0% found this document useful (0 votes)
0 views4 pages

UEP DROP Survey Report A

Uploaded by

Asia Belmont
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views4 pages

UEP DROP Survey Report A

Uploaded by

Asia Belmont
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

DROPS Survey Report

UEP RIG-1
Report # BA-UEP1-01-24

Disclaimer

Belmont Asia certify that the item(s) described in this


reports were examined in the prescribed manner. The
inspection parameters were found satisfactory at the
time of inspection. This inspection report does not
relieve the contractor/user from his obligations to keep
the equipment maintained and used safely. Belmont
Asia’s assumes no responsibility and shall not be liable
to any person for any loss, damage or expense caused
by reliance on the information or advice in this
document

This work is intended solely for the Client(s) named. The


scope of work and related responsibilities is defined in
the Conditions of Assignment. Any use which a third
party makes of the work, or any reliance on or decisions
to be made based on it, are the responsibility of such
third parties. Decisions made or actions taken as a
result of our work shall be the responsibility of the
parties directly involved in the decisions or actions
DROPS Survey Report
UEP RIG-1
Report # BA-UEP1-01-24

1.1 Scope of Work

In accordance with the instructions received from UEP, BELMONT ASIA Surveyors
attended the Drilling Rig UEP-1, to complete Inspection of the Rig in compliance with
DROPS.

The purpose of this Inspection/ Survey was to determine the general condition and
state of maintenance of the Rig, in order to minimize downtime caused by any
incident during drilling operations and to ensure that the equipment is maintained in
safe working order.

Inspections include a detailed review of all permanent structures, equipment,


machinery, ancillary items used at height, and their individual identification
reference, primary fixing method, secondary retention feature, and safety securing
device where fitted.

1.2 Applicable Standards and References

The criteria which have been used as reference during this survey are internationally
recognized standards of DROPS, local legislative requirements, client’s safety and
operating standards, the original equipment manufacturer’s maintenance and
operating specifications and accepted oilfield operating and safety practices.
DROPS Survey Report
UEP RIG-1
Report # BA-UEP1-01-24

EXECUTIVE SUMMARY
As instructed by UEP, Surveyor team of BELMONT ASIA attended UEP-1 Drilling
Rig, which was in operational position at MAZARI OIL FILED

The inspection of the UEP-1 Rig was conducted on 16TH February 2024.

The inspection Process carried out with as following steps.

1. Visual Inspection
2. Documentation review / Certification review

BELMONT ASIA would like to thank the Operations Team from the UEP-1 Rig who
were involved with the inspection of the rig. Assistance was provided whenever
possible. The attending surveyors appreciated the time that was provided. All
personnel were accommodating in locating and providing information to
complete the inspection.

CONCLUSION

The preservation process of the equipment and assets throughout the


installation found intact, the maintenance system was effective and efficient. It
was clear that there were ample efforts taken within the maintenance, stock
controls, ordering, purchasing and/or procedures with the effective upkeep of
the various components and equipment rig-wide.
DROPS Survey Report
UEP RIG-1
Report # BA-UEP1-01-24

DROPS ZONE CLASSIFICATIONS