S-Curve & Progress Table

This document is the monthly meeting minutes for Package VIII, which includes a mobile power plant and fixed gas engine power plant. It provides progress reports for various work items, showing the quantity completed, progress percentage for the current month and total to date, and percent of work completed to date. A graph shows the planned and actual spending curve over time.

Uploaded by

Shinta Theresia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
288 views4 pages

S-Curve & Progress Table

This document is the monthly meeting minutes for Package VIII, which includes a mobile power plant and fixed gas engine power plant. It provides progress reports for various work items, showing the quantity completed, progress percentage for the current month and total to date, and percent of work completed to date. A graph shows the planned and actual spending curve over time.

Uploaded by

Shinta Theresia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Rev.

0
20170407

MOBILE POWER PLANT AND FIXED TYPE GAS ENGINE POWER PLANT
PACKAGE VIII (MOBILE POWER PLANT)
MONTHLY MEETING – 2017

PACKAGE

VIII
Rev. 0 PACKAGE VIII
J
S-CURVE
A
Y 100.000%

A 90.000%

P 80.000%

U
70.000%
R
A 60.000%

50.000%

40.000%

30.000%

20.000%

PACKAGE

VIII
10.000%

0.000%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
INCREMENTAL PLAN 0.625%0.625%0.625%1.301%1.301%2.916%3.795%3.893%4.070%5.018%6.034%5.824%5.934%6.274%5.395%4.929%5.582%5.347%5.297%4.569%4.391%4.366%2.013%2.815%2.354%2.354%2.411%
INCREMENTAL ACTUAL 2.201%1.833%1.107%0.658%3.201%0.802%6.390%1.063%0.954%0.640%0.469%7.381% 16.842 0.073%1.317%8.749%5.026%4.502% 15.461
CUMULATIVE PLAN 0.625%1.250%1.875%3.176%4.477%7.393% 11.187 15.081 19.151 24.169 30.203 36.027 41.961 48.234 53.629 58.558 64.140 69.487 74.728 79.297 83.687 88.053 90.066 92.881 95.235 97.589 100.00
CUMULATIVE ACTUAL 2.201%4.033%5.140%5.798%9.000%9.802% 16.192 17.255 18.209 18.849 19.318 26.699 43.541 43.614 44.931 53.680 58.706 63.208 78.670

Rev. 0 PACKAGE VIII


J
PROGRESS REPORT
A
Y NO
DESCRIPTION UNIT QTY WF %
UNTIL LAST MONTH THIS MONTH UNTIL THIS MONTH
ITEM

A QTY PROGRESS WF % QTY PROGRESS WF % QTY PROGRESS WF %

I PROCUREMENT

P SCOPE OF PT. PP
EX-WORK PORTION (PT. PP)
23,690% 59,168% 12,062% 4,360% 59,168% 16,422%

U ENGINEERING
MECHANICAL
Ls
Ls
1
1
0,953%
6,584%
1
1
90,290%
46,543%
0,860%
3,065%
1
1
5,420%
9,500%
0,052%
0,625%
1
1
95,710%
56,043%
0,912%
3,690%
5%
95%
ELECTRICAL Ls 1 11,521% 1 45,803% 5,277% 1 19,367% 2,231% 1 65,170% 7,508% 95%
R INLAND TRANSPORTATION
SCOPE OF WARTSILA OY
Ls 1 4,631%
51,963%
1 61,746% 2,860%
22,276%
1 31,350% 1,452%
25,013%
1 93,096% 4,311%
47,289%

A FOB PORTION
ENGINEERING Ls 1 2,460% 1 0,000% 0,000% 1 100,000% 2,460% 1 100,000% 2,460% 5%
MECHANICAL Ls 1 43,421% 1 45,000% 19,539% 1 45,000% 19,539% 1 90,000% 39,079% 95%
ELECTRICAL Ls 1 0,680% 1 45,000% 0,306% 1 45,000% 0,306% 1 90,000% 0,612% 95%
INSTRUMENT & CONTROL Ls 1 2,523% 1 45,000% 1,135% 1 45,000% 1,135% 1 90,000% 2,271% 95%
OTHER Ls 1 0,108% 1 45,000% 0,049% 1 45,000% 0,049% 1 90,000% 0,098% 95%
MARINE TRANSPORT (WARTSILA OY) Ls 1 2,771% 1 45,000% 1,247% 1 55,000% 1,524% 1 100,000% 2,771%
SCOPE OF PT. WARTSILA INDONESIA 0,727%
O&M MOBILIZATION PERIOD (PT. WARTSILA INDONESIA) Ls 1 0,727% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%

II CONSTRUCTION WORK, ERECTION & COMMISSIONING (22.440%)

SCOPE OF PT. PP 22,239% 48,626% 10,593% 4,365% 48,626% 14,958% 67,26%


II.1 ENGINEERING 1,112% 1 90,290% 1,004% 1 5,420% 0,060% 1 95,710% 1,064% 5%
II.2 CIVIL AND STRUCTURAL WORKS
A PREPATORY WORKS Ls 1 7,671% 1 65,481% 5,023% 1 25,103% 1,926% 1 90,583% 6,948% 95%
B POWER GENERATION AREA Ls 1 2,351% 1 100,000% 2,351% 1 0,000% 0,000% 1 100,000% 2,351% 95%
PACKAGE C ADMINISTRATION BUILDING Ls 1 0,372% 1 39,000% 0,145% 1 18,000% 0,067% 1 57,000% 0,212% 95%

VIII
D CENTRAL CONTROL BUILDING Ls 1 0,836% 1 21,000% 0,176% 1 54,000% 0,452% 1 75,000% 0,627% 95%
E MECHANICAL FACILITIES Ls 1 1,131% 1 13,450% 0,152% 1 27,500% 0,311% 1 40,950% 0,463% 95%
F ELECTRICAL FACILITIES Ls 1 0,656% 1 67,500% 0,443% 1 17,750% 0,116% 1 85,250% 0,559% 95%
G BALANCE OF PLANT Ls 1 0,808% 1 80,963% 0,654% 1 4,613% 0,037% 1 85,575% 0,691% 95%
H MISCELLANEOUS BUILDINGS & STRUCTURES Ls 1 1,314% 1 8,806% 0,116% 1 16,456% 0,216% 1 25,261% 0,332% 95%
I OTHER FACILITIES Ls 1 0,546% 1 13,800% 0,075% 1 2,000% 0,011% 1 15,800% 0,086% 95%
J SITE FINISHING Ls 1 1,414% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000% 95%
K PILLING WORK Ls 1 0,455% 1 100,000% 0,455% 1 0,000% 0,000% 1 100,000% 0,455% 95%

Rev. 0 PACKAGE VIII


J
PROGRESS REPORT
A
Y NO
ITEM
DESCRIPTION UNIT QTY WF %
QTY
UNTIL LAST MONTH

PROGRESS WF % QTY
THIS MONTH

PROGRESS WF % QTY
UNTIL THIS MONTH

PROGRESS WF %

A II.3 MECHANICAL WORK


A POWER GENERATION PACKAGE Lot 1 1,876% 1 0,000% 0,000% 1 38,925% 0,730% 1 38,925% 0,730%

P B
C
MOBILITY FEATURE
FUEL SUPPLY SYSTEM
Lot
Lot
1
1
0,241%
0,121%
1
1
0,000%
0,000%
0,000%
0,000%
1
1
29,167%
11,550%
0,070%
0,014%
1
1
29,167%
11,550%
0,070%
0,014%

U D
E
F
COMPRESSED AIR SYSTEM
WASTEWATER COLLECTION AND TREATMENT SYSTEM
WATER SUPPLY AND TREATMENT SYSTEM
Lot
Lot
Lot
1
1
1
0,107%
0,080%
0,080%
1
1
1
0,000%
0,000%
0,000%
0,000%
0,000%
0,000%
1
1
1
0,000%
27,900%
27,000%
0,000%
0,022%
0,022%
1
1
1
0,000%
27,900%
27,000%
0,000%
0,022%
0,022%

R G
H
FIRE PROTECTION SYSTEM
LABORATORY AND INSTRUMENTS
Lot
Lot
1
1
0,134%
0,007%
1
1
0,000%
0,000%
0,000%
0,000%
1
1
18,000%
0,000%
0,024%
0,000%
1
1
18,000%
0,000%
0,024%
0,000%

A II.4
I
J
WORKSHOP AND MACHINERY EQUIPMENT
AIR CONDITIONING AND VENTILATION
ELECTRICAL
Lot
Lot
1
1
0,007%
0,027%
1
1
0,000%
0,000%
0,000%
0,000%
1
1
0,000%
0,000%
0,000%
0,000%
1
1
0,000%
0,000%
0,000%
0,000%

A COMPLETE GENERATOR AND MAIN OUTPUT SYSTEM Ls 1 0,143% 1 0,000% 0,000% 1 43,200% 0,062% 1 43,200% 0,062%
B COMPLETE PLANT ELECTRICAL EQUIPMENT Ls 1 0,357% 1 0,000% 0,000% 1 44,725% 0,160% 1 44,725% 0,160%
C COMPLETE POWER TRANSFORMER Lot 1 0,143% 1 0,000% 0,000% 1 45,000% 0,064% 1 45,000% 0,064%
D CONNECTING TO 150 KV SUBSTATION Ls 1 0,071% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
II.5 INSTRUMENTATION & CONTROL

A DISTRIBUTED DIGITAL CONTROL SYSTEM AND PLC CONTROL SYSTEM Ls 1 0,036% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%

B THE CUBICLE AND ACCESSORIES, I/O MODULES Ls 1 0,018% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
C POWER PLANT OPERATION CONTROL DESKS Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
D DIAGNOSTIC SOFTWARE Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
E SUPERVISORY AND PLANT MANAGEMENT SYSTEM Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
F INSTRUMENT VALVE Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
G FIELD INSTRUMENTS Ls 1 0,036% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
PACKAGE H ANALYZER EQUIPMENT Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%

VIII
I FIRE AND GAS DETECTOR Ls 1 0,027% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
INSTRUMENT CABLE, CABLE TRAY, JUNCTION BOX, GLAND, AND
J Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
ACCESSORIES
K INSTRUMENT INSTALLATION BULK MATERIAL AND ACCESSORIES Ls 1 0,009% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
SCOPE OF PT. WARTSILA INDONESIA 1,382% 0,000% 0,000% 0,000% 0,000% 0,000%
II.8 OTHER
A ENGINEERING Ls 1 0,069% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
B TA (TECHNICAL ADVISOR FOR CONSTRUCTION Ls 1 1,070% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%
C CONSUMABLES PER SCHEDULE 1.6 Ls 1 0,243% 1 0,000% 0,000% 1 0,000% 0,000% 1 0,000% 0,000%

Rev. 0 PACKAGE VIII


100,000% 44,931% 33,738% 78,670%