RA For Post Tension
RA For Post Tension
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
1 Delivery of 1. Over speed Workers, staff 3 3 9 1. Traffic management. 1 2 2 DM COCSP # 20 Driver, Security, Flag
post tension Collision. 2. Speed limits. man, EHS team, CM
materials 2. Incompetent 1. Minor or major 3. HSE induction for driver, EPT & EPT (Emirates
driver. personnel staff Post tension)
3. Unaware injuries. 4. Pedestrian walk ways & vehicle
about site rules. 2. Fatalities access.
4. Access 3. Property 5. Ensure alarm, buzzer and
obstruction. damage. reverse alarm horn.
4. Enforcement / 6. Ensure proper parking space.
legal action. 7. Competent, certified & licensed
5. Loss of operators & drivers.
production time. 8. Use of mandatory PPE’s
2 Marking out 1. Workers fall Workers, staff, 3 3 9 1. Conform to main contractor 1 2 2 DMCOCSP # EPT Work incharge,
of tendon from height. visitors and form work staging is fully 4.2.8, 6.7 & foreman, SE, CM,
locations in 2. Falling public. completed before commencing 10.1.9-8 General PM, EHS Officer
accordance objects. actual works at particular area. Construction
to shop 3. In appropriate 1. Minor or major 2. Ensure edge protection are
drawings ppe’s. personnel completed & ensure safe access
4. Incompetent injuries. for the slab level.
operatives. 2. Fatalities 3. Ensure Loading / unloading
5. Inadequate 3. Property permit.
supervision. damage. 4. Install jack to be used for
6. Unsafe access 4. Enforcement / anchorage point for safety
legal action. harness.
5. Loss of 5. Warning signages.
production time. Information, instruction, training
Loss of & supervision.
reputation. 6. Use of PPE & safe access.
5 Positioning of Worker falling Serious injury or 2 3 6 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.8 Work incharge,
ducts from edge at death to falling provided at edge of form work & 10.1.9-8 foreman, EHS
height. worker (Were reasonably practicable). General Officer
2. Use of proper PPE Construction
3. Information, instruction,
training & supervision.
6 Placing 1. Workers Serious injury or 3 3 9 1. Ensure coordination between 1 2 2 DMCOCSP # 4.2.8 Work incharge,
strand coil in hand crushed death to workers. workers carrying out the & 10.1.9-8 foreman, EHS
strand frame between frame operation. General Officer
& coil. 2. Provide barication around the Construction
2. Strand frame area.
give way. 3. Ensure tie rods are secured
3. Strand coil properly.
crushed worker. 4. Ensure tight co-ordination
between rigger & operator.
5. Use proper PPE.
6. Warning signages.
7. Information, instruction,
training & supervision.
11 Tying of 1. Cut when Serious injury or 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
tendons and tying tendons fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
anchor plates and anchor falling of worker (Were reasonably practicable). General Officer
to required plates. from height. 2. Hot work precautions to be Construction
profile. 2. Workers taken.
falling from 3. Ensure safe access.
edge at height. 2. Use of PPE safety certificate.
12 Installation of 1. Cut by hand Serious injury or 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
grout vents. tools when fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
cutting grout falling of worker (Were reasonably practicable). General Officer
vents to from height. 2. Use of PPE & safe access. Construction
required
lengths.
2. Worker
falling from
edge at height.
13 Sealing of 1. Workers eye Serious injury or 3 3 9 1. Ensure safety life lines are 1 1 1 DMCOCSP # 4.2.9 Work incharge,
duct at dead- affect by foam fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
end spray. falling of worker (Were reasonably practicable). General Officer
2. Worker from height. 2. Use of PPE. Construction
falling from
edge at height.
16 Installation of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
anchor head material falling or fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
& wedges from height. falling of worker (Were reasonably practicable). General Officer
from height. 2. Provide safety net Construction
3. Use of PPE.
17 Stressing of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
tendons & material falling or fatality due to provided at edge of form work & 10.1.9-8 foreman, EHS
recording of from height. falling of worker (Were reasonably practicable). General Officer
strand 2. Strand from height. 2. Provide safety fan net Construction
elongation slippage due to 3. Cordon off & minimize
entrance to stressing area.
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 8 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
anchorage 2. Strand will hit 4. Ensure anchor heads and
wedge failure. to opposite / wedges are properly installed
3. Strand stressing end. before carrying our stressing.
breakage due to 3. Oil leakage risk 5. Restrict activities behind
strand failure. of fire. anchorages when stressing is in
4. Bursting of progress.
anchor 6. Ensure 3rd party inspection
plate/anchor certificate for stressing machine.
head. 6. Oil spillage are cleaned by spill
5. Electrocuted kit and proper dispose.
by live cables 7. Use of proper PPE.
when using
stressing jack.
6.Hydraulic oil
leakage
18 Cutting of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
excess strand material falling or fatality due to provided at edge of form work General foreman, EHS
after from height. falling of worker (Were reasonably practicable). requirements-1. Officer
stressing. 2. Cut by from height. 2. Provide safety net
grinder. 2. Strand will hit 3. Ensure Operator is trained &
3. Electrocuted to opposite / competent.
by live cables stressing end. 4. Disconnect power cables when
when using unused & cable routing are in
stressing jack. proper dressing condition.
4. Worker’s 5. Cordon off & minimize
eyes will affect entrance to stressing area.
due to sparks 6. Keep monitoring by supervisor
while cutting when cutting excess strand.
with grinder. 7. Restrict activities behind
5. Strand due to anchorages when cutting of
anchorages / excess strand is in progress.
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 9 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
wedge 8. Collect & keep cut strand >1 m
damaged when away from when edge cutting.
cutting excess 9. Cordon of area below during
strand. cutting operation.
10. Use proper PPE.
19 Patching of 1. Worker & 1. Serious injury 3 3 9 1. Ensure safety life lines are 1 2 2 DMCOCSP # 4.2.9 Work incharge,
recess material falling or fatality due to provided at edge of form work General foreman, EHS
from height. falling of worker (Were reasonably practicable). requirements-1. Officer
from height. 2. Provide safety net
3. Use proper PPE.
20 Cleaning of 1. Workers 1. Injury to 2 3 6 1. Stay clear from adjacent outlet 1 2 2 DMCOCSP # 4.2.2 Work incharge,
tendons affect by debris worker at the vents when washing. foreman
using while cleaning outlet of the 2. Ensure 3rd party inspection
compressed the duct. vent. certificate of air compressor.
air & water. 3. Competent operations
4. Use proper PPE.
21 Mixing of 1. Excessive 1. Respiratory 3 3 9 1. Rotation of workers carrying 1 2 2 DMCOCSP # Work incharge,
grout inhalation of irritation and out the job. 18.1.4 & 14.1.17 foreman, EHS
cement and acute diseases to 2. Provide MSDS on site for Officer
additive dust. workers. emergency purpose.
2. Exposure to 2. Eye irritation. 3. Limit duration of operation to
cement and 3. Workers falling control the time of exposure.
additive dust in from height. 4. Ensure platform is properly
the air. 4. Serious injury erected.
3. Mixing grout to workers. 5. Ensure hands and loose
spit out of clothing’s are keep away from
mixer and hit moving gears of mixer.
worker eye. 6. Regular maintenance and
4. Workers checking of cables.
falling off 7. Hang cables above ground
grouting /wet surface.
GCC-EHSF-27/HIRA/Rev.02- 01072021 Page 10 of 12
GCC – GENERAL CONSTRUCTION COMPANY
HAZARD IDENTIFICATION & RISK ASSESSMENT
Risk Level
S. Significant potential People at risk Risk Level
After Responsibility
Activity Element Action to be Taken to Reduce Risk Legal
No Hazards
Associated risks L S R L S R
platform at 6. Use proper PPE.
height.
5. Hand caught
in moving gear
of mixer.
6. Electrocuted
by live cables
when using
mixer.
22 Injecting 1. Grout hose 1. Grout spit out 3 3 9 1. Ensure 3rd party inspection 1 2 2 DMCOCSP # 4.2 Work incharge,
grout to give way at the at high pressure certificate grouting machine. foreman, EHS
tendon at nozzle / at hose and hit worker’s 2. Ensure joints are properly Officer
inlet vent. connections. eyes. secured.
2. Nozzle 2. Ensure grout hose is laid out
dislodged from properly and evenly spread to
inlet vent. prevent excess pressure built up.
3. Grout valve 3. Ensure nozzle is properly
not closed in secured and cramped to the inlet
time causing vent.
grout to spit 4. Provide / Maintain efficient
out. communications during grouting
operation.
5. Use proper PPE like goggles
etc.
23 Tying of 1. Grout exiting 1. Grout spit out 2 3 6 1. Provide / Maintain efficient 1 2 2 DMCOCSP # 10-1- Work incharge,
outlet grout vent in high at high pressure communications during grouting 9 foreman, EHS
event pressure. and worker’s operation. Officer
eyes. 2. Ensure grout vent not facing
directly to anyone.