Anderson
Sweeney
Williams
QUANTITATIVE METHODS FOR BUSINESS 8e
Slides Prepared by JOHN LOUCKS
2001 South-Western College Publishing/Thomson Learning
Slide 1
Chapter 1 Introduction
Body of Knowledge Problem Solving and Decision Making Quantitative Analysis and Decision Making Quantitative Analysis Models of Cost, Revenue, and Profit Quantitative Methods in Practice The Management Scientist
Slide 2
Body of Knowledge
Quantitative methods for business involve rational approaches to decision making based on the scientific method of problem solving. This body of knowledge is often referred to as management science, operations research or decision science. It had its early roots in World War II and is flourishing in business and industry with the aid of computers.
Slide 3
Problem Solving and Decision Making
7 Steps of Problem Solving (First 5 steps are the process of decision making) Identify and define the problem. Determine the set of alternative solutions. Determine the criteria for evaluating the alternatives. Evaluate the alternatives. Choose an alternative. -------------------------------------------------------------------- Implement the chosen alternative. Evaluate the results.
Slide 4
Quantitative Analysis and Decision Making
Potential Reasons for a Quantitative Analysis Approach to Decision Making The problem is complex. The problem is very important. The problem is new. The problem is repetitive.
Slide 5
Quantitative Analysis
Quantitative Analysis Process Model Development Data Preparation Model Solution Report Generation
Slide 6
Model Development
Models are representations of real objects or situations. Three forms of models are iconic, analog, and mathematical. Iconic models are physical replicas (scalar representations) of real objects. Analog models are physical in form, but do not physically resemble the object being modeled. Mathematical models represent real world problems through a system of mathematical formulas and expressions based on key assumptions, estimates, or statistical analyses.
Slide 7
Advantages of Models
Generally, experimenting with models (compared to experimenting with the real situation): requires less time is less expensive involves less risk
Slide 8
Mathematical Models
Cost/benefit considerations must be made in selecting an appropriate mathematical model. Frequently a less complicated (and perhaps less precise) model is more appropriate than a more complex and accurate one due to cost and ease of solution considerations.
Slide 9
Mathematical Models
Relate decision variables (controllable inputs) with fixed or variable parameters (uncontrollable inputs). Frequently seek to maximize or minimize some objective function subject to constraints. Are said to be stochastic if any of the uncontrollable inputs is subject to variation, otherwise are said to be deterministic. Generally, stochastic models are more difficult to analyze. The values of the decision variables that provide the mathematically-best output are referred to as the optimal solution for the model.
Slide 10
Transforming Model Inputs into Output
Uncontrollable Inputs (Environmental Factors)
Controllable Inputs (Decision Variables)
Mathematical Model
Output (Projected Results)
Slide 11
Example: Project Scheduling
Consider a construction company building a 250unit apartment complex. The project consists of hundreds of activities involving excavating, framing, wiring, plastering, painting, landscaping, and more. Some of the activities must be done sequentially and others can be done simultaneously. Also, some of the activities can be completed faster than normal by purchasing additional resources (workers, equipment, etc.). What is the best schedule for the activities and for which activities should additional resources be purchased?
Slide 12
Example: Project Scheduling
Question: How could management science be used to solve this problem? Answer: Management science can provide a structured, quantitative approach for determining the minimum project completion time based on the activities' normal times and then based on the activities' expedited (reduced) times.
Slide 13
Example: Project Scheduling
Question: What would be the uncontrollable inputs? Answer: Normal and expedited activity completion times Activity expediting costs Funds available for expediting Precedence relationships of the activities
Slide 14
Example: Project Scheduling
Question: What would be the decision variables of the mathematical model? The objective function? The constraints? Answer: Decision variables: which activities to expedite and by how much, and when to start each activity Objective function: minimize project completion time Constraints: do not violate any activity precedence relationships and do not expedite in excess of the funds available.
Slide 15
Example: Project Scheduling
Question: Is the model deterministic or stochastic? Answer: Stochastic. Activity completion times, both normal and expedited, are uncertain and subject to variation. Activity expediting costs are uncertain. The number of activities and their precedence relationships might change before the project is completed due to a project design change.
Slide 16
Example: Project Scheduling
Question: Suggest assumptions that could be made to simplify the model. Answer: Make the model deterministic by assuming normal and expedited activity times are known with certainty and are constant. The same assumption might be made about the other stochastic, uncontrollable inputs.
Slide 17
Data Preparation
Data preparation is not a trivial step, due to the time required and the possibility of data collection errors. A model with 50 decision variables and 25 constraints could have over 1300 data elements! Often, a fairly large data base is needed. Information systems specialists might be needed.
Slide 18
Model Solution
Involves identifying the values of the decision variables that provide the best output for the model. One approach is trial-and-error. might not provide the best solution inefficient (numerous calculations required) Special solution procedures have been developed for specific mathematical models. some small models/problems can be solved by hand calculations most practical applications require using a computer
Slide 19
Computer Software
A variety of software packages are available for solving mathematical models. Spreadsheet packages such as Microsoft Excel The Management Scientist, developed by the textbook authors
Slide 20
Model Testing and Validation
Often, the goodness/accuracy of a model cannot be assessed until solutions are generated. Small test problems having known, or at least expected, solutions can be used for model testing and validation. If the model generates expected solutions: use the model on the full-scale problem. If inaccuracies or potential shortcomings inherent in the model are identified, take corrective action such as: collection of more-accurate input data modification of the model
Slide 21
Report Generation
A managerial report, based on the results of the model, should be prepared. The report should be easily understood by the decision maker. The report should include: the recommended decision other pertinent information about the results (for example, how sensitive the model solution is to the assumptions and data used in the model)
Slide 22
Implementation and Follow-Up
Successful implementation of model results is of critical importance. Secure as much user involvement as possible throughout the modeling process. Continue to monitor the contribution of the model. It might be necessary to refine or expand the model.
Slide 23
Example: Austin Auto Auction
An auctioneer has developed a simple mathematical model for deciding the starting bid he will require when auctioning a used automobile. Essentially, he sets the starting bid at seventy percent of what he predicts the final winning bid will (or should) be. He predicts the winning bid by starting with the car's original selling price and making two deductions, one based on the car's age and the other based on the car's mileage. The age deduction is $800 per year and the mileage deduction is $.025 per mile.
Slide 24
Example: Austin Auto Auction
Question: Develop the mathematical model that will give the starting bid (B ) for a car in terms of the car's original price (P ), current age (A) and mileage (M ). Answer: The expected winning bid can be expressed as: P - 800(A) - .025(M ) The entire model is: B = .7(expected winning bid) or B = .7(P - 800(A) - .025(M )) or B = .7(P )- 560(A) - .0175(M )
Slide 25
Example: Austin Auto Auction
Question: Suppose a four-year old car with 60,000 miles on the odometer is up for auction. If its original price was $12,500, what starting bid should the auctioneer require? Answer: B = .7(12,500) - 560(4) - .0175(60,000) = $5460.
Slide 26
Example: Austin Auto Auction
Question: The model is based on what assumptions? Answer: The model assumes that the only factors influencing the value of a used car are the original price, age, and mileage (not condition, rarity, or other factors). Also, it is assumed that age and mileage devalue a car in a linear manner and without limit. (Note, the starting bid for a very old car might be negative!)
Slide 27
Example: Iron Works, Inc.
Iron Works, Inc. (IWI) manufactures two products made from steel and just received this month's allocation of b pounds of steel. It takes a1 pounds of steel to make a unit of product 1 and it takes a2 pounds of steel to make a unit of product 2. Let x1 and x2 denote this month's production level of product 1 and product 2, respectively. Denote by p1 and p2 the unit profits for products 1 and 2, respectively. The manufacturer has a contract calling for at least m units of product 1 this month. The firm's facilities are such that at most u units of product 2 may be produced monthly.
Slide 28
Example: Iron Works, Inc.
Mathematical Model The total monthly profit = (profit per unit of product 1) x (monthly production of product 1) + (profit per unit of product 2) x (monthly production of product 2) = p1x1 + p2x2 We want to maximize total monthly profit: Max p1x1 + p2x2
Slide 29
Example: Iron Works, Inc.
Mathematical Model (continued) The total amount of steel used during monthly production = (steel required per unit of product 1) x (monthly production of product 1) + (steel required per unit of product 2) x (monthly production of product 2) = a1x1 + a2x2 This quantity must be less than or equal to the allocated b pounds of steel: a1x1 + a2x2 < b
Slide 30
Example: Iron Works, Inc.
Mathematical Model (continued) The monthly production level of product 1 must be greater than or equal to m : x1 > m The monthly production level of product 2 must be less than or equal to u : x2 < u However, the production level for product 2 cannot be negative: x2 > 0
Slide 31
Example: Iron Works, Inc.
Mathematical Model Summary
Max s.t. p1x1 + p2x2 a1x1 + a2x2 x1 x2 x2 < > < > b m u 0
Slide 32
Example: Iron Works, Inc.
Question: Suppose b = 2000, a1 = 2, a2 = 3, m = 60, u = 720, p1 = 100, p2 = 200. Rewrite the model with these specific values for the uncontrollable inputs. Answer: Substituting, the model is: Max 100x1 + 200x2 s.t. 2x1 + 3x2 < 2000 x1 > 60 x2 < 720 x2 > 0
Slide 33
Example: Iron Works, Inc.
Question: The optimal solution to the current model is x1 = 60 and x2 = 626 2/3. If the product were engines, explain why this is not a true optimal solution for the "real-life" problem. Answer: One cannot produce and sell 2/3 of an engine. Thus the problem is further restricted by the fact that both x1 and x2 must be integers. They could remain fractions if it is assumed these fractions are work in progress to be completed the next month.
Slide 34
Example: Iron Works, Inc.
Uncontrollable Inputs
$100 profit per unit Prod. 1 $200 profit per unit Prod. 2 2 lbs. steel per unit Prod. 1 3 lbs. Steel per unit Prod. 2 2000 lbs. steel allocated 60 units minimum Prod. 1 720 units maximum Prod. 2 0 units minimum Prod. 2
60 units Prod. 1 626.67 units Prod. 2 Controllable Inputs Max 100(60) + 200(626.67) s.t. 2(60) + 3(626.67) < 2000 60 > 60 626.67 < 720 626.67 > 0 Mathematical Model
Slide 35
Profit = $131,333.33 Steel Used = 2000 Output
Example: Ponderosa Development Corp.
Ponderosa Development Corporation (PDC) is a small real estate developer operating in the Rivertree Valley. It has seven permanent employees whose monthly salaries are given in the table on the next slide. PDC leases a building for $2,000 per month. The cost of supplies, utilities, and leased equipment runs another $3,000 per month. PDC builds only one style house in the valley. Land for each house costs $55,000 and lumber, supplies, etc. run another $28,000 per house. Total labor costs are figured at $20,000 per house. The one sales representative of PDC is paid a commission of $2,000 on the sale of each house. The selling price of the house is $115,000.
Slide 36
Example: Ponderosa Development Corp.
Employee Monthly Salary President $10,000 VP, Development 6,000 VP, Marketing 4,500 Project Manager 5,500 Controller 4,000 Office Manager 3,000 Receptionist 2,000
Slide 37
Example: Ponderosa Development Corp.
Question: Identify all costs and denote the marginal cost and marginal revenue for each house. Answer: The monthly salaries total $35,000 and monthly office lease and supply costs total another $5,000. This $40,000 is a monthly fixed cost. The total cost of land, material, labor, and sales commission per house, $105,000, is the marginal cost for a house. The selling price of $115,000 is the marginal revenue per house.
Slide 38
Example: Ponderosa Development Corp.
Question: Write the monthly cost function c (x), revenue function r (x), and profit function p (x). Answer: c (x) = variable cost + fixed cost = 105,000x + 40,000 r (x) = 115,000x p (x) = r (x) - c (x) = 10,000x - 40,000
Slide 39
Example: Ponderosa Development Corp.
Question: What is the breakeven point for monthly sales of the houses? Answer: r (x ) = c (x ) or 115,000x = 105,000x + 40,000 Solving, x = 4. Question: What is the monthly profit if 12 houses per month are built and sold? Answer: p (12) = 10,000(12) - 40,000 = $80,000 monthly profit
Slide 40
Example: Ponderosa Development Corp.
Graph of Break-Even Analysis 1200 1000 800
Thousands of Dollars
Total Revenue = 115,000x
Total Cost = 40,000 + 105,000x
600
400 200 0 0 1 2 3 4 5 6 7 8 9 10
Slide 41
Break-Even Point = 4 Houses
Number of Houses Sold (x)
Example: Ponderosa Development Corp.
A spreadsheet software package such as Microsoft Excel can be used to perform a quantitative analysis of Ponderosa Development Corporation. We will enter the problem data in the top portion of the spreadsheet. The bottom of the spreadsheet will be used for model development.
Slide 42
Example: Ponderosa Development Corp.
Formula Spreadsheet
A 1 PROBLEM DATA 2 Fixed Cost 3 Variable Cost Per Unit 4 Selling Price Per Unit 5 MODEL 6 Sales Volume 7 Total Revenue 8 Total Cost 9 Total Profit (Loss) B
40000 105000 115000
=B4*B6 =B2+B3*B6 =B7-B8
Slide 43
Example: Ponderosa Development Corp.
Question: What is the monthly profit if 12 houses per month are built and sold? Spreadsheet Solution:
A 1 PROBLEM DATA 2 Fixed Cost 3 Variable Cost Per Unit 4 Selling Price Per Unit 5 MODEL 6 Sales Volume 7 Total Revenue 8 Total Cost 9 Total Profit (Loss) B
$40,000 $105,000 $115,000
12
$1,380,000 $1,300,000 $80,000
Slide 44
Example: Ponderosa Development Corp.
Question: What is the breakeven point for monthly sales of houses? Spreadsheet Solution: One way to determine the break-even point is to use a trial-and-error approach. We will enter trial sales quantities ranging from 1 to 7 houses in the cells D3:D9 of the spreadsheet. Then we enter the formula for profit in cell E2. Finally, we use Excel s Table command to compute profit (or loss) for each of the trial sales values.
Slide 45
Example: Ponderosa Development Corp.
Spreadsheet Solution: Trial-and-Error Approach to Determining Break-Even Point
Using Excel s Table Command Step 1: Select cells D2:E9 Step 2: Select the Data pull-down menu Step 3: Select the Table option Step 4: Enter B6 in the Column Input Cell of the Table dialog box, and select OK
Slide 46
Example: Ponderosa Development Corp.
Spreadsheet Solution: Trial-and-Error Approach to Determining Break-Even Point
A PROBLEM DATA Fixed Cost Variable Cost Per Unit Selling Price Per Unit MODEL Sales Volume Total Revenue Total Cost Total Profit (Loss) B
$40,000 $105,000 $115,000
12 $1,380,000 $1,300,000 $80,000
E $80,000 -$30,000 -$20,000 -$10,000 $0 $10,000 $20,000 $30,000
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7
Slide 47
Example: Ponderosa Development Corp.
Question: What is the breakeven point for monthly sales of the houses? Spreadsheet Solution: Another way to determine the break-even point using a spreadsheet is to use the Goal Seek tool. Microsoft Excel s Goal Seek tool allows the user to determine the value for an input cell that will cause the output cell to equal some specified value. In our case, the goal is to set Total Profit to zero by seeking an appropriate value for Sales Volume.
Slide 48
Example: Ponderosa Development Corp.
Spreadsheet Solution: Goal Seek Approach to Determining Break-Even Point
Using Excel s Goal Seek Tool Step 1: Select the Tools pull-down menu Step 2: Choose the Goal Seek option Step 3: When the Goal Seek dialog box appears: Enter B9 in the Set cell box Enter 0 in the To value box Enter B6 in the By changing cell box Select OK
Slide 49
Example: Ponderosa Development Corp.
Spreadsheet Solution: Goal Seek Approach to Determining Break-Even Point
Completed Goal Seek Dialog Box
Goal Seek ? X B9
Set cell: To value: By changing cell:
OK
0
B6 Cancel
Slide 50
Example: Ponderosa Development Corp.
Spreadsheet Solution: Goal Seek Approach to Determining Break-Even Point
A PROBLEM DATA Fixed Cost Variable Cost Per Unit Selling Price Per Unit MODEL Sales Volume Total Revenue Total Cost Total Profit (Loss) B
$40,000 $105,000 $115,000 4 $460,000 $460,000 $0
Slide 51
1 2 3 4 5 6 7 8 9
The End of Chapter 1
Slide 52