Instrumentation and Control System

The document describes an instrumentation and control system with 4 main sections: 1. Field instrumentations used to measure process variables like temperature, pressure, flow, and level. Transmitters send signals to control panels. 2. A plant control panel houses devices for monitoring, controlling, and operating the plant. It includes interfaces for anti-condensation heaters, ventilation fans, lighting, and more. 3. A plant control system coordinates steam turbine control, monitoring, and hierarchy from total plant down to individual equipment. It includes a central control room and electronic equipment room. 4. Functional control systems manage equipment like the steam turbine, boiler and auxiliary systems, water treatment, emissions monitoring, fire

Uploaded by

ikhsannurrahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
100 views

Instrumentation and Control System

The document describes an instrumentation and control system with 4 main sections: 1. Field instrumentations used to measure process variables like temperature, pressure, flow, and level. Transmitters send signals to control panels. 2. A plant control panel houses devices for monitoring, controlling, and operating the plant. It includes interfaces for anti-condensation heaters, ventilation fans, lighting, and more. 3. A plant control system coordinates steam turbine control, monitoring, and hierarchy from total plant down to individual equipment. It includes a central control room and electronic equipment room. 4. Functional control systems manage equipment like the steam turbine, boiler and auxiliary systems, water treatment, emissions monitoring, fire

Uploaded by

ikhsannurrahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 7

INSTRUMENTATION AND CONTROL SYSTEM

1. FIELD INSTRUMENTATIONS
2. PLANT INSTRUMENT & CONTROL PANEL
3. PLANT CONTROL SYSTEM
4. FUNCTIONAL CONTROL SYSTEM
FIELD INSTRUMENTATIONS

• Field Instrument Installation: Limit Switches, Temperature Measuring Element,


Pressure Measuring Elements, Flow Measuring Elements, Level Measurement Elements, Local Mounted Instrument

• Transmitter
• Control Drive
• Special Measurement Equipment: Vibration measurement, Fire Detector,
Continuous Emission Monitoring System (CEMS), Hazardous Steam Monitors

• Substation Automation System and SCADA


Communication
PLANT INSTRUMENT & CONTROL PANEL
• Panel Function: • Plant Instrumentation and
1. Local Control Panel Control Panel Devices:
2. System Cabinets 1. Anti-Condensation Heater
3. I/O cabinets 2. Ventilation Fan
4. Termination Cabinet 3. Grounding
5. Marshalling Cabinet 4. Interior Lighting
5. Convenience Plug
6. Nameplate
PLANT CONTROL SYSTEM

• Plant Control System Configuration: Steam turbine control and monitoring system , Common control and monitoring system
• Plant Control System Hardware

• Plant Control Hierarchy: Total Plant Control (most integrated control), Sequence Master Control, Grouped Control, Individual Control
(most detailed level)

• Central Control Room: Operator Station; Common Operator Station; Engineering Station; Supervisory
Station; Large screen monitor; Steam Turbine Emergency Push Button, Printer; CEMS Station;, Closed Circuit
Television System (CCTV) Station, Fire Protection and Detection System Station , Adequate proper furniture,
and; Adequate rooms and spaces.

• Electronic Equipment Room (EER): Unit Processor Control System, Interface System, Power Supply System, Common Processor Control
System, Marshalling Cabinet, Input/Output System, I/O wires and termination, Communication control network bus system, Fire wall, Gateway control system
FUNCTIONAL CONTROL SYSTEM

• Steam Turbine Control System:


• AVR supervision
• Supervision of the Medium voltage generator breaker
• Derating of generator
• Exhaust steam ventilation control

• Steam Regulating Unit control, steam leakage test


• Pre-lubrication control
• Pre-heating control
• Generator start/stop sequence and start block
supervision • Cooling 3-way valve control
• Power Monitoring data monitoring • Cooling radiator control
• Protection relay data monitoring

• BOP Control System:


 Water treatment plant
 Waste water treatment plant
 Fire Protection and Detection system
 Fuel oil system
 Emergency diesel generator control
 Fuel steam system
 Etc
 Continuous Emission Monitoring System (CEMS)
Metering
Steam turbine & auxiliary System
controller
PROJECT SCHEDULE