0% found this document useful (0 votes)
162 views12 pages

RA For Post Tension

Uploaded by

mdrasheedcs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views12 pages

RA For Post Tension

Uploaded by

mdrasheedcs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

GCC – GENERAL CONSTRUCTION COMPANY

HAZARD IDENTIFICATION & RISK ASSESSMENT

Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
1 Delivery of 1. Over speed Workers, staff 3 3 9 1. Traffic management. 1 2 2 DM COCSP # 20 Driver, Security, Flag
post tension Collision. 2. Speed limits. man, EHS team, CM
materials 2. Incompetent 1. Minor or major 3. HSE induction for driver, EPT & EPT (Emirates
driver. personnel staff Post tension)
3. Unaware injuries. 4. Pedestrian walk ways & vehicle
about site rules. 2. Fatalities access.
4. Access 3. Property 5. Ensure alarm, buzzer and
obstruction. damage. reverse alarm horn.
4. Enforcement / 6. Ensure proper parking space.
legal action. 7. Competent, certified & licensed
5. Loss of operators & drivers.
production time. 8. Use of mandatory PPE’s
2 Marking out 1. Workers fall Workers, staff, 3 3 9 1. Conform to main contractor 1 2 2 DMCOCSP # EPT Work incharge,
of tendon from height. visitors and form work staging is fully 4.2.8, 6.7 & foreman, SE, CM,
locations in 2. Falling public. completed before commencing 10.1.9-8 General PM, EHS Officer
accordance objects. actual works at particular area. Construction
to shop 3. In appropriate 1. Minor or major 2. Ensure edge protection are
drawings ppe’s. personnel completed & ensure safe access
4. Incompetent injuries. for the slab level.
operatives. 2. Fatalities 3. Ensure Loading / unloading
5. Inadequate 3. Property permit.
supervision. damage. 4. Install jack to be used for
6. Unsafe access 4. Enforcement / anchorage point for safety
legal action. harness.
5. Loss of 5. Warning signages.
production time. Information, instruction, training
Loss of & supervision.
reputation. 6. Use of PPE & safe access.

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 2 of 12


GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
3 Hoisting of 1. Failure of 1. Fatalities 3 3 9 1. Ensure competent & certified 1 2 2 DMCOCSP #, 21, Rigger, TC Operator,
material to lifting 2. Major/ minor rigger & operator. 22 & 10.1.9-8 EPT work incharge
work area by accessories. injuries due to 2. Third party inspection for General & EHS team.
using tower Falling Objects. falling of lifting gears & equipment. Construction
crane or (Improper materials. 3. Periodic inspection &
mobile crane. rigging) maintenance of equipment.
4. Strictly control the
2. Hoisted 1. Serious injury unauthorized entry into the lifting
material or death who area.
Collided onto worked in 5. Ensure proper communication
scaffold/ scaffold/ between rigger & operator.
Formwork/ Formwork 6. Use tag line to avoid spinning
Workers. workers. materials.
7. Consider wind speed during
lifting. (38 Km/h)
8. Secure the load properly
before lifting.
9. Information, instruction,
supervision & training.
10. Warning signages.
11. Use of PPE & safe access.

3. Transport 1. Injuries/ 2 3 6 1. Traffic management. 1 2 2 DMCOCSP # 20 Drivers & Flag man.


Hazard. Fatalities due to 2. Speed limits.
Collision with 3. Pedestrian walk ways.
man, material 4. Ensure proper parking space.
and vehicle. 5. Competent, certified &
2. Property licensed operators & drivers.
damage. 6. Ensure alarm, buzzer and
reverse alarm horn.

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 3 of 12


GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
4 Preparation / 1. Workers 1. Serious cut 2 3 6 1. Ensure operator is informed on 1 2 2 DMCOCSP # Work incharge,
Cutting of hand crushed injurious to safe use of grinder and 14.3.4 & 10.1.9-8 foreman, EHS
ducts between frame workers. competent and close supervision General Officer
& coil. 2. Burn injuries by supervisor. Construction
2. Cut by hand 2. Hot work permit & Hot work
tools. precautions to be taken.
3. Electrocuted 3. Fire warden should in place.
by live cables 4. Disconnect power when
when using unused.
power tools. 5. Use of proper PPE

5 Positioning of Worker falling Serious injury or 2 3 6 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.8 Work incharge,
ducts from edge at death to falling provided at edge of form work & 10.1.9-8 foreman, EHS
height. worker (Were reasonably practicable). General Officer
2. Use of proper PPE Construction
3. Information, instruction,
training & supervision.
6 Placing 1. Workers Serious injury or 3 3 9 1. Ensure coordination between 1 2 2 DMCOCSP # 4.2.8 Work incharge,
strand coil in hand crushed death to workers. workers carrying out the & 10.1.9-8 foreman, EHS
strand frame between frame operation. General Officer
& coil. 2. Provide barication around the Construction
2. Strand frame area.
give way. 3. Ensure tie rods are secured
3. Strand coil properly.
crushed worker. 4. Ensure tight co-ordination
between rigger & operator.
5. Use proper PPE.
6. Warning signages.
7. Information, instruction,
training & supervision.

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 4 of 12


GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
7 Pushing of 1. Cut when 1. Cut or crush 3 3 9 1. Ensure hands & loose clothes 2 1 2 DMCOCSP # 14.1- Work incharge,
strand into handling injury to workers. kept away from moving gear and 17 & 10.1.9-8 foreman, EHS
ducts. strands. 2. Entanglement machine is guarded. General Officer
2. Hand caught clothes. 2. Ensure sufficient working space Construction
inside inserting 3. between the worker’s hand &
machine/strand opening of the duct.
pusher. 3. Stay clear and deploy worker at
3. Hand caught end point as guide.
between duct 4. Ensure tie rods are secure
opening and properly.
strand when 5. Use proper PPE.
doing manual 6. Warning Signages.
pushing. 7 .Information, instruction,
4. Worker hit by supervision & training.
incoming strand
at the exit of
the duct during
inserting.
5. Strand frame
overturned.
8 Cutting of 1. Cut by 1. Serious injury 3 3 9 1. Ensure Hot work permit & hot 1 2 2 DMCOCSP # 16 & Work incharge,
strand grinder/ circular or death to work precautions should be 10.1.9-8 General Electrician, Foreman
saw. worker. taken, Fire watcher should be in Construction & EHS Officer
2. Electrocuted 2. Enforcement place.
by live cables action. 2. Ensure operator is trained and
when using competent on usage of grinder.
power tools & 3. Disconnect power when not in
poor cable use.
management. 4. Periodic checking of cables.
3. Worker’s eye
affect while
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 5 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
using grinder 5. Cables are placed hang and in
machine. proper dressing not in ground
4. Strand level.
sprung up & hit 6. Warning Signages.
into worker 7. Information, instruction,
after cutting. supervision & training.
8. Use proper PPE.
9 Making of 1. Cut when 1. Serious injury 3 3 9 1. Ensure workers hand stay clear 2 1 2 DMCOCSP # 4.2.8 Work incharge,
dead end inserting strand or eye injury or of machine before commit the & 10.1.9-8 foreman, EHS
bulb to dead-end death to workers. operation. General Officer
bulb maker. 2. 2. Ensure competent operator. Construction
2. Hand caught 3. Periodic checking of electric
in between cables.
when 4. Hang cables above ground & in
compressing proper dressing condition.
strand. 5. Ensure 3rd party inspection
3. Electrocuted certificate for the hydraulic
by live cables stressing machine.
when using 6. Periodic maintenance of
power tools. equipment.
4. Hydraulic oil 7. Stay clear when releasing the
leaked and spill wedge from the strand.
into the worker 8.
eye. 9. Use proper PPE.
5. Strand 10. Information, instruction,
sprung up & hit supervision & training.
into worker
when releasing
from machine.

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 6 of 12


GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
10 Positioning 1. Dropping of Serious injury or 3 3 9 1. Keep un attended anchor plate 1 2 2 DMCOCSP # 4.2.9 Work incharge,
and anchor plate fatality due to >1m away from edge. & 10.1.9-8 foreman, EHS
installation of from height. falling of worker 2. Ensure safety life lines are General Officer
anchor plate 2. Worker from height. provided at edge of form work Construction
and pocket falling from (Were reasonably practicable).
former. edge at height. 3. Use of PPE & safe access.

11 Tying of 1. Cut when Serious injury or 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
tendons and tying tendons fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
anchor plates and anchor falling of worker (Were reasonably practicable). General Officer
to required plates. from height. 2. Hot work precautions to be Construction
profile. 2. Workers taken.
falling from 3. Ensure safe access.
edge at height. 2. Use of PPE safety certificate.

12 Installation of 1. Cut by hand Serious injury or 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
grout vents. tools when fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
cutting grout falling of worker (Were reasonably practicable). General Officer
vents to from height. 2. Use of PPE & safe access. Construction
required
lengths.
2. Worker
falling from
edge at height.
13 Sealing of 1. Workers eye Serious injury or 3 3 9 1. Ensure safety life lines are 1 1 1 DMCOCSP # 4.2.9 Work incharge,
duct at dead- affect by foam fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
end spray. falling of worker (Were reasonably practicable). General Officer
2. Worker from height. 2. Use of PPE. Construction
falling from
edge at height.

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 7 of 12


GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
14 Hacking of 1. Worker 1. Serious injury 3 3 9 1. Keep loose concrete more than 1 1 1 DMCOCSP # 4.2.9 Work incharge,
Excess falling from or fatality due to 1 m away from edge when & 10.1.9-8 foreman, EHS
concrete edge at height. falling of worker hacking. General Officer
around 2. Loose from height. 2. Cordon off area below hacking Construction.
pocket concrete falling 2. Injury to operation.
former. edge at height. workers who all 3. Regular preventive
3. Prolonged are working maintenance for power tools.
exposure to bellow. 4. Hang cables above ground & in
noise when 3. Noise induced proper dressing condition.
using concrete deafness. 5. Adequate housekeeping.
breaker. 6. Use proper PPE.
4. Electrocuted 7. Information, instruction,
by live cables supervision & training.
when using
power tools.
15 Removal of 1.Worker falling 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
pocket from height or fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
former falling of worker (Were reasonably practicable). General Officer
from height. 2. Use of PPE. Construction

16 Installation of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
anchor head material falling or fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
& wedges from height. falling of worker (Were reasonably practicable). General Officer
from height. 2. Provide safety net Construction
3. Use of PPE.
17 Stressing of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
tendons & material falling or fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
recording of from height. falling of worker (Were reasonably practicable). General Officer
strand 2. Strand from height. 2. Provide safety fan net Construction
elongation slippage due to 3. Cordon off & minimize
entrance to stressing area.
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 8 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
anchorage 2. Strand will hit 4. Ensure anchor heads and
wedge failure. to opposite / wedges are properly installed
3. Strand stressing end. before carrying our stressing.
breakage due to 3. Oil leakage risk 5. Restrict activities behind
strand failure. of fire. anchorages when stressing is in
4. Bursting of progress.
anchor 6. Ensure 3rd party inspection
plate/anchor certificate for stressing machine.
head. 6. Oil spillage are cleaned by spill
5. Electrocuted kit and proper dispose.
by live cables 7. Use of proper PPE.
when using
stressing jack.
6.Hydraulic oil
leakage
18 Cutting of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
excess strand material falling or fatality due to provided at edge of form work General foreman, EHS
after from height. falling of worker (Were reasonably practicable). requirements-1. Officer
stressing. 2. Cut by from height. 2. Provide safety net
grinder. 2. Strand will hit 3. Ensure Operator is trained &
3. Electrocuted to opposite / competent.
by live cables stressing end. 4. Disconnect power cables when
when using unused & cable routing are in
stressing jack. proper dressing condition.
4. Worker’s 5. Cordon off & minimize
eyes will affect entrance to stressing area.
due to sparks 6. Keep monitoring by supervisor
while cutting when cutting excess strand.
with grinder. 7. Restrict activities behind
5. Strand due to anchorages when cutting of
anchorages / excess strand is in progress.
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 9 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
wedge 8. Collect & keep cut strand >1 m
damaged when away from when edge cutting.
cutting excess 9. Cordon of area below during
strand. cutting operation.
10. Use proper PPE.
19 Patching of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
recess material falling or fatality due to provided at edge of form work General foreman, EHS
from height. falling of worker (Were reasonably practicable). requirements-1. Officer
from height. 2. Provide safety net
3. Use proper PPE.
20 Cleaning of 1. Workers 1. Injury to 2 3 6 1. Stay clear from adjacent outlet 1 2 2 DMCOCSP # 4.2.2 Work incharge,
tendons affect by debris worker at the vents when washing. foreman
using while cleaning outlet of the 2. Ensure 3rd party inspection
compressed the duct. vent. certificate of air compressor.
air & water. 3. Competent operations
4. Use proper PPE.
21 Mixing of 1. Excessive 1. Respiratory 3 3 9 1. Rotation of workers carrying 1 2 2 DMCOCSP # Work incharge,
grout inhalation of irritation and out the job. 18.1.4 & 14.1.17 foreman, EHS
cement and acute diseases to 2. Provide MSDS on site for Officer
additive dust. workers. emergency purpose.
2. Exposure to 2. Eye irritation. 3. Limit duration of operation to
cement and 3. Workers falling control the time of exposure.
additive dust in from height. 4. Ensure platform is properly
the air. 4. Serious injury erected.
3. Mixing grout to workers. 5. Ensure hands and loose
spit out of clothing’s are keep away from
mixer and hit moving gears of mixer.
worker eye. 6. Regular maintenance and
4. Workers checking of cables.
falling off 7. Hang cables above ground
grouting /wet surface.
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 10 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
platform at 6. Use proper PPE.
height.
5. Hand caught
in moving gear
of mixer.
6. Electrocuted
by live cables
when using
mixer.
22 Injecting 1. Grout hose 1. Grout spit out 3 3 9 1. Ensure 3rd party inspection 1 2 2 DMCOCSP # 4.2 Work incharge,
grout to give way at the at high pressure certificate grouting machine. foreman, EHS
tendon at nozzle / at hose and hit worker’s 2. Ensure joints are properly Officer
inlet vent. connections. eyes. secured.
2. Nozzle 2. Ensure grout hose is laid out
dislodged from properly and evenly spread to
inlet vent. prevent excess pressure built up.
3. Grout valve 3. Ensure nozzle is properly
not closed in secured and cramped to the inlet
time causing vent.
grout to spit 4. Provide / Maintain efficient
out. communications during grouting
operation.
5. Use proper PPE like goggles
etc.
23 Tying of 1. Grout exiting 1. Grout spit out 2 3 6 1. Provide / Maintain efficient 1 2 2 DMCOCSP # 10-1- Work incharge,
outlet grout vent in high at high pressure communications during grouting 9 foreman, EHS
event pressure. and worker’s operation. Officer
eyes. 2. Ensure grout vent not facing
directly to anyone.

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 11 of 12


GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
24 Removal of Worker falling Serious injury or 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
grout vent from edge at death of falling provided at edge of form work & 10.1.9 foreman, EHS
(After height. worker. (Were reasonably practicable). Officer
setting)
2. Information, Instruction,
Training & Supervision.
3. Use of PPE & safe access.
25 Closing the Men or material Serious injury or 3 3 9 1. Adequate working platform 1 2 2 DMCOCSP # 4.2.9 Work incharge,
grout vent Fall from height death of falling with safe access. & 10.1.9 foreman, EHS
Contact with worker. 2. Tool tethering. Officer
chemical hazard 3. Safe use of fall arrester.
4. Information, Instruction,
Training & Supervision.
5. Use of PPE.
26 Working 1. Extreme Mason & helpers. 3 2 6 1. Provide shelter area for 1 2 2 DMCOCSP # 3 Work in charge; Site
outside temperature. 1. Dehydration. workers as much as possible. Engineer , Foreman,
under 2. Heat stress. 2. Faint 2. Drink water & hydrate. EHS Officer
sunlight in Heat stroke 3. Fatigue 3. Adequate welfare facilities.
summer 4. Dizziness 4. Mid-day rest time during
summer season.
5. Information, instruction,
training for Extreme temperature
and its risk.
6.PPE

GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 12 of 12