SAUDI ARAMCO ID/PIEU-31-Dec-2020 - REV.2020.12.
00 (Standards Cutoff - Dec 31,2020) Rev 62 31-Dec-20
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
Coating Application on Concrete Surfaces SATIP-H- 003- 01 31-Jan-21 CIVIL COATING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
TWO(2)PDMS IN QTIF-161 & 614 PLATEFORM AND ASSOCIATED FACILITIES-ONSHORE
12-20000/12-22000 SAIPEM / MIA ARABIA
SCOPE LTA-85
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
1.0 DOCUMENT REVIEW
Review of Procedure for Liquid Coatings SAIC-H-
1.1
on Industrial Services
SAIC-H-2023
2023 RH RH
SAIC-H-
1.2 Coating Equipment Inspection SAIC-H-2026
2026 RH RH
Review of Coating Personnel SAIC-H-
1.3
Qualification and Certification
SAIC-H-2010
2010 RH RH
RECEIVING
2.0
INSPECTION
Concrete Coating and Repair Materials
SAIC-H-
2.1 Receiving, Storage and Preservation SAIC-H-1002
1002 I W
Inspection
3.0 INSTALLATION
Concrete Coatings and Pre-Installation SAIC-H-
3.1
Inspection
SAIC-H-1003
1003 H H
SAIC-H-
3.2 Coating and Final Installation Inspection SAIC-H-1004
1004 I W
4.0 PRE-COMMISSIONING
4.1 Not Applicable
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-Dec-2020 - REV.2020.12.00 (Standards Cutoff - Dec 31,2020) Rev 62 31-Dec-20
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
Coating Application on Concrete Surfaces SATIP-H- 003- 01 31-Jan-21 CIVIL COATING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
TWO(2)PDMS IN QTIF-161 & 614 PLATEFORM AND ASSOCIATED FACILITIES-ONSHORE
12-20000/12-22000 SAIPEM / MIA ARABIA
SCOPE LTA-85
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
1 the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection/Test
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-July-2019 - REV.2019.07.00 (Standards Cutoff - July 31,2019)
Saudi Aramco: Company General Use
Rev 2019.07.00
###
Saudi Aramco: Company General Use
31-Jul-19
Saudi Aramco: Company General Use
### 1-Oct-18
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-July-2019 - REV.2019.07.00 (Standards Cutoff - July 31,2019)
Saudi Aramco: Company General Use
Rev 2019.07.00
###
Saudi Aramco: Company General Use
31-Jul-19
Saudi Aramco: Company General Use
### 1-Oct-18
Saudi Aramco: Company General Use