVL +8050MM
PASSAGE TOILET BED ROOM +6900
SECOND FLR. SECOND FLR.
SF
LVL +7150 MM LVL +6900 MM

3325
JALI
WALL
LVL +4900MM
8950

BED ROOM TOILET PASSAGE TOILET BED ROOM +3575


FIRST FLR. FIRST FLR.
LVL +3850 MM LVL +3575 MM FF

EXISTING
DRAWN CHKD APPD.

3325
Owner
200

200

BED ROOM TOILET PASSAGE TOILET BED ROOM 250


200
1350

PLINTH LVL. +450 PLINTH LVL. +250


GF
400

INDIA INTERNATIONAL
GROUND LVL ±00 +0000
GROUND LVL ±00

ELEVATION 4 CENTRE
TUNNEL TUNNEL BASEMENT
LVL. -2150

SECTION BB
40, Max Mueller Marg, Lodhi Estate,
SCALE 1:400
New Delhi
SCALE 1:400
Owner's Signature

Architect

TERRACE FLR.
LVL +10250 MM
Anuj Srivastava
LVL +8700MM Design Consultants
650

LVL +8050MM
L-321, Delta-2, Greater Noida 201310
SECOND FLR.
LVL +7150 MM PHONE : +91-8826272227
3150

email : [email protected]
150
700

LVL +4900MM

FIRST FLR.
LVL +3850 MM Existing Auditorium Building
Architect's Signature N
4350

900mm Ht Parapet
900mm Ht Parapet

PLINTH LVL. +450


+0000
150

GROUND LVL ±00 GL


3600

RISER = 150
TREAD = 300

4000
WIDTH = 1500

For Revised Sanction


G1 G1 D1
LVL. -3050

BASEMENT BASEMENT
-4000
LVL. -4000

Elevations
SECTION AA Scale:
Date:
1 : 200 @ A-0
DWG. No.

05
REV.

SCALE 1:400
Drawn by: Christopher Paul

05-08-2025
WALL CUTOUT (300x600) AT EVERY
FLOOR (BOT. AT 1700MM FROM FIN.
FLOOR LEV.) GENERAL NOTES:
LVL + 300
UP LVL + 300 UP
WALL CUTOUT (200x300) AT 1. All dimensions are in mm unless mentioned otherwise.
EVERY FLOOR (BOT. AT
1700MM FROM FIN. FLOOR
LEV.)
2. All Levels from the

RWP-1 RWP-2
PLANTER 3150 6850 ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.
SUNKEN SUNKEN
RWP 3. The Building is mechanically ventilated and artificially lighted
RWP as per NBC.

SHAFT
SHAFT

3750
1450

1565
450 THICK STONE WALL
LIFT FHC UP TO LIFT FHC 4. The Provisions of Green Buildings as per chapter 10 of

4460
(0.60 M high from FFL) +12600 TERRACE
PREFUNCTION
LVL + 10185
UBBL 2016, as applicable to this category of this plot size, as

2
RISER - (1-17)155
RISER - (18-24)150
LVL + 1350 LVL + 1350 RISER - 150
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
16250
TREAD - 300 TREAD - 300
WIDTH - 1500
LOBBY
WIDTH - 1500

LVL + 300

1
DN
115 THK STONE
UP UP CLADDING LOBBY RWP
5. All service equipment should be camouflaged appropriately
DN
+300 +1350 DN
LVL + 10200
(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion

2670
RWP-3
for Project Assessment and Approval) of DUAC.

3 4
F.CEILING@+4650 LVL .
RAMP CONTROL
LVL +1200
UP ELECTRICAL PANEL 6. The entire proposal shall be adhere to all the applicable
LVL + 1350 PRE-FUNCTION statutory provisions, and norms/regulations of the prevailing
UP Lutyens Bungalow Zone (LBZ) guidelines.

LVL + 1350
PREFUNCTION
FIRST FLOOR LINE
5900 A.H.U.
17200 7. Sustainability features shall be as per point no. 7 of the
CPAA (Criterion for Project Assessment and Approval) of
KITCHEN UP ROOM-1 TERRACE
36 SQ.M. 1400X4310 LVL + 5985 DUAC shall be installed at site.
LVL + 1350 LVL + 300

13360
LVL +1050
STRUCTURE STABILITY CERTIFICATE

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


SPOUT FOR
AHU DRAIN APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND

18670
UP THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
GUEST ROOM 450 THK STONE ART GALLERY TO THE BEST OF OUR KNOWLEDGE.
WALL LVL + 10200
CUT-OUT FOR A.C. DUCT ROOM-2

16000
130.25 SQ.M. / 1400 SFT.
RWP-4
IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
FA INTAKE SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
ENTRANCE FOR AHU
LVL + 1350 FOYER
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
LVL + 1350
BE ADHERED TO DURING THE CONSTRUCTION.
RWP
MULTIPURPOSE HALL

66
WATER HARVESTING CERTIFICATE

70 TERRACE
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE WATER HARVESTING
LVL + 10185 REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
+ 8000 DISCHARGE OF WASTE WATER AND THE INFORMATION
26 GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
80
CUT-OUT FOR A.C. DUCT
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
ROOM-3
GE
NT WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
230 THICK S
R.C.C. WALL

LL
CERTIFICATE

WA
FHC PRE-FUNCTION

K
FH
PRE-FUNCTION C

IC
LA
THE MULBA DURING THE CONSTRUCTION WILL BE

BR
DIE
111 SQ.M. / 1195 SFT. S
REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN

HK
THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA

0T
ROOM-4
(CH. AT SITE)

23
LOBBY
AND THE COST SHALL BE BORNE BY THE OWNER OF THE

0
F.CEILING@+4650 LVL . LOBBY LVL + 10200 PLOT.

80
24
LVL + 1350 SH SH 51 220 THICK
+2745 56
STONE CLADDING
AF A DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
26
6
FT

G
T

IN
RWP-6 OF THE OWNER TO PROPERLY SCREEN THE
80

11
ILD
48
RWP-5
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
+10200

0
BU
A.H.U. ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
NG

104

68
LIFT DN LIFT

00
+3055

188
UP ROOM-5 2750X1800
DI

FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO

NG
300x900 DUCT

0
IL

29
18
59
FOR CWPs
BU

UP AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN

TI

00
2
+1350 77

+3830

18
0
SH SH

IS
63
NG

74
AF
LVL + 300 2493 AF ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE

EX
DN T 50 T
TI

ROAD
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE

00
IS

45
LVL + 200
EX

64 +5380 81
BUILDING TO ENSURE THAT ANY FALLING MATERIAL
EXISTING BUILDING REMAINS WITHIN THE PROTECTED AREA.

72
LANDING AT +3830 87
+8335
RISER - 155
TREAD - 300
73
92
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
WIDTH - 1500
TOTAL NO. OF RISERS =30 CONSTRUCTION AT NIGHT AFTER 10 P.M.

LABOUR HUTMENT CERTIFICATE

FE
Kamladevi (CONFERENCE) Block TERRACE THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
Ground Floor Plan
LL
OW 30
48 AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
'S
FL OCCUPYING THE PROPOSED BUILDING.
AT

Kamladevi (CONFERENCE) Block


Second Floor Plan

GOVT. QUARTERS
S
N
E
D
R
G
A
3

M A R G
I POND

H
D
O
L
4

R
M U E L L E
WALL CUTOUT (200x300) AT
EVERY FLOOR (BOT. AT WALL CUTOUT (300x600) AT
EVERY FLOOR (BOT. AT
POND

1700MM FROM FIN. FLOOR

GOVT. QUARTERS
450 THICK STONE WALL LEV.) 1700MM FROM FIN. FLOOR
LEV.)

TYPE NOS.

M A X
RWP 1 2
WINDOWS
505 1400
RWP
FW1 2
SHAFT

FW2 1
LIFT
1450

1565

FHC FORD FOUNDATION


FW3 1
LVL + 6000 PRE FUNCTION KEY PLAN

1
FW3A 1
4680

RISER - 150
TREAD - 300
940
WIDTH - 1500

FW4 1
UP LOBBY
DN
RWP FW6 2
1200

FW7 1

BALCONY control SEMINAR ROOM FW8 1


LVL + 4950 LVL + 6000 (55 SEATS)
1000

FW9 2
TERRACE
LVL + 5985
1650
2
DRAWN CHKD APPD.

F
ROOM 1 Owner
8612

1872
INDIA INTERNATIONAL
CENTRE
40, Max Mueller Marg, Lodhi Estate,
New Delhi
ROOM 2
3 Owner's Signature
RWP
SEMINAR ROOM

4
(90 SEATS)
WALL CUTOUT (300x600)
AT ONLY FIRST FLOOR
(BOT. AT 400MM FROM FIN.
FLOOR LEV.)

PRE FUNCTION LADIES TOILET RWP


LVL + 6000 Architect

ROOM 3 Anuj Srivastava


CONFERENCE ROOM
(36 SEATS)
Design Consultants
FHC GENTS TOILET L-321, Delta-2, Greater Noida 201310
CO PHONE : +91-8826272227
N
RO TRO email : [email protected]
OM L
ROOM 4 1
2 33
10
up

LOBBY Architect's Signature N


+6000 LVL + 6000 24
51
46

+6465 SH
38

0
AF
T
AHU
AHU
0
NG

68

ROOM 5 77
UP +6000
DI

LIFT
81

0
IL

29
34

79
BU

00

76
DN SH
18

300x900
+6465
For Revised Sanction
74
NG

DUCT FOR AF
24
50 T
TI

CWPs
IS
EX

FIRST FLOOR
FA INTAKE

Kamladevi CONFERENCE Block


FOR AHU 80

EX 84 +5380
IS
TIN
: Floor Plans
70

G 220 THICK
BU
73
STONE CLADDING
ILD RISER - 155.55
IN TREAD - 300
G WIDTH - 1500
NO OF RISERS - 27
Scale: 1 : 200 @ A-0 REV.
DWG. No.
Date:

Kamladevi (CONFERENCE) Block Drawn by: Christopher Paul 06


30

FIrst Floor Plan


48

05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the


ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.

9600 15600 3. The Building is mechanically ventilated and artificially lighted

3150 505
1400 940 C GROUND FLOOR COVERED AREA 5550
as per NBC.

4. The Provisions of Green Buildings as per chapter 10 of


UBBL 2016, as applicable to this category of this plot size, as

1450

1565
A - 3.15 x 4.46 = 14.04 SQ.M

3750
28600
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
4460

A 234 23 4 5

6200
5. All service equipment should be camouflaged appropriately
B
2770
B - 28.60 x 6.20 = 177.32 SQ.M

1413
(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
1 4820

11340
for Project Assessment and Approval) of DUAC.
6395
5350

5350
C - 15.60 x 0.52 = 8.11 SQ.M

7810
6. The entire proposal shall be adhere to all the applicable
6

9500
statutory provisions, and norms/regulations of the prevailing

5140
F D F Lutyens Bungalow Zone (LBZ) guidelines.

2300 74 D - 16.00 + 5.14 X 22.65 = 239.41 SQ.M 2300


82
0
5800 30 7. Sustainability features shall be as per point no. 7 of the
2
22650

68 CPAA (Criterion for Project Assessment and Approval) of


50 DUAC shall be installed at site.

20
7
16000

E - 21.50 + 7.43 X 18.80 = 271.94 SQ.M

39
41 STRUCTURE STABILITY CERTIFICATE
00
2
12 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR

F - 2.30 X 5.35 = 12.30 SQ.M


APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
33

50
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND
0

46
THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
E TOTAL = 723.12 SQ.M FIRST FLOOR COVERED AREA TO THE BEST OF OUR KNOWLEDGE.

G IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN


SAME AS GROUND FLOOR - TERRACE INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON

80 0
170
DEDUCTION
SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE

18 710

81
0

0
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL

34
0
8

68

6
24

4
5 BE ADHERED TO DURING THE CONSTRUCTION.
14

38
H
1
G - 7.10 x 0.33 = 2.34 SQ.M F - 2.30 X 5.35 = 12.30 SQ.M
600

8
00
0 9
29
18
9 33
51
WATER HARVESTING CERTIFICATE

215 H - 1.70 x 0.60 = 1.02 SQ.M 1 - 1.413 x 2.77 = 3.914 SQ.M CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
00 APPROVAL SATISFY THE WATER HARVESTING
70
10 10
30

2 - 1.45 x 0.505 = 0.732 SQ.M


00
2 - 1.455 x 0.47 = 0.684 SQ.M
REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
31

DISCHARGE OF WASTE WATER AND THE INFORMATION

3 - 1.45 x 1.400 = 2.03 SQ.M


GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
3 - 1.455 x 1.32 = 1.920 SQ.M OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
GROUND FLOOR 4 - 1.565 x 0.94 = 1.471 SQ.M 4 - 1.42 x 1.775 = 2.52 SQ.M FIRST FLOOR CERTIFICATE

8 - 2.451 x 0.68 = 1.667 SQ.M 5 - 5.55 x 3.75 = 20.81 SQ.M THE MULBA DURING THE CONSTRUCTION WILL BE
Kamladevi (CONFERENCE) Block Kamladevi (CONFERENCE) Block REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN

9 - 2.451 x 1.80 = 4.411 SQ.M 6 - 9.50 + 7.81 X 4.82 = 41.71 SQ.M


THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
AND THE COST SHALL BE BORNE BY THE OWNER OF THE
PLOT.
10- 2.451 x 0.29 = 0.711 SQ.M 2 DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
7 - 4.10 + 0.82 X 3.92 = 9.64 SQ.M OF THE OWNER TO PROPERLY SCREEN THE
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
TOTAL = 14.382 SQ.M 2 ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
8 - 2.30 x 0.637 = 1.465 SQ.M AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN

= 723.12 - 14.382 = 708.738 SQ.M


ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE

9 - 2.30 x 1.90 = 4.37 SQ.M


MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
BUILDING TO ENSURE THAT ANY FALLING MATERIAL
REMAINS WITHIN THE PROTECTED AREA.
10- 2.30 x 0.225 = 0.517 SQ.M
TOTAL Coverage = 708.738 SQ.M NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
12 - 6.85 x 4.65 = 31.85 SQ.M CONSTRUCTION AT NIGHT AFTER 10 P.M.

GROUND FLOOR COVERED AREA (SANCTIONED) 14- 1/2 x 3.351 x (3.846 + 3.481) = 12.276 SQ.M
LABOUR HUTMENT CERTIFICATE

THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED

= 723.07 SQ.M
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
TOTAL = 143.976 SQ.M AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
OCCUPYING THE PROPOSED BUILDING.

GOVT. QUARTERS
S

= 723.12 - 143.976 = 579.144 SQ.M.


N
E
D
R
G
A
3
= TOTAL FAR AREA OF FIRST FLOOR = 579.144 SQ.M.

M A R G
I POND

H
D
O
L
4

R
= TOTAL COVERED AREA OF FIRST FLOOR = 579.144 + 3.914 + 12.276 SQ.M.

M U E L L E
POND

GOVT. QUARTERS
= TOTAL COVERED AREA OF FIRST FLOOR = 595.334 SQ.M.

M A X
1 2

FIRST FLOOR COVERED AREA (SANCTIONED)


= 570.63 SQ.M
FORD FOUNDATION

KEY PLAN

3150 6850
BCD
3750
4460

2
DRAWN CHKD APPD.
16250
1 Owner
2670

3 4 INDIA INTERNATIONAL
5900 17200 CENTRE
40, Max Mueller Marg, Lodhi Estate,
13360

New Delhi
SECOND FLOOR COVERED AREA SECOND FLOOR COVERED AREA: DEDUCTIONS
18670

Owner's Signature
16000

1 - 3.15 x 4.46 = 14.05 SQ.M


66
7 0 B - 1.455 x 0.47 = 0.684 SQ.M
2 - 6.85 x 3.75 = 25.68 SQ.M
26
80 C - 1.455 x 1.32 = 1.920 SQ.M
3 - 5.90 X 2.67 = 15.75 SQ.M
D - 1.42 x 1.775 = 2.52 SQ.M
4 - 18.67 + 13.36 X 17.20 = 275.45 SQ.M E - 2.30 x 0.637 = 1.465 SQ.M
Architect
5 E 2 Anuj Srivastava
00

F - 2.30 x 1.90 = 4.37 SQ.M


8

Design Consultants
G F
5

11

5 - 6.67 + 18.82 X 11.80 = 150.39 SQ.M


186

188 I G - 2.30 x 0.225 = 0.517 SQ.M L-321, Delta-2, Greater Noida 201310
20 274 6 2 PHONE : +91-8826272227

SECOND FLOOR
00

email : [email protected]
I - 1.865 X 2.745 = 5.12 SQ.M
5
72

6 - 2.68 X 7.20 = 19.29 SQ.M Architect's Signature N

TOTAL = 16.596 SQ.M


Kamladevi (CONFERENCE) Block TOTAL = 500.61 SQ.M
TOTAL Coverage = 484.014 + 5.12 SQ.M
TOTAL = 500.61 - 16.596 SQ.M For Revised Sanction
= 489.134 Sq.m
TOTAL = 484.014 SQ.M Kamla Devi Block: Area Charts

SECOND FLOOR COVERED AREA (SANCTIONED) Scale: 1 : 200 @ A-0


DWG. No.
REV.

= 412.38 SQ.M
Date:
Drawn by: Christopher Paul 07

05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.


DOOR & WINDOWS SCHEDULE DOOR & WINDOWS SCHEDULE
TYPE SIZE HT.OF CILL HT.OF LINTEL NOS. TYPE SIZE HT.OF CILL HT.OF LINTEL NOS.
2. All Levels from the
ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.
6920 W1 W1
600 X 2650 300 2950 1 600 X 2650 300 2950 1
3. The Building is mechanically ventilated and artificially lighted
W2 1500 X 2050 900 2950 1 W2 1500 X 2050 900 2950 1 as per NBC.
3265
450 X 2575 325 2900 4 450 X 2575 325 2900 4
W3 W3 4. The Provisions of Green Buildings as per chapter 10 of

6515
PROPOSED 1000 X 2575 325 2900 1000 X 2575 325 2900
UBBL 2016, as applicable to this category of this plot size, as
W4 2 W4 2
STAFF REST ROOM per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
B D E F G

3881
STAFF GYM W5 2870 X 2575 325 2900 2 W5 2870 X 2575 325 2900 2
5. All service equipment should be camouflaged appropriately
3540
W6 7150 X 2575 325 2900 1
C' A H W6 7150 X 2575 325 2900 1 (in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
W7 600 X 2575 325 2900 1 565 11750 W7 600 X 2575 325 2900 1
for Project Assessment and Approval) of DUAC.
2100
7680 3840 2085 1685

300
W8 600 X 1825 325 2150 1 W8 600 X 1825 325 2150 1 6. The entire proposal shall be adhere to all the applicable
EXPOSED AGREEGATE
statutory provisions, and norms/regulations of the prevailing

1500
300 W4 W4
Lutyens Bungalow Zone (LBZ) guidelines.
2 PASSAGE
B B'
W3
7. Sustainability features shall be as per point no. 7 of the

450
UP UP
1100 X 450 CUT OUT D7 CPAA (Criterion for Project Assessment and Approval) of
IN ROOF SLAB
DUAC shall be installed at site.
STAFF CAFE
1500

4000
V1 2000 X 750 2250 V1 2280 X 900 2100
300
3000 1 3000 1
STRUCTURE STABILITY CERTIFICATE
V2 3195 X 750 2250 3000 1 V2 3195 X 900 2100 3000 1

V3 15600 X 450 2500 2950 1


W3
1100 V3 15600 X 450 2500 2950 1
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
V4 3770 X 600 2300 2900 1 3 V4 3770 X 600 2300 2900 1 STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND
THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
LVL -3250 D1 STAFF CAFE KITCHEN TO THE BEST OF OUR KNOWLEDGE.
D' D'

4000
G1 3610 X 2950 - 2950 1 G1 3610 X 2950 - 2950 1 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
V4
W5 EXISTING INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON

1500 1240950
5 BLOCK SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
UP
D1 1500 X 2150 A-1-401 D1 1500 X 2150
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
- 2150 1 - 2150 1
D3 BE ADHERED TO DURING THE CONSTRUCTION.
D3
1538
LADIES D3

1050X450 CUT OUT


D4

230 230
1435
D2 1000 X 2150 - 2150 1 D2 1000 X 2150 - 2150 1

115
F 4 F' WATER HARVESTING CERTIFICATE

IN ROOF SLAB
3528

cooler
D4 D4 D3 950 X 2150 - 2150 1 D3 950 X 2150 - 2150 2+1
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR

485
16230
D4 BATH J.C. LVL -3250 D4 750 X 2150 - 2150 12 D4 750 X 2150 - 2150 12 APPROVAL SATISFY THE WATER HARVESTING
H/D

4000
REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
D5 1000 X 2400 - 2400 1 D5 1000 X 2400 - 2400 1 DISCHARGE OF WASTE WATER AND THE INFORMATION
W5
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
EQ EQ 1000 1000
D6 950 X 2400 - 2400 2+1 1500
6101500 D6 950 X 2400 - 2400 2+1
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
H/D

D4 D4 D4 D4
D7 1500 X 2400 - 2400 2 D7 1500 X 2400 - 2400 2
WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.

115
GENT'S 5 2685 CERTIFICATE
F.H.C.

W3
D7 D6

1730
D4 D4 D4 D4 230
450
THE MULBA DURING THE CONSTRUCTION WILL BE

115
UP
1085 REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN

4000
1100 1100 1100 1100 2670
DUMB
REST ROOM
1915
F.H.C. THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
1500

3000
BATH BATH BATH BATH WAITER
AND THE COST SHALL BE BORNE BY THE OWNER OF THE

950
DN
1500 PLOT.

1800

1870
E' LVL+3800 DUMB

230
WAITER
V2
D6
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
W3 W6 W7 OF THE OWNER TO PROPERLY SCREEN THE
6

450
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
900X900X600 DEEP SUMP 230 ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
1200 600 AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN
ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
A' H' MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
C BUILDING TO ENSURE THAT ANY FALLING MATERIAL
REMAINS WITHIN THE PROTECTED AREA.

BASEMENT FLOOR PLAN DOOR & WINDOWS SCHEDULE FIRST FLOOR PLAN DOOR & WINDOWS SCHEDULE NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO

Program Block (Lotus Lounge) TYPE SIZE HT.OF CILL HT.OF LINTEL NOS.
Program Block (Lotus Lounge) TYPE SIZE HT.OF CILL HT.OF LINTEL NOS.
CONSTRUCTION AT NIGHT AFTER 10 P.M.

LABOUR HUTMENT CERTIFICATE


W1 600 X 2650 300 2950 1 W1 600 X 2650 300 2950 1
THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
W2 1500 X 2050 900 2950 1 W2 1500 X 2050 900 2950 1
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
450 X 2575 325 2900 4 450 X 2575 325 2900 4 AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
W3 W3
OCCUPYING THE PROPOSED BUILDING.
1000 X 2575 325 2900 2 1000 X 2575 325 2900 2
W4 W4

W5 2870 X 2575 325 2900 2 W5 2870 X 2575 325 2900 2

2 W6 7150 X 2575 325 2900 1 W6 7150 X 2575 325 2900 1

GOVT. QUARTERS
A B E
N
S

C' A H
W7 600 X 2575 325 2900 1 W7 600 X 2575 325 2900 1 D
R
G
A
3

M A R G
W8 600 X 1825 325 W8 600 X 1825 325
C D E F G 2150 1 2150 1 H
I POND

2535 3380 4300 3840 2085 1685 L


O
D

R
M U E L L E
1' POND

GOVT. QUARTERS
V1 2280 X 900 2100 3000 1 V1 2280 X 900 2100 3000 1

M A X
1 2
V2 3195 X 900 2100 3000 1 V2 3195 X 900 2100 3000 1
EXTENT OF BASEMENT
6700

V3 15600 X 450 2500 2950 1 V3 15600 X 450 2500 2950 1


LVL + 00 FORD FOUNDATION
V4 3770 X 600 2300 2900 1 V4 3770 X 600 2300 2900 1
B D E F G KEY PLAN
UP

565
G1 3610 X 2950 - 2950 1 7680 3840 2085 1685 G1 3610 X 2950 - 2950 1
300

415

LVL + 300
230

2 D1 1500 X 2150 - 2150 1 2 D1 1500 X 2150 - 2150 1

B 565 B' 230


1100
230

230 230
D2 1000 X 2150 - 2150 1 D2 1000 X 2150 - 2150 1
380 380
4000

D3 950 X 2150 - D3 950 X 2150 -


4000

2150 2+1 2150 2+1

450
EXTENT OF FLOOR ABOVE
D4 750 X 2150 - 2150 12 D4 750 X 2150 - 2150 12 DRAWN CHKD APPD.

Owner
230
1320 D5 1000 X 2400 - 2400 1 D5 1000 X 2400 - 2400 1

1 STILTED - UP AREA
D6 950 X 2400 - 2400 2+1
3
D6 950 X 2400 - 2400 2+1
INDIA INTERNATIONAL
3 LVL + 300 D7 1500 X 2400 - D7 1500 X 2400 -
CENTRE
2400 2 2400 2
WATER COOLER

D' D 40, Max Mueller Marg, Lodhi Estate,


4000
4000

EXISTING
135510001435

150TH. STONE MASONARY BLOCK


1205

New Delhi
1250 TERRACE

1500 LVL+VARIES
1240

FT

Owner's Signature
H/D

4
600 4
485

F F' 4
DN
R4

D5 TO TERRACE
-3250
4000

LVL+VARIES
4
4000

HANDICAPED
20
1185

J.C.
1200
FT
LVL + 300

1730
900

FT
FT TERRACE
FT FT + 9800

Architect
5
GENTS
885 5 2685 1085 5
H/D

Anuj Srivastava
1730

1085 LVL+00 Design Consultants


F.H.C.

4000
4000

F.H.C.
D5
3000 HANDICAPED UP 1915
1800 LVL+300 DN
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
1915
1870

D3 LVL+7400
E' FT DN
TO
DUMB
WAITER E email : [email protected]
-3250 W1 W8
185

Architect's Signature
G1
6 6 6 N
CUT-OUT
2085 1685
D E F G
TERRACE FLOOR PLAN
M.S. GRATING

C A' H'
3 Program Block (Lotus Lounge)
150 DIA RAIN WATER PIPE

For Revised Sanction


ROOF PLAN
GROUND FLOOR PLAN PROGRAM BLOCK
Program Block (Lotus Lounge) Program Block (Lotus Lounge) Lotus Lounge Floor Plans
Scale: 1 : 100 @ A-0 REV.
DWG. No.
Date:
Drawn by: Christopher Paul 08
05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the


ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.

3. The Building is mechanically ventilated and artificially lighted


as per NBC.

4. The Provisions of Green Buildings as per chapter 10 of


UBBL 2016, as applicable to this category of this plot size, as
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.

5. All service equipment should be camouflaged appropriately


(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
for Project Assessment and Approval) of DUAC.

6. The entire proposal shall be adhere to all the applicable


statutory provisions, and norms/regulations of the prevailing
Lutyens Bungalow Zone (LBZ) guidelines.

7. Sustainability features shall be as per point no. 7 of the


CPAA (Criterion for Project Assessment and Approval) of
DUAC shall be installed at site.

STRUCTURE STABILITY CERTIFICATE

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND
THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
TO THE BEST OF OUR KNOWLEDGE.

IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN


INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
DOOR / WINDOW SCHEDULE SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
TYPE NOS. SIZE CILL LINTEL BE ADHERED TO DURING THE CONSTRUCTION.
17 11 17 11
WINDOWS
LVL - 3800 WATER HARVESTING CERTIFICATE
- 3978 LW1 LW1 LW3 RISER - 164.28 UW3 UW3
- 5456
LIFT FHC SERVICE FHC TREAD - 300
LIFT WIDTH - 1500 AHU AHU CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
UW1 2 3370 X 2270 900 3170
11 31
(FOR GROUND FLOOR)
10
10
10
(FOR UPPER
(3270 X4010) 30 APPROVAL SATISFY THE WATER HARVESTING
21 BASEMENT) 33

SERVICE SERVICE (3500 X4010) UW2 2 1200 X 1800 900 2700 REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
UP UP
8 15
STAIRCASE LOBBY
8
DISCHARGE OF WASTE WATER AND THE INFORMATION
LVL - 5785
RISER - 164.28
TREAD - 300
LVL - 2335 DN
UW3 1 1800 X 2270 900 3170 GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
WIDTH - 1500 - 3485 UD5 RAMP UP
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
UW5 2 700 X 1800 900 2700
1 7 RISER - 160.21 1 7
TREAD - 300
WIDTH - 1500 DN
20 WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
1 D3 D3 21
UP UP
UW6 1 780 X 2270 900 3170
RISER - 175.47
LD2
TREAD - 250 CERTIFICATE
UP WIDTH - 1200
LGL3 UD2 UW7 1 1200 X 1270 900 2170
UP
THE MULBA DURING THE CONSTRUCTION WILL BE
1570 DOORS REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
ELECTRICAL PANEL THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
UD1 2 1250 X 2435 - 2435
ELECTRICAL PANEL AND THE COST SHALL BE BORNE BY THE OWNER OF THE
UD2 5 1500 X 2435 - 2435
PLOT.
UGL4 air-conditioned DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
OF THE OWNER TO PROPERLY SCREEN THE
OFFICE & OTHER FACILITIES D1 5 950 X 2435 - 2435 CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
- 2335 LVL ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
D2 1 1000 X 2435 - 2435
FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
D3 2 1200 X 2435 - 2435 AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN
ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
air-conditioned MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
PANTRY BUILDING TO ENSURE THAT ANY FALLING MATERIAL
4.97X10.0 GLAZINGS REMAINS WITHIN THE PROTECTED AREA.
UGL1 1 1500 X 2435 - 2435
- 2135 LVL NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
UGL1
UGL2 1 1800 X 2435 - 2435 CONSTRUCTION AT NIGHT AFTER 10 P.M.
LVL - 5485 D1
UGL3 1 2800 X 2435 - 2435 LABOUR HUTMENT CERTIFICATE
DISH WASHING UGL4 1 3285 X 2435 - 2435
3170X15500 THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
wa
co ter LADIES UGL5 1 4625 X 2435 - 2435 WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
ole
EXISTING BUILDING r AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
SH
UGL6 1 5150 X 2435 - 2435
OW
ER CH
OCCUPYING THE PROPOSED BUILDING.
AN
RO GIN
OM G
JA
N
RO ITOR
OM
D1
300 THK. RCC UGL3 1000X1400 W.C.
D1

GOVT. QUARTERS
WALL S
N
UPTO ±00 LVL. E
air-conditioned R
D

G
A
3

M A R G
LW5
CENTRAL BOOKING OFFICE GENTS I POND

UW5 H
D
D2 LIGHT & VENTILATION SHAFT O
UGL5 HA
L
4
air-conditioned
LW2 ND

R
IC UW2
OPEN SHAFT TO AP

M U E L L E
IL P
LD1 20 ET ED
FOR VENTILATION WAITING AREA 00
X2 POND

08
FAN ROOM FHC FOR BOOKING OFFICE UW5

GOVT. QUARTERS
LW5 5
FHC
SH
OW
ER

M A X
1 2
TOILET CH
AN
RO GIN
OM G

LGL1
UGL3
300 THK. RCC FORD FOUNDATION
LOBBY WALL
LDS UPTO ±00 LVL.
LOBBY KEY PLAN
11
- 4217
10 LVL - 5785
SH
DOOR / WINDOW SCHEDULE - 2335 LVL
SH
A A FT
12
FT TYPE NOS. SIZE CILL LINTEL UGL4
s)

WINDOWS
on

- 3903
rs

1
LIFT
Pe

UP GUEST
)

LGL2 UW1
in
5

LW1 2 4140 X 835 2050 2885 LIFT


m
(1

UP
0
L

13
60
DE 245 MR

SH

TH = 3 3.54
A LW2 1 1650 X 835 2050 2885
(1
PT 0

FT SH
PIT 00X dler

DN AF

0
= 1 00
WIDEAD 15
T

50
18 hin

-5785 UW4
LW3 1 1200 X 1200

=
Sc

22

TR ER
RIS
STORE
LW4 1 1200 X 2035 900 2935 UW2
DRAWN CHKD APPD.
LW5 2 700 X 2035 900 2935
Owner
DOORS
LD1 1 950 X 2435 - 2435
INDIA INTERNATIONAL
CENTRE
LD2 1 1350X 2435 - 2435

LD3 1 750 X 2435 - 2435


40, Max Mueller Marg, Lodhi Estate,
LOWER BASEMENT FLOOR PLAN GLAZINGS UPPER BASEMENT FLOOR PLAN New Delhi
LGL1 1 2830 X 2435 - 2435

LGL2 1 1800 X 2435 - 2435


Owner's Signature
LGL3 1 1500 X 2435 - 2435

Architect

Anuj Srivastava
Design Consultants
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]

Architect's Signature N

For Revised Sanction


Basement Floor Plans:
K D Block
Scale: 1 : 100 @ A-0 REV.
DWG. No.
Date:
Drawn by: Christopher Paul 09
05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the


ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.

3. The Building is mechanically ventilated and artificially lighted


as per NBC.

SITE 3 - CONFERENCE BLOCK SITE 1 - PROGRAMME BLOCK: (LOTUS LOUNGE)


4. The Provisions of Green Buildings as per chapter 10 of
UBBL 2016, as applicable to this category of this plot size, as
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
CONSTRUCTED/ACHIEVED LOWER BASEMENT (LVL.-2)
5. All service equipment should be camouflaged appropriately
COVERED AREA (in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
FOR FAR CALCULATION 14285
for Project Assessment and Approval) of DUAC.

7375 3685 6. The entire proposal shall be adhere to all the applicable

3770 300
statutory provisions, and norms/regulations of the prevailing
3470 1 - 17.048 + 15.447 X 3.47 = 56.38 SQ.M 450
b a Lutyens Bungalow Zone (LBZ) guidelines.
11750
2 c 7. Sustainability features shall be as per point no. 7 of the
1 D CPAA (Criterion for Project Assessment and Approval) of
2 - 5.715 x 3.724 = 21.28 SQ.M DUAC shall be installed at site.
c

3770
15447

STRUCTURE STABILITY CERTIFICATE

16980
3 - 1/2 x 5.577 x 2.884 = 8.04 SQ.M 4
17048

16230

20930
c
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR

3770
4 - 2.015 x 4.591 = 9.25 SQ.M 2050 3 APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND

870
5715 20 THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
15 5 - 3.813 x 1.43 = 5.45 SQ.M c 1 TO THE BEST OF OUR KNOWLEDGE.

450 3770
2

3600
4 14

1870
3724

91 30 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN

930
2 5 TOTAL = 100.40 SQ.M
45
INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
4000 d
1130
g SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
3 5 2805 1085 A
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL

13
557 11750
84

38 BE ADHERED TO DURING THE CONSTRUCTION.


LOWER BASEMENT COVERED AREA (LVL-2)

3600
7
28

2000
C

1870
B WATER HARVESTING CERTIFICATE

A - 3.466 x 3.90 = 13.52 SQ.M GROUND FLOOR COVERED AREA 11900 28051085
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE WATER HARVESTING
REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED

LOWER BASEMENT B - 25.799 x 6.225 = 160.60 SQ.M 1 - 1.085 x 1.870 = 2.03 SQ.M DISCHARGE OF WASTE WATER AND THE INFORMATION
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
C - 15.447 + 5.867 X 21.15 = 225.39 SQ.M 2 - 2.805 x 3.600 = 10.10 SQ.M BASEMENT FLOOR COVERED AREA OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
LEVEL-2 2
WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.

D - 19.802 + 6.42 X 16.96 = 222.36 SQ.M 3 - 2.050 x 0.870 = 1.78 SQ.M FOR FAR CALCULATION CERTIFICATE

2 4 - 11.750 x 16.980 = 199.51 SQ.M THE MULBA DURING THE CONSTRUCTION WILL BE
REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
3466 25799 E - 4.185 x 0.15 = 0.63 SQ.M 5 - 0.450 x 16.230 = 7.30 SQ.M
THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA

4185 A - 1.085 x 1.870 = 2.03 SQ.M AND THE COST SHALL BE BORNE BY THE OWNER OF THE
PLOT.
E
505
1400
F - 1.483 + 1.197 X 5.051 = 6.76 SQ.M B - 2.805 x 3.600 = 10.10 SQ.M
150

940

2 TOTAL = 220.72 SQ.M


DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
1450

62251565

B
3900

C - 11.900 x 2.000 = 23.80 SQ.M


OF THE OWNER TO PROPERLY SCREEN THE
2 34 G - 2.79 x 5.282 = 14.74 SQ.M DEDUCTION
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
A H - 1.57 x 3.009 = 4.72 SQ.M D - 14.285 x 20.930 = 298.98 SQ.M FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN

21150 a - 13.685 x 0.30 = 4.10 SQ.M ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
TOTAL = 648.72 SQ.M b - 7.375 x 0.30 = 2.21 SQ.M TOTAL = 334.91 SQ.M
BUILDING TO ENSURE THAT ANY FALLING MATERIAL
5867

DEDUCTION REMAINS WITHIN THE PROTECTED AREA.

C 64
c - 3.77 x 0.45 x 4 = 6.78 SQ.M NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
2 - 1.45 x 0.505 = 0.732 SQ.M BASEMENT FLOOR COVERED AREA (SANCTIONED)
d - 4.00 x 0.45 = 1.80 SQ.M
20 CONSTRUCTION AT NIGHT AFTER 10 P.M.
15447

3 - 1.45 x 1.400 = 2.03 SQ.M g - 1.13 x 0.93 = 1.05 SQ.M (LIFT)


LABOUR HUTMENT CERTIFICATE

4 - 1.565 x 0.94 = 1.471 SQ.M


= 440.87 SQ.M THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
15
TOTAL = 15.94 SQ.M
AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
70
8 - 2.451 x 0.68 = 1.667 SQ.M 4960
OCCUPYING THE PROPOSED BUILDING.
0 9

H 9 - 2.451 x 1.80 = 4.411 SQ.M 1 - 4.960 x 10.460 = 51.88 SQ.M


30

24
D GROUND FLOOR COVERED AREA
51
1
0
68

8 10- 2.451 x 0.29 = 0.711 SQ.M 1730


2 - 1.730 x 1.960 = 3.39 SQ.M
00
0

GOVT. QUARTERS
= 220.72 - 15.94 = 204.78 SQ.M.
29

1960
S
18

96

9 2
N

10460
E

3 - 1.360 x 4.230 = 5.75 SQ.M


D
16

R
0

TOTAL = 11.022 SQ.M


G
A
3

M A R G
279

G
I

10
POND

H
505
3

TOTAL = 61.02 SQ.M


148

O
1
= 648.72 - 11.022 = 637.698 SQ.M
L

F
4

R
197 528

M U E L L E
31 2
(FREE FROM F.A.R)
7

1360
3
POND
9

GOVT. QUARTERS
11

= 637.698 - 100.40 = 537.298 SQM. GROUND FLOOR COVERED AREA (SANCTIONED) 4230

M A X
1 2

LOWER BASEMENT = 237.87 SQ.M


LEVEL-2 BASEMENT LVL-2 COVERED AREA (SANCTIONED)
U.G. FIRE PUMP ROOM
FORD FOUNDATION

= 723.07 SQ.M TOTAL GROUND FLOOR COVERED AREA BASEMENT FLOOR


KEY PLAN

= = 204.78 SQ.M.
UPPER BASEMENT COVERED AREA TOTAL GROUND FLOOR FAR AREA
505
1400 FOR FAR CALCULATION = = 204.78 SQ.M.
940

A - 9.765 x 4.60 = 44.92 SQ.M


1450

1565

9765 21615 4185 DRAWN CHKD APPD.


4600

2 34
6375
6225

A Owner
B E B - 21.615 x 6.225 = 134.55 SQ.M FIRST FLOOR FAR AREA
C - 16.269 + 5.867 X 22.950 = 254.01 SQ.M
INDIA INTERNATIONAL
22950

2 SAME AS GROUND FLOOR CENTRE


5867

40, Max Mueller Marg, Lodhi Estate,


D - 20.858 + 6.42 X 18.476 = 251.99 SQ.M FIRST FLOOR FAR AREA = 204.78 sq.m.
C 64 2 New Delhi
20
17744

E - 4.185 x 6.375 = 26.68 SQ.M


16269

FIRST FLOOR COVERED AREA (SANCTIONED) Owner's Signature

TOTAL = 712.15 SQ.M = 188.27 SQ.M

D 24
51
DEDUCTION
0
68

8 Architect
6
00
0

47
29

2 - 1.45 x 0.505 = 0.732 SQ.M


18

9
18

Anuj Srivastava
3 - 1.45 x 1.400 = 2.03 SQ.M Design Consultants
208 10
58 4 - 1.565 x 0.94 = 1.471 SQ.M L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
8 - 2.451 x 0.68 = 1.667 SQ.M
UPPER BASEMENT 9 - 2.451 x 1.80 = 4.411 SQ.M Architect's Signature N
LEVEL-1 10- 2.451 x 0.29 = 0.711 SQ.M

TOTAL = 11.022 SQ.M


FAR AREA = 712.15 - 11.022 = 701.128 SQ.M For Revised Sanction
Lotus Lounge Block & Kamladevi Block
Total Covered Area = 701.128 SQ.M : Area Charts
Scale: 1 : 200 @ A-0 REV.
DWG. No.
BASEMENT LVL-1 COVERED AREA (SANCTIONED) Date:
Drawn by: Christopher Paul 10
= 723.07 SQ.M
05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00


Road Level.

3. The Building is mechanically ventilated and artificially lighted as per


NBC.

4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016, as


applicable to this category of this plot size, as per clause no. 10.2 of
UBBL- 2016 shall be installed at the site.

5. All service equipment should be camouflaged appropriately (in terms of


the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment
and Approval) of DUAC.

6. The entire proposal shall be adhere to all the applicable statutory


provisions, and norms/regulations of the prevailing Lutyens Bungalow
Zone (LBZ) guidelines.

7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion


for Project Assessment and Approval) of DUAC shall be installed at site.
STRUCTURE STABILITY CERTIFICATE

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


APPROVAL SATISFY THE SAFETY REQUIREMENTS AS STIPULATED
UNDER THE BUILDING BYE-LAWS 2016, AND THE INFORMATION
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF OUR
KNOWLEDGE.

IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN INCLUDING


SAFETY FROM NATURAL HAZARDS BASED ON SOIL CONDITIONS
HAS BEEN DULLY INCORPORATED IN THE DESIGN OF THE
BUILDING AND THESE PROVISIONS SHALL BE ADHERED TO
DURING THE CONSTRUCTION.

WATER HARVESTING CERTIFICATE

CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR


APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
ETC.

CERTIFICATE

THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED ON


WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE THE
LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
BE BORNE BY THE OWNER OF THE PLOT.

DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE


OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
3660
LESS THAN 8FT. IN HEIGHT FROM THE GROUND LEVEL WHICH IS
TO BE PAINTED TO AVOID UNPLEASANT LOOK FROM THE ROAD
SIDE. IN ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
R PI
NKLE OM
PE
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE BUILDING
SPRI MP RO
100Ø0Ø 100Ø TO PU
UP
TO ENSURE THAT ANY FALLING MATERIAL REMAINS WITHIN THE
15

PIPE OM
PROTECTED AREA.
ANT MP RO 150Ø HYDRANT PIPE 100Ø SPRINKLER PIPE
HYDR TO PU
150Ø TO UP UNDER GROUNDS PIPE UNDER GROUNDS PIPE
TO PUMP ROOM TO PUMP ROOM
UP
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
14
CONSTRUCTION AT NIGHT AFTER 10 P.M.

LABOUR HUTMENT CERTIFICATE


-06
EFHB
THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED WITHIN
ST12 FIRE BRIGADE FOUR WAY
INLET CONNECTION
THE PREMISES ALONG WITH THE TOILET FACILITY AND LABOUR
HUTMENT SHALL BE REMOVED BEFORE OCCUPYING THE
ST14
100Ø
150Ø
PROPOSED BUILDING.

9.00
EFHB-07

Site Location Plan


NS L5 CK
DE
O
BL
AR CE
IG
N
ST11 RE
DH FE
150Ø

LO
100Ø
EFHB
-05
N
CO
EN
GARD
R- 7
E3
- L4 LODI

.00
M
= 820
' 4"
SIT
EN
250

R D
GA
POND
INDIA INTERNATION CENTRE
CK
POOL-2= 124.35 SQM. RO

G13 ST9 ST13


796.27 Sq.m.
EFHB
-04
R- 6 EFHB-09

FORD FOUNDATION

EXIST. BLOCK
G14

RG
500.95 Sq.m. GUARD
EXIST. BLOCK
ST10 ROOM
SITE4 -
GUEST ST8 WB FFHQ

MAX MUELLER MA
ROOMS

MAX MUELLER MARG


SECON
D FL.

EXIST. BLOCK
G12
223.377 Sq.m. PLAZA
IIC

EFHB
-03
L3
IICC CM WWF
150Ø
EXIST. BLOCK EXIST. BLOCK 100Ø
100Ø
150Ø
LODI ROAD

D WIDENING

148.00 M = 484'0"
LOCATION PLAN
R-8
ST7
ST6

AREA FOR ROA


G11
POND 790.68 Sq.m.
+ 00
-02
EFHB
POOL-3= 569.86 SQM.

GOVT. QUARTERS
EXIST. BLOCK ST5

EXIST. BLOCK
G5 EFHB-09

POOL-1= 190.0 SQM. G10


376.423 Sq.m.
100Ø
150Ø DINING
7000X13000
AREA
G15
37.92 Sq.m.
L2 DINING
AREA
553.239 Sq.m.

-01
EFHB DRAWN CHKD APPD.
FIRE BRIGADE FOUR WAY DINING
7000X13000
AREA
PLANTER

INLET CONNECTION EFHB-10 150Ø


PLANTER

ST15
PIPE 100Ø
ANT NT
HYDRSEME
150ØTO BA 7700
PIPE
UP
100Ø Owner
KLER G16
3204

150Ø
SPRIN MENT EFHB-10
100Ø BASE
UP TO
UP
2750 150.93 Sq.m.

INDIA INTERNATIONAL
61.54 Sq.m.
G6
G9 33926

CENTRE
318.464 Sq.m. 150Ø
263.295 Sq.m.
MUMTY

100Ø
R-2
G1
ST3 ST4 40, Max Mueller Marg, Lodhi Estate,
ST2

DELIVERY HEADER
1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK

SUCTION HEADER
SITE1 - EFHB-11 FIRE TANK /POND New Delhi
PROGRAMME CAP:1,00,000 lts.
BLOCK
32.00 M = 103' 0"

R-9
Owner's Signature

AMF ROOM ST1 L6 L1


R-3 DN

150Ø
EXIST. MUMTY
EXISTING STAFF FACILITY

9.5
6.STAFF 5.GAS BANK & GARBAGE
7.65

KITCHEN FIRE BRIGADE FOUR WAY EFHB-14 EFHB-13 EFHB-12


GUARD
HOUSE
Architect
INLET CONNECTION EFHB-12 150Ø 150Ø 150Ø 150Ø

PROPOSED TOILET UNDER SWACHH


GUARD ROOM BHARAT ABHIYAN SCHEME
Anuj Srivastava
Design Consultants
G7
1484.195 Sq.m.
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
212.00 M / 695' 2" email : [email protected]

Architect's Signature N

FORD FOUNDATION

For Revised Sanction

Stair & Lifts


Scale: 1 : 200 @ A-0 REV.
DWG. No.
Date:
Drawn by: Christopher Paul 11

05 - 08 -2025
GENERAL NOTES:

TREE LEGEND
1. All dimensions are in mm unless mentioned otherwise.

LANDSCAPED CALCULATIONS 2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00


Road Level.

1. BOTTEL BLSH NET AREA OF THE PLOT = 18,986.65 SQ.M.


3. The Building is mechanically ventilated and artificially lighted as per
NBC.

4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016, as

2. FISH TAIL PALM TOTAL GROUND FLOOR applicable to this category of this plot size, as per clause no. 10.2 of
UBBL- 2016 shall be installed at the site.

COVERED AREA= 4188.106 SQ.M 5. All service equipment should be camouflaged appropriately (in terms of

3. ALSTONIA
the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment

MIMOSA
and Approval) of DUAC.

AREA REQUIRED FOR LANDSCAPING 6. The entire proposal shall be adhere to all the applicable statutory

4. MIMOSA = 50% OF OPEN AREA


provisions, and norms/regulations of the prevailing Lutyens Bungalow
Zone (LBZ) guidelines.

= 14798.544 X 50/ 100 = 7399.272 SQM. 7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion

5. SITA ASHOKA
for Project Assessment and Approval) of DUAC shall be installed at site.
OPEN AREA = PLOT AREA - STRUCTURE STABILITY CERTIFICATE

(COVD. AREA AT GR. FL. + CAR PARKING AREA) CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR

6. JAMUN TREE = 18,986.65 - (4188.106 + 5168.137)


APPROVAL SATISFY THE SAFETY REQUIREMENTS AS STIPULATED
UNDER THE BUILDING BYE-LAWS 2016, AND THE INFORMATION
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF OUR

= 18,986.65 - 9356.197 = 9630.453 SQM. KNOWLEDGE.

7. KACHNAK AREA LEFT FOR LANDSCAPING =


3660 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN INCLUDING
SAFETY FROM NATURAL HAZARDS BASED ON SOIL CONDITIONS
HAS BEEN DULLY INCORPORATED IN THE DESIGN OF THE

8. ROYAL PALM 7645.998 SQM.


BUILDING AND THESE PROVISIONS SHALL BE ADHERED TO

GOVT. QUARTERS
PE
R PI
NKLE OM DURING THE CONSTRUCTION.
SPRI MP RO
100Ø 100Ø TO PU
150Ø UP

PIPE OM WATER HARVESTING CERTIFICATE

9. MAXICAN SILK
ANT MP RO 150Ø HYDRANT PIPE 100Ø SPRINKLER PIPE
HYDR PU
150ØTO UP TO UNDER GROUNDS PIPE UNDER GROUNDS PIPE

ALSTONIA
TO PUMP ROOM TO PUMP ROOM
UP
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
14 APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER

10. KADAM
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
-06 RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
FISH TAIL
EFHB
ETC.

6 NOS SITA
11. GOOLER PALM 100Ø
150Ø
FIRE BRIGADE FOUR WAY
INLET CONNECTION

ASHOKA TREE
CERTIFICATE

THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED ON

9.0
0
12. ROSE WOOD
WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE THE
EFHB-07
LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
S CK
BE BORNE BY THE OWNER OF THE PLOT.
EN LO
RD B DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE

13. NEEM D HI
G A
FER
EN
CE
150Ø
OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
LESS THAN 8FT. IN HEIGHT FROM THE GROUND LEVEL WHICH IS

LO
5 100Ø
N
-0
EFHB
O TO BE PAINTED TO AVOID UNPLEASANT LOOK FROM THE ROAD

14. YELLOW FLAME -C


R- 7 SIDE. IN ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
E3 MATERIAL SHALL BE HOISTED AT THE FACADES OF THE BUILDING
250
.00
M
= 820
' 4"

N
SIT JAMUN TO ENSURE THAT ANY FALLING MATERIAL REMAINS WITHIN THE
PROTECTED AREA.

15. RED WOOD FLAME


DE
POND
POOL-2= 124.35 SQM. RO
CK
G AR
TREE NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
CONSTRUCTION AT NIGHT AFTER 10 P.M.

16. CASSIA NODOSA


LABOUR HUTMENT CERTIFICATE
G13
796.27 Sq.m. THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED WITHIN
EFHB
-04
R- 6 EFHB-09 THE PREMISES ALONG WITH THE TOILET FACILITY AND LABOUR

17. SILVER OAK


HUTMENT SHALL BE REMOVED BEFORE OCCUPYING THE
PROPOSED BUILDING.

EXIST. BLOCK Site Location Plan

18. BARGAD
G14

RG
500.95 Sq.m.
BOTTLE
GUARD
EXIST. BLOCK ROOM
SITE4 -
GUEST

MAX MUELLER MA
BRUSH
EN
GARD
SECON ROOMS LODI

D FL.
G12
223.377 Sq.m.
5 NOS
INDIA INTERNATION CENTRE

-03 KACHNAR

EXIST. BLOCK
EFHB

100Ø
EXIST. BLOCK EXIST. BLOCK
150Ø
100Ø TREE
150Ø

D WIDENING
FORD FOUNDATION

148.00 M = 484'0"
R-8
3 NOS ROYAL FFHQ

AREA FOR ROA


WB

PALM

MAX MUELLER MARG


POND
2 + 00
HB-0 PLAZA
EF
POOL-3= 569.86 SQM.

GOVT. QUARTERS
IIC

EXIST. BLOCK
MEXICAN G11
5 NOS SITA

EXIST. BLOCK
790.68 Sq.m.
IICC CM WWF

G5
POOL-1= 190.0 SQM. G10
SILK EFHB-09
ASHOKA TREE LODI ROAD

376.423 Sq.m.
G15 553.239 Sq.m.
100Ø
DINING LOCATION PLAN
2385

1925

LIFT

150Ø DINING AREA 1666

7000X13000
37.92 Sq.m. 2126
AREA
-01
EFHB
FIRE BRIGADE FOUR WAY DINING AREA
7000X13000
PLANTER

INLET CONNECTION EFHB-10 150Ø


PLANTER
PIPE 100Ø
ANT T
HYDRSEMEN
150Ø TO BA
UP
PE FIRE EXIT STAIR
R PI 100Ø
NKLE
SPRI MENT
G16 CASE 150Ø EFHB-10
100ØTO BASE UP
2750 150.93 Sq.m.
UP 61.54 Sq.m.
G6
G9 33926

318.464 Sq.m. 150Ø


100Ø 263.295 Sq.m.
MUMTY

R-2
G1 DRAWN CHKD APPD.

DELIVERY HEADER
1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK Owner

SUCTION HEADER
SITE1 - EFHB-11 FIRE TANK /POND
PROGRAMME CAP:1,00,000 lts.
BLOCK INDIA INTERNATIONAL
32.00 M = 103' 0"

R-9 CENTRE
MEXICAN 40, Max Mueller Marg, Lodhi Estate,
AMF ROOM
New Delhi
R-3
150Ø
DN

SILK
EXIST. MUMTY
EXISTING STAFF FACILITY Owner's Signature

9.5
6.STAFF
7.65

GUARD
KITCHEN FIRE BRIGADE FOUR WAY
INLET CONNECTION EFHB-12 150Ø
EFHB-14 150Ø EFHB-13 150Ø EFHB-12
150Ø HOUSE

BARGAD
GUARD ROOM TOILET UNDER SWACHH
BHARAT ABHIYAN SCHEME
5180 X 3880 G7
KADAM
ALSTONIA 1484.195 Sq.m.

GOOLER Architect

Anuj Srivastava
212.00 M / 695' 2"

Design Consultants
3 NOS ALSTONIA
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227

SILVER OAK RED WOOD email : [email protected]

CASSIA FLAME Architect's Signature N

NODASA
4 NOS FICUS YELLOW
LYRATA FLAME
For Revised Sanction

TREES & Landscape Layout


Scale: 1 : 200 @ A-0 REV.
DWG. No.
Date:
Drawn by: Christopher Paul 12
NEEM ROSE
WOOD 05-08-2025
GENERAL NOTES:

1. All dimensions are in mm unless mentioned otherwise.

2. All Levels from the Ãââ‚Ãâ€Ã‚± 0.00 Road Level.

3. The Building is mechanically ventilated and artificially lighted as per

SOLAR PANEL ETP


NBC.

4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016, as


SOLAR OHT 15 KLP applicable to this category of this plot size, as per clause no. 10.2 of
UBBL- 2016 shall be installed at the site.

OHT PANEL UNDERGROUND 5KL 5. All service equipment should be camouflaged appropriately (in terms of
the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment
24.2 KVA WATER TANK and Approval) of DUAC.

HVAC 75000X2=150000 6. The entire proposal shall be adhere to all the applicable statutory
provisions, and norms/regulations of the prevailing Lutyens Bungalow
Zone (LBZ) guidelines.

U.G.T. RAINWATER
7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion
for Project Assessment and Approval) of DUAC shall be installed at site.

SOLID WASTE HARVESTING STRUCTURE STABILITY CERTIFICATE

MANAGEMENT
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
10 ft DEEP APPROVAL SATISFY THE SAFETY REQUIREMENTS AS STIPULATED
UNDER THE BUILDING BYE-LAWS 2016, AND THE INFORMATION
10ft Dia GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF OUR
KNOWLEDGE.

150 ft BORE 6"


3660

IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN INCLUDING


SAFETY FROM NATURAL HAZARDS BASED ON SOIL CONDITIONS

GOVT. QUARTERS
R PI
NKLE OM
PE
HAS BEEN DULLY INCORPORATED IN THE DESIGN OF THE
SPRI MP RO BUILDING AND THESE PROVISIONS SHALL BE ADHERED TO
100Ø0Ø 100Ø TO PU
15 UP
DURING THE CONSTRUCTION.
PIPE OM
ANT MP RO 150Ø HYDRANT PIPE 100Ø SPRINKLER PIPE
HYDR PU
150ØTO UP TO
UP
UNDER GROUNDS PIPE
TO PUMP ROOM
UNDER GROUNDS PIPE
TO PUMP ROOM WATER HARVESTING CERTIFICATE

OHT 20 KL 14
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
-06
EFHB TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
ETC.
OHT 100Ø0Ø
15
FIRE BRIGADE FOUR WAY
INLET CONNECTION
CERTIFICATE

9.0
5KL

0
+ 13.463 EFHB-07 THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED ON
WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE THE
S K
EN
LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
OC
RD
L BE BORNE BY THE OWNER OF THE PLOT.
EB
I GA EN
C DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE

DH ER
150Ø OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
NF
LO
5 100Ø
HB-0 THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
O
EF

R- 7 C LESS THAN 8FT. IN HEIGHT FROM THE GROUND LEVEL WHICH IS


E3- TO BE PAINTED TO AVOID UNPLEASANT LOOK FROM THE ROAD

.00
M
= 820
' 4"
SIT SIDE. IN ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE BUILDING
EN
250

D TO ENSURE THAT ANY FALLING MATERIAL REMAINS WITHIN THE


GAR PROTECTED AREA.
POND CK
POOL-2= 124.35 SQM. RO
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
CONSTRUCTION AT NIGHT AFTER 10 P.M.
G13
796.27 Sq.m. LABOUR HUTMENT CERTIFICATE
EFHB
-04
R- 6 EFHB-09
THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED WITHIN
THE PREMISES ALONG WITH THE TOILET FACILITY AND LABOUR
HUTMENT SHALL BE REMOVED BEFORE OCCUPYING THE
+ 6.90 EXIST. BLOCK PROPOSED BUILDING.
G14
+ 6.90 Site Location Plan

RG
500.95 Sq.m. GUARD
EXIST. BLOCK ROOM
SITE4 -
GUEST

MAX MUELLER MA
SECON ROOMS
D FL. LODI
GARD
EN
G12
223.377 Sq.m.

U.G.T. -03

EXIST. BLOCK
EFHB INDIA INTERNATION CENTRE

100000 100Ø
EXIST. BLOCK EXIST. BLOCK
150Ø
100Ø

150Ø

+ 6.90

AD WIDENING

148.00 M = 484'0"
HVAC R-8 + 10.225 FORD FOUNDATION

AREA FOR RO
G11 FFHQ
POND
WB

GOVT. QUARTERS

MAX MUELLER MARG


+ 00
790.68 Sq.m.
-02
EFHB
POOL-3= 569.86 SQM.
EXIST. BLOCK
MEXICAN IIC
PLAZA

EXIST. BLOCK
+ 10.225 SILK
+ 10.225 G5 IICC
EFHB-09 CM WWF
POOL-1= 190.0 SQM. G10
376.423 Sq.m.
G15 553.239 Sq.m. LODI ROAD
100Ø
DINING
2385

1925

LIFT

COOLING
150Ø 1666

37.92 Sq.m. 2126


AREA
-01
LOCATION PLAN

TOWER
EFHB
FIRE BRIGADE FOUR WAY DINING
AREA
PLANTER

INLET CONNECTION EFHB-10 150Ø


PLANTER
PIPE 100Ø

3x200
ANT T

COMPOST
HYDRSEMEN
150Ø TO BA
UP
PE FIRE EXIT STAIR
R PI 100Ø
G16
TR
NKLE CASE 150Ø
SPRI MENT EFHB-10
100ØTO BASE 150.93 Sq.m.
PIT
UP

61.54 Sq.m.
150 KG
UP

G6
G9 33926

318.464 Sq.m.
ORGANIC WATER
150Ø
263.295 Sq.m.
MUMTY

100Ø
R-2
G1
COMPOST

DELIVERY HEADER
1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK

SUCTION HEADER
DRAWN CHKD APPD.
SITE1 - EFHB-11 FIRE TANK /POND
PROGRAMME CAP:1,00,000 lts. Owner
BLOCK
+ 10.225 + 9.013
32.00 M = 103' 0"

R-9 100000 INDIA INTERNATIONAL


WATER FIRE CENTRE
AMF ROOM
TANK 40, Max Mueller Marg, Lodhi Estate,
New Delhi
DN

150Ø
EXIST. MUMTY
EXISTING STAFF FACILITY

9.5
6.STAFF 5.GAS BANK & GARBAGE Owner's Signature
7.65

KITCHEN FIRE BRIGADE FOUR WAY EFHB-14 EFHB-13 EFHB-12


GUARD
INLET CONNECTION EFHB-12 150Ø 150Ø 150Ø 150Ø HOUSE

AC GUARD ROOM
PROPOSED TOILET UNDER SWACHH
BHARAT ABHIYAN SCHEME

PLANT G7
1484.195 Sq.m.

2x150 TR
2x300 TR 212.00 M / 695' 2"
Architect

Anuj Srivastava
750 KVA Design Consultants
DC BIOGAS DG SET FIRE PUMP
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227

SET PLANT OHT SOLID WASTE ROOM


email : [email protected]

500 EV CHARGING Architect's Signature


500 MANAGEMENT N

KVA KPD 7.2 KVA


I.G.L. SOLAR
GAS PANEL
BANK 46.4 KVA STP For Revised Sanction
(PNG) 100 KLD
FORD FOUNDATION ( Across the Road) ENVIRONMENTAL FEATURES
Scale: 1 : 200 @ A-0 REV.
DWG. No.
Date:
Drawn by: Christopher Paul 13