0% found this document useful (0 votes)
6 views141 pages

Final Print Liluh Yard Augmentation T-SCH. 21.08.25

How to form tender documents

Uploaded by

sanjoybapi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views141 pages

Final Print Liluh Yard Augmentation T-SCH. 21.08.25

How to form tender documents

Uploaded by

sanjoybapi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 141

NAME OF WORK :Construction and Provision for LLH

Traffic Yard augmentation for increased wagon holding


capacity.
TENDER SCHEDULE ( Under
Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of
23-24, UWB Item no. 740B-24-25) at Liluah Workshop ,
Eastren Railway.

Estimate No.

TOTAL CIVIL ENGG. Rs. 148938597


COST Total
Rs. : Say Rs.
14.89 crores

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWY (CONSTRUCTION DEPARTMENT )
PARTICULARS REQUIRED FOR CALLING OF TENDER
1 Name of work: Construction and Provision for LLH Traffic Yard
augmentation for increased wagon holding capacity.

( Under Mother Umbrella PB #


1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-
24-25) at Liluah Workshop , Eastren Railway.

2 Reference to sanctioned estimate.


a) Estimate No & sanctioned estimate. :: Estimate no. 36 CAO/Con/09-10.
b) Amount: :: 67.15 crores only ( for civil engg portion)
c) If estimate is not sanctioned, current position of the
estimate with refrence vetting of A/Cs etc. SANCTIONED.

d) Item No. of estimate page and amount provided NAME OF WORK : Detailed estimate for
against the item of estimate. Liluah-Augumentation
of LHB AC Coach OVH facilities at J-Shop(BAY-3)
including other adjscent area development work such as
CC/RCC FLOORING, EPOXY FLOORING OLD
SHEET changing etc. at Liluah Workshop , Eastren
Railway.
e) Provision in the estimate being exceeded what action
is proposed to meet the commitment ,saving from
other items etc.

3 Approximate Cost of this tender now proposed in Rs. #NAME?

SCHEDULE-- 'A-I' (NS item) :: 13455416.20


SCHEDULE-- 'A-II' (NS item P.way) :: 23344860.00
Schedule- "B - I"- 'A' ( Schedule Item - 2011) :: 67756489.00
Schedule- "B - I"- 'B' ( Schedule Item - 2011) :: 0.00
Schedule- "B - I"- 'C' ( Schedule Item - 2011) :: 1537234.00
Schedule- "B - I"- 'D' ( Schedule Item - 2011) :: 0.00
Cost of Schedule Items USSOR-2011-B-I(E )PILE #NAME?
Schedule- B II (Unforseen Schedule items - :: 1139549.31
WORKS -- 2011)
Schedule- C I (Cement) :: 37348158.11
Schedule - CII (Reinforcement Steel) :: 4356890.01
TOTAL :: #NAME?
Say Rs. #NAME?
4 (i) Similar nature of works means: :: Any Civil engineering work involving
execution of fabrication and erection of
structural steel work, over pile foundation

4(ii) Refrence to T/No. /Agrt.No for the tender already :: NO


floated/finalised/ with brief description & cost
including cost of Rly. material issued from.
5 Total financial commitment upto date against this :: Nil
estimate ie, total of item 3&4
6 Pink book/FWP item No. year and allotment for the For the year Item No - 552 of 2022-23 Outlay provided
year. under this item is 11.03 Cr.
7 Plan No. according to which tender is invited the plan :: GAD(Approved) copy enclosed
position where pending.

8 Complete schedule of item & qty. for which tender is :: Proposed Tender Schedule is enclosed
to be invited. The particular to be furnished as per herewith from page no
proforma in item 13 below.

9 Spl. Condition, if any: :: NIL


10 If Bank Guarantee is required (Amount to be
mention) against steel etc.(qty. to be
mention),remaining in the custody of contractor
during fabrication to be indicated specifically.

11 Probable time required for completing the work from :: 06 (Six) months.
the date of Acceptance of the tender.

12 Probable date for commencement for the work. :: NA


13 From where railway material will be supplied. :: N.A.

14 No. of reference to be indicated(at least three rates)


against each non schedule item relevent to this Rate reference is furnished in the schedule based on the
particular work, based on this works already finalised rates provided from HQ/Con's data base. Copy enclosed
in the district including Schedule-B percentage. with RBI Index for ready reference.

15 If it is a Risk & cost tender, particular of the previous :: NA


tender.
16 Approval may be given for inviting tender. :: Open tender .

Certified that:-1. Quantities & specification of items of the tender schedule are based on the siteconditions and I
am personally satisfied with same.
2. Quantities & specifications (1) above on the tender schedule are based on the approved General Arrangement
Drawing.
3. All the items including brief description, rate,units and cost have been checked personally and found correct
and all LARs are freefrom restriction and similar geographical are and latest nature to the best of the knowledge
& assesmment at this stage.
4. All the items including brief description,rate,units and cost including total basic cost of Sch.B based on L&M
schedule of rate 2011 have been checked personally and found correct.

(P S Meena)
Dy.Chief Engineer/Con/II/ER/Howrah.

Chief Engineer/Con/VI/ER/Kolkata.
EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop
, Eastren Railway.
SUMMARY SHEET
Sl. Schedule Basic Cost % Final Cost
No Escalation

1 Sch-A-I (NS-1)(NS Items Works) 13,455,416.20 0.00% Rs. 13,455,416.20


2 Sch-B-I
DSR-2021
(DSR-1)(Supply of Reinforcement Steel )
25,102,000.00 93.00% Rs. 23,344,860.00

Sch-B-II (DSR-2) (Other than Reinforcement


3 72,856,439.78 93.00% Rs.
Work) DSR-2021 67,756,489.00
Sch-C-I (USR-1) (Supply of Reinforcement
4 - 0.00%
Steel) USSOR -2021 0.00
5 Sch-C-II (USR-2) (Supply of Cement) USSOR 1,537,234.00 0.00% Rs. 1,537,234.00
Sch-C-III (USR-3) (Earth work iteams)
6 - 0.00% Rs.
USSOR -2021 0.00
Sch-C-IV (USR-4) (Structural Steel items)
7 1,139,549.31 0.00% Rs.
USSOR -2021 1,139,549.31
8 Sch-C-V (USR-5) (P.Way work) USSOR -2021 37,348,158.11 0.00% Rs.
37,348,158.11
Sch-C-VI (USR-6) (Other requried items)
9 4,356,890.01 0.00% Rs.
USSOR -2021 4,356,890.01
Sch-D-I (DSR-3) (Hoticulture & Landscaping
10 - 0.00% Rs. 0.00
Work) DSR-2021
Total Rs. 148,938,596.63
Say Rs. 14.89 crores

SSE/W/C/HWH,SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWY (CONSTRUCTION DEPARTMENT )

PARTICULARS REQUIRED FOR CALLING OF TENDER


1 Name of work: NAME OF WORK :Construction and Provision for LLH Traffic Yard
augmentation for increased wagon holding capacity.

( Under Mother Umbrella PB # 1185/NR/23-24, PB


Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren
Railway.

2 Reference to sanctioned estimate.


a) Estimate No & sanctioned estimate. :: UNDER VETTING AT CON/ACCTS.

b) Amount: :: 15.93 crores only ( for civil engg portion)

c) If estimate is not sanctioned, current position of the estimate


with refrence vetting of A/Cs etc. UNDER PROCESS at CON/HQ

d) Item No. of estimate page and amount provided against the The proposed tender schedule broadly involves New track laying inside BESY
item of estimate. and Construction and Provision for LLH Traffic Yard augmentation for increased
wagon holding capacity.

( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of


23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

e) Provision in the estimate being exceeded what action is


proposed to meet the commitment ,saving from other items
etc.

3 Approximate Cost of this tender now proposed in Rs. 14.89 crores


Sch-A-I (NS Items Works) :: 13455416.20

Sch-B-I (Supply of Reinforcement Steel ) DSR-2021 :: 23344860.00

:: 67756489.00
Sch-B-II (Other than Reinforcement Work) DSR-2021
:: 0.00
Sch-C-I (Supply of Reinforcement Steel) USSOR -2021

Sch-C-II (Supply of Cement) USSOR -2021 :: 1537234.00

Sch-C-III (Earth work iteams) USSOR -2021 :: 0.00

Sch-C-IV (Structural Steel items) USSOR -2021 :: 1139549.31

Sch-C-V (P.Way work) USSOR -2021 :: 37348158.11

Sch-C-VI (Other requried items) USSOR -2021 :: 4356890.01


:: 0.00
Sch-D-I (Hoticulture & Landscaping Work) DSR-2021
Total 148,938,596.63
Say 14.89 crores
4 (i) Similar nature of works means: :: Any Civil engineering work involving linking of Railway
track by manual or mechanized means.
4(ii) Refrence to T/No. /Agrt.No for the tender already :: NO
floated/finalised/ with brief description & cost including cost
of Rly. material issued from.

5 Total financial commitment upto date against this estimate ie, :: Nil
total of item 3&4

6 Pink book/FWP item No. year and allotment for the year. For the year Item No -Under Mother Umbrella PB # 1185/NR/23-24,
UWB Item no. 740B-24-25 Outlay provided under this item is 1.0(one
thousand only)
7 Plan No. according to which tender is invited the plan position :: GAD(Under process)
where pending.

8 Complete schedule of item & qty. for which tender is to be :: Proposed Tender Schedule is enclosed herewith from page
invited. The particular to be furnished as per proforma in item no
13 below.
9 Spl. Condition, if any: :: NIL

10 If Bank Guarantee is required (Amount to be mention) against


steel etc.(qty. to be mention),remaining in the custody of
contractor during fabrication to be indicated specifically.

11 Probable time required for completing the work from the date :: 08 (Eight) months.
of Acceptance of the tender.
12 Probable date for commencement for the work. :: NA
13 From where railway material will be supplied. :: N.A.

14 No. of reference to be indicated(at least three rates) against


each non schedule item relevent to this particular work, based
on this works already finalised in the district including Rate reference is furnished in the schedule based on the rates provided from
Schedule-B percentage. HQ/Con's data base. Copy enclosed with RBI Index for ready reference.

15 If it is a Risk & cost tender, particular of the previous tender. :: NA

16 Approval may be given for inviting tender. :: Open tender (Two Packet System) .

Certified that:-1. Quantities & specification of items of the tender schedule are based on the siteconditions and I am personally satisfied with
same.
2. Quantities & specifications (1) above on the tender schedule are based on the approved General Arrangement Drawing.

3. All the items including brief description, rate,units and cost have been checked personally and found correct and all LARs are freefrom
restriction and similar geographical are and latest nature to the best of the knowledge & assesmment at this stage.

4. All the items including brief description,rate,units and cost including total basic cost of Sch.B based on USSOR & DSR - 2021 have been
checked personally and found correct.

(AMAN YADAV)
Dy.Chief Engineer/Con/II/ER/Howrah.
Chief Engineer/Con/I/ER/Kolkata.
EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of
23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.
Schedule-A- I (NON SCHEDULE ITEMS)
Schedule-A- I
It. Decription of work Unit Qty. Rate in Rs. Amount
No.
1 Laying 15 mm thick hardened topping on concrete surface with 1 part 1 M2 10,000 409.00 4,090,000.00
metallic floor hardener,4 parts cement and 9 parts by weight of hard
stone chips of size 6 mm mixed and laid as per specifications. USSOR- LAR 1
2011 Item no. 092050

2 Supplying, manufacturing and fitting alluminium sheet of 1.22 mm 1 Sqm 400 1,081.00 432,400.00
thickness bent or curved in joints or wherever necessary including supply
of all fastening, nuts and bolts as per approved drawings or as directed by
the site Engineer with contractor's labour, materials, tools and plants etc LAR 2
complete in all respects.

3 Supplying, transporting to site, erecting and Fixing translucent fibre glass 1 M2 300 1,345.00 403,500.00
reinforced polyester troughed sheet as per B.S. 4154Pt. II 1985 of approx.
3mm thick (tolerance as mentioned in B.S. book) of approved quality
matching with the profile of alluminium sheet of roof, side gable walls,
end walls to be laid along with alluminium sheet with proper lapping for
north light glazing including all fixtures ad fastenings such as GI J/L hooks,
bolts, nuts, washers, glazing bars, limpet/bituminous washer etc. LAR 3
complete as per approved drawings. The rate shall include the cost of all
labour, materials, tools & plants.

Note:-No extra payment will be made for overlapping as per codal


provision, measurement andpayment will be made for clear translucent
area.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


4 Supplying, Fittings, fixing and erecting 3mm thick Transparent 1 M2 50 3,945.00 197,250.00
Polycarbonate sheet as per I.S.-14443-1997 of approved colour of GE-
LEXAN/VMI Plastic "SUNLITE" or equivalent in Roof, Side,Gables,Walls,
End Louvers etc. including cutting of sheets for proper lapping and length
as per approved drawing, supply of necessary bolts with nuts and washers
with standard bituminuous washers etc. as required complete in all
respect to make the entire roofing watertight and leak proof. (No extra LAR 4
payment will be made for over lapping and payment will be made for clear
area only.)

5 Providing of temporary support (for existing roof girder) with all 1 Each 1 14,225.00 14,225.00
contractors structural members like MS Pipe, angle, nuts bolts clamps etc.
as per approved drawing with all contractor's labour, tools and plants in all
respect to support the existing structure for safety. After completion of
work the temporary supprot shall be removed and taken back by the
contractor. Temporary supports will be made by 4 nos. 3" dia M.S. pipe LAR 5
/75x75x8 M.S. angle of height upto 6 m. with proper lacing/brecing
approved drawing.

6 Supplying, Fitting and Fixing edge protection of concrete and drain covers, 1 MT 50 74,460.00 3,723,000.00
slabs, etc. with MS angle and plates respectively of any size and section
including welding MS rods with angles, cutting and placing in position in
true shape and level. The rate includes all materials, tools and plants,
labour to complete the work in all respect. The payment shall be made as LAR 6
per the standard weight.

7 Supply of labour/Khalasi for any kind of work as per direction of Engineer 1 Each 1,500 Err:509 Err:509
– in – Charge. All safety equipments/tools/plants etc. necessary for the
work will be made available at site including First Aid box by the LAR 7
contractor.

8 Supply of SGCI insert as per railway standard . 1 No 5,000 122.00 610,000.00 LAR 8

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


9 Design and supply of detailed GAD ,foundation and fabrication drawing of 1 Job 1 248,284.00 248,284.00 LAR 9
welded steel structures including columns,roof girder, truss,crane
girder,purlin,gabble,louver,screen girder etc etc cmplete in all respect as
per instruction of Engineer-in-charge. Whereever required,design and
drawing of suitable type of foundations (including pile and pile cap if
required) shall be given. The rate includes supply print out of all required
drawings on tracing paper with 5 copies of ammonia print out, 1 copy of
RTF and one soft copy on CD-ROM/DVD. The rate also includes supply of
detailed bill quantity including weights if all structural elements on paper
as well as in soft copy o CD-ROM/DVD. The design and drawing should be
prepared on the basis of I.S. Code.

10 Design and supply of detailed structural drawing of RCC Building/Structure 1 M2 250 54.00 13,500.00 LAR 10
includig columns/walls of RCC/Brick or other material as per instruction of
Engineer-in-charge and modyfing the existing structure , if required by the
engineer-in-charge. The drawings should give RCC details, layout of
columns, foundations, floor slabs, beams, chhajas and related components
& other details as required. The rate includes supply print outof all
required drawings on tracing paper with 5 copies of ammonia print out, 1
copy of RTF and one soft copy on CD-ROM/DVD. The rate also includes
suply of detailed bill quantity including weights of all structural elements
on paper as well as in soft copy on CD-ROM/DVD.

11 Supplying, erecting and fixing in postion ridges, apron pieces made of 1 M 400 929.00 371,600.00 LAR 11
alluminium plain sheet of 1.22mm thickness and proper housig with
troughed sheet roofing, fastenings as per approved drawings or as
directed by Engineer-at site with contractor's labour, materials, tools &
plants etc. complete in all respects.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


12 Supply, preparation & finishing 3mm thick flow applied Epoxy resin based 1 M2 2,000 1,590.03 3,180,060.00 LAR 12
floor topping Nitoflor SL 4000 or similar over 2 mm Highstrength
selfsmoothing Epoxy under lay Nitoflor EU5 or similar with the following
operations:-
a) Surface preparation:- Surface shall be prepared by mile scarfication to
get Mechanical key effect to the primer and the concrete surface for
ensuring maximum bonding. Strong degrease shall be used to remove the
oil deposit on the concrete. Dust and loose particles shall be cleaned using
vaccum cleaners.
b)After surface preparation supply and application of Nitoflor TF 5000 or
similar in all the Construction Joints & pot holes after removing all the
existing Filler Materials from the joints & pot holes and clean properly.
Nitoprime 25 or similar to be applied in the joints and potholes before the
application of Nitoflor TF 5000 or similar.
c) Primiring:- Applying of primer NITOPRIME 25M or similar after mixing
the base and hardener mechanically using a slow speed heavy duty drilling
machine (400 to 500 rpm) fitted with suitable paddle to achieve
homogeneous mix and applied on the prepared surface.

d) Base Layer :- Supply and application of Nitoflor EU5 or similar, a high


strenght self smoothing epoxy underlay is applied as the base layer, after
mixing the base, hardener and filler components thoroughly and poured
onto the primed surface and spread evenly to maintain the required
thickness @2mm using a serrated trowel followed by that spike roller shall
be rolled over the levelled underlay to remove any entrapped air and
allowed to cure for a day.
e) Application of Nitoflor SL 4000 or similar :- Supply and application of
Nitoflor SL 4000 or similar over the prepared surface after mixing
mechanically the two components using heavy duty drilling machine until
achieving a homogenous mix, and spread on the prepared area using
serrated trowel for a thickness of 3mm Spike roller shall be rolled over to
remove the entrapped air.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


13 Supplying, fitting, erecting & fixing UPVC Type-B pipes 150mm/160mm 1 M 200.00 768.13 153626.00 LAR 13
dia of Brand supreme or similar make etc. with necessary
connections/fastening for industrial sheds or buildings etc. for rain water/
soil/ waste water discharge. The rate also includes the supply and fixing of
all the necessary fittings including sockets, clamps, screws etc. ( except
bends and tees, which shall be paid separately) and includes making
scaffolding, making holes to the existing walls/structures etc. and making
good the same,providing proper alignment including necessary clamps or
fixed in-position arrangements as directed including all lift &lead complete
in all respect. The rate will be including supplying of all the materials,
labours, tools, plants, equipments, scaffolding and staging etc. complete
work shall be carried out as directed by engineer in charge.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


14 Supplying, fitting, fixing of UPVC Type-B Tee junction with or without 1 each 20.00 494.87 9897.40 LAR 14
access door for UPVC pipes 150mm/160mm dia of Brand supreme or
similar make etc. with necessary connections/fastening for industrial sheds
or buildings etc. for rain water/ soil/ waste water discharge. The rate will be
including supplying of all the materials, labours, tools, plants, equipments,
scaffolding and staging etc. complete work shall be carried out as directed
by engineer in charge.

15 Supplying, fitting, fixing of UPVC Type-B Bend of required degree with or 1 each 20.00 403.69 8073.80 LAR 15
without access door for UPVC pipes 150mm/160mm dia of Brand
supreme or similar make etc. with necessary connections/fastening for
industrial sheds or buildings etc. for rain water/ soil/ waste water
discharge. The rate will be including supplying of all the materials, labours,
tools, plants, equipments, scaffolding and staging etc. complete work shall
be carried out as directed by engineer in charge.

16 Hiring of JCB Machine (in good working condition) for 1 Hour 500.00 Err:509 Err:509 LAR 16
leveling and dressing ground / dismantling structures including
disposal of debris through dumpers etc. with contractor’s labour, JCB
machine, machine operator, fuel etc. The contractor shall arrange road
permit for vehicle for all the States of operation, as per instructions
of engineer in-charge and vehicle shall not be more than three
years old. Payment shall be made for actual working hours at
site. USSOR 2011, ITEM NO.021510,@ 1061.27/Hour, Chapter 2

Total Cost of Sch.A-I = Rs. Err:509

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Eastern Railway
(Construction Dept.)
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-
24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.
SCHEDULE-C-I (Cement)
Sl No DESCRIPTION OF WORKS Unit Qty RATE AMOUNT
1 Supply and using Cement at Worksite USSOR-2021, ITEM - 025070 RATE REF:
USSOR-
(a) Ordinary Portland Cement 53 grade of approved brands/makes. 1 MT 250 7,686.17 1,921,542.50 2021, ITEM -
025072
USSOR-2021, ITEM - 025072
Note:
(1) Materials as per requirements shall be brought to site and kept under
Contractor custody at their own cost and risk, without any damage like
(2) Payment
setting of theetc.
of cement materials will be made through running and final bills,
as per actual consumption in the work and whatever wastage taken place
i.e. empty cement bags etc. will be the contractors property and the same
shall be removed from the site at his own cost.

(3) The materials are to be procured from the main producers/authorized


dealers/authorized stock yards and shall conform to latest IS(BIS),
specifications.

(4) Cement bags preferably in papers bags should bear follwing


information in legible marking: [i] Name of Manufacturer [ii] Regd. Trade
mark of manufacturer, if any. [iii] Type of cement. [iv] Wt. of each bag in
Kg. or No. of bags/Tonne. [v] Date of manufacturing: generally marked as
week-month-year of manufacture. [vi] It will bear the ISI Certification
mark.

(5) Manufacturers test certificate conforming to latest IS [BIS]


Specification should also be produced by Contractor, duly authenticated
by the Gazetted Officer of the Engineering Department

(6) Contractor shall also establish his own field laboratory equipped with
apparatus duly manned for carrying out the following tests of Cement
according to relevant IS[BIS] specification. (i) Compressive & tensile
strength, (ii) Initial and final setting time, (iii) Consistency, (iv) Soundness,
(v) Fineness modules,

(7) The railway reserves the right to take samples of materials supplied by
the Contractor and to get the same tested in reputed laboratories and the
results there of shall be binding on the Contractor. Cost of the test to be
born by the contractor,

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Total of Schedule C-I = Rs. 1,921,542.50

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of
23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

SCHEDULE-C-II (Reinforcement steel)


Sl No DESCRIPTION OF WORKS Unit Qty RATE AMOUNT
1 Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level. RATE As
a Thermo-Mechanically Treated bars of grade Fe-500D or more.
DSR-2021-5.22 ,Page 118 DSR- 1 Kg 300000 89.65 26,895,000.00 per DSR-
2021-5.22.6 ,Page 118 2021

2 Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing in position and binding all complete above plinth level.
DSR-2021-5.22A ,Page 118

a Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR- 1 Kg 100000 89.65 8,965,000.00
2021-5.22A.6 ,Page 118

Conditions for supply of Reinforcing Steel :


(1) Materials as per requirements shall be brought to site and kept under
Contractor custody at their own cost and risk, without any damage like
rusting of steel etc.

(2) Payment of the materials will be made through running and final bills,
as per actual consumption in the work and whatever wastage taken place
i.e. cut pieces, etc. will be the property of contractor and the same shall
be removed from the site at his own cost.

(3) Steel should be purchased only from the manufacturers mentioned in


the clause 14.5.1 of Ch-II of this tender document,
(4) Manufacturers test certificate conforming to latest IS [BIS]
Specification should also be produced by Contractor, duly authenticated
by the Gazetted Officer of the Enineering Department.

(5) The railway reserves the right to take samples of materials supplied by
the Contractor and to get the same tested in reputed laboratories and the
results there of shall be binding on the Contractor. Cost of the test to be
born by the contractor.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


(6) Payment towards reinforcing steel will be made through running and
final bills on the basis of actual consumption based on theoretical
requirements in the work as per design/drawing, bar bending schedule,
lap length and no payment will be payable towards whatever wastage
taken place i.e. cut pieces etc. which will be the contractor's property and
the same shall be removed from the site at his own cost.

(7) The contractor shall make his own arrangements for storing reinforcing
steel in a safe and satisfactory manner.

(8) In case of any doubts regarding quality of steel, the Railway reserves
the right to take samples of steel supplied by the contractor at any time
and to get the same tested in reputed laboratories and acceptance of the
supplied steel shall be subject to such test results which shall be binding
on the contractor. Cost incurred towards conducting such tests will be
borne by the contractor.

(9) Testing of reinforcing steel will be done periodically or as instructed by


Engineer-in - Charge from Govt laboratory or reputed Institution. Testing
charges will be borne by the contractor.

(10) The rate shall be inclusive of all wastage, octroi, and all kind of taxes,
levied by local municipal authorities / State Govt./Central Govt.

(11) Railway reserves the right to supply the material partly or fully from
its own stores.
(12) Particular attention is invited to the fact materials are not meant for
supply only and no payment shall be made for supply alone. The payment
shall be made only after use of these materials in the actual work for
which supply is intended. The payment shall be restricted to the extent of
Total of Schedule C-II = Rs. 35,860,000.00
Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -2,510,200.00
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be deducted of the (For HWH Div.)
total amount of Schedule B of DSR 2021

Total Cost of Schedule C-II = Rs. 33,349,800.00

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB
Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.
Schedule-SCH AI(NS)
Schedule-A- I
It. Decription of work Unit Qty. Rate in Rs. Amount
No.
1 Laying 15 mm thick hardened topping on concrete surface with 1 part 1 M2 10,000 409.00 4,090,000.00
metallic floor hardener,4 parts cement and 9 parts by weight of hard
stone chips of size 6 mm mixed and laid as per specifications. USSOR- LAR 1
2011 Item no. 092050

2 Supplying, manufacturing and fitting alluminium sheet of 1.22 mm 1 Sqm 400 1,081.00 432,400.00
thickness bent or curved in joints or wherever necessary including supply
of all fastening, nuts and bolts as per approved drawings or as directed by
the site Engineer with contractor's labour, materials, tools and plants etc LAR 2
complete in all respects.

3 Supplying, transporting to site, erecting and Fixing translucent fibre glass 1 M2 300 1,345.00 403,500.00
reinforced polyester troughed sheet as per B.S. 4154Pt. II 1985 of approx.
3mm thick (tolerance as mentioned in B.S. book) of approved quality
matching with the profile of alluminium sheet of roof, side gable walls,
end walls to be laid along with alluminium sheet with proper lapping for
north light glazing including all fixtures ad fastenings such as GI J/L hooks,
bolts, nuts, washers, glazing bars, limpet/bituminous washer etc. LAR 3
complete as per approved drawings. The rate shall include the cost of all
labour, materials, tools & plants.

Note:-No extra payment will be made for overlapping as per codal


provision, measurement andpayment will be made for clear translucent
area.
4 Supplying, Fittings, fixing and erecting 3mm thick Transparent 1 M2 50 3,945.00 197,250.00
Polycarbonate sheet as per I.S.-14443-1997 of approved colour of GE-
LEXAN/VMI Plastic "SUNLITE" or equivalent in Roof, Side,Gables,Walls,
End Louvers etc. including cutting of sheets for proper lapping and length
as per approved drawing, supply of necessary bolts with nuts and washers
with standard bituminuous washers etc. as required complete in all LAR 4
respect to make the entire roofing watertight and leak proof. (No extra
payment will be made for over lapping and payment will be made for clear
area only.)

SSE/W/C/HWH,SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


5 Providing of temporary support (for existing roof girder) with all 1 Each 1 14,225.00 14,225.00
contractors structural members like MS Pipe, angle, nuts bolts clamps etc.
as per approved drawing with all contractor's labour, tools and plants in all
respect to support the existing structure for safety. After completion of
work the temporary supprot shall be removed and taken back by the
contractor. Temporary supports will be made by 4 nos. 3" dia M.S. pipe LAR 5
/75x75x8 M.S. angle of height upto 6 m. with proper lacing/brecing
approved drawing.

6 Supplying, Fitting and Fixing edge protection of concrete and drain covers, 1 MT 50 74,460.00 3,723,000.00
slabs, etc. with MS angle and plates respectively of any size and section
including welding MS rods with angles, cutting and placing in position in
true shape and level. The rate includes all materials, tools and plants,
labour to complete the work in all respect. The payment shall be made as LAR 6
per the standard weight.

7 Supply of SGCI insert as per railway standard . 1 No 5,000 122.00 610,000.00


LAR 7
8 Design and supply of detailed GAD ,foundation and fabrication drawing of 1 Job 1 248,284.00 248,284.00
welded steel structures including columns,roof girder, truss,crane
girder,purlin,gabble,louver,screen girder etc etc cmplete in all respect as
per instruction of Engineer-in-charge. Whereever required,design and
drawing of suitable type of foundations (including pile and pile cap if
required) shall be given. The rate includes supply print out of all required
drawings on tracing paper with 5 copies of ammonia print out, 1 copy of
RTF and one soft copy on CD-ROM/DVD. The rate also includes supply of LAR 8
detailed bill quantity including weights if all structural elements on paper
as well as in soft copy o CD-ROM/DVD. The design and drawing should be
prepared on the basis of I.S. Code.

9 Design and supply of detailed structural drawing of RCC Building/Structure 1 M2 250 54.00 13,500.00 LAR 9
includig columns/walls of RCC/Brick or other material as per instruction of
Engineer-in-charge and modyfing the existing structure , if required by the
engineer-in-charge. The drawings should give RCC details, layout of
columns, foundations, floor slabs, beams, chhajas and related components
& other details as required. The rate includes supply print outof all
required drawings on tracing paper with 5 copies of ammonia print out, 1
copy of RTF and one soft copy on CD-ROM/DVD. The rate also includes
suply of detailed bill quantity including weights of all structural elements
on paper as well as in soft copy on CD-ROM/DVD.

SSE/W/C/HWH,SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


10 Supplying, erecting and fixing in postion ridges, apron pieces made of 1 M 400 929.00 371,600.00 LAR 10
alluminium plain sheet of 1.22mm thickness and proper housig with
troughed sheet roofing, fastenings as per approved drawings or as
directed by Engineer-at site with contractor's labour, materials, tools &
plants etc. complete in all respects.

11 Supply, preparation & finishing 3mm thick flow applied Epoxy resin based 1 M2 2,000 1,590.03 3,180,060.00 LAR 11
floor topping Nitoflor SL 4000 or similar over 2 mm Highstrength
selfsmoothing Epoxy under lay Nitoflor EU5 or similar with the following
operations:-
a) Surface preparation:- Surface shall be prepared by mile scarfication to
get Mechanical key effect to the primer and the concrete surface for
ensuring maximum bonding. Strong degrease shall be used to remove the
oil deposit on the concrete. Dust and loose particles shall be cleaned using
vaccum cleaners.
b)After surface preparation supply and application of Nitoflor TF 5000 or
similar in all the Construction Joints & pot holes after removing all the
existing Filler Materials from the joints & pot holes and clean properly.
Nitoprime 25 or similar to be applied in the joints and potholes before the
application of Nitoflor TF 5000 or similar.
c) Primiring:- Applying of primer NITOPRIME 25M or similar after mixing
the base and hardener mechanically using a slow speed heavy duty drilling
machine (400 to 500 rpm) fitted with suitable paddle to achieve
homogeneous mix and applied on the prepared surface.

d) Base Layer :- Supply and application of Nitoflor EU5 or similar, a high


strenght self smoothing epoxy underlay is applied as the base layer, after
mixing the base, hardener and filler components thoroughly and poured
onto the primed surface and spread evenly to maintain the required
thickness @2mm using a serrated trowel followed by that spike roller shall
be rolled over the levelled underlay to remove any entrapped air and
allowed to cure for a day.
e) Application of Nitoflor SL 4000 or similar :- Supply and application of
Nitoflor SL 4000 or similar over the prepared surface after mixing
mechanically the two components using heavy duty drilling machine until
achieving a homogenous mix, and spread on the prepared area using
serrated trowel for a thickness of 3mm Spike roller shall be rolled over to
remove the entrapped air.

SSE/W/C/HWH,SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


12 Supplying, fitting, erecting & fixing UPVC Type-B pipes 150mm/160mm 1 M 200.00 768.13 153626.00 LAR 12
dia of Brand supreme or similar make etc. with necessary
connections/fastening for industrial sheds or buildings etc. for rain water/
soil/ waste water discharge. The rate also includes the supply and fixing of
all the necessary fittings including sockets, clamps, screws etc. ( except
bends and tees, which shall be paid separately) and includes making
scaffolding, making holes to the existing walls/structures etc. and making
good the same,providing proper alignment including necessary clamps or
fixed in-position arrangements as directed including all lift &lead complete
in all respect. The rate will be including supplying of all the materials,
labours, tools, plants, equipments, scaffolding and staging etc. complete
work shall be carried out as directed by engineer in charge.

13 Supplying, fitting, fixing of UPVC Type-B Tee junction with or without 1 each 20.00 494.87 9897.40 LAR 13
access door for UPVC pipes 150mm/160mm dia of Brand supreme or
similar make etc. with necessary connections/fastening for industrial sheds
or buildings etc. for rain water/ soil/ waste water discharge. The rate will be
including supplying of all the materials, labours, tools, plants, equipments,
scaffolding and staging etc. complete work shall be carried out as directed
by engineer in charge.

14 Supplying, fitting, fixing of UPVC Type-B Bend of required degree with or 1 each 20.00 403.69 8073.80 LAR 14
without access door for UPVC pipes 150mm/160mm dia of Brand
supreme or similar make etc. with necessary connections/fastening for
industrial sheds or buildings etc. for rain water/ soil/ waste water
discharge. The rate will be including supplying of all the materials, labours,
tools, plants, equipments, scaffolding and staging etc. complete work shall
be carried out as directed by engineer in charge.

Total Cost of Sch.A-I = Rs. 13,455,416.20

SSE/W/C/HWH,SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
L.A.R. Statement for :-
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

RBI Index (2011-12=100) for Cement, Lime & Plaster of MAY'25 132.1 RBI Index (2011-12=100) MS Bright Bars MAY'25 134.3 Escalation Jan'17 to MAY'25(Base 2011-12=100)

RBI Index (Base 2011-12=100) MAY'25 All commodities = 154.1 Escalation March'17 to MAY'25 (Base 2011-12=100)

RBI Index (Base 2004-05=100) March'2017 185.8 RBI Index (Base 2011-12=100) MARCH'17 113.2 ROUND(((152.5-112.6)/113.2),4) = 36.130%

Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepted REBATE REBATED RBI RBI % Rate after Rate after Avg. Rate Amount
Offer ( %)
No. OPENING RATE Index Index Escalati escalation escalation
in Old in on upto upto Date
Series New Jan'17
Series

SCHEDULE - A-I
Bid offer
1 Laying 15 mm thick 1 M2 10,000 Agrt No CE/C/VI/39 of 2016-17 Construction of Lifting 5/24/2016 246.88 27.20% 0.00% 314.03 180.2 3.11% 323.79 440.78
hardened topping on Dt 15-02-2017 Bay shed at LLH W
concrete surface with 1 shop 409.00 4,090,000.00
part metallic floor
hardener,4 parts cement
and 9 parts by weight of Tender Number: 02HWHCONII Liluah widening of 9/20/2021 246.88 36.42% 0.00% 336.787 137.40 12.15% 377.72
hard stone chips of size 6 OF 2021-22(OPEN) Dated- Traverser bay-2…
mm mixed and laid as per 21.09.21 etc at LLH-W.SHOP
specifications. ……..DCE/C/II/HWH/AGR/086
USSOR-2011 Item no. DTD. 20.01.2022
092050 DCE/CON/II/HWH/WT/076 Dt.20- New shed at A shop -- 5/8/2019 246.88 30.31% 0.00% 321.71 121.60 26.73% 407.69
12-2019 LLH-W.SHOP
Item included as not
available in DSR/USSOR-

2 Supplying, manufacturing 1 m2 400 DCE/CON/II/HWH/Agr/095 Dt.18- J-Shop (2nd BAY) -- 9/2/2022 1068.00 0.00% 0.00% 1068.000 151.90 1.45% 1083.47
and fitting aluminium sheet 04-2023 LLH-W.SHOP
of 1.22 mm thickness bent 1,081.00 432,400.00
or curved in joints or
whereever necessary
including supply of all
fastening, nuts and bolts as DCE/CON/II/HWH/973 OF 2017- Battery storage shed 2/12/2018 886.00 -5.50% 0.0% 837.27 116.1 32.73% 1111.31
per approved drawings or as 18, Dtd. 20.04.2018 --LLH-W.SHOP
directd by the site etc.

LOA No- Construction of shed 8/2/2024 1082.00 -2.00% 1.00% 1049.76 154.4 -0.19% 1047.72
ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)

SSE/W/CON/HWH, SSE/P.WAY/HWH AEN/CON/II/HWH DY.CE/CON/II/HWH


3 Supplying, transporting to 1 m2 300 Tender Number: 02HWHCONII Liluah widening of 9/20/2021 1258.00 -8.80% 0.00% 1147.296 137.40 12.15% 1286.74
site, erecting and Fixing OF 2021-22(OPEN) Dated- Traverser bay-2…
translucent fibre glass 21.09.21 etc at LLH-W.SHOP 1,345.00 403,500.00
reinforced polyster ……..DCE/C/II/HWH/AGR/086
troughed sheet as per DTD. 20.01.2022
B.S. 4154Pt. II 1985 of LOA No- Construction of shed 8/2/2024 1379.00 -2.00% 1.00% 1337.91 154.4 -0.19% 1335.31
approx. 3mm thick ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
(tolerance as mentioned in II OF 2024-25/00805500112858 of LHB AC coach... J-
B.S. book) of approved Dt 13-09-24 Shop (Bay-3)
quality matching with the DCE/CON/II/HWH/Agr/095 Dt.18- J-Shop (2nd BAY) -- 9/2/2022 1393.00 0.00% 0.00% 1393.000 151.90 1.45% 1413.18
profile etc. 04-2023 LLH-W.SHOP

4 Supplying, Fittings, fixing 1 M2 50 Tender Number: 01-DCE-CON- Construction of High 2/5/2023 4,154.00 0.0% 7.01% 3862.80 150.9 2.12% 3944.72
and erecting 3mm thick ROBSDAH-23-24 Industrial shed at KPA 3,945.00 197,250.00
Transparent Polycarbonate LOA Number: 00903550079600 W.Shop
sheet as per I.S.-14443-1997 Dated- 21/06/2023
of approved colour of GE-
LEXAN/VMI Plastic "SUNLITE"
or equivalent …etc.

5 Providing of temporary 1 Each 1 Tender Number: 02HWHCONII Liluah widening of 9/20/2021 12877.00 -8.80% 0.00% 11743.824 137.40 12.15% 13171.20
support with all contractors OF 2021-22(OPEN) Dated- Traverser bay-2… 14,225.00 14,225.00
structure members like MS 21.09.21 etc at LLH-W.SHOP
Pipe, angle, nuts bolts ……..DCE/C/II/HWH/AGR/086
clamps etc. as per approved LOA No- Construction of shed 8/2/2024 14806.00 -2.00% 1.00% 14364.78 154.4 -0.19% 14336.87
drawing with all contractor's ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
labour, tools and plants in all II OF 2024-25/00805500112858 of LHB AC coach... J-
respect etc Dt 13-09-24 Shop (Bay-3)
DCE/CON/II/HWH/Agr/095 Dt.18- J-Shop (2nd BAY) -- 9/2/2022 14951.00 0.00% 0.00% 14951.00 151.90 1.45% 15167.54
04-2023 LLH-W.SHOP

6 Supplying, Fitting and Fixing 1 MT 50 Tender Number: 02HWHCONII Liluah widening of 9/20/2021 67403.00 -8.80% 0.00% 61471.536 137.40 12.15% 68942.97
edge protection of concrete OF 2021-22(OPEN) Dated- Traverser bay-2… 74,460.00 3,723,000.00
and drain covers, slabs, etc. 21.09.21 etc at LLH-W.SHOP
with MS angle and plates DCE/CON/II/HWH/Agr/095 Dt.18-
……..DCE/C/II/HWH/AGR/086 J-Shop (2nd BAY) -- 9/2/2022 78261.00 0.00% 0.00% 78261.00 151.90 1.45% 79394.47
respectively of any size and 04-2023 LLH-W.SHOP
section including welding MS
rods with angles, cutting and LOA No- Construction of shed 8/2/2024 77499.00 -2.00% 1.00% 75189.53 154.4 -0.19% 75043.44
placing in position in true ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
shape and level. ….etc II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)

7 Supply of SGCI insert 1 Nos 5000 Tender Number: 02HWHCONII Liluah widening of 9/20/2021 110.00 -8.80% 0.00% 100.320 137.40 12.15% 112.51
OF 2021-22(OPEN) Dated- Traverser bay-2… 122.00 610,000.00
21.09.21 etc at LLH-W.SHOP
DCE/CON/II/HWH/Agr/095 Dt.18-
……..DCE/C/II/HWH/AGR/086 J-Shop (2nd BAY) -- 9/2/2022 128.00 0.00% 0.00% 128.00 151.90 1.45% 129.85
04-2023 LLH-W.SHOP
LOA No- Construction of shed 8/2/2024 127.00 -2.00% 1.00% 123.22 154.4 -0.19% 122.98
ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)

SSE/W/CON/HWH, SSE/P.WAY/HWH AEN/CON/II/HWH DY.CE/CON/II/HWH


8 Design and supply of 1 JOB 1 LOA No- Construction of shed 8/2/2024 257013.14 -2.00% 1.00% 249354.15 154.4 -0.19% 248869.65
detailed GAD ,foundation ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
and fabrication drawing of II OF 2024-25/00805500112858 of LHB AC coach... J- 248,284.00 248,284.00
welded steel structures Dt 13-09-24 Shop (Bay-3)
including columns, roof
girder, truss, crane DCE/CON/II/HWH/Agr/095 Dt.18- J-Shop (2nd BAY) -- 9/2/2022 259539.00 0.00% 0.00% 259539.00 151.90 1.45% 263297.96
girder ,purlin , gabble , 04-2023 LLH-W.SHOP
louber,screen girder etc etc
cmplete in all respect as per
instruction of Engineer-in-
charge. . ..etc.

Tender Number: 02HWHCONII Liluah widening of 9/20/2021 227486.00 -8.80% 0.00% 207467.23 137.40 12.15% 232683.41
OF 2021-22(OPEN) Dated- Traverser bay-2…
21.09.21 etc at LLH-W.SHOP
……..DCE/C/II/HWH/AGR/086
DTD. 20.01.2022
9 Design and supply of 1 M2 250 LOA No- Construction of shed 8/2/2024 56.00 -2.00% 1.00% 54.33 154.4 -0.19% 54.23
detailed structural drawing ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation 54.00 13,500.00
of RCC Building/Structure II OF 2024-25/00805500112858 of LHB AC coach... J-
includig columns/walls of Dt 13-09-24
DCE/CON/II/HWH/Agr/095 Shop (Bay-3)
Dt.18- J-Shop (2nd BAY) -- 9/2/2022 56.00 0.00% 0.00% 56.00 151.90 1.45% 56.81
RCC/Brick or other material 04-2023 LLH-W.SHOP
as per instruction of
Engineer-in-charge and
modyfing the same, if
Tender Number: 02HWHCONII Liluah widening of 9/20/2021 49.00 -8.80% 0.00% 44.688 137.40 12.15% 50.12
required by the engineer-in-
OF 2021-22(OPEN) Dated- Traverser bay-2…
charge. The drawings should
21.09.21 etc at LLH-W.SHOP
give RCC details, layout of
……..DCE/C/II/HWH/AGR/086
columns, foundations, floor
DTD. 20.01.2022
slabs, beams, chhajas etc.

10 Supplying, erecting and 1 M2 400 LOA No- Construction of shed 8/2/2024 967.00 -2.00% 1.00% 938.18 154.4 -0.19% 936.36 371,600.00
fixing in postion ridges, ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation 929.00
apron pieces made of II OF 2024-25/00805500112858 of LHB AC coach... J-
alluminium plain sheet of Dt 13-09-24
DCE/CON/II/HWH/Agr/095 Shop (Bay-3)
Dt.18- J-Shop (2nd BAY) -- 9/2/2022 976.00 0.00% 0.00% 976.00 151.90 1.45% 990.14
1.22mm thickness and 04-2023 LLH-W.SHOP
proper housig with troughed
sheet roofing, fastenings as Tender Number: 02HWHCONII Liluah widening of 9/20/2021 841.00 -8.80% 0.00% 766.992 137.40 12.15% 860.21
per approved etc OF 2021-22(OPEN) Dated- Traverser bay-2…
21.09.21 etc at LLH-W.SHOP
……..DCE/C/II/HWH/AGR/086
DTD. 20.01.2022

SSE/W/CON/HWH, SSE/P.WAY/HWH AEN/CON/II/HWH DY.CE/CON/II/HWH


11 Supply, preparation & 1 M2 2000 Engg/08/18-19/LLH, Dated Epoxy Flooring at L- 7/26/2018 1777.55 -27.05% 0.00% 1296.72 119.9 28.52% 0.00 1666.60 3,180,060.00
finishing 3mm th flow 02.08.2018 Shop Over hauling
applied Epoxy resin section in C&W Work
based floor topping ……. shop,Liluah.
etc.
Tender Number: 01-DCE-CON- Construction of High 2/5/2023 1641.00 0.00% 7.01% 1525.97 150.9 2.12% 0.00 1558.33
ROBSDAH-23-24 Industrial shed at KPA
LOA Number: 00903550079600 W.Shop
Dated- 21/06/2023 1,590.03

LOA No- Construction of shed 8/2/2024 1595.72 -2.00% 1.00% 1548.17 154.4 -0.19% 1545.16
ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)

12 Supplying, fitting, erecting & 1 M 200 Engg/11/22-23/LLH openR-2, Upgradation & 31-05.2023 815.00 0.00% 0.00% 815.00 149.4 3.15% 0.00 840.64 768.13
fixing UPVC Type-B pipes 00983090082213 , Dated Augumentation of
150mm/160mm dia of 21.07.2023 infrastructure 153,626.00
Brand supreme or similar facility……etc. at C &
make etc. W Work shop,
E.Railway Liluah
Tender Number: 01-DCE-CON- Construction of High 2/5/2023 801.00 0.00% 7.01% 744.85 150.9 2.12% 0.00 760.65
ROBSDAH-23-24 LOA Number: Industrial shed at KPA
00903550079600 Dated- W.Shop
21/06/2023

LOA No- Construction of shed 8/2/2024 726.11 -2.00% 1.00% 704.47 154.4 -0.19% 703.10
ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)
13 Supplying, fitting, fixing of 1 each 20 Engg/11/22-23/LLH openR-2, Upgradation & 31-05.2023 490.00 0.00% 0.00% 490.00 149.4 3.15% 0.00 505.41
UPVC Type-B Tee junction 00983090082213 , Dated Augumentation of
with or without access door 21.07.2023 infrastructure
for UPVC pipes facility……etc. at C & 494.87 9,897.40
150mm/160mm dia …. W Work shop,
E.Railway Liluah

LOA No- Construction of shed 8/2/2024 500.17 -2.00% 1.00% 485.26 154.4 -0.19% 484.32
ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)

14 Supplying, fitting, fixing of 1 each 20 Engg/11/22-23/LLH openR-2, Upgradation & 31-05.2023 350.00 0.00% 0.00% 350.00 149.4 3.15% 0.00 361.01
UPVC Type-B Bend of 00983090082213 , Dated Augumentation of
required degree with or 21.07.2023 infrastructure
without access door for facility……etc. at C & 403.69 8,073.80
UPVC pipes W Work shop,
150mm/160mm dia E.Railway Liluah

Tender Number: 01-DCE- Construction of High 2/5/2023 489.00 0.00% 7.01% 454.72 150.9 2.12% 0.00 464.36
CON-ROBSDAH-23-24 LOA Industrial shed at KPA
Number: 00903550079600 W.Shop
Dated- 21/06/2023

LOA No- Construction of shed 8/2/2024 398.33 -2.00% 1.00% 386.46 154.4 -0.19% 385.71
ER-CAO-C-HQ-ENGG/02HWHCON of LLH augmentation
II OF 2024-25/00805500112858 of LHB AC coach... J-
Dt 13-09-24 Shop (Bay-3)

SSE/W/CON/HWH, SSE/P.WAY/HWH AEN/CON/II/HWH DY.CE/CON/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of
23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.
SCHEDULE-DSR SCH BI(TMT)
Sl No DESCRIPTION OF WORKS Unit Qty RATE AMOUNT

1 Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing in position and binding all complete upto plinth level.
DSR-2021-5.22 ,Page 118 RATE As
per DSR-
a Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR- 1 Kg 200000 89.65 17,930,000.00 2021
2021-5.22.6 ,Page 118

2 Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing in position and binding all complete above plinth level.
DSR-2021-5.22A ,Page 118
a Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR- 1 Kg 80000 89.65 7,172,000.00
2021-5.22A.6 ,Page 118

Conditions for supply of Reinforcing Steel :


(1) Materials as per requirements shall be brought to site and kept under
Contractor custody at their own cost and risk, without any damage like
rusting of steel etc.

(2) Payment of the materials will be made through running and final bills,
as per actual consumption in the work and whatever wastage taken place
i.e. cut pieces, etc. will be the property of contractor and the same shall
be removed from the site at his own cost.

(3) Steel should be purchased only from the manufacturers mentioned in


the clause 14.5.1 of Ch-II of this tender document,
(4) Manufacturers test certificate conforming to latest IS [BIS]
Specification should also be produced by Contractor, duly authenticated
by the Gazetted Officer of the Enineering Department.

(5) The railway reserves the right to take samples of materials supplied by
the Contractor and to get the same tested in reputed laboratories and the
results there of shall be binding on the Contractor. Cost of the test to be
born by the contractor.

(6) Payment towards reinforcing steel will be made through running and
final bills on the basis of actual consumption based on theoretical
requirements in the work as per design/drawing, bar bending schedule,
lap length and no payment will be payable towards whatever wastage
taken place i.e. cut pieces etc. which will be the contractor's property and
the same shall be removed from the site at his own cost.

SSE/W/C/HWH, SSE.P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


(7) The contractor shall make his own arrangements for storing reinforcing
steel in a safe and satisfactory manner.

(8) In case of any doubts regarding quality of steel, the Railway reserves
the right to take samples of steel supplied by the contractor at any time
and to get the same tested in reputed laboratories and acceptance of the
supplied steel shall be subject to such test results which shall be binding
on the contractor. Cost incurred towards conducting such tests will be
borne by the contractor.

(9) Testing of reinforcing steel will be done periodically or as instructed by


Engineer-in - Charge from Govt laboratory or reputed Institution. Testing
charges will be borne by the contractor.
(10) The rate shall be inclusive of all wastage, octroi, and all kind of taxes,
levied by local municipal authorities / State Govt./Central Govt.

(11) Railway reserves the right to supply the material partly or fully from
its own stores.
(12) Particular attention is invited to the fact materials are not meant for
supply only and no payment shall be made for supply alone. The payment
shall be made only after use of these materials in the actual work for
which supply is intended. The payment shall be restricted to the extent of
materials used in the work.

Total of Schedule DSR SCH BI(TMT) = Rs. 25,102,000.00


Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -1,757,140.00
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be deducted of the (For HWH Div.)
total amount of Schedule B of DSR 2021

Total of Schedule DSR SCH BI(TMT) = Rs. 23,344,860.00

SSE/W/C/HWH, SSE.P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Detailed estimate for Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25)
Schedule-DSR SCH B II (OTHERS)
Schedule Items as per E.Rly's DSR- 2021
Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
1 12 mm cement plaster of mix : DSR-2,2021 -13.1 258
a 1:4 (1 cement: 4 fine sand) 1 M2 294.85 2000.00 589,700.00 DSR -13.1.1 258
b 1:6 (1 cement: 6 fine sand) 1 M2 282.00 3000.00 846,000.00 DSR -13.1.2 258
2 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) 1 M2 253.05 300.00 75,915.00 DSR -13.16.1 259
3 12 mm cement plaster finished with a floating coat of neat DSR -13.7
cement of mix :
a 1:3 (1 cement: 3 fine sand) 1 M2 374.15 250.00 93,537.50 DSR -13.7.1 258

4 15 mm cement plaster on rough side of single or half brick wall DSR -13.5
of mix:
a 1:4 (1 cement: 4 coarse sand) 1 M2 354.50 75.00 26,587.50 DSR -13.5.1 258
b 1:6 (1 cement: 6 coarse sand) 1 M2 339.10 75.00 25,432.50 DSR -13.5.2 258
5 Providing wood work in frames of doors, windows, clerestory 1 M3 131576.95 5.00 657,884.75 DSR1- 9.1.1 182
windows and other frames and trusses, wrought, framed and
fixed in position :
Second Class Teak Wood

6 Providing and fixing panelled/glazed or panelled and glazed 1 Sqm 3704.45 25.00 92,611.25 DSR1- 9.5.1.1 182
shutters for doors, windows and clerestory windows including
ISI marked black enamelled M.S. butt hinges with necessary
screws excluding, panelling/glazing which will be paid for
separately.
Second class teak wood, 35mm thick shutters

7 Providing and fixing ISI marked oxidised M.S. tower bolt black DSR1-9.63
finish,(Barrel type) with necessary screws etc. complete: (copper
oxidizedas per IS: 1378)

a 250x10 mm 1 each 10.00 746.50 DSR1-9.63.1


74.65
8 Providing and fixing ISI marked oxidised M.S. sliding door bolts DSR1-9.62
with nuts and screws etc. complete : (copper oxidized as per IS:
1378)

a 250x16 mm 1 each 165.90 10.00 1,659.00 DSR1-9.62.2

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


9 Providing and fixing stainless steel fancy handle of approved 1 each 10.00 1,531.50 DSR1-9.170.1
make fixed with SS screws etc. complete as per direction of
Engineer-in-charge. 200 mm 153.15

10 Providing and fixing M.S. grills of required pattern in frames of DSR-1-2021- 9.48
windows etc. with M.S. flats, square or round bars etc. all
complete

a Fixed to opening / wooden frames with rawl plugs screws etc. 1 Kg. 350.00 69,195.00 DSR 9.48.2 189
197.70

b Fixed to steel window by welding 1 Kg. 181.00 50.00 9,050.00 DSR 9.48.1 189
c Providing and fixing factory door frame------- solid P.V.C. foam 1 Metre 80.00 38,548.00 DSR 9.123
------- engineer in charge. 481.85 186

11 Providing and fixing factory made 30mm thick door shutter 1 Sqm 3060.60 100.00 306,060.00 DSR 9.124.1
made of solid pvc foam profile ---------------------specifications
and direction of Engineer-In-Charge. Non
decorative finish 187

12 Providing and fixing anodised aluminium work for doors, DSR-II - 2021-21.1
windows, ventilators and partitions with extruded built-up
standard tubular and other sections of approved make
conforming to IS:733 . and IS:1285, anodised transparent or to
required shade according to IS:1868 (Minimum anodic coating of
grade AC 15), fixed with rawl plugs and screws or with fixing
clips, or with expansion hold fasteners including necessary filling
up of gaps at junctions, at top, bottom and sides with required
PVC/neoprene felt etc. Aluminium sections shall be smooth, rust
free, straight, mitered and jointed mechanically wherever
required including cleat angle.Aluminium snap beading for
glazing/panelling, C.P. brass/stainless steel screws, all complete
as per architectural drawings and directions of Engineer-in
charge. (Glazing, panelling & dash fasterners to be paid
separately to be paid for separately)

a Powder Coated aluminium 1 Kg. 466.30 500.00 233,150.00 21.1.1.2 427


b For Shutter of doors, windows & Ventilators -------- of EDPM 1 Kg. 100.00 56,480.00
rubber/neoprene gasket required. Power coated aluminium
564.80 21.1.2.2 427
c Providing and fixing glazing alluminium door,window,ventilator 1 Sqm 50.00 66,277.50
shutter and partitation -------- EIC. With float glass panes of 5mm 1325.55 21.3.2 428
thick.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


13 Painting Steel work with Deluxe Multi Surface Paint to give an 1 M2 140.05 100.00 14,005.00 DSR 13.48.3 262
even shade. Two or more coats applied @ 0.90 litre/10sqm over
an under coat of primer applied @ 0.80 litre/10sqm of approved
brand or manufacture

14 Painting wood work with Deluxe Multi Surfaces Paint of required 1 M2 144.9 100.00 14,490.00 DSR 13.48.2 262
shade. Two or more coat applied @ 0.90 litre/10sqm over an
under coat of primer, applied @ 0.75 litre/10sqm of approved
brand or manufacture

15 Providing and fixing G.I. pipes complete with G.I. fittings DSR-II-2021, 18.10
including trenching and refilling etc. : External Work

(a) 15mm dia. nominal bore 1 M 304.15 100.00 30,415.00 DSR- 18.10.1 372
(b) 20mm dia. nominal bore 1 M 373.35 40.00 14,934.00 DSR- 18.10.2 372
(c) 25mm dia. nominal bore 1 M 491.20 50.00 24,560.00 DSR-18.10.3 372
(d) 50mm dia. nominal bore 1 M 893.20 50.00 44,660.00 DSR-18.10.6 372
16 Providing and fixing 3 layer PP-R (Poly Propylene Random
copolymer) pipes, approved by CBRI and conforming to
IS:15801; SDR 7.4 UV stabilized & anti-microbial fusion welded,
having thermal stability for hot & cold water supply including all
PP-R plain & brass threaded polypropylene random fittings
including fixing pipe with clamps at 1.0m spacing. This includes DSR-II-2021,18.4
testing of joints complete as per direction of Engineer-in-Charge.
Internal work – exposed on wall

(a) PN-16 Pipe, 20mm OD(SDR-7.4) 1 Metre 254.95 50.00 12,747.50 DSR-18.4.1 370
(b) PN-16 Pipe, 25mm OD(SDR-7.4) 1 Metre 316.10 50.00 15,805.00 DSR-18.4.2 370
(c) PN-16 Pipe, 32mm OD(SDR-7.4) 1 Metre 358.90 50.00 17,945.00 DSR-18.4.3 370
(d) PN-16 Pipe, 40mm OD(SDR-7.4) 1 Metre 523.60 50.00 26,180.00 DSR-18.4.4 370
(e) PN - 10 Pipe, 50mm OD(SDR-11) 1 Metre 666.65 50.00 33,332.50 DSR-18.4.5 370
17 Providing and fixing C.P. brass bib cock, 15mm nominal bore of 1 Each 434.20 8.00 3,473.60 DSR-II,18.49.1 380
approved quality conforming to IS:8931

18 Providing and fixing C.P. brass stop cock, 15mm nominal bore, 1 Each 594.75 8.00 4,758.00 DSR-II,-18.52.1 380
(concealed) of standard design and of approved make
conforming to IS:8931
19 Providing and fixing gun metal non- return valve of approved 1 Each 506.65 2.00 1,013.30 DSR-II,-18.19.1.1 373
quality (screwed end) :25 mm nominal bore Horizontal
20 Providing and fixing gun metal non- return valve of approved 1 Each 1173.65 1.00 1,173.65 DSR-II,-18.19.4.1 373
quality (screwed end) : 50 mm nominal bore.Horizontal

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


21 Providing and placing on terrace (at all floor levels) polyethylene 1 Ltr 9.70 4000.00 38,800.00 DSR-II,-18.48 380
water storage tank, IS : 12701 marked, with cover and suitable
locking arrangement and making necessary holes for inlet, outlet
and overflow
pipes but without fittings and the base support for tank.

22 White Vitreous China Wash basin size 630x450 mm 1 Each 2275.00 4.00 9,100.00 DSR-II,-17.7.1
with a pair of 15 mm C.P. brass pillar taps

23 Providing and fixing water closet squatting pan (Indian type DSR-II,-17.1
W.C.pan ) with 100 mm sand cast Iron P or S trap, 10 litre low
level white P.V.C. flushing cistern, including flush pipe, with
manually controlled device (handle lever) conforming to IS :
7231, with all fittings and fixtures complete, including cutting
and making good the walls and floors wherever required:

a White Vitreous china Orissa pattern W.C. pan of size 1 Each 5781.35 4.00 23,125.40 DSR-II,-17.1.1
580x440 mm with integral type foot rests.
24 Providing and fixing white vitreous china pedestal type water DSR-II,-17.2
closet (European type W.C. pan) with seat and lid, 10 litre low
level white P.V.C. flushing cistern, including flush pipe, with
manually controlled device (handle lever), conforming to IS :
7231, with all fittings and fixtures complete, including cutting
and making good the walls and floors wherever required :

a W.C. pan with ISI marked white solid plastic seat and lid 1 Each 5540.55 4.00 22,162.20 DSR-II,-17.2.1

25 Providing and fixing white vitreous china flat back or wall corner
type lipped front urinal basin of 430x260x350 mm and
340x410x265 mm sizes respectively with automatic flushing
cistern with standard flush pipe and C.P. brass spreaders with
brass unions and G.I clamps complete, including painting of
fittings and brackets, cutting and making good the walls and
floors wherever required :

a One urinal basin with 5 litre white P.V.C. automatic flushing 1 Each 5268.85 3.00 15,806.55 DSR-II,-17.4.1
cistern.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


26 Providing and fixing one piece construction white vitreous china DSR-II,-17.6
squatting plate with an integral longitudinal flushing pipe, white
P.V.C. automatic flushing cistern, with fittings, standard size
G.I. / PVC flush pipe for back and front flush with standard
spreader pipes with fittings, G.I clamps and C.P. brass coupling
complete, including painting of fittings and cutting and making
good the walls and floors
etc. wherever required :

a Single squatting plate with 5 litre P.V.C. automatic 1 Each 7752.60 3.00 23,257.80 DSR-II,-17.6.1
flushing cistern

27 Providing and fixing C.P. brass shower rose with 15 or 20 mm DSR-II,-18.22


inlet :

a 100 mm diameter 1 Each 166.35 2.00 332.70 DSR-II,-18.22.1

28 Dismantling roofing including ridges, hips, valleys and gutters 1 M2 136.00 50.00 6,800.00 DSR-15.28.1 289
etc., and stacking the material within 50 metres lead of: G.S.
Sheet

29 Earth work in surface excavation not exceeding 30 cm in depth DSR-1-2021, 2.1 2.0 CH-2 87
but exceeding 1.5 m in width as well as 10 sqm on plan including
getting out and disposal of excavated earth upto 50 m and lift
upto 1.5 m, as directed by Engineer-in- Charge:

a All kinds of soils 1 M3 107.00 10000.00 1,070,000.00 DSR 2.1.1


30 Filling available excavated earth (excluding rock) in trenches, 1 M3 253.95 2000.00 507,900.00 DSR -1,2.25 2.0 CH-2 90
plinth,sides of foundations etc. in layers not exceeding 20cm in
depth, consolidating each deposited layer by ramming and
watering, lead upto 50 m and lift upto 1.5 m.

31 Earth work in excavation by mechanical means (Hydraulic DSR-2.8 2.0 CH-2


excavator)/manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing
of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated
soil as directed, within a lead of 50 m.

a All kinds of soils 1 M3 286.85 12000.00 3,442,200.00 DSR 2.8.1 CH-2 87

32 Surface dressing of the ground including removing vegetation DSR 2.28 CH-2
and inequalities not exceeding 15 cm deep and disposal of
rubbish, lead up to 50 m and lift up to 1.5 m.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


a All kinds of soil 1 m2 28.15 5000.00 140,750.00 DSR 2.28.1 CH-2 91

33 Supplying and filling in plinth with sand under floors, including 1 M3 2161.20 5000.00 10,806,000.00 DSR 2.27 CH-2 90
watering, ramming, consolidating and dressing complete.

34 Providing and laying Ceramic glazed floor tiles of size 300x300 1 M2 935.60 500.00 467,800.00 DSR -11.37 11 222
mm(thickness to be specified by the manufacturer) of 1st quality
conforming to IS : 15622 of approved make in colours such as
White, Ivory, Grey,Fume Red Brown, laid on 20 mm thick
cement mortar 1:4 (1 Cement :4 Coarse sand), Jointing with grey
cement slurry @ 3.3 kg/sqm including
pointing the joints with white cement and matching pigment
etc.,complete

35 Providing and fixing 1st quality ceramic glazed floor tiles 1 M2 938.50 250.00 234,625.00 DSR -11.37A 11 223
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades except
burgundy, bottle green, black of any size as approved by
Engineer-in-Charge in skirting, risers of steps and dados over 12
mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand)
and jointing with grey cement slurry @ 3.3kg per sqm including
pointing in white cement mixed with pigment of matching shade
complete.

36 Providing & laying vitrified tiles in floor -------------------placing the DSR -11.41A 11 224
tiles gently and easily ….etc.
Glazed vitrified floor tiles polished finish DSR -11.41A.2
a Size of Tile 600 x 600 mm 1 M2 1359.20 400.00 543,680.00 DSR -11.41A.2.1 11 224

37 Applying one coat of water thinnable cement primer of DSR -13.43 262
approved brand and manufacture on wall surface :

a Water thinnable cement primer (DSR-13.43.1) 1 m2 64.45 1500.00 96,675.00 DSR -13.43.1 262

38 White washing with lime to give an even shade DSR-II, 2021,13.37

a New work (three or more coats) 1 M2 30.00 973.50


32.45 DSR 13.,37.1 261
39 Finishing walls with water proofing cement paint of required 1 M2 97.60 1000.00 97,600.00 DSR 13.44.1 262
shaed two or more coats on new work applied @ 3.84 kg/10
sqm.

40 Finishing with Deluxe Multi surface paint system for interiors DSR-13.48 262
and exteriors using Primer as per manufacturers specifications :

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


a Two or more coats applied on walls @ 1.25 ltr/10 sqm over and 1 M2 158.95 1000.00 158,950.00 DSR 13.48.1 262
including one coat of Special primer applied @
0.75 ltr /10 sqm

41 Finishing walls with Premium Acrylic Smooth exterior Paint new 1 M2 166.85 2000.00 333,700.00 DSR 13.46.1 262
work two or more coats

42 Applying priming coat: DSR -13.50 262

a With ready mixed red oxide zinc chromate primer of 1 m2 55.50 200.00 11,100.00 DSR -13.50.3 263
approved brand and manufacture on steel galvanised iron/
steel works
43 Painting with aluminium paint of approved brand and DSR -13.100 121092 12 268
manufacture to give an even shade:
a One or more coats on old work 1 m2 79.40 200.00 15,880.00 DSR -13.100.1 268

44 Painting with aluminium paint of approved brand and DSR -13.63


manufacture to give an even shade .

a Two or more coats on new work 1 m2 121.45 200.00 24,290.00 DSR -13.63.1 264
45 Clearing jungle including uprooting of rank vegetation, grass, 1 m2 14.50 35000.00 507,500.00 DSR -2.31
brush wood,trees and saplings of girth up to 30 cm measured at
a height of 1 m above ground level and removal of rubbish up to
a distance of 50 m outside the periphery of the area cleared.

46 Felling trees of the girth (measured at a height of 1 m above DSR1 -2.33


ground level), including cutting of trunks and branches,
removing the roots and stacking of serviceable material and
disposal of unserviceable material.

a Beyond 60 cm girth upto and including 120 cm girth 1 each 1957.15 20.00 39,143.00 DSR1 -2.33.2

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


47 Providing and fixing precoated galvanised iron profile sheets 1 Sqm 671.55 1500.00 1,007,325.00 DSR -12.50 12 245
(size,shape and pitch of corrugation as approved byEngineer-in-
charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc
coating 120 grams per sqm as per IS: 277, in 240 mpa steel
grade, 5-7 microns epoxy primer on both side of the sheet and
polyester top coat 15-18 microns. Sheet should have protective
guard film of 25 microns minimum to avoid scratches during
transportation and should be supplied in single length upto 12
metre or as desired by Engineerin-
charge. The sheet shall be fixed using self drilling /self
tappingscrews of size (5.5x 55 mm) with EPDM seal, complete
upto any pitch in horizontal/ vertical or curved surfaces,
excluding the cost of purlins, rafters and trusses and including
cutting to size and shape wherever required.

48 Providing and fixing precoated galvanised steel sheet roofing DSR -12.51 12 245
accessories 0.50 mm (+0.05 %) total coated thickness, Zinc
coating 120 grams per sqm as per IS: 277, in 240 mpa steel
grade, 5-7 microns epoxy primer on both side of the sheet and
polyester top coat 15-18 microns using self drilling/ self tapping
screws complete :

a Ridges plain (500 - 600mm) 1 m 450.60 600.00 270,360.00 DSR -12.51.1 12 245

b Gutter (600 mm over all girth) 1 m 1110.60 1000.00 1,110,600.00 DSR -12.51.6 12 246

49 Providing and fixing on wall face unplasticised Rigid PVC rain DSR -12.41 243
water pipes conforming to IS : 13592 Type A, including jointing
with seal ring conforming to IS : 5382, leaving 10 mm gap for
thermal expansion, (i) Single socketed pipes.

a 110 mm diameter 1 m 319.75 100.00 31,975.00 DSR -12.41.2 243


b Bend 87.5°, 110mm bend 1 Each 132.00 10.00 1,320.00 DSR -12.42.5.2 243
50 Shoe (Plain), 110mm shoe 1 each 115.95 10.00 1,159.50 DSR -12.42.6.2 243
51 Dismantling steel work in built up sections in angles, tees, flats 1 Kg 4.65 200.00 930.00 DSR-1 -15.18 289
and channels including all gusset plates, bolts, nuts, cutting
rivets, welding etc. including dismembering and stacking within
50 metres lead.

52 Dismantling steel work manually/ by mechanical means in built 1 Kg 3.20 500.00 1,600.00 DSR-1 -15.19 289
up sections without dismembering and stacking within 50
metres lead as per direction of Engineer-in-charge.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


53 Extra for dismantling trusses, rafters, purlins etc. of steel work 1 kg per 0.70 200.00 140.00 DSR-1 -15.20 289
for every additional span of one metre or part thereof beyond metre
10 metres span
54 Extra for dismantling trusses, rafters, purlins etc. of steel work 1 kg per 0.70 200.00 140.00 DSR-1 -15.21 289
for every additional height of one metre or part thereof beyond metre
5 metres. height

55 Dismantling steel work in single sections including DSR-1 -15.17 288


dismembering and stacking within 50 metres lead in:

a R.S. Joists 1 Kg 2.80 100.00 280.00 DSR-1 -15.17.1 288


b Channels, angles, tees and flats 1 Kg 1.90 100.00 190.00 DSR-1-15.17.2 288
56 Demolishing cement concrete manually/ by mechanical means DSR -B.15.2 CH-15 287
including disposal of material within 50 metres lead as per
direction of Engineer - in - charge.

a Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 1 m3 2007.10 1000.00 2,007,100.00 DSR -B.15.2.1 287

57 Demolishing R.C.C. work manually/ by mechanical means 1 m3 2928.10 1000.00 2,928,100.00 DSR -B.15.3 CH-15 287
including stacking of steel bars and disposal of unserviceable
material within 50 metres lead as per direction of Engineer - in-
charge.

58 Demolishing brick work manually/ by mechanical means DSR -B.15.7 CH-15 287
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per direction of
Engineer-in-charge.

a In cement mortar 1 m3 1698.45 400.00 679,380.00 DSR -B.15.7.4 CH-15 287

59 CARRIAGE OF MATERIALS 1.1 By DSR-2021-1, -1.1 CH-1


Mechanical Transport including loading,unloading and stacking

a Disposal of moorum/building rubbish/ malba/ similar 1 m3 411.30 5000.00 2,056,500.00 DSR-2021-1, -1.1.18 CH-1 81
unserviceable, dismantled or waste material by mechanical
transport including loading, transporting, unloading to approved
municipal dumping ground for lead upto 10 km for all lifts,
complete as per directions of Engineer-in-charge.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


REMARKS :The rates will be applicable to net quantities after
deduction of prescribed percentage for voids mentioned in the
specification nder subhead "Carriage of Materials"Disposal of
moorum/building rubbish/ malba/ similar unserviceable,
dismantled or waste material by mechanical transport including
loading, transporting, unloading to approved municipal dumping
ground for lead upto 10 km for all lifts, completeas per
directions of Engineer-in-charge.
Note - item to be applicable in urban areas having directions for
restricted hours for movement/ plying of load carrying
motor vehicle of 3.5 cum or more.

60 CARRIAGE OF MATERIALS 1.1 By DSR-2021-1, -1.1 CH-1


Mechanical Transport including loading,unloading and
stacking.Note:- These rates are inclusive of GST on work
contract, Contractor's profit and over heads, Cess etc. (Rate i/c
GST on Work Contract @ 12%, 15% CP & OH and 1% Cess)

a Steel - 5 km 1 tonne 193.03 1.30 250.94 DSR-2021-1, -1.1.11 CH-1 80

b Beyond 5 km upto 10 km per km 1 Km 13.76 1.30 17.89 DSR-2021-1, -1.1.11 CH-1 80

61 Fencing with R.C.C. post placed at required distance, embedded DSR-2 - 16.17 16 302
in cement concrete blocks, every 15th post, last but one end
post and corner post shall be strutted on both sides and end
post one side only, provided with horizontal lines and two
diagonals of barbed wire weighing 9.38 kg per 100 metres
(minimum), between the two posts fitted and fixed with G.I.
staples on wooden plugs or G.I. binding wire tied to 6 mm bar
nibs fixed while casting the post (cost of R.C.C. posts, struts,
earth work and concrete to be paid for separately) :- Payment to
be made per metre cost of total length of barbed wire used.

a With G.I. barbed wire 1 RM 12.45 1000.00 12,450.00 DSR-2 - 16.17.1 16 302

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


62 Fencing with angle iron post placed at required distance DSR-2 - 16.18 16 302
embedded in cement concrete blocks, every 15th post, last but
one end post and corner post shall be strutted on both sides and
end post on one side only and provided with horizontal lines and
two diagonals interwoven with horizontal wires, of barbed wire
weighing 9.38 kg per
100 m (minimum), between the two posts fitted and fixed with
G.I.staples, turn buckles etc. complete. (Cost of posts, struts,
earth work and concrete work to be paid for separately).
Payment to be made per metre cost of total length of barbed
wire used.

a With G.I. barbed wire 1 RM 19.60 1000.00 19,600.00 DSR-2 - 16.18.1 16 302
Brick work with common burnt clay F.P.S. (non modular) bricks DSR -2021-6.1
63 of class designation 7.5 in foundation and plinth in:
a Cement mortar 1:4 (1 cement : 4 coarse sand) 1 cum 6882.00 100 688200.00 DSR -2021-6.1.1 6 129
b Cement mortar 1:6 (1 cement : 6 coarse sand) 1 cum 6658.25 300 1997475 DSR -2021-6.1.2 129
64 Brick work with common burnt clay F.P.S. (non modular) bricks DSR -2021-6.4
of class designation 7.5 in superstructure above plinth level up
to floor V level in all shapes and sizes in :

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


a Cement mortar 1:4 (1 cement : 4 coarse sand) 1 cum 8512.1 50.00 425,605.00 DSR -2021-6.4.1 6 129
b Cement mortar 1:6 (1 cement : 6 coarse sand) 1 cum 8288.35 300.00 2,486,505.00 DSR -2021-6.4.2 6 129
65 Half brick masonry with common burnt clay F.P.S. (non modular) DSR -2021-6.12 6 130
bricks of class designation 7.5 in foundations and plinth in :

a Cement mortar 1:4 (1 cement : 4 coarse sand) 1 M2 837.85 25.00 20,946.25 DSR -2021-6.12.2 6 130
66 Half brick masonry with common burnt clay F.P.S. (non modular) DSR -2021-6.13 6
bricks of class designation 7.5 in superstructure above plinth
level up to floor V level.

a Cement mortar 1:4 (1 cement :4 coarse sand) 1 M2 1018.05 50.00 50,902.50 DSR -2021-6.13.2 6 130

67 Providing and laying in position cement concrete of specified DSR-1-2021 - 2021 4.1 4 99
grade excluding the cost of centering and shuttering - All work
up to plinth level :

a 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from 1 M3 6833.4 500 3,416,700.00 DSR - 2021 4.1.5 4 99
natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources)

b 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from 1 M3 7365.15 750 5,523,862.50 DSR - 2021 4.1.3 4 99
natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources)

68 Providing and laying in position ready mixed or site batched DSR - 2021 4.20 104
design mix cement concrete for plain cement concrete work;
using coarse aggregate and fine aggregate derived from natural
sources, Portland Pozzolana/Ordinary Portland /Portland Slag
cement, admixtures in recommended proportions as per IS:9103
to accelerate / retard setting of concrete, to improve durability
and workability without impairing strength; including pumping
of concrete to site of laying, curing, carriage for all leads; but
excluding the cost of centering, shuttering and finishing as per
direction of the engineer-in-charge; for the following grades of
concrete. Note: Extra cement up to 10% of the minimum
specified cement content in design mix shall be payable
separately. In case the cement content in design mix is more
than 110% of the minimum specified cement content, the
contractor shall have discretion to either re-design the mix or
bear the cost of extra cement.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


a All works upto plinth level : 1 M3 8387.15 800 6,709,720.00 DSR - 2021 4.20.1.3 4 105
Concrete of M20 grade with minimum cement content of 270
kg /cum
b All works above plinth and upto floor V level : Concrete 1 M3 10009.5 30 300,285.00 DSR - 2021. 4.20.2.3 4 105
of M20 grade with minimum cement
content of 270 kg /cum
69 Providing and laying in position ready mixed or site batched DSR - 2021. 5.33 5 112
design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from
natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions
as per IS: 9103 to accelerate / retard setting of concrete, to
improve durability and workability without impairing strength;
including pumping of concrete to site of laying, curing, carriage
for all leads; but excluding the cost of centering, shuttering,
finishing and reinforcement as per direction of the engineer-in-
charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement
content in design mix shall be payable separately. In case the
cement content in design mix is more than 1.10 times of the
specified minimum cement content, the contractor shall have
discretion to either re-design the mix or bear the cost of extra
a All work up to plinth level : DSR -5.33.1 5
Concrete of M25 grade with minimum cement 1 M3 8683.80 800 6,947,040.00 DSR -5.33.1.1 5 120
content of 330 kg /cum
b All works above plinth level upto floor V level DSR -5.33.2 5
Concrete of M25 grade with minimum cement 1 M3 10306.20 100 1,030,620.00 DSR -5.33.2.1 120
content of 330 kg /cum
70 Providing and laying in position specified grade of reinforced DSR -5.1 5
cement concrete, excluding the cost of centering, shuttering,
finishing and reinforcement -
All work up to plinth level :

a 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from 1 M3 8364.20 1000 8,364,200.00 DSR -5.1.2 5 112
natural sources : 3 graded stone aggregate 20 mm nominal size
derived from natural sources)

71 Reinforced cement concrete work in walls (any thickness), DSR - 2021. 5..2 5
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. above plinth level up to floor five level, excluding cost
of centering, shuttering, finishing and reinforcement :

a Providing and laying cement concrete 1:1.5:3 with 20mm 1 M3 10185.05 100 1,018,505.00 DSR - 2021 5.2.2 5 112
nominal size aggregate etc. above excluding shuttering,
centering :

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


b Providing, hoisting and fixing above plinth level upto five floor 1 M3 9673.5 20 193,470.00 DSR - 2021 5.12 5 115
level precast reinforced cement concrete work -------------------
excluding cost of reinforcement with 1:1.5:3.

72 Smooth finishing of the exposed surface of R.C.C. work with 6 1 M2 253.05 10 2530.50 DSR - 2021 5.23 5 119
mm thick cement mortar 1:3 (1 Cement : 3 fine sand).

73 Centering and Shuttering including strutting, propping and 1 M2 307.95 1800 554,310.00 DSR - 2021 5.9.1 114
removal of form for Foundation, footing, bases of columns etc.
for mass concrete.

74 Centering and Shuttering including strutting, propping and 1 M2 766.55 400 306,620.00 DSR - 2021 5.9.3 114
removal of form for Suspended floor, roofs, landing, balconiss
and asses platform

75 Centering and Shuttering including strutting, propping and 1 M2 608.35 400 243,340.00 DSR - 2021 5.9.5 114
removal of form for Lintel, Beams, Plinth Beams, Girders,
Bressumers and Cantiliver

76 Centering and Shuttering including strutting, propping and 1 M2 657.75 300 197,325.00 DSR - 2021 5.9.7 114
removal of form for Stairs.(excluding landings)
77 Centering and Shuttering including strutting, propping and 1 M2 804.25 200 160,850.00 DSR - 2021 5.9.6 114
removal of form for Columns, Pillers, Piers, Abutments, Posts
and struts.
TOTAL DSR SCH B II (OTHERS) Amount Rs 72,856,439.78
Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -5,099,950.78
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be (For HWH Div.)
deducted of the total amount of Schedule B of DSR 2021

TOTAL DSR SCH B II (OTHERS) Amount Rs 67,756,489.00

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of
23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

SCH CII (USR-2) (CEMENT) USSOR-2021


Sl No DESCRIPTION OF WORKS Unit Qty RATE AMOUNT

1 Supply and using Cement at Worksite USSOR-2021, ITEM - 025070 RATE REF:
USSOR-
(a) Ordinary Portland Cement 53 grade of approved brands/makes. 1 MT 200 7,686.17 1,537,234.00 2021, ITEM -
USSOR-2021, ITEM - 025072 025072

Note:
(1) Materials as per requirements shall be brought to site and kept under
Contractor custody at their own cost and risk, without any damage like
setting of cement etc.

(2) Payment of the materials will be made through running and final bills,
as per actual consumption in the work and whatever wastage taken place
i.e. empty cement bags etc. will be the contractors property and the same
shall be removed from the site at his own cost.

(3) The materials are to be procured from the main producers/authorized


dealers/authorized stock yards and shall conform to latest IS(BIS),
specifications.
(4) Cement bags preferably in papers bags should bear follwing
information in legible marking: [i] Name of Manufacturer [ii] Regd. Trade
mark of manufacturer, if any. [iii] Type of cement. [iv] Wt. of each bag in
Kg. or No. of bags/Tonne. [v] Date of manufacturing: generally marked as
week-month-year of manufacture. [vi] It will bear the ISI Certification
mark.

(5) Manufacturers test certificate conforming to latest IS [BIS]


Specification should also be produced by Contractor, duly authenticated
by the Gazetted Officer of the Engineering Department

(6) Contractor shall also establish his own field laboratory equipped with
apparatus duly manned for carrying out the following tests of Cement
according to relevant IS[BIS] specification. (i) Compressive & tensile
strength, (ii) Initial and final setting time, (iii) Consistency, (iv) Soundness,
(v) Fineness modules,

(7) The railway reserves the right to take samples of materials supplied by
the Contractor and to get the same tested in reputed laboratories and the
results there of shall be binding on the Contractor. Cost of the test to be
born by the contractor,

Total of Schedule C-I = Rs. 1,537,234.00

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Detailed estimate for Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25)
ScheduleUSR SCH C-IV (STRUCTURAL STEEL)
Schedule Items as per E.Rly's USSOR & DSR- 2021
Sl No DESCRIPTION OF WORKS Unit RATE Qty AMOUNT
1 Supplying fabricating and erecting welded and/or bolted and/or 1 MT 121349.03 0.40 48,539.61 USSOR - 2021 -
riveted steel work in built up sections, trusses and framed work, 041370
staging, racks, Height Gauge etc. for Steel Structures other than
bridgegi rders, using RSJ, tees, angles and channels/flats, plates,
gussets, round or square bars, cleats, bolts etc., with contractors
own steel including cutting, bending, straightening, drilling,
riveting, hoisting,
fixing, erecting, welding, bolting etc., with Providing stiffeners
wherever required as per approved drawing including applying a
priming coat of a approved steel primer with all contractor’s
materials, labour, tools & plants, lead & lift including crossing of
tracks if required etc., complete
as per specification and as directed by Engineer-in-charge. Note:
The payment shall be made on the theoretical weight of main
components and gusset plates only.

Structural steel work in single section, fixed with or without 1 kg 86.54 11000.00 951,901.50 DSR - 2021- 10.1 Building Cost 93.05 x
connecting plate, including cutting, hoisting, fixing in position Index for Howrah 93% =
and applying a priming coat of approved steel primer all as per 86.54
complete. PCE/ER/KKK's
letter no.
W(2)506/USSOR/
2021 Dated
16.07.2024 i.e 7%
2 is to be deducted
of the rate of DSR
2021

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


3 Providing and fixing various size HTS holding down bolts 1 KG 135.37 200.00 27,074.00 USSOR - 2021 -
conforming to relevant Codes/Specification in concrete column 041072
or in other structures with proper nuts, bolts, washers/plates,
grouting of holes with cement or epoxy concrete with all
material, labour, T&P as a complete job.
a) With epoxy concrete grouting.

Providing and fixing bolts including nuts and washers complete. 1 KG 130.34 100.00 13,033.95 DSR - 2021- 10.20 Building Cost 140.15
Index for Howrah x 93%
as per =130.1
PCE/ER/KKK's 4
letter no.
W(2)506/USSOR/
2021 Dated
4 16.07.2024 i.e 7%
is to be deducted
of the rate of DSR
2021

Supplying and fixing HSFG bolts of any dia and any length with 1 KG 229.03 100.00 22,903.00 USSOR - 2021 -
suitable nuts including DTI washers conforming to IRS-B1-2001 041020
5 for bridges and steel structures with contractors labour, tools
and plants and lead and lift etc., complete.

Extra for providing and fixing wind ties of 40x 6 mm flat iron 1 meter 152.19 500.00 76,097.25 DSR - 2021- 12.11 Building Cost 163.65
section Index for Howrah x 93%
as per =152.1
PCE/ER/KKK's 9
letter no.
W(2)506/USSOR/
2021 Dated
6 16.07.2024 i.e 7%
is to be deducted
of the rate of DSR
2021

TOTAL Amount Rs 1,139,549.31

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB
Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.
USSOR SCH C-V (P.WAY)
It. No. Decription of work Unit Qty. Rate in Rs. Amount LAR/USSOR-2011
ITEM NO.s
1 Linking of BG track (exceptat LC ,Bridges and SEJs) with any type of rail
section and sleeper of specified density, on ballast bed spread and compacted
with suitable roller, over prepared formation including leading free
rails/welded panels available along the alignment on to formation, leading and
spreading all fittings and fastenings, spreading of sleepers at specified
spacing, squaring, placing of rails over sleepers and fixing rails to sleepers
with all types of fittings and fastenings to correct gauge & alignment,
lubrication of fittings and fastenings with contractor's grease as per IRPWM
standards with contractors labour, tools, consumables,withall lead, lifts etc. USSOR -2021, Item
- No. - 123040
complete and raising, levelling and initia lpacking of track to make it fit for 30
kmph and meet other prerequisites prescribed in Indian Railway Track
Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting
and Hole drilling shall be paid separately. 2.Spreading of ballast and
compaction shall be paid separately under relevant item.

USSOR -2021, Item


1 (a) For sleeper density of 1660 sleepers per km 1 TRM 6100 329.53 2,010,133.00 No. - 123041
2 Linking of track at level crossing locations as per RDSO drawings with any
type of rail section and sleeper on prepared formation including leading free
rails/welded panels available along the alignment on to formation, spreading
of sleepers at specified spacing, squaring, placing of rails over sleepers and
fixing rails to sleepers with all types of fittings and fastenings to correct gauge
& alignment, excavating level crossing portion as necessary, fixing check rails
to running rails, providing C.C blocks, chairs, anti corrosive painting to
running rails and check rails, lubrication of fittings and fastenings with
contractor's grease as per IRPWM standards with contractors labour, tools, USSOR -2021, Item
1 TRM 100 515.21 51,521.00 No. - 123050
consumables,with all lead, lifts etc. complete and raising, levelling and initial
packing of track to make it fit for 30 kmph and meet other prerequisites
prescribed in Indian Railway Track Machine Manual for deployment of
Tamping Machine. Note: Rail cutting and hole drilling, if required, shall be
paid separately under relevant item.

3 Laying and linking of turn outs of all types including diamond crossings & USSOR -2021, Item
Derailing switches with 52Kg/60Kg rail section on PSC sleepers on prepared No. - 072040
ballast bed for New lines or during total closure of section at indicated
location as per standard drawing, duly leading sleepers, rails, switches,
crossings, fastenings including rail cutting, drilling, fixing of all components,
fittings with housing of tongue rails as per requirement of signaling, preparing
ballast bed, filling and spreading of ballast as required, linking of turnout with -
track, attending track parameters including lifting, providing one round of
packing to make track fit for20kmph speed including lubrication of
fittings/fastenings, complete as directed by Engineer in-charge.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


USSOR -2021, Item
3 (a) 1 in 8½ Turnouts 1 Set 9 50406.37 453,657.33 No. - 072041
USSOR -2021, Item
3 (b) Derailing Switch 1 Set 11 11483.85 126,322.35 No. - 072046
4 Assembling all types of Switches on staging, clear of infringements, USSOR -2021, Item
to correct gauge and alignment as per standard drawings with all types of rail No. - 072020
sections over PSC sleepers at specified locations ,duly leading rails, special
sleepers, switches with a maximum lead of 500 m, all lift& crossing of track
as required including cutting, drilling, fixing of all components, fittings etc.
with housing of tongue rails as per requirement of signaling including -
lubrication of fittings/fastenings,
complete in all respect. Note: Required P.Way fittings shall be supplied at
SSE/P.Way stores.

USSOR -2021, Item


4(a) 1 in 8½ Turnouts 1 Set 9 20882.10 187,938.90 No. - 072021
USSOR -2021, Item
4(b) Derailing Switch 1 Set 11 9961.19 109,573.09 No. - 072025
5 Loading, leading and unloading of PSC Sleepers of 52Kg/60Kg by Railway's - USSOR -2021, Item
Rail Dolly/DipLorry to the nominated location under traffic in case road No. - 172030
carriage is not possible for different leads and lift up to 5 metres. 1

5 (a) For lead up to 500 metres 1 MT 3500 354.59 1,241,065.00 USSOR -2021, Item
No. - 172031
5 (b) For lead beyond 500 metre and up to 1 Km 1 MT 2000 526.66 1,053,320.00 USSOR -2021, Item
No. - 172032
5 (C) Extra to Items no. 172032 for lead beyond 1 Km for every subsequent Km or 1 MT 1000 55.00 55,000.00 USSOR -2021, Item
part thereof and up to 10 Km No. - 172033
5 (d) Extra to Item no. 172031 and 172032 with contractor's Rail Dolly/Dip Lorry. 1 MT 3500 18.64 65,240.00 USSOR -2021, Item
No. - 172034
6 Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by - USSOR -2021, Item
Railway's Rail Dolly /Dip Lorry to the nominated location under traffic with No. - 171030
line protection in case road carriage is not possible with different lead with a
lift up to 5 metre during block period.

6 (a) For lead up to 500 metre. 1 MT 800 455.32 364,256.00 USSOR -2021, Item
No. - 171031
6 (b) For lead beyond 500 metre and up to 1 Km. 1 MT 450 587.97 264,586.50 USSOR -2021, Item
No. - 171032
6 (C) Extra to Items no.171032 for lead beyond 1 Km for every subsequent Km or 1 MT 400 70.51 28,204.00 USSOR -2021, Item
part thereof and up to 10 Km No. - 171033
6 (d) Extra to Item no. 171031 and 171032 with contractor's Rail Dolly/Dip Lorry 1 MT 800 16.85 13,480.00 USSOR -2021, Item
No. - 171034
7 Through packing of track, as per procedure prescribed in latest edition of - USSOR -2021, Item
Indian Railways Permanent Way Manual No. - 131010
7 (a) For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more 1 TRM 6500 124.02
USSOR -2021, Item
806,130.00 No. - 131011
8 First or Second Through Packing of track of all sleeper density including - USSOR -2021, Item
giving a general lift, as desired to eliminate sag after Deep Screening work, No. - 131030
lifting of track, lowering of track and major realignment of curves and
formation rehabilitation as per procedure prescribed in latest edition of
IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to
50 mm.

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


8 (b) For PSC Sleeper Track with Sleeper Density of 1660 TRM 6500 163.7 1,064,050.00 USSOR -2021, Item
No. - 131032
9 Third or subsequent Through Packing of track for all sleeper density including - USSOR -2021, Item
picking of slacks, as required after second through packing, subsequent to No. - 131040
Deep Screening work as per procedure prescribed in latest edition of IRPWM.
This item can also be used after lifting/regrading/realignment works also.
Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.

9 (b) For PSC Sleeper Track with Sleeper Density of 1660 1 TRM 6500 125.92 818,480.00 USSOR -2021, Item
No. - 131042
10 Through packing of points and crossings, derailing switches including - USSOR -2021, Item
gauging, fittings recoupment, ballasting as required, elimination of sag and to No. - 131050
the required alignment after Deep Screening as per procedure prescribed in
latest edition of IRPWM complete as per direction of Engineer-in-charge.
Note: This work shall be operated in exceptional cases with written approval
at DEN level when UNIMAT is not available and immediate packing is
required to pass train over it.

10 (a) 1 in 8½ PSC layout 1 Set 36 13583.64 489,011.04 USSOR -2021, Item


No. - 131051

10 (b) 1 in 8½ Derailing Switch 1 Set 44 1928.41 84,850.04 USSOR -2021, Item


No. - 131054
11 Lifting and packing for regrading the existing PSC sleeper track to required USSOR -2021, Item
height / level in stages not exceeding 75 mm or part thereof at a time, No. - 083010
providing permissible ramp for the track, insertion of moorum/sand/stone
ballast uniformly under the existing track and placing the same to safe
approved gradient, gauge, cushion including levelling and one round of
through packing to allow train movement at restricted speed of 30 kmph for a
specified length with all leads & lifts and fixing, marking, painting rail level 1 TRM 6100 212.73 1,297,653.00
pegs at every 30m interval.
Note: Lifting of track shall be done in stages as per procedure
prescribed in latest edition of IRPWM to get the proposed final level as per
approved working profile, as directed by Engineer in-charge.

11 (a) Extra for additional lift over 75 mm for every 50 mm lift or part there of up to USSOR -2021, Item
275 mm for item nos. 083010 for each TRM. 1 TRM 6100 33.04 201,544.00 No. -083011
12 Fabrication including cutting, bending/machining and fixing of check rails of USSOR -2021, Item
all rail sections over PSCS leepers as per Railway’s approved drawings & No. - 183020
specifications for level crossings/ trolleypaths/inspection lines in yards duly
cutting rail flanges, wherever required to correct alignment and level, drilling
of holes with machine in check rails and fixing to Running rail and sleepers
with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets,
packing pieces, bolts, washers etc including grinding of brackets if required,
fixing of Railway's wooden blocks at flare ends duly cutting and plaining, 1 TRM 100 1219.38 121,938.00
crossing of tracks and as directed by the engineer in-charge Note:1. Drilling of
holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2.
Required P.Way materials will be supplied at SSE/P.Way stores.

13 Cutting foot of rail by gas or any other approved method for check rails and USSOR -2021, Item
grinding sharp edges into smooth profile. Payment shall be made for length of 1 RM 100 197.14 19,714.00 No. - 183030
cutting of foot.
14 Fixing check rails to running rails on level crossings with MS brackets, 1 Set 150 5962.30
USSOR -2021, Item
894,345.00 No. - 183040

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


15 Drilling of parabolic shaped holes to the web of check rail as per drawings & 1 Nos 150 150.85 22627.5
USSOR -2021, Item
specifications and as directed by engineer in- charge. No. - 183010
16 Unloading of 52kg /60kg PSC line and special sleepers up to 2.75 metre USSOR -2021, Item
length in Depot /Station/Mid-section between stations in neat manner for No. - 172060
Railway usage from departmental material train (DMT) or contractor's
/Railway's Truck/Trailer with crane or any other means including crossing of
one track and lead up to 250 metre & lift up to 5 metre with contractor's -
labour, tools & plants, machinery, consumables etc. Note: In case of any
damage to sleeper during loading, penalty@50% of the all inclusive cost of
sleeper shall be levied.

16 (a) From DMT - During period of traffic block 1 MT 4000 197.95


USSOR -2021, Item
791,800.00 No. - 172061
16 (b) From DMT - Not involving traffic block or on lines, not opened to traffic 1 MT 1000 140.52
USSOR -2021, Item
140,520.00 No. - 172062
16 (c) From Truck / Trailer 1 MT 4000 95.29
USSOR -2021, Item
381,160.00 No. - 172063
17 Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in - USSOR -2021, Item
Depot / Station / Mid-section between stations in neat manner for Railway No. - 172070
usage fromdepartmental material train(DMT) or contractor's
/Railway'sTruck/Trailer with crane or any other means including crossing of
one track and lead up to 50 metre & lift up to 5 metre with contractor's labour,
tools & plants, machinery, consumables etc. Note: In case of any damage to
sleeper during loading, penalty @ 50% of the all inclusive cost.

17 (a) From DMT - During period of traffick block 1 MT 350 251.77 88,119.50 USSOR -2021, Item
No. - 172071
17 (b) From Truck / Trailor 1 MT 350 96.69 33,841.50 USSOR -2021, Item
No. - 172073
18 Loading, leading and unloading of all types of P.Way fittings and all other - USSOR -2021, Item
miscellaneous material except Rails, sleepers, switches, crossings, SEJs and No. - 172040
Glued Joints by road vehicles for different leads. Note: Lead shall be the
shortest motorable road length between the points of loading and unloading.

18(a) Lead up to 5 Km 1 MT 100 193.12 19,312.00 USSOR -2021, Item


No. - 172041
18(b) Lead beyond 5 Km and up to 10 km 1 MT 100 236.04 23,604.00 USSOR -2021, Item
No. - 172042
18(C) Lead beyond 10 Km and up to 20 km 1 MT 100 294.29 29,429.00 USSOR -2021, Item
No. - 172043
18(d) Lead beyond 20 Km and up to 30 km 1 MT 100 365.05 36,505.00 USSOR -2021, Item
No. - 172044
18(e) Lead beyond 30 Km and up to 50 km 1 MT 100 463.07 46,307.00 USSOR -2021, Item
No. - 172045
18(f) 6 Lead beyond 50 Km and up to 100 Km 1 MT 100 675.98 67,598.00 USSOR -2021, Item
No. - 172046
18(g) Lead beyond 100 Km and up to 150 Km 1 MT 100 995.41 99,541.00 USSOR -2021, Item
No. - 172047
18(h) Extra for every Km per MT beyond 150 Km over item no. 172047 1 MT Km 150000 3.27 490,500.00 USSOR -2021, Item
No. - 172048

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


19 Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints - USSOR -2021, Item
by road vehicles for different leads .Note:1. Lead shall be the shortest No. - 172050
motorable road length between the points of loading and unloading. 2.
Loading and unloading shall be paid extra under relevant items.

19(a) Lead up to 5 Km 1 MT 4960 55.91 277,313.60 USSOR -2021, Item


No. - 172051
19(b) Lead beyond 5 Km and up to 10 km 1 MT 4960 98.82 490,147.20 USSOR -2021, Item
No. - 172052
19(C) Lead beyond 10 Km and up to 20 km 1 MT 4960 157.08 779,116.80 USSOR -2021, Item
No. - 172053
19(d) Lead beyond 20 Km and up to 30 km 1 MT 4960 227.84 1,130,086.40 USSOR -2021, Item
No. - 172054
19(e) Lead beyond 30 Km and up to 50 km 1 MT 4960 325.85 1,616,216.00 USSOR -2021, Item
No. - 172055
19(f) 6 Lead beyond 50 Km and up to 100 Km 1 MT 4960 538.76 2,672,249.60 USSOR -2021, Item
No. - 172056
19(g) Lead beyond 100 Km and up to 150 Km 1 MT 4960 858.20 4,256,672.00 USSOR -2021, Item
No. - 172057
19(h) Extra for every Km per MT beyond 150 Km over item no. 172057 1 Mt Km 200000 3.27 654,000.00 USSOR -2021, Item
No. - 172058
20 Insertion of rails of all types & length in track, laid on any type &density of - USSOR -2021, Item
sleeper to the specified gauge under traffic block. Rates include fastening of No. - 061030
rail with sleepers with standard set of fastenings CHAPTER 6 : Rails,
Sleepers and Fittings Renewal include fastening of rail with sleepers with
standard set of fastenings and fixing of fish plates and bolts or, if required,
providing gap for welding and stacking of released material without
infringement within 250 m as directed by Engineer-in Charge. Note: Rail
drilling and cutting to be paid separately.

20 (a) For Casual/scattered rail renewal work 1 RM 1000 44.67 44,670.00 USSOR -2021, Item
No. - 061032
21 Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including USSOR -2021, Item
chamfering with appropriate chamfering tools in all types of rail section with No. - 061040
contractor's tools & plants, equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge. Rail DrillingMachine will be as 1 Nos -
per RDSO Specification No.TM/SM/3, dated 24.04.1991.

USSOR -2021, Item


21 (a) Outside Track 1 Nos 4000 57.02 228,080.00 No. - 061041
USSOR -2021, Item
21 (b) On Running Line 1 Nos 50 75.99 3,799.50 No. - 061042
22 Lubrication of fish plated rail joints under traffic, by using Grease Graphite USSOR -2021, Item
Grade 'O' (IS:408) and Black oil supplied by contractor, for all types of rail No. - 063050
sections as per procedure laid down in latest version of IRPWM and as
directed by Engineer Incharge. Note: Release U/S bolt & nuts is to be -
deposited back. If any fish bolts is jammed it should be cut with chisel and
hammer and replaced with fresh fish bolt supplied.

USSOR -2021, Item


22 (a) For 1.00m long fish plates 1 Joint 500 125.10 62,550.00 No. - 063051
USSOR -2021, Item
22 (b) For 610 mm long fish plates. 1 Joint 500 85.23 42,615.00 No. - 063052

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


23 Unloading of Ballast from Railway's wagons other than Hopper wagons by USSOR -2021, Item
opening the doors of boxes and pulling & pushing down ballast with rake No. - 084050
irons / phowrahs and distributing unloaded ballast uniformly over the track as -
required, clearing infringements/jammed ballast, profiling and boxing
following all prescribed safety norms.

USSOR -2021, Item


23 (a) Under Traffic Block Conditions: 1 cum 20000 142.63 2,852,600.00 No. - 084051
USSOR -2021, Item
23 (b) Under Conditions not requiring Traffic Block: 1 cum 2000 116.33 232,660.00 No. - 084052
24 Boxing and profiling of ballast as per procedure prescribed in latest edition of USSOR -2021, Item
IRPWM including cess dressing on both sides of track.The work will include No. - 083030
removing excess ballast from track and putting the same in crib and shoulder
by leading to a maximum of 50 m including crossing of track, deweeding on 1 TRM 6100 31.27 190,747.00
ballast section etc and as directed by Engineer-In charge.

25 Slewing and realigning of curves under traffic line block condition ,as directed USSOR -2021, Item
by Engineer in-charge with contractor's labour, tools & plants, as required No. - 134010
with general lift up to 25mm including one round of through packing, ballast
profiling, loosening/tightening of P.Way fittings, if required and other
incidental works. Note:Payment will be made based on average slew -
calculated in each 50 m length of track by averaging absolute values of
positive and negative value of slews.

USSOR -2021, Item


25 (a) PSC Sleeper track - Maximum slew up to 50mm 1 TRM 500 149.36 74,680.00 No. - 134015
USSOR -2021, Item
25 (b) PSC Sleeper track-Maximum slew more than 50 mm and up to 100 mm 1 TRM 300 188.35 56,505.00 No. - 134016
USSOR -2021, Item
25 (C) PSC Sleeper track-Maximum slew more than 100 mm and up to 150mm 1 TRM 200 217.66 43,532.00 No. - 134017
26 Dismantling of existing LWR/SWR track of any structure, removing rails, USSOR -2021, Item
sleepers, fish plates, cutting of rails, segregation and stacking of released No. - 121010
Rails, Sleepers and fitting at nominated location in countable manner within a
free lead of 500m, levelling of ballast to correct profile for laying new track
1 TRM 1500 219.07 328,605.00
over it ,all as per direction of Engineer-in Charge.

27 Under Traffic Block:Dismantling of existing BG turnouts, diamond crossings USSOR -2021, Item
and derailing switches with all types of rails and sleeper layout, removing No. - 071010
rails, switches, crossings, sleepers & fastenings,
leveling of ballast to correct profile & stacking all the released
materials, sleepers, fastenings, rails, switches & crossings including
segregating & stacking at specified locations in a neat and countable manner,
within the lead of 250m & all lift, clear of infringements, crossing of track, if
any complete, as directed. Note: 1. This item shall be operated only when -
existing turnout is replaced either with new turnout in case of TTR or with
plain track when existing turnout is no more required at that location. 2.Rail
cutting will be paid extra under relevant item.3. Laying of new turnout or
plain track on prepared ballast bed, as required, shall be paid separately under
relevant item.

USSOR -2021, Item


27 (a) 1 in 8½ Turnout (Under Traffic Block) 1 Set 2 36340.97 72,681.94 No. - 071011

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


28 Lifting the newly inserted BG 60Kg. /52Kg. turnouts/ trap switches to USSOR -2021, Item
required level to provide full ballast cushion as per approved drawings after No. - 073020
initial laying with Railway's stone ballast in convenient stages including one
round of through packing after completion of final stage of lift, levelling,
aligning, gauging and boxing to standard profile to make it fit for 20 kmph
with all lead and lifts, complete in all respect and as directed by the Engineer- -
in-charge. Note:1.The item shall be used only when UNIMAT is not available
for the work before the turnout is opened for operation. 2. Leading and
dumping of ballast will be paid separately under relevant item.

USSOR -2021, Item


28(a) For 1 in 8½ Points & Crossing 1 Set 9 9340.14 84,061.26 No. - 073021
USSOR -2021, Item
28(b) For Derailing Switch 1 Set 11 6870.31 75,573.41 No. - 073024
Anti-corrosive painting of rail out side track on rail bottom, web, foot and USSOR -2021, Item
fishing plane with two coats of thickness of 100 microns each by bituminous No. - 137010
29 black paint confirms to IS-9862 of reputed make including surface -
preparation, as a complete job as per procedure prescribed in latest edition of
IRPWM.

USSOR -2021, Item


29(a) For 60 Kg Rails 1 RM 12000 65.22 782,640.00 No. - 137011
Marking, inscribing, painting ,writing, bordering etc. on new/old iron surface USSOR -2021, Item
at various locations of Points & Crossings with details of turn in / turn-out No. - 137070
reference station mark on rail web for one set, duly preparing surface with
contractor's wire brush and applying two coats of yellow synthetic enamel
paint of approved quality as background and stenciling the details to suitable
30 size,as described for every curve reference station mark / switch / crossing -
details with black enamel paint of approved quality complete, as
directed :Note: Stenciling of letters is only permitted. No hand written letters
are accepted.

USSOR -2021, Item


30(a) 1 in 8½ Turnout 1 Set 9 773.29 6,959.61 No. - 137073
USSOR -2021, Item
30(b) Derailing Switch 1 Set 11 386.64 4,253.04 No. - 137074
Cutting of rails with Rail Cutting Machine (Saw type) in all types of rail USSOR -2021, Item
sections with contractor's tools & plants, equipment, consumable with all lead No. - 161020
& lift etc. complete, as directed by Engineer in-charge. Rail Cutting Machine
31 (Saw type) will be as per RDSO Specification No. TM/SM/4, dated -
24.04.1991. Note: This item shall only be used in specific circumstances on
specific order of Engineer-in-Charge.

USSOR -2021, Item


31(a) 60 Kg - 90 UTS - Outside Track 1 Each 1500 291.73 437,595.00 No. - 161022
USSOR -2021, Item
31(b) 52 Kg - 90 UTS- On Running Line 1 Each 100 307.62 30,762.00 No. - 161027

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


32 Mechanical manufacturing of blanketing material by using only hard 1 cum 3000 1907.97 5723910.00
and durable stone crushed in mechanical crusher to different
gradations, wet mixing of the same in designed proportion in Pug mill
or wet mix plant to have uniform gradation including all incidental
transportation, laying over finished formation in uniform layer(s) with
motor grader, compaction with suitable vibratory roller to specified
density and finishing to correct profile, complete as per RDSO USSOR -2021, Item
Specification No. RDSO/2020/GE: IRS-0004 with latest correction No. -12030
slips. Note: This item shall be used only when entire constituent of
blanketing material is mechanically manufactured by crushing of hard
and durable stone into desired gradation of designed proportion.

Total Cost of Sch.-USR SCH C-V (P.WAY) Rs. 37,348,158.11

SSE/W/C/HWH, SSE/P.WAY/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Detailed estimate for Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25)
Schedule-USR SCH C-VI(OTHERS)
Schedule Items as per E.Rly's USSOR 2021
Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
1 Dewtering of natural or accumulated water from any location. 1 HP. 44.97 6480.00 291,405.60 USSOR - 2021 052260 CH-V
Payment to be done for Horse power of pump multiplied by hour
pumping hours

2 Cement Sand Mortar (1:1) Grout with 20% anti-shrinkage 1 KG 149.07 500.00 74,535.00 USSOR - 2021 052072 CH-V
compound w.r.t. cement.
3 Epoxy Grout 1 KG 1296.66 500.00 648,330.00 USSOR - 2021 052073 CH-V
4 Applying epoxy mortar over…..etc 1 M2 1747.24 1000.00 1,747,240.00 USSOR - 2021 052080 CH-V
5 Soil Exploration and Testing USSOR - 2021 021000 CH-2
6 Exploratory drilling of boreholes down to required depth, drilling USSOR - 2021 021010 CH-2
of 150mm dia. boreholes in all type of soils except hard rock &
large boulders (boulder core more than 30cm) including refilling,
reinstating surface and disposing off surplus material including
use of mechanical rigs with power operated winches as well as
percussion/chiselling tool
for advancing through occasional seams of hard strata to be
employed, where necessary in Dry area.

a 0 m to 10m 1 m 1441.73 4 5766.92 USSOR - 2021 021011 CH-2

b 10m to 20m 1 m 1585.91 4 6343.64 USSOR - 2021 021012 CH-2

c 20m to 30m 1 m 1730.07 4 6920.28 USSOR - 2021 021013 CH-2

7 Taking out 100mm dia. & 450mm long disturbed samples of soil 1 each 144.18 25 3604.5 USSOR - 2021 021120 CH-2
from bore holes, including provision of air tight containers for
packing, labeling and transporting the samples to laboratory.
Samples shall be collected as per IS:2720.

8 Conducting standard penetration test as per IS:2131 at 1 each 751.44 50 37572 USSOR - 2021 021130 CH-2
approximate1.5m intervals in bore holes, as directed by the
Engineer in charge
9 Collection of water samples at required intervals 1 each 216.26 25 5406.5 USSOR - 2021 021140 CH-2

10 Conducting laboratory Tests on collected soil samples as per USSOR - 2021 021150 CH-2
relevant IS code
a Moisture Content/Dry Density 1 each 360.44 25 9011 USSOR - 2021 021151 CH-2

b Atterberg Limits 1 each 865.04 25 21626 USSOR - 2021 021152 CH-2

SSE/W/C/HWH, SSE/P.WAY/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


c Specific Gravity 1 each 384.46 25 9611.5 USSOR - 2021 021153 CH-2

d Grain size analysis including Hydrometer analysis 1 each 706.46 25 17661.5 USSOR - 2021 021154 CH-2

e Direct Shear Test 1 each 2847.43 4 11389.72 USSOR - 2021 021155 CH-2

f Natural Density 1 each 384.46 25 9611.5 USSOR - 2021 021156 CH-2

g Consolidation Test 1 each 2883.47 25 72086.75 USSOR - 2021 021157 CH-2

h Unconfined Compression Test 1 each 2214.50 4 8858 USSOR - 2021 021158 CH-2

i Tri-axial Test 1 each 2214.50 4 8858 USSOR - 2021 021159 CH-2

j Conducting chemical analysis of ground water samples to 1 each 3604.34 4 14417.36 USSOR - 2021 021170 CH-2
determine suitability for concreting and aggressiveness in
relation to attack on concrete / reinforcement including
determination of pH value.

k Conducting chemical analysis of soil samples to determine 1 each 4829.81 4 19319.24 USSOR - 2021 021180 CH-2
aggressiveness in relation to attack on concrete / reinforcement
including determination of pH value
11 Hiring of machinery for minor miscellaneous works for short USSOR - 2021 211200 CH-21
duration including operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all statutory permitsas
required by rules and regulations prevailing in the area ofwork.
Payment shall be made for actual working hours at site

a JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 1 Hour 808.64 500 404320.00 USSOR - 2021 211201 CH-21
cum bucket capacity
12 Basic Rates of Labour
a Labour (unskilled) 1 Day 615.33 1500 922995.00 AOR of USSOR - 0020
2021
TOTAL of Sch.-USR SCH C-VI(OTHERS) Rs. 4,356,890.01

SSE/W/C/HWH, SSE/P.WAY/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB #
1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

Non Schedule-A-II (Sl no. 1 & 2) and USSOR-2021 (P. Way Work)
It. No. Decription of work Unit Qty. Rate in Rs. Amount LAR/USSOR-
2021/DSR ITEM
NO.s

1 Dismantlingofexisting LWR/SWR trackofanystructure, 1 TM 12000 219.07 2,628,840.00 Ussor - 2021, It.


removing rails,sleepers, fishplates,cuttingof No. -121010, CH. -
rails,segregationandstackingof 12
releasedRails,Sleepersandfittingatnominatedlocationincount
able manner withina free leadof 500m, levelling of ballast to
correct profilefor layingnewtrack over
it,allasperdirectionofEngineer-in-charge.

2 USSOR-2021, Item
123040, CH. -12
LinkingofBGtrack(exceptatLC,BridgesandSEJs)withanytypeo
f rail sectionandsleeper of specifieddensity, on ballast
bedspread and compacted with suitable roller, over prepared
formation including leading free rails/welded panels available
along the alignment on to formation, leading and spreading
all fittings and fastenings, spreading of sleepers at specified
spacing, squaring, placingof
railsoversleepersandfixingrailstosleeperswithall types of
fittingsandfastenings tocorrectgauge&alignment, lubricationof
fittings and fastenings with contractor's grease as per
IRPWM standardswithcontractors labour, tools,
consumables,withall lead, liftsetc. completeandraising,
levellingandinitialpackingof trackto make it fit for
30kmphandmeet other prerequisitesprescribed in
IndianRailwayTrackMachineManual for deployment of
Tamping Machine. Note: 1.Rail cutting and Hole drilling shall
be paid separately.2.Spreading of ballast and compaction
shall be paid Separately under relevant item.

2 (a) 1 TRM 10000 329.53 3,295,300.00 USSOR-2021, Item


For sleeper density of 1660 sleepers per km 123041, CH. -12

3 Transportation of Rails, sleepers, switches, crossings, USSOR-2021, Item


SEJs and Glued Joints by road vehicles for different 172050, CH. -17
leads.Note: 1. Lead shall be the shortest motorable
road length between the points of loading and
unloading. 2. Loading
and unloading shall be paid extra under relevant items.

3a Lead up to 5 Km 1 MT 3000 55.91 167,730.00 172051

3b Lead beyond 5 Km and up to 10 km 1 MT 3000 98.82 296,460.00 172052

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


It. No. Decription of work Unit Qty. Rate in Rs. Amount LAR/USSOR-
2021/DSR ITEM
NO.s

3c Lead beyond 10 Km and up to 20 km MT 1 MT 3000 157.08 471,240.00 172053

3d Lead beyond 20 Km and up to 30 km 1 MT 3000 227.84 683,520.00 172054

3e Lead beyond 30 Km and up to 50 km MT 1 MT 3000 325.85 977,550.00 172055

3f 172056 Lead beyond 50 Km and up to 100 Km MT 1 MT 3000 538.76 1,616,280.00 172056

3g 172057 Lead beyond 100 Km and up to 150 Km MT 1 MT 3000 858.20 2,574,600.00 172057

3h 172058 Extra for every Km per MT beyond 150 Km over 1 MT KM 3000 3.27 9,810.00 172058
item no. 172057 MT Km

4 Loading of 52kg / 60kg PSC normal line and special USSOR-2021, Item
sleepers up to 2.75 metre length in Depot / Station / 172010, CH. -17
Mid-section between stations in a neat manner to
departmental material train (DMT) or contractor's /
Railway's Truck/Trailer with crane or any other means
including crossing of one track with free lead up to 250
metre and lift up to 5 metre, if required with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any damage to
sleeper during loading, penalty @ 50% of the all
inclusive cost of sleeper shall belevied.

4a In Wagon where mechanical handling is possible and 1 MT 6000 97.16 582,960.00 172014
traffic block is not required or in Truck / trailer

5 Loading of tongue rail, stock rail, switch assembly and USSOR-2021, Item
crossings of any section and length, SEJ, Glued joint etc. 171020,
with / without P.Way fittings and fastenings, in CH. -17
Wagon / Truck / trailer including lead up to250 metre
and lift up to 5 metre.

5a In Wagon where mechanical handling is possible and 1 MT 50 128.29 6,414.50 171024


traffic block is not required or in Truck/trailer.

Total Cost of Sch.-A II Rs. 13,310,704.50

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Detailed estimate for Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother
Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25)
A-II (P. Way Work) USSOR 2021.2011 & L M Schedule 1987-(As kept in PWP)
It. No. Decription of work Unit Qty. Rate in Rs. Amount LAR/USSOR-2011
ITEM NO.s

1 Linking of BG track (exceptat LC ,Bridges and SEJs) with any type of rail
section and sleeper of specified density, on ballast bed spread and compacted
with suitable roller, over prepared formation including leading free
rails/welded panels available along the alignment on to formation, leading and
spreading all fittings and fastenings, spreading of sleepers at specified
spacing, squaring, placing of rails over sleepers and fixing rails to sleepers
with all types of fittings and fastenings to correct gauge & alignment,
lubrication of fittings and fastenings with contractor's grease as per IRPWM
standards with contractors labour, tools, consumables,withall lead, lifts etc.
complete and raising, levelling and initia lpacking of track to make it fit for 30 USSOR -2021, Item
- No. - 123040
kmph and meet other prerequisites prescribed in Indian Railway Track
Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting
and Hole drilling shall be paid separately. 2.Spreading of ballast and
compaction shall be paid separately under relevant item.

USSOR -2021, Item


1 (a) For sleeper density of 1660 sleepers per km 1 TRM 6100 329.53 2,010,133.00 No. - 123041

2 Linking of track at level crossing locations as per RDSO drawings with any
type of rail section and sleeper on prepared formation including leading free
rails/welded panels available along the alignment on to formation, spreading
of sleepers at specified spacing, squaring, placing of rails over sleepers and
fixing rails to sleepers with all types of fittings and fastenings to correct gauge
& alignment, excavating level crossing portion as necessary, fixing check rails
to running rails, providing C.C blocks, chairs, anti corrosive painting to
running rails and check rails, lubrication of fittings and fastenings with
contractor's grease as per IRPWM standards with contractors labour, tools, USSOR -2021, Item
consumables,with all lead, lifts etc. complete and raising, levelling and initial 1 TRM 100 515.21 51,521.00 No. - 123050
packing of track to make it fit for 30 kmph and meet other prerequisites
prescribed in Indian Railway Track Machine Manual for deployment of
Tamping Machine. Note: Rail cutting and hole drilling, if required, shall be
paid separately under relevant item.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


3 Laying and linking of turn outs of all types including diamond crossings & USSOR -2021, Item
Derailing switches with 52Kg/60Kg rail section on PSC sleepers on prepared No. - 072040
ballast bed for New lines or during total closure of section at indicated
location as per standard drawing, duly leading sleepers, rails, switches,
crossings, fastenings including rail cutting, drilling, fixing of all components,
fittings with housing of tongue rails as per requirement of signaling, preparing
ballast bed, filling and spreading of ballast as required, linking of turnout with
track, attending track parameters including lifting, providing one round of
-
packing to make track fit for20kmph speed including lubrication of
fittings/fastenings, complete as directed by Engineer in-charge.

USSOR -2021, Item


3 (a) 1 in 8½ Turnouts 1 Set 9 50406.37 453,657.33 No. - 072041
USSOR -2021, Item
3 (b) Derailing Switch 1 Set 11 11483.85 126,322.35 No. - 072046

4 Assembling all types of Switches on staging, clear of infringements, USSOR -2021, Item
to correct gauge and alignment as per standard drawings with all types of rail No. - 072020
sections over PSC sleepers at specified locations ,duly leading rails, special
sleepers, switches with a maximum lead of 500 m, all lift& crossing of track
as required including cutting, drilling, fixing of all components, fittings etc.
with housing of tongue rails as per requirement of signaling including
lubrication of fittings/fastenings, -
complete in all respect. Note: Required P.Way fittings shall be supplied at
SSE/P.Way stores.

USSOR -2021, Item


4(a) 1 in 8½ Turnouts 1 Set 9 20882.10 187,938.90 No. - 072021
USSOR -2021, Item
No. - 072025
4(b) Derailing Switch 1 Set 11 9961.19 109,573.09

5 Loading, leading and unloading of PSC Sleepers of 52Kg/60Kg by Railway's - USSOR -2021, Item
Rail Dolly/DipLorry to the nominated location under traffic in case road No. - 172030
carriage is not possible for different leads and lift up to 5 metres. 1

5 (a) For lead up to 500 metres 1 MT 3500 354.59 1,241,065.00 USSOR -2021, Item
No. - 172031
5 (b) For lead beyond 500 metre and up to 1 Km 1 MT 2000 526.66 1,053,320.00 USSOR -2021, Item
No. - 172032
5 (C) Extra to Items no. 172032 for lead beyond 1 Km for every subsequent Km or 55,000.00 USSOR -2021, Item
part thereof and up to 10 Km 1 MT 1000 55.00 No. - 172033

5 (d) Extra to Item no. 172031 and 172032 with contractor's Rail Dolly/Dip Lorry. 65,240.00 USSOR -2021, Item
1 MT 3500 18.64 No. - 172034

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


6 Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by - USSOR -2021, Item
Railway's Rail Dolly /Dip Lorry to the nominated location under traffic with No. - 171030
line protection in case road carriage is not possible with different lead with a
lift up to 5 metre during block period.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


6 (a) For lead up to 500 metre. 1 MT 800 455.32
364,256.00 USSOR -2021, Item
No. - 171031
6 (b) 264,586.50 USSOR -2021, Item
For lead beyond 500 metre and up to 1 Km. 1 MT 450 587.97 No. - 171032

6 (C) 28,204.00 USSOR -2021, Item


Extra to Items no.171032 for lead beyond 1 Km for every subsequent Km or No. - 171033
part thereof and up to 10 Km
1 MT 400 70.51

6 (d) Extra to Item no. 171031 and 171032 with contractor's Rail Dolly/Dip Lorry 13,480.00 USSOR -2021, Item
1 MT 800 16.85 No. - 171034

7 Through packing of track, as per procedure prescribed in latest edition of - USSOR -2021, Item
Indian Railways Permanent Way Manual No. - 131010

7 (a) For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more USSOR -2021, Item
1 TRM 6500 124.02 806,130.00 No. - 131011

8 First or Second Through Packing of track of all sleeper density including - USSOR -2021, Item
giving a general lift, as desired to eliminate sag after Deep Screening work, No. - 131030
lifting of track, lowering of track and major realignment of curves and
formation rehabilitation as per procedure prescribed in latest edition of
IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to
50 mm.

8 (b) 1,064,050.00 USSOR -2021, Item


For PSC Sleeper Track with Sleeper Density of 1660 TRM 6500 163.7 No. - 131032

9 Third or subsequent Through Packing of track for all sleeper density including - USSOR -2021, Item
picking of slacks, as required after second through packing, subsequent to No. - 131040
Deep Screening work as per procedure prescribed in latest edition of IRPWM.
This item can also be used after lifting/regrading/realignment works also.
Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.

9 (b) 818,480.00 USSOR -2021, Item


For PSC Sleeper Track with Sleeper Density of 1660 1 TRM 6500 125.92 No. - 131042

10 Through packing of points and crossings, derailing switches including - USSOR -2021, Item
gauging, fittings recoupment, ballasting as required, elimination of sag and to No. - 131050
the required alignment after Deep Screening as per procedure prescribed in
latest edition of IRPWM complete as per direction of Engineer-in-charge.
Note: This work shall be operated in exceptional cases with written approval
at DEN level when UNIMAT is not available and immediate packing is
required to pass train over it.

489,011.04 USSOR -2021, Item


10 (a) 1 in 8½ PSC layout 1 Set 36 13583.64 No. - 131051

84,850.04 USSOR -2021, Item


10 (b) 1 in 8½ Derailing Switch 1 Set 44 1928.41 No. - 131054

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


11 Lifting and packing for regrading the existing PSC sleeper track to required USSOR -2021, Item
height / level in stages not exceeding 75 mm or part thereof at a time, No. - 083010
providing permissible ramp for the track, insertion of moorum/sand/stone
ballast uniformly under the existing track and placing the same to safe
approved gradient, gauge, cushion including levelling and one round of
through packing to allow train movement at restricted speed of 30 kmph for a
specified length with all leads & lifts and fixing, marking, painting rail level
pegs at every 30m interval.
Note: Lifting of track shall be done in stages as per procedure
1 TRM 6100 212.73 1,297,653.00
prescribed in latest edition of IRPWM to get the proposed final level as per
approved working profile, as directed by Engineer in-charge.

11 (a) Extra for additional lift over 75 mm for every 50 mm lift or part there of up to USSOR -2021, Item
275 mm for item nos. 083010 for each TRM. No. -083011
1 TRM 6100 33.04 201,544.00

12 Fabrication including cutting, bending/machining and fixing of check rails of USSOR -2021, Item
all rail sections over PSCS leepers as per Railway’s approved drawings & No. - 183020
specifications for level crossings/ trolleypaths/inspection lines in yards duly
cutting rail flanges, wherever required to correct alignment and level, drilling
of holes with machine in check rails and fixing to Running rail and sleepers
with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets,
packing pieces, bolts, washers etc including grinding of brackets if required,
fixing of Railway's wooden blocks at flare ends duly cutting and plaining, 1 TRM 100 1219.38 121,938.00
crossing of tracks and as directed by the engineer in-charge Note:1. Drilling of
holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2.
Required P.Way materials will be supplied at SSE/P.Way stores.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


13 Cutting foot of rail by gas or any other approved method for check rails and USSOR -2021, Item
grinding sharp edges into smooth profile. Payment shall be made for length of No. - 183030
cutting of foot. 1 RM 100 197.14 19,714.00

14 Fixing check rails to running rails on level crossings with MS brackets, USSOR -2021, Item
1 Set 150 5962.30 894,345.00 No. - 183040

15 Drilling of parabolic shaped holes to the web of check rail as per drawings & USSOR -2021, Item
specifications and as directed by engineer in- charge. 1 Nos 150 150.85 22627.5 No. - 183010

16 Unloading of 52kg /60kg PSC line and special sleepers up to 2.75 metre USSOR -2021, Item
length in Depot /Station/Mid-section between stations in neat manner for No. - 172060
Railway usage from departmental material train (DMT) or contractor's
/Railway's Truck/Trailer with crane or any other means including crossing of
one track and lead up to 250 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery, consumables etc. Note: In case of any -
damage to sleeper during loading, penalty@50% of the all inclusive cost of
sleeper shall be levied.

16 (a) USSOR -2021, Item


From DMT - During period of traffic block 1 MT 4000 197.95 791,800.00 No. - 172061

16 (b) USSOR -2021, Item


From DMT - Not involving traffic block or on lines, not opened to traffic 1 MT 1000 140.52 140,520.00 No. - 172062

16 (c) USSOR -2021, Item


From Truck / Trailer 1 MT 4000 95.29 381,160.00 No. - 172063

17 Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in - USSOR -2021, Item
Depot / Station / Mid-section between stations in neat manner for Railway No. - 172070
usage fromdepartmental material train(DMT) or contractor's
/Railway'sTruck/Trailer with crane or any other means including crossing of
one track and lead up to 50 metre & lift up to 5 metre with contractor's labour,
tools & plants, machinery, consumables etc. Note: In case of any damage to
sleeper during loading, penalty @ 50% of the all inclusive cost.

17 (a) From DMT - During period of traffick block 88,119.50 USSOR -2021, Item
No. - 172071
1 MT 350 251.77

17 (b) From Truck / Trailor 33,841.50 USSOR -2021, Item


No. - 172073
1 MT 350 96.69

18 Loading, leading and unloading of all types of P.Way fittings and all other - USSOR -2021, Item
miscellaneous material except Rails, sleepers, switches, crossings, SEJs and No. - 172040
Glued Joints by road vehicles for different leads. Note: Lead shall be the
shortest motorable road length between the points of loading and unloading.

18(a) 19,312.00 USSOR -2021, Item


Lead up to 5 Km 1 MT 100 193.12 No. - 172041

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


18(b) 23,604.00 USSOR -2021, Item
Lead beyond 5 Km and up to 10 km 1 MT 100 236.04 No. - 172042

18(C) 29,429.00 USSOR -2021, Item


Lead beyond 10 Km and up to 20 km 1 MT 100 294.29 No. - 172043

18(d) 36,505.00 USSOR -2021, Item


Lead beyond 20 Km and up to 30 km 1 MT 100 365.05 No. - 172044

18(e) Lead beyond 30 Km and up to 50 km 46,307.00 USSOR -2021, Item


1 MT 100 463.07 No. - 172045
18(f) 67,598.00 USSOR -2021, Item
6 Lead beyond 50 Km and up to 100 Km 1 MT 100 675.98 No. - 172046

18(g) 99,541.00 USSOR -2021, Item


Lead beyond 100 Km and up to 150 Km 1 MT 100 995.41 No. - 172047

18(h) 490,500.00 USSOR -2021, Item


Extra for every Km per MT beyond 150 Km over item no. 172047 1 MT Km 150000 3.27 No. - 172048

19 Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints - USSOR -2021, Item
by road vehicles for different leads .Note:1. Lead shall be the shortest No. - 172050
motorable road length between the points of loading and unloading. 2.
Loading and unloading shall be paid extra under relevant items.

19(a) 277,313.60 USSOR -2021, Item


Lead up to 5 Km 1 MT 4960 55.91 No. - 172051

19(b) 490,147.20 USSOR -2021, Item


Lead beyond 5 Km and up to 10 km 1 MT 4960 98.82 No. - 172052

19(C) 779,116.80 USSOR -2021, Item


Lead beyond 10 Km and up to 20 km 1 MT 4960 157.08 No. - 172053

19(d) 1,130,086.40 USSOR -2021, Item


Lead beyond 20 Km and up to 30 km 1 MT 4960 227.84 No. - 172054

19(e) 1,616,216.00 USSOR -2021, Item


Lead beyond 30 Km and up to 50 km 1 MT 4960 325.85 No. - 172055

19(f) 2,672,249.60 USSOR -2021, Item


6 Lead beyond 50 Km and up to 100 Km 1 MT 4960 538.76 No. - 172056

19(g) 4,256,672.00 USSOR -2021, Item


Lead beyond 100 Km and up to 150 Km 1 MT 4960 858.20 No. - 172057

19(h) 654,000.00 USSOR -2021, Item


Extra for every Km per MT beyond 150 Km over item no. 172057 1 Mt Km 200000 3.27 No. - 172058

20 Insertion of rails of all types & length in track, laid on any type &density of - USSOR -2021, Item
sleeper to the specified gauge under traffic block. Rates include fastening of No. - 061030
rail with sleepers with standard set of fastenings CHAPTER 6 : Rails,
Sleepers and Fittings Renewal include fastening of rail with sleepers with
standard set of fastenings and fixing of fish plates and bolts or, if required,
providing gap for welding and stacking of released material without
infringement within 250 m as directed by Engineer-in Charge. Note: Rail
drilling and cutting to be paid separately.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


20 (a) 44,670.00 USSOR -2021, Item
For Casual/scattered rail renewal work 1 RM 1000 44.67 No. - 061032

21 Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including USSOR -2021, Item
chamfering with appropriate chamfering tools in all types of rail section with No. - 061040
contractor's tools & plants, equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge. Rail DrillingMachine will be as
per RDSO Specification No.TM/SM/3, dated 24.04.1991.
1 Nos -

USSOR -2021, Item


21 (a) Outside Track 1 Nos 4000 57.02 228,080.00 No. - 061041
USSOR -2021, Item
21 (b) On Running Line 1 Nos 50 75.99 3,799.50 No. - 061042
22 Lubrication of fish plated rail joints under traffic, by using Grease Graphite USSOR -2021, Item
Grade 'O' (IS:408) and Black oil supplied by contractor, for all types of rail No. - 063050
sections as per procedure laid down in latest version of IRPWM and as
directed by Engineer Incharge. Note: Release U/S bolt & nuts is to be
deposited back. If any fish bolts is jammed it should be cut with chisel and -
hammer and replaced with fresh fish bolt supplied.

USSOR -2021, Item


22 (a) For 1.00m long fish plates 1 Joint 500 125.10 62,550.00 No. - 063051
USSOR -2021, Item
22 (b) For 610 mm long fish plates. 1 Joint 500 85.23 42,615.00 No. - 063052

23 Unloading of Ballast from Railway's wagons other than Hopper wagons by USSOR -2021, Item
opening the doors of boxes and pulling & pushing down ballast with rake No. - 084050
irons / phowrahs and distributing unloaded ballast uniformly over the track as
required, clearing infringements/jammed ballast, profiling and boxing -
following all prescribed safety norms.

USSOR -2021, Item


23 (a) Under Traffic Block Conditions: 1 cum 20000 142.63 2,852,600.00 No. - 084051
USSOR -2021, Item
23 (b) Under Conditions not requiring Traffic Block: 1 cum 2000 116.33 232,660.00 No. - 084052
24 Boxing and profiling of ballast as per procedure prescribed in latest edition of USSOR -2021, Item
IRPWM including cess dressing on both sides of track.The work will include No. - 083030
removing excess ballast from track and putting the same in crib and shoulder
by leading to a maximum of 50 m including crossing of track, deweeding on
ballast section etc and as directed by Engineer-In charge. 1 TRM 6100 31.27 190,747.00

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


25 Slewing and realigning of curves under traffic line block condition ,as directed USSOR -2021, Item
by Engineer in-charge with contractor's labour, tools & plants, as required No. - 134010
with general lift up to 25mm including one round of through packing, ballast
profiling, loosening/tightening of P.Way fittings, if required and other
incidental works. Note:Payment will be made based on average slew
calculated in each 50 m length of track by averaging absolute values of -
positive and negative value of slews.

USSOR -2021, Item


25 (a) PSC Sleeper track - Maximum slew up to 50mm 1 TRM 500 149.36 74,680.00 No. - 134015

USSOR -2021, Item


25 (b) PSC Sleeper track-Maximum slew more than 50 mm and up to 100 mm 1 TRM 300 188.35 56,505.00 No. - 134016

USSOR -2021, Item


25 (C) PSC Sleeper track-Maximum slew more than 100 mm and up to 150mm 1 TRM 200 217.66 43,532.00 No. - 134017

26 Dismantling of existing LWR/SWR track of any structure, removing rails, USSOR -2021, Item
sleepers, fish plates, cutting of rails, segregation and stacking of released No. - 121010
Rails, Sleepers and fitting at nominated location in countable manner within a
free lead of 500m, levelling of ballast to correct profile for laying new track 1 TRM 1500 219.07 328,605.00
over it ,all as per direction of Engineer-in Charge.

27 Under Traffic Block:Dismantling of existing BG turnouts, diamond crossings USSOR -2021, Item
and derailing switches with all types of rails and sleeper layout, removing No. - 071010
rails, switches, crossings, sleepers & fastenings,
leveling of ballast to correct profile & stacking all the released
materials, sleepers, fastenings, rails, switches & crossings including
segregating & stacking at specified locations in a neat and countable manner,
within the lead of 250m & all lift, clear of infringements, crossing of track, if
any complete, as directed. Note: 1. This item shall be operated only when
existing turnout is replaced either with new turnout in case of TTR or with
-
plain track when existing turnout is no more required at that location. 2.Rail
cutting will be paid extra under relevant item.3. Laying of new turnout or
plain track on prepared ballast bed, as required, shall be paid separately under
relevant item.

USSOR -2021, Item


27 (a) 1 in 8½ Turnout (Under Traffic Block) 1 Set 2 36340.97 72,681.94 No. - 071011

28 Lifting the newly inserted BG 60Kg. /52Kg. turnouts/ trap switches to USSOR -2021, Item
required level to provide full ballast cushion as per approved drawings after No. - 073020
initial laying with Railway's stone ballast in convenient stages including one
round of through packing after completion of final stage of lift, levelling,
aligning, gauging and boxing to standard profile to make it fit for 20 kmph
with all lead and lifts, complete in all respect and as directed by the Engineer-
in-charge. Note:1.The item shall be used only when UNIMAT is not available -
for the work before the turnout is opened for operation. 2. Leading and
dumping of ballast will be paid separately under relevant item.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


USSOR -2021, Item
28(a) For 1 in 8½ Points & Crossing 1 Set 9 9340.14 84,061.26 No. - 073021
USSOR -2021, Item
28(b) For Derailing Switch 1 Set 11 6870.31 75,573.41 No. - 073024
Anti-corrosive painting of rail out side track on rail bottom, web, foot and USSOR -2021, Item
fishing plane with two coats of thickness of 100 microns each by bituminous No. - 137010
black paint confirms to IS-9862 of reputed make including surface
preparation, as a complete job as per procedure prescribed in latest edition of
29 -
IRPWM.

USSOR -2021, Item


29(a) For 60 Kg Rails 1 RM 12000 65.22 782,640.00 No. - 137011
Marking, inscribing, painting ,writing, bordering etc. on new/old iron surface USSOR -2021, Item
at various locations of Points & Crossings with details of turn in / turn-out No. - 137070
reference station mark on rail web for one set, duly preparing surface with
contractor's wire brush and applying two coats of yellow synthetic enamel
paint of approved quality as background and stenciling the details to suitable
size,as described for every curve reference station mark / switch / crossing
30 details with black enamel paint of approved quality complete, as -
directed :Note: Stenciling of letters is only permitted. No hand written letters
are accepted.

USSOR -2021, Item


30(a) 1 in 8½ Turnout 1 Set 9 773.29 6,959.61 No. - 137073
USSOR -2021, Item
30(b) Derailing Switch 1 Set 11 386.64 4,253.04 No. - 137074
Cutting of rails with Rail Cutting Machine (Saw type) in all types of rail USSOR -2021, Item
sections with contractor's tools & plants, equipment, consumable with all lead No. - 161020
& lift etc. complete, as directed by Engineer in-charge. Rail Cutting Machine
(Saw type) will be as per RDSO Specification No. TM/SM/4, dated
31 24.04.1991. Note: This item shall only be used in specific circumstances on -
specific order of Engineer-in-Charge.

USSOR -2021, Item


31(a) 60 Kg - 90 UTS - Outside Track 1 Each 1500 291.73 437,595.00 No. - 161022
USSOR -2021, Item
31(b) 52 Kg - 90 UTS- On Running Line 1 Each 100 307.62 30,762.00 No. - 161027
Total Cost of Sch.-A II( P.WAY) (i) Rs. 31,624,248.11

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


(P. Way Work) L & M Schedule (P.WAY-1987) Items
It. No. Decription of work Unit Qty. Rate in Rs. Amount LAR/L.M
SCHEDULE
P.WAY-1987.
1 Collecting & stacking 90R./52 kg rails
1 Mtr 19000 0.50 9,500.00
[Ch.-XXIV ITEM 29]

2 Collecting, Stacking of PSC Sleepers (Ch. XXIV; Item-32)


100 Nos 9000 173.00 15,570.00

3 (Ch. XXIV; Item-51)


Leading of PSC Sleepers for every addl. 30M (5 lead) etc. 100 Nos 115000 152.00 174,800.00

4 [Ch.-XXIV ITEM 94]


Trolleying of CI/ST/Wooden sleepers upto 1km on Rly dip lorry
including lead upto 30 M
100 Nos 5000 353.00 17,650.00

5 Trolleying of CI/ST/Wooden sleepers for every additional 1km on Rly.


[Ch.-XXIV ITEM
100 Nos 3000 161.00 4,830.00 95]
Dip lorry.
6 Distribution of small track fitting by Rly's Materials trolley upto a [Ch.-XXIV ITEM
distance of 2 Kms 1 Tonne 350 136.00 47,600.00 96]

7 Unloading of rails from BFR 60kg./65kg.


1 Mtr 6000 1.00 6,000.00
[Ch. XXIV Item 41]

8 Unloading of PSC sleepers from BFR onto the cess along the track in [Ch. XXIV Item 47]
block period. 100 Nos 4000 460.00 18,400.00

Total AII (II) 294,350.00


Add: 431.81 % above 1,271,032.74
Cost of Schedule-A-II (II) 1,565,382.74

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


P.WAY - USSOR - 2011 Items
It. No. Decription of work Unit Qty. Rate in Rs. Amount LAR/USSOR - 2011.

Earth work in excavation as per approved drawings and dumping at


embankment site or spoil heap, within railway land, including 50m
lead and 1.5m lift, the lead to be measured from the centre of gravity
of excavation to centre of gravity of spoil heap; the lift to be 1 Cum 1400 88.16 123,424.00 CH.-1; Item-011011
measured from natural ground level and paid for in layers of
1.5m each including incidental work, as per specifications-All
kinds of soils
Extra for manual compaction of earthwork, where permitted,
with rammers
1 Cum 1000 8.16 8,160.00 CH.-1; Item-011040

Loading/Unloading ballast, kankar, brickbats, stone chips, shingle,


stone boulders, block kankar, pitching stones, rubble stones, laterite,
coal, surkhi, dry mortar, sand, moorum, earth, manure or sludge, 1 Cum 2400 41.23 98,952.00 CH.-2; Item-021070
ashes, lime etc. including lead up to 50m and stacking into/from
trucks, trailors or wagons
Leading ballast, kankar, surkhi, lime, sand, ashes, stone- chips,
pitching, stone, boulders, soling, stone, rubble stone, brickbats,
shingle, dry mortar, laterite or similar materials including picking
1 Cum 2400 97.39 233,736.00 CH.-2; Item-021080
up and stacking, lead upto 50m
Additional lead for every subsequent 50m or part thereof, 29124
over 50m and upto 500m over item no. 021080
1 Cum 1200 24.27 CH.-2; Item-021081
106000

Leading ballast, kankar, brickbats, stone-chips, shingle, stone


boulders, block kankar, pitching stones, rubble stones, laterite, coal,
surkhi, dry mortar, sand, moorum, earth, manure or sludge, ashes, 1 Cum 1000 106 CH.-2; Item-021090
lime, debris, muck, malba, etc. for lead upto 25 km. Note : Lead
under this item is payable when the same exceeds 500m.

Uprooting weeds on or from station platforms, surroundings as well as 19647.6


slopes after loosening surface by raking
100 Sqm 6000 327.46 CH.-16; Item-161520

Providing and laying in position M-20 Grade concrete for 13662.45


reinforced concrete structural elements, but excluding cost of
centering, shuttering, reinforcement and Admixtures in recommended
proportion (as per IS:9103) to accelerate, retard setting of concrete,
improve workability without impairing strength and
durability as per direction of Engineer in charge -All work upto plinth level 1 cum 5 2732.49 CH.-4; Item-041011
including raft foundation of washable aprons, HS tank, pile cap, footings of
FOB and Platform shelter etc.

12mm cement plaster finished with a floating coat of neat cement of mix -1:4 2274.9
(1 cement : 4 fine sand) 1 sqm 30 75.83 CH.-11; Item-111072

Supply and using cement at worksite: PPC 24359.3


1 Tonne 3.56 6842.5 CH.-3; Item-033063

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Centering and shuttering including strutting, propping etc. and removal 2188.5
of form for :Foundations, footings, bases of columns, raft foundation of 1 sqm 15 145.9 CH.-4; Item-042011
washable aprons, Pile caps, Footings of FOB etc.
Providing and laying cement concrete, up to plinth in retaining walls, 11626.7
walls (any thickness) including attached plasters, columns, pillars,
posts, struts, buttresses, string or lacing courses, parapets, coping,
bed blocks, anchor blocks, plain window sills, fillets etc, excluding 1 cum 5 2325.34 CH.-3; Item-031023
the cost of cement and of shuttering, centering.-1:2:4 (1 cement : 2
sand : 4 graded stone aggregate 20mm nominal size)

Supply of materials
9556.2
Anticorrosive bituminous paint (black) 1 Litre 90 106.18 CH.-25; Item-254060
6681.5
Synthetic Enamel paint in all shades 1 Litre 35 190.9 CH.-25; Item-254070
3392.4
Red oxide Zinc chromate primer 1 Litre 30 113.08 CH.-25; Item-254190

Supply and laying of quarry dust including consolidation, supply 2683110


of all materials, labour, lead, lift, tools, plants, crossing of tracks as per
drawing and technical specification as directed by the Engineer
in charge in case loose slush is encountered at site of
foundation before casting the foundation or before laying the 1 cum 3000 894.37 CH.-22; Item-222030
filtering media

Laying and spreading blanketing materials (Natural or 182820


Mechanically prepared as per GE-1 or G.E.IRS-2) over new / old
embankment / cutting in layers of 30cm in loose state to make
the embankment of designed profile as per specifications. The
rate is inclusive of initial site clearance, cutting of shrubs, removal
of roots of vegetation growth & heavy grass, surfacing &
leveling to give required slope, benching, if required on existing bank
slope, dressing and finishing of bank, all lead & lift, ascent, descent,
crossing of nallahs / other obstructions, spreading the material and
final dressing of slopes and top surface as per specified camber using
contractor’s own machinery, equipment, T&P, labour etc. as a 1 cum 3000 60.94 CH.-1; Item-013150
complete job. Note - The rate does not include supply / compaction of
blanketing material at site which shall be paid separately.

Cost of P.WAY Schedule- 'A II(iii) 3558715.55

Add: 23.46 % above 834874.67

Cost of P.WAY Schedule- 'A II(iii) 4393590.22

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


ALL TOTAL Cost of P.WAY Schedule- 'A II 37,583,221.07

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop ,
Eastren Railway.

EASTERN RAILWAY HOWRAH DIVISION

Escalation upto MAR -2023 based on Consumer price Index (384) for Industrial workers.

Sl. Description of items LAR References LAR (Rs) Date of CPI of CPI % Rate as Average
No. Accpt. LAR Idex as increas per % rate of
Letter(L month on e of CPI increase LAR(Rs.)
AR) MAR. of CPI
'23'

Schedule-A
1 Loading / unloading of any kind of P- OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 162.73 Sep-22 378.00 384 1.59 165.32 176.17
way materialsetc. 171.29/- with 5% below

Letter No: HOWRAH DIVISION -ENGG/153_2020- 160.21 Feb-21 343.00 384 11.95 179.36
21/00915850032323 Dated 18.02.2021 Rate Rs.
164.03/- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 162.78 SEP-20 340.00 384 12.94 183.84
155.03 /- with 5% above

2 Trolleying of switch, Xing, rails, any OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 188.31 Sep-22 378.00 384 1.59 191.3 203.11
type of sleepers and other p way 198.22/- with 5% below
materials with free lead up to 100 m, all
lift, with proper stacking including OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 190.37 SEP-20 340.00 384 12.94 215
crossing of multiple lines with 181.30 /- with 5% above
contractors own tools & plants.
Letter No: HOWRAH DIVISION -ENGG/153_2020- 181.37 Feb-21 343.00 384 11.95 203.04
21/00915850032323 Dated 18.02.2021 Rate Rs.
185.70/- with 2.33% below
3 Trollying Rails upto 1 km by dip lorry OAH/2/117/2022-23/RPH dated -29.09.2022 rate-20.51/- 19.48 Sep-22 378.00 384 1.59 19.79 21.01
with all lead, lift, stacking and crossing with 5% below
multiole lines with ascend, descend
during day or night as per instruction of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 19.70 SEP-20 340.00 384 12.94 22.25
Engineer in Charge or his 18.76 /- with 5% above
representative.
Letter No: HOWRAH DIVISION -ENGG/153_2020- 18.76 Feb-21 343.00 384 11.95 21
21/00915850032323 Dated 18.02.2021 Rate Rs.
19.21/- with 2.33% below

4 Trollying ordinary PSC sleeprs upto OAH/2/117/2022-23/RPH dated -29.09.2022 rate-70.17/- 66.66 Sep-22 378.00 384 1.59 67.72 71.90
1 km by dip lorry with all lead, lift, with 5% below
stacking and crossing multiole lines
with ascend, descend during day or OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 67.39 SEP-20 340.00 384 12.94 76.11
night as per instruction of Engineer 64.18 /- with 5% above
in Charge or his representative. Letter No: HOWRAH DIVISION -ENGG/153_2020- 64.21 Feb-21 343.00 384 11.95 71.88
21/00915850032323 Dated 18.02.2021 Rate Rs.
65.74/- with 2.33% below
5 Trollying Spl. Size PSC Sleepers upto OAH/2/117/2022-23/RPH dated -29.09.2022 rate-80.47/- 76.45 Sep-22 378.00 384 1.59 77.67 82.88
1 km by dip lorry with all lead, lift, with 5% below
stacking and crossing multiole lines Letter No: HOWRAH DIVISION -ENGG/153_2020- 75.86 Feb-21 343.00 384 11.95 84.93
with ascend, descend during day or 21/00915850032323 Dated 18.02.2021 Rate Rs.
night as per instruction of Engineer 77.67/- with 2.33% below
in Charge or his representative.
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 76.18 SEP-20 340.00 384 12.94 86.04
72.55 /- with 5% above

6 Through packing of PSC sleeper of OAH/2/117/2022-23/RPH dated -29.09.2022 rate-36.90/- 35.06 Sep-22 378.00 384 1.59 35.62 40.28
normal track, SEJ, glued joints, with 5% below
bridge approach, LC gate approach OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 37.61 Aug-20 338.00 384 13.61 42.73
etc. 35.82/- with 4.99 % above
OAH/2/52/2020-21/DEN(1) Dated 01-09-2020 Rate 37.61 SEP-20 340.00 384 12.94 42.48
35.82 /- with 5% above

7 Through packing of 1 in 8.5 Points & OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 3315.11 Aug-20 338.00 384 13.61 3766.3 3640.79
Xing sleepers including rectification etc. 3157.55/- with 4.99 % above
( In case of 1 in 8.5 Points & x-ings - 70
% payment will be made) OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 3358.23 Sep-22 378.00 384 1.59 3411.63
3534.98/- with 5% below
7 Through packing of 1 in 8.5 Points &
Xing sleepers including rectification etc.
( In case of 1 in 8.5 Points & x-ings - 70
% payment will be made)

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 3315.43 SEP-20 340.00 384 12.94 3744.45
3157.55 /- with 5% above

8 Lifting of screened track upto 150mm OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 54.17 SEP-20 340.00 384 12.94 61.18 57.80
in two stages including Points & 51.59 /- with 5% above
Crossing as required to achieve correct
longitudinal level with initial packing as OAH/2/117/2022-23/RPH dated -29.09.2022 rate-56.41/- 53.59 Sep-22 378.00 384 1.59 54.44
directed by the Site-In-charge. (Lifting with 5% below
of track at P & C will be paid 1.5 times Letter No: HOWRAH DIVISION -ENGG/153_2020- 51.61 Feb-21 343.00 384 11.95 57.78
the straight length of Track) 21/00915850032323 Dated 18.02.2021 Rate Rs.
52.84/- with 2.33% below

9 Overhauling of LC Gate to provide clean Letter No: HOWRAH DIVISION -ENGG/153_2020- 844.87 Feb-21 343.00 384 11.95 945.83 950.28
cushion upto 300mm by digging below 21/00915850032323 Dated 18.02.2021 Rate Rs.
the sleeper & removing ballasted 865.03/- with 2.33% below
muck / earth for a total width upto
4.8m. Ballast should be separated from OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 886.67 Aug-20 338.00 384 13.61 1007.35
the muck and put back at proper long 844.53/- with 4.99 % above
level and to make the LC Gate Track fit OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 883.60 Sep-22 378.00 384 1.59 897.65
for normal traffic. (per metre) 930.10/- with 5% below
10 Changing of LC gate sleepers after OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 539.10 Sep-22 378.00 384 1.59 547.67 579.78
opening of road surface of any type and 567.47/- with 5% below
filling the same after work. The rate OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 540.97 Aug-20 338.00 384 13.61 614.6
including oiling & greasing of fittings 515.26/- with 4.99 % above
(supplied by Railway) and adjustment
of check rail. Letter No: HOWRAH DIVISION -ENGG/153_2020- 515.46 Feb-21 343.00 384 11.95 577.06
21/00915850032323 Dated 18.02.2021 Rate Rs.
527.76/- with 2.33% below

11 Dismantling of road surface including OAH/2/105/2019-20/Sr.DEN /2/HWH dt. 09.09.2019, 11626.50 SEP-19 322.00 384 19.25 13864.60 13384.11
stone sets removing all debris/ ballast/ Rate Rs. 9452.44 /-with 23 % above.
dust/ muck etc upto bottom of rails Letter No: HOWRAH DIVISION -ENGG/153_2020- 11152.72 Feb-21 343.00 384 11.95 12485.47
completely and opening of bolts & nuts, 21/00915850032323 Dated 18.02.2021 Rate Rs.
if required by cutting and refixing the 11418.78/- with 2.33% below
existing check rails with serviceable
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 12148.81 Aug-20 338.00 384 13.61 13802.26
bolts & nuts and providing wooden
11571.40/- with 4.99 % above
sleeper for passage of vehicle traffic as
required.

12 Fabrication & fixing check rails 52/60Kg OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 1077.70 Sep-22 378.00 384 1.59 1094.84 1162.43
for LC gate as per RDSO Drawing etc. 1134.42/- with 5% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 1089.46 SEP-20 340.00 384 12.94 1230.44
1037.58 /- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 1037.98 Feb-21 343.00 384 11.95 1162.02
21/00915850032323 Dated 18.02.2021 Rate Rs.
1062.74/- with 2.33% below
13 Unloading of special size Pts. & xing Letter No: HOWRAH DIVISION -ENGG/153_2020- 56.59 Feb-21 343.00 384 11.95 63.35 56.60
PSC sleepers from BOX, BFR, Truck, 21/00915850032323 Dated 18.02.2021 Rate Rs.
Tarailer during day or night by using 57.94/- with 2.33% below
sand bags/scrap tyres to minimise
damage to sleeper including proper OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 46.99 SEP-20 340.00 384 12.94 53.07
sizeing by crossing track, if required. 44.75/- with 5% above

OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 46.98 Aug-20 338.00 384 13.61 53.37
44.75/- with 4.99 % above

14 Changing of rails at length 13 M less Letter No: HOWRAH DIVISION -ENGG/153_2020- 49.53 Feb-21 343.00 384 11.95 55.45 57.28
in running track as per direction of 21/00915850032323 Dated 18.02.2021 Rate Rs.
site in charge. 50.71/- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 51.38 SEP-20 340.00 384 12.94 58.03
48.93/- with 5% above

OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 51.37 Aug-20 338.00 384 13.61 58.36
48.93/- with 4.99 % above
15 Unloading of stone dust from any OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 56.65 Aug-20 338.00 384 13.61 64.36 62.93
type of wagon on the track or cess 53.96/- with 4.99 % above
during the traffic block of day/night OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 56.66 SEP-20 340.00 384 12.94 63.99
on running lines with all tools and 53.96/- with 5% above
plants , consumable etc. It will
Letter No: HOWRAH DIVISION -ENGG/153_2020- 53.98 Feb-21 343.00 384 11.95 60.43
include a clearing the infringement
21/00915850032323 Dated 18.02.2021 Rate Rs.
wherever required for safe passage
55.27/- with 2.33% below
of train after the block. The rate
includes spreading of stone dust up
to 30 m lead.

16 Earth work in filling in all kinds of OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 265.72 Sep-22 378.00 384 1.59 269.94 286.61
soil for making up of cess (except 279.71/- with 5% below
black cotton) for LC gate surface & OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 268.62 SEP-20 340.00 384 12.94 303.38
making trolley refuges including all 255.83/- with 5% above
lead, lift, etc. Letter No: HOWRAH DIVISION -ENGG/153_2020- 255.93 Feb-21 343.00 384 11.95 286.51
21/00915850032323 Dated 18.02.2021 Rate Rs.
262.04/- with 2.33% below

17 Drilling hole in 60 kg/52 kg rails by OAH/2/117/2022-23/RPH dated -29.09.2022 rate-69.94/- 66.44 Sep-22 378.00 384 1.59 67.5 72.09
contractors men and materials. with 5% below
Letter No: HOWRAH DIVISION -ENGG/153_2020- 66.30 Feb-21 343.00 384 11.95 74.22
21/00915850032323 Dated 18.02.2021 Rate Rs.
67.88 /- with 2.33% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 66.02 SEP-20 340.00 384 12.94 74.56
62.88/- with 5% above
18 Cutting of rail 60/52kg by OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 74.43 SEP-20 340.00 384 12.94 84.06 78.33
contractors men & materials. 70.89/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 68.68 Feb-21 343.00 384 11.95 76.89
21/00915850032323 Dated 18.02.2021 Rate Rs.
70.32 /- with 2.33% below
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-76.73/- 72.89 Sep-22 378.00 384 1.59 74.05
with 5% below
19 Rail cutting by gas etc. OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 85.89 SEP-20 340.00 384 12.94 97 94.36
81.80 /- with 5% above
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-91.70/- 87.12 Sep-22 378.00 384 1.59 88.51
with 5% below

OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 85.88 Aug-20 338.00 384 13.61 97.57
81.80/- with 4.99 % above

20 Greasing ERC. This includes opening of OAH/2/117/2022-23/RPH dated -29.09.2022 rate-9.69/- 9.21 Sep-22 378.00 384 1.59 9.36 9.93
ERC leaning of CI insert of metal liners with 5% below
on rail foot liners by means of wire OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 9.30 SEP-20 340.00 384 12.94 10.5
brush, greasing ERC leg inside CI insert 8.86/- with 5% above
and contract surface of rail foot by Letter No: HOWRAH DIVISION -ENGG/153_2020- 8.86 Feb-21 343.00 384 11.95 9.92
liners renewal of 21/00915850032323 Dated 18.02.2021 Rate Rs. 9.07/-
corroded/teamed/crushed liners, rubber with 2.33% below
pad and ineffective ERC's and fixing
them properly as per IRPWM in all
respect. Grease to be supplied by
contractor.

21 Cleaning of yard drain and clearing the Letter No: HOWRAH DIVISION -ENGG/153_2020- 284.54 Feb-21 343.00 384 11.95 318.54 327.13
ballast and muck etc.etc. 21/00915850032323 Dated 18.02.2021 Rate Rs. 291.33
/- with 2.33% below

OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 304.86 Sep-22 378.00 384 1.59 309.71
320.91/- with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 312.68 SEP-20 340.00 384 12.94 353.14
297.79/- with 5% above
22 Transporting all sorts of P. way materials Required in use of track including loading & 384
unloading.
(a) Upto 40 km OAH/2/52/2020-21/DEN(1) Dated 01-09-2020 Rate 16.12 SEP-20 340.00 384 12.94 18.21 18.24
15.35/- with 5% above
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 16.12 Aug-20 338.00 384 13.61 18.31
15.35/- with 4.99 % above
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 16.12 SEP-20 340.00 384 12.94 18.21
15.35/- with 5% above
(b) From 40 km upto 120 km OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 12.76 Aug-20 338.00 384 13.61 14.5 14.44
12.15/- with 4.99 % above
OAH/2/52/2020-21/DEN(1) Dated 01-09-2020 Rate 12.76 SEP-20 340.00 384 12.94 14.41
12.15/- with 5% above

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 12.76 SEP-20 340.00 384 12.94 14.41
12.15/- with 5% above
© More than 120 km OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 6.26 SEP-20 340.00 384 12.94 7.07 7.08
5.96/- with 5% above
OAH/2/52/2020-21/DEN(1) Dated 01-09-2020 Rate 6.26 SEP-20 340.00 384 12.94 7.07
5.96/- with 5% above
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 6.26 Aug-20 338.00 384 13.61 7.11
5.96/- with 4.99 % above
23 Arrangement of JCB pay loader for OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 1448.64 SEP-20 340.00 384 12.94 1636.09 1564.40
cutting and removal of hard 1379.66/- with 5% above
compact stone product/eartch etc Letter No: HOWRAH DIVISION -ENGG/153_2020- 1418.76 Feb-21 343.00 384 11.95 1588.3
from inside/outside track etc. 21/00915850032323 Dated 18.02.2021 Rate Rs.
1452.61/- with 2.33% below

OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 1445.82 Sep-22 378.00 384 1.59 1468.81
1521.92/- with 5% below
24 supply of skilled labour OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 616.86 Aug-20 338.00 384 13.61 700.81 702.53
587.54/- with 4.99 % above
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 616.92 SEP-20 340.00 384 12.94 696.75
587.54/- with 5% above

OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 628.67 Sep-20 340.00 384 12.94 710.02
587.54 /- with 7 % above

25 Greasing of fishplate joints by rail OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 227.58 Aug-20 338.00 384 13.61 258.55 257.55
grease etc. 216.76 /- with 4.99 % above
(B) For ordinary fishplate joint etc. for
52/60 kg. OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 227.60 SEP-20 340.00 384 12.94 257.05
216.76/- with 5% above
OAH/2/52/2020-21/DEN(1) Dated 01-09-2020 Rate 227.60 SEP-20 340.00 384 12.94 257.05
216.76/- with 5% above
26 Supplying, fitting and fixing spring OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 15545.72 SEP-20 340.00 384 12.94 17557.34 17668.81
lever with all accessories including 14805.45/- with 5% above
pull rod/ connecting rod etc.
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 15841.83 Sep-20 340.00 384 12.94 17891.76
14805.45 /- with 7 % above

OAH/2/52/2020-21/DEN(1) dated -01.09.2020 rate 15545.72 Sep-20 340.00 384 12.94 17557.34
14805.45/- with 5% above
27 Dismantling of track having any OAH/2/52/2020-21/DEN(1) dated -01.09.2020 rate 78.96 Sep-20 340.00 384 12.94 89.18 89.35
types of rails and sleepers , 75.20/- with 5% above
including segregation & stacking of
released materials as per direction OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 78.96 SEP-20 340.00 384 12.94 89.18
of engineer at site.(Dismantling of 75.20/- with 5% above
P&C will be paid 1.5 times the OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 78.95 Aug-20 338.00 384 13.61 89.7
length of straight track) 75.20/- with 4.99 % above
28 Supply of fixing of fish bolts & nuts of size OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 129.94 Aug-20 338.00 384 13.61 147.62 142.45
25x140mm as per RDSO drawing No. T- 123.76/- with 4.99 % above
1899 (if fixing done by railway then Rs. 5/-
will be deducted each bolt). Letter No: HOWRAH DIVISION -ENGG/153_2020- 118.78 Feb-21 343.00 384 11.95 132.97
21/00915850032323 Dated 18.02.2021 Rate Rs.
121.61 /- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 129.95 SEP-20 340.00 384 12.94 146.77
123.76/- with 5% above
29 Rail drilling machine(RDSO) OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 51490.80 Aug-20 338.00 384 13.61 58498.7 54395.25
specification no. TM/SM/3 of 1991 49043.53/- with 4.99 % above
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 51495.71 SEP-20 340.00 384 12.94 58159.25
49043.53/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 41561.23 Feb-21 343.00 384 11.95 46527.8
21/00915850032323 Dated 18.02.2021 Rate Rs.
42552.71/- with 2.33% below

30 Supply of round up chemical for Letter No: HOWRAH DIVISION -ENGG/153_2020- 724.00 Feb-21 343.00 384 11.95 810.52 795.12
deweeding shalimar brand or 21/00915850032323 Dated 18.02.2021 Rate Rs.
similar. 741.27/- with 2.33% below

OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 700.47 Sep-22 378.00 384 1.59 711.61
737.34/- with 5% below
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 759.83 Aug-20 338.00 384 13.61 863.24
723.72 /- with 4.99 % above
31 Trial assembly of switches at OAH/2/52/2020-21/DEN(1) dated -01.09.2020 rate 14629.02 Sep-20 340.00 384 12.94 16522.02 16228.04
convenient location. 13932.4/- with 5% above
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 14627.63 Aug-20 338.00 384 13.61 16618.45
13932.40 /- with 4.99 % above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 13884.47 Feb-21 343.00 384 11.95 15543.66
21/00915850032323 Dated 18.02.2021 Rate Rs.
14215.70/- with 2.33% below
32 Fabrication of 52Kg./60Kg. 1:12 Pts. OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 17201.19 Aug-20 338.00 384 13.61 19542.27 19466.68
& Xings sleeper at place or location 16383.65/- with 4.99 % above
as directed by PWI at site including OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 17202.83 SEP-20 340.00 384 12.94 19428.88
dressing the location of site of 16383.65/- with 5% above
fabrication. Rate includes leading of
rails, switches, Crossings & sleepers OAH/2/52/2020-21/DEN(1) dated -01.09.2020 rate 17202.83 Sep-20 340.00 384 12.94 19428.88
for fabrication work including 16383.65/- with 5% above
crossing of lines of from with in
100m & this also includes posting
of rubber pad with approved
glued/araldite. (70% payment will
be made if the work is done on 1:8½
P & C).

33 Linking of new P&C 1 in 12 including OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 18443.97 Aug-20 338.00 384 13.61 20954.19 20873.14
carring all materials like rail, PSC 17567.36 /- with 4.99 % above
sleeper etc. upto 1 Km and fixing, OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 18445.73 SEP-20 340.00 384 12.94 20832.61
fitting, fish plate greasing and 17567.36/- with 5% above
greasing leg 1kg of ERC and eye if
OAH/2/52/2020-21/DEN(1) dated -01.09.2020 rate 18445.73 Sep-20 340.00 384 12.94 20832.61
MCI inserts etc. ie, complete in all
17567.36/- with 5% above
respected (for 1 in 8.5 P&C rate
should be @ 70%.).

34 Renewal of ordinary OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 219.24 Aug-20 338.00 384 13.61 249.08 249.69
wooden/steel/CI/PSC sleeper by PSC 208.82 /- with 4.99 % above
sleepers ( sleepers at site of work )
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 219.26 SEP-20 340.00 384 12.94 247.63
208.82/- with 5% above

OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 223.44 Sep-20 340.00 384 12.94 252.35
208.82/- with 7 % above
35 Painting of Rail by anti crossive paint as OAH/2/117/2022-23/RPH dated -29.09.2022 rate-69.99/- 66.49 Sep-22 378.00 384 1.59 67.55 69.71
per standard specification etc.etc. with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 72.51 SEP-20 340.00 384 12.94 81.89
69.06/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 53.33 Feb-21 343.00 384 11.95 59.7
21/00915850032323 Dated 18.02.2021 Rate Rs.
54.60/- with 2.33% below
36 Unloading of stone ballast from OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 45.79 SEP-20 340.00 384 12.94 51.72 48.86
BOB/BOBY/Hopper Wagons . 43.61/- with 5% above

OAH/2/117/2022-23/RPH dated -29.09.2022 rate-47.68/- 45.30 Sep-22 378.00 384 1.59 46.02
with 5% below

Letter No: HOWRAH DIVISION -ENGG/153_2020- 43.63 Feb-21 343.00 384 11.95 48.84
21/00915850032323 Dated 18.02.2021 Rate Rs.
44.67/- with 2.33% below

37 Extra for unloading during night time. Letter No: HOWRAH DIVISION -ENGG/153_2020- 2.25 Feb-21 343.00 384 11.95 2.52 2.46
All lingting arrangement required 21/00915850032323 Dated 18.02.2021 Rate Rs. 2.30/-
during night working to the arrangment with 2.33% below
by the contractor.
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-2.39/- 2.27 Sep-22 378.00 384 1.59 2.31
with 5% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 2.27 SEP-20 340.00 384 12.94 2.56
2.16/- with 5% above

38 Assisting UTV M/C in day/night during Letter No: HOWRAH DIVISION -ENGG/153_2020- 130.57 Feb-21 343.00 384 11.95 146.17 146.22
traffic block materials. 21/00915850032323 Dated 18.02.2021 Rate Rs.
133.68/- with 2.33% below
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 135.57 Sep-22 378.00 384 1.59 137.73
142.70/- with 5% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 137.04 SEP-20 340.00 384 12.94 154.77
130.51/- with 5% above
39 Removing of rusted ERC by Letter No: HOWRAH DIVISION -ENGG/153_2020- 42.30 Feb-21 343.00 384 11.95 47.35 47.37
heating,applying gas of approved etc. 21/00915850032323 Dated 18.02.2021 Rate Rs.
43.31/- with 2.33% below
39 Removing of rusted ERC by
heating,applying gas of approved etc.

OAH/2/117/2022-23/RPH dated -29.09.2022 rate-46.23/- 43.92 Sep-22 378.00 384 1.59 44.62
with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 44.40 SEP-20 340.00 384 12.94 50.15
42.29/- with 5% above

40 Dressing & boxing of track with OAH/2/117/2022-23/RPH dated -29.09.2022 rate-24.43/- 23.21 Sep-22 378.00 384 1.59 23.58 25.03
available ballast with picking and with 5% below
leading etc. etc.
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 23.46 SEP-20 340.00 384 12.94 26.5
22.34/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 22.35 Feb-21 343.00 384 11.95 25.02
21/00915850032323 Dated 18.02.2021 Rate Rs.
22.88 /- with 2.33% below
41 Opening of corroded/seized/broken Letter No: HOWRAH DIVISION -ENGG/153_2020- 95.06 Feb-21 343.00 384 11.95 106.42 106.49
plate screws etc. 21/00915850032323 Dated 18.02.2021 Rate Rs.
97.33 /- with 2.33% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 99.83 SEP-20 340.00 384 12.94 112.75
95.08/- with 5% above
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 98.73 Sep-22 378.00 384 1.59 100.3
103.93/- with 5% below
42 Manufacturing & supplying of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 6577.81 SEP-20 340.00 384 12.94 7428.98 7018.39
insulated rails dollies complete in 6264.58/- with 5% above
all respect (insulated by garfon) OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 6506.75 Sep-22 378.00 384 1.59 6610.21
including supply of two nos wheels 6849.28/- with 5% below
(CS), 04 Nos. bearing (make SRF No. Letter No: HOWRAH DIVISION -ENGG/153_2020- 6267.06 Feb-21 343.00 384 11.95 7015.97
6304 os size (20x52x17mm), 2 nos, 21/00915850032323 Dated 18.02.2021 Rate Rs.
axle with nut, 1 no. chain (Spl) and 6416.57 /- with 2.33% below
complete painting.

43 Supply of roller ball bearing dip lorry Letter No: HOWRAH DIVISION -ENGG/153_2020- 66695.57 Feb-21 343.00 384 11.95 74665.69 77583.18
complete in all respect with a 21/00915850032323 Dated 18.02.2021 Rate Rs.
capacity of 20 ton on each lorry for 68286.65 /- with 2.33% below
carrying heavy materials. The dip
trolley to be used by contractor OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 69782.12 SEP-20 340.00 384 12.94 78811.93
during work and will be return the 66459.16/- with 5% above
same to the Railway after
completion of work in good OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 69775.47 Aug-20 338.00 384 13.61 79271.91
condition. 66459.16 /- with 4.99 % above
44 Manufacturing & supplying (made of OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 24611.31 Aug-20 338.00 384 13.61 27960.91 27337.53
Sal-wood) of insulated material trolley 23441.58/- with 4.99 % above
complete in all respect as per railways OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 24613.66 SEP-20 340.00 384 12.94 27798.67
standard drawing to Rlys. The material 23441.58/- with 5% above
trolley will be used by contractor for
transporting small fittings to site as per Letter No: HOWRAH DIVISION -ENGG/153_2020- 23450.65 Feb-21 343.00 384 11.95 26253.00
direction & instruction of PWI etc. 21/00915850032323 Dated 18.02.2021 Rate Rs.
24010.08 /- with 2.33% below

45 Realignment of curve by slewing of OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 119.93 Aug-20 338.00 384 13.61 136.25 135.78
track in stages of not more than 50 114.23/- with 4.99 % above
mm each to give required slew with
through packing after each stage of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 119.94 SEP-20 340.00 384 12.94 135.46
slewing as per the direction of the 114.23/- with 5% above
site in charge . The slew to be given Letter No: HOWRAH DIVISION -ENGG/153_2020- 121.16 Feb-21 343.00 384 11.95 135.64
to track will be personally verified 21/00915850032323 Dated 18.02.2021 Rate Rs.
by AEN of the section before 124.05/- with 2.33% below
starting the work. the rate includes
marking and paging etc as rerquired
at site.

46 Complete dismantling of existing OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 14846.63 Aug-20 338.00 384 13.61 16867.26 16802.01
90R/52/60Kg 1 in 12 P&C on any 14140.99 /- with 4.99 % above
type of sleeper during day/ night
block period including full opening of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 14848.04 SEP-20 340.00 384 12.94 16769.38
ballast upto bottom level of sleepers 14140.99/- with 5% above
& dressing of the ballast for making
room for laying fabricated pts. & OAH/2/52/2020-21/DEN(1) dated -01.09.2020 rate 14848.04 Sep-20 340.00 384 12.94 16769.38
xing including initial packing and 14140.99/- with 5% above
alignment in newly laid panel. Rate
also includes the work of
segregating & stacking of released
materials at location as described
by site -in -charge within a lead of
100 m & assisting T-28 machine for
laying of P & C including making
path for moving the machine to site
of work. ( 70% payment will be
made if the work is done on 1 in 8.5
P&C)

47 Supply of Abrasive rail cutting machine OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 179623.02 Aug-20 338.00 384 13.61 204069.71 165985.33
(RDSO) specification no. TM/SM/1 of 171085.84 /- with 4.99 % above
2008 Letter No: HOWRAH DIVISION -ENGG/153_2020- 83123.03 Feb-21 343.00 384 11.95 93056.23
21/00915850032323 Dated 18.02.2021 Rate Rs.
85106/- with 2.33% below
OAH/2/218/2019-20/KWAE dated 08.01.2020, Rate 172593.71 JAN-20 330 384 16.36 200830.04
Rs.164390.62/- with 4.99% above.
48 Abrasive rail cutting Disc (wheel) OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 699.36 Aug-20 338.00 384 13.61 794.54 776.84
400x4X22.23 mm as per RDSO 666.12 /- with 4.99 % above
specification No. TM/SM/02 (Rev.01 OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 699.43 SEP-20 340.00 384 12.94 789.94
of 2007). 666.12/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 666.41 Feb-21 343.00 384 11.95 746.05
21/00915850032323 Dated 18.02.2021 Rate Rs.
682.31/- with 2.33% below

49 Cutting holes on CC/RCC of OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 87.27 Aug-20 338.00 384 13.61 99.15 99.39
minimum size 80×80×100 mm 83.12/- with 4.99 % above
depth to fix MCI inserts.
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 87.28 SEP-20 340.00 384 12.94 98.57
83.12/- with 5% above
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 88.94 Sep-20 340.00 384 12.94 100.45
83.12/- with 7 % above
50 Grouting MCI insert in Epoxy OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 146.83 Aug-20 338.00 384 13.61 166.81 167.22
Grouting & Padding for fixing rail 139.85/- with 4.99 % above
over pit line.
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 146.84 SEP-20 340.00 384 12.94 165.84
139.85/- with 5% above

OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 149.64 Sep-20 340.00 384 12.94 169
139.85/- with 7 % above

51 Making levelling course with epoxy OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 249.76 Aug-20 338.00 384 13.61 283.75 284.44
mortar as per drg. No. 139-90(CE- 237.89/- with 4.99 % above
SRC).
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 249.78 SEP-20 340.00 384 12.94 282.1
237.89/- with 5% above
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 254.54 Sep-20 340.00 384 12.94 287.48
237.89/- with 7 % above

52 Lifting of screened track from 150mm & OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 51.50 SEP-20 340.00 382 12.35 57.86 58.34
upto 300mm in two stages including 49.05 /- with 5% above
Points & Crossing as required to OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 51.50 Aug-20 338.00 382 13.02 58.21
achieve correct longitudinal level with 49.05/- with 4.99 % above
initial packing as directed by the Site- OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 52.48 Sep-20 340.00 382 12.35 58.96
In-charge. (Lifting of track at P & C will 49.05 /- with 7 % above
be paid 1.5 times the straight length of
Track)

53 Shallow screening of track including OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 124.76 Aug-20 338.00 382 13.02 141 136.36
lifting of track from 0 to 100 mm 118.83/- with 4.99 % above
with one round of through packing OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 126.55 Sep-22 378.00 382 1.06 127.89
etc. 133.21/- with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 124.77 SEP-20 340.00 382 12.35 140.18
118.83 /- with 5% above
54 Deep screening of 52 kg/60 kg pts & Letter No: HOWRAH DIVISION -ENGG/153_2020- 18839.13 Feb-21 343.00 382 11.37 20981.14 21088.90
xing 1 in 12 in running track 21/00915850032323 Dated 18.02.2021 Rate Rs.
300/250 mm below bottom of PSC 19288.55 /- with 2.33% below
sleeper for distance of 1.5 M from
the edge of PSC sleepers etc.
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 19941.37 SEP-20 340.00 382 12.35 22404.13
18991.78/- with 5% above

OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 19672.91 Sep-22 378.00 382 1.06 19881.44
20708.33/- with 5% below
55 Deep screening of existing track with OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 368.87 Sep-22 378.00 382 1.06 372.78 395.99
20mm sieve upto top of formation or 388.28/- with 5% below
300mm. If formation level is reached OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 372.37 SEP-20 340.00 382 12.35 418.36
before 300mm, etc. 354.64/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 356.32 Feb-21 343.00 382 11.37 396.83
21/00915850032323 Dated 18.02.2021 Rate Rs.
364.82/- with 2.33% below

56 4th round consolidation Packing in Letter No: HOWRAH DIVISION -ENGG/153_2020- 4837.53 Feb-21 343.00 382 11.37 5387.56 5279.73
1 in 12 ut as per para 224 of IRPWM 21/00915850032323 Dated 18.02.2021 Rate Rs.
(70% payment will be made if the 4952.93/- with 2.33% below
work is done on 1 in 8.5 Pts. & Xings
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 4895.12 SEP-20 340.00 382 12.35 5499.67
4662.02/- with 5% above
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 4900.01 Sep-22 378.00 382 1.06 4951.95
5157.90/- with 5% below
57 Inter changing of gauge face of OAH/2/117/2022-23/RPH dated -29.09.2022 rate-39.39/- 37.42 Sep-22 378.00 382 1.06 37.82 40.15
90R/52/60 Kg rail during block with 5% below
period & fixing it with all fittings . Letter No: HOWRAH DIVISION -ENGG/153_2020- 36.04 Feb-21 343.00 382 11.37 40.14
The rate icludings opening of all 21/00915850032323 Dated 18.02.2021 Rate Rs.
fittings, interchanging of rails, 36.90/- with 2.33% below
recoupments of all
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 37.83 SEP-20 340.00 382 12.35 42.5
missing/damaged fittings, fixing of
36.03 /- with 5% above
fish plate etc.to give the line fit as
per direction of engineer in-charge.

58 Laying of SEJ on end of LWR/CWR which Letter No: HOWRAH DIVISION -ENGG/153_2020- 2894.45 Feb-21 343.00 382 11.37 3223.55 3306.64
includes cutting rails,drilling holes on 21/00915850032323 Dated 18.02.2021 Rate Rs.
rails including greasing of fish plated 2963.5/- with 2.33% below
joints as per direction of site in-charge.
( oil & grease to be supplied by the OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 3096.99 Sep-22 378.00 382 1.06 3129.82
contrator). The rate includes insertion 3259.99/- with 5% below
of SEJ sleepers and SEJ rails with all
fittings all labours, tools & plants etc. OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 3174.49 SEP-20 340.00 382 12.35 3566.54
3023.32 /- with 5% above

59 Changing of worn out switches OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 1810.27 Sep-22 378.00 382 1.06 1829.46 1948.78
under traffic block including 1905.55/- with 5% below
trolleying up to 1 Km etc. Letter No: HOWRAH DIVISION -ENGG/153_2020- 1777.64 Feb-21 343.00 382 11.37 1979.76
21/00915850032323 Dated 18.02.2021 Rate Rs.
1820.05/- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 1813.18 SEP-20 340.00 382 12.35 2037.11
1726.84/- with 5% above

60 Changing of worn out crossing of OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 2113.09 Sep-22 378.00 382 1.06 2135.49 2274.65
any type under traffic block 2224.30/- with 5% below
including 1 Km etc. Letter No: HOWRAH DIVISION -ENGG/153_2020- 2074.42 Feb-21 343.00 382 11.37 2310.28
21/00915850032323 Dated 18.02.2021 Rate Rs.
2123.91/- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 2116.77 SEP-20 340.00 382 12.35 2378.19
2015.97/- with 5% above
61 Casual renewal of any type of OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 211.04 Sep-22 378.00 382 1.06 213.28 227.72
damaged special type points & xing 222.15/- with 5% below
( 1 in 12/ 1 in 8.5), SEJ sleeper Letter No: HOWRAH DIVISION -ENGG/153_2020- 210.10 Feb-21 343.00 382 11.37 233.99
maintaining gauge, cross level, 21/00915850032323 Dated 18.02.2021 Rate Rs.
paking with proper spacing & 215.11/- with 2.33% below
Squaring renewal of fattings by
railway grease. After changing
release slepper stacked properly as OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 209.96 SEP-20 340.00 382 12.35 235.89
per direction of site in-charge. In 199.96/- with 5% above
cluding shifting of lines if required.

62 Through rail renewal by pairing, OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 120.10 Aug-20 338.00 382 13.02 135.74 132.59
butting, insertion and laying 114.39/- with 4.99 % above
90R/52/60 Kg rail. The rate includes OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 120.11 SEP-20 340.00 382 12.35 134.94
pulling back of rails if required, 114.39/- with 5% above
oiling and greasing of Pandrol clips
Letter No: HOWRAH DIVISION -ENGG/153_2020- 114.11 Feb-21 343.00 382 11.37 127.08
and insert (grease to be supplied by
21/00915850032323 Dated 18.02.2021 Rate Rs.
the Contractor)etc.
116.83/- with 2.33% below

63 Changing of rails at length 13 M less Letter No: HOWRAH DIVISION -ENGG/153_2020- 49.53 Feb-21 343.00 382 11.37 55.16 56.98
in running track as per direction of 21/00915850032323 Dated 18.02.2021 Rate Rs.
site in charge. 50.71/- with 2.33% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 51.38 SEP-20 340.00 382 12.35 57.73
48.93/- with 5% above
63 Changing of rails at length 13 M less 56.98
in running track as per direction of
site in charge.

OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 51.37 Aug-20 338.00 382 13.02 58.06
48.93/- with 4.99 % above
64 Rail renewal at any type of Diamond Letter No: HOWRAH DIVISION -ENGG/153_2020- 9471.94 Feb-21 343.00 382 11.37 10548.9 10699.09
crossing (SS/DS) by 60kg/52kg rail 21/00915850032323 Dated 18.02.2021 Rate Rs.
in running track on PSC including 9697.90/- with 2.33% below
switch and crossing full set under
traffic block. The rates will include
fittings all blocks erquired as per OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 9561.79 SEP-20 340.00 382 12.35 10742.67
standard design and trolleying of all 9106.47 /- with 5% above
released rail, switch and Xing upto a OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 9560.88 Aug-20 338.00 382 13.02 10805.71
distance of 500 mtrs. including 9106.47/- with 4.99 % above
crossing of multiple track, if
required.

65 Insertion of glued joint 52kg/60kg in OAH/2/117/2022-23/RPH dated -29.09.2022 rate-97.60/- 92.72 Sep-22 378.00 382 1.06 93.7 98.96
relayed track where ever required with 5% below
including all cuttings, drilling reqd.
for the work. Rates includes carrying OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 95.14 SEP-20 340.00 382 12.35 106.89
of glued joints from nearest site/ 90.61/- with 5% above
road approach to the work site.
Letter No: HOWRAH DIVISION -ENGG/153_2020- 86.45 Feb-21 343.00 382 11.37 96.28
21/00915850032323 Dated 18.02.2021 Rate Rs.
88.51/- with 2.33% below

66 Changing of SEJ rail including, fittings OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 1441.89 SEP-20 340.00 382 12.35 1619.96 1530.46
over PSC/Wooden layout. The rate 1373.23/- with 5% above
includes cutting, drilling & trolleying SEJ
rails upto 1 km and return of released OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 1426.33 Sep-22 378.00 382 1.06 1441.45
rails to nearest PWI store and oiling & 1501.40/- with 5% below
greasing SEJ and all its fittings.
Letter No: HOWRAH DIVISION -ENGG/153_2020- 1373.77 Feb-21 343.00 382 11.37 1529.97
21/00915850032323 Dated 18.02.2021 Rate Rs.
1406.54/- with 2.33% below

67 Rail renewal of 60/52 kg derailing OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 2136.79 Sep-20 340.00 382 12.35 2400.68 2375.37
switch in running track on PRC 1997.00 /- with 7 % above
sleeper full set under traffic block.
Rate also includes fittings of all OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 2096.85 SEP-20 340.00 382 12.35 2355.81
blocks as required as per standard 1997.00 /- with 5% above
design .
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 2096.65 Aug-20 338.00 382 13.02 2369.63
1997.00/- with 4.99 % above
68 Complete dismantling of existing OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 14846.63 Aug-20 338.00 382 13.02 16779.66 16820.32
90R/52/60Kg 1 in 12 P&C on any 14140.99 /- with 4.99 % above
type of sleeper during day/ night
block period including full opening of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 14848.04 SEP-20 340.00 382 12.35 16681.77
ballast upto bottom level of sleepers 14140.99/- with 5% above
& dressing of the ballast for making
room for laying fabricated pts. & OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 15130.86 Sep-20 340.00 382 12.35 16999.52
xing including initial packing and 14140.99 /- with 7 % above
alignment in newly laid panel. Rate
also includes the work of
segregating & stacking of released
materials at location as described
by site -in -charge within a lead of
100 m & assisting T-28 machine for
laying of P & C including making
path for moving the machine to site
of work. ( 70% payment will be
made if the work is done on 1 in 8.5
P&C)

69 Extra over item no above if work is OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 3294.50 Aug-20 338.00 382 13.02 3723.44 3732.47
done manually during day/night i.e 3137.92 /- with 4.99 % above
dismantling of existing 1 in 12 P & C
, laying new P& C Sleeper , rails, OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 3294.82 SEP-20 340.00 382 12.35 3701.73
switches, crossing during block or 3137.92/- with 5% above
underspeed restriction.( 70%
payment will be made if the work is OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 3357.57 Sep-20 340.00 382 12.35 3772.23
done on 1 in 8.5 P&C) 3137.92 /- with 7 % above
NB: unit to be read as per " Set"

70 Replacement/renewal pf elastic rail OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 21.55 SEP-20 340.00 382 12.35 24.21 23.99
clips liners and grooved rubber pad 20.52/- with 5% above
etc of concrete sleeper (PSC-12/PSC- Letter No: HOWRAH DIVISION -ENGG/153_2020- 22.85 Feb-21 343.00 382 11.37 25.45
14) including greasing of central lrgs 21/00915850032323 Dated 18.02.2021 Rate Rs.
of elastic rail clips and eye of MCI 23.40 /- with 2.33% below
inserts and extracting of elastic rail
clips etc.
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-23.25/- 22.09 Sep-22 378.00 382 1.06 22.32
with 5% below
71 Destressing of LWR/CWR track of any OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 13.57 SEP-20 340.00 382 12.35 15.25 14.40
rail section 52/60Kg with hydrolic Rail 12.92/- with 5% above
tensor or manually as per LWR manual OAH/2/117/2022-23/RPH dated -29.09.2022 rate-14.12/- 13.41 Sep-22 378.00 382 1.06 13.55
etc. with 5% below
Letter No: HOWRAH DIVISION -ENGG/153_2020- 12.92 Feb-21 343.00 382 11.37 14.39
21/00915850032323 Dated 18.02.2021 Rate Rs.
13.23/- with 2.33% below
72 Drilling hole 6 mm dia for signal OAH/2/117/2022-23/RPH dated -29.09.2022 rate-53.43/- 50.76 Sep-22 378.00 382 1.06 51.3 54.47
bonding including supplying of channel with 5% below
pins and bonding wires. Letter No: HOWRAH DIVISION -ENGG/153_2020- 48.89 Feb-21 343.00 382 11.37 54.45
21/00915850032323 Dated 18.02.2021 Rate Rs.
50.06 /- with 2.33% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 51.31 SEP-20 340.00 382 12.35 57.65
48.87/- with 5% above
73 Drilling hole 18 mm dia in rails for OAH/2/117/2022-23/RPH dated -29.09.2022 rate-44.98/- 42.73 Sep-22 378.00 382 1.06 43.18 45.85
traction OHE and "X" Bonds. with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 43.20 SEP-20 340.00 382 12.35 48.54
41.14/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 41.16 Feb-21 343.00 382 11.37 45.84
21/00915850032323 Dated 18.02.2021 Rate Rs.
42.14 /- with 2.33% below
74 Hiring charges for 5-KVA DG set Letter No: HOWRAH DIVISION -ENGG/153_2020- 488.28 Feb-21 343.00 382 11.37 543.8 543.97
including fuel lubrication oil, 21/00915850032323 Dated 18.02.2021 Rate Rs.
operation & maintanance with 499.93/- with 2.33% below
highlightetc. OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 506.96 Sep-22 378.00 382 1.06 512.33
533.64/- with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 512.48 SEP-20 340.00 382 12.35 575.77
488.08/- with 5% above
75 Assisting to thermit welding of 60/52 Kg rail joints and glued joints including supply of petrol and labour by SKV
(a) process
Upto under
two joint pertraffic
day block on running and filling/grinding
OAH/2/117/2022-23/RPH of welded
dated -29.09.2022 rate- joints on top and
4160.15 both face
Sep-22 etc. 382
378.00 1.06 4204.25 4855.59
4379.10/- with 5% below
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 4731.97 SEP-20 340.00 382 12.35 5316.37
4506.64/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 4530.97 Feb-21 343.00 382 11.37 5046.14
21/00915850032323 Dated 18.02.2021 Rate Rs.
4639.06/- with 2.33% below
76 Welding of rail joints Letter No: HOWRAH DIVISION -ENGG/153_2020- 622.72 Feb-21 343.00 382 11.37 693.52 722.16
(90R/52Kg./60kg) on cess including 21/00915850032323 Dated 18.02.2021 Rate Rs.
supply of petrol and Artisan staff 637.58/- with 2.33% below
and labour by making vertical and
horizontal alignment with creation of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 653.60 SEP-20 340.00 382 12.35 734.32
gap ( Including cutting & drilling in 622.48/- with 5% above
this connection ) & filing of welded
joints on top & faces as per welding OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 653.54 Aug-20 338.00 382 13.02 738.63
manual and numbering of welding 622.48/- with 4.99 % above
joints to the entire satisfaction of
SE(PW)/Higher authorities etc.

77 Making & Erection of creep post Letter No: HOWRAH DIVISION -ENGG/153_2020- 683.18 Feb-21 343.00 382 11.37 760.86 739.05
including cutting and painting of 21/00915850032323 Dated 18.02.2021 Rate Rs.
rails as per direction of PWI. 699.48/- with 2.33% below

OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 542.06 Jun-18 291 382 31.27 711.56
Rs. 516.84/- with 4.88% above.
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 736.92 Sep-22 378.00 382 1.06 744.73
775.70/- with 5% below

42 Opening & refixing of existing OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 38.55 Aug-20 338.00 382 13.02 43.57 43.68
joggled fish plate already fixed over 36.72/- with 4.99 % above
the old SKV welds in running line .
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 38.56 SEP-20 340.00 382 12.35 43.32
The rate includes cleaning of welds
Rate36.72/- with 5% above
with wire brush, cost of all labour ,
tools & plants as per direction of OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 39.29 Sep-20 340.00 382 12.35 44.14
engineer in charge . (Two joggled 36.72 /- with 7 % above
fish plates over one joint will be
44 Redistribution of ballast for making OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 32.36 SEP-20 340.00 382 12.35 36.36 36.66
ballast profile as per IRPWM. The 30.82/- with 5% above
work includes cutting of excess
ballast and spreading the same with
proper screening with a maximum
lead of 1 km on either side.
44 Redistribution of ballast for making 36.66
ballast profile as per IRPWM. The
work includes cutting of excess OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 32.36 Aug-20 338.00 382 13.02 36.57
ballast and spreading the same with 30.82 /- with 4.99 % above
proper screening with a maximum
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 32.98 Sep-20 340.00 382 12.35 37.05
lead of 1 km on either side.
30.82 /- with 7 % above

45 Removing of bur in points & xing , OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 86.99 Aug-20 338.00 382 13.02 98.32 95.08
L.C Zone in running line , all tools & 82.86 /- with 4.99 % above
plants supplied by agency. The rate OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 87.00 SEP-20 340.00 382 12.35 97.74
also includes cost of materials , 82.86/- with 5% above
labour , lead,lift, crossing of line etc. OAH/2/117/2022-23/RPH dated -29.09.2022 rate-92.88/- 88.24 Sep-22 378.00 382 1.06 89.18
Work is to be done as per direction with 5% below
of Engineer in charge.

46 Renewal of switch fittings i.e. slide OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 13709.29 Aug-20 338.00 382 13.02 15494.24 15531.79
chair, special bearing plate & plate 13057.71/- with 4.99 % above
screws with greasing of plate screws OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 13710.60 SEP-20 340.00 382 12.35 15403.86
( grease supply by railway) . The 13057.71/- with 5% above
rate includes transportation
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 13971.75 Sep-20 340.00 382 12.35 15697.26
including loading & unloading of all
13057.71 /- with 7 % above
materials to the site of work /PWI 'S
store and release materials to be
returned back to PWI store and
crossing of multiple tracks etc. and
as per direction of site-in-charge or
his representitives.
for 1 in 12 switch ( consisting of
slide chairs -34 nos , spl. bearing
plates -14 nos & plate screw with
ring washer-192 nos)

47 Renewal of SEJ fittings, i.e SEJ OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 5216.84 Aug-20 338.00 382 13.02 5896.07 5910.35
bearing plates , brackets ,Angles, 4968.89/- with 4.99 % above
necessary bolts & nuts and plate OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 5217.33 SEP-20 340.00 382 12.35 5861.67
screws ( by rly. Grease) . The rate 4968.89/- with 5% above
includes transportation including
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 5316.71 Sep-20 340.00 382 12.35 5973.32
loading & unloading of all materials
4968.89 /- with 7 % above
to the site of work /PWI 'S store and
release materials to be returned
back to PWI store and crossing of
multiple tracks etc. and as per
direction of site-in-charge or his
representitives.

48 Reconditioning of MCI Insert of PSC OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 157.31 Aug-20 338.00 382 13.02 177.79 171.93
sleeper 149.83/- with 4.99 % above
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 157.32 SEP-20 340.00 382 12.35 176.75
149.83/- with 5% above
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 159.56 Sep-22 378.00 382 1.06 161.25
167.96/- with 5% below
49 Casual renewal of PSC-Sleeper, the OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 294.56 Aug-20 338.00 382 13.02 332.91 333.72
rate includes proper spacing, 280.56/- with 4.99 % above
squaring, packing with proper OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 294.59 SEP-20 340.00 382 12.35 330.97
gauge, cross level and boxing, with 280.56/- with 5% above
renewal of fittings by Railway
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 300.20 Sep-20 340.00 382 12.35 337.27
grease. After changing release
280.56 /- with 7 % above
sleeper to be stacked properly as
per direction of site in charge.
50 Fixing ferrule at existing location on OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 269.43 Aug-20 338.00 382 13.02 304.51 294.47
PSC sleeper as required for fixing 256.62/- with 4.99 % above
screw with ACC "Shrinkomnp 30". OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 269.45 SEP-20 340.00 382 12.35 302.73
The rate includes the cost of drilling 256.62/- with 5% above
suitable holes and supply of ferrule, OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 273.28 Sep-22 378.00 382 1.06 276.18
labour, Lead, lift, crossing of line 287.66/- with 5% below
etc.

53 Dismantling CC/RCC Work of any OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 439.03 Sep-20 340.00 382 12.35 493.25 481.05
grade by compressor or by any 410.31 /- with 7 % above
means for making pocket for OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 334.37 Aug-16 278 382 37.41 459.46
changing PRC, etc. 360.00/- - 7.12% below.
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 368.48 Mar-18 287 382 33.1 490.45
Rs. 342.80/ with +7.49% above.
54 Shuttering by thermocol for creating OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 59.13 Sep-20 340.00 382 12.35 66.43 63.85
gap between concrete and all 55.26 /- with 7 % above
around PRC OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 41.80 Aug-16 278 382 37.41 57.44
45.00/- - 7.12% below.
OAH/2/326/Qty/14-15/Tr.-HWH Dt.31.03.2015. Rate 45.00 Mar-15 254 382 50.39 67.68
Rs. 45.00/- - ar par
55 Hiring charges of Generator set OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 462.70 Sep-20 340.00 382 12.35 519.84 495.50
including fuel etc. for use of electric 432.43/- with 7 % above
tools etc. OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 333.03 Aug-16 278 382 37.41 457.62
358.56/- - 7.12% below.
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 382.44 Mar-18 287 382 33.1 509.03
Rs. 355.79/ with +7.49% above.
56 Supplying, laying & fixing 10 mm. OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 558.37 Sep-20 340.00 382 12.35 627.33 600.11
thick trapezoidal rubber grooved 521.84/- with 7 % above
sole plate of size 1000x270/234 mm OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 394.74 Aug-16 278 382 37.41 542.41
as per RDSO Specification T/37 1989 425.00/- - 7.12% below.
(Amendment No. 2) including
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 473.78 Mar-18 287 382 33.1 630.6
labours,
Rs. 440.77/ with +7.49% above.
materials,lead,lift,ascend,descend,cr
ossing multiple track complete in all
respect.

57 Concreting by M-20 all around the OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 1127.03 Sep-20 340.00 382 12.35 1266.22 1234.91
PRC to rebuild the dismantled area 1053.30/- with 7 % above
with proper slope at washing apron. OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 858.38 Aug-16 278 382 37.41 1179.5
924.18/- - 7.12% below.
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 945.92 Mar-18 287 382 33.1 1259.02
Rs. 880.01/ with +7.49% above.
58 Mixing and placing of filler materials OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 1234.74 Sep-20 340.00 382 12.35 1387.23 1352.93
in expansion joints of washable 1153.96/- with 7 % above
aprons at approx. 10 to 15 mm OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 940.41 Aug-16 278 382 37.41 1292.22
thk. . The filler material shall be of 1012.50/- - 7.12% below.
mixture of bitumen (Gr. 60/70) and
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 1036.32 Mar-18 287 382 33.1 1379.34
clear coarse sand with ratio 1:1. The
Rs. 964.11/ with +7.49% above.
rate is inclusive of cost of labour,
materials, transports, tools & plants
and consumables materials required
for heating of bitumen and sand
mixture before mixing and placing
in position complete in all respects
as per direction of Engineer-in-
charge.

62 Modified all weather bitumen paste Letter No: HOWRAH DIVISION -ENGG/153_2020- 39.69 Feb-21 343.00 382 11.37 44.2 45.74
in liquid asphalt with chemicals, 21/00915850032323 Dated 18.02.2021 Rate Rs.
anti-stripping agents, graded 40.64/- with 2.33% below
aggregates and additives etc etc.
62 Modified all weather bitumen paste 45.74
in liquid asphalt with chemicals,
anti-stripping agents, graded
aggregates and additives etc etc.
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 41.27 Aug-20 338.00 382 13.02 46.64
39.31 /- with 4.99 % above
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 41.28 SEP-20 340.00 382 12.35 46.38
39.31/- with 5% above
65 Fabrication of 1:12 52Kg./60Kg. OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 14439.55 Aug-20 338.00 382 13.02 16319.58 16359.12
Switch sleepers at place or location 13753.26/- with 4.99 % above
as directed by PWI at site including OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 14440.92 SEP-20 340.00 382 12.35 16224.37
dressing the location of site of 13753.26/- with 5% above
fabrication. Rate includes all lead &
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 14715.99 Sep-20 340.00 382 12.35 16533.41
crossing of lines of rails & sleepers
13753.26 /- with 7 % above
from with in 100m & this also
67 Assisting CSM/Duomat during day/night OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 7.77 SEP-20 340.00 382 12.35 8.73 8.25
for pre-block work to ensure smooth 7.40/- with 5% above
tamping etc. etc. Letter No: HOWRAH DIVISION -ENGG/153_2020- 7.40 Feb-21 343.00 382 11.37 8.24
21/00915850032323 Dated 18.02.2021 Rate Rs. 7.58 /-
with 2.33% below
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-8.09/- 7.69 Sep-22 378.00 382 1.06 7.77
with 5% below
68 Post block work of CSM/Duomatic OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 2.59 SEP-20 340.00 382 12.35 2.91 2.75
during day/night by filling up the 2.47/- with 5% above
ballast etc. etc. OAH/2/117/2022-23/RPH dated -29.09.2022 rate-2.70/- 2.57 Sep-22 378.00 382 1.06 2.6
with 5% below
Letter No: HOWRAH DIVISION -ENGG/153_2020- 2.47 Feb-21 343.00 382 11.37 2.75
21/00915850032323 Dated 18.02.2021 Rate Rs. 2.53 /-
with 2.33% below
69 Assisting Unimat/MPT machine during Letter No: HOWRAH DIVISION -ENGG/153_2020- 1460.57 Feb-21 343.00 382 11.37 1626.64 1627.16
day/night for pre-block work to ensure 21/00915850032323 Dated 18.02.2021 Rate Rs.
smooth tamping etc. etc. 1495.41 /- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 1532.99 SEP-20 340.00 382 12.35 1722.31
1459.99/- with 5% above
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 1516.45 Sep-22 378.00 382 1.06 1532.52
1596.26/- with 5% below

70 Post block work of Unimat/MPT during OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 631.85 SEP-20 340.00 382 12.35 709.88 670.66
day/night by filling up the ballast etc. 601.76/- with 5% above
etc. OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 625.03 Sep-22 378.00 382 1.06 631.66
657.93/- with 5% below
Letter No: HOWRAH DIVISION -ENGG/153_2020- 602.00 Feb-21 343.00 382 11.37 670.45
21/00915850032323 Dated 18.02.2021 Rate Rs.
616.36/- with 2.33% below
78 Fixing of GR sole pad on PSC sleeper OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 5.86 SEP-20 340.00 382 12.35 6.58 6.22
rail seat at crossing portion of points & 5.58/- with 5% above
crossings under running line with the Letter No: HOWRAH DIVISION -ENGG/153_2020- 5.58 Feb-21 343.00 382 11.37 6.21
helpof commercial epoxy resin (araldite 21/00915850032323 Dated 18.02.2021 Rate Rs. 5.71 /-
or similar) etc . with 2.33% below
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-6.10/- 5.80 Sep-22 378.00 382 1.06 5.86
with 5% below
80 Painting of SKV and F.B wild collars of OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 9.44 SEP-20 340.00 382 12.35 10.61 10.02
Rail by removing dust,loose dust & mill 8.99/- with 5% above
scale by wire brushing etc.
OAH/2/117/2022-23/RPH dated -29.09.2022 rate-9.83/- 9.34 Sep-22 378.00 382 1.06 9.44
with 5% below

Letter No: HOWRAH DIVISION -ENGG/153_2020- 9.00 Feb-21 343.00 382 11.37 10.02
21/00915850032323 Dated 18.02.2021 Rate Rs. 9.21/-
with 2.33% below
82 Fabrication of INSITU glued OAH/2/202/2022-23/Sr.DEN/4/HWH Dated - 14628.60 Jan-23 382 382 0 14628.6 14580.57
insulated joints for 52kg/60 kg rails 06.01.2023rate-13800.57/- with 6% above
as per RDSO approved drawing
LOA NO.01395060073261 LOA DATE-13.03.2023 Rate- 14301.53 Mar-23 382 14301.53
no.5361 and 5843 respectively and
13911.99/- with 2.85% bove
conforming to manual for glued
insulated rail joints, 1998 issued by OAH/2/141/18-19/KWAE dated 04.01.2019 (rate - Rs. 11903.55 Jan-19 307 382 24.43 14811.59
Ministry of Railway, RDSO/LKO and 10723.92/- + 11% above)
in accordance with the process
sheet of E. Rlys/PD/MGS dated
04.11.98 with supply of all fittings
and accessories such as:- i) 950 mm
long fish plate, ii) HTS bolts & nuts,
iii) Punched washer, iv) Insulated
bushes, v) Insulated channels, vi)
10/6 mm thick end post, vii)
Araldite, viii) Hardener, ix) Glass
cloth carrier and all other materials
& fixtures for clening & assembling
excluding rails conmplete in all
respect.

84 Provision of two semi skilled labour OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 944.43 Aug-20 338.00 382 13.02 1067.39 1069.98
for assisting blacksmith as per 899.54/- with 4.99 % above
instruction of PWI/Incharge from OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 944.52 SEP-20 340.00 382 12.35 1061.17
7/00 Hrs to 17/00 Hrs. 899.54/- with 5% above
OAH/2/54/2020-21/TR-HWH Dated 01-09-2020 Rate 962.51 Sep-20 340.00 382 12.35 1081.38
899.54 /- with 7 % above
87 Chamfering kit (RDSO specification Letter No: HOWRAH DIVISION -ENGG/153_2020- 13027.51 Feb-21 343.00 382 11.37 14508.74 14638.75
no. TM-53 of 2004). 21/00915850032323 Dated 18.02.2021 Rate Rs.
13338.29/- with 2.33% below

OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 13049.17 SEP-20 340.00 382 12.35 14660.74
12427.78/- with 5% above
OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 13047.93 Aug-20 338.00 382 13.02 14746.77
12427.78/- with 4.99 % above
90 Supply of RDSO approved toe load OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 76629.45 SEP-20 340.00 382 12.35 86093.19 84694.81
measuring device. 72980.43/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 73083.32 Feb-21 343.00 382 11.37 81392.89
21/00915850032323 Dated 18.02.2021 Rate Rs.
74826.78/- with 2.33% below

OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 76622.15 Aug-20 338.00 382 13.02 86598.35
72980.43/- with 4.99 % above
95 Supplying, fittings, fixing of retro- OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 6925.22 Sep-22 378.00 382 1.06 6998.63 7430.80
reflective as per ASTMD 4956 standard 7289.70/- with 5% below
high intensity retro-reflecting sitting on OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 7000.78 SEP-20 340.00 382 12.35 7865.38
2mm thick Aluminium alloy sheet 6667.41/- with 5% above
conforming to IS:737 as backing Letter No: HOWRAH DIVISION -ENGG/153_2020- 6670.01 Feb-21 343.00 382 11.37 7428.39
material making Engg. Indicator as per 21/00915850032323 Dated 18.02.2021 Rate Rs.
IRPWM and station name signage item 6829.13/- with 2.33% below
include cost of transportation, lead, lift
etc.

96 Supply of lime ( Note :- here 10 Nos. OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 191.37 Aug-20 338.00 382 13.02 216.29 209.16
Means 10 kg) 182.27/- with 4.99 % above
OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 191.38 SEP-20 340.00 382 12.35 215.02
182.27/- with 5% above
OAH/2/117/2022-23/RPH dated -29.09.2022 rate- 194.10 Sep-22 378.00 382 1.06 196.16
204.32/- with 5% below

97 Hiring of charges for generator set OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 333.03 Aug-16 278 375 34.89 449.22 491.39
including fuel etc for use of elecric 358.56/- - 7.12% below.
tools etc OAH/2/154/2014-15/RPH dt.26.12.14 Rate Rs. 354.38 Dec-14 253 375 48.22 525.26
341.14/- + 3.88% above.
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 382.44 Mar-18 287 375 30.66 499.7
Rs. 355.79/ with +7.49% above.
98 Concreting by M-20 all around the OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 858.38 Aug-16 278 375 34.89 1157.87 1196.91
PRC to rebuild the dismantled area 924.18/- - 7.12% below.
with proper slope at washing apron. OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 945.92 Mar-18 287 375 30.66 1235.94
(No other LAR is available.) Rs. 880.01/ with +7.49% above.
99 Mixing and placing of filler materials OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 940.41 Aug-16 278 375 34.89 1268.52 1311.29
in expansion joint of washable 1012.50/- - 7.12% below.
approns at approx. 10 to 15 mm th. OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 1036.32 Mar-18 287 375 30.66 1354.06
The filler materials shall be of Rs. 964.11/ with +7.49% above.
mixure of bitumen (Gr. 60/70) and
101 Cutting holes on CC/RCC of minimum size OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 70.19 Mar-18 287 375 30.66 91.71 94.46
80×80×100 mm depth to fix MCI inserts. Rs. 65.30/ with +7.49% above.
(No other LAR is available.) OAH/2/252/2016-17/DEN(Arbn)/HWH dated 73.87 Aug-17 285 375 31.58 97.2
18.08.17, Rate Rs. 69.85/ with +5.76% above.
102 Grouting MCI insert in Epoxy OAH/2/252/2016-17/DEN(Arbn)/HWH dated 120.78 Aug-17 285 375 31.58 158.92 158.92
Grouting & Padding for fixing rail 18.08.17, Rate Rs. 114.20/ with +5.76% above.
over pit line. (No other LAR is
available.)

103 Making levelling course with epoxy OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 286.35 Mar-18 287 375 30.66 374.14 270.32
mortar as per drg. No. 139-90(CE- Rs. 266.40/ with +7.49% above.
SRC).(No other LAR is available.) OAH/2/252/2016-17/DEN(Arbn)/HWH dated 126.54 Aug-17 285 375 31.58 166.5
18.08.17, Rate Rs. 119.65/ with +5.76% above.

104 Modified all weather bitumen paste Letter no. 62195199100227 dated- 07- jun-2019 38.00 Jun-19 319 375 17.55 44.67 39.31
in liquid asphalt with chemicals, rate Rs. 38.00/-
anti-stripping agents, graded
aggregates and additives etc etc.
(No other LAR is available.)

105 Fabrication & fixing check rails OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 964.91 SEP-18 301 375 24.58 1202.08 1179.08
52/60Kg for LC gate as per RDSO 847.30/ with +13.88% above.
Drawing etc. OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 995.26 NOV-18 302 375 24.17 1235.81
880.76/- with 13% above.
OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 853.07 JUN-18 291 375 28.87 1099.35
Rs. 813.38/- with 4.88% above.
106 Shallow screening of track including OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 107.05 SEP-18 301 375 24.58 133.36 135.03
lifting of track from 0 to 100 mm 94.00/ with +13.88% above.
with one round of through packing OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 117.36 NOV-18 302 375 24.17 145.73
etc. 103.86/- with 13% above.
OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 97.78 JUN-18 291 375 28.87 126.01
Rs. 93.23/- with 4.88% above.
107 Manual Deep screening of ballast OAH/2/95/2017-18/DEN(4)/HWH dated 26.02.18, Rate 318.65 Feb-18 287 375 30.66 416.35 386.70
upto depth of 300mm below the Rs.287.10 with 10.99% above.
bottom of sleeper and upto centre Letter No: HOWRAH DIVISION -ENGG/153_2020- 356.32 Feb-21 343.00 375 9.33 389.56
line of two track/entire available 21/00915850032323 Dated 18.02.2021 Rate Rs.
cess/coping wall in PF area/ballast 364.82/- with 2.33% below
retaining wall on bridge as per OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate Rs. 271.07 Mar-18 287 375 30.66 354.18
procedure laid down in para-218 of 252.18 with +7.49% above.
IRPWM 2004 & LWR manual. The
rate includes the followings.

12 Inter changing of gauge face of OAH/2/239/17-18/Tr.HWH dated 12.03.2018 , Rate 29.91 MAR-18 287 375 30.66 39.08 40.94
90R/52/60 Kg rail during block Rs. 29.91/- at per
period & fixing it with all fittings . OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 32.15 MAR-18 287 375 30.66 42.01
The rate icludings opening of all Rs. 29.91/ with +7.49% above.
fittings, interchanging of rails,
recoupments of all
missing/damaged fittings, fixing of
fish plate etc.to give the line fit as OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 33.49 SEP-18 301 375 24.58 41.72
per direction of engineer in-charge. 29.41/ with +13.88% above.

13 Laying of SEJ on end of LWR/CWR OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 2692.88 NOV-18 302 375 24.17 3343.75 3435.56
which includes cutting rails,drilling 2383.08/- with 13% above.
holes on rails including greasing of OAH/2/257/2018-19/Tr.HWH dt. 06.08.2019 Rate 3114.76 AUG-19 320 375 17.19 3650.19
fish plated joints as per direction of Rs. 2650.86 + 17.50% ab
site in-charge. ( oil & grease to be
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 2659.13 SEP-18 301 375 24.58 3312.74
supplied by the contrator). The rate
2335.03/ with +13.88% above.
includes insertion of SEJ sleepers
and SEJ rails with all fittings all
labours, tools & plants etc.

14 Changing of SEJ rail including, OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 1347.22 SEP-18 301 375 24.58 1678.37 1560.52
fittings over PSC/Wooden layout. 1183.02/ with +13.88% above.
The rate includes cutting, drilling & OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 1239.69 DEC-18 301 375 24.58 1544.41
trolleying SEJ rails upto 1 km and Rate Rs. 1183.02 + 4.79% above
return of released rails to nearest
OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 1131.98 JUN-18 291 375 28.87 1458.78
PWI store and oiling & greasing SEJ
Rs. 1079.31/- with 4.88% above.
and all its fittings.

15 Changing of worn out switches OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 1634.19 SEP-18 301 375 24.58 2035.87 1962.34
under traffic block including 1435.01/ with +13.88% above.
trolleying up to 1 Km etc. OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 1650.26 NOV-18 302 375 24.17 2049.13
Rs.1435.01/- with 15% above.
OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 1398.33 JUN-18 291 375 28.87 1802.03
Rs. 1333.27/- with 4.88% above.
16 Changing of worn out crossing of OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 1906.64 SEP-18 301 375 24.58 2375.29 2290.91
any type under traffic block 1674.25/ with +13.88% above.
including 1 Km etc. OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 1925.39 NOV-18 302 375 24.17 2390.76
Rs.1674.25/- with 15% above.
OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 1634.74 JUN-18 291 375 28.87 2106.69
Rs. 1558.68/- with 4.88% above.
17 Unloading of special size Pts. & xing OAH/2/104/05-06/BHP dt. 24.02.06, Rate 22/-at par 22.00 Feb-06 119 375 27.20 27.98 49.58
PSC sleepers from BOX, BFR, Truck,
Tarailer during day or night by using OAH/2/166/2010-11/Sr.DEN(4) dt. 01.01.2010 Rate 27.61 Jan-10 172 375 118.02 60.2
sand bags/scrap tyres to minimise Rs.27.20/- + 1.50% above.
damage to sleeper including proper
OAH/2/84/2016-17/LLH(2) dt. 27.01.2017, Rate Rs. 44.25 Jan-17 274 375 36.86 60.56
sizeing by crossing track, if required.
44.25/- taken as base rate.

18 Casual renewal of any type of OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 208.08 SEP-18 301 375 24.58 259.23 227.23
damaged special type points & xing 182.72/ with +13.88% above.
( 1 in 12/ 1 in 8.5), SEJ sleeper OAH/2/06/2018-19/RPH dated 28.05.18, Rate Rs. 149.60 MAY-18 289 375 29.76 194.12
maintaining gauge, cross level, 168.95/- with 6% below & 5.80% rebate.
paking with proper spacing &
OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 177.19 JUN-18 291 375 28.87 228.34
Squaring renewal of fattings by
Rs. 168.95/- with 4.88% above.
railway grease. After changing
release slepper stacked properly as
per direction of site in-charge. In
cluding shifting of lines if required.

19 Changing OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 78.56 NOV-18 302 375 24.17 97.55 98.56
insertion/laying/replacement of 69.52/- with 13% above.
90R/52kg/60Kg rail/Glued joints in OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 83.17 SEP-18 301 375 24.58 103.61
track where ever requied. Rate 73.03/ with +13.88% above.
includes opening and refixing of all
Letter No: HOWRAH DIVISION -ENGG/153_2020- 86.45 Feb-21 343.00 375 9.33 94.52
fittings recoupment/ replacement of
21/00915850032323 Dated 18.02.2021 Rate Rs.
missing/ damaged fittings. gauging ,
88.51/- with 2.33% below
fixing of fish plates as per
requirment, inital packing to make
fit the track movement and stacking
the realesed rail/glude joint within
100M as per diewction of engineer
in- Charfe. missing/damaded
fittings. Gauging, fixing of fish paltes
as per requirment, initial packing to
make fit the track movement and
staking the realsed rail/gluld joint
within 100

20 Through rail renewal by pairing, OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 104.97 Mar-18 287 375 30.66 137.15
butting, insertion and laying Rs. 97.66/ with +7.49% above.
90R/52/60 Kg rail. The rate includes OAH/2/86/2013/14/AZ dated 26.12.13, Rate rs. 78.80 Dec-13 239 375 56.9 123.64 129.99
pulling back of rails if required, 78.80 taken as base rate.
oiling and greasing of Pandrol clips
and insert (grease to be supplied by
the Contractor) Jim crowing of all
the kinky spots of the new rail,
fixing of the joints by fish plate, fish
bolt & nut and providing wooden
shoes at the end of panel during
pairing & butting for safe passage of
trains as directed by Engineer at
site with all labours, tools and plants
and consumable etc.(50% payment
is to be made if only one side rail to
be changed).
Through rail renewal by pairing,
butting, insertion and laying
90R/52/60 Kg rail. The rate includes
pulling back of rails if required,
oiling and greasing of Pandrol clips
OAH/2/231/2015-16/AZ dated 30.03.16, Rate 92.31 Mar-16 268 375 39.93 129.17
and insert (grease to be supplied by
Rs.87.73/- +5.22% above.
the Contractor) Jim crowing of all
the kinky spots of the new rail,
fixing of the joints by fish plate, fish
bolt & nut and providing wooden
shoes at the end of panel during
pairing & butting for safe passage of
trains as directed by Engineer at
site with all labours, tools and plants
and consumable etc.(50% payment
is to be made if only one side rail to
be changed).

21 Changing of rails at length 13 M less OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 43.98 Nov-18 302 375 24.17 54.61 55.60
in running track as per direction of Rs.38.24/- with 15% above.
site in charge. OAH/2/257/2018-19/Tr.HWH dt. 06.08.2019 Rate 49.77 Aug-19 320 375 17.19 58.33
Rs. 42.36 + 17.50% above
OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 43.37 NOV-18 302 375 24.17 53.85
38.38/- with 13% above.
22 Rail renewal at any type of Diamond OAH/2/300/2014-15/Tr.HWH dt. 28.03.2016, Rate 6808.14 Mar-16 268 375 39.93 9526.63
crossing (SS/DS) by 60kg/52kg rail Rs. 6303.83/- + 8% above.
in running track on PSC including OAH/2/170/2011-12/BDC dt. 07.09.2011, Rate Rs. 5227.19 Sep-11 197 375 90.36 9950.48 10348.63
switch and crossing full set under 5591.18/- at par with 6.51% rebate.
traffic block. The rates will include
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 8854.12 Mar-18 287 375 30.66 11568.79
fittings all blocks erquired as per
Rs. 8237.16/ with +7.49% above.
standard design and trolleying of all
released rail, switch and Xing upto a
distance of 500 mtrs. including
crossing of multiple track, if
required.

23 Rail renewal of 60/52kg derailing OAH/2/188/2017-18/Tr.-HWH dt. 05.03.18 Rate 1874.91 Mar-18 287 375 30.66 2449.76 2269.30
switch in running track on PSC Rs.1736.03/+ 8% above.
sleepers. OAH/2/84/2016-17/Sr.DEN/2/HWH dt. 27.01.2017 1702.85 Jan-17 274 375 36.86 2330.52
Rate Rs. 1702.85/- with taken as base rate.

OAH/2/09/2016-17/Sr.DEN/2/HWH dt. 18.07.2016 1513.93 Jul-16 280 375 33.93 2027.61


Rate Rs. 1455.70/-+4% above
24 Distressing of LWR/CWR track of any OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 11.35 NOV-18 302 375 24.17 14.09 14.68
rail section 52/60Kg with hydrolic 10.04/- with 13% above.
Rail tensor or manually as per LWR OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 13.37 AUG-19 320 375 17.19 15.67
manual etc. Rs. 11.38 + - 17.50% above.
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 11.50 NOV-18 302 375 24.17 14.28
Rs.10.00/- with 15% above.
25 Painting of SKV and F.B wild collars OAH/2/257/2018-19/Tr.HWH dt. 06.08.2019 Rate 8.70 AUG-19 320 375 17.19 10.19 10.22
of Rail by removing dust,loose dust Rs. 7.40 + 17.50% above.
& mill scale by wire brushing etc. OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 7.93 DEC-18 301 375 24.58 9.88
Rate Rs. 7.57 + 4.79% above
OAH/2/94/2017-18/RPH dt. 26.02.18 Rate 7.50 with 8.10 FEB-18 287 375 30.66 10.58
7.99% above
26 Painting of Rail by anti crossive OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 92.30 NOV-18 302 375 24.17 114.61 78.47
paint as per standard specification Rs.80.26/- with 15% above.
etc.etc. OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 55.26 AUG-19 320 375 17.19 64.76
47.03 with 17.50% above
OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 44.99 DEC-18 301 375 24.58 56.05
Rate Rs.42.93 + 4.79% above

(b) Three joint per day OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 2622.79 DEC-18 301 375 24.58 3267.47 3808.03
Rate Rs. 2502.90 + 4.79% above
OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 3538.94 AUG-19 320 375 17.19 4147.28
Rs. 3011.86/- with 17.50% above.
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 3228.92 NOV-18 302 375 24.17 4009.35
Rs.2807.76/- with 15% above.
(C) More than three joint per day OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 2398.98 NOV-18 302 375 24.17 2978.81 3024.67
2122.99/- with 13% above.
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 2467.68 SEP-18 301 375 24.58 3074.24
2166.91/ with +13.88% above.
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 2432.93 NOV-18 302 375 24.17 3020.97
Rs.2115.59/- with 15% above.
28 Welding of rail joints OAH/2/94/2017-18/RPH dated 26.02.18, Rate 560.11 FEB-18 287 375 30.66 731.84 707.37
(90R/52Kg./60kg) on cess including Rs.518.67 with 7.99% above.
supply of petrol and Artisan staff OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 577.54 SEP-18 301 375 24.58 719.5
and labour by making vertical and 507.15/ with +13.88% above.
horizontal alignment with creation of
OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 538.42 DEC-18 301 375 24.58 670.76
gap ( Including cutting & drilling in
Rate Rs. 513.81 + 4.79% above
this connection ) & filing of welded
joints on top & faces as per welding
manual and numbering of welding
joints to the entire satisfaction of
SE(PW)/Higher authorities. The rate
also includes supply of generator if
required etc etc.

29 Supplying, fittings, fixing of retro- OAH/2/101/2018-19/KWAE dated 05.11.18, Rate Rs. 6001.03 NOV-18 302 375 24.17 7451.48 7576.59
reflective as per ASTMD 4956 5310.65/- with 13% above.
standard high intensity retro- OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 6190.80 SEP-18 301 375 24.58 7712.5
reflecting sitting on 2mm thick 5436.25/ with +13.88% above.
Aluminium alloy sheet conforming to
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 6093.10 NOV-18 302 375 24.17 7565.8
IS:737 as backing material making
Rs.5298.35/- with 15% above.
Engg. Indicator as per IRPWM and
station name signage item include
cost of transportation, lead, lift etc.
33 Drilling hole 6 mm dia for signal OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 43.88 NOV-18 302 375 24.17 54.49 55.54
bonding including supplying of Rs.38.16/- with 15% above.
channel pins and bonding wires. OAH/2/257/2018-19/Tr.HWH dt. 06.08.2019 Rate 49.82 AUG-19 320 375 17.19 58.38
Rs.42.40+ 17.50% above
OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 43.28 NOV-18 302 375 24.17 53.74
38.30 + 13% above
34 Drilling hole 18 mm dia in rails for OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 37.17 SEP-18 301 375 24.58 46.31 46.76
traction OHE and "X" Bonds. 32.64/ with +13.88% above.
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 38.12 NOV-18 302 375 24.17 47.33
Rs.33.15/- with 15% above.
OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 37.55 NOV-18 302 375 24.17 46.63
33.23 + 13% above
35 Drilling hole 60/52 kg.rails by OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 58.68 NOV-18 302 375 24.17 72.86 71.45
contractors men and materials. 51.93 + 13% above
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 59.57 NOV-18 302 375 24.17 73.97
Rs.51.80/- with 15% above.
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 54.21 SEP-18 301 375 24.58 67.53
47.60/ with +13.88% above.
36 Cutting of rail 60/52 kg rails by OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 65.32 NOV-18 302 375 24.17 81.11 80.56
contractors men & materials. Rs.56.80/- with 15% above.
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 64.68 SEP-18 301 375 24.58 80.58
56.80/ with +13.88% above.
OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 64.41 NOV-18 302 375 24.17 79.98
57.00 + 13% above
37 Cutting rails ( of any sectiion) by gas OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 77.27 AUG-19 320 375 17.19 90.55 92.95
etc. 65.76 with 17.50% above
OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 65.91 NOV-18 302 375 24.17 81.84
58.33 + 13% above
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 91.41 SEP-19 322 375 16.46 106.46
09.09.19, Rate Rs.74.32 with +23% above.
38 Hiring charges for 5-KVA DG set OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 411.13 NOV-18 302 375 24.17 510.5 554.65
including fuel lubrication oil, Rs.357.50/- with 15% above.
operation & maintanance with OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 473.74 AUG-19 320 375 17.19 555.18
highlightetc. 403.18 with 17.50% above
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 513.70 SEP-19 322 375 16.46 598.26
09.09.19, Rate Rs.417.64 with +23% above.
39 Making & Erection of creep post OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 795.11 SEP-18 301 375 24.58 990.55 894.52
including cutting and painting of 698.20/ with +13.88% above.
rails as per direction of PWI. OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 626.85 DEC-18 301 375 24.58 780.93
Rate Rs. 598.20 + 4.79% above
OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 778.30 AUG-19 320 375 17.19 912.09
662.38 with 17.50% above
40 Assisting CSM/Duomat during OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 6.71 SEP-18 301 375 24.58 8.36 8.41
day/night for pre-block work to 5.89/ with +13.88% above.
ensure smooth tamping etc. etc. OAH/2/105/2019-20/Sr. DEN/2/HWH dated 7.45 SEP-19 322 375 16.46 8.68
09.09.19, Rate Rs. 6.06 with +23% above.
OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 7.00 AUG-19 320 375 17.19 8.2
5.96 with 17.50% above
41 Post block work of CSM/Duomatic OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 2.09 MAR-18 287 375 30.66 2.73 2.81
during day/night by filling up the Rs. 1.94 with +7.49% above.
ballast etc. etc. OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 2.36 AUG-19 320 375 17.19 2.77
2.01 with 17.50% above
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 2.52 SEP-19 322 375 16.46 2.93
09.09.19, Rate Rs. 2.05 with +23% above.
42 Assisting Unimat/MPT machine OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 1541.40 SEP-18 301 375 24.58 1920.28 1659.11
during day/night for pre-block work 1353.53/ with +13.88% above.
to ensure smooth tamping etc. etc. OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 1282.19 JUN-18 291 375 28.87 1652.36
Rs. 1222.53/- with 4.88% above.
OAH/2/06/2018-19/RPH dated 28.05.18, Rate Rs. 1082.53 MAY-18 289 375 29.76 1404.69
1222.53/- with 6% below & 5.80% rebate.
43 Post block work of Unimat/MPT OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 640.12 SEP-18 301 375 24.58 797.46 683.83
during day/night by filling up the 562.10/ with +13.88% above.
ballast etc. etc. OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 525.97 JUN-18 291 375 28.87 677.82
Rs. 501.50/- with 4.88% above.
OAH/2/06/2018-19/RPH dated 28.05.18, Rate Rs. 444.06 MAY-18 289 375 29.76 576.21
501.49/- with 6% below & 5.80% rebate.
44 Assisting UTV M/C in day/night OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 121.69 NOV-18 302 375 24.17 151.1 148.30
during traffic block materials. 107.69 + 13% above
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 112.71 SEP-18 301 375 24.58 140.41
98.97/ with +13.88% above.
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 123.54 NOV-18 302 375 24.17 153.4
Rs.107.43/- with 15% above.
45 Greasing ERC. This includes opening OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 9.17 AUG-19 320 375 17.19 10.75 10.07
of ERC leaning of CI insert of metal 7.80 with 17.50% above
liners on rail foot liners by means of OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 8.13 SEP-18 301 375 24.58 10.13
wire brush, greasing ERC leg inside 7.14/ with +13.88% above.
CI insert and contract surface of rail
OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 7.48 SDEC-18 301 375 24.58 9.32
foot by liners renewal of
Rate Rs.7.14+ 4.79% above
corroded/teamed/crushed liners,
rubber pad and ineffective ERC's
and fixing them properly as per
IRPWM in all respect. Grease to be
supplied by contractor.

46 Removing of rusted ERC by OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 43.64 AUG-19 320 375 17.19 51.14 48.05
heating,applying gas of approved 37.14 with 17.50% above
etc. OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 36.59 DEC-18 301 375 24.58 45.58
Rate Rs.34.92+ 4.79% above
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 38.20 NOV-18 302 375 24.17 47.43
Rs.33.22/- with 15% above.
47 Dressing & boxing of track with OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 19.73 DEC-18 301 375 24.58 24.58 25.39
available ballast with picking and Rate Rs.18.83+ 4.79% above
leading etc. etc. OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 21.44 SEP-18 301 375 24.58 26.71
18.83/ with +13.88% above.
OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 21.23 AUG-19 320 375 17.19 24.88
18.07 with 17.50% above
48 Cleaning of yard drain and clearing OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 285.79 DEC-18 301 375 24.58 356.04 338.40
the ballast and muck etc.etc. Rate Rs.272.73+ 4.79% above
OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 232.31 AUG-19 320 375 17.19 272.24
197.71 with 17.50% above
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 310.58 SEP-18 301 375 24.58 386.92
272.73/ with +13.88% above.
49 Opening of corroded/seized/broken OAH/2/257/2018-19 Dated 06.08.2019 Rate Rs. 97.51 AUG-19 320 375 17.19 114.27 108.04
plate screws etc. 82.99 with 17.50% above
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 87.73 SEP-18 301 375 24.58 109.29
77.04/ with +13.88% above.
OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 80.73 DEC-18 301 375 24.58 100.57
Rate Rs.77.04+ 4.79% above
50 Fixing of GR sole pad on PSC sleeper OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 5.04 SEP-18 301 375 24.58 6.28 6.34
rail seat at crossing portion of points 4.43/ with +13.88% above.
& crossings under running line with OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 5.16 NOV-18 302 375 24.17 6.41
the helpof commercial epoxy resin Rs.4.49/- with 15% above.
(araldite or similar) etc .
OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 5.09 NOV-18 302 375 24.17 6.32
4.50 + 13% above
51 Transporting all sorts of P. way materials such as rails, crossing, switches, 375
(a) sleepers and
Uptoother
40 kmP. way fittings [NS/SH/SC] from any to any
OAH/2/147/2018-19/DEN/4/HWH dt.Rly store or
17.12.2018 14.86 DEC-18 301 375 24.58 18.51 17.45
Ratemultiple
depot by road transport including crossing Rs. 14.18lines
+ 4.79%
andabove
stacking the
same with free lead of 100 Mtrs as per instruction ofdated
OAH/2/93/2018-19/LLH/2 Engineer-at-site.
20.09.2018, Rate 11.72 SEP-18 301 375 24.58 14.6
Rs. 10.85/- with 7.99% above.
OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 16.41 AUG-19 320 375 17.19 19.23
Rs.13.97/- - 17.50% above.
(b) From 40 km upto 120 km OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 10.38 DEC-18 301 375 24.58 12.93 13.80
Rate Rs. 9.91 + 4.79% above
OAH/2/93/2018-19/LLH/2 dated 20.09.2018, Rate 10.70 SEP-18 301 375 24.58 13.33
Rs. 9.91/- with 7.99% above.
OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 12.93 AUG-19 320 375 17.19 15.15
Rs.11.00/- - 17.50% above.
(c ) More than 120 km OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 5.16 DEC-18 301 375 24.58 6.43 6.78
Rate Rs. 4.92 + 4.79% above
OAH/2/93/2018-19/LLH/2 dated 20.09.2018, Rate 5.31 SEP-18 301 375 24.58 6.62
Rs. 4.92/- with 7.99% above.
OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 6.22 AUG-19 320 375 17.19 7.29
Rs5.29/- - 17.50% above.
52 Arrangement of JCB pay loader for OAH/2/255/2017-18/LLH(1) dated 01.06.18, Rate 1139.70 JUN-18 291 375 28.87 1468.73 1567.82
cutting and removal of hard Rs. 1086.67/- with 4.88% above.
compact stone product/eartch etc OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 1159.69 SEP-18 301 375 24.58 1444.74
from inside/outside track etc. 1018.34/ with +13.88% above.
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 1441.57 NOV-18 302 375 24.17 1790
Rs.1253.54/- with 15% above.
53 Manual Deep screening of ballast OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 349.19 AUG-19 320 375 17.19 409.22 403.01
upto depth of 300mm below the Rs.297.18/- - 17.50% above.
bottom of sleeper and upto centre OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 294.25 DEC-18 301 375 24.58 366.58
line of two track/entire available Rate Rs. 284.80 + 4.79% above
cess/coping wall in PF area/ballast
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 371.99 SEP-19 322 375 16.46 433.22
retaining wall on bridge as per
09.09.19, Rate Rs.302.43 with +23% above.
procedure laid down in para-218 of
IRPWM 2004 & LWR manual. The
rate includes the followings.

54 Manual Deep screening of 52/60Kg OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 15388.44 DEC-18 301 375 24.58 19170.92 21581.75
Fanshaped Pts & Xings 1 in 12 in Rate Rs. 14685.03 + 4.79% above
running track 250mm below bottom
of replaceed PSC Sleeper for OAH/2/105/2019-20/Sr. DEN/2/HWH dated 19892.35 SEP-19 322 375 16.46 23166.63
distance of 1.5 M from the edge of 09.09.19, Rate Rs.16172.64 with +23% above.
PSC Sleepers. The work should be
OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 19120.82 AUG-19 320 375 17.19 22407.69
done as per details in spl. Condition
Rs.16273.04/- - 17.50% above.
if formation is reached within 25mm
cushion to be provided by lifting the
track.( In 1 in 8.5 points & crossings
-70% payment will be made)

55 1st to 4th round consolidation OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 4641.94 AUG-19 320 375 17.19 5439.89 5297.80
Packing in 1 in 12 ut as per para 224 Rs.3950.59/- - 17.50% above.
of IRPWM (70% payment will be OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 3848.55 DEC-18 301 375 24.58 4794.52
made if the work is done on 1 in 8.5 Rate Rs. 3672.63 + 4.79% above
Pts. & Xings)
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 4859.16 SEP-19 322 375 16.46 5658.98
09.09.19, Rate Rs.3950.54 with +23% above.
56 Opening and refixing of existing OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 33.72 SEP-18 301 375 24.58 42.01 41.73
joggled fish plate already fixed over 29.61/ with +13.88% above.
old SKV Welds in running line OAH/2/129/2014-15/KWAE dt. 27.01.15 Rate Rs. 30 31.20 JAN-15 254 375 47.64 46.06
etc.etc. +4% above.
OAH/2/36/2014-15/BDC dt. 01.08.2014, (Rate 25.04 AUG-14 253 375 48.22 37.11
Rs .30 - 16.52% below)
57 Provision of two semi skilled labour OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 820.52 SEP-18 301 375 24.58 1022.2 1022.20
for assisting blacksmith as per 720.51/ with +13.88% above.
instruction of PWI/Incharge from
7/00 Hrs to 17/00 Hrs. ( No other
LAR is available. )

58 Supply of skilled labour (No other OAH/2/255/2017-18 /LLH(1 )Dated 01.06.2018 Rate 518.11 June -18 291 375 28.87 667.69 667.69
LAR is Avaible) Rs. 494 with 4.88 % above.
59 Greasing of fishplate joints, Grease supplied by Railway 375
a For 1m fishplate joint etc.for 52/60 OAH/2/158/2015-16/Sr. DEN/2/HWH dt. 02.02.2016 281.29 FEB-16 267 375 40.45 395.07 410.52
kg. .NB:(No other LAR is available) Rate Rs. 278.50/- +1% above
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 341.92 SEP-18 301 375 24.58 425.96
300.25/ with +13.88% above.
(b) For ordinary fishplate joint etc. for OAH/2/158/2015-16/Sr. DEN/2/HWH dt. 02.02.2016 168.77 FEB-16 267 375 40.45 237.04 246.31
52/60 kg. .NB:(No other LAR is Rate Rs. 167.10/- +1% above
available) OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 205.15 SEP-18 301 375 24.58 255.58
180.15/ with +13.88% above.
60 Redistribution of ballast for making OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 26.92 SEP-18 301 375 24.58 33.54 35.03
ballast profile as per IRPWM. etc. 23.64/ with +13.88% above.
OAH/2/133/2017-18/KWAE dated 07.12.17, Rate 24.74 DEC-17 286 375 31.12 32.44
Rs. 25.26/- - 2.05% below.
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 33.57 SEP-19 322 375 16.46 39.1
09.09.19, Rate Rs.27.29 with +23% above.
61 Removing of Bur in point & xing, LC OAH/2/152/16-17/Sr.DEN(2)HWH, Dt. -17/02/17 65.05 FEB-17 274 375 36.86 89.03 94.16
zone in running line, all tool & plants Rate Rs.69.41/- - 6.28 % below.
supplied by agency, the rate to OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 80.30 SEP-18 301 375 24.58 100.04
include cost of materials, labour, 70.51/ with +13.88% above.
lead, lift, crossing of line etc. Work
OAH/2/156/16-17/Sr.DEN(2)HWH, Dt. -03/03/17 68.51 MAR-17 275 375 36.36 93.42
to be done as per direction of Engg.-
Rate Rs.69.41/- - 1.29 % below.
in-charge.

62 Manufacturing & supplying of OAH/2/06/2018-19/RPH dated 28.05.18, Rate Rs. 4914.30 MAY-18 289 375 29.76 6376.8 7118.84
insulated rails dollies complete in 5549.87/- with 6% below & 5.80% rebate.
all respect (insulated by garfon)
including supply of two nos wheels OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 5637.48 DEC-18 301 375 24.58 7023.17
(CS), 04 Nos. bearing (make SRF No. Rate Rs. 5379.79 + 4.79% above
6304 os size (20x52x17mm), 2 nos,
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 6386.69 SEP-18 301 375 24.58 7956.54
axle with nut, 1 no. chain (Spl) and
5608.26/ with +13.88% above.
complete painting.

63 Supply of roller ball bearing dip lorry OAH/2/150/11-12/AZ dt. 28.11.2011 @ Rs. 38113.13 Nov-11 199 375 88.44 71820.38 75521.64
complete in all respect with a 38890.95 each at par with 2% rebate
capacity of 20 ton on each lorry for OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 61335.68 DEC-18 301 375 24.58 76411.99
carrying heavy materials. The dip Rate Rs. 58532 + 4.79% above
trolley to be used by contractor
OAH/2/94/2017-18/RPH dt. 26.02.18 Rate 59951.45 Feb-18 287 375 30.66 78332.56
during work and will be return the
55515.74with 7.99% above
same to the Railway after
completion of work in good
condition.

64 Supplying, fitting and fixing Spring OAH/2/300/2014-15/Tr.-HWH dt. 28.03.2016 Rate 11632.29 Mar-16 268 375 39.93 16277.06 16824.99
lever with all accessories including Rs.10770.64/+ 8% above.
pull rod/connecting rod etc.(No
OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 13296.28 Mar-18 287 375 30.66 17372.92
other LAR is available.)
Rs. 12369.78/ with +7.49% above.

65 Realignment of curve by slewing of OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 105.80 Mar-18 287 375 30.66 138.24
track in stages of not more than Rs. 98.43/ with +7.49% above.
50mm each to give required slew OAH/2/09/2016-17/Sr.DEN/2/HWH dt. 18.07.2016 91.52 Jul-16 280 375 33.93 122.57 129.81
with through packing after each Rate Rs. 88.00/-+4% above
stage of slewing as per the direction
of the site in-charge. The slew to be
given to track will be parsonally
verified by AEN of the section before
starting the work. The rate includes
marking and paging etc as required
at site.
65 Realignment of curve by slewing of
track in stages of not more than
50mm each to give required slew
with through packing after each
stage of slewing as per the direction
OAH/2/239/17-18/Tr.- HWH date 12.03.18, Rate Rs. 98.43 Mar-18 287 375 30.66 128.61
of the site in-charge. The slew to be
98.43/- - at par
given to track will be parsonally
verified by AEN of the section before
starting the work. The rate includes
marking and paging etc as required
at site.

66 Dismantalling of track having any OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 67.12 Mar-18 287 375 30.66 87.7 85.45
type of rails and sleepers etc etc. Rs. 62.44/ with +7.49% above.
OAH/2/202/2017-18/Sr.DEN/2/HWH dt. 05.02.2018, 68.72 Feb-18 287 375 30.66 89.79
Rate Rs. 75.36/- - 0.19% above & 8.99% rebate

OAH/2/50/2016-17/RPH dt. 30.08.16 Rate Rs.64.25/- 58.47 Aug-16 278 375 34.89 78.87
- 9% below.
67 Complete dismantling of existing OAH/2/09/16-17/Sr.DEN(2)/HWH dt. 18.07.2016, 10093.57 JUL-16 280 375 33.93 13518.32 16069.30
90R/52Kg/60Kg 1 in 12 P&C on Rate Rs.9705.36 +4% above
ST/WOOD/PSC Sleepers during OAH/2/188/17-18/TR/HWH dt. 05.03.2018, Rate 13138.12 MAR-18 287 375 30.66 17166.27
day/night block period including full Rs.12222.64 with 7.49% above
openning of ballast upto bottom
level of sleeper and dressing of
ballast for making room etc. Rate
includes the work of tacking of
released materials seperately at
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 14065.91 SEP-18 301 375 24.58 17523.31
location shown by site in charge
12351.52/ with +13.88% above.
with in a lead of 100 mt. (70%
payment will be made if the work is
done on 1 in 8.5 P&C).

68 Extra if work is done mannualy OAH/2/367/2010-011/LLH(1) dt.14.03.2011, Rate 1788.08 Mar-11 185 375 102.7 3624.44
during day/night i.e. dismantling of 1788.08/-at par .
existing P & C sleeper, rails, OAH/2/133/2010-11/Tr.HWH dt.31.12.2010, Rate 1772.07 Dec-10 185 375 102.7 3591.99 3565.78
switches and crossing during block 1754.52/- +1% above
or under speed restriction (70%
OAH/2/260/2011-12/BDC dt. 26.10.2012,Rate 2014.30 Oct-12 217 375 72.81 3480.91
payment will be made if the work is
1900.28/- +6% above
done on 1 in 8.5 P & C)

69 Fabrication of 52/60 Kg 1 in 12 pts & OAH/2/153/16-17/Sr.DEN(2)/HWH dt. 18.07.2017, 18820.62 JUL-17 287 375 30.66 24591.02 25673.54
Xing sleeper for T-28 maching at Rate Rs.18820.62 taken as base rate.
place or location as directed by PWI
at site including dressing of the site OAH/2/09/16-17/Sr.DEN(2)/HWH dt. 18.07.2016, 18820.62 JUL-16 280 375 33.93 25206.46
of fabrication. Rates includes Rate Rs.18096.75 +4% above
leading of rail, switch, crossing and
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 21851.94 SEP-18 301 375 24.58 27223.15
sleeper for fabrication work
19188.57/ with +13.88% above.
including crossing of lines of from
within 100m & this also includes
pasting of rubber pad with approved
glue/araldite. (70% payment will be
made if the work is done on 1 in 8.5
P&C).
70 Assisting T-28 maching for shifting OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 16404.05 SEP-18 301 375 24.58 20436.17 20436.17
of 1 in 12 Pts & Xings to adjust 14404.68/ with +13.88% above. (No other LAR is
crossover lenth for rectification of Available)
alignment. Work
375

71 Replacement/renewal pf elastic rail OAH/2/158/15-16/Sr.DEN/2/HWH Dt. 17.69 FEB-16 267 375 40.45 24.85 23.32
clips liners and grooved rubber pad 02.02.2016,Rate- Rs.17.50/- with 1% above.
etc of concrete sleeper (PSC-12/PSC-
14) including greasing of central lrgs OAH/2/09/2016-17/Sr.DEN/2/HWH dt. 18.07.2016 14.86 JUL-16 280 375 33.93 19.9
of elastic rail clips and eye of MCI Rate Rs. 14.29/-+4% above
inserts and extracting of elastic rail
clips and other work should be as OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 20.24 SEP-18 301 375 24.58 25.21
per guidene of PWI In-charges or his 17.77/ with +13.88% above.
supervisors at site, seized ERC
elastic rail clip if any, to be
extracted by using approved
chemical and or heating of the MCI
inserts by any suitable means and
without damaging if any extracting
seized ERC to be brone by the
agency along with the cost of its
renewal. The works includes
carrying new ERC's, liners & GR pad
etc by any means from PWI store &
return the released materials to PWI
store as per direction of Engineer In-
Charges or his representative
( greas will be supplied by
contractor ).

72 Raking of ballast within track in OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 13.24 SEP-18 301 375 24.58 16.49 18.04
advance of BCM block within 4.2M 11.63 with 13.88% above.
(2.1 M from C/L of track as either OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 14.40 NOV-18 302 375 24.17 17.88
side) drawing ballast from sides as Rs.12.52/- with 15% above.
existing at site on cess, adequately
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 16.96 sep-19 322 375 16.46 19.75
before deep screening by BCM . Any
09.09.19, Rate Rs. 13.79 with +23% above.
kind of obstruction in track such as
rail post, boulder rail etc.to be
removed for making room for BCM
within 4.2m of track in advance of
BCM block.
73 Screening of additional width of OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 26.80 SEP-18 301 375 24.58 33.39 37.92
ballast (at both sides of track) which 23.53 with 13.88% above.
does not come under the scope of OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 28.76 NOV-18 302 375 24.17 35.71
BCM/FRM to coincide with the depth Rs.25.01/- with 15% above.
screened by BCM/FRM with proper
slope of formation as per
Specification of IRPWM including
dressing of entire available cess
complete on either end . Screening
to be done by 20mm sieve to
separate clean ballast from muck
and drawing ballast to the track
upto lead of 800mm . When ever
deficiency exist to have uniform
ballast section and depositing muck
sufficiently away from track as per
instruction of site in-charge. Muck
shall not be thrown on the slope of
cutting on inside the drain in
cutting. This includes throwing muck
away from catch water drains in
cutting. This work of additional
width has to be done simultaneously
just behind along with BCM machine
working and work should be up to
date behind the location where BCM
is working. This item also includes
dressing disposal of muck released
by BCM/FRM Machine after
screening.
OAH/2/105/2019-20/Sr. DEN/2/HWH dated 34.17 MAR-18 287 375 30.66 44.65
09.09.19, Rate Rs. 27.78 with +23% above.

74 Assisting BCM in pre-block work, OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 15.91 SEP-18 301 375 24.58 19.82 21.71
during block work for making room 13.97 with 13.88% above.
for placing blades & cutting chain OAH/2/105/2019-20/Sr. DEN/2/HWH dated 20.41 SEP-19 322 375 16.46 23.77
removing unforeseen obstructions 09.09.19, Rate Rs. 16.59 with +23% above.
within the screening zone, such as
rail post boulders etc for carring out
the smooth work of smooth work of
BCM and packing sleepers at the
end of the days work of BCM. No
payment shall be made for non-
block day or day as which machine
is under break down.
74 Assisting BCM in pre-block work, 21.71
during block work for making room
for placing blades & cutting chain
removing unforeseen obstructions
within the screening zone, such as
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 17.34 NOV-18 302 375 24.17 21.53
rail post boulders etc for carring out
Rs.15.08/- with 15% above.
the smooth work of smooth work of
BCM and packing sleepers at the
end of the days work of BCM. No
payment shall be made for non-
block day or day as which machine
is under break down.
75 Extra for the work as per item 82 OAH/2/105/2019-20/Sr. DEN/2/HWH dated 6.45 SEP-19 322 375 16.46 7.51 7.07
above during night time. The other 09.09.19, Rate Rs. 5.24 with +23% above.
condition remains same as per item OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 5.19 MAR-18 287 375 30.66 6.78
no.82. Rs. 4.83 with +7.49% above.
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 5.56 SEP-18 301 375 24.58 6.93
4.88 with 13.88% above.
76 Spreading / dressing etc. of debris OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 17.60 NOV-18 302 375 24.17 21.85 21.59
mixed with chips., over size ballast, Rs.15.30/- with 15% above.
ash, dust etc as thrown by BCM on OAH/2/09/16-17/Sr. DEN(2)/HWH dated 18.07.2016 15.84 JUL-16 280 375 33.93 21.21
cess for repair to cess when on high ( rate 15.23 + 4% above
bank debris to be thrown to slope of
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 17.42 SEP-18 301 375 24.58 21.7
bank, cross drains at every 13m of
15.30 with 13.88% above.
track to be cleaned where debris to
be removed from drains site. The
work must be completed to the
satisfaction of site in-charge with
cleaning of cess from jungles,
grasses etc. in both sides of track.

77 One Round Packing , whenver OAH/2/09/16-17/Sr.DEN(2)/HWH dt. 18.07.2016, 24.85 JUL-16 280 375 33.93 33.28 32.91
required to provide smooth long Rate Rs .23.89/- +4% above
level after BCM has worked with OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 27.95 SEP-18 301 375 24.58 34.82
opening & dressing/ boxing of 24.54 with 13.88% above.
ballast within in free lead of 30mts.
OAH/2/242/15-16/BWN dated 25.05.2016 , Rate 22.46 MAY-16 275 375 36.36 30.63
Rs.23.89/- 6% below
78 Deep screening of 1 in 12 Pts & OAH/2/09/16-17/Sr.DEN(2)/HWH dt. 18.07.2016, 25552.80 JUL-16 280 375 33.93 34222.87 33839.65
Xing by BCM,payment will be made Rate Rs.24570.00 +4% above
70% for 1 in 8.5 Pts & xing. OAH/2/242/15-16/BWN date 25.05.2016 Rate 23095.80 MAY-16 275 375 36.36 31493.43
Rs.24570.00/- 6% below
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 28738.67 SEP-18 301 375 24.58 35802.64
25235.92 with 13.88% above.
79 Cutting trench beside Pts. & Xing 1 OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 51.97 SEP-18 301 375 24.58 64.74 64.74
mtr. Away from edge of F.S PRC 45.64 with 13.88% above.(NO OTHER LAR IS
sleeper 0.5 m deep in formation to AVAILABLE.)
identify signal cable along and cross
cable for smooth movement of BCM
without hindrance as well as to save
tearing of signal cable to avoid
signal failure. Work includes
lowering of signal cable if found in
below bottom of sleeper for smooth
passing of BCM cutter.

80 Renewal of switch fittings i.e. slide 375


chair, spl. bearing plate & plate
screws with greasing of plate screws
(grease supply by Rly.). The rate
includes transportation including
loading & unloading of all materials
to the site of work/ PWI'S store and
release materials to be returned
back to PWI store and crossing of
multiple tracks etc. and as per
direction of Engineer In Charge or
his representative.
(a) For 1 in 12 switch (consisting of OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 11910.71 SEP-18 301 375 24.58 14838.36 14838.36
slide chair-34 nos. Spl. bearing plate 10459.00 with 13.88% above.
14 nos. & plate screw with ring NO OTHER LAR IS AVAILABLE.
washer-192 nos.)

(b) For 1 in 8.5 switch (consisting of OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 8337.15 SEP-18 301 375 24.58 10386.42 10386.42
slide chair-20 nos. Spl. bearing plate 7321.00 with 13.88% above.
6 nos. & plate screw with ring NO OTHER LAR IS AVAILABLE.
washer-104 nos.) payment will be
made 70% of item no 74/a

81 Renewal of SEJ fittings, i.e. SEJ OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 4532.42 SEP-18 301 375 24.58 5646.49 5646.49
bearing plates, brackets, Angles, 3980.00 with 13.88% above.
necessary bolts & nuts and plate NO OTHER LAR IS AVAILABLE.
screws. (by Rly grease). The rate
includes transportation including,
unloading of all materials to the site
of work/PWI's store and release
material returned back to PWI store
and crossing of multiple tracks etc.

82 Grinding of riser using motorised OAH/2/129/14-15/KWAE dated 27.01.15, Rate 83.20 JAN-15 254 375 47.64 122.84 123.74
grinding joggle fish plate etc. Rs.80/- + 4% above.
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 100.56 SEP-18 301 375 24.58 125.28
88.30 with 13.88% above.
OAH/2/322/14-15/KWAE dated 17.07.15 Rate Rs. 86.33 JUL-15 263 375 42.59 123.1
80.00/- + 9% above.- 1% rebate
83 Supply of fixing of fish bolts & nuts of size OAH/2/71/16-17/LLH(2)/Qtn date 24.02.17 Rate 96.00 FEB-17 274 375 36.86 131.39 140.64
25x140mm as per RDSO drawing No. T-1899 Rs.96./- At per
(if fixing done by railway then Rs. 5/- will be
deducted each bolt). OAH/2/317/14-15/LLH(2)/Qtn date 27.03.15 Rate Rs 96.00 MAR-15 254 375 47.64 141.73
.96/- At per
OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 119.44 SEP-18 301 375 24.58 148.8
104.88 with 13.88% above.
84 Supply of bolts & nuts 25x275mm cutting OAH/2/71/16-17/LLH(2)/Qtn date 24.02.17 Rate 131.21 FEB-17 274 375 36.86 179.57 187.61
machine as per RDSO drawing (if fixing done Rs.131.21./- At per No other is available
by railway then Rs. 5/- will be deducted each
bolt). (No other LAR is available.) OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 157.05 SEP-18 301 375 24.58 195.65
137.91 with 13.88% above.

85 Supply of bolts & nuts 25x300mm cutting OAH/2/71/16-17/LLH(2)/Qtn date 24.02.17 Rate 149.76 FEB-17 274 375 36.86 204.96 214.14
machine as per RDSO drawing (if fixing done Rs.149.76/- At per No other is available
by railway then Rs. 5/- will be deducted each
bolt). (No other LAR is available.) OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 179.26 SEP-18 301 375 24.58 223.32
157.41 with 13.88% above.

86 Supply of bolts & nuts 25x330mm cutting OAH/2/71/16-17/LLH(2)/Qtn date 24.02.17 Rate 157.77 FEB-17 274 375 36.86 215.92 225.6
machine as per RDSO drawing (if fixing done Rs.157.77./- At per No other is available
by railway then Rs. 5/- will be deducted each
bolt). (No other LAR is available.) OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 188.85 SEP-18 301 375 24.58 235.27
165.83 with 13.88% above.

87 Supply of Lime. (No other LAR is available.) OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 166.26 SEP-18 301 375 24.58 207.13 207.13
146 with 13.88% above.
88 Chamfering kit (RDSO specification OAH/2/104/2012-13/Sr. DEN(4)HWH dt. 19.10.12 8563.36 Oct-12 217 375 72.81 14798.34 14122.47
no. TM-53 of 2004). (No other LAR is Rs. 9308/- with 8% below
available.) OAH/2/84/2013-14/Sr.DEN (4)/HWH dt. 26.05.2014 8749.17 May-14 244 375 53.69 13446.6
Rate Rs. 8846.48/- At par with 1.1% rebate

89 Rail drilling machine(RDSO) OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 41796.93 Dec-18 301 375 24.58 52070.61 55730.92
specification no. TM/SM/3 of 1991 Rate Rs. 39886.37 + 4.79% above
OAH/2/257/2018 -19/Tr. HWH dated 06.08.19, Rate 52194.77 AUG-19 320 375 17.19 61167.05
Rs.44421.08/- - 17.50% above.
89 Rail drilling machine(RDSO) 55730.92
specification no. TM/SM/3 of 1991

OAH/2/94/2017-18/RPH dt. 26.02.18 Rate 38238.98 41294.27 Feb-18 287 375 30.66 53955.1
with 7.99% above
90 Abrasive rail cutting Disc (wheel) P.O.No.: 61195163100316 dated :09-SEP-19 Rate 650.00 Sep-19 322 375 16.46 756.99 666.12
400x4X22.23 mm as per RDSO specification Rs. 650.00/-
No. TM/SM/02 (Rev.01 of 2007). (No other
LAR is available.)

91 Reconditioning of MCI Insert of PSC OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 136.67 SEP-18 301 375 24.58 170.26 170.26
sleeper. (No other LAR is available.) 120.01 with 13.88% above.

92 Supply of round up chemical for OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 667.63 NOV-18 302 375 24.17 829 822.41
deweeding shalimar brand or Rs.580.55/- with 15% above.
similar. OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 661.14 SEP-18 301 375 24.58 823.65
580.55 with 13.88% above.
OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate Rs. 656.02 NOV-18 302 375 24.17 814.58
580.55 + 13% above
93 Casual renewal of ordinary PSC- OAH/2/93/2018-19/LLH(2) dated 20.09.18, Rate Rs. 293.81 SEP-18 301 375 24.58 366.03 318.82
Sleeper, the rate includes proper 258 with 13.88% above.
spacing, squaring, packing with OAH/2/101/2018-19/KWAE dt. 05.11.2018 Rate 235.66 NOV-18 302 375 24.17 292.62
proper gauge, cross level and Rs.208.55 + 13% above
boxing, with renewal of fittings by
OAH/2/95/2018-19/KWAE dt. 14.11.2018 Rate 239.83 NOV-18 302 375 24.17 297.8
Railway grease. After changing
Rs .208.55 /- with 15% above.
release sleeper stacked properly as
per direction of site in charge.

94 Fixing ferrul at existing location on OAH/2/52/2016-17/RPH dt. 22.07.16, Rate Rs. 213.35 Jul-16 280 375 33.93 285.74 291.61
PSC sleeper as required for fixing 217.70/- - 2% below
screw with ACC ''Shrinkommp 30''. OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 240.26 Mar-18 287 375 30.66 313.92
The rate includes the cost of drilling Rs. 223.52/ with +7.49% above.
suitable holes and supply of ferrul,
labour, lead, lift, crossing of line etc.

OAH/2/170/2015-16/BHP dt. 04.02.2016 Rate Rs. 195.93 Feb-16 267 375 40.45 275.18
217.70/- -9.999% below
95 Dismantling CC/RCC work of any OAH/2/41/2016-17/Tr.-HWH dt. 01.08.16 Rate Rs. 334.37 Aug-16 278 375 34.89 451.03 466.25
grade by compressor or by any 360.00/- - 7.12% below.
means for making pocket for OAH/2/188/2017-18/Tr/HWH dated 05.03.18, Rate 368.48 Mar-18 287 375 30.66 481.46
changing PRC. (No other LAR is Rs. 342.80/ with +7.49% above.
available.)

105 Trial assembly of switches at OAH/2/92/2017-18/DEN/4/HWH dt. 23-10-17, Rate 11808.99 Oct-17 287 375 30.66 15429.63 15832.37
convenient location. Rs. 11465.04/- - 3% above
OAH/2/94/2017-18/RPH dt. 26.02.18 Rate 11465.04 12381.10 Feb-18 287 375 30.66 16177.14
with 7.99% above
OAH/2/147/2018-19/DEN/4/HWH dt. 17.12.2018 12755.12 Dec-18 301 375 24.58 15890.33
Rate Rs. 12172.08 + 4.79% above
106 Fabrication of 52Kg./60Kg. 1:12 Pts. OAH/2/188/2017-18/T dated 05.03.18, Rate 14703.60 Jan-17 274 375 36.86 20123.35 18617.39
& Xings sleeper at place or location Rs.13679.04/- with +7.49% above
as directed by PWI at site including OAH/2/09/2016-17/Sr.DEN/2/HWH dt. 18.07.2016 12776.40 Jul-16 280 375 33.93 17111.43
dressing the location of site of Rate Rs. 12285.00/-+4% above
fabrication. Rate includes leading of
rails, switches, Crossings & sleepers
for fabrication work including
crossing of lines of from with in
100m & this also includes posting
of rubber pad with approved
glued/araldite. (70% payment will
be made if the work is done on 1:8½
P & C). (No other LAR is available)

107 Fabrication of 1:12 52Kg./60Kg. OAH/2/260/2011-12/BDC dt. 26.10.2012, Rate 8445.65 Oct-12 217 375 72.81 14594.93 15628.77
Switch sleepers at place or location Rs.7967.59/- +6% above.
as directed by PWI at site including OAH/2/188/2017-18/T dated 05.03.18, Rate 11537.08 Dec-13 239 375 56.9 18101.68
dressing the location of site of Rs.10733.17/- with +7.49% above
fabrication. Rate includes all lead &
OAH/2/231/2015-16/AZ dated 30.03.16, Rate 10140.57 Mar-16 268 375 39.93 14189.7
crossing of lines of rails & sleepers
Rs.9637.49/- +5.22% above.
from with in 100m & this also
includes posting of rubber pad with
approved glued/araldite. (70%
payment will be made if the work is
done on 1:8½ P&C)

108 Linking of new P&C 1 in 12 including OAH/2/09/2016-17/Sr.DEN/2/HWH dt. 18.07.2016 14905.28 Jul-16 280 375 33.93 19962.64 19962.64
carring all materials like rail, PSC Rate Rs. 14332/-+4% above
sleeper etc. upto 1 Km and fixing,
fitting, fish plate greasing and
greasing leg 1kg of ERC and eye if
MCI inserts etc. ie, complete in all
respected (for 1 in 8.5 P&C rate
should be @ 70%.).(No other LAR is
available)

109 Renewal of ordinary OAH/2/35/2014-15/BDC dt. 01.08.2014 Rate Rs. 154.77 Aug-14 253 375 48.22 229.4 237.30
wooden/steel/CI/PSC sleeper by PSC 201/- - 23% below.
sleepers ( sleepers at site of work ) OAH/2/87/15-16/BDC dated 16.10.2015, Rate Rs. 175.88 Oct-15 269 375 39.41 245.19
(No other LAR is available) 210/- -16.25 % below.

110 Supply of RDSO approved toe load OAH/2/55/2020-21/TR-HWH Dated 01-09-2020 Rate 76629.45 SEP-20 340.00 375 10.29 84514.62 83142.96
measuring device. 72980.43/- with 5% above
Letter No: HOWRAH DIVISION -ENGG/153_2020- 73083.32 Feb-21 343.00 375 9.33 79901.99
21/00915850032323 Dated 18.02.2021 Rate Rs.
74826.78/- with 2.33% below

OAH/2/57/2020-21/LLH (1) Dated 17-08-2020 Rate 76622.15 Aug-20 338.00 375 10.95 85012.28
72980.43/- with 4.99 % above
102 Fabrication of INSITU glued E -LOA NO: HOWRAH DIVISION _ENGG/153_2019- 13259.77 Dec-19 330 375 13.64 15068.4 13911.99
insulated joints for 52kg/60 kg rails 20/00922800011715 Dated 13.12.2019( Rate -
as per RDSO approved drawing 11631.38/- With 14% above)
no.5361 and 5843 respectively and
conforming to manual for glued OAH/2/123/16-17/BDC dt.14.12.2016 (rate - 8893.64 Dec-16 275 375 36.36 12127.37
insulated rail joints, 1998 issued by 9461.32/- - 6% below)
Ministry of Railway, RDSO/LKO and
in accordance with the process
sheet of E. Rlys/PD/MGS dated
04.11.98 with supply of all fittings
and accessories such as:- i) 950 mm
long fish plate, ii) HTS bolts & nuts,
iii) Punched washer, iv) Insulated
bushes, v) Insulated channels, vi)
10/6 mm thick end post, vii)
Araldite, viii) Hardener, ix) Glass
cloth carrier and all other materials
& fixtures for clening & assembling
excluding rails conmplete in all
respect.
insulated joints for 52kg/60 kg rails
as per RDSO approved drawing
no.5361 and 5843 respectively and
conforming to manual for glued
insulated rail joints, 1998 issued by
Ministry of Railway, RDSO/LKO and
in accordance with the process OAH/2/141/18-19/KWAE dated 04.01.2019 (rate - 11903.55 Jan-19 307 375 22.15 14540.19
sheet of E. Rlys/PD/MGS dated Rs. 10723.92/- + 11% above)
04.11.98 with supply of all fittings
and accessories such as:- i) 950 mm
long fish plate, ii) HTS bolts & nuts,
iii) Punched washer, iv) Insulated
bushes, v) Insulated channels, vi)
10/6 mm thick end post, vii)
Araldite, viii) Hardener, ix) Glass
cloth carrier and all other materials
& fixtures for clening & assembling
excluding rails conmplete in all
respect.
EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

Detailed estimate for Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25)
Schedule-B-I-A Misc. Work
Schedule Items as per E.Rly's USSOR & DSR- 2021
Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
1 12 mm cement plaster of mix : DSR-2,2021 -13.1 258
a 1:4 (1 cement: 4 fine sand) 1 M2 294.85 2000.00 589,700.00 DSR -13.1.1 258
b 1:6 (1 cement: 6 fine sand) 1 M2 282.00 3000.00 846,000.00 DSR -13.1.2 258
2 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) 1 M2 253.05 300.00 75,915.00 DSR -13.16.1 259
3 12 mm cement plaster finished with a floating coat of neat DSR -13.7
cement of mix :
a 1:3 (1 cement: 3 fine sand) 1 M2 374.15 250.00 93,537.50 DSR -13.7.1 258

4 15 mm cement plaster on rough side of single or half brick wall DSR -13.5
of mix:
a 1:4 (1 cement: 4 coarse sand) 1 M2 354.50 75.00 26,587.50 DSR -13.5.1 258
b 1:6 (1 cement: 6 coarse sand) 1 M2 339.10 75.00 25,432.50 DSR -13.5.2 258
5 Providing wood work in frames of doors, windows, clerestory 1 M3 131576.95 5.00 657,884.75 DSR1- 9.1.1 182
windows and other frames and trusses, wrought, framed and
fixed in position :
Second Class Teak Wood

6 Providing and fixing panelled/glazed or panelled and glazed 1 Sqm 3704.45 25.00 92,611.25 DSR1- 9.5.1.1 182
shutters for doors, windows and clerestory windows including
ISI marked black enamelled M.S. butt hinges with necessary
screws excluding, panelling/glazing which will be paid for
separately.
Second class teak wood, 35mm thick shutters

7 Providing and fixing ISI marked oxidised M.S. tower bolt black DSR1-9.63
finish,(Barrel type) with necessary screws etc. complete: (copper
oxidizedas per IS: 1378)

a 250x10 mm 1 each 10.00 746.50 DSR1-9.63.1


74.65
8 Providing and fixing ISI marked oxidised M.S. sliding door bolts DSR1-9.62
with nuts and screws etc. complete : (copper oxidized as per IS:
1378)

a 250x16 mm 1 each 165.90 10.00 1,659.00 DSR1-9.62.2


8 Providing and fixing stainless steel fancy handle of approved 1 each 10.00 1,531.50 DSR1-9.170
make fixed with SS screws etc. complete as per direction of
Engineer-in-charge. 153.15

7 Providing and fixing M.S. grills of required pattern in frames of DSR-1-2021- 9.48
windows etc. with M.S. flats, square or round bars etc. all
complete

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
a Fixed to opening / wooden frames with rawl plugs screws etc. 1 Kg. 350.00 69,195.00 DSR 9.48.2 189
197.70

b Fixed to steel window by welding 1 Kg. 181.00 50.00 9,050.00 DSR 9.48.1 189
c Providing and fixing factory door frame------- solid P.V.C. foam 1 Metre 80.00 38,548.00 DSR 9.123
------- engineer in charge. 481.85 186

8 Providing and fixing factory made 30mm thick door shutter 1 Sqm 3060.60 100.00 306,060.00 DSR 9.124.1
made of solid pvc foam profile ---------------------specifications
and direction of Engineer-In-Charge. Non
decorative finish 187

9 Providing and fixing anodised aluminium work for doors, DSR-II - 2021-21.1
windows, ventilators and partitions with extruded built-up
standard tubular and other sections of approved make
conforming to IS:733 . and IS:1285, anodised transparent or to
required shade according to IS:1868 (Minimum anodic coating of
grade AC 15), fixed with rawl plugs and screws or with fixing
clips, or with expansion hold fasteners including necessary filling
up of gaps at junctions, at top, bottom and sides with required
PVC/neoprene felt etc. Aluminium sections shall be smooth, rust
free, straight, mitered and jointed mechanically wherever
required including cleat angle.Aluminium snap beading for
glazing/panelling, C.P. brass/stainless steel screws, all complete
as per architectural drawings and directions of Engineer-in
charge. (Glazing, panelling & dash fasterners to be paid
separately to be paid for separately)

a Powder Coated aluminium 1 Kg. 466.30 500.00 233,150.00 21.1.1.2 427


b For Shutter of doors, windows & Ventilators -------- of EDPM 1 Kg. 100.00 56,480.00
rubber/neoprene gasket required. Power coated aluminium
564.80 21.1.2.2 427
c Providing and fixing glazing alluminium door,window,ventilator 1 Sqm 50.00 66,277.50
shutter and partitation -------- EIC. With float glass panes of 5mm 1325.55 21.3.2 428
thick.
10 Painting Steel work with Deluxe Multi Surface Paint to give an 1 M2 140.05 100.00 14,005.00 DSR 13.48.3 262
even shade. Two or more coats applied @ 0.90 litre/10sqm over
an under coat of primer applied @ 0.80 litre/10sqm of approved
brand or manufacture

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
11 Painting wood work with Deluxe Multi Surfaces Paint of required 1 M2 144.9 100.00 14,490.00 DSR 13.48.2 262
shade. Two or more coat applied @ 0.90 litre/10sqm over an
under coat of primer, applied @ 0.75 litre/10sqm of approved
brand or manufacture

12 Providing and fixing G.I. pipes complete with G.I. fittings DSR-II-2021, 18.10
including trenching and refilling etc. : External Work

(a) 15mm dia. nominal bore 1 M 304.15 100.00 30,415.00 DSR- 18.10.1 372
(b) 20mm dia. nominal bore 1 M 373.35 40.00 14,934.00 DSR- 18.10.2 372
(c) 25mm dia. nominal bore 1 M 491.20 50.00 24,560.00 DSR-18.10.3 372
(d) 50mm dia. nominal bore 1 M 893.20 50.00 44,660.00 DSR-18.10.6 372
13 Providing and fixing 3 layer PP-R (Poly Propylene Random
copolymer) pipes, approved by CBRI and conforming to
IS:15801; SDR 7.4 UV stabilized & anti-microbial fusion welded,
having thermal stability for hot & cold water supply including all
PP-R plain & brass threaded polypropylene random fittings
including fixing pipe with clamps at 1.0m spacing. This includes DSR-II-2021,18.4
testing of joints complete as per direction of Engineer-in-Charge.
Internal work – exposed on wall

(a) PN-16 Pipe, 20mm OD(SDR-7.4) 1 Metre 254.95 50.00 12,747.50 DSR-18.4.1 370
(b) PN-16 Pipe, 25mm OD(SDR-7.4) 1 Metre 316.10 50.00 15,805.00 DSR-18.4.2 370
(c) PN-16 Pipe, 32mm OD(SDR-7.4) 1 Metre 358.90 50.00 17,945.00 DSR-18.4.3 370
(d) PN-16 Pipe, 40mm OD(SDR-7.4) 1 Metre 523.60 50.00 26,180.00 DSR-18.4.4 370
(e) PN - 10 Pipe, 50mm OD(SDR-11) 1 Metre 666.65 50.00 33,332.50 DSR-18.4.5 370
14 Providing and fixing C.P. brass bib cock, 15mm nominal bore of 1 Each 434.20 8.00 3,473.60 DSR-II,18.49.1 380
approved quality conforming to IS:8931

15 Providing and fixing C.P. brass stop cock, 15mm nominal bore, 1 Each 594.75 8.00 4,758.00 DSR-II,-18.52.1 380
(concealed) of standard design and of approved make
conforming to IS:8931
16 Providing and fixing gun metal non- return valve of approved 1 Each 506.65 2.00 1,013.30 DSR-II,-18.19.1.1 373
quality (screwed end) :25 mm nominal bore Horizontal

17 Providing and fixing gun metal non- return valve of approved 1 Each 1173.65 1.00 1,173.65 DSR-II,-18.19.4.1 373
quality (screwed end) : 50 mm nominal bore.Horizontal

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
18 Providing and placing on terrace (at all floor levels) polyethylene 1 Ltr 9.70 4000.00 38,800.00 DSR-II,-18.48 380
water storage tank, IS : 12701 marked, with cover and suitable
locking arrangement and making necessary holes for inlet, outlet
and overflow
pipes but without fittings and the base support for tank.

19 White Vitreous China Wash basin size 630x450 mm 1 Each 2275.00 4.00 9,100.00 DSR-II,-17.7.1
with a pair of 15 mm C.P. brass pillar taps

20 Providing and fixing water closet squatting pan (Indian type DSR-II,-17.1
W.C.pan ) with 100 mm sand cast Iron P or S trap, 10 litre low
level white P.V.C. flushing cistern, including flush pipe, with
manually controlled device (handle lever) conforming to IS :
7231, with all fittings and fixtures complete, including cutting
and making good the walls and floors wherever required:

a White Vitreous china Orissa pattern W.C. pan of size 1 Each 5781.35 4.00 23,125.40 DSR-II,-17.1.1
580x440 mm with integral type foot rests.
21 Providing and fixing white vitreous china pedestal type water DSR-II,-17.2
closet (European type W.C. pan) with seat and lid, 10 litre low
level white P.V.C. flushing cistern, including flush pipe, with
manually controlled device (handle lever), conforming to IS :
7231, with all fittings and fixtures complete, including cutting
and making good the walls and floors wherever required :

a W.C. pan with ISI marked white solid plastic seat and lid 1 Each 5540.55 4.00 22,162.20 DSR-II,-17.2.1

22 Providing and fixing white vitreous china flat back or wall corner
type lipped front urinal basin of 430x260x350 mm and
340x410x265 mm sizes respectively with automatic flushing
cistern with standard flush pipe and C.P. brass spreaders with
brass unions and G.I clamps complete, including painting of
fittings and brackets, cutting and making good the walls and
floors wherever required :

a One urinal basin with 5 litre white P.V.C. automatic flushing 1 Each 5268.85 3.00 15,806.55 DSR-II,-17.4.1
cistern.
23 Providing and fixing one piece construction white vitreous china DSR-II,-17.6
squatting plate with an integral longitudinal flushing pipe, white
P.V.C. automatic flushing cistern, with fittings, standard size
G.I. / PVC flush pipe for back and front flush with standard
spreader pipes with fittings, G.I clamps and C.P. brass coupling
complete, including painting of fittings and cutting and making
good the walls and floors
etc. wherever required :

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
a Single squatting plate with 5 litre P.V.C. automatic 1 Each 7752.60 3.00 23,257.80 DSR-II,-17.6.1
flushing cistern

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
24 Providing and fixing C.P. brass shower rose with 15 or 20 mm DSR-II,-18.22
inlet :

a 100 mm diameter 1 Each 166.35 2.00 332.70 DSR-II,-18.22.1

Dismantling roofing including ridges, hips, valleys and gutters 1 M2 136.00 50.00 6,800.00 DSR-15.28.1 289
etc., and stacking the material within 50 metres lead of: G.S.
Sheet

25 Earth work in surface excavation not exceeding 30 cm in depth DSR-1-2021, 2.1 2.0 CH-2 87
but exceeding 1.5 m in width as well as 10 sqm on plan including
getting out and disposal of excavated earth upto 50 m and lift
upto 1.5 m, as directed by Engineer-in- Charge:

26 All kinds of soils 1 M3 107.00 10000.00 1,070,000.00 DSR 2.1.1


27 Filling available excavated earth (excluding rock) in trenches, 1 M3 253.95 2000.00 507,900.00 DSR -1,2.25 2.0 CH-2 90
plinth,sides of foundations etc. in layers not exceeding 20cm in
depth, consolidating each deposited layer by ramming and
watering, lead upto 50 m and lift upto 1.5 m.

28 Earth work in excavation by mechanical means (Hydraulic DSR-2.8 2.0 CH-2


excavator)/manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing
of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated
soil as directed, within a lead of 50 m.

29 All kinds of soils 1 M3 286.85 12000.00 3,442,200.00 DSR 2.8.1 CH-2 87

30 Surface dressing of the ground including removing vegetation DSR 2.28 CH-2
and inequalities not exceeding 15 cm deep and disposal of
rubbish, lead up to 50 m and lift up to 1.5 m.

a All kinds of soil 1 m2 28.15 5000.00 140,750.00 DSR 2.28.1 CH-2 91

31 Dewtering of natural or accumulated water from any location. 1 HP. 44.97 6480.00 291,405.60 USSOR - 2021 0 52260 CH-V
Payment to be done for Horse power of pump multiplied by hour
pumping hours

32 Supplying and filling in plinth with sand under floors, including 1 M3 2161.20 5000.00 10,806,000.00 DSR 2.27 CH-2 90
watering, ramming, consolidating and dressing complete.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
33 Cement Sand Mortar (1:1) Grout with 20% anti-shrinkage 1 KG 149.07 500.00 74,535.00 USSOR - 2021 052072 CH-V
compound w.r.t. cement.
34 Epoxy Grout 1 KG 1296.66 500.00 648,330.00 USSOR - 2021 052073 CH-V
35 Applying epoxy mortar over…..etc 1 M2 1747.24 1000.00 1,747,240.00 USSOR - 2021 052080 CH-V
36 Providing and laying Ceramic glazed floor tiles of size 300x300 1 M2 935.60 500.00 467,800.00 DSR -11.37 11 222
mm(thickness to be specified by the manufacturer) of 1st quality
conforming to IS : 15622 of approved make in colours such as
White, Ivory, Grey,Fume Red Brown, laid on 20 mm thick
cement mortar 1:4 (1 Cement :4 Coarse sand), Jointing with grey
cement slurry @ 3.3 kg/sqm including
pointing the joints with white cement and matching pigment
etc.,complete

37 Providing and fixing 1st quality ceramic glazed floor tiles 1 M2 938.50 250.00 234,625.00 DSR -11.37A 11 223
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades except
burgundy, bottle green, black of any size as approved by
Engineer-in-Charge in skirting, risers of steps and dados over 12
mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand)
and jointing with grey cement slurry @ 3.3kg per sqm including
pointing in white cement mixed with pigment of matching shade
complete.

38 Providing & laying vitrified tiles in floor -------------------placing the DSR -11.41A 11 224
tiles gently and easily ….etc.
Glazed vitrified floor tiles polished finish DSR -11.41A.2
a Size of Tile 600 x 600 mm 1 M2 1359.20 400.00 543,680.00 DSR -11.41A.2.1 11 224

39 Applying one coat of water thinnable cement primer of DSR -13.43 262
approved brand and manufacture on wall surface :

a Water thinnable cement primer (DSR-13.43.1) 1 m2 64.45 1500.00 96,675.00 DSR -13.43.1 262

40 White washing with lime to give an even shade DSR-II, 2021,13.37

a New work (three or more coats) 1 M2 30.00 973.50


32.45 DSR 13.,37.1 261
41 Finishing walls with water proofing cement paint of required 1 M2 97.60 1000.00 97,600.00 DSR 13.44.1 262
shaed two or more coats on new work applied @ 3.84 kg/10
sqm.

42 Finishing with Deluxe Multi surface paint system for interiors DSR-13.48 262
and exteriors using Primer as per manufacturers specifications :

a Two or more coats applied on walls @ 1.25 ltr/10 sqm over and 1 M2 158.95 1000.00 158,950.00 DSR 13.48.1 262
including one coat of Special primer applied @
0.75 ltr /10 sqm

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
43 Finishing walls with Premium Acrylic Smooth exterior Paint new 1 M2 166.85 2000.00 333,700.00 DSR 13.46.1 262
work two or more coats

44 Applying priming coat: DSR -13.50 262

a With ready mixed red oxide zinc chromate primer of 1 m2 55.50 200.00 11,100.00 DSR -13.50.3 263
approved brand and manufacture on steel galvanised iron/
steel works
45 Painting with aluminium paint of approved brand and DSR -13.100 121092 12 268
manufacture to give an even shade:
a One or more coats on old work 1 m2 79.40 200.00 15,880.00 DSR -13.100.1 268

46 Painting with aluminium paint of approved brand and DSR -13.63


manufacture to give an even shade .

a Two or more coats on new work 1 m2 121.45 200.00 24,290.00 DSR -13.63.1 264
47 Clearing jungle including uprooting of rank vegetation, grass, 1 m2 14.50 35000.00 507,500.00 DSR -2.31
brush wood,trees and saplings of girth up to 30 cm measured at
a height of 1 m above ground level and removal of rubbish up to
a distance of 50 m outside the periphery of the area cleared.

48 Felling trees of the girth (measured at a height of 1 m above DSR1 -2.33


ground level), including cutting of trunks and branches,
removing the roots and stacking of serviceable material and
disposal of unserviceable material.

a Beyond 60 cm girth upto and including 120 cm girth 1 each 1957.15 20.00 39,143.00 DSR1 -2.33.2

49 Providing and fixing precoated galvanised iron profile sheets 1 Sqm 671.55 1500.00 1,007,325.00 DSR -12.50 12 245
(size,shape and pitch of corrugation as approved byEngineer-in-
charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc
coating 120 grams per sqm as per IS: 277, in 240 mpa steel
grade, 5-7 microns epoxy primer on both side of the sheet and
polyester top coat 15-18 microns. Sheet should have protective
guard film of 25 microns minimum to avoid scratches during
transportation and should be supplied in single length upto 12
metre or as desired by Engineerin-
charge. The sheet shall be fixed using self drilling /self
tappingscrews of size (5.5x 55 mm) with EPDM seal, complete
upto any pitch in horizontal/ vertical or curved surfaces,
excluding the cost of purlins, rafters and trusses and including
cutting to size and shape wherever required.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
50 Providing and fixing precoated galvanised steel sheet roofing DSR -12.51 12 245
accessories 0.50 mm (+0.05 %) total coated thickness, Zinc
coating 120 grams per sqm as per IS: 277, in 240 mpa steel
grade, 5-7 microns epoxy primer on both side of the sheet and
polyester top coat 15-18 microns using self drilling/ self tapping
screws complete :

51 Ridges plain (500 - 600mm) 1 m 450.60 600.00 270,360.00 DSR -12.51.1 12 245

a Gutter (600 mm over all girth) 1 m 1110.60 1000.00 1,110,600.00 DSR -12.51.6 12 246

52 Providing and fixing on wall face unplasticised Rigid PVC rain DSR -12.41 243
water pipes conforming to IS : 13592 Type A, including jointing
with seal ring conforming to IS : 5382, leaving 10 mm gap for
thermal expansion, (i) Single socketed pipes.

a 110 mm diameter 1 m 319.75 100.00 31,975.00 DSR -12.41.2 243


b Bend 87.5°, 110mm bend 1 Each 132.00 10.00 1,320.00 DSR -12.42.5.2 243
53 Shoe (Plain), 110mm shoe 1 each 115.95 10.00 1,159.50 DSR -12.42.6.2 243
54 Dismantling steel work in built up sections in angles, tees, flats 1 Kg 4.65 200.00 930.00 DSR-1 -15.18 289
and channels including all gusset plates, bolts, nuts, cutting
rivets, welding etc. including dismembering and stacking within
50 metres lead.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
55 Dismantling steel work manually/ by mechanical means in built 1 Kg 3.20 500.00 1,600.00 DSR-1 -15.19 289
up sections without dismembering and stacking within 50
metres lead as per direction of Engineer-in-charge.

56 Extra for dismantling trusses, rafters, purlins etc. of steel work 1 kg per 0.70 200.00 140.00 DSR-1 -15.20 289
for every additional span of one metre or part thereof beyond metre
10 metres span
57 Extra for dismantling trusses, rafters, purlins etc. of steel work 1 kg per 0.70 200.00 140.00 DSR-1 -15.21 289
for every additional height of one metre or part thereof beyond metre
5 metres. height

58 Dismantling steel work in single sections including DSR-1 -15.17 288


dismembering and stacking within 50 metres lead in:

59 R.S. Joists 1 Kg 2.80 100.00 280.00 DSR-1 -15.17.1 288


59.a Channels, angles, tees and flats 1 Kg 1.90 100.00 190.00 DSR-1-15.17.2 288
59.b Demolishing cement concrete manually/ by mechanical means DSR -B.15.2 CH-15 287
including disposal of material within 50 metres lead as per
direction of Engineer - in - charge.

60 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 1 m3 2007.10 1000.00 2,007,100.00 DSR -B.15.2.1 287

61 Demolishing R.C.C. work manually/ by mechanical means 1 m3 2928.10 1000.00 2,928,100.00 DSR -B.15.3 CH-15 287
including stacking of steel bars and disposal of unserviceable
material within 50 metres lead as per direction of Engineer - in-
charge.

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
62 Demolishing brick work manually/ by mechanical means DSR -B.15.7 CH-15 287
including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per direction of
Engineer-in-charge.

63 In cement mortar 1 m3 1698.45 400.00 679,380.00 DSR -B.15.7.4 CH-15 287

a CARRIAGE OF MATERIALS 1.1 By DSR-2021-1, -1.1 CH-1


Mechanical Transport including loading,unloading and stacking

64 Disposal of moorum/building rubbish/ malba/ similar 1 m3 411.30 5000.00 2,056,500.00 DSR-2021-1, -1.1.18 CH-1 81
unserviceable, dismantled or waste material by mechanical
transport including loading, transporting, unloading to approved
municipal dumping ground for lead upto 10 km for all lifts,
complete as per directions of Engineer-in-charge.

a REMARKS :The rates will be applicable to net quantities after


deduction of prescribed percentage for voids mentioned in the
specification nder subhead "Carriage of Materials"Disposal of
moorum/building rubbish/ malba/ similar unserviceable,
dismantled or waste material by mechanical transport including
loading, transporting, unloading to approved municipal dumping
ground for lead upto 10 km for all lifts, completeas per
directions of Engineer-in-charge.
Note - item to be applicable in urban areas having directions for
restricted hours for movement/ plying of load carrying
motor vehicle of 3.5 cum or more.

CARRIAGE OF MATERIALS 1.1 By DSR-2021-1, -1.1 CH-1


Mechanical Transport including loading,unloading and
stacking.Note:- These rates are inclusive of GST on work
contract, Contractor's profit and over heads, Cess etc. (Rate i/c
GST on Work Contract @ 12%, 15% CP & OH and 1% Cess)

65a Steel - 5 km 1 tonne 193.03 1.30 250.94 DSR-2021-1, -1.1.11 CH-1 80

65b. Beyond 5 km upto 10 km per km 1 Km 13.76 1.30 17.89 DSR-2021-1, -1.1.11 CH-1 80

66 Anti-corrosive painting of rail outside track on rail bottom, web, USSOR - 2021 137010 CH-13
foot and fishing plane with two coats of thickness of 100
microns each by bituminous black paint confirms to IS-9862 of
reputed make including surface preparation, as a complete job
as per procedure prescribed in latest edition of IRPWM.

67 For 60 Kg Rails 1 RM 65.22 6000.00 391,320.00 USSOR - 2021 137011 CH-13


67a. For 52 Kg Rails 1 RM 57.95 4000.00 231,800.00 USSOR - 2021 137012 CH-13

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
68 Fencing with R.C.C. post placed at required distance, embedded DSR-2 - 16.17 16 302
in cement concrete blocks, every 15th post, last but one end
post and corner post shall be strutted on both sides and end
post one side only, provided with horizontal lines and two
diagonals of barbed wire weighing 9.38 kg per 100 metres
(minimum), between the two posts fitted and fixed with G.I.
staples on wooden plugs or G.I. binding wire tied to 6 mm bar
nibs fixed while casting the post (cost of R.C.C. posts, struts,
earth work and concrete to be paid for separately) :- Payment to
be made per metre cost of total length of barbed wire used.

68.a With G.I. barbed wire 1 RM 12.45 1000.00 12,450.00 DSR-2 - 16.17.1 16 302
69 Fencing with angle iron post placed at required distance DSR-2 - 16.18 16 302
embedded in cement concrete blocks, every 15th post, last but
one end post and corner post shall be strutted on both sides and
end post on one side only and provided with horizontal lines and
two diagonals interwoven with horizontal wires, of barbed wire
weighing 9.38 kg per
100 m (minimum), between the two posts fitted and fixed with
G.I.staples, turn buckles etc. complete. (Cost of posts, struts,
earth work and concrete work to be paid for separately).
Payment to be made per metre cost of total length of barbed
wire used.

69.a With G.I. barbed wire 1 RM 19.60 1000.00 19,600.00 DSR-2 - 16.18.1 16 302
Total Cost of Sch.-B-I-A Rs. 35,602,058.63
Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -2,210,395.11
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be (For HWH Div.)
deducted of the total amount of Schedule B of DSR 2021

TOTAL 33,391,663.52

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
Schedule-B-I(B) Brick work
Brick work with common burnt clay F.P.S. (non modular) bricks DSR -2021-6.1
of class designation 7.5 in foundation and plinth in:
1 Cement mortar 1:4 (1 cement : 4 coarse sand) 1 cum 6882.00 100 688200.00 DSR -2021-6.1.1 6 129
a Cement mortar 1:6 (1 cement : 6 coarse sand) 1 cum 6658.25 300 1997475 DSR -2021-6.1.2 129
b Brick work with common burnt clay F.P.S. (non modular) bricks DSR -2021-6.4
of class designation 7.5 in superstructure above plinth level up
to floor V level in all shapes and sizes in :
2 Cement mortar 1:4 (1 cement : 4 coarse sand) 1 cum 8512.1 50.00 425,605.00 DSR -2021-6.4.1 6 129
a Cement mortar 1:6 (1 cement : 6 coarse sand) 1 cum 8288.35 300.00 2,486,505.00 DSR -2021-6.4.2 6 129
b Half brick masonry with common burnt clay F.P.S. (non modular) DSR -2021-6.12 6 130
bricks of class designation 7.5 in foundations and plinth in :

3 Cement mortar 1:4 (1 cement : 4 coarse sand) 1 M2 837.85 25.00 20,946.25 DSR -2021-6.12.2 6 130
a Half brick masonry with common burnt clay F.P.S. (non modular) DSR -2021-6.13 6
bricks of class designation 7.5 in superstructure above plinth
level up to floor V level.

4 Cement mortar 1:4 (1 cement :4 coarse sand) 1 M2 1018.05 50.00 50,902.50 DSR -2021-6.13.2 6 130

a Total Rs. 5,669,633.75


Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -396,874.36
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be (For HWH Div.)
deducted of the total amount of Schedule B of DSR 2021

Total Cost of Sch.-B-I(B) Rs 5,272,759.39

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.

Schedule-B-I(C) Concrete
Providing and laying in position cement concrete of specified DSR-1-2021 - 2021 4.1 4 99
grade excluding the cost of centering and shuttering - All work
up to plinth level :

1 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from 1 M3 6833.4 600 4,100,040.00 DSR - 2021 4.1.5 4 99
natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources)

a 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from 1 M3 7365.15 850 6,260,377.50 DSR - 2021 4.1.3 4 99
natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources)

2 Providing and laying in position ready mixed or site batched DSR - 2021 4.20 104
design mix cement concrete for plain cement concrete work;
using coarse aggregate and fine aggregate derived from natural
sources, Portland Pozzolana/Ordinary Portland /Portland Slag
cement, admixtures in recommended proportions as per IS:9103
to accelerate / retard setting of concrete, to improve durability
and workability without impairing strength; including pumping
of concrete to site of laying, curing, carriage for all leads; but
excluding the cost of centering, shuttering and finishing as per
direction of the engineer-in-charge; for the following grades of
concrete. Note: Extra cement up to 10% of the minimum
specified cement content in design mix shall be payable
separately. In case the cement content in design mix is more
than 110% of the minimum specified cement content, the
contractor shall have discretion to either re-design the mix or
bear the cost of extra cement.
All works upto plinth level :

3 Concrete of M20 grade with minimum cement content of 270 1 M3 8387.15 1000 8,387,150.00 DSR - 2021 4.20.1.3 4 105
kg /cum

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
a All works above plinth and upto floor V level DSR - 2021 4.20.2 4 105

4 Concrete of M20 grade with minimum cement 1 M3 10009.5 30 300,285.00 DSR - 2021. 4.20.2.3 4 105
content of 270 kg /cum

a Providing and laying in position ready mixed or site batched DSR - 2021. 5.33 5 112
design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived from
natural sources, Portland Pozzolana / Ordinary Portland
/Portland Slag cement, admixtures in recommended proportions
as per IS: 9103 to accelerate / retard setting of concrete, to
improve durability and workability without impairing strength;
including pumping of concrete to site of laying, curing, carriage
for all leads; but excluding the cost of centering, shuttering,
finishing and reinforcement as per direction of the engineer-in-
charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement
content in design mix shall be payable separately. In case the
cement content in design mix is more than 1.10 times of the
specified minimum cement content, the contractor shall have
discretion to either re-design the mix or bear the cost of extra
5 All work up to plinth level : DSR -5.33.1 5
Concrete of M25 grade with minimum cement 1 M3 8683.80 900 7,815,420.00 DSR -5.33.1.1 5 120
content of 330 kg /cum
a All works above plinth level upto floor V level DSR -5.33.2 5
Concrete of M25 grade with minimum cement 1 M3 10306.20 100 1,030,620.00 DSR -5.33.2.1 120
content of 330 kg /cum
6 Providing and laying in position specified grade of reinforced DSR -5.1 5
cement concrete, excluding the cost of centering, shuttering,
finishing and reinforcement -
All work up to plinth level :

6A 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from 1 M3 8364.20 1100 9,200,620.00 DSR -5.1.1.2 5 112
natural sources : 3 graded stone aggregate 20 mm nominal size
derived from natural sources)

7 Reinforced cement concrete work in walls (any thickness), DSR - 2021. 5..2 5
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, pillars, piers, abutments, posts and
struts etc. above plinth level up to floor five level, excluding cost
of centering, shuttering, finishing and reinforcement :

7a Providing and laying cement concrete 1:1.5:3 with 20mm 1 M3 10185.05 120 1,222,206.00 DSR - 2021 5.2.2 5 112
nominal size aggregate etc. above excluding shuttering,
centering :
7b Providing, hoisting and fixing above plinth level upto five floor 1 M3 9673.5 20 193,470.00 DSR - 2021 5.12 5 115
level precast reinforced cement concrete work -------------------
excluding cost of reinforcement with 1:1.5:3.

8 Smooth finishing of the exposed surface of R.C.C. work with 6 1 M2 253.05 10 2530.50 DSR - 2021 5.23 5 119
mm thick cement mortar 1:3 (1 Cement : 3 fine sand).

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
9 Centering and Shuttering including strutting, propping and 1 M2 307.95 1800 554,310.00 DSR - 2021 5.9.1 114
removal of form for Foundation, footing, bases of columns etc.
for mass concrete.

10 Centering and Shuttering including strutting, propping and 1 M2 766.55 400 306,620.00 DSR - 2021 5.9.3 114
removal of form for Suspended floor, roofs, landing, balconiss
and asses platform

11 Centering and Shuttering including strutting, propping and 1 M2 608.35 400 243,340.00 DSR - 2021 5.9.5 114
removal of form for Lintel, Beams, Plinth Beams, Girders,
Bressumers and Cantiliver

12 Centering and Shuttering including strutting, propping and 1 M2 657.75 300 197,325.00 DSR - 2021 5.9.7 114
removal of form for Stairs.(excluding landings)
13 Centering and Shuttering including strutting, propping and 1 M2 804.25 200 160,850.00 DSR - 2021 5.9.6 114
removal of form for Columns, Pillers, Piers, Abutments, Posts
and struts.
14 TOTAL Amount Rs 39,975,164.00
Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -2,798,261.48
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be (For HWH Div.)
deducted of the total amount of Schedule B of DSR 2021

TOTAL 37,176,902.52

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.

SCHEDULE-"B-'I'-'D'." Steel Structural Work


Structural steel work riveted, bolted or welded in built up 1 KG 111.95 400.00 44,780.00 DSR - 2021- 10.2 207
sections, trusses and framed work, including cutting, hoisting,
fixing in position and applying a priming coat of approved steel
primer all complete.

Structural steel work in single section, fixed with or without 1 kg 93.05 11000.00 1,023,550.00 DSR - 2021- 10.1 207
connecting plate, including cutting, hoisting, fixing in position
1 and applying a priming coat of approved steel primer all
complete.

Providing and fixing mild steel round holding down bolts with 1 KG 88.50 200.00 17,700.00 DSR - 2021- 10.19 210
2 nuts and washer plates complete.

3 Providing and fixing bolts including nuts and washers complete. 1 KG 140.15 100.00 14,015.00 DSR - 2021- 10.20 210

TOTAL Rs 1,100,045.00
Building Cost Index for Howrah as per PCE/ER/KKK's letter no. 93.00% to be taken of the total -77,003.15
W(2)506/USSOR/2021 Dated 16.07.2024 i.e 7% is to be (For HWH Div.)
deducted of the total amount of Schedule B of DSR 2021

TOTAL Amount Rs 1,023,041.85

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
Schedule-B-I(E) SOIL TEST
1 Soil Exploration and Testing USSOR - 2021 21000 CH-2
Exploratory drilling of boreholes down to required depth, drilling USSOR - 2021 21010 CH-2
of 150mm dia. boreholes in all type of soils except hard rock &
large boulders (boulder core more than 30cm) including refilling,
reinstating surface and disposing off surplus material including
use of mechanical rigs with power operated winches as well as
percussion/chiselling tool
for advancing through occasional seams of hard strata to be
employed, where necessary in Dry area.

a 0 m to 10m 1 m 1441.73 4 5766.92 USSOR - 2021 21011 CH-2


b 10m to 20m 1 m 1585.91 4 6343.64 USSOR - 2021 21012 CH-2
c 20m to 30m 1 m 1730.07 4 6920.28 USSOR - 2021 21013 CH-2
2 Taking out 100mm dia. & 450mm long disturbed samples of soil 1 each 144.18 25 3604.5 USSOR - 2021 21120 CH-2
from bore holes, including provision of air tight containers for
packing, labeling and transporting the samples to laboratory.
Samples shall be collected as per IS:2720.

3 Conducting standard penetration test as per IS:2131 at 1 each 751.44 50 37572 USSOR - 2021 21130 CH-2
approximate1.5m intervals in bore holes, as directed by the
Engineer in charge

4 Collection of water samples at required intervals 1 each 216.26 25 5406.5 USSOR - 2021 21140 CH-2

5 Conducting laboratory Tests on collected soil samples as per USSOR - 2021 21150 CH-2
relevant IS code
a Moisture Content/Dry Density 1 each 360.44 25 9011 USSOR - 2021 021151 CH-2
b Atterberg Limits 1 each 865.04 25 21626 USSOR - 2021 21152 CH-2
c Specific Gravity 1 each 384.46 25 9611.5 USSOR - 2021 21153 CH-2
d Grain size analysis including Hydrometer analysis 1 each 706.46 25 17661.5 USSOR - 2021 21154 CH-2
e Direct Shear Test 1 each 2847.43 4 11389.72 USSOR - 2021 21155 CH-2
f Natural Density 1 each 384.46 25 9611.5 USSOR - 2021 21156 CH-2
g Consolidation Test 1 each 2883.47 25 72086.75 USSOR - 2021 21157 CH-2
h Unconfined Compression Test 1 each 2214.50 4 8858 USSOR - 2021 21158 CH-2
i Tri-axial Test 1 each 2214.50 4 8858 USSOR - 2021 21159 CH-2
j Conducting chemical analysis of ground water samples to 1 each 3604.34 4 14417.36 USSOR - 2021 21170 CH-2
determine suitability for concreting and aggressiveness in
relation to attack on concrete / reinforcement including
determination of pH value.

k Conducting chemical analysis of soil samples to determine 1 each 4829.81 4 19319.24 USSOR - 2021 21180 CH-2
aggressiveness in relation to attack on concrete / reinforcement
including determination of pH value

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Sl. No. Description of work Unit Rate Qty Amount DSR-2021, Item USSOR-2021, Chapter Page
no. Item no. no.
TOTAL of Sch.-B-I-E Rs. 268,064.41

SSE/W/C/HWH AEN/C/II/HWH DY.CE/C/II/HWH


Eastern Railway
(Construction Department)

Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB #
1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

SCHEDULE – B - II (WORKS)

Sl. No. DESCRIPTION OF WORKS UNIT AMOUNT

1 Any item under Eastern Railway IR USSOR-2021 and DSR VOL. I & II- 2021 of Rates (Works & Materials) except the
items included in Schedule A-I, A-II, B-I(a), B-I(b), B-I(C), B-I(d) & B-I(e) as per the specification, rate & unit of
USSOR-2021,and DSR VOL. I & II- 2021

Approx. basic cost-` 1000000.00 1000000.00

ADD 0% 0.00
TOTAL COST OF SCHEDULE B-II(WORKS) RUPEES 1000000.00
Note:
(1) Any item of schedule of Eastern Railway Unified Standard Schedule of Rates (Works & Materials) 2021,DSR I &2
can be executed under this schedule except that items which are listed in Sch-B-I(A),B-I(B),B-I©,B-I(D),B-I(E),B-I(F).
(2) Only one percentage is to be quoted.
(3) All the materials / conditions for works under this schedule. Will be as given at the top of each Chapter in Eastern
Railway Unified Standard Schedule of Rates (Works & Materials) 2021,DSR I &2 (2021)in the following modifications.

i) All the water to be used in works shall be of appropriate quality & shall be supplied by the contractor at site of
requirement, Railway shall not supply the same.
ii)The materials to be supplied by Railway shall be supplied by the SSE/W/CON’s stores at ---------- from where the
contractor will transport the same to site & return excess materials to the said stores without any separate payment for lead
loading & unloading. The contractor shall include such expenses in the overall percentages.
iii) Railway shall not supply any equipment, tools & machineries.
iv) Work under this Schedule will be executed after getting work order approved by Engineer-In-Charge.

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


Eastern Railway
( Construction Department )
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity. ( Under Mother Umbrella PB #
1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

Mar'17 =113.2 Base 2011-12 =100


Escalation Up to October - 2023 RBI Index (2011-12=100) 152.50 Oct'23= 152.50 Base 2011-12 =100
LOWEST AVERAGE RATE STATEMENT Escalation Up to March'17 RBI Index (2004-05=100) = 185.80 ROUND(((152.50-113.20)/113.2),4)= 34.720%

ESCALATED /
OLD RBI NEW RBI
ESCALATED RE-
SL DESCRIPTION LOCATIO DATE OF BASIC OFFERED REBATED ACCEPTED FINAL INDEX OF INDEX OF % OF AVERAGE
Unit Qty. LAR RERENCE RATE UPTO ESCALATED BASIC COST
NO OF WORKS N OPENING RATE RATE RATE RATE RATE OPENING OPENING INCRESE RATE
MAR'17 UPTO AUG -
MONTH MONTH
2023

SCHEDULE - B-I(A) [ MISCELLINIOUS WORK]


SCHEDULE - As per DSR - 2021 / USSOR -
1 1 Rs 0.00 4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.93% 0.93% 0.00% 0.00
B-I(A) 2021

SCHEDULE - B-I(B) [ BRICK WORK]


SCHEDULE -
2 1 Rs 1,320.00 As per DSR - 2021 4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.93% 0.93% 0.00% 1,320.00
B-I (B)
SCHEDULE - B-I(C) [ CONCRETE]
SCHEDULE -
3 1 Rs -2,210,395.11 As per DSR - 2021 4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.93% 0.93% 0.00% -2,210,395.11
B-I(C)

SCHEDULE - "B -'I'-'D'".[STRUCTURAL STEEL]

Schedle-B-I (D)
(DSR-2021) As per DSR - 2021 / USSOR -
4 1 Rs 2,486,505.00 4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.93% 0.93% 0.00% 2,486,505.00
[STRCTRAL 2021
STEEL]

SCHEDULE - "B -'I'-'E'". [ PILE] AS PER USSOR - 2011/DSR-2021

5 Schedle-B-I (E) As per USSOR - 2021 & DSR -


(USSOR/DSR- 1 Rs 6,260,377.50 2021
4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.93% 0.93% 0.00% 6,260,377.50
2021) [PILE]

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


SCHEDULE - "B -'I'-'F'".Dismantling and carriage Work( DSR-2021)

Schedle-
6 Dismantling As per USSOR - 2021 & DSR -
and carriage 1 Rs 0.00 2021
4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.93% 0.93% 0.00% 0.00
Work( DSR202
1)

SCHEDULE - B-II [ WORKS]

SCHEDULE -
B-II (Works) As per USSOR - 2021 & DSR - 0.93% 0.93%
7 1 Rs 1000000.00 4/1/2021 0.00% 0.00% 0.00% 0.00% 0.00% 151.10 0.00% 1,000,000.00
(USSOR & DSR 2021
- 2021)

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


Eastern Railway
(Construction Department)

Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother
Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

SCHEDULE – B - II (WORKS)

Sl. No. DESCRIPTION OF WORKS UNIT AMOUNT

1 Overall percentage increase/ decrease over the rates under Howrah Division of Eastern Railway Unified
Standard Schedule of Rates (Works & Materials) 2011 for all items not included in Schedule –BI.
Approx. basic cost-` 1000000.00 1000000.00

ADD 0% 0.00
TOTAL COST OF SCHEDULE B-II(WORKS) RUPEES 1000000.00
Note:
(1) Any item of schedule of Eastern Railway Unified Standard Schedule of Rates (Works & Materials) 2011 can be
executed under this schedule except that items which are listed in Sch-B-I(A),B-I(B),B-I©,B-I(D),B-I(E),B-I(F).
(2) Only one percentage is to be quoted.
(3) All the materials / conditions for works under this schedule. Will be as given at the top of each Chapter in Eastern
Railway Unified Standard Schedule of Rates (Works & Materials) 2011 in the following modifications.
i) All the water to be used in works shall be of appropriate quality & shall be supplied by the contractor at site of
requirement, Railway shall not supply the same.
ii)The materials to be supplied by Railway shall be supplied by the SSE/W/CON’s stores at ---------- from where the
contractor will transport the same to site & return excess materials to the said stores without any separate payment for lead
loading & unloading. The contractor shall include such expenses in the overall percentages.
iii) Railway shall not supply any equipment, tools & machineries.
iv) Work under this Schedule will be executed after getting work order approved by Engineer-In-Charge.

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


Eastern Railway
(Construction Department)
LAR Statement
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah
Workshop , Eastren Railway.
RBI Index (2011-12=100) for Cement, Lime & Plaster ofAugust 2023 = 137.9 RBI Index (2011-12=100) MS Bright Bars June'22 (P) 139.6
RBI Index (Base 2011-12=100) August 2023 All commodities = 152.4 Escalation Jan'17 to June'22 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 BI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. Unit Basic Cost LAR Reference SECTION Date of Assess Accept Rebate Rebate Actual % RBI RBI % Rate Rate Avg. Amount
No. opening rate ed d Rate above/ Index Index Escalati after after Rate
Rate Below in Old in on escalati escalati
on Serie New on upto on upto
USSOR s Series Jan'17 Date
2011 (2004-
05=100
1 LAR for Schdule B1(A) Misc.
1 Rs 0.00 CAO/C/WT/9314, Bhattanagar - 7/26/2018 44.00% 7.00% 0.00% 7.00% 54.08% 119.90 27.11% 95.84% 80.00% 0.00
DT.14.1.2019 Baltiktri
CAO/CON/WT/9309, Tikiapara Yard 7/6/2018 44.00% 14.30% 12.00% 0.58% 44.84% 119.90 27.11% 84.10%
DT.10.10.18 Remodelling
DCE-I/HWH/Agr/119, DRM Building HWH 7/14/2020 37.27% -7.53% 0.00% -7.53% 26.93% 121.00 25.95% 59.87%
dt.28.12.2020

2 LAR for Schdule B1(B) Brick works


1 Rs 1,320.00 CAO/C/WT/9314, Bhattanagar - 7/26/2018 119.00% -7.00% 0.00% -7.00% 103.67% 119.90 27.11% 158.88% 145.00% 3,234.00
DT.14.1.2019 Baltiktri
ER-CAO-C-HQ-Engg/03 FOB, PF Shed, 3/31/2021 104.00% 8.00% 0.00% 8.00% 120.32% 129.90 17.32% 158.48%
CAO CER2020-21/00884 Misc. Work
54 00 38222 dt.12.7.2021 Dankuni-
Chandanpur
CAO/C/WT9357, E.work,blanketing, 10/11/2020 96.00% -9.99% 0.00% -9.99% 76.42% 123.60 23.30% 117.53%
dt.27.11.20 minor Br.
Etc.Bainchi - SKG

3 LAR for Schdule B1( C) Conc.


1 Rs -2,210,395.11 CAO/CON/WT/9309, Tikiapara Yard 7/6/2018 46.00% 16.00% 12.00% 2.08% 49.04% 119.90 27.11% 89.43% 87.00% -4,133,438.85
DT.10.10.18 Remodelling
ER-CAO-C-HQ-Engg/03 FOB, PF Shed, 3/31/2021 58.00% 5.00% 0.00% 5.00% 65.90% 129.90 17.32% 94.64%
CAO CER2020-21/00884 Misc. Work
54 00 38222 dt.12.7.2021 Dankuni-
Chandanpur
CAO/C/WT9357, E.work,blanketing, 10/11/2020 59.00% -9.99% 0.00% -9.99% 43.12% 123.60 23.30% 76.46%
dt.27.11.20 minor Br.
Etc.Bainchi - SKG

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


RBI Index (2011-12=100) for Cement, Lime & Plaster ofAugust 2023 = 137.9 RBI Index (2011-12=100) MS Bright Bars June'22 (P) 139.6
RBI Index (Base 2011-12=100) August 2023 All commodities = 152.4 Escalation Jan'17 to June'22 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 BI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. Unit Basic Cost LAR Reference SECTION Date of Assess Accept Rebate Rebate Actual % RBI RBI % Rate Rate Avg. Amount
No. opening rate ed d Rate above/ Index Index Escalati after after Rate
Rate Below in Old in on escalati escalati
on Serie New on upto on upto
USSOR s Series Jan'17 Date
2011 (2004-
05=100
4 Sch-B-I(D) (USSOR- 2011) for Structural Steel
1 Rs 2,486,505.00 ER-CAO-C-HQ-ENGG/05- 03 Phase EMU KPA 2/28/2022 13.76% 0.00% 1.25% -1.25% 12.34% 144.90 5.18% 18.15% 29.00% 3,207,591.45
DCE-CON-ROB-SDAH-21-
22/008922 00 51414
dt.21.03.22

ER-CAO-C-HQ-ENGG /03WT 4TH Line Between 3/31/2021 21.00% -11.91% 0.00% -11.91% 6.59% 129.9 17.32% 25.05%
CAOCER2020- DKAE-
21/008845400 38222 CHANDANPUR
Dated 12/07/2021
CAO/C/WT9357, E.work,blanketing, 10/11/2020 19.00% -1.99% 0.00% -1.99% 16.63% 123.6 23.30% 43.81%
dt.27.11.20 minor Br.
Etc.Bainchi - SKG
5 LAR for Schdule B-IE (Piling Work).
1 Rs 6,260,377.50 ER-CAO-C-HQ-ENGG/05- 03 Phase EMU KPA 2/28/2022 18.51% 0.00% 1.25% -1.25% 17.03% 144.90 5.18% 23.09% 4.00% 6,510,792.60
DCE-CON-ROB-SDAH-21-
22/008922 00 51414
dt.21.03.22

CAO/Con/WT9309 10.10.18 Remodelling 7/6/2018 -16.00% 16.00% 12.00% 2.08% -14.25% 119.9 27.11% 8.99%
Coaching Yard
Tikiapara.

CAO/C/WT/9207 Lifting Bayat LLH 5/24/2016 -43.06% 0.00% 0.00% 0.00% -43.06% 180.2 2.72% -41.51% -20.84%
dt.17.08.16 17 (500mm dia
Pile)

6 LAR for Schdule B-II (Works).


1 Rs 1,000,000.00 DCE/CON/II/HWH/973 OF Construction of 2/12/2018 4.00% 10.00% 0.00% 10.00% 14.40% 116.10 31.27% 50.17% 38.00% 1,380,000.00
2017-18, Dtd. 20.04.2018 Battery storage
shed --LLH-
W.SHOP
DCE/Con/II/HWH/WT/969 J-shop LLH 7/21/2017 4.00% 0.00% 0.00% 0.00% 4.00% 113.90 33.80% 39.15%
dt.14.09.17 workshop
ER-CAO-C-HQ-ENGG/ 3RD Line Between 10/11/2020 7.00% -4.99% 0.00% -4.99% 1.66% 123.60 23.30% 25.35%
01WTCA OC ER 2020- Boinchi - Saktigarh
21/011833700 28786
Dated 25/11/2020

SSE/W/C/LLH AEN/C/AMBG DY.CE/C/II/HWH


PARTICULAR REQUIRED FOR CALLING OF TENDER

Sl. Particulars Reply

1 Brief justification
2 Name of work Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.

( Under Mother Umbrella PB # 1185/NR/23-


24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.
3 Reference to sanctioned estimate
(a) Estimate No & sanctioned estimate. NA
(b) Amount 12.32 Crore (Civil)
(c) If estimate is not sanctioned, current
position of the estimate with reference NA
vetting of A/Cs etc.
(d) Item No. of estimate page and amount
provided against the item of estimate.

(e) Provision in the estimate being


exceeded what action is proposed to meet
the commitment, saving from other items
etc.
4 Approx. Cost of this tender & proposed Total Cost ### Crore (approx.)
Sch-A I (Works) 13,455,416.20
Sch-A II (Works) 23,344,860.00
Sch-BI (A) (as per USSOR/DSR-2011) 67,756,489.00
Sch-BI (B) (as per USSOR/DSR-2011) -
Sch-BI ( C ) (as per USSOR/DSR-2011) 1,537,234.00
Sch-BI (D) (as per USSOR/DSR-2011) -
Sch-BI ( E )(as per USSOR/DSR-2011) #NAME?
Sch-BII (Unforseen- USSOR/DSR-2011) 1,139,549.31
Sch-CI (Cement) 37,348,158.11
Sch-C-II (Steel)(as per USSOR/DSR-2011) 4,356,890.01
Reference to T/No. / Agrt. No to the tenders
already floated/finalized with brief
description & cost including cost of Rly.
Material issued free. Total financial
commitment upto date against this Estt.
i.e. total item-3 & 4

5 Pink book/PWP item No. year and allotment 586D OF 2022-23


for the year .
6 Plan No. according to which tender is
invited the plan position where pending.
7 Complete schedule of item & qty. for which Schedule attached
tender is to be invited. The particular
furnished as per proforma in item 13
below.
8 Spl. Condition, if any: If Bank Guarantee is
required (Amount to be mentioned) against
each etc. (Qty to be mentioned) remaining
in the custody of contractors during
fabrication to be indicated specifically.

9 Probable time required for completing the Eighteen Months (18 Months)
work from the date of acceptance of the
tender.
10 Probable date for commencement for the At Earliest
work
11 From where Railway material will be
supplied
12 Previous 3 (three) accepted rates open Attached with tender schedule
tender/LAR with Agt. No. ref. to be
indicated (at least three rates) against each
Non-schedule items relevant to this
particulars works based on the works
already finalised in the district including
schedule-3 perscentage in the proforma
given below.

13 "Definition of similar nature of work" in


terms of CAO/Con/WT/Circular/Pt.-I dt.
27.10.2014
SL Descritption of works with approx. Qty Assessed cost Amount Previous accepted rate with agreement reference.
Schedule attached

Certified that- 1. Quantities & Specification of items of the tender schedule are based on the site condition and personally satisfied with the
same.
2. Quantities & Specifications (1) above of the tender schedule are based on the approved drawing.
3. All the items including brief description, rates, amount, chapter, items including total cost of Schedule has been attached.

Dy. Chief Engineer/Con/II/HWH


E. Rly/Howrah.
EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
L.A.R. Statement for :-
Construction and Provision for LLH Traffic Yard augmentation for increased wagon holding capacity.
( Under Mother Umbrella PB # 1185/NR/23-24, PB Item 596f of 23-24, UWB Item no. 740B-24-25) at Liluah Workshop , Eastren Railway.

RBI Index (2011-12=100) for Cement, Lime & Plaster of August'23 = 137.9 RBI Index (2011-12=100) MS Bright Bars August 2023 139.6
RBI Index (Base 2011-12=100) August'23 All commodities 152.4 Escalation Jan'17 to August 23 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 RBI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepte REBAT REBATED RBI RBI % Rate Rate after Avg. Rate Amount
No. OPENING d Offer E ( %) RATE Index Index Escalati after escalation
in Old in on escalatio upto Date
Series New n upto
Series Jan'17

SCHEDULE - A-I
1 Dismantling and taking out 1 MT Err:509 DCE/C/II/HWH/WT/969, J-Shop LLH Work Shop 7/21/2017 6905.00 -6.15% 0.00% 6480.3425 113.9 33.80% 0.00 8670.80 8,933.00 Err:509
of old steel structure as per dt.14.9.17
instruction of engineer-in-
DCE/CON/II/HWH/973 OF 2017- Battery storage shed 2/12/2018 7065.00 -5.50% 0.00% 6676.425 116.1 31.27% 0.00 8763.89
charge of Railway at site. All
18, Dtd. 20.04.2018 --LLH-W.SHOP
released materials must be
handed over to concerned DCE/CON/II/HWH/WT/994. New shed at A shop -- 5/8/2019 7742.00 -3.50% 0.00% 7471.030 121.6 25.33% 0.00 9363.36
SE/Works/Con at site in Dt.05/08/2019 LLH-W.SHOP
proper stacks at a safe

2 Dismantling of CC/RCC/BW 1 m3 Qty. DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 980.00 -5.50% 0.00% 926.100 116.10 31.27% 0.00 1215.66 1,238.00 #VALUE!
etc. or any other concrete 18, Dtd. 20.04.2018 Battery storage shed
of any grade by compressor --LLH-W.SHOP
machine or by any other DCE/C/II/HWH/WT/969, J-Shop LLH Work Shop 7/21/2017 957.00 -6.15% 0.00% 898.145 113.90 33.80% 0.00 1201.73
means , etc structure/ dt.14.9.17
running tracks, disposing
the dismantled materials DCE/CON/II/HWH/WT/994/1475. Construction ofNew 5/8/2019 1073.00 -3.50% 0.00% 1035.445 121.60 25.33% 0.00 1297.71
from railway premises with Dt .05/08/2019 shed at A shop --LLH-
all lead, lift, ascent, descent, W.SHOP
crossing tracks including

3 Erecting and fixing crane rail 1 m Err:509 CAO/Con/WT/ Lifting bay shed along 24.05.2016 617.00 -13.50% 0.00% 533.705 180.20 2.72% 548.22 742.01 884.00 Err:509
52Kg/90 R/60kg in position 9207,dt.04.10.2016 with track
to correct gauge and level CAO/Con/WT/9050, Wheelshop at LLH 19.06.2014 816.00 0.00% 5.55% 770.712 183.00 1.15% 779.56 1055.13
with MS clips as per dt.13.08.2014 Workshop.
approved drawing. The rate
includes all labour, materials DCE/CON/II/HWH/WT/994. New shed at A shop -- 5/8/2019 708.00 -3.50% 0.00% 683.220 121.6 25.33% 0.00 856.27
tools and plants and Dt.05/08/2019 LLH-W.SHOP
scaffolding as reuired to

4 Supplying, manufacturing 1 m2 10000 CAO/CON/WT/9207 dt. 17.08.16 Lifting Bay, RCC Pit, 5/24/2016 879.00 -13.50% 0.0% 760.34 180.2 2.72% 781.01 1057.10 1,057.00 10,570,000.00
and fitting aluminium sheet bogoe shed etc. At
of 1.22 mm thickness bent LLH Shed.
or curved in joints or
whereever necessary
including supply of all
fastening, nuts and bolts as
per approved drawings or as
directd by the site etc.

5 Supplying manufacturing 1 Each 400 CAO/Con/WT/ Construction of Lifting 24.05.2016 672.00 -13.50% 0.00 581.28 180.20 2.72% 597.09 808.16 860.00 344,000.00
and fixing in position with all 9207,dt.04.10.2016 bay.. LLH W.Shop
rivetting as required,
DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 668.00 -6.15% 0.00% 626.92 113.9 33.80% 0.00 838.83
bellmouth pieces made of
plain Aluminium sheet of 18
SWG for connecting down CAO/C/WT/9048,DT.16.7.15 12/18/2014 756.00 -12.00% 0.10% 664.61 178.70 3.58% 688.42 931.77
water pipe with gutter
complete in all respect.etc.

Page 136 of 141


RBI Index (2011-12=100) for Cement, Lime & Plaster of August'23 = 137.9 RBI Index (2011-12=100) MS Bright Bars August 2023 139.6
RBI Index (Base 2011-12=100) August'23 All commodities 152.4 Escalation Jan'17 to August 23 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 RBI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepte REBAT REBATED RBI RBI % Rate Rate after Avg. Rate Amount
No. OPENING d Offer E ( %) RATE Index Index Escalati after escalation
in Old in on escalatio upto Date
Series New n upto
Series Jan'17

6 Supplying, transporting to 1 m2 300 CAO/C/WT/9207 dt.27.07.16 Constn. Of Lifting 5/24/2016 1,085.00 -13.50% 0.00% 938.53 180.2 2.72% 964.05 1304.84 1,378.00 413,400.00
site, erecting and Fixing Bayat LLH
translucent fibre glass
DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 1093.00 -6.15% 0.00% 1025.78 113.9 33.80% 0.00 1372.51
reinforced polyster troughed
sheet as per B.S. 4154Pt. II
1985 of approx. 3mm thick CAO/C/WT/9050,dt.13.8.14 Extn Of Wheel shop At 6/19/2014 1,127.00 0.0% 5.55% 1064.45 183.0 1.15% 1076.67 1457.27
(tolerance as mentioned in LLH Workshop
B.S. book) of approved
7 Providing of temporary 1 Each 50 CAO/Con/WT/ Construction of Lifting 24.05.2016 12835.00 -13.50% 0.00% 11102.28 180.20 2.72% 11404.17 15435.54 14,796.00 739,800.00
support with all contractors 9207,dt.04.10.2016 bay.. LLH W.Shop
structure members like MS
DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 11732.00 -5.50% 0.00% 11086.74 116.10 31.27% 0.00 14553.14
Pipe, angle, nuts bolts
18, Dtd. 20.04.2018 Battery storage shed
clamps etc. as per approved
--LLH-W.SHOP
drawing with all contractor's
labour, tools and plants in all DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 11467.00 -6.15% 0.00% 10761.78 113.9 33.80% 0.00 14399.43
respect etc

8 Supplying, Fitting and Fixing 1 MT 50 CAO/Con/WT/ Construction of Lifting 24.05.2016 62308.00 -13.50% 0.00 53896.42 180.20 2.72% 55361.97 74932.43 77,448.00 3,872,400.00
edge protection of concrete 9207,dt.04.10.2016 bay.. LLH W.Shop
and drain covers, slabs, etc.
DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 62346.00 -6.15% 0.00% 58511.72 113.9 33.80% 0.00 78289.61
with MS angle and plates
respectively of any size and
section including welding MS DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 63784.00 -5.50% 0.00% 60275.88 116.10 31.27% 0.00 79121.83
rods with angles, cutting and 18, Dtd. 20.04.2018 Battery storage shed
placing in position in true --LLH-W.SHOP

9 Supply of labour(helpers) for 1 man/ 1500 Chief Labour Commissioner © New Delhi, Dt. 23/04/2021 With Effect from 645.00 ADD CONTRACTOR'S PROFIT @ 15% 96.75 = 742.00 1,113,000.00
assistance of Rly day 01/04/2021
inspector(s) /officers,

10 Straightening,cutting,bendin 1 MT Err:509 DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 5863.00 -5.50% 0.00 5540.535 116.1 31.27% 0.00 7272.85 7,080.00 Err:509
g and placing in position of 18, Dtd. 20.04.2018 Battery storage shed
reinforcement Steel with --LLH-W.SHOP
galvonised 18 SWG wire
which should be supplied by DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 4934.00 -6.15% 0.00% 4630.559 113.9 33.80% 0.00 6195.76
contractor at his own cost .
Work should be done as per DCE/CON/II/HWH/WT/994. Construction ofNew 5/8/2019 6425.00 -3.50% 0.00% 6200.13 121.6 25.33% 0.00 7770.55
approved drawing and Dt .05/08/2019 shed at A shop --LLH-
instruction of engineer W.SHOP

11 Supply of SGCI insert 1 Nos 5000 CAO/Con/WT/ Construction of Lifting 24.05.2016 106.00 -13.50% 0.00% 91.69 180.20 2.72% 94.18 127.48 127.00 635,000.00
9207,dt.04.10.2016 bay.. LLH W.Shop
DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 97.00 -6.15% 0.00% 91.0345 113.9 33.80% 0.00 121.81

DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 106.00 -5.50% 0.00 100.170 116.1 31.27% 0.00 131.49
18, Dtd. 20.04.2018 Battery storage shed
--LLH-W.SHOP

12 Painting of rails surface with 1 M2 400 DCE/CON/II/HWH/942/919 dt. Linking of track, 10/1/2015 17.00 -5.99% 0.00% 15.982 176.90 4.64% 16.72 22.63 21.00 8,400.00
one coat ready mixed oil 03/02/16 Khanyan Boinchi 3rd
bound primer of approved Line.
quality including cleaning of DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 16.00 -6.15% 0.00% 15.016 113.9 33.80% 0.00 20.09
surface to make it free from
all rust, grease etc. The rate DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 17.00 -5.50% 0.00% 16.065 116.1 31.27% 0.00 21.09
includes supply of paint by 18, Dtd. 20.04.2018 Battery storage shed
the contractor. --LLH-W.SHOP

Page 137 of 141


RBI Index (2011-12=100) for Cement, Lime & Plaster of August'23 = 137.9 RBI Index (2011-12=100) MS Bright Bars August 2023 139.6
RBI Index (Base 2011-12=100) August'23 All commodities 152.4 Escalation Jan'17 to August 23 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 RBI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepte REBAT REBATED RBI RBI % Rate Rate after Avg. Rate Amount
No. OPENING d Offer E ( %) RATE Index Index Escalati after escalation
in Old in on escalatio upto Date
Series New n upto
Series Jan'17

13 Painting oil cleaned rail 1 M2 400 DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 23.00 -5.50% 0.00% 21.735 116.1 31.27% 0.00 28.53 25.00 10,000.00
surface with ready mixed 18, Dtd. 20.04.2018 Battery storage shed
Bituminous paint conforming --LLH-W.SHOP
to I.S.158 after painting with
primer as it (10) above. The DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 13.00 -6.15% 0.00% 12.201 113.9 33.80% 0.00 16.32
rate includes supply of paint
by the contractor.(One Coat)
DCE/CON/II/HWH/WT/994. Construction ofNew 5/8/2019 25.00 -3.50% 0.00% 24.13 121.6 25.33% 0.00 30.24
Note: Engineer at site will
Dt .08/05/2019 shed at A shop --LLH-
cirtify before starting second
W.SHOP

14 Empty boring measured 1m 1 ER-CAO-C-HQ-Engg/ FOB,PF Kamarkundu, 3/31/2021 449.00 5.50% 0.00% 473.695 129.9 17.32% 0.00 555.74 545.00 545.00
from working platform level 03WTCAOCER 2020- Chandanpur
to cut off level (500mmdia) 21/00884540038222
required for above bored dt.12.07.2021
pile for which casing may be CAO/C/WT/9207 dt.17.08.16 Constn. Of Lifting Bay 5/24/2016 431.00 -13.50% 0.00% 372.82 180.2 2.72% 382.95 518.33
required for driving and at LLH
withdrawal and casting DCE/CON/II/HWH/WT/994. Construction ofNew 5/8/2019 463.00 -3.50% 0.00% 446.80 121.6 25.33% 0.00 559.96
complete in all respect. No Dt .08/05/2019 shed at A shop --LLH-
extra payment will be made W.SHOP

15 Carrying out integrity test to 1 No. Err:509 ER-CAO-C-HQ-ENGG/05-DCE- 03 Phase EMU KPA 2/28/2022 2133 0.00% 1.25% 2106.34 144.9 5.18% 0.00 2215.36 2,415.00 Err:509
be done of piles (500mm CON-ROB-SDAH-21-
dia) with preparation of pile 22/00892200 51414 dt.21.03.22
heads and fixing of PVC pipe
(40mm dia) by the specialist DCE/CON/II/HWH/WT/994. Construction ofNew 5/8/2019 1994.00 -3.50% 0.00% 1924.21 121.6 25.33% 0.00 2411.59
and also specialist need to Dt .08/05/2019 shed at A shop --LLH-
visit at project site along ER-CAO-C-HQ-Engg/ W.SHOP
FOB,PF Kamarkundu, 3/31/2021 2114.00 5.50% 0.00% 2230.27 129.9 17.32% 0.00 2616.58
with equipment 03WTCAOCER 2020- Chandanpur
21/00884540038222
dt.12.07.2021

16 Metallising the steel surface 1 m2 250 ER-CAO-C-HQ-Engg/ FOB,PF Kamarkundu, 3/31/2021 862.00 -6.41% 0.00% 806.746 129.9 17.32% 0.00 946.48 1,069.00 267,250.00
of girder with sprayed 03WTCAOCER 2020- Chandanpur
alluminium of 99.9% purity 21/00884540038222
DCE-I/HWH/WT/584 /203 dt. Dankuni - Chandanpur 1/11/2019 888.00 0.00% 0.00% 888.000 119.2 27.85% 0.00 1135.33
with coating of minimum dt.12.07.2021
150 micron 24.05.19
DCE/CON/II/HWH/Agr/083, dated BR NO 188A ,in c/w 10/16/2020 912.00 0.00% 0.00% 912.000 123.6 23.30% 0.00 1124.50
29.03.21 third line between
bainchi & shaktigarh

17 Design and supply of 1 JOB 2000 DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 217344.0 -5.50% 0.00% 205390.08 116.1 31.27% 0.00 269,607.65 256,843.00 ###
detailed GAD ,foundation 18, Dtd. 20.04.2018 Battery storage shed
and fabrication drawing of --LLH-W.SHOP
welded steel structures
including columns, roof DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 212442.4 -6.15% 0.00% 199377.15 113.9 33.80% 0.00 266,769.77
girder, truss, crane
girder ,purlin , gabble , CAO/C/WT/9050,dt.13.8.14 Extn Of Wheel shop At 6/19/2014 181085.0 0.0% 5.55% 171034.78 183.0 1.15% ### 234,152.08
louber,screen girder etc etc LLH Workshop
cmplete in all respect as per

18 Design and supply of 1 M2 0 DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 43.00 -5.50% 0.00% 40.635 116.1 31.27% 0.00 53.34 56.00 0.00
detailed structural drawing 18, Dtd. 20.04.2018 Battery storage shed
of RCC Building/Structure --LLH-W.SHOP
includig columns/walls of
RCC/Brick or other material DCE/C/II/HWH/WT/969,dt.14.9.17 J-Shop LLH Work Shop 7/21/2017 41.74 -6.15% 0.00% 39.173 113.9 33.80% 0.00 52.41
as per instruction of
Engineer-in-charge and CAO/C/WT9087,dt.3.6.15 Shed Deep pit KPA 12/18/2014 44 0% 0.30% 43.87 178.7 3.58% 45.44 61.50
modyfing the same, if

Page 138 of 141


RBI Index (2011-12=100) for Cement, Lime & Plaster of August'23 = 137.9 RBI Index (2011-12=100) MS Bright Bars August 2023 139.6
RBI Index (Base 2011-12=100) August'23 All commodities 152.4 Escalation Jan'17 to August 23 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 RBI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepte REBAT REBATED RBI RBI % Rate Rate after Avg. Rate Amount
No. OPENING d Offer E ( %) RATE Index Index Escalati after escalation
in Old in on escalatio upto Date
Series New n upto
Series Jan'17

19 Supplying, erecting and 1 M2 200 DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 794.00 -5.50% 0 750.33 116.1 31.27% 0.00 984.93 966.00 193,200.00
fixing in postion ridges, 18, Dtd. 20.04.2018 Battery storage shed
apron pieces made of --LLH-W.SHOP
alluminium plain sheet of
DCE/CON/II/HWH/WT/969 OF J-Shop LLH Work Shop 7/21/2017 686.00 -6.15% 0 643.81 113.9 33.80% 0.00 861.43
1.22mm thickness and
14.09.17
proper housig with troughed
sheet roofing, fastenings as DCE/CON/II/HWH/WT/994. Construction ofNew 5/8/2019 870.00 -3.50% 0.00% 839.55 121.6 25.33% 0.00 1052.20
per approved etc Dt .05/08/2019 shed at A shop --LLH-
W.SHOP
20 Supply, preparation & 1 M2 20 Engg/08/18-19/LLH, Dated Epoxy Flooring at L- 7/26/2018 1777.55 -27.05% 0.00% 1296.72 113.2 34.63% 0.00 1745.76 1,746.00 5,935,584.00
finishing 3mm th flow 02.08.2018 Shop Over hauling
applied Epoxy resin based section in C&W Work
floor topping ……. shop,Liluah.

21 Supplying, Fittings, fixing 1 M2 600 4,050.00


and erecting 3mm thick
Transparent
Polycarbonate
corrugated and profile

22 Supplying, Fittings, fixing 1 M2 0 3,950.00


and erecting 3mm thick
Transparent
Polycarbonate Plain
sheet

23 Supplying, fitting, erecting & 1 M 0 Engg/11/22-23/LLH openR-2, Upgradation & 31-05.2023 815.00 0.00% 0.00% 815.00 127 ### 0.00 0.00 0.00
fixing UPVC Type-B pipes 00983090082213 , Dated Augumentation of
150mm/160mm dia of Brand 21.07.2023 infrastructure
supreme or similar facility……etc. at C &
W Work shop,
E.Railway Liluah

Total of Sch. A-I = Rs. Err:509

Schedule A-II RBI Index of Industrial workers April 2023 = 134.2 X 2.88 386.4960
1 Dismantling of existing 1 TM 12000 CAO/C/WT/9314,dt.14.01.2019 Bhattanager-Baltikuri 26.07.2018 82.00 -7.00% 0.00% 76.26 301 28.40% 0.00 97.92 98.00 1,176,000.00
60kg/52
kg/90R/110lb/85/75lb track DCE/CON/II/HWH/WT/969 OF J-Shop LLH Work Shop 21.07.17 68.00 0.00% 0.00% 68.00 285 35.61% 0.00 92.22
on any type of sleeper and 14.09.17
other track elementsto be
WITHOUT BLOCK DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 77.00 0.00% 0.00% 77.00 287 34.67% 0.00 103.69
PROTECTION. 18, Dtd. 20.04.2018 Battery storage shed
--LLH-W.SHOP

Page 139 of 141


RBI Index (2011-12=100) for Cement, Lime & Plaster of August'23 = 137.9 RBI Index (2011-12=100) MS Bright Bars August 2023 139.6
RBI Index (Base 2011-12=100) August'23 All commodities 152.4 Escalation Jan'17 to August 23 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 RBI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepte REBAT REBATED RBI RBI % Rate Rate after Avg. Rate Amount
No. OPENING d Offer E ( %) RATE Index Index Escalati after escalation
in Old in on escalatio upto Date
Series New n upto
Series Jan'17

2 Linking of BG track with 1 TM 0 CAO/C/WT/9314,dt.14.01.2019 Bhattanager-Baltikuri 7/26/2018 269.00 -7.00% 0.00% 250.17 301 28.40% 0.00 321.23 306.00 0.00
single rail/3 rail panel with
standard fitting and
DCE/CON/II/HWH/WT/969 OF J-Shop LLH Work Shop 7/21/2017 216.00 0.00% 0.00% 216.00 285 35.61% 0.00 292.92
fastening to make stndard
BG track as per IRPWM 14.09.17
60/52 kg rail on PSC sleeper DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 226.00 0.00% 0.00% 226.00 287 34.67% 0.00 304.35
with sleeper density 1660 18, Dtd. 20.04.2018 Battery storage shed
per km --LLH-W.SHOP

3 Transportation of P-Way
items, by Truck /
tractor/trailor small fittings
rail, ordinary/special PSC
3(a) Lead upto 25 km 1 MT/ 3000 DCE/CON/II/HWH/942/919 dt. Linking Khanyan 10/1/2015 15.00 -5.99% 0.00% 14.10 176.90 4.64% 14.76 19.97 19.00 57,000.00
Km 03/02/16 Boinchi 3rd Line.
CAO/Con/WT/ Construction of Lifting 24.05.2016 14.00 0.00% 0.00% 14.00 180.2 2.72% 14.38 19.46
9207,dt.04.10.2016 bay.. LLH W.Shop
CAO/C/WT/9314,dt.14.01.2019 Bhattanager-Baltikuri 7/26/2018 14.00 -7.00% 0.00% 13.02 119.90 27.11% 0.00 16.55

3(b) Lead more than 25 km but 1 MT/ 3000 DCE/CON/II/HWH/942/919 dt. Linking Khanyan 10/1/2015 12.00 -5.99% 0.00% 11.28 176.90 4.64% 11.80 15.98 16.00 48,000.00
less than 60 km Km 03/02/16 Boinchi 3rd Line.
CAO/Con/WT/ 24.05.2016 11.00 0.00% 0.00% 11.00 180.20 2.72% 11.30 15.29
9207,dt.04.10.2016
CAO/C/WT/9314,dt.14.01.2019 Bhattanager-Baltikuri 7/26/2018 13.00 -7.00% 0.00% 12.09 119.90 27.11% 0.00 15.37

Page 140 of 141


RBI Index (2011-12=100) for Cement, Lime & Plaster of August'23 = 137.9 RBI Index (2011-12=100) MS Bright Bars August 2023 139.6
RBI Index (Base 2011-12=100) August'23 All commodities 152.4 Escalation Jan'17 to August 23 (Base 2011-12=100)
RBI Index (Base 2004-05=100) January'2017 185.1 RBI Index (Base 2011-12=100) Jan'2017 112.6 ROUND(((152.4-112.6)/112.6),4)= 35.350%
Sl. DESCRIPTION OF WORKS Unit QTY. Agrt./A.L.No Location DATE OF RATE Accepte REBAT REBATED RBI RBI % Rate Rate after Avg. Rate Amount
No. OPENING d Offer E ( %) RATE Index Index Escalati after escalation
in Old in on escalatio upto Date
Series New n upto
Series Jan'17

3(C) Lead more than 60 km and 1 MT/ 3000 DCE/CON/II/HWH/942/919 dt. Linking Khanyan 10/1/2015 3.00 -5.99% 0.00% 2.82 176.90 4.64% 2.95 3.99 4.00 12,000.00
less than 200 km For every Km 03/02/16 Boinchi 3rd Line.
additional lead more than 60
CAO/Con/WT/ Construction of Lifting 24.05.2016 3.00 0.00% 0% 3.00 180.2 2.72% 3.08 4.17
km less than .equal to 200
9207,dt.04.10.2016 bay.. LLH W.Shop
km
CAO/C/WT/9314,dt.14.01.2019 Bhattanager-Baltikuri 7/26/2018 4.00 -7.00% 0.00% 3.72 119.90 27.11% 0.00 4.73

3(d) Lead beyond 200 km 1 MT/ 3000 DCE/CON/II/HWH/942/919 dt. Linking Khanyan 10/1/2015 2.00 -5.99% 0.00% 1.88 176.90 4.64% 1.97 2.66 3.00 9,000.00
Km 03/02/16 Boinchi 3rd Line.
DCE/CON/II/HWH/973 OF 2017- Construction of 2/12/2018 2.00 0.00% 0.00% 2.00 116.1 31.27% 0.00 2.63
18, Dtd. 20.04.2018 Battery storage shed
--LLH-W.SHOP
CAO/C/WT/9314,dt.14.01.2019 Bhattanager-Baltikuri 7/26/2018 3.00 -0.07 0.00% 2.79 119.90 27.11% 0.00 3.55

Total of Sch. A-II = Rs. 1,302,000.00

SCHEDULE-C/I Manufacture of Cement, Lime & Plaster August'23 = 137.9

1 SLAG CEMENT I.S.455 1 MT 250 DCE/C/II/HWH/AGR/085 Dt. 13- Br. No 188A at Palsit 10/25/2021 8276 0.00% 0.24% 8256.14 126.5 9.01% 9,000.17 8,535.00 2,133,750.00
12-2021
ER-CAO-C-HQ-ENGG /03WTCAO 4TH Line Between 7/12/2021 7829 -3.85% 0.00% 7527.58 126.2 9.27% 8,225.47
CER2020-21/00884540038222 DKAE-CHANDANPUR
Dated 12/07/2021

CAO/C/WT9357,dt.27.11.20 E.work,Bainchi - SKG 10/11/2020 7844.00 -7.49% 0.00% 7256.48 119.4 15.49% 8,380.81

Total Cost of Sch. C-I = Rs. 2,133,750.00

SCHEDULE-C/II RBI Index MS Bright Bars August 2023 = 139.6


1 REINFORCING STEEL TOR 1 MT 300000 A/L no. Br. No 188A at Palsit 10/25/2021 79336 2.00% 0.24% 80728.51 142.2 -1.83% 79,252.46 76,722.00 ###
ER-CAO-C-HQ-ENGG/04HWHCON Agr. No.
IIOF2021-22/10528490044607 DCE/C/II/HWH/
dt.09.11.21 AGR/085 Dt. 13-12-
2021
ER-CAO-C-HQ-ENGG/01WTCA OC 3RD Line Between 10/11/2020 62907 -4.49% 0.00% 60082.48 105.1 32.83% 79,805.08
ER 2020-21/01183370028786 Boinchi - Saktigarh
Dated 25/11/2020

ER-CAO-C-HQ-ENGG 4TH Line Between 7/12/2021 61449 10.00% 0.00% 67593.90 132.7 5.20% 71,108.58
/03WTCAOCER 2020- DKAE-CHANDANPUR
21/00884540038222 Dated
Total Cost of Sch. C-II = Rs. 23,016,600,000.00
12/07/2021