Crisis at Maruti Suzuki'S Manesar Plant: An HR Insight: Presented by - Swati Chandra Pinky Kumari
Crisis at Maruti Suzuki'S Manesar Plant: An HR Insight: Presented by - Swati Chandra Pinky Kumari
TABLE OF CONTENTS
2
S.NO. 1 2 3 4 5 6 7 8 9
CONTENTS OVERVIEW PROBLEM FALL IN DEMAND LOSS IN OUTPUT WORKERS PERSPECTIVE MANAGEMENT PERSPECTIVE ACTIONS TAKEN FACTS SOLUTION
OVERVIEW
3
for over 45% of the domestic car market First company in India to mass-produce and sell more than a million cars Annually exports more than 50,000 cars Manufacturing facilities are located at two facilities Gurgaon and Manesar It offers 14 brands and over 150 variants ranging from peoples car Maruti 800 to the stylish hatchback Ritz
THE PROBLEM
5
Working condition
Lack of proper negotiation
FALL IN DEMAND
6
season, when car sales touch the peak. The Manesar plant is the hub for the key 'Swift' model, which runs a huge backlog in the retail market. The bookings for the new Swift and waiting list of customers are very high. Delay in production affect the delivery of cars resulting in disappointment among customers.
LOSS IN OUTPUT
7
Estimated loss of more than 90 million dollar. On August 24, 1,230 cars were planned to be
produced, but only 437 were assembled. Out of which, just 96 cars could pass quality check. Halt in production on the 5th September, around 4000 workers rallied till the highway to block it. Poor dispatch numbers with respect to meeting targets and quality control
CONT.
8
sign the Good Conduct undertaking Production was stalled as the company barricaded various entrances to prohibit entry of those who refused to sign the 'good conduct bond'.
is awarded with a promotion but in case a labourer dares to reply, he is issued a notice on grounds of disciplinary action," said Rajender Kumar, a technician
CONT.
10
Cockroaches and dead flies found in the food in the hurried lunch-
break that workers earn in the canteen km from the working station. The tea was without tea leaves or sugar in the 7 minute break The company doctor give heavy doses of instant medicines even on minor complaint so that disruption of work could be prevented. One days wage cut of Rs.1500, two days Rs.2200, three days cut of Rs.7-8000 is implemented, so that almost the total months wage is cut. One second late into punching-card entry is a days wage cut, but they have to give full production for that day too. Forced to fill an undertaking form, which means that in case of any problem, workers cannot raise any objections against management.
WORKERS DEMAND
11
Maruti Suzuki Employees Union (MSEU)in the company. Currently, the company has one recognized union Maruti Udyog Kamgar Union which is dominated by workers at the Gurgaon plant
Unhappy workers have found out a new way to disrupt ongoing work at the plant by creating serious defects in quality of the cars, so they would fail the compulsory vehicle inspection quality test.
Source: http://www.ndtv.com/
CONT.
13
output and are compromising customer interests Revenge for the June strike. Refused to sign good conduct form which aims at ensuring the production of good quality products. Employees are being charged with sabotage and causing quality problems in the cars produced.
CONT.
14
problems had been observed in the vehicles produced. For example, vehicle door was not properly clamped leading to doors falling during production, wiring harnesses were found cut in produced vehicle, dents were noticed on the body and critical components were not fitted on to vehicles. Such deliberate acts, if not detected during quality checks, would have led to serious implications and directly harmed customers," a senior company official said.
15
What ideas come into your mind after seeing this picture?
Uninteresting nature of work.. Political nature of unions.. Poor wages. Occupational instability. Poor behavioural climate
Suspension of 10 workers
Dismissal of five
Discontinued the services of six trainees. Also suspended four workers for "instigating indiscipline"
a week before Another four suspended in late July for manhandling supervisors. Charges of sabotage and causing quality problems in the cars produced. On 14th August; police force of 500 sent to occupy the factory to prevent violent activities
CONT.
17
38 on August 29th and 30th on false charges demanding a good-conduct bond with the state police and administration, the media, and bouncers on its payroll as its willing pawns. The Maruti Suzuki Employees Union (MSEU) was demanded as an immediate measure, the withdrawal of the charge-sheet, termination, suspension of the 49 workers. The workers were sitting day-and-night at the factory gate, peeling off the layers of Maruti Suzukis way of life.
Facts
18
June 1) 13-days strike demanding the recognition of the MSEU at the Manesar plant 2) Production loss of 12,600 cars, valued at about Rs 630 crore. July 1) Production stopped for a day at the same plant because of strike by some workers. August 1) Reported 12.74 per cent fall in sales for August to 91,442 as compared to the sale of 1,04,791 units in the same month last year
September 7 1) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore. Source: Economic Times
Production stopped at Manesar Third production halt in three months at Manesar. The company stopped operations for 10 working
days in June The firm lost Rs 425 crore because of the strike.
Manesar labour problem is essentially a political issue and not a problem which involves any significant demand from the workers
Solution
21
Establishment of separate union for Manesar Plant 2. Code of Conduct- Falling standards of manufacturing. 3. Basic sanitary enhancements demanded by the workforce.
1.
conditions: 1. Members of the trade union to be nominated with consent of both workers and management. 2. The leader of this union would be appointed by the management.
24
26