0% found this document useful (0 votes)
20 views7 pages

Longer Lead Times Better Planning

Uploaded by

SANDEEP KUMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views7 pages

Longer Lead Times Better Planning

Uploaded by

SANDEEP KUMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1/7

LONGER LEAD TIMES


= BETTER PLANNING
THE MATH BEHIND WHY SLOW (BUT STEADY) CAN BE
SMARTER.
2/7

Common Belief
The myth:

SHORTER LEAD TIMES = BETTER SUPPLY


CHAINS.

BUT IS SPEED
ALWAYS THE MOST
EFFICIENT?

LET’S TEST IT WITH NUMBERS.


3/7

Case Setup:
2 Suppliers
Supplier A Supplier B

Lead Time 3 days 12 days

Order
52/year 12/year
Frequency

Order
460 units 2,000 units
Quantity

Ordering
Cost per ₹1,000 ₹1,000
Order
4/7

Ordering Cost Math

ORDERING COST = ORDERS/YEAR ×


COST/ORDER

A B
52 × ₹1,000 = 12 × ₹1,000 =
₹52,000 ₹12,000

SUPPLIER B SAVES ₹40,000/YEAR


— JUST BY CONSOLIDATING ORDERS!
5/7

Holding Cost Math


HOLDING COST = ₹10/UNIT/YEAR

AVG INVENTORY = ORDER QTY ÷ 2

A B
460 ÷ 2 × ₹10 × 52 2,000 ÷ 2 × ₹10 ×
= ₹1,19,600 12 = ₹1,20,000

HOLDING COSTS ARE NEARLY EQUAL


— BUT B GAINS ON ORDERING COST.
6/7

Real-World Strategy
COMPANIES THAT PLAN > PANIC

ZARA: LONG LEAD UPSTREAM, FAST


LOCAL FINISHING

IKEA: PREDICTABLE LONG LEAD,


BUFFER AT DCS

TOYOTA: SELECTS SUPPLIERS BASED


ON RELIABLE LEAD TIME, NOT SPEED

PREDICTABILITY PLANNING SAVINGS


7/7

Key Insight
SPEED ISN’T ALWAYS EFFICIENCY.

LONGER LEAD TIMES (WHEN PREDICTABLE)


GIVE US:

SMARTER PLANNING

LOWER ADMIN LOAD

FEWER LAST-MINUTE FIRES

CONSISTENT COST CONTROL

SOMETIMES, SLOWER = SMOOTHER.

Let’s Connect

You might also like