Interlock Protection and Changeover Scheme of 2MB &1TB System
The document describes the interlocking and changeover schemes for a 2MB & 1TB power system. It outlines several conditions that must be met to close various isolators and circuit breakers, including that isolators can only be operated when their associated breakers are open to avoid parallel paths. The changeover process between main and tie breakers and between buses is also summarized, requiring specific isolators and breakers to be opened and closed in a set sequence.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
51 views10 pages
Interlock Protection and Changeover Scheme of 2MB &1TB System
The document describes the interlocking and changeover schemes for a 2MB & 1TB power system. It outlines several conditions that must be met to close various isolators and circuit breakers, including that isolators can only be operated when their associated breakers are open to avoid parallel paths. The changeover process between main and tie breakers and between buses is also summarized, requiring specific isolators and breakers to be opened and closed in a set sequence.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 10
Interlock Protection and Changeover
Scheme of 2MB &1TB system
Closing interlocks of Isolator-A/ B 1-st cond. (When any put into bus) A)All poles of the breaker are open B)Connected earth switch is open C) CVT isolator close D) Isolator B open E) Selection is in remote 2-nd Cond. ( when bus changing over) A) Breaker is closed B) Isolator B is closed C) Selection is in remote Closing interlock of Isolator C A)All poles of the breaker open B) Earth switches in the both sides of isolator are open C) Selection is in Remote Closing Interlocks of circuit breaker A)All group A & group B lock out relays are in reset condition B) Auto reclose relay is in reset condition C)All poles of the breakers are open D)Bus bar differential relay is not operated Selection of the breaker is in remote Closing interlock of Isolator D A)Isolator earth switch is open B)All the other D isolator are in open condition C)Selection is in Remote condtion Changeover Scheme
Changeover of bay from MB1 to MB2
Check the isolator physically and the castle key. The earthing isolator in open condition Close the isolator of the bus in which bay will be shifted. Open the isolator of the bus from which the bay has to be isolated Changeover of the bay from Main breaker to Bus coupler breaker A) Check physically bus coupler bay, Bus coupler breaker and Isolator D B)Close isolator D Close Isolator A/B & Isolator C of Bus coupler bay Close Bus coupler Breaker Open Main Breaker Open all the isolator of the main breaker Isolator is an offline connector. Do not operate it when breaker is closed. When paralla current path is established isolator can be operated. Checking one bus is put into service after shutdown Check physically the bus Close CVT isolator Close both Bus tie isolators Close Bus tie breaker.