PARKING CALCULATIONS LANDSCAPED CALCULATIONS Revisions in Sanction 1. All dimensions are in mm unless mentioned otherwise.
REQUIRED PARKING SPACE = 2 ECS NET AREA OF THE PLOT = 18,986.65 SQ.M. 2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00
Road Level.
FOR EVERY 100.0 SQ.M. FAR AREA TOTAL GROUND FLOOR Revision No Item Length( m) Breadth(m) Total Area( Sq.m.) 3. The Building is mechanically ventilated and artificially lighted as per
TOTAL FAR AREA = 10,931.919 SQ.M. COVERED AREA= 4188.106 SQ.M NBC.
= 10,931.919 SQ.M.X(2/100 ) = 218.6CARS AREA REQUIRED FOR LANDSCAPING 6 Fellow flats -A 8.00 3.00 24.00
4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016, as
applicable to this category of this plot size, as per clause no. 10.2 of
SAY = 219 CARS = 50% OF OPEN AREA UBBL- 2016 shall be installed at the site.
= 14798.544 X 50/ 100 = 7399.272 SQM. 7 KD Block -Kitchen Extn. 4.02 3.50 14.07 5. All service equipment should be camouflaged appropriately (in terms of
TOTAL SPACE REQUIRED FOR PARKING OPEN AREA = PLOT AREA - 8 Lounge Pantry 5.10 3.14 16.02 the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment
= 219 X 23.00 SQ.M. = 5037 SQ.M. (COVD. AREA AT GR. FL. + CAR PARKING AREA)
and Approval) of DUAC.
= 18,986.65 - (4188.106 + 5168.137) 9 Lift near Library block 2.1 2.4 5.04 6. The entire proposal shall be adhere to all the applicable statutory
PROPOSED CAR PARKING SPACE = 5168.137 sq.m. provisions, and norms/regulations of the prevailing Lutyens Bungalow
= 18,986.65 - 9356.197 = 9630.453 SQM. Zone (LBZ) guidelines.
TOTAL PROPOSED CAR PARKING = (5168.137 / 23) AREA LEFT FOR LANDSCAPING = (Note* : Point Nos. 3, 4, 5 & 9. To be excused as per UBBL 2016) 7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion
7645.998 SQM. for Project Assessment and Approval) of DUAC shall be installed at site.
STRUCTURE STABILITY CERTIFICATE
900
HAS BEEN DULLY INCORPORATED IN THE DESIGN OF THE
2860
Section
BUILDING AND THESE PROVISIONS SHALL BE ADHERED TO
2164 2400
DURING THE CONSTRUCTION.
Elevation Feature Steel Truss Roofing
WATER HARVESTING CERTIFICATE
2400
2860
2624
2164
False
3930
Door Lift
Corridor
3104
Plan
3030
1100
Lift
UP lights APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
LOUNGE PANTRY WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
Total Ground Coverage = 22.058% LOUNGE PANTRY 1100
TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
Door Corridor
ETC.
CERTIFICATE
1500
1500
parapet wall
1000
Terrace LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
TOTAL SECOND FLOOR COVERED AREA = 2327.075 SQ.M
Terrace Level
+13.2 m BE BORNE BY THE OWNER OF THE PLOT.
TOTAL BASEMENT FOR FAR CALCULATION = 1,136.438 SQ.M Section DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE
OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
TOTAL = 10,931.919 SQ.M
1100
4500
4500
TO BE PAINTED TO AVOID UNPLEASANT LOOK FROM THE ROAD
= 57.577% SIDE. IN ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
2200
2100
1000 mm high
parapet wall
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE BUILDING
TO ENSURE THAT ANY FALLING MATERIAL REMAINS WITHIN THE
1000
corridor
PROTECTED AREA.
TOTAL F.A.R. (SANCTIONED)
S. Floor Level
+9.2m
724
724
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
TOTAL GROUND FLOOR COVERED AREA = 4,609.60 SQ.M CONSTRUCTION AT NIGHT AFTER 10 P.M.
15200
15200
TOTAL FIRST FLOOR COVERED AREA = 3,461.60 SQ.M LABOUR HUTMENT CERTIFICATE
TOTAL SECOND FLOOR COVERED AREA = 2,234.49 SQ.M 1100
TOTAL AREA FOR PARKING = 5168.137 SQ.M THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED WITHIN
4400
4400
TOTAL BASEMENT FOR FAR CALCULATION
= 1,568.47 SQ.M THE PREMISES ALONG WITH THE TOILET FACILITY AND LABOUR
Lift well
TOTAL ECS = 225 CARS HUTMENT SHALL BE REMOVED BEFORE OCCUPYING THE
2200
2100
1000 mm high
PROPOSED BUILDING.
TOTAL = 11,874.16 SQ.M = 1,27,765.96 SQ.FT
parapet wall
1000
BASEMENT AREA FOR FAR CALCULATION (SANCTIONED)
corridor
F.Floor Level
+4.0 m
Site Location Plan
= 64.39 % = EXTENSION OF PROGRAMME BLOCK + CONFERENCE BLOCK
1100
3350
3350
STP
= 955.94 SQ.M
2200
2100
8.2
1000 mm high
EN
GARD
0
parapet wall
1000
corridor LODI
Stilt Level
+0.65m
PROPOSED TOILET UNDER SWACHH
650
650
650
Ground Level
+/-0.00
BHARAT ABHIYAN SCHEME 5330 X 4130 = 22.012 SQM Lift
1000
Pit
3.66 INDIA INTERNATION CENTRE
.3 8 C.B
450
65 Ø
200
ELECTRICAL PANEL ROOM
GOVT. QUARTERS
INLET C.B
C.C.
C.B
200ØR.
UNDER UBBL 2016 NON F.A.R
30.90
11
Ø
FIN. GROUND LVL. FIN. GROUND LVL. 150 AREA = 997 SQM.
C.B F
INLET C.B 4020
9.0
C.B FFHQ
0
WB
3500
FE Section
GRAVELS 5 TO 10MM LO 40
R- 7
3 -C
ON
PLAN
ITE
20
00
IICC CM
S
35 WWF
' 4"
BOULDERS 5-20MM
= 820
M
.00
EN
250
12
POND RD
GA 683.00
SLOPE 1:10
CK LODI ROAD
16298
300 DIA BORE FILLER WITH RO 2000 M H/L
POOL-2= 124.35 SQM.
GRAVELS 3-6MM G13
C.B. C.B. 150Ø
100MM DIA M.S. PIPE 796.27 Sq.m. 9300
LOCATION PLAN
Elevation
RAMP UP
3800
SLOTTED PIPE 3MM SLOT SIZE R- 6 11605
230mm High Peripheral Wall
E
PIP
OW EXIST. BLOCK FIRST FLR.
FL
G14
OV
ER
2000
LVL +3850 MM
G
500.95 Sq.m. 12677
EXIST. BLOCK GUARD 6.0 SQM
19306
685.88 9665 5983
CB CHAMBER
FL. G12
Kitchen
223.377 Sq.m.
15947
150Ø 14
12150
EXIST. BLOCK
148.00 M = 484'0"
76
INDIA INTERNATIONAL
02
51
GROUND LVL ±00
31
ELEVATION SECTION
40
150
R-8 150Ø
Ø
CB
WIDENING
CENTRE
PROPOSED SEWER
08
46 CB
9.0
150Ø
POND
CB 10 790.68 Sq.m.
40, Max Mueller Marg, Lodhi Estate,
AREA FOR ROAD
+ 00
GOVT. QUARTERS
EXIST. BLOCK New Delhi
Elevation & Section
90
EXIST. BLOCK
150Ø
R691
00
53
21429
20
G5
EXIST. BLOCK
LIFT
50,000 LTR
MH
2126
Elevation Section
17100
PLANTER
PLANTER 6750
34938
PROPOSED FIRE EXIT 7600
STAIR CASE :
MH
HARVESTING WELL 61.54 Sq.m. R- 5 4000 19
4500
4529
MH M H G16 MH
UP
318.464 Sq.m.
11900
262.022 Sq.m.
MUMTY
3800
G1
ROOM
18.20
BLOCK
R-9
PLAN
GATE
5017
Design Consultants
2624
LIFT
29.50 MH
MH MH
2851 Setback line at 12m from boundary 26713
R-3
4200
9300
40.14 EXISTING SEWER
12002
BOARD
230mm High Peripheral Wall
6972
DN
14285
17
19169 MH 7 16 6
3.89
4444
11382
6.STAFF 3500 18
7598
5260
9.0
4800
34243
GUARD 6"Ø S.W.P
3460
HOUSE
3880
4353
2500
27553
9.5
9.5
9500
9.5
9500
9.5
9500
9556
9.5
G7
1 2 3 4 5 1678.751 Sq.m.
46542 19959
46101 14792
34
Shaft, lifts & cut outs
79
86
Road Level.
Des. No. Length Breadth Nos Formula Area Des. No. Length Breadth Nos Formula Area
1 70.623 11.270 1.000 Rectangle 795.921 i 0.950 1.080 1.000 Rectangle 1.026 3. The Building is mechanically ventilated and artificially lighted as per
R-7 2 3.709 3.140 0.500 Semi-circle 21.598 ii 2.610 1.032 1.000 Rectangle 2.694 NBC.
77
3 5.547 19.215 0.500 Triangle 53.293 iii 0.938 1.226 1.000 Rectangle 1.150
4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016,
59
9
815 4 10.120 19.215 1.000 Rectangle 194.456 iv 1.557 1.808 1.000 Rectangle 2.815
as applicable to this category of this plot size, as per clause no. 10.2 of
5 8.857 19.215 2.990 Trapezium 41.968 v 1.227 0.920 3.000 Rectangle 3.387
UBBL- 2016 shall be installed at the site.
6 6.315 1.227 1.000 Rectangle 7.749 vi 2.147 2.147 1.000 Rectangle 4.610
1 49
57
7 3.430 1.227 1.000 Rectangle 4.209 vii 2.147 0.383 1.000 Rectangle 0.822 5. All service equipment should be camouflaged appropriately (in
8 16.530 8.390 1.000 Rectangle 138.687 viii 1.124 0.728 5.000 Rectangle 4.091 terms of the point nos. 10, 11 & 12 of the CPAA (Criterion for Project
48
46
1894
34
75
9 2.908 2.363 1.000 Rectangle 6.872 ix 1.124 0.935 5.000 Rectangle 5.255 Assessment and Approval) of DUAC.
10 4.186 14.981 0.500 Triangle 31.355 x 1.656 3.749 0.500 Triangle 3.104
2524
11 8.713 14.981 1.000 Rectangle 130.529 xi 1.669 3.718 0.500 Triangle 3.103 6. The entire proposal shall be adhere to all the applicable statutory
1317
9300
12 12.472 8.390 0.500 Triangle 52.320 xii 1.650 3.739 0.500 Triangle 3.085 provisions, and norms/regulations of the prevailing Lutyens Bungalow
18
3564 0.500 Triangle Triangle Zone (LBZ) guidelines.
96
13 4.482 7.075 15.855 xiii 1.894 1.317 0.500 1.247
914
3739
BEDROOM
14 4.896 4.482 6.463 Trapezium 30.305 xiv 0.914 0.914 2.000 Rectangle 1.671
1650 3.7 x 6.8
R6 7. Sustainability features shall be as per point no. 7 of the CPAA
3800
7203
15 79.376 69.153 30.200 Sector 399.967 xv 0.341 0.497 0.500 Triangle 0.085
2401
(Criterion for Project Assessment and Approval) of DUAC shall be
TOILET
1.5 x2.1
16 1.413 5.140 0.500 Triangle 3.631 xvi 2.165 2.400 1.000 Rectangle 5.196
914 installed at site.
0.500 Triangle
13020
1669
17 5.714 5.245 14.985 Sub - Total 43.339 STRUCTURE STABILITY CERTIFICATE
3718
4572 18 2.173 6.400 0.500 Triangle 6.954
19 3.527 6.064 1.000 Rectangle 21.388 SERVICES & Non FAR CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
914 Des. No. Length Breadth Nos Formula Area APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
7164
20 83.873 67.927 27.660 Sector 583.987
1.000 Rectangle Rectangle STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND THE
5217
B
21 3.016 12.802 38.611 A 5.499 5.651 1.000 31.075
3749
914
341
1656 22 3.886 2.732 1.000 Rectangle 10.617 B 1.281 4.670 1.000 Rectangle 5.982 INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT TO
23 2.732 8.521 0.500 Triangle 11.640 C 0.579 4.520 1.000 Rectangle 2.617 THE BEST OF OUR KNOWLEDGE.
3527 27.71° 24 7.611 8.809 0.500 Triangle 33.523
BALCONY 8 16694 9369 8364 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
497
3 25 2.524 4.572 7.203 Trapezium 25.556
13 INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON SOIL
09 26 8.364 5.217 1.000 Rectangle 43.635
BALCONY
88
CONDITIONS HAS BEEN DULLY INCORPORATED IN THE DESIGN
43
BED ROOM 27 9.369 7.164 1.000 Rectangle 67.120 Sub - Total 39.674 OF THE BUILDING AND THESE PROVISIONS SHALL BE ADHERED
64
SNACK BAR BED ROOM
6064
2
76
28 2.401 3.564 1.000 Rectangle 8.557 TO DURING THE CONSTRUCTION.
55
3
21
11
75
4
1.000 Rectangle
85
29 16.694 13.020 217.356
5
BALCONY 27 0.500 Triangle WATER HARVESTING CERTIFICATE
SHAFT 6 32 30 4.634 8.159 18.904
SHAFT
31 7.759 8.159 1.000 Rectangle 63.306
7
32 7.914 3.486 1.000 Rectangle 27.588 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
1124 SHAFT 112
4 APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS
GUES
8
2147 BALCONY 33 9.490 3.068 1.000 Rectangle 29.115
728
T RO AS WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE
935
SHAFT
OM
86
STORE 34 18.945 3.858 1.000 Rectangle 73.090
SHAFT
S 9
WATER AND THE INFORMATION GIVEN THEREIN IS FACTUALLY
38
RECEPTION SHAFT
383
35 2.860 2.625 1.000 Rectangle 7.508
A.C.DUCT
SHAFT CORRECT TO THE BEST OF OUR KNOWLEDGE AND
16
WAITING
10
AREA
R-6 9.3 3.8 1 Rectangle 35.340
UNDERSTANDING. THE RECYCLE WATER SHALL BE USED FOR
2147
BED ROOM BED ROOM
89
LIFT
(Taken in #32 above) Rectangle
20 19 SHAFT R-7 HORTICULTURE PURPOSE ETC.
BUILDING ABOVE
18 SHAFT
SHAFT
17 R-8 5.102 3.14 1 Rectangle 16.020
5140 16
DN
CERTIFICATE
FLOWER BED
1413
b 6.069 1.227 1.000 7.447
45
SHAFT 14 SHAFT
96
2
UP
80
13
65
ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE
B
12
02 7
A Sub - Total 3317.927
6400
31
27.73°
51 122 THE LOCAL BODY SHALL REMOVE THE MULBA AND THE COST
UP
12
920
40
Deductions
R-8 SHALL BE BORNE BY THE OWNER OF THE PLOT.
57
11 PANTRY C Shafts, Lifts & Cut-outs 43.339
41
8587 SHAFT D NON FAR : Services, corridors etc 39.674
30 F
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF
2173 16 Total
THE OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE
64
Ground
64
Cover F= A-C 3274.588 OFF THE MAIN ROADS BY MEANS OF ERECTING A SCREEN
G Total FAR WALL NOT LESS THAN 8FT. IN HEIGHT FROM THE GROUND
on GF G= F-D 3234.914 LEVEL WHICH IS TO BE PAINTED TO AVOID UNPLEASANT LOOK
UP
To be Constructed
7
8713
LOUNGE
34
1557 79 THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
86
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY AND
BUILDING ABOVE
1808
77
59
00 59
35 81
4 2363
16530
31
KEY PLAN
2
46
8390 10120 1894
34
LIBRARY
30
UP
8 1
GOVT. QUARTERS
S
21980 6315 6069 2524 N
E
1317
D
R
1227
13 22 A
3
xiii G
M A R G
9300
1227
1227
1227
1032
938
I
TROLLY
3564 H
POND
25
914
3739
O
1650 L
4596
2610 xii
3800
R6 4
7203
R
2401
1226
28
DOWN TO BASEMENT TOILET
TOILET
M U E L L E
UP
RISER=160
914
13020
COLLECTION TREAD=280
POND
29
UP
INDIA AND HIMALAYAN
1669
GOVT. QUARTERS
3718
2660 950 3025 4572
6370 PROGRAM BUILDING xi
LEV=-810
STORE
LEV=-810 LIBRARY
1080
11270
11270
19215
AUDITORIUM 5547
M A X
914 1 2
27
7164
26
5217
3749
xiv
914
HI=3110
TECHNICAL ROOM
5881
5731
x
HI=3110
2990 1656
ELECTRICAL ROOM
341
16694
xv
LEV=-650
3527
FHI=2330
FHI=2400 SERVER ROOM
FHI=2400 DEEP FREEZZER
FORD FOUNDATION
9369 8364
497
R3
70
24 09
9 88
2624
2164
LIFT 27.66°
19
6064
76
2400
23
21
viii
11
85
2860
A 27
3 2
DN
112
4 22
5° 2147
728
70623 27.6
935
6
vii F
8
38
383
ix
5213
1124
2147
vi 20
3 15 4944
1412
21
DRAWN CHKD APPD.
16
52
65 Owner
2
80
02 17
12
7
6478
51 122
INDIA INTERNATIONAL
31
R-8
56
40
18
920
98
CENTRE
SCALE 1:200
8587
v 30
96 16
48
64
2173
40, Max Mueller Marg, Lodhi Estate,
63
14
New Delhi
12472
4186 8 2
44
Owner's Signature
14981
10 11 13
12
70
75
1557
SCALE 1:200
6331
2908
1808
iv
9
2363 Architect
16530
8
Anuj Srivastava
8390 10120
Design Consultants
21980 6069 L-321, Delta-2, Greater Noida 201310
6315
3430
PHONE : +91-8826272227
1227
1227
938
7
Architect's Signature
1227
2610
1032
1226 N
C
579
4520
5547
1281
950
12497
B
1080
5 4 3
11270
11270
19215
8857
4670 1
i
5651
2990
A
5499
For Revised Sanction
2
Ground Floor Plan: Main Block
70623
R3
70
9
xvi
2624
2164
3858
18945
05-08-2025
GENERAL NOTES:
34
8
2. All Levels from the ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00
6
Envelope Area Services & Corridors : No GC & Non FAR
Road Level.
-59
NO
OM
RO
Des. No. Length Breadth Nos Formula Area Des. No. Length Breadth Nos Formula Area 3. The Building is mechanically ventilated and artificially lighted as per
T
AF
SH
NBC.
-59
Rectangle Rectangle
77
1 45.600 12.497 1.000 569.863 A 5.468 2.725 1.000 14.900
NO
OM
CB
RO
59
59 2 25.022 3.140 1.000 Rectangle 78.569 B 3.560 4.241 1.000 Rectangle 15.098
81 4. The Provisions of Green Buildings as per chapter 10 of UBBL 2016,
B
E.D
3 0.339 3.240 1.000 Rectangle 1.098 as applicable to this category of this plot size, as per clause no. 10.2 of
-60
NO
4 4.720 0.681 1.000 Rectangle 3.214 UBBL- 2016 shall be installed at the site.
OM
RO
7 Rectangle
4 95 8 15.304 8.390 1.000 128.401
5. All service equipment should be camouflaged appropriately (in
48
46
1894 9 2.908 2.363 1.000 Rectangle 6.872
75
34
terms of the point nos. 10, 11 & 12 of the CPAA (Criterion for Project
10 4.186 14.981 0.500 Triangle 31.355 Sub - Total 29.998 Assessment and Approval) of DUAC.
2524
11 8.713 14.981 1.000 Rectangle 130.529
1317
12 12.643 8.390 0.500 Triangle 53.037 6. The entire proposal shall be adhere to all the applicable statutory
18
provisions, and norms/regulations of the prevailing Lutyens Bungalow
96
13 4.482 7.075 0.500 Triangle 15.855 Zone (LBZ) guidelines.
3739
914
1650 Trapezium DEDUCTION : Shaft, lifts & cut outs
14 4.896 4.573 6.488 30.717
7203
15 79.376 69.153 30.180 Sector 399.702 Des. No. Length Breadth Nos Formula Area 7. Sustainability features shall be as per point no. 7 of the CPAA
914 (Criterion for Project Assessment and Approval) of DUAC shall be
Triangle Rectangle
13020
16 1.413 5.140 0.500 3.631 i 0.950 1.080 1.000 1.026 installed at site.
1669
3718
4572
17 5.714 5.245 0.500 Triangle 14.985 iii 0.733 1.063 1.000 Rectangle 0.779 STRUCTURE STABILITY CERTIFICATE
18 2.173 6.400 0.500 Triangle 6.954 iv 1.557 1.808 1.000 Rectangle 2.815
914
Rectangle CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
20 83.873 67.927 27.660 Sector 583.987 v 1.227 0.920 3.000 3.387
6090
APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
5217
3749
914
1656 21 3.016 12.802 1.000 Rectangle 38.611 vi 2.147 2.147 1.000 Rectangle 4.610 STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND THE
341
16694 22 3.886 2.732 1.000 Rectangle 10.617 vii 2.147 0.383 1.000 Rectangle 0.822 INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT TO
27.66° 23 2.732 8.521 0.500 Triangle 11.640 viii 1.124 0.728 5.000 Rectangle 4.091 THE BEST OF OUR KNOWLEDGE.
BALCONY 9369 8364
497
24 7.611 8.809 0.500 Triangle 33.523 ix 1.124 0.935 5.000 Rectangle 5.255 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
09 25 2.524 4.572 7.203 Trapezium 25.556 x 1.656 3.749 0.500 Triangle 3.104 INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON SOIL
BALCONY
88
ROOM BED ROOM BED ROOM
CONDITIONS HAS BEEN DULLY INCORPORATED IN THE DESIGN
76
1 2
BED ROOM
26 8.364 5.217 1.000 Rectangle 43.635 xi 1.669 3.718 0.500 Triangle 3.103
11
3 OF THE BUILDING AND THESE PROVISIONS SHALL BE ADHERED
21
4 27 9.369 6.090 1.000 Rectangle 57.057 xii 1.650 3.739 0.500 Triangle 3.085
TO DURING THE CONSTRUCTION.
85
5
BALCONY 27 29 16.694 13.020 1.000 Rectangle 217.356 xiii 1.894 1.317 0.500 Triangle 1.247
SHAFT 6 32
30.18°
SHAFT
30 4.634 8.159 0.500 Triangle 18.904 xiv 0.914 0.914 2.000 Rectangle 1.671 WATER HARVESTING CERTIFICATE
BALCONY 7
BALCONY 1124 SHAFT 112 31 7.759 8.159 1.000 Rectangle 63.306 xv 0.341 0.497 0.500 Triangle 0.085
4 8 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
2147
GUES
BALCONY
Rectangle Rectangle
728
32 5.692 3.486 1.000 19.842 xvi 2.400 2.164 1.000 5.194 APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS
935
SHAFT
T RO
86
STORE
OM
SHAFT 9 Rectangle AS WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE
S
38
BED ROOM SHAFT 33 2.860 2.624 1.000 7.505 Sub - Total 40.273
383
BED ROOM 1
2
A.C.DUCT
SHAFT
10 Sub - Total 2606.321 WATER AND THE INFORMATION GIVEN THEREIN IS FACTUALLY
16
2147
3
LIFT
BED ROOM BED ROOM 89 CORRECT TO THE BEST OF OUR KNOWLEDGE AND
20 19
18 SHAFT
SHAFT UNDERSTANDING. THE RECYCLE WATER SHALL BE USED FOR
A 2606.321
4
SHAFT
5140 17
DN HORTICULTURE PURPOSE ETC.
16
15
Deductions
1413
C Shafts, Lifts & Cut-outs 40.273 CERTIFICATE
45
SHAFT 14 SHAFT
BALCONY 5
52
DN
96
2
80
GALLERY UP
13 D NON FAR : Services, Corridors etc 29.998
30.18°
65
THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED
12
6400
E
R71956
UP
12
ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE
115
R69275
BED ROOM
F 2566.048 THE LOCAL BODY SHALL REMOVE THE MULBA AND THE COST
57
6
11 PANTRY Total Ground Cover F= A-B-C
14
8587 96 SHAFT G Total FAR on FF G= F-D 2536.050 SHALL BE BORNE BY THE OWNER OF THE PLOT.
48 28.03°
30
2173 16
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF
64
64
R69
DN
AHU
70
5595
75
SCALE 1:200
1808
2
THE PROPOSED BUILDING.
569
34
PRIVATE DINING HALL
86
15304
2363
32
77
8390
59
59
30 23
81
34364
GOVT. QUARTERS
35 44 31 E
N
S
DN D
3240 R
1227
A
3
733
G
339
M A R G
9
46
I
1894 8 15 H
POND
34
4241
4596
681 D
30
BHI=2250
LEDISE TOILET
FHI=2570
DIRECTOR
DEEP FREZZERS O
MEDICAL ROOM GENTS TOILET
MAINTENANCE HEAD
2908
1063 L
SECURITY HEAD MANAGER CATERING HONORARY TREASURER
BOARD ROOM
AHU ROOM
2524 4
R
TREADE=280
RISER=170
1317
M U E L L E
UP
UP DN
4585
PROJECTION ROOM
POND
12497
GOVT. QUARTERS
DEEP FREZZERS
1080
11270
25
3739
914
AUDITORIUM BELOW
1650
xii
7203
2450
M A X
1 2
914
5468
DN
DEEP AHU ROOM CONFERENCE ROOM
FREZZERS RECEPTION
13020
29
DEEP
3669
PRESIDENT
1669
3718
FREZZERS
4572
STAIRCASE
TOILET
xi
FORD FOUNDATION
914
27
6090
26
5217
25022 45600
3749
xiv
914
1656 x
164
2624
LIFT 341
24002 16694
2860
27.66° xv
9369 8364
497
24 09
88
DN
76
3
11
23
87
21
viii
R83
85
27
32
30.18°
2130
2147
1124 112
4 22
728
935
6
vii F
8
38
383
DRAWN CHKD APPD.
ix
Owner
2147
vi 20
R79
15 4944
INDIA INTERNATIONAL
376
1412 16 21
52
65
CENTRE
2
80
17
12
227 40, Max Mueller Marg, Lodhi Estate,
6478
1
56
18 New Delhi
920
98
927
8587 96
48 v 30
R67
16
64
2173
88
R69
14
Owner's Signature
153
73
45
12643
4186
14981
10 11 13
12
70
77
8713
6331
1557
iv
1808
2363
8 L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
8390
733
339
B
4241
681
950 3560
For Revised Sanction
4720
12497
2725
1080
11270
2 1
i A 4
First Floor Plan: Main Block
5468
2400
05-08-2025
GENERAL NOTES:
9 2.908 2.363 1.000 Rectangle 6.872 6. The entire proposal shall be adhere to all the applicable statutory
provisions, and norms/regulations of the prevailing Lutyens Bungalow
10 12.390 6.166 5.384 Trapezium 49.953 Zone (LBZ) guidelines.
11 12.390 7.198 4.428 Trapezium 43.368 7. Sustainability features shall be as per point no. 7 of the CPAA
12 12.643 8.390 0.500 Triangle 53.037 Sub - Total 15.792 (Criterion for Project Assessment and Approval) of DUAC shall be
installed at site.
13 4.482 7.075 0.500 Triangle 15.855 STRUCTURE STABILITY CERTIFICATE
14 4.896 4.482 6.464 Trapezium 30.310 DEDUCTION : Shaft, lifts & cut outs CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
27.66°
15 79.376 69.155 30.190 Sector 399.761 STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND THE
BALCONY
16 1.413 5.140 0.500 Triangle 3.631 Des. No. Length Breadth Nos Formula Area INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT TO
THE BEST OF OUR KNOWLEDGE.
BED ROOM
BALCONY 17 5.714 5.245 0.500 Triangle 14.985 i 1.000 2.600 1.000 Rectangle 2.600
PANTRY
1 2
BED ROOM
IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
3 18 2.173 6.400 0.500 Triangle 6.954 iv 1.557 1.808 1.000 Rectangle 2.815 INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON SOIL
4
5
Rectangle Rectangle CONDITIONS HAS BEEN DULLY INCORPORATED IN THE DESIGN
SHAFT 6
BALCONY 19 6.837 5.137 1.000 35.122 v 1.227 0.920 3.000 3.387 OF THE BUILDING AND THESE PROVISIONS SHALL BE ADHERED
8° SHAFT
TO DURING THE CONSTRUCTION.
30.1 20 83.873 74.793 27.660 Sector 347.575 vi 2.147 2.147 1.000 Rectangle 4.610
BALCONY 7
BALCONY SHAFT 112
4 8
BALCONY 21 3.016 9.010 1.000 Rectangle 27.174 vii 2.147 0.383 1.000 Rectangle 0.822 WATER HARVESTING CERTIFICATE
728
BED ROOM 2147 SHAFT 9
22 2.624 2.860 1.000 Rectangle 7.505 viii 1.124 0.728 5.000 Rectangle 4.091 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
383
BED ROOM 1
A.C.DUCT
2
10
Triangle APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS
Sub - Total 1883.271 ix 1.649 1.091 0.500 0.900
2147
3
LIFT AS WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE
SHAFT
x 2.164 2.400 1.000 Rectangle 5.194 WATER AND THE INFORMATION GIVEN THEREIN IS FACTUALLY
SHAFT
4
5140 TERRACE
CORRECT TO THE BEST OF OUR KNOWLEDGE AND
A 1883.271 Sub - Total 24.418 UNDERSTANDING. THE RECYCLE WATER SHALL BE USED FOR
1413
BALCONY 5
SHAFT
45 DN
HORTICULTURE PURPOSE ETC.
52 Deductions
DN
96
GALLERY UP
65
B NON FAR : Services, Corridors etc CERTIFICATE
15.792
6400
10
BED ROOM
90
57
6
PANTRY C Shafts, Lifts & Cut-outs 24.418 THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED
14
9 6 SHAFT ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE
16
48 E
30 THE LOCAL BODY SHALL REMOVE THE MULBA AND THE COST
49
16
TERRACE
2173
TERRACE
64
91 F= A-C 1858.853
AC
10
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF
AC
14
DN
G Total FAR on SF G= F-D 1843.061 THE OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE
81
5384 22 UP
12
7198
CONFERENCE ROOM 2 FROM THE ROAD SIDE. IN ADDITION TO THIS, A NET OR SOME
CANTROL ROOM
1557
LABOUR HUTMENT CERTIFICATE
SCALE 1:200
2908
1808
LIFT
8390
KEY PLAN
6315
35
2600
1913
44
1227
AHU
DN
DW
1000
GOVT. QUARTERS
5075 S
N
E
1441
D
5215
4596
R
G
A
3
M A R G
3309
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE G.TOILET L.TOILET STORE
I POND
H
ELECTRIC ROOM D
DN O
L
1672
R
CORRIDOR
M U E L L E
11270
11270
TERRACE
POND
2450
GOVT. QUARTERS
STORE OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RECEPTION OFFICE OFFICE
M A X
2
3669
FORD FOUNDATION
2164
2624
LIFT
27.66°
2400
2860
R83873
To be Constructed
DN
viii
20
8
30.1
2130
5137 112
4
R79376
19
728
vii
R74793
2147 F
383
2147
6837
15 4944 Owner
1412
16 65 21 INDIA INTERNATIONAL
50
52
50
17
CENTRE
7
6478
122
10
R69155
90
56
18
920
ix
98
48 v 30
49
16
New Delhi
64
2173
7
64
91
10
14
14
81
5384 22
Owner's Signature
12
82
44
12643
10
12390
6166
7198
11 13
12
70
75
4428
1557
iv
1808
Architect
9
2363 Anuj Srivastava
16531
8390
SCALE 1:200 Design Consultants
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
6315
B 2600
2
1913
1227
i Architect's Signature N
1000
5075
5215
A
1672
3478
12497
11270
11270
1
For Revised Sanction
DWG. No.
2400 Date:
22 2860
Drawn by: Christopher Paul 04
05-08-2025
GENERAL NOTES:
4071
ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.
TERRACE FLR.
LVL +10250 MM
3. The Building is mechanically ventilated and artificially lighted
LVL +8700MM
as per NBC.
3325
LVL +8050MM
13463
SECOND FLR.
LVL +7150 MM
4. The Provisions of Green Buildings as per chapter 10 of
UBBL 2016, as applicable to this category of this plot size, as
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
3325
LVL +4900MM
FIRST FLR.
LVL +3850 MM
5. All service equipment should be camouflaged appropriately
(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
3325
PLINTH LVL. +450
for Project Assessment and Approval) of DUAC.
150
ELEVATION 1
GROUND LVL ±00
6. The entire proposal shall be adhere to all the applicable
statutory provisions, and norms/regulations of the prevailing
R-7 : KD Block -Kitchen Extn.
R-8: Proposed Lounge Lutyens Bungalow Zone (LBZ) guidelines.
Pantry
SCALE 1:400 7. Sustainability features shall be as per point no. 7 of the
CPAA (Criterion for Project Assessment and Approval) of
DUAC shall be installed at site.
CERTIFICATE
SCALE 1:400
REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
AND THE COST SHALL BE BORNE BY THE OWNER OF THE
PLOT.
9013
LVL +4900MM
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
FIRST FLR.
LVL +3850 MM
AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
OCCUPYING THE PROPOSED BUILDING.
4645
900mm Ht Parapet
ELEVATION 3
GOVT. QUARTERS
S
N
E
D
R
SCALE 1:400
G
A
3
M A R G
I POND
H
D
O
L
4
R
M U E L L E
POND
GOVT. QUARTERS
M A X
1 2
FORD FOUNDATION
KEY PLAN
To be Constructed
VAULTED ROOF
VAULTED ROOF
PROPOSED
GLAZING
3325
LVL +8700MM
VAULTED ROOF
LVL +8050MM
PASSAGE TOILET BED ROOM +6900
SECOND FLR. SECOND FLR.
SF
LVL +7150 MM LVL +6900 MM
3325
JALI
WALL
LVL +4900MM
8950
EXISTING
DRAWN CHKD APPD.
3325
Owner
200
200
INDIA INTERNATIONAL
GROUND LVL ±00 +0000
GROUND LVL ±00
ELEVATION 4 CENTRE
TUNNEL TUNNEL BASEMENT
LVL. -2150
SECTION BB
40, Max Mueller Marg, Lodhi Estate,
SCALE 1:400
New Delhi
SCALE 1:400
Owner's Signature
Architect
TERRACE FLR.
LVL +10250 MM
Anuj Srivastava
LVL +8700MM Design Consultants
650
LVL +8050MM
L-321, Delta-2, Greater Noida 201310
SECOND FLR.
LVL +7150 MM PHONE : +91-8826272227
3150
email : [email protected]
150
700
LVL +4900MM
FIRST FLR.
LVL +3850 MM Existing Auditorium Building
Architect's Signature N
4350
900mm Ht Parapet
900mm Ht Parapet
RISER = 150
TREAD = 300
4000
WIDTH = 1500
BASEMENT BASEMENT
-4000
LVL. -4000
Elevations
SECTION AA Scale:
Date:
1 : 200 @ A-0
DWG. No.
05
REV.
SCALE 1:400
Drawn by: Christopher Paul
05-08-2025
WALL CUTOUT (300x600) AT EVERY
FLOOR (BOT. AT 1700MM FROM FIN.
FLOOR LEV.) GENERAL NOTES:
LVL + 300
UP LVL + 300 UP
WALL CUTOUT (200x300) AT 1. All dimensions are in mm unless mentioned otherwise.
EVERY FLOOR (BOT. AT
1700MM FROM FIN. FLOOR
LEV.)
2. All Levels from the
RWP-1 RWP-2
PLANTER 3150 6850 ÃÆâ€ÃƒÂ¢Ã¢â€ÃƒÆ’ââ‚Ãâ€Ã‚± 0.00 Road Level.
SUNKEN SUNKEN
RWP 3. The Building is mechanically ventilated and artificially lighted
RWP as per NBC.
SHAFT
SHAFT
3750
1450
1565
450 THICK STONE WALL
LIFT FHC UP TO LIFT FHC 4. The Provisions of Green Buildings as per chapter 10 of
4460
(0.60 M high from FFL) +12600 TERRACE
PREFUNCTION
LVL + 10185
UBBL 2016, as applicable to this category of this plot size, as
2
RISER - (1-17)155
RISER - (18-24)150
LVL + 1350 LVL + 1350 RISER - 150
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
16250
TREAD - 300 TREAD - 300
WIDTH - 1500
LOBBY
WIDTH - 1500
LVL + 300
1
DN
115 THK STONE
UP UP CLADDING LOBBY RWP
5. All service equipment should be camouflaged appropriately
DN
+300 +1350 DN
LVL + 10200
(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
2670
RWP-3
for Project Assessment and Approval) of DUAC.
3 4
F.CEILING@+4650 LVL .
RAMP CONTROL
LVL +1200
UP ELECTRICAL PANEL 6. The entire proposal shall be adhere to all the applicable
LVL + 1350 PRE-FUNCTION statutory provisions, and norms/regulations of the prevailing
UP Lutyens Bungalow Zone (LBZ) guidelines.
LVL + 1350
PREFUNCTION
FIRST FLOOR LINE
5900 A.H.U.
17200 7. Sustainability features shall be as per point no. 7 of the
CPAA (Criterion for Project Assessment and Approval) of
KITCHEN UP ROOM-1 TERRACE
36 SQ.M. 1400X4310 LVL + 5985 DUAC shall be installed at site.
LVL + 1350 LVL + 300
13360
LVL +1050
STRUCTURE STABILITY CERTIFICATE
18670
UP THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
GUEST ROOM 450 THK STONE ART GALLERY TO THE BEST OF OUR KNOWLEDGE.
WALL LVL + 10200
CUT-OUT FOR A.C. DUCT ROOM-2
16000
130.25 SQ.M. / 1400 SFT.
RWP-4
IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
FA INTAKE SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
ENTRANCE FOR AHU
LVL + 1350 FOYER
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
LVL + 1350
BE ADHERED TO DURING THE CONSTRUCTION.
RWP
MULTIPURPOSE HALL
66
WATER HARVESTING CERTIFICATE
70 TERRACE
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE WATER HARVESTING
LVL + 10185 REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
+ 8000 DISCHARGE OF WASTE WATER AND THE INFORMATION
26 GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
80
CUT-OUT FOR A.C. DUCT
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
ROOM-3
GE
NT WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
230 THICK S
R.C.C. WALL
LL
CERTIFICATE
WA
FHC PRE-FUNCTION
K
FH
PRE-FUNCTION C
IC
LA
THE MULBA DURING THE CONSTRUCTION WILL BE
BR
DIE
111 SQ.M. / 1195 SFT. S
REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
HK
THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
0T
ROOM-4
(CH. AT SITE)
23
LOBBY
AND THE COST SHALL BE BORNE BY THE OWNER OF THE
0
F.CEILING@+4650 LVL . LOBBY LVL + 10200 PLOT.
80
24
LVL + 1350 SH SH 51 220 THICK
+2745 56
STONE CLADDING
AF A DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
26
6
FT
G
T
IN
RWP-6 OF THE OWNER TO PROPERLY SCREEN THE
80
11
ILD
48
RWP-5
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
+10200
0
BU
A.H.U. ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
NG
104
68
LIFT DN LIFT
00
+3055
188
UP ROOM-5 2750X1800
DI
NG
300x900 DUCT
0
IL
29
18
59
FOR CWPs
BU
TI
00
2
+1350 77
+3830
18
0
SH SH
IS
63
NG
74
AF
LVL + 300 2493 AF ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
EX
DN T 50 T
TI
ROAD
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
00
IS
45
LVL + 200
EX
64 +5380 81
BUILDING TO ENSURE THAT ANY FALLING MATERIAL
EXISTING BUILDING REMAINS WITHIN THE PROTECTED AREA.
72
LANDING AT +3830 87
+8335
RISER - 155
TREAD - 300
73
92
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
WIDTH - 1500
TOTAL NO. OF RISERS =30 CONSTRUCTION AT NIGHT AFTER 10 P.M.
FE
Kamladevi (CONFERENCE) Block TERRACE THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
Ground Floor Plan
LL
OW 30
48 AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
'S
FL OCCUPYING THE PROPOSED BUILDING.
AT
GOVT. QUARTERS
S
N
E
D
R
G
A
3
M A R G
I POND
H
D
O
L
4
R
M U E L L E
WALL CUTOUT (200x300) AT
EVERY FLOOR (BOT. AT WALL CUTOUT (300x600) AT
EVERY FLOOR (BOT. AT
POND
GOVT. QUARTERS
450 THICK STONE WALL LEV.) 1700MM FROM FIN. FLOOR
LEV.)
TYPE NOS.
M A X
RWP 1 2
WINDOWS
505 1400
RWP
FW1 2
SHAFT
FW2 1
LIFT
1450
1565
1
FW3A 1
4680
RISER - 150
TREAD - 300
940
WIDTH - 1500
FW4 1
UP LOBBY
DN
RWP FW6 2
1200
FW7 1
FW9 2
TERRACE
LVL + 5985
1650
2
DRAWN CHKD APPD.
F
ROOM 1 Owner
8612
1872
INDIA INTERNATIONAL
CENTRE
40, Max Mueller Marg, Lodhi Estate,
New Delhi
ROOM 2
3 Owner's Signature
RWP
SEMINAR ROOM
4
(90 SEATS)
WALL CUTOUT (300x600)
AT ONLY FIRST FLOOR
(BOT. AT 400MM FROM FIN.
FLOOR LEV.)
+6465 SH
38
0
AF
T
AHU
AHU
0
NG
68
ROOM 5 77
UP +6000
DI
LIFT
81
0
IL
29
34
79
BU
00
76
DN SH
18
300x900
+6465
For Revised Sanction
74
NG
DUCT FOR AF
24
50 T
TI
CWPs
IS
EX
FIRST FLOOR
FA INTAKE
EX 84 +5380
IS
TIN
: Floor Plans
70
G 220 THICK
BU
73
STONE CLADDING
ILD RISER - 155.55
IN TREAD - 300
G WIDTH - 1500
NO OF RISERS - 27
Scale: 1 : 200 @ A-0 REV.
DWG. No.
Date:
05-08-2025
GENERAL NOTES:
3150 505
1400 940 C GROUND FLOOR COVERED AREA 5550
as per NBC.
1450
1565
A - 3.15 x 4.46 = 14.04 SQ.M
3750
28600
per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
4460
A 234 23 4 5
6200
5. All service equipment should be camouflaged appropriately
B
2770
B - 28.60 x 6.20 = 177.32 SQ.M
1413
(in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
1 4820
11340
for Project Assessment and Approval) of DUAC.
6395
5350
5350
C - 15.60 x 0.52 = 8.11 SQ.M
7810
6. The entire proposal shall be adhere to all the applicable
6
9500
statutory provisions, and norms/regulations of the prevailing
5140
F D F Lutyens Bungalow Zone (LBZ) guidelines.
20
7
16000
39
41 STRUCTURE STABILITY CERTIFICATE
00
2
12 CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
50
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND
0
46
THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
E TOTAL = 723.12 SQ.M FIRST FLOOR COVERED AREA TO THE BEST OF OUR KNOWLEDGE.
80 0
170
DEDUCTION
SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
18 710
81
0
0
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
34
0
8
68
6
24
4
5 BE ADHERED TO DURING THE CONSTRUCTION.
14
38
H
1
G - 7.10 x 0.33 = 2.34 SQ.M F - 2.30 X 5.35 = 12.30 SQ.M
600
8
00
0 9
29
18
9 33
51
WATER HARVESTING CERTIFICATE
215 H - 1.70 x 0.60 = 1.02 SQ.M 1 - 1.413 x 2.77 = 3.914 SQ.M CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
00 APPROVAL SATISFY THE WATER HARVESTING
70
10 10
30
8 - 2.451 x 0.68 = 1.667 SQ.M 5 - 5.55 x 3.75 = 20.81 SQ.M THE MULBA DURING THE CONSTRUCTION WILL BE
Kamladevi (CONFERENCE) Block Kamladevi (CONFERENCE) Block REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
GROUND FLOOR COVERED AREA (SANCTIONED) 14- 1/2 x 3.351 x (3.846 + 3.481) = 12.276 SQ.M
LABOUR HUTMENT CERTIFICATE
= 723.07 SQ.M
WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
TOTAL = 143.976 SQ.M AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
OCCUPYING THE PROPOSED BUILDING.
GOVT. QUARTERS
S
M A R G
I POND
H
D
O
L
4
R
= TOTAL COVERED AREA OF FIRST FLOOR = 579.144 + 3.914 + 12.276 SQ.M.
M U E L L E
POND
GOVT. QUARTERS
= TOTAL COVERED AREA OF FIRST FLOOR = 595.334 SQ.M.
M A X
1 2
KEY PLAN
3150 6850
BCD
3750
4460
2
DRAWN CHKD APPD.
16250
1 Owner
2670
3 4 INDIA INTERNATIONAL
5900 17200 CENTRE
40, Max Mueller Marg, Lodhi Estate,
13360
New Delhi
SECOND FLOOR COVERED AREA SECOND FLOOR COVERED AREA: DEDUCTIONS
18670
Owner's Signature
16000
Design Consultants
G F
5
11
188 I G - 2.30 x 0.225 = 0.517 SQ.M L-321, Delta-2, Greater Noida 201310
20 274 6 2 PHONE : +91-8826272227
SECOND FLOOR
00
email : [email protected]
I - 1.865 X 2.745 = 5.12 SQ.M
5
72
= 412.38 SQ.M
Date:
Drawn by: Christopher Paul 07
05-08-2025
GENERAL NOTES:
6515
PROPOSED 1000 X 2575 325 2900 1000 X 2575 325 2900
UBBL 2016, as applicable to this category of this plot size, as
W4 2 W4 2
STAFF REST ROOM per clause no. 10.2 of UBBL- 2016 shall be installed at the site.
B D E F G
3881
STAFF GYM W5 2870 X 2575 325 2900 2 W5 2870 X 2575 325 2900 2
5. All service equipment should be camouflaged appropriately
3540
W6 7150 X 2575 325 2900 1
C' A H W6 7150 X 2575 325 2900 1 (in terms of the point nos. 10, 11 & 12 of the CPAA (Criterion
W7 600 X 2575 325 2900 1 565 11750 W7 600 X 2575 325 2900 1
for Project Assessment and Approval) of DUAC.
2100
7680 3840 2085 1685
300
W8 600 X 1825 325 2150 1 W8 600 X 1825 325 2150 1 6. The entire proposal shall be adhere to all the applicable
EXPOSED AGREEGATE
statutory provisions, and norms/regulations of the prevailing
1500
300 W4 W4
Lutyens Bungalow Zone (LBZ) guidelines.
2 PASSAGE
B B'
W3
7. Sustainability features shall be as per point no. 7 of the
450
UP UP
1100 X 450 CUT OUT D7 CPAA (Criterion for Project Assessment and Approval) of
IN ROOF SLAB
DUAC shall be installed at site.
STAFF CAFE
1500
4000
V1 2000 X 750 2250 V1 2280 X 900 2100
300
3000 1 3000 1
STRUCTURE STABILITY CERTIFICATE
V2 3195 X 750 2250 3000 1 V2 3195 X 900 2100 3000 1
4000
G1 3610 X 2950 - 2950 1 G1 3610 X 2950 - 2950 1 IT IS ALSO CERTIFIED THAT THE STRUCTURAL DESIGN
V4
W5 EXISTING INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
1500 1240950
5 BLOCK SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
UP
D1 1500 X 2150 A-1-401 D1 1500 X 2150
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
- 2150 1 - 2150 1
D3 BE ADHERED TO DURING THE CONSTRUCTION.
D3
1538
LADIES D3
230 230
1435
D2 1000 X 2150 - 2150 1 D2 1000 X 2150 - 2150 1
115
F 4 F' WATER HARVESTING CERTIFICATE
IN ROOF SLAB
3528
cooler
D4 D4 D3 950 X 2150 - 2150 1 D3 950 X 2150 - 2150 2+1
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
485
16230
D4 BATH J.C. LVL -3250 D4 750 X 2150 - 2150 12 D4 750 X 2150 - 2150 12 APPROVAL SATISFY THE WATER HARVESTING
H/D
4000
REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
D5 1000 X 2400 - 2400 1 D5 1000 X 2400 - 2400 1 DISCHARGE OF WASTE WATER AND THE INFORMATION
W5
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
EQ EQ 1000 1000
D6 950 X 2400 - 2400 2+1 1500
6101500 D6 950 X 2400 - 2400 2+1
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
H/D
D4 D4 D4 D4
D7 1500 X 2400 - 2400 2 D7 1500 X 2400 - 2400 2
WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
115
GENT'S 5 2685 CERTIFICATE
F.H.C.
W3
D7 D6
1730
D4 D4 D4 D4 230
450
THE MULBA DURING THE CONSTRUCTION WILL BE
115
UP
1085 REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
4000
1100 1100 1100 1100 2670
DUMB
REST ROOM
1915
F.H.C. THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
1500
3000
BATH BATH BATH BATH WAITER
AND THE COST SHALL BE BORNE BY THE OWNER OF THE
950
DN
1500 PLOT.
1800
1870
E' LVL+3800 DUMB
230
WAITER
V2
D6
DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
W3 W6 W7 OF THE OWNER TO PROPERLY SCREEN THE
6
450
CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
900X900X600 DEEP SUMP 230 ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
1200 600 AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN
ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
A' H' MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
C BUILDING TO ENSURE THAT ANY FALLING MATERIAL
REMAINS WITHIN THE PROTECTED AREA.
BASEMENT FLOOR PLAN DOOR & WINDOWS SCHEDULE FIRST FLOOR PLAN DOOR & WINDOWS SCHEDULE NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
Program Block (Lotus Lounge) TYPE SIZE HT.OF CILL HT.OF LINTEL NOS.
Program Block (Lotus Lounge) TYPE SIZE HT.OF CILL HT.OF LINTEL NOS.
CONSTRUCTION AT NIGHT AFTER 10 P.M.
GOVT. QUARTERS
A B E
N
S
C' A H
W7 600 X 2575 325 2900 1 W7 600 X 2575 325 2900 1 D
R
G
A
3
M A R G
W8 600 X 1825 325 W8 600 X 1825 325
C D E F G 2150 1 2150 1 H
I POND
R
M U E L L E
1' POND
GOVT. QUARTERS
V1 2280 X 900 2100 3000 1 V1 2280 X 900 2100 3000 1
M A X
1 2
V2 3195 X 900 2100 3000 1 V2 3195 X 900 2100 3000 1
EXTENT OF BASEMENT
6700
565
G1 3610 X 2950 - 2950 1 7680 3840 2085 1685 G1 3610 X 2950 - 2950 1
300
415
LVL + 300
230
230 230
D2 1000 X 2150 - 2150 1 D2 1000 X 2150 - 2150 1
380 380
4000
450
EXTENT OF FLOOR ABOVE
D4 750 X 2150 - 2150 12 D4 750 X 2150 - 2150 12 DRAWN CHKD APPD.
Owner
230
1320 D5 1000 X 2400 - 2400 1 D5 1000 X 2400 - 2400 1
1 STILTED - UP AREA
D6 950 X 2400 - 2400 2+1
3
D6 950 X 2400 - 2400 2+1
INDIA INTERNATIONAL
3 LVL + 300 D7 1500 X 2400 - D7 1500 X 2400 -
CENTRE
2400 2 2400 2
WATER COOLER
EXISTING
135510001435
New Delhi
1250 TERRACE
1500 LVL+VARIES
1240
FT
Owner's Signature
H/D
4
600 4
485
F F' 4
DN
R4
D5 TO TERRACE
-3250
4000
LVL+VARIES
4
4000
HANDICAPED
20
1185
J.C.
1200
FT
LVL + 300
1730
900
FT
FT TERRACE
FT FT + 9800
Architect
5
GENTS
885 5 2685 1085 5
H/D
Anuj Srivastava
1730
4000
4000
F.H.C.
D5
3000 HANDICAPED UP 1915
1800 LVL+300 DN
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
1915
1870
D3 LVL+7400
E' FT DN
TO
DUMB
WAITER E email : [email protected]
-3250 W1 W8
185
Architect's Signature
G1
6 6 6 N
CUT-OUT
2085 1685
D E F G
TERRACE FLOOR PLAN
M.S. GRATING
C A' H'
3 Program Block (Lotus Lounge)
150 DIA RAIN WATER PIPE
SERVICE SERVICE (3500 X4010) UW2 2 1200 X 1800 900 2700 REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
UP UP
8 15
STAIRCASE LOBBY
8
DISCHARGE OF WASTE WATER AND THE INFORMATION
LVL - 5785
RISER - 164.28
TREAD - 300
LVL - 2335 DN
UW3 1 1800 X 2270 900 3170 GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
WIDTH - 1500 - 3485 UD5 RAMP UP
OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
UW5 2 700 X 1800 900 2700
1 7 RISER - 160.21 1 7
TREAD - 300
WIDTH - 1500 DN
20 WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
1 D3 D3 21
UP UP
UW6 1 780 X 2270 900 3170
RISER - 175.47
LD2
TREAD - 250 CERTIFICATE
UP WIDTH - 1200
LGL3 UD2 UW7 1 1200 X 1270 900 2170
UP
THE MULBA DURING THE CONSTRUCTION WILL BE
1570 DOORS REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
ELECTRICAL PANEL THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
UD1 2 1250 X 2435 - 2435
ELECTRICAL PANEL AND THE COST SHALL BE BORNE BY THE OWNER OF THE
UD2 5 1500 X 2435 - 2435
PLOT.
UGL4 air-conditioned DURING CONSTRUCTION, IT IS MANDATORY ON THE PART
OF THE OWNER TO PROPERLY SCREEN THE
OFFICE & OTHER FACILITIES D1 5 950 X 2435 - 2435 CONSTRUCTION SITE OFF THE MAIN ROADS BY MEANS OF
- 2335 LVL ERECTING A SCREEN WALL NOT LESS THAN 8FT. IN HEIGHT
D2 1 1000 X 2435 - 2435
FROM THE GROUND LEVEL WHICH IS TO BE PAINTED TO
D3 2 1200 X 2435 - 2435 AVOID UNPLEASANT LOOK FROM THE ROAD SIDE. IN
ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
air-conditioned MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
PANTRY BUILDING TO ENSURE THAT ANY FALLING MATERIAL
4.97X10.0 GLAZINGS REMAINS WITHIN THE PROTECTED AREA.
UGL1 1 1500 X 2435 - 2435
- 2135 LVL NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
UGL1
UGL2 1 1800 X 2435 - 2435 CONSTRUCTION AT NIGHT AFTER 10 P.M.
LVL - 5485 D1
UGL3 1 2800 X 2435 - 2435 LABOUR HUTMENT CERTIFICATE
DISH WASHING UGL4 1 3285 X 2435 - 2435
3170X15500 THE TEMPORARY LABOUR HUTMENT SHALL BE PROVIDED
wa
co ter LADIES UGL5 1 4625 X 2435 - 2435 WITHIN THE PREMISES ALONG WITH THE TOILET FACILITY
ole
EXISTING BUILDING r AND LABOUR HUTMENT SHALL BE REMOVED BEFORE
SH
UGL6 1 5150 X 2435 - 2435
OW
ER CH
OCCUPYING THE PROPOSED BUILDING.
AN
RO GIN
OM G
JA
N
RO ITOR
OM
D1
300 THK. RCC UGL3 1000X1400 W.C.
D1
GOVT. QUARTERS
WALL S
N
UPTO ±00 LVL. E
air-conditioned R
D
G
A
3
M A R G
LW5
CENTRAL BOOKING OFFICE GENTS I POND
UW5 H
D
D2 LIGHT & VENTILATION SHAFT O
UGL5 HA
L
4
air-conditioned
LW2 ND
R
IC UW2
OPEN SHAFT TO AP
M U E L L E
IL P
LD1 20 ET ED
FOR VENTILATION WAITING AREA 00
X2 POND
08
FAN ROOM FHC FOR BOOKING OFFICE UW5
GOVT. QUARTERS
LW5 5
FHC
SH
OW
ER
M A X
1 2
TOILET CH
AN
RO GIN
OM G
LGL1
UGL3
300 THK. RCC FORD FOUNDATION
LOBBY WALL
LDS UPTO ±00 LVL.
LOBBY KEY PLAN
11
- 4217
10 LVL - 5785
SH
DOOR / WINDOW SCHEDULE - 2335 LVL
SH
A A FT
12
FT TYPE NOS. SIZE CILL LINTEL UGL4
s)
WINDOWS
on
- 3903
rs
1
LIFT
Pe
UP GUEST
)
LGL2 UW1
in
5
UP
0
L
13
60
DE 245 MR
SH
TH = 3 3.54
A LW2 1 1650 X 835 2050 2885
(1
PT 0
FT SH
PIT 00X dler
DN AF
0
= 1 00
WIDEAD 15
T
50
18 hin
-5785 UW4
LW3 1 1200 X 1200
=
Sc
22
TR ER
RIS
STORE
LW4 1 1200 X 2035 900 2935 UW2
DRAWN CHKD APPD.
LW5 2 700 X 2035 900 2935
Owner
DOORS
LD1 1 950 X 2435 - 2435
INDIA INTERNATIONAL
CENTRE
LD2 1 1350X 2435 - 2435
Architect
Anuj Srivastava
Design Consultants
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
Architect's Signature N
7375 3685 6. The entire proposal shall be adhere to all the applicable
3770 300
statutory provisions, and norms/regulations of the prevailing
3470 1 - 17.048 + 15.447 X 3.47 = 56.38 SQ.M 450
b a Lutyens Bungalow Zone (LBZ) guidelines.
11750
2 c 7. Sustainability features shall be as per point no. 7 of the
1 D CPAA (Criterion for Project Assessment and Approval) of
2 - 5.715 x 3.724 = 21.28 SQ.M DUAC shall be installed at site.
c
3770
15447
16980
3 - 1/2 x 5.577 x 2.884 = 8.04 SQ.M 4
17048
16230
20930
c
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
3770
4 - 2.015 x 4.591 = 9.25 SQ.M 2050 3 APPROVAL SATISFY THE SAFETY REQUIREMENTS AS
STIPULATED UNDER THE BUILDING BYE-LAWS 2016, AND
870
5715 20 THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
15 5 - 3.813 x 1.43 = 5.45 SQ.M c 1 TO THE BEST OF OUR KNOWLEDGE.
450 3770
2
3600
4 14
1870
3724
930
2 5 TOTAL = 100.40 SQ.M
45
INCLUDING SAFETY FROM NATURAL HAZARDS BASED ON
4000 d
1130
g SOIL CONDITIONS HAS BEEN DULLY INCORPORATED IN THE
3 5 2805 1085 A
DESIGN OF THE BUILDING AND THESE PROVISIONS SHALL
13
557 11750
84
3600
7
28
2000
C
1870
B WATER HARVESTING CERTIFICATE
A - 3.466 x 3.90 = 13.52 SQ.M GROUND FLOOR COVERED AREA 11900 28051085
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE WATER HARVESTING
REQUIREMENTS AS WELL AS MINIMUM ANTICIPATED
LOWER BASEMENT B - 25.799 x 6.225 = 160.60 SQ.M 1 - 1.085 x 1.870 = 2.03 SQ.M DISCHARGE OF WASTE WATER AND THE INFORMATION
GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF
C - 15.447 + 5.867 X 21.15 = 225.39 SQ.M 2 - 2.805 x 3.600 = 10.10 SQ.M BASEMENT FLOOR COVERED AREA OUR KNOWLEDGE AND UNDERSTANDING. THE RECYCLE
LEVEL-2 2
WATER SHALL BE USED FOR HORTICULTURE PURPOSE ETC.
D - 19.802 + 6.42 X 16.96 = 222.36 SQ.M 3 - 2.050 x 0.870 = 1.78 SQ.M FOR FAR CALCULATION CERTIFICATE
2 4 - 11.750 x 16.980 = 199.51 SQ.M THE MULBA DURING THE CONSTRUCTION WILL BE
REMOVED ON WEEKLY BASIS, IF THE SAME IS NOT DONE, IN
3466 25799 E - 4.185 x 0.15 = 0.63 SQ.M 5 - 0.450 x 16.230 = 7.30 SQ.M
THAT CASE THE LOCAL BODY SHALL REMOVE THE MULBA
4185 A - 1.085 x 1.870 = 2.03 SQ.M AND THE COST SHALL BE BORNE BY THE OWNER OF THE
PLOT.
E
505
1400
F - 1.483 + 1.197 X 5.051 = 6.76 SQ.M B - 2.805 x 3.600 = 10.10 SQ.M
150
940
62251565
B
3900
21150 a - 13.685 x 0.30 = 4.10 SQ.M ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE
TOTAL = 648.72 SQ.M b - 7.375 x 0.30 = 2.21 SQ.M TOTAL = 334.91 SQ.M
BUILDING TO ENSURE THAT ANY FALLING MATERIAL
5867
C 64
c - 3.77 x 0.45 x 4 = 6.78 SQ.M NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
2 - 1.45 x 0.505 = 0.732 SQ.M BASEMENT FLOOR COVERED AREA (SANCTIONED)
d - 4.00 x 0.45 = 1.80 SQ.M
20 CONSTRUCTION AT NIGHT AFTER 10 P.M.
15447
24
D GROUND FLOOR COVERED AREA
51
1
0
68
GOVT. QUARTERS
= 220.72 - 15.94 = 204.78 SQ.M.
29
1960
S
18
96
9 2
N
10460
E
R
0
M A R G
279
G
I
10
POND
H
505
3
O
1
= 648.72 - 11.022 = 637.698 SQ.M
L
F
4
R
197 528
M U E L L E
31 2
(FREE FROM F.A.R)
7
1360
3
POND
9
GOVT. QUARTERS
11
= 637.698 - 100.40 = 537.298 SQM. GROUND FLOOR COVERED AREA (SANCTIONED) 4230
M A X
1 2
= = 204.78 SQ.M.
UPPER BASEMENT COVERED AREA TOTAL GROUND FLOOR FAR AREA
505
1400 FOR FAR CALCULATION = = 204.78 SQ.M.
940
1565
2 34
6375
6225
A Owner
B E B - 21.615 x 6.225 = 134.55 SQ.M FIRST FLOOR FAR AREA
C - 16.269 + 5.867 X 22.950 = 254.01 SQ.M
INDIA INTERNATIONAL
22950
D 24
51
DEDUCTION
0
68
8 Architect
6
00
0
47
29
9
18
Anuj Srivastava
3 - 1.45 x 1.400 = 2.03 SQ.M Design Consultants
208 10
58 4 - 1.565 x 0.94 = 1.471 SQ.M L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
email : [email protected]
8 - 2.451 x 0.68 = 1.667 SQ.M
UPPER BASEMENT 9 - 2.451 x 1.80 = 4.411 SQ.M Architect's Signature N
LEVEL-1 10- 2.451 x 0.29 = 0.711 SQ.M
CERTIFICATE
PIPE OM
PROTECTED AREA.
ANT MP RO 150Ø HYDRANT PIPE 100Ø SPRINKLER PIPE
HYDR TO PU
150Ø TO UP UNDER GROUNDS PIPE UNDER GROUNDS PIPE
TO PUMP ROOM TO PUMP ROOM
UP
NOISE RELATED ACTIVITIES WILL NOT BE TAKEN UP TO
14
CONSTRUCTION AT NIGHT AFTER 10 P.M.
9.00
EFHB-07
LO
100Ø
EFHB
-05
N
CO
EN
GARD
R- 7
E3
- L4 LODI
.00
M
= 820
' 4"
SIT
EN
250
R D
GA
POND
INDIA INTERNATION CENTRE
CK
POOL-2= 124.35 SQM. RO
FORD FOUNDATION
EXIST. BLOCK
G14
RG
500.95 Sq.m. GUARD
EXIST. BLOCK
ST10 ROOM
SITE4 -
GUEST ST8 WB FFHQ
MAX MUELLER MA
ROOMS
EXIST. BLOCK
G12
223.377 Sq.m. PLAZA
IIC
EFHB
-03
L3
IICC CM WWF
150Ø
EXIST. BLOCK EXIST. BLOCK 100Ø
100Ø
150Ø
LODI ROAD
D WIDENING
148.00 M = 484'0"
LOCATION PLAN
R-8
ST7
ST6
GOVT. QUARTERS
EXIST. BLOCK ST5
EXIST. BLOCK
G5 EFHB-09
-01
EFHB DRAWN CHKD APPD.
FIRE BRIGADE FOUR WAY DINING
7000X13000
AREA
PLANTER
ST15
PIPE 100Ø
ANT NT
HYDRSEME
150ØTO BA 7700
PIPE
UP
100Ø Owner
KLER G16
3204
150Ø
SPRIN MENT EFHB-10
100Ø BASE
UP TO
UP
2750 150.93 Sq.m.
INDIA INTERNATIONAL
61.54 Sq.m.
G6
G9 33926
CENTRE
318.464 Sq.m. 150Ø
263.295 Sq.m.
MUMTY
100Ø
R-2
G1
ST3 ST4 40, Max Mueller Marg, Lodhi Estate,
ST2
DELIVERY HEADER
1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK
SUCTION HEADER
SITE1 - EFHB-11 FIRE TANK /POND New Delhi
PROGRAMME CAP:1,00,000 lts.
BLOCK
32.00 M = 103' 0"
R-9
Owner's Signature
150Ø
EXIST. MUMTY
EXISTING STAFF FACILITY
9.5
6.STAFF 5.GAS BANK & GARBAGE
7.65
Architect's Signature N
FORD FOUNDATION
05 - 08 -2025
GENERAL NOTES:
TREE LEGEND
1. All dimensions are in mm unless mentioned otherwise.
2. FISH TAIL PALM TOTAL GROUND FLOOR applicable to this category of this plot size, as per clause no. 10.2 of
UBBL- 2016 shall be installed at the site.
COVERED AREA= 4188.106 SQ.M 5. All service equipment should be camouflaged appropriately (in terms of
3. ALSTONIA
the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment
MIMOSA
and Approval) of DUAC.
AREA REQUIRED FOR LANDSCAPING 6. The entire proposal shall be adhere to all the applicable statutory
= 14798.544 X 50/ 100 = 7399.272 SQM. 7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion
5. SITA ASHOKA
for Project Assessment and Approval) of DUAC shall be installed at site.
OPEN AREA = PLOT AREA - STRUCTURE STABILITY CERTIFICATE
(COVD. AREA AT GR. FL. + CAR PARKING AREA) CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
GOVT. QUARTERS
PE
R PI
NKLE OM DURING THE CONSTRUCTION.
SPRI MP RO
100Ø 100Ø TO PU
150Ø UP
9. MAXICAN SILK
ANT MP RO 150Ø HYDRANT PIPE 100Ø SPRINKLER PIPE
HYDR PU
150ØTO UP TO UNDER GROUNDS PIPE UNDER GROUNDS PIPE
ALSTONIA
TO PUMP ROOM TO PUMP ROOM
UP
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
14 APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER
10. KADAM
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
-06 RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
FISH TAIL
EFHB
ETC.
6 NOS SITA
11. GOOLER PALM 100Ø
150Ø
FIRE BRIGADE FOUR WAY
INLET CONNECTION
ASHOKA TREE
CERTIFICATE
9.0
0
12. ROSE WOOD
WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE THE
EFHB-07
LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
S CK
BE BORNE BY THE OWNER OF THE PLOT.
EN LO
RD B DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE
13. NEEM D HI
G A
FER
EN
CE
150Ø
OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
LESS THAN 8FT. IN HEIGHT FROM THE GROUND LEVEL WHICH IS
LO
5 100Ø
N
-0
EFHB
O TO BE PAINTED TO AVOID UNPLEASANT LOOK FROM THE ROAD
N
SIT JAMUN TO ENSURE THAT ANY FALLING MATERIAL REMAINS WITHIN THE
PROTECTED AREA.
18. BARGAD
G14
RG
500.95 Sq.m.
BOTTLE
GUARD
EXIST. BLOCK ROOM
SITE4 -
GUEST
MAX MUELLER MA
BRUSH
EN
GARD
SECON ROOMS LODI
D FL.
G12
223.377 Sq.m.
5 NOS
INDIA INTERNATION CENTRE
-03 KACHNAR
EXIST. BLOCK
EFHB
100Ø
EXIST. BLOCK EXIST. BLOCK
150Ø
100Ø TREE
150Ø
D WIDENING
FORD FOUNDATION
148.00 M = 484'0"
R-8
3 NOS ROYAL FFHQ
PALM
GOVT. QUARTERS
IIC
EXIST. BLOCK
MEXICAN G11
5 NOS SITA
EXIST. BLOCK
790.68 Sq.m.
IICC CM WWF
G5
POOL-1= 190.0 SQM. G10
SILK EFHB-09
ASHOKA TREE LODI ROAD
376.423 Sq.m.
G15 553.239 Sq.m.
100Ø
DINING LOCATION PLAN
2385
1925
LIFT
7000X13000
37.92 Sq.m. 2126
AREA
-01
EFHB
FIRE BRIGADE FOUR WAY DINING AREA
7000X13000
PLANTER
R-2
G1 DRAWN CHKD APPD.
DELIVERY HEADER
1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK Owner
SUCTION HEADER
SITE1 - EFHB-11 FIRE TANK /POND
PROGRAMME CAP:1,00,000 lts.
BLOCK INDIA INTERNATIONAL
32.00 M = 103' 0"
R-9 CENTRE
MEXICAN 40, Max Mueller Marg, Lodhi Estate,
AMF ROOM
New Delhi
R-3
150Ø
DN
SILK
EXIST. MUMTY
EXISTING STAFF FACILITY Owner's Signature
9.5
6.STAFF
7.65
GUARD
KITCHEN FIRE BRIGADE FOUR WAY
INLET CONNECTION EFHB-12 150Ø
EFHB-14 150Ø EFHB-13 150Ø EFHB-12
150Ø HOUSE
BARGAD
GUARD ROOM TOILET UNDER SWACHH
BHARAT ABHIYAN SCHEME
5180 X 3880 G7
KADAM
ALSTONIA 1484.195 Sq.m.
GOOLER Architect
Anuj Srivastava
212.00 M / 695' 2"
Design Consultants
3 NOS ALSTONIA
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
NODASA
4 NOS FICUS YELLOW
LYRATA FLAME
For Revised Sanction
OHT PANEL UNDERGROUND 5KL 5. All service equipment should be camouflaged appropriately (in terms of
the point nos. 10, 11 & 12 of the CPAA (Criterion for Project Assessment
24.2 KVA WATER TANK and Approval) of DUAC.
HVAC 75000X2=150000 6. The entire proposal shall be adhere to all the applicable statutory
provisions, and norms/regulations of the prevailing Lutyens Bungalow
Zone (LBZ) guidelines.
U.G.T. RAINWATER
7. Sustainability features shall be as per point no. 7 of the CPAA (Criterion
for Project Assessment and Approval) of DUAC shall be installed at site.
MANAGEMENT
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
10 ft DEEP APPROVAL SATISFY THE SAFETY REQUIREMENTS AS STIPULATED
UNDER THE BUILDING BYE-LAWS 2016, AND THE INFORMATION
10ft Dia GIVEN THEREIN IS FACTUALLY CORRECT TO THE BEST OF OUR
KNOWLEDGE.
GOVT. QUARTERS
R PI
NKLE OM
PE
HAS BEEN DULLY INCORPORATED IN THE DESIGN OF THE
SPRI MP RO BUILDING AND THESE PROVISIONS SHALL BE ADHERED TO
100Ø0Ø 100Ø TO PU
15 UP
DURING THE CONSTRUCTION.
PIPE OM
ANT MP RO 150Ø HYDRANT PIPE 100Ø SPRINKLER PIPE
HYDR PU
150ØTO UP TO
UP
UNDER GROUNDS PIPE
TO PUMP ROOM
UNDER GROUNDS PIPE
TO PUMP ROOM WATER HARVESTING CERTIFICATE
OHT 20 KL 14
CERTIFICATE THAT THE BUILDING PLANS SUBMITTED FOR
APPROVAL SATISFY THE WATER HARVESTING REQUIREMENTS AS
WELL AS MINIMUM ANTICIPATED DISCHARGE OF WASTE WATER
AND THE INFORMATION GIVEN THEREIN IS FACTUALLY CORRECT
-06
EFHB TO THE BEST OF OUR KNOWLEDGE AND UNDERSTANDING. THE
RECYCLE WATER SHALL BE USED FOR HORTICULTURE PURPOSE
ETC.
OHT 100Ø0Ø
15
FIRE BRIGADE FOUR WAY
INLET CONNECTION
CERTIFICATE
9.0
5KL
0
+ 13.463 EFHB-07 THE MULBA DURING THE CONSTRUCTION WILL BE REMOVED ON
WEEKLY BASIS, IF THE SAME IS NOT DONE, IN THAT CASE THE
S K
EN
LOCAL BODY SHALL REMOVE THE MULBA AND THE COST SHALL
OC
RD
L BE BORNE BY THE OWNER OF THE PLOT.
EB
I GA EN
C DURING CONSTRUCTION, IT IS MANDATORY ON THE PART OF THE
DH ER
150Ø OWNER TO PROPERLY SCREEN THE CONSTRUCTION SITE OFF
NF
LO
5 100Ø
HB-0 THE MAIN ROADS BY MEANS OF ERECTING A SCREEN WALL NOT
O
EF
.00
M
= 820
' 4"
SIT SIDE. IN ADDITION TO THIS, A NET OR SOME OTHER PROTECTIVE
MATERIAL SHALL BE HOISTED AT THE FACADES OF THE BUILDING
EN
250
RG
500.95 Sq.m. GUARD
EXIST. BLOCK ROOM
SITE4 -
GUEST
MAX MUELLER MA
SECON ROOMS
D FL. LODI
GARD
EN
G12
223.377 Sq.m.
U.G.T. -03
EXIST. BLOCK
EFHB INDIA INTERNATION CENTRE
100000 100Ø
EXIST. BLOCK EXIST. BLOCK
150Ø
100Ø
150Ø
+ 6.90
AD WIDENING
148.00 M = 484'0"
HVAC R-8 + 10.225 FORD FOUNDATION
AREA FOR RO
G11 FFHQ
POND
WB
GOVT. QUARTERS
EXIST. BLOCK
+ 10.225 SILK
+ 10.225 G5 IICC
EFHB-09 CM WWF
POOL-1= 190.0 SQM. G10
376.423 Sq.m.
G15 553.239 Sq.m. LODI ROAD
100Ø
DINING
2385
1925
LIFT
COOLING
150Ø 1666
TOWER
EFHB
FIRE BRIGADE FOUR WAY DINING
AREA
PLANTER
3x200
ANT T
COMPOST
HYDRSEMEN
150Ø TO BA
UP
PE FIRE EXIT STAIR
R PI 100Ø
G16
TR
NKLE CASE 150Ø
SPRI MENT EFHB-10
100ØTO BASE 150.93 Sq.m.
PIT
UP
61.54 Sq.m.
150 KG
UP
G6
G9 33926
318.464 Sq.m.
ORGANIC WATER
150Ø
263.295 Sq.m.
MUMTY
100Ø
R-2
G1
COMPOST
DELIVERY HEADER
1162.152 Sq.m. EXIST. BLOCK EXIST. BLOCK
SUCTION HEADER
DRAWN CHKD APPD.
SITE1 - EFHB-11 FIRE TANK /POND
PROGRAMME CAP:1,00,000 lts. Owner
BLOCK
+ 10.225 + 9.013
32.00 M = 103' 0"
150Ø
EXIST. MUMTY
EXISTING STAFF FACILITY
9.5
6.STAFF 5.GAS BANK & GARBAGE Owner's Signature
7.65
AC GUARD ROOM
PROPOSED TOILET UNDER SWACHH
BHARAT ABHIYAN SCHEME
PLANT G7
1484.195 Sq.m.
2x150 TR
2x300 TR 212.00 M / 695' 2"
Architect
Anuj Srivastava
750 KVA Design Consultants
DC BIOGAS DG SET FIRE PUMP
L-321, Delta-2, Greater Noida 201310
PHONE : +91-8826272227
05 - 08 -2025