0% found this document useful (0 votes)
85 views16 pages

Monczka Purchasing and Supply Chain Management 7th Edition Test Bank

Uploaded by

sse6x19q1x
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views16 pages

Monczka Purchasing and Supply Chain Management 7th Edition Test Bank

Uploaded by

sse6x19q1x
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Test Bank + Answer Key

Test Bank for Monczka Purchasing and Supply Chain


Management 7th Edition by Monczka

View Full Product:


https://selldocx.com/products/test-bank-monczka-purchasing-and-supply-chain-ma

Book Title: Monczka Purchasing and Supply Chain Management

Edition: 7th Edition

Author: Monczka

Click above to view a sample


Name Class Dat
: : e:

chapter 2

Indicate whether the statement is true or false.

1. Capital equipment purchasing involves buying assets intended for use less than one year.
a. True
b. False

2. It is a common and preferred current practice for suppliers to arrange shipment to a purchaser and simply include the
transportation cost as part of the purchase cost.
a. True
b. False

3. Buyers use competitive bidding when price is a minor criterion and the required item (or service) has complex material
specifications.
a. True
b. False

4. Purchasing’s right to evaluate and select suppliers means that sales representatives are not allowed to talk with non-
purchasing personnel.
a. True
b. False

5. For standard items, the negotiation process is an efficient method to purchase relatively straightforward requirements.
a. True
b. False

6. The process that buyers use to select suppliers does not vary widely depending on the required item and the relationship
that a buyer has with its suppliers.
a. True
b. False

7. Material discrepancies usually result from incorrect quantity shipments.


a. True
b. False

8. If the requested item is complex or requires an untested or new production process, purchasing can include additional
information or attachments on its RFQ to assist the supplier, which might include detailed blueprints, samples, or
technical drawings.
a. True
b. False

9. Contract management should be used to trigger proactive sourcing events only after a contract expires.
a. True
b. False

10. The buyer should assume that the purchasing cycle ends with the receipt of an ordered item or the selection of a
supplier.
Copyright Cengage Learning. Powered by Cognero. Page 1
Name Class Dat
: : e:

chapter 2

a. True
b. False

11. Enterprises are relying increasingly on external suppliers to provide only materials and products, not information
technology, services, and design activities.
a. True
b. False

12. In drafting a purchase order, purchasing must include a large number of details regarding policies because it is a
legally binding document.
a. True
b. False

13. Organizations are constantly looking for people who have developed the skills necessary to deal with the narrow
variety of tasks faced by purchasing.
a. True
b. False

14. Historically, most organizations have paid minimal attention to MRO items.
a. True
b. False

15. For routine, off-the-shelf items, the purchase requisition may contain all the information that purchasing requires.
a. True
b. False

16. If a supplier’s components are defective and causing problems for manufacturing, then purchasing must find ways to
improve supplier quality.
a. True
b. False

17. Responsibility for concealed damage is often simple and easy to detect.
a. True
b. False

18. When purchasing works directly with internal stakeholders to anticipate future requirements, such as during new-
product development, or with physician councils in a health care provider, purchasing is acting reactively.
a. True
b. False

19. Purchasing can directly affect (positively or negatively) the long-term growth, revenue, and operating outcomes and
plans of stakeholders and business units.
a. True
b. False

20. Buyers use material purchase releases to order items covered by blanket purchase orders.
Copyright Cengage Learning. Powered by Cognero. Page 2
Name Class Dat
: : e:

chapter 2

a. True
b. False

21. When creating a forecast for a needed product or service, internal customers may not always be able to express exactly
what it is they will need at a future point in time.
a. True
b. False

22. The way MRO items are typically dispersed throughout an organization makes monitoring MRO inventory relatively
simple.
a. True
b. False

23. Almost all firms establish blanket purchase orders with their suppliers.
a. True
b. False

24. The objectives of a world-class purchasing organization do not include evolving beyond the traditional goal of
“getting the lowest price!”
a. True
b. False

25. Managing the purchase of semifinished components is not a critical purchasing responsibility because components
rarely affect product quality and cost.
a. True
b. False

26. The authority to review and challenge specifications (for products or for services) is within purchasing’s span of
control in managing demand, although internal stakeholders sometimes dispute this right.
a. True
b. False

Indicate the answer choice that best completes the statement or answers the question.

27. Effective supply market intelligence involves all of the following except _____.
a. updating supply markets and trends and translating their impacts on key business outcomes
b. ensuring that purchasing does not exceed its annual operating budget
c. identifying emerging materials and service technologies to support company strategies in key performance
areas
d. developing supply options and contingency plans to reduce risk
e. supporting the organization’s requirements for a diverse and globally competitive supply base

28. Which of the following is false regarding concealed damage?


a. A user may discover concealed damages after opening a shipping container.
b. Responsibility for concealed damage is often difficult to establish.
Copyright Cengage Learning. Powered by Cognero. Page 3
Name Class Dat
: : e:

chapter 2

c. The carrier may blame the supplier or maintain that the damage occurred after delivery of the material.
d. The supplier may maintain total innocence and implicate the carrier.
e. The bill of lading protects the carrier against charges of concealed damage.

29. _____ include(s) the materials required to pack and ship final products, such as pallets, boxes, master shipping
containers, tape, bags, wrapping, inserts, and other packaging material.
a. Raw materials
b. Production support items
c. Semifinished products
d. Components
e. Work-in-process inventory

30. _____ is the process of developing insights into stakeholder requirements, comparing these to external industry
intelligence, supply base capabilities and operational risks, and developing a strategy to align internal requirements with
external supply market conditions.
a. Spend analysis
b. Cost management
c. Contract management
d. Category management
e. Procure-to-pay

31. The purchasing cycle begins with the _____.


a. selection of an appropriate supplier
b. issuance of a purchase order
c. receipt of a supplier’s acknowledgement
d. identification of a need (a requirement)
e. determination of who can authorize the purchase

32. A/An _____ has demonstrated its performance capabilities through previous purchase contracts and therefore receives
preference during the supplier selection process.
a. internal supplier
b. new supplier
c. capable supplier
d. final supplier
e. preferred supplier

33. Which of the following is not an appropriate performance criterion to be used when evaluating suppliers?
a. Ability to develop process and product technology.
b. Commitment to quality.
c. Management capability and commitment.
d. Cost performance.
e. Commitment to effective marketing analytics and promotion.

34. In a _____, when inventory is depleted to a given level, the system notifies the materials control department (or the
Copyright Cengage Learning. Powered by Cognero. Page 4
Name Class Dat
: : e:

chapter 2
buyer in some organizations) to issue a request to a supplier for inventory replenishment.
a. reorder point system
b. traveling purchase requisition system
c. customer service system
d. forecasting system
e. just-in-time system

35. _____ is might be the best choice for standard items, where the requirements are well understood and there is common
agreement between supply chain partners about what certain terms mean.
a. Description by market grade
b. Description by brand
c. Description by performance characteristics
d. Use of prototypes
e. Description by specification

36. When using negotiating a/an _____, it is necessary to include a/an _____ that allows a buyer to terminate the contract
in the event of persistently poor quality, delivery problems, and so on.
a. spot buy contract….evergreen clause
b. RFP….RFQ
c. purchase order….purchase agreement
d. blanket purchase order….escape clause
e. online catalog….RFP

37. Which of the following is not one of the common ways that internal customers should communicate their needs to
purchasing?
a. Purchase requisitions from internal users.
b. Chance meeting in the company cafeteria.
c. Forecasts and customer orders.
d. Material requirements identified during new-product development.
e. Routine reordering systems.

38. One of the most important objectives of the purchasing function is the selection, development, and maintenance of
suppliers, a process that is sometimes described as _____.
a. supplier performance management
b. category management
c. customer service
d. procure-to-pay
e. maverick buying

39. The _____ helps protect the carrier against wrongful allegations that the carrier somehow damaged, lost, or otherwise
tampered with a shipment.
a. bill of lading
b. material packing slip
c. invoice
Copyright Cengage Learning. Powered by Cognero. Page 5
Name Class Dat
: : e:

chapter 2

d. material purchase release


e. blanket purchase order

40. All of the following are benefits of electronically generating and transmitting purchasing-related documents except
_____.
a. a reduction in the need to ensure higher levels of quality from suppliers
b. a virtual elimination of paperwork and paperwork handling
c. improved communication both within the company and with suppliers
d. a reduction in errors
e. a reduction in the time spent by purchasing personnel on processing purchase orders and invoices and more
time spent on strategic value-adding purchasing activities

41. All of the following are conditions under which competitive bidding is effective except _____.
a. the buyer has a preferred supplier for the item
b. volume is high enough to justify this method
c. the marketplace is competitive
d. the specifications or requirements are clear to the seller
e. adequate time is available for suppliers to evaluate the RFQs

42. A _____ details any shipping or receiving discrepancies noted by the receiving department.
a. receiving discrepancy report
b. bill of lading
c. material packing slip
d. change notice
e. RFP

43. _____ is used when a product or service is proprietary or when there is a perceived advantage to using a particular
supplier’s products or services.
a. Description by market grade
b. Description by industry standard
c. Description by specification
d. Description by performance characteristics
e. Description by brand

44. _____ include anything that does not go directly into an organization’s product.
a. MRO items
b. Raw materials
c. Production support items
d. Services
e. Semifinished products and components

45. All of the following are required elements in a purchase requisition except _____.
a. quantity and date required
b. estimated unit cost
Copyright Cengage Learning. Powered by Cognero. Page 6
Name Class Dat
: : e:

chapter 2

c. operating account to be charged


d. authorized signature
e. identification and approval of a supplier by the end user

46. _____ is a process associated with defining the contract, defining roles and responsibilities of both parties, and
advising when to modify and ensure appropriate escalation.
a. Spend analysis
b. Contract management
c. Cost management
d. Supplier selection
e. Category management

47. Which of the following is not one of the objectives in supplier performance management?
a. Selecting suppliers that are competitive.
b. Identifying new suppliers that have the potential for excellent performance and developing closer
relationships with these suppliers.
c. Improving existing suppliers.
d. Developing new suppliers that are not competitive with current suppliers.
e. Ensuring timely and accurate payment of supplier invoices.

48. Which of the following is not one of the characteristics of a mature, well-developed supply strategy?
a. A repeatable and well-defined process for building strategy and governance around defining, planning,
managing, and receiving products and services for a business.
b. Clear alignment with executive vision and internal user-specific business goals.
c. Established goals and metrics for short-term project plans, as well as a definite five-year plan that provides
year over year performance improvements.
d. Established communication plan to inform senior management and all lines of business updated and reviewed
quarterly against defined goals and objectives.
e. Required use of an online catalog.

49. Which of the following is not one of the conditions under which face-to-face negotiation is effective?
a. When the purchase requires agreement about a wide range of performance factors, such as price, quality,
delivery, risk sharing, and product support.
b. When the buyer requires early supplier involvement.
c. When the specifications or requirements are clear to the seller.
d. When the supplier cannot determine risks and costs.
e. When the supplier requires a long period of time to develop and produce the items purchased.

50. Suppliers are more often being paid through _____, which is the automatic transfer of payment from the buyer’s bank
account to the supplier’s bank account.
a. RFQ
b. EFT
c. MRO
d. PO
Copyright Cengage Learning. Powered by Cognero. Page 7
Name Class Dat
: : e:

chapter 2

e. None of these answers.

51. _____ is the process of using unit and rate consumption levels to forecast and estimate future consumption in an
internal functional customer and providing guidance and input on how to optimize usage and educating the user on the
tradeoffs.
a. Specification management
b. Demand management
c. Category management
d. Supply market intelligence
e. Cost management

52. _____ is the process of collecting historical data by commodity, relative to demand from the lines of business, with the
exception of personnel expenses, occupancy, and corporate spend.
a. Demand management
b. Supply analysis
c. Category management
d. Contract management
e. Spend analysis

53. Transportation carriers use a/an _____ to record the quantity of goods delivered to a facility.
a. electronic transfer of funds
b. material packing slip
c. receiving discrepancy report
d. bill of lading
e. purchase order

54. _____ is a situation that occurs when sellers seek to “go around” purchasing and instead directly contact and attempt
to sell directly to end users (stakeholders).
a. Insourcing
b. Bidding
c. Maverick buying and selling
d. Negotiating
e. Outsourcing

55. The _____, which the supplier provides, details the contents of a shipment and contains the description and quantity of
the items in a shipment.
a. material packing slip
b. purchase requisition
c. bill of lading
d. electronic funds transfer
e. request for quotation

56. Which of the following is not a feature that separates capital equipment purchases from other purchases?
a. Capital equipment purchases do not occur with regular frequency.
Copyright Cengage Learning. Powered by Cognero. Page 8
Name Class Dat
: : e:

chapter 2

b. Capital equipment investment requires large sums of money.


c. For accounting purposes, most capital equipment is not depreciable over the life of the item.
d. Buyers can rarely switch suppliers in the middle of a large-scale project or dispose of capital equipment after
delivery because of dissatisfaction.
e. Capital equipment is highly sensitive to general economic conditions.

57. In a _____, the supplier is reimbursed all of their actual costs plus some agreed on operational margin and overhead
amount.
a. RFP
b. cost-based contract
c. material purchase release
d. fixed-price contract
e. reverse auction

58. A/An _____ is an open order, usually effective for one year, covering repeated purchases of an item or family of
items.
a. outstanding order
b. pending order
c. blanket purchase order
d. completed order
e. order acceptance

59. _____ is the end-to-end process of managing a supplier through the entire sourcing life cycle, which includes first
identifying the abilities of a particular company with regard to performing a service for the internal customer, completing
a sourcing event, negotiating a contract, executing an order, and determining payment.
a. P2P
b. CRM
c. Outsourcing
d. Competitive bidding
e. SRM

60. The _____ purchase category includes such items are petroleum, coal, lumber, and metals such as copper and zinc.
a. semifinished products and components
b. finished products
c. MRO items
d. raw materials
e. capital equipment

61. The _____ is used to identify user requirements, evaluate the user needs in a concise and accurate manner, identify
suppliers who can meet user requirements, develop agreements with those suppliers, employ a mechanism to place the
order with suppliers, ensure payment occurs promptly, validate that the need was effectively met, and drive continuous
improvement.
a. demand management process
b. backdoor buying process
Copyright Cengage Learning. Powered by Cognero. Page 9
Name Class Dat
: : e:

chapter 2

c. materials budgeting process


d. forecasting process
e. purchasing process

62. _____ involves unbundling the price paid and understanding the total cost of ownership over the life cycle of a
product or service to deliver a target cost and a unit rate to determine if it is priced competitively in the marketplace.
a. Cost management
b. Procure-to-pay
c. Supplier relationship management
d. Category management
e. Spend management

63. _____ focuses attention on the outcomes the customer wants, not on the precise configuration of the product or
service.
a. Description by industry standard
b. Description by brand
c. Description by specification
d. Description by performance characteristic
e. Description by market grade

64. _____ can cover such characteristics as the materials used, the manufacturing or service steps required, and even the
physical dimensions of the product.
a. Description by market grade
b. Description by specification
c. Description by brand
d. Description by industry standard
e. Description by performance characteristics

65. In a _____, the price stated in the agreement does not change, regardless of fluctuations in general overall economic
conditions, industry competition, levels of supply, market prices, or other environmental changes.
a. blanket purchase order
b. RFQ
c. cost-based contract
d. material purchase release
e. fixed-price contract

66. When marketing wants to purchase an advertising campaign, the _____ should specify the work that is to be
completed, when it is needed, and what type of service provider is required.
a. reorder point
b. acknowledgement
c. traveling purchase requisition
d. statement of work
e. sales forecast

Copyright Cengage Learning. Powered by Cognero. Page 10


Name Class Dat
: : e:

chapter 2
67. A key characteristic of a/an _____ is a lack of processing by the supplier into a newly formed product.
a. component
b. semifinished product
c. finished good
d. MRO item
e. raw material

68. Good reasons for allowing other departments to view purchase orders and incoming receipts does not include which of
the following?
a. The accounting department gains visibility to future accounts payable obligations.
b. The requestor can refer to the purchase order number when inquiring into the status of an order.
c. Receiving has a record of the order to match against the receipt of the material.
d. Traffic becomes aware of inbound delivery requirements and can make arrangements with carriers or use the
company’s own vehicles to schedule material delivery.
e. There is never a good reason for purchasing to allow other departments access to purchase orders and
incoming receipts due to the confidential nature of the price and delivery terms.

69. When a situation arises when an internal customer has a need that comes up suddenly, which is not planned for and for
which there is no preexisting supplier identified to provide the product or service required, purchasing should use a/an
_____ approach.
a. spot buy
b. long term agreement
c. P2P
d. e-procurement
e. None of these answers.

70. All of the following are objectives of a world-class purchasing organization except _____.
a. ensure that all hard copies of purchase orders and other paper documents are filed correctly in a secure area
b. develop aligned goals with internal stakeholders
c. manage the procure-to-process efficiently and effectively
d. supplier performance management
e. supply assurance

71. Failing to respond to the needs of internal customers will diminish the confidence these users have in purchasing, and
they may try to negotiate contracts themselves (a practice known as _____).
a. strategic sourcing
b. spend management
c. maverick buying
d. outsourcing
e. internal sourcing

72. A _____ involves the physical checking of inventory to verify that system records match actual on-hand inventory
levels.
a. reorder point system
Copyright Cengage Learning. Powered by Cognero. Page 11
Name Class Dat
: : e:

chapter 2

b. stock check
c. just-in-time system
d. forecasting system
e. p-card system

Copyright Cengage Learning. Powered by Cognero. Page 12


Name Class Dat
: : e:

chapter 2
Answer Key
1. False

2. False

3. False

4. False

5. False

6. False

7. True

8. True

9. False

10. False

11. False

12. True

13. False

14. True

15. True

16. True

17. False

18. False

19. True

20. True

21. True

22. False

23. True

24. False

Copyright Cengage Learning. Powered by Cognero. Page 13


Name Class Dat
: : e:

chapter 2
25. False

26. True

27. b

28. e

29. b

30. d

31. d

32. e

33. e

34. a

35. a

36. d

37. b

38. a

39. a

40. a

41. a

42. a

43. e

44. a

45. e

46. b

47. e

48. e

49. c

Copyright Cengage Learning. Powered by Cognero. Page 14


Name Class Dat
: : e:

chapter 2
50. b

51. b

52. e

53. d

54. c

55. a

56. c

57. b

58. c

59. e

60. d

61. e

62. a

63. d

64. b

65. e

66. d

67. e

68. e

69. a

70. a

71. c

72. b

Copyright Cengage Learning. Powered by Cognero. Page 15

You might also like