Welcome to Monthly Progress
Review Meeting of
Master Infrastructure Consultant
work of MBSIR
Presented to
Gujarat Industrial Corridor Corporation Ltd
(GICC)
Presented by:
Agenda
Abouttheprojectsite
ProjectObjective&Scope
ProgressofworkTilldate
Datacollection
FurtherActionPlan
Supportsoughtfromemployerandqueries
About the project site
The MBSIR site is located 90 km from the
Ahmedabad&85kmfromGandhinagar
Spreadarea102sq.km.(8villagescovering)
Theareadividedintwocluster
51.50sq.km(covering5villages)
50.60sq.km(covering3villages)
5nos.ofT.Pschemeintwocluster
Industrial hubs and comprise automobile,
manufacturingandauxiliaryindustries.
GICChasbeenawardedtheworkinWAPCOS
for Master consultant for selection for Mandal
Becharaji Special investment Region on
04.06.2016.
Project Objective
Assessment and
validation the
existing roads and all
utility services.
Develop strategies
for phased
development to
ensure sustainable
development
Feasibility studies of
infrastructure
components.
Prepare preliminary
and/or detailed
engineering design
and drawings for
various components.
Prepare tender
documents and assist
in selection of DB
contractors, EPC
Contractors and
Employers Engineers,
EIA Consultants
Project Scope
Progress of Work - Till date
Correspondence
Performance Bank guarantee were submitted on 2.06.2016.
Various insurance policies i.e.
Third party liability insurance,
Professional Liability Insurance,
Employers liability and workers compensation insurance and
Third party Motor vehicle liability insurance were submitted on
dated 21.6.2016 and 29.06.2016.
We have Submitted draft copy of Agreement as per terms of
condition mentioned in the RFQ cum RFP document on dated
26.7.2016.
We have Submitted compliance of comment received from GICC
on QAP on 23.8.2016.
Conti
Reports submission / study of data or reports
Study and review of the Development plan collected from MBSIRDA.
Master schedule of MBSIR project was submitted on 22.07.2016,
Quality Assurance Plan (QAP) was submitted on 26.07.2016,
Preliminary Report for Hydrology and hydraulics calculation of
proposed drain passing from Maruti Plant (within MBSIR) were
submitted on 1.08.2016
Inception Report with design basis parameter was submitted on
6.08.2016, as per deliverable schedule mentioned in ToR.
Monthly Progress Report-1 for the month of June and July 2016 was
submitted on 12.08.2016.
Revised Quality Assurance Plan (QAP) was submitted on 23.8.2016
with incorporation of comment received from GICC.
Conti
Meetings
A Kick Off meeting was called on 2.07.2016 by the client
for discussion on project approach and methodology,
progress of work, Role and Responsibility of various key
experts, project time line, various deliverables, way
forward etc.
Meeting with GICC and MBSIRDA official on 15.07.2016 for
progress of work after award of the work.
Also, regularly meeting with GICC and MBSIRDA official
carry out regarding the progress of work, discussion on
various deliverables, further planning on the project etc.
Conti
Site visit
Carry out site visit of the proposed MBSIR area on dated 30.06.2016 by
WAPCOS
engineers
to
understand
the
existing
topography
and
infrastructure facility.
Reconnaissance site visit with GICC and MBSIRDA official on 12.07.2016
of propose MBSIR area to understand the topography, drainage pattern,
various available source etc of the propose MBSIR area.
Carry out site visit by the our engineer to identify and measure the
existing structure crossing the drain passing from Maruti Plant (within
MBSIR).
Conti
Data collection
Secondary data i.e. Development Plan, Map of development plan,
survey map of Maruti Plant (Hard Copy) was collected from
MBSIRDA.
Following
Toposheet
purchased
from
Survey
of
India
(SoI),
Gandhinagar to carry out hydrology study of drain passing from
Maruti Plant,
o F42F14
o F42F15
o F43A2
o F43A3
Village demography details from village directory, Census, 2011.
Data Collection - Status
We have identified following Government and private sector for collection of the various
data/detailsforMBSIRproject.
Sr.
No.
1
Department
Data required
Progress / Status
Bharat Sanchar Nigam
Limited
(BSNL),
Reliance, IDEA, Airtel,
Vodafoneetc.
Availability of existing telecommunication We have contacted Assistant General
networkfacility.
Manager and Area Manager at BSNL,
Existing
and
Proposed
details
of Mehsanaforcollectionofrequireddata.
TelecommunicationNetwork
Gujarat
Energy Details of existing switchyard location, We have contacted Executive Engineer,
Transmission Corporation existing and proposed transmission network Construction division, GETCO. and received
Limited(GETCO)
&detailsofpowersupply.
details of concern office for get data i.e. Sh.
H.D. Sharma, Supertending Engineer,
Mehsana.
Gujarat
Industrial Details of existing and Proposed Industrial WeshallplanpersonallyvisitGIDCatMBSIR
Development Corporation AreainGIDC.
areaandcollecttherequireddata.
(GIDC)
Details of effluent location, type, quality and
quantityofindustrialwasteandeffluent.
Gujarat
State
Road
Development Corporation
(GSRDC)
GujaratWaterSupplyand
SewerageBoard(GWSSB)
Existing and Proposed Road Development
Plan with details of road type, its section its
connectivityetc.
Details of existing ESR, GSR, existing and
proposed water supply and drainage
facilities/Network.
IrrigationDepartment
Details of water bodies & existing drains Wehaveidentifyofficeofsupertendingoffice
passingfromproposedMBSIRarea
atAhemdabadfordatacollectionandvisitin
nextweek.
We have contacted Sh. Piyush Chodhary, Dy.
ExecutiveEngineer,GSRDC,Gandhinagar.
We have contacted Dy. Executive Engineer,
GWSSB,Sector-10,Gandhinagarandreceived
details of concern office for get data i.e. Sh.
P.P.Gupta,ExecutiveEngineer,Mehsana
Conti
Sr.
No.
Department
Maruti Suzuki
Limited(MSIL)
Road
&
Department
10
Data required
Progress
India Proposed plant boundary map, details of WeshallplanpersonallyvisitMSILatMBSIR
areaandcollecttherequireddata.
stormwaternetworkinlet/outlet.
Details of effluent location, type, quality
and quantity of industrial waste and
effluent.
Building ExistingandProposedRoadDevelopment
Plan with details of road type, its section
itsconnectivityetc.
Sardar
Sarovar DetailsofexistingBranchcanalandother
Narmada
Nigam canalnetworkinproposedMBSIRarea.
Limited(SSNNL)
Salientfeatures&L-SectionofZinzuwada
&KharaghodaBranchcanalatthelocation
of off taking and boundary of proposed
MBSIRarea.
We have contacted Sh. Piyush Chodhary, Dy.
ExecutiveEngineer,GSRDC,Gandhinagar.
WehavecontactedSSNNLofficeatBecharaji
and get the concern office for data collection
atCongressBhavan,Mehsana.
StateWaterDataCentre Rainfall,Evaporationandwhetherdataof We have Membership in HDUG, SWDC and
requireddatatobereceivedinnextweek.
(SWDC)
proposedMBSIRarea
Further Action Plan
Next stage as per Project Milestone is assessment and validation of various
Physical&Socialinfrastructure.
WeshallassesstheProposedDevelopmentplanindetails.
We shall collect previous study report that is carried out for this region from
theconcerneddepartments,
We shall collect various existing & proposed industrial (within MBSIR)
conceptualplanandinfrastructurereporttocarryouttheassessment.
We will carry the Technical and ground trothing study, in which we will
identify various existing Infrastructure facilities i.e. Water supply its
Networking, Sewerage system its Networking, dumping location of domestic
waste, power supply, Tele communication, Gas services, road services,
commercial infrastructure, industrial infrastructure, flood management plan
etc.
Assessment of connectivity of proposed internal infrastructure with the
externalinfrastructurefacilitylikeroad,telecom,power,wateravailabilityetc.
Wewillcarryoutthesocial&Demandsurvey,coveringthedetailsofexisting
available facilities in that region such as health, education & its level, skill
development, affordable housing, recreational, road connectivity and further
demand.
Conti
We will carry out Market survey and Demand Assessment, which covers
macro-economic study of region, opportunity assessment at global, national
and regional level, detail discussion with various stakeholder & Government
Department. Also, Identify the Availability of Human Resource and expected
employmentpotentialetc.
Also, validate all the relevant studies on the basis of assessment and
incorporate all relevant interface in the preliminary/ detailed design for the
respectiveinfrastructurecomponent.
Based on the Assessment and Validation Report, we shall prepare broad
phasingplananddemarcatepriorityareafordevelopmentofPhase-1,MBSIR
area.
ProposedLocationofTrafficandAxialLoadsurvey
LocationNo-4onMDRBecharajitoMehsana
LocationNo-1atBecharajiTown
LocationNo-2athansalpurChokdi
LocationNo-7onSH135
LocationNo-8onSH55
LocationNo-3VitthalpurChokdi
LocationNo-5onSH133
LocationNo-6onSH7
Support sought from employer
SigningofAgreement
Topographicalsurveydatawithcontourmap,ifavailable.
Geo-TechnicalInvestigationdata,ifavailable.
Joint meeting with other stakeholder involved in MBSIR
projectlikeTPconsultantetc.
Constitute steering committee to approval of the various
report,output,andvarioussubmissionsforthesaidproject.
Earlyreleaseofpaymenti.e.5%ofthetotalconsultancyvalue.