0% found this document useful (0 votes)
188 views78 pages

Final Wbs With Numbering

This document provides a work breakdown structure (WBS) for the redevelopment of Pragati Maidan into an integrated exhibition-cum-convention centre (IECC) in Delhi, India. The WBS includes 6 main work packages - 1) site preparation, 2) substructure, 3) superstructure, 4) services, 5) finishing, and 6) site development. Under the substructure work package, the document lists and provides further breakdown of activities such as earthwork, waterproofing, raft foundation, pile foundation, retaining wall, beams, slabs, and columns/shear walls.

Uploaded by

Raymon Prakash
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views78 pages

Final Wbs With Numbering

This document provides a work breakdown structure (WBS) for the redevelopment of Pragati Maidan into an integrated exhibition-cum-convention centre (IECC) in Delhi, India. The WBS includes 6 main work packages - 1) site preparation, 2) substructure, 3) superstructure, 4) services, 5) finishing, and 6) site development. Under the substructure work package, the document lists and provides further breakdown of activities such as earthwork, waterproofing, raft foundation, pile foundation, retaining wall, beams, slabs, and columns/shear walls.

Uploaded by

Raymon Prakash
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 78

DEPARTMENT OF BUILDING ENGINEERING AND MANAGEMENT,SPA,DELHI 5TH GROUP--PROJECT PLANNING AND SCHEDULING

WBS/ACTIVITY LISTING
IIEC,PRAGATI MAIDAN

APOORV AGARWAL ANUBHA SINGHAL SANDEEP SINGH


THOUFEER MUHAMMED N RAYMON PRAKASH SHINEY ELIZABETH ABRAHAM
1. SITE PREPARATION

(CONVENTION CENTRE &


IECC, PRAGATI MAIDAN
2. SUB STRUCTURE

BASEMENT)
3. SUPER STRUCTURE

4. SERVICES

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION

1.1 SITE & VEGETATION CLEANING

1.2 SITE BARRICADING

1.3 DEMARCATION OF EXCAVATION


1. SITE PREPARATION BOUNDARY
IECC, PRAGATI MAIDAN (CONVENTION

1.4 SETTING UP TEMPORARY


2. SUB STRUCTURE
SERVICES
CENTRE & BASEMENT)

3. SUPER STRUCTURE 1.5 RESOURCE MOBILISATI0ON

4. SERVICES

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION

1.1 SITE & VEGETATION CLEANING 1.4.1 SETTING OF SITE OFFICE

1.2 SITE BARRICADING 1.4.2 SEDIMENTATION TANK

1.3 DEMARCATION OF EXCAVATION


1. SITE PREPARATION 1.4.3 MOBILE TOILETS
BOUNDARY
IECC, PRAGATI MAIDAN (CONVENTION

1.4 SETTING UP TEMPORARY


2. SUB STRUCTURE 1.4.4 ELECTRIC & WATER SUPPLY
SERVICES
CENTRE & BASEMENT)

3. SUPER STRUCTURE 1.5 RESOURCE MOBILISATI0ON 1.4.5 MEDICAL & SAFETY OFFICE

1.4.6 WORKSHOP & MATERIAL


4. SERVICES
TESTING LAB

5. FINISHING 1.4.7 TEMPORARY ACCESS ROAD

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION

1.1 SITE & VEGETATION CLEANING

1.2 SITE BARRICADING

1.3 DEMARCATION OF EXCAVATION


1. SITE PREPARATION
BOUNDARY

1.5.1 SETTING UP TOWER CRANES


IECC, PRAGATI MAIDAN (CONVENTION

1.4 SETTING UP TEMPORARY


2. SUB STRUCTURE
SERVICES
CENTRE & BASEMENT)

1.5.2 SETTING UP BATCHING PLANT

3. SUPER STRUCTURE 1.5 RESOURCE MOBILISATI0ON

1.5.3 MATERIAL STOARAGE AREA

4. SERVICES

1.5.4 VEHICLE FOR RESOURCE


TRANSPORTATION

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2 WATERPROOFING

2.3 RAFT FOUNDATION


(BASEMENT)

1. SITE PREPARATION

2.4 PILE FOUNDATION


(CONVENTION CENTRE)
(CONVENTION CENTRE &
2. SUB STRUCTURE
IECC, PRAGATI MAIDAN

2.5 RETAINING WALL


BASEMENT)

3. SUPER STRUCTURE

2.6 BEAM

4. SERVICES

2.7 SLAB

5. FINISHING

2.8 COLUMNS AND SHEAR


WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1.1 TOP SOIL
EXCAVATION &
STORAGE

2.1.2 SOIL
STABILIZATION
THROUGH ANCHORED
SHEET PILING

2.1.3 EXCAVATION

2.1 EARTHWORK
2.1.4 DEWATERING

2.2 WATERPROOFING 2.1.5 SOIL


COMPACTION
2.3 RAFT FOUNDATION
(BASEMENT) 2.1.6 ANTI TERMITE
1. SITE PREPARATION TREATMENT
(CONVENTION CENTRE &

2.4 PILE FOUNDATION


IECC, PRAGATI MAIDAN

(CONVENTION CENTRE) 2.1.7 BACK FILLING


2. SUB STRUCTURE
2.5 RETAINING WALL
BASEMENT)

3. SUPER STRUCTURE
2.6 BEAM
4. SERVICES
2.7 SLAB
5. FINISHING
2.8 COLUMNS AND
SHEAR WALLS
6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2.1 PROVIDING HDPE


2.2 WATERPROOFING
MEMBRANE WATER PROOFING

2.3 RAFT FOUNDATION


(BASEMENT)

1. SITE PREPARATION

2.4 PILE FOUNDATION


(CONVENTION CENTRE)
(CONVENTION CENTRE &

2. SUB STRUCTURE
IECC, PRAGATI MAIDAN

2.5 RETAINING WALL


BASEMENT)

3. SUPER STRUCTURE

2.6 BEAM

4. SERVICES

2.7 SLAB

5. FINISHING

2.8 COLUMNS AND SHEAR


WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.3.1 PCC LAYING

2.2 WATERPROOFING

2.3.2 SHUTTERING AND


FORMWORKS
2.3 RAFT FOUNDATION
(BASEMENT)

1. SITE PREPARATION 2.3.3 REINFORCEMENTS

2.4 PILE FOUNDATION


(CONVENTION CENTRE)
(CONVENTION CENTRE &

2. SUB STRUCTURE 2.3.4 CONCRETING


IECC, PRAGATI MAIDAN

2.5 RETAINING WALL


BASEMENT)

3. SUPER STRUCTURE

2.6 BEAM

4. SERVICES

2.7 SLAB

5. FINISHING

2.8 COLUMNS AND SHEAR


WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2 WATERPROOFING

2.4.1 BORING

2.3 RAFT FOUNDATION


(BASEMENT)

1. SITE PREPARATION 2.4.2 REINFORCEMENTS

2.4 PILE FOUNDATION


(CONVENTION CENTRE)
(CONVENTION CENTRE &

2. SUB STRUCTURE 2.4.3 CONCRETING


IECC, PRAGATI MAIDAN

2.5 RETAINING WALL


BASEMENT)

2.4.4 PILE CAPS


3. SUPER STRUCTURE

2.6 BEAM

4. SERVICES

2.7 SLAB

5. FINISHING

2.8 COLUMNS AND SHEAR


WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2 WATERPROOFING

2.3 RAFT FOUNDATION


(BASEMENT)
2.5.1 SHUTTERING AND
1. SITE PREPARATION
FORMWORKS
2.4 PILE FOUNDATION
(CONVENTION CENTRE)
(CONVENTION CENTRE &

2. SUB STRUCTURE 2.5.2 REINFORCEMENTS


IECC, PRAGATI MAIDAN

2.5 RETAINING WALL


BASEMENT)

3. SUPER STRUCTURE 2.5.3 CONCRETING

2.6 BEAM

4. SERVICES 2.5.4 WATERPROOFING

2.7 SLAB

5. FINISHING

2.8 COLUMNS AND SHEAR


WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2 WATERPROOFING

2.3 RAFT FOUNDATION


(BASEMENT)

1. SITE PREPARATION

2.4 PILE FOUNDATION


(CONVENTION CENTRE)
(CONVENTION CENTRE &

2. SUB STRUCTURE
IECC, PRAGATI MAIDAN

2.6.1 SHUTTERING AND


2.5 RETAINING WALL
FORMWORKS
BASEMENT)

3. SUPER STRUCTURE

2.6 BEAM 2.6.2 REINFORCEMENTS

4. SERVICES

2.7 SLAB 2.6.3 CONCRETING

5. FINISHING

2.8 COLUMNS AND SHEAR


WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2 WATERPROOFING

2.3 RAFT FOUNDATION


(BASEMENT)

1. SITE PREPARATION

2.4 PILE FOUNDATION


(CONVENTION CENTRE)
(CONVENTION CENTRE &

2. SUB STRUCTURE
IECC, PRAGATI MAIDAN

2.5 RETAINING WALL


BASEMENT)

3. SUPER STRUCTURE

2.7.1 SHUTTERING AND


2.6 BEAM
FORMWORKS

4. SERVICES

2.7 SLAB 2.7.2 REINFORCEMENTS

5. FINISHING

2.8 COLUMNS AND SHEAR


2.7.3 CONCRETING
WALLS

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2.1 EARTHWORK

2.2 WATERPROOFING

2.3 RAFT FOUNDATION


(BASEMENT)
1. SITE PREPARATION
2.4 PILE FOUNDATION
(CONVENTION CENTRE)
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

2.5 RETAINING WALL


BASEMENT)

3. SUPER STRUCTURE

2.6 BEAM

4. SERVICES
2.8.1 SHUTTERING AND
2.7 SLAB
FORMWORKS
5. FINISHING
2.8 COLUMNS AND SHEAR
2.8.2 REINFORCEMENTS
WALLS
6. SITE DEVELOPMENT

2.8.3 CONCRETING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

2. SUB STRUCTURE
2.1 EARTHWORK
Demarcation of the line for sheet piling
Driving of sheet piles inside the soil
Excavate the designated areas
Carry the top soil for preservation
Dewatering through Well Point Dewatering system
Compation of Soil
Application of Anti termite treatment

2.2 WATERPROOFING
Lay cement based treatment
Put layer of cement mortar base mixed with waterproofing compound
Application of twin tape over the waterproofing coat
Place 8mm HDPE Self-Adhessive Membrane

2.3 RAFT FOUNDATION (BASEMENT)


Concreting for PCC
Installation of Formwork
Preparing Reinforcement Cage
Placing Cover Block
Pouring Concrete

2.4 PILE FOUNDATION (CONVENTION CENTRE)


Demarcation of piles on site
Boring at the designated areas through shell and auger technique
Inserting Reinforcement Cage
Pouring Concrete

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.5 RETAINING WALL
Installation of Formwork
Preparing Reinforcement Cage
Placing Cover Block
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)

2.6 BEAM
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)

2.7 SLAB
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Surface Vibrators
Removal of Form Work(Shuttering)

2.8 COLUMNS AND SHEAR WALLS


Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle/Surface Vibrators
Removal of Form Work(Shuttering)

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. PRIMER
2. WATERPROOFING PIPE PENETRATIONS
3. PREPARING WALL/FLOOR
4. INSTALLING FILLETS
5. WATERPROOFING LAYER
6. PROTECTION OF THE WATERPROOFING
LAYER

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARATION

IECC, PRAGATI MAIDAN (CONVENTION


2. SUB STRUCTURE
CENTRE & BASEMENT)

3.1 IN SITU CONSTRUCTION

3. SUPER STRUCTURE

3.2 PRE-FAB CONSTRUCTION

4. SERVICES

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.1.1.1.1 SCAFFOLDING

3.1.1.1.2 PERI
SHUTTERING
3.1.1.1TREE COLUMN
3.1.1.1.3 PLACING OF
3.1.1 COLUMN
REINFORCEMENT
3.1.1.2VERTICAL
1. SITE PREPARATION
COLUMN
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

3.1.2 BEAM 3.1.1.1.4 CONCRETING


2. SUB STRUCTURE
3.1 IN SITU
3.1.3 SLAB
BASEMENT)

CONSTRUCTION
3. SUPER STRUCTURE
3.2 PRE-FAB
3.1.4 WALLS
CONSTRUCTION
4. SERVICES
3.1.5 STAIRCASE &
RAMPS
5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.1.2.1 SCAFFOLDING

3.1.1 COLUMN

1. SITE PREPARATION 3.1.2.2 PERI SHUTTERING

3.1.2 BEAM
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

3.1.2.3 PLACING OF
2. SUB STRUCTURE
REINFORCEMENT
3.1 IN SITU CONSTRUCTION 3.1.3 SLAB
BASEMENT)

3. SUPER STRUCTURE 3.1.2.4 CONCRETING

3.2 PRE-FAB CONSTRUCTION 3.1.4 WALLS

4. SERVICES

3.1.5 STAIRCASE & RAMPS

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.1.1 COLUMN

1. SITE PREPARATION 3.1.3.1 SCAFFOLDING

3.1.2 BEAM
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE 3.1.3.2 PERI SHUTTERING

3.1 IN SITU CONSTRUCTION 3.1.3 SLAB


BASEMENT)

3.1.3.3 PLACING OF
3. SUPER STRUCTURE
REINFORCEMENT
3.2 PRE-FAB CONSTRUCTION 3.1.4 WALLS

4. SERVICES 3.1.3.4 CONCRETING

3.1.5 STAIRCASE & RAMPS

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.1.1 COLUMN

1. SITE PREPARATION

3.1.2 BEAM
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
3.1.4.1 AAC BLOCKS
3.1 IN SITU CONSTRUCTION 3.1.3 SLAB
MASONRY
BASEMENT)

3. SUPER STRUCTURE
3.1.4.2 BRICK WALLS
3.2 PRE-FAB CONSTRUCTION 3.1.4 WALLS
MASONRY
4. SERVICES

3.1.5 STAIRCASE & RAMPS 3.1.4.3 RCC WALLS

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.1.1 COLUMN

1. SITE PREPARATION
(CONVENTION CENTRE & BASEMENT)

3.1.2 BEAM

2. SUB STRUCTURE
IECC, PRAGATI MAIDAN

3.1 IN SITU CONSTRUCTION 3.1.3 SLAB

3. SUPER STRUCTURE

3.2 PRE-FAB CONSTRUCTION 3.1.4 WALLS

4. SERVICES

3.1.5 STAIRCASE & RAMPS

5. FINISHING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.2.1.1 TRANSFERRING OF
STEEL JOISTS
1. SITE PREPARATION
3.2.1.2 SETTING UP OF
CRAWLER CRANE
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
3.2.1.3 INSTALLATION OF
3.1 IN SITU CONSTRUCTION
STEEL JOISTS
BASEMENT)

3.2.1 COMPOSITE DECK


3. SUPER STRUCTURE
FLOORING
3.2.1.4 PLACEMENT OF
3.2 PRE-FAB CONSTRUCTION
STEEL DECK
4. SERVICES 3.2.2 ROOF TRUSS
3.2.1.5 LAYING OF
REINFORCEMENTS
5. FINISHING

3.2.1.6 CONCRETING

6. SITE DEVELOPMENT

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

3.2.2.1 TRANSFER OF STEEL


2. SUB STRUCTURE
MEMBERS
3.1 IN SITU CONSTRUCTION
BASEMENT)

3.2.1 COMPOSITE DECK 3.2.2.2 PLACEMENT AND


3. SUPER STRUCTURE
FLOORING WELDING OF MEMBERS
3.2 PRE-FAB CONSTRUCTION

4. SERVICES 3.2.2 ROOF TRUSS 3.2.2.3 BOLTING AND FIXING

5. FINISHING 3.2.2.4 ROOF SHEETING

6. SITE DEVELOPMENT 3.2.2.5 FINISHING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3. SUPER STRUCTURE
3.1 IN-SITU CONSTRUCTION
3.1.1 Columns (Tree Column)
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)

3.1.2 Columns (Vertical Column)


Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)

3.1.3 Beams
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.1.4 Slabs
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)

3.1.5 Walls
Demarcation of the Wall layout
Cleaning the surface to remove dirt and loose substances
Laying of bricks with mortar using alternate successive courses

3.1.6 Staircases & Ramps


Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Surface Vibrators
Removal of Form Work(Shuttering)

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

3.2 PRE-FABRICATED CONSTRUCTION


3.2.1 COMPOSITE DECK FLOORING
Installation of Formwork
Setting Up Of Crawler Crane
Transferring Of Steel Joists
Installation Of Steel Joists
Placement Of Steel Deck
Preparing Reinforcement Cage
Pouring Concrete
Removal of Form Work(Shuttering)

3.2.2 ROOF TRUSS


Installation of Formwork
Transfer of Steel Members through Crawler Crane
Placement And Joining Of Members
Sheeting
Removal of Form Work(Shuttering)

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION
IECC, PRAGATI MAIDAN (CONVENTION
4.1 HVAC

2. SUB STRUCTURE
CENTRE & BASEMENT)

4.2 ELECTRICAL

3. SUPER STRUCTURE

4.3 PLUMBING

4. SERVICES

4.4 FIRE FIGHTING

5. FINISHING

4.5 BMS

6. SITE DEVELOPMENT

4.6 LIFT AND ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.1.1.1 AHU

4.1.1.2 CHILLER PLANTS

1. SITE PREPARAION 4.1.1 HIGH SIDE

4.1 HVAC
4.1.1.3 COOLING TOWERS
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE 4.1.2 LOW SIDE

4.2 ELECTRICAL 4.1.1.4 PUMPS &


BASEMENT)

EQUIPMENNTS FOR PLANT


3. SUPER STRUCTURE ROOM

4.3 PLUMBING

4. SERVICES

4.4 FIRE FIGHTING

5. FINISHING

4.5 BMS

6. SITE DEVELOPMENT

4.6 LIFT AND ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.1.2.1 PIPING

1. SITE PREPARAION 4.1.1 HIGH SIDE 4.1.2.2 DUCTING

4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE 4.1.2 LOW SIDE 4.1.2.3 FCU

4.2 ELECTRICAL
BASEMENT)

4.1.2.4 RETURN & SUPPLY


3. SUPER STRUCTURE
GRILLS
4.3 PLUMBING
4.1.2.5 SPLIT UNITS
4. SERVICES

4.4 FIRE FIGHTING

5. FINISHING

4.5 BMS

6. SITE DEVELOPMENT

4.6 LIFT AND ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.4 HVAC
Low side
4.4.1 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)
4.4.2 GI metal sheet ducting (Regular and Insulation)
4.4.3 Drain Pipes

High side
4.4.4 Installation of Cooling Towers in the ground floor (Level 1)
4.4.5 Installation of Chiller Plants in the Basement floor (Level 1)
4.4.6 Installation of AHU units on each floor
4.4.7 Fan coil Unit
4.4.8 Packaged Unit Air conditioner

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.2.1.1.1 INSTALLATION
OF TRANSFORMERS

4.2.1.1.2 INSTALLATION
OF HT PANELS
4.2.1.1 INSTLLATION OF
SUBSTATIONS 1,2 &3
4.2.1.1.3 INSTALLATION
OF LT PANELS
1. SITE PREPARAION
4.2.1.1.4 TERMINATION
(CONVENTION CENTRE &

4.1 HVAC
IECC, PRAGATI MAIDAN

,TESTING AND
COMMISIONING
2. SUB STRUCTURE 4.2.1 HIGH SIDE
4.2 ELECTRICAL 4.2.1.2.1 INSTALLATION
BASEMENT)

OF CHIMNEYS
3. SUPER STRUCTURE 4.2.2 LOW SIDE
4.3 PLUMBING 4.2.1.2.2 INSTALLATION
OF COOLING TOWER
4.2.1.2 INSTALLATION OF
4. SERVICES 6 DG SETS
4.4 FIRE FIGHTING
4.2.1.2.3 ATS PANEL
5. FINISHING CONECTION,TESTING
AND COMMISSIONING
4.5 BMS
6. SITE DEVELOPMENT
4.6 LIFT AND
ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION 4.2.2.3.1 FLOOR PANEL


4.2.2.1 CONDUITING &
(CONVENTION CENTRE &

4.1 HVAC CABLE TRAY


IECC, PRAGATI MAIDAN

INSTALLATION
2. SUB STRUCTURE 4.2.1 HIGH SIDE 4.2.2.3.2 PEAK-LDB
4.2.2.2
4.2 ELECTRICAL CABLING,EARTHING &
BASEMENT)

WIRING
3. SUPER STRUCTURE 4.2.2 LOW SIDE 4.2.2.3.3 NON PEAK-LDB
4.2.2.3 PANEL & DB
4.3 PLUMBING
INSTALLATION
4. SERVICES 4.2.2.3.4 UPS- DB
4.2.2.4 TERMINATION
4.4 FIRE FIGHTING ,TESTING AND
COMMISSIONING 4.2.2.3.5 RAW POWER –
5. FINISHING
DB
4.5 BMS
6. SITE DEVELOPMENT 4.2.2.3.6 INVERTOR-DB
4.6 LIFT AND
ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.1 Electrical
Low Side
4.1.1 Conduiting
4.1.2 Installation of busbars
4.1.3 Wiring
4.1.4 Distribution box/MCB
4.1.5 Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
4.1.6 Point wiring (Wiring for light point /fan point/exhaust fan point )
4.1.7 Junction boxes
4.1.8 Switches and sockets
4.1.9 Light fixtures and fans
4.1.10 public addressal system fixtures
4.1.11 Passive LAN wiring
4.1.12 Steel and PVC conduiting

High Side
4.1.13 Installation of transformers 2x 630KVA and 3x1500KVA
4.1.14 Installation of HT panel
4.1.15 Installation of LT panel

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.3.1.1 WATER PUMPS

4.3.1.2 BASEMENT DRAINAGE


PUMPS
1. SITE PREPARAION

4.1 HVAC 4.3.1.3 WATER TANKS


(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

4.2 ELECTRICAL 4.3.1.4 SEWAGE PUMPS


BASEMENT)

3. SUPER STRUCTURE 4.3.1 HIGH SIDE


4.3.1.5 WATER TREATMENT
4.3 PLUMBING
PUMPS
4. SERVICES 4.3.2 LOW SIDE
4.3.1.6 MBR-SEWAGE
4.4 FIRE FIGHTING
TREATMENT PLANT
5. FINISHING
4.3.1.7 STORM WATER
4.5 BMS
DRAINAGE
6. SITE DEVELOPMENT
4.3.1.8 RAIN WATER
4.6 LIFT AND ESCALATORS
HARVESTING TANK

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION

4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

4.2 ELECTRICAL
BASEMENT)

3. SUPER STRUCTURE 4.3.1 HIGH SIDE


4.3.2.1 SANITARY FIXTURE
4.3 PLUMBING
AND FITTINGS
4. SERVICES 4.3.2 LOW SIDE
4.3.2.2 INTERNAL PIPE
4.4 FIRE FIGHTING
LAYOUTS
5. FINISHING

4.5 BMS

6. SITE DEVELOPMENT

4.6 LIFT AND ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.2 Plumbing
Low Side
4.2.1 Water supply pipes
4.2.2 Concealed PVC pipes
4.2.3 Pvc pipes exposed in ducts and terrace
4.2.4 External piping (From main lineto a particular area)
4.2.5 Drainage Pipes (Waste Pipes ,Soil pipes, Vent pipes)
4.2.6 Gratings,Drains and Traps
4.2.7 SWR pipe 110mm dia
4.2.8 Sanitary Installation
4.2.9 Wash basins, WC,urinals ,taps ,health faucets
4.2.10 Pillar Taps ,Valves and heaters
4.2.11 Laying of pipes

High Side
4.2.14 Treated Water Tank (4x200KL)
4.2.15 Installation of Sump Tanks-Rainwater tank(4 X100KL)
4.2.16 Installation of Overhead Domestic Water tank (5Kl)
4.2.17 Installation of Overhead Water tank for AHU (5Kl)
4.2.18 Installation of Pumps
4.2.19 Installation of STP
4.2.20 Construction of Manholes

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION

4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

4.4.1.1 EXTERNAL FIRE


2. SUB STRUCTURE
HYDRANTS
4.2 ELECTRICAL
BASEMENT)

4.4.1.2 CONNECTION TO FIRE


3. SUPER STRUCTURE
TANKS
4.3 PLUMBING
4.4.1.3 EXTERNAL PIPE
4. SERVICES 4.4.1 HIGH SIDE
NETWORK
4.4 FIRE FIGHTING

5. FINISHING 4.4.2 LOW SIDE 4.4.1.4 UG AND OH WATER


TANKS
4.5 BMS
4.4.1.5 INSTALLATION OF
6. SITE DEVELOPMENT
PUMPS
4.6 LIFT AND ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION
(CONVENTION CENTRE &

4.1 HVAC
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
4.2 ELECTRICAL
BASEMENT)

3. SUPER STRUCTURE
4.3 PLUMBING
4. SERVICES 4.4.1 HIGH SIDE
4.4.2.1.1 BEAM
4.4.2.1 FIRE ALARM
4.4 FIRE FIGHTING DETECTORS,SMOKE
SYSTEM
DETECTORS
5. FINISHING 4.4.2 LOW SIDE
4.4.2.2 SPRINKLER
4.5 BMS
SYSTEM
6. SITE DEVELOPMENT
4.6 LIFT AND
ESCALATORS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.3 Fire Fighting


Low side
4.3.1 Pipes for internal wet riser /Down comer system /Headers
4.3.2 External and Internal Hydrant system
4.3.3 Stainless Steel Pipe
4.3.4 Hose Reel ,Axe ,Cabinet
4.3.5 Automatic Sprinkler system
4.3.6 Pendent or Side wall sprinklers
High Side
4.3.7 Installation of underground Fire tank ( 4 x 225KL)
4.3.8 Installation of Overhead Fire Water tank (20Kl)

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION

4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

4.2 ELECTRICAL
BASEMENT)

3. SUPER STRUCTURE

4.3 PLUMBING
4.5.1 LIGHTING
4. SERVICES
INTEGRATION
4.4 FIRE FIGHTING
4.5.2 CCTV SYSTEM
5. FINISHING
INTEGRATION
4.5 BMS
4.5.3 FIRE ALARM SYSTEM
6. SITE DEVELOPMENT
INTEGRATION
4.6 LIFT AND ESCALATORS
4.5.4 ACCESS AND CONTROL
ROOMS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

1. SITE PREPARAION
(CONVENTION CENTRE &

4.1 HVAC
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

4.2 ELECTRICAL
BASEMENT)

3. SUPER STRUCTURE

4.3 PLUMBING

4. SERVICES

4.4 FIRE FIGHTING

5. FINISHING 4.6.1 LIFT INSTALLATION

4.5 BMS
4.6.2 TESTING ,
6. SITE DEVELOPMENT COMMISIONING
&LISENCING
4.6 LIFT AND ESCALATORS
4.6.3 ESCALATOR
INSTALLATION

4.6.4 TESTING
,COMMISIONING AND
LISENCING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE

4.5 Foundations -basement


Construction of Lift pit and machine rooms
Installation of Lift equipments
Escaltors pit
Installation of Escalator equipments

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

5.1.1.1.1 RUBBER
OVERLAY
5.1.1.1. IPS FLOORING
5.1.1.1.2 CARPET FLOOR
TILE/ FIRE RETARDENT
CARPET FLOOR

5.1.1.2.3 POLISHED KOTA


1. SITE PREPARATION STONE FLOORING
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

5.1.1.2.4 ITALIAN
5.1.1.2. STONE MARBLE FLOORING
2. SUB STRUCTURE
FLOORING WITH CARPET OVERLAY
5.1.1. FLOORING
BASEMENT)

5.1.1.2.5 POLISHED
3. SUPER STRUCTURE
GRANITE FLOORING
5.1.3. WALL FINISH
4. SERVICES 5.1.1.3.6 VITRIFIED TILES
5.1. INTERNAL FINISHES 5.1.4. CEILING 5.1.1.3. TILE FLOORING
5. FINISHING 5.1.1.3.7 ANTI STATIC
TILES
5.2. EXTERNAL FINISHES 5.1.5. PARTITIONS 5.1.1.4 SKIRTING
6. SITE DEVELOPMENT
5.1.6. ACCESSORIES

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

1. SITE PREPARATION
(CONVENTION CENTRE &

5.1.1.1VITRIFIED TILE 5.1.1.2.1 WOODEN


IECC, PRAGATI MAIDAN

CLADDING (UPTO 4 FT)


2. SUB STRUCTURE

5.1.1. FLOORING 5.1.1.2 WALL CLADDING


BASEMENT)

5.1.1.2.2 RIGATO/SAND
BLASTED FINISHED
3. SUPER STRUCTURE
NATURAL DHAULPUR
5.1.1.3 FABRIC STONE CLADDING
5.1.3. WALL FINISH
PANELLING (4FT – 8FT)
4. SERVICES
5.1. INTERNAL FINISHES 5.1.4. CEILING 5.1.1.4 PAINTING
5.1.1.5.1 MICRO-
5. FINISHING PERFORATED WOODEN
5.1.1.5 ACOUSTIC PANELLING
5.2. EXTERNAL FINISHES 5.1.5. PARTITIONS
TREATMENT 5.1.1.5.2 0.7 NRC
6. SITE DEVELOPMENT STRETCHED FABRIC
PANRLLING
5.1.6. ACCESSORIES

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

5.1.1.2.1 GYPSUM
BOARD CEILING

1. SITE PREPARATION 5.1.1.2.2 POP FALSE


5.1.1.1 SCAFFOLDING
CEILING
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE 5.1.1.2.3 GRC


5.1.1.2 DECORATED
PANELLING WITH COVE
FALSE CEILING
5.1.1. FLOORING LIGHTS
BASEMENT)

3. SUPER STRUCTURE 5.1.1.2.4 VENEERED


WOODEN FLOATED
5.1.3. WALL FINISH CEILING
4. SERVICES 5.1.1.2.5 ALUMINIUM
5.1. INTERNAL FINISHES 5.1.4. CEILING GRID CEILING

5. FINISHING 5.1.1.3.1 0.7 NRC MICRO


PERFORATED GYP
5.2. EXTERNAL FINISHES 5.1.5. PARTITIONS 5.1.1.3 ACOUSTIC BOARD CEILING
6. SITE DEVELOPMENT TREATMENT CEILING 5.1.1.3.2 ACOUSTUCAL
DESIGNER WOODEN
5.1.6. ACCESSORIES 5.1.1.4 MR GRADE CEILING
GYPSUM GRADE CEILING

5.1.1.5 P5.LASTERING
WITH OBD/ WHITE
WASH

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

5.1.1. FLOORING
BASEMENT)

3. SUPER STRUCTURE

5.1.3. WALL FINISH


5.1.4.1 INSTALLATION OF
4. SERVICES
DOUBLE STUD FRAMEWORK
5.1. INTERNAL FINISHES 5.1.4. CEILING
5.1.4.2 GYPSUM BOARD DRY
5. FINISHING
WALL (STC 55)
5.2. EXTERNAL FINISHES 5.1.5. PARTITIONS
5.1.4.3 ALUMINIUM CURTAIN
6. SITE DEVELOPMENT
WALLS
5.1.6. ACCESSORIES
5.1.4.4 PRE-LAMINATED
MODULAR TOILET PARTITIONS

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
BASEMENT)

3. SUPER STRUCTURE
5.2.1.1 STEEL SUPPORT
FRAME FIXED WITH RCC
STRUCTURE
4. SERVICES 5.2.1 GRC CLADDING
5.2.1.2 FIXING OF GRC PANEL
5.1. INTERNAL FINISHES
TO STEEL SUPPORT FRAME
5. FINISHING 5.2.2 ALUMINIUM CLADDING

5.2. EXTERNAL FINISHES

6. SITE DEVELOPMENT 5.2.3 TERRACE GARDEN

5.2.4 INSTALLATION OF
HELIPAD

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
BASEMENT)

3. SUPER STRUCTURE

5.2.3.1 INSTALLING
GALVANISED STEEL FRAME
4. SERVICES 5.2.1 GRC CLADDING ONTO RCC STRUCTURE

5.1. INTERNAL FINISHES


5.2.3.2 FIXING ALUMINIUM
CLADDING ONTO STEEL
5. FINISHING 5.2.3 ALUMINIUM CLADDING BRACKET

5.2. EXTERNAL FINISHES


5.2.3.3 FIXING ALUMINIUM
CLADDING ONTO GALVANISED
6. SITE DEVELOPMENT 5.2.4 TERRACE GARDEN
STEEL FRAME ATTACHED TO
RCC COLUMN

5.2.5 INSTALLATION OF
HELIPAD

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

IECC, PRAGATI MAIDAN (CONVENTION 1. SITE PREPARATION

2. SUB STRUCTURE
CENTRE & BASEMENT)

3. SUPER STRUCTURE

4. SERVICES 5.2.1 GRC CLADDING

5.1. INTERNAL FINISHES

5. FINISHING 5.2.2 ALUMINIUM CLADDING

5.2. EXTERNAL FINISHES

6. SITE DEVELOPMENT 5.2.3 TERRACE GARDEN

5.2.4 INSTALLATION OF HELIPAD

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

IECC, PRAGATI MAIDAN (CONVENTION 1. SITE PREPARATION

2. SUB STRUCTURE
CENTRE & BASEMENT)

3. SUPER STRUCTURE

4. SERVICES 5.2.1 GRC CLADDING

5.1. INTERNAL FINISHES

5. FINISHING 5.2.2 ALUMINIUM CLADDING

5.2. EXTERNAL FINISHES

6. SITE DEVELOPMENT 5.2.3 TERRACE GARDEN

5.2.4 INSTALLATION OF HELIPAD

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION 6.1.1. SITE WORK
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

6.1.2. CONSTRUCTION OF STEPPED


2. SUB STRUCTURE
AREAS
BASEMENT)

3. SUPER STRUCTURE 6.1.3. LAYING OF GRASS/SHURBS

6.1. LANDSCAPING
6.1.4. LANDSCAPE WORK FOR
4. SERVICES
PATHWAYS
6.2. ROADS

5. FINISHING 6.1.5.EXTERNAL LIGHTING

6.3. BOUNDARY WALL


6.1.6INSALLATION OF FOUNTAIN
6. SITE DEVELOPMENT
AND WATER BODY
6.4. PAVING

6.5. ENTRANCE GATE

6.6. GRADING &


LEVELING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE

6.2.1 EARTH WORK


BASEMENT)

3. SUPER STRUCTURE
6.2.2 FILLING (3 LAYER
6.1. LANDSCAPING
ROLLING)
4. SERVICES

6.2. ROADS 6.2.3 RCC

5. FINISHING

6.3. BOUNDARY WALL 6.2.4 PREPARE SUBGRADE

6. SITE DEVELOPMENT
6.2.5 CONCRETE SUB BASE
6.4. WALK WAY
OVER SUBGRADE

6.5. ENTRANCE GATE

6.6. GRADING & LEVELING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
BASEMENT)

3. SUPER STRUCTURE 6.3.1 EARTH WORK

6.1. LANDSCAPING

4. SERVICES 6.3.2 FOUNDATION

6.2. ROADS

5. FINISHING 6.3.3 BRICKWORK

6.3. BOUNDARY WALL

6. SITE DEVELOPMENT 6.3.4 EARTH BACK FILLING

6.4. WALK WAY


6.3.5 INSTALLATION OF
FENCING
6.5. ENTRANCE GATE

6.3.6 FINISHING

6.6. GRADING & LEVELING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN

2. SUB STRUCTURE
BASEMENT)

3. SUPER STRUCTURE

6.1. LANDSCAPING

4. SERVICES

6.2. ROADS 6.4.1 PCC

5. FINISHING

6.3. BOUNDARY WALL 6.4.2 Brickwork


6. SITE DEVELOPMENT

6.4. WALK WAY


6.4.3 60mm thk
Paver block

6.5. ENTRANCE GATE


6.4.4 60mm thk
Paver block (grass)

6.6. GRADING & LEVELING 6.4.5 Kerb stone

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION

(CONVENTION CENTRE &


IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
BASEMENT)
3. SUPER STRUCTURE
6.1. LANDSCAPING
4. SERVICES
6.2. ROADS
5. FINISHING
6.3. BOUNDARY WALL

6. SITE DEVELOPMENT 6.5.1 GATE FABRICATION


6.4. WALK WAY

6.5.2 FIXING OF GATE


6.5. ENTRANCE GATE
6.5.3 LAYING OF
ELECTRICAL SERVICES
6.6. GRADING &
LEVELING
6.5.4 SURFACE
FINISHING

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
6.EXTERNAL DEVELOPMENT
6.1 LANDSCAPE WORKS
6.1.1 Site Work
6.1.1.1 Cleaning of site
6.1.1.2 Demarcation of area for work
6.1.1.3 Leveling of site
6.1.1.4 Dig trench for installation of plumbing pipes for water circulation
6.1.1.5 Installation of drip irrigation as per design
6.1.1.6 laying of electric wires
6.1.1.7 Installation of light poles
6.1.2 Construction of stepped areas
6.1.2.1 Marking of area
6.1.2.2 Excavation of earth
6.1.2.3 Doing RCC work
6.1.2.4 primary water proofing and protective plaster laying
6.1.2.5 Light weight fill and 100 mm Thk PCC over it
6.1.2.6 30 MM thick stone laying
6.1.3 Laying of grass/Shurbs
6.1.3.1 Marking of area
6.1.3.2 Excavation of earth
6.1.3.3 Doing RCC work
6.1.3.4 Primary water proofing and protective plaster laying
6.1.3.5 Screed laying for slope
6.1.3.6 Secondary water proofing
6.1.3.7 High density polyehyene drainage
6.1.3.8 Earthfilling or cutting as required
6.1.3.9 Laying of grass/Shurbs
6.1.3.10Fertilizing

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
6.1.4 Landscape work for pathways
6.1.4.1 Demarcation and cleaning of surface
6.1.4.2 Installation of curb stone
6.1.4.3 Leveling the surface between curb stone
6.1.4.4 Achieving the desired level of pathway by pouring PCC
6.1.4.5 Laying of interlocking tiles/Stepping stones
6.1.5 External Lighting
6.1.5.1 Excavation for pedestal of light poles
6.1.5.2 constructing pedestal as per detail drawing
6.1.5.3 Fixing the ligh pole to the top of pedestal
6.1.6 Insallation of fountain and water body
6.1.6.1 Demarcation and excavation of the area
6.1.6.2 placing the foundation as per drawing provided
6.1.6.3 Construction of fountain and water bodystructure as per detail drawing provided
6.1.6.4 Installation of wire/conduit for electric motor
6.1.6.5 Finishing the fountain structure as per detail drawing provided

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
6.2 ROADS
6.2.1 Earthwork
6.2.2 Filling (3 layer Rolling)
6.2.3 RCC wok
6.2.4 Preparation of subgrade
6.2.5 laying Concrete Sub base over subgrade
6.3 BOUNDARY WALL
6.3.1 Earthwork
6.3.1.1 Excavation
6.3.1.2 Soil stabilization
6.3.1.3 Ramming of earth
6.3.2 Foundation
6.3.2.1 Laying of PCC bed
6.3.2.2 Centering
6.3.2.3 Construction of footing
6.3.2.4 Laying DPC
6.3.3 Brickwork above ground level
6.3.4 Earth backfilling
6.3.4.1 Backfill at side of foundation
6.3.4.2 Compaction of earth

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
OBSERVATION

DECK SLAB

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
OBSERVATION AND INFERENCES

TRUSSES

450mm

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
ROOF ASSEMBLY DETAIL

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
ROOF ASSEMBLY DETAIL

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
ROOF ASSEMBLY DETAIL

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
WATER PROOFING DETAIL

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
TIMBER PROFILE DETAIL

WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC

You might also like