4/30/25, 5:53 PM Shri Mahavir Ferro Alloys Pvt Ltd Mail - TPM Progress Review against Master Plan
Mail - TPM Progress Review against Master Plan (24-25)
TPM Cell <tpm.cell@smfal.com>
TPM Progress Review against Master Plan (24-25)
TPM Cell <tpm.cell@smfal.com> Thu, Apr 10, 2025 at 10:40 AM
To: Asim Nath <asim.nath@smfal.com>, Pellet Electrical DGM Bhajahari Das <pellet2.electrical@smfal.com>, AGM IR & Admin <agm.iradmin@smfal.com>, DGM HR
<dgm.hr@smfal.com>, Safety Smfal <safety@smfal.com>, "Subhas Ch. Dey" <sc.dey@smfal.com>, Pellet Process <pellet.process@smfal.com>, Pellet Mechanical
AGM <pellet2.mechanical@smfal.com>, Sourabh Mishra <safety.counsellor@envirocareinfra.in>, PP Mechanical <pp.mechanical@smfal.com>, Debashis Jena
<beneficiation.mechanical@smfal.com>, Himanshu Singh <operationexcellence@smfal.com>
Cc: Vicky Jain <vicky.jain@smfal.com>, S Pati <s.pati@smfal.com>, Advisor Business Excellence Smfal <be.advisor@smfal.com>, Paramesh Bhattacharya
<vp.power@envirocareinfra.in>, Rajkumar Bansal <r.bansal@smfal.com>, Vivek P <vivek.p@envirocareinfra.in>
Bcc: TPM Cell <tpm.cell@smfal.com>, Subhasish Durgeshnandan <coe.pellet@smfal.com>
Dear Pillar Heads,
Enclosed please find the MoM of 8th SCM meeting held on 09/04/2025 Chaired by Mr.P.Bhattacharyya. Meeting PPT & master plan is also attached. The MoM is
also uploaded in the TPM meeting action log sheet. All concerned to complete this action within the next 15 days. Next review is tentatively scheduled on 29th April
2025.
TPM 8th Steering Committee Meeting MoM.(09/04/2025)
S No. Action Points Responsibility
All red items in the previous year master plan to be completed by respective pillar heads
1 within the next 15 days time. TPM cell to coordinate the action and target date & upload TPM cell
this TPM meeting action log sheet.
2 Co-lead list need to be shared with SC Chairman TPM cell
Target setting to be done for KMI, based on ;last year's actual & best performance jointly by
3 Himanshu Singh
HODs, operational excellence head , COE & TPM.OPE head to lead this.
4 Maintenance cost & lubrication consumption data need to be incorporated in PM pillar PPT Bhajahari Das
PM pillar heads to set the new target for reduction in lubrication consumption after
5 Bhajahari Das
discussion with the team.
6 Losses to be linked with cost and individual photo to be associated with ocurred losses. Himanshu Singh
7 Operational HODs to form Kaizen team for reducing various losses. Operational HODs
8 Kaizen & 16 losses training to be provided to KK,QM & PM pillar TPM cell
9 4M condition setting to be completed within next 15 days SC Dey
10 Training effectiveness evaluation to be done after 3 months of training S.Chinera
11 SOP based JHA to be made for pellet division D.Grahacharya
12 TGR to be captured within 15 days of ongoing project areas Sahil Panigrahi
13 At Least 1why- why analysis needs to be done for TGW within 15 days Sahil Panigrahi
https://mail.google.com/mail/u/0/?ik=f32c9eae76&view=pt&search=all&permmsgid=msg-a:r7938006027311066226&simpl=msg-a:r7938006027311066226 1/2
4/30/25, 5:53 PM Shri Mahavir Ferro Alloys Pvt Ltd Mail - TPM Progress Review against Master Plan (24-25)
14 Visualisation improvement of MMMs JH Co-leads
15 Presentation format was standardized long back. All pillars must comply with this. TPM cell
16 RCA format need to be shared with all pillar head TPM cell
17 PTW system need to be closed in next 15 days.(Reference MoM of SHE pillar) D.Grahacharya
18 OTPM pillar need to align the work inline with the overall philosophy of OTPM. Hemant Pati
TPM cell to jot down 15 days plan of every pillar & share the same with pillar heads. SC
19 chairman shall review the actions once every 15 days.Next meeting is tentatively scheduled TPM Cell
on 29 th April 25.
---------- Forwarded message ---------
From: TPM Cell <tpm.cell@smfal.com>
Date: Wed, Apr 9, 2025 at 2:15 PM
Subject: TPM Progress Review against Master Plan (24-25)
To: Paramesh Bhattacharya Sir Eipl <vp.power@envirocareinfra.in>
Cc: Vicky Jain <vicky.jain@smfal.com>, S Pati <s.pati@smfal.com>, Vivek P <vivek.p@envirocareinfra.in>, Advisor Business Excellence
<advisor.businessexcellence@envirocareinfra.in>, Rajkumar Bansal <r.bansal@smfal.com>
[Quoted text hidden]
3 attachments
TPM Master Plan 24-25.xlsx
192K
TPM Master Plan 25-26.xlsx
40K
8_steering committe 09.04.25.pdf
521K
https://mail.google.com/mail/u/0/?ik=f32c9eae76&view=pt&search=all&permmsgid=msg-a:r7938006027311066226&simpl=msg-a:r7938006027311066226 2/2