WBS/ACTIVITY LISTING
IIEC,PRAGATI MAIDAN
BASEMENT)
3. SUPER STRUCTURE
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION
3. SUPER STRUCTURE 1.5 RESOURCE MOBILISATI0ON 1.4.5 MEDICAL & SAFETY OFFICE
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SITE PREPARATION
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
1. SITE PREPARATION
3. SUPER STRUCTURE
2.6 BEAM
4. SERVICES
2.7 SLAB
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1.1 TOP SOIL
EXCAVATION &
STORAGE
2.1.2 SOIL
STABILIZATION
THROUGH ANCHORED
SHEET PILING
2.1.3 EXCAVATION
2.1 EARTHWORK
2.1.4 DEWATERING
3. SUPER STRUCTURE
2.6 BEAM
4. SERVICES
2.7 SLAB
5. FINISHING
2.8 COLUMNS AND
SHEAR WALLS
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
1. SITE PREPARATION
2. SUB STRUCTURE
IECC, PRAGATI MAIDAN
3. SUPER STRUCTURE
2.6 BEAM
4. SERVICES
2.7 SLAB
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
3. SUPER STRUCTURE
2.6 BEAM
4. SERVICES
2.7 SLAB
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
2.4.1 BORING
2.6 BEAM
4. SERVICES
2.7 SLAB
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
2.6 BEAM
2.7 SLAB
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
1. SITE PREPARATION
2. SUB STRUCTURE
IECC, PRAGATI MAIDAN
3. SUPER STRUCTURE
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
1. SITE PREPARATION
2. SUB STRUCTURE
IECC, PRAGATI MAIDAN
3. SUPER STRUCTURE
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.1 EARTHWORK
2.2 WATERPROOFING
2. SUB STRUCTURE
3. SUPER STRUCTURE
2.6 BEAM
4. SERVICES
2.8.1 SHUTTERING AND
2.7 SLAB
FORMWORKS
5. FINISHING
2.8 COLUMNS AND SHEAR
2.8.2 REINFORCEMENTS
WALLS
6. SITE DEVELOPMENT
2.8.3 CONCRETING
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2. SUB STRUCTURE
2.1 EARTHWORK
Demarcation of the line for sheet piling
Driving of sheet piles inside the soil
Excavate the designated areas
Carry the top soil for preservation
Dewatering through Well Point Dewatering system
Compation of Soil
Application of Anti termite treatment
2.2 WATERPROOFING
Lay cement based treatment
Put layer of cement mortar base mixed with waterproofing compound
Application of twin tape over the waterproofing coat
Place 8mm HDPE Self-Adhessive Membrane
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2.5 RETAINING WALL
Installation of Formwork
Preparing Reinforcement Cage
Placing Cover Block
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)
2.6 BEAM
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)
2.7 SLAB
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Surface Vibrators
Removal of Form Work(Shuttering)
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. PRIMER
2. WATERPROOFING PIPE PENETRATIONS
3. PREPARING WALL/FLOOR
4. INSTALLING FILLETS
5. WATERPROOFING LAYER
6. PROTECTION OF THE WATERPROOFING
LAYER
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARATION
3. SUPER STRUCTURE
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.1.1.1.1 SCAFFOLDING
3.1.1.1.2 PERI
SHUTTERING
3.1.1.1TREE COLUMN
3.1.1.1.3 PLACING OF
3.1.1 COLUMN
REINFORCEMENT
3.1.1.2VERTICAL
1. SITE PREPARATION
COLUMN
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
CONSTRUCTION
3. SUPER STRUCTURE
3.2 PRE-FAB
3.1.4 WALLS
CONSTRUCTION
4. SERVICES
3.1.5 STAIRCASE &
RAMPS
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.1.2.1 SCAFFOLDING
3.1.1 COLUMN
3.1.2 BEAM
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
3.1.2.3 PLACING OF
2. SUB STRUCTURE
REINFORCEMENT
3.1 IN SITU CONSTRUCTION 3.1.3 SLAB
BASEMENT)
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.1.1 COLUMN
3.1.2 BEAM
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
3.1.3.3 PLACING OF
3. SUPER STRUCTURE
REINFORCEMENT
3.2 PRE-FAB CONSTRUCTION 3.1.4 WALLS
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.1.1 COLUMN
1. SITE PREPARATION
3.1.2 BEAM
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
3.1.4.1 AAC BLOCKS
3.1 IN SITU CONSTRUCTION 3.1.3 SLAB
MASONRY
BASEMENT)
3. SUPER STRUCTURE
3.1.4.2 BRICK WALLS
3.2 PRE-FAB CONSTRUCTION 3.1.4 WALLS
MASONRY
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.1.1 COLUMN
1. SITE PREPARATION
(CONVENTION CENTRE & BASEMENT)
3.1.2 BEAM
2. SUB STRUCTURE
IECC, PRAGATI MAIDAN
3. SUPER STRUCTURE
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.2.1.1 TRANSFERRING OF
STEEL JOISTS
1. SITE PREPARATION
3.2.1.2 SETTING UP OF
CRAWLER CRANE
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
3.2.1.3 INSTALLATION OF
3.1 IN SITU CONSTRUCTION
STEEL JOISTS
BASEMENT)
3.2.1.6 CONCRETING
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3. SUPER STRUCTURE
3.1 IN-SITU CONSTRUCTION
3.1.1 Columns (Tree Column)
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)
3.1.3 Beams
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
3.1.4 Slabs
Installation of Formwork
Preparing Reinforcement Cage
Pouring Concrete
Compaction of Concrete by using Needle Vibrators
Removal of Form Work(Shuttering)
3.1.5 Walls
Demarcation of the Wall layout
Cleaning the surface to remove dirt and loose substances
Laying of bricks with mortar using alternate successive courses
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARAION
IECC, PRAGATI MAIDAN (CONVENTION
4.1 HVAC
2. SUB STRUCTURE
CENTRE & BASEMENT)
4.2 ELECTRICAL
3. SUPER STRUCTURE
4.3 PLUMBING
4. SERVICES
5. FINISHING
4.5 BMS
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
4.1.1.1 AHU
4.1 HVAC
4.1.1.3 COOLING TOWERS
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
4.3 PLUMBING
4. SERVICES
5. FINISHING
4.5 BMS
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
4.1.2.1 PIPING
4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
4.2 ELECTRICAL
BASEMENT)
5. FINISHING
4.5 BMS
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
4.4 HVAC
Low side
4.4.1 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)
4.4.2 GI metal sheet ducting (Regular and Insulation)
4.4.3 Drain Pipes
High side
4.4.4 Installation of Cooling Towers in the ground floor (Level 1)
4.4.5 Installation of Chiller Plants in the Basement floor (Level 1)
4.4.6 Installation of AHU units on each floor
4.4.7 Fan coil Unit
4.4.8 Packaged Unit Air conditioner
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
4.2.1.1.1 INSTALLATION
OF TRANSFORMERS
4.2.1.1.2 INSTALLATION
OF HT PANELS
4.2.1.1 INSTLLATION OF
SUBSTATIONS 1,2 &3
4.2.1.1.3 INSTALLATION
OF LT PANELS
1. SITE PREPARAION
4.2.1.1.4 TERMINATION
(CONVENTION CENTRE &
4.1 HVAC
IECC, PRAGATI MAIDAN
,TESTING AND
COMMISIONING
2. SUB STRUCTURE 4.2.1 HIGH SIDE
4.2 ELECTRICAL 4.2.1.2.1 INSTALLATION
BASEMENT)
OF CHIMNEYS
3. SUPER STRUCTURE 4.2.2 LOW SIDE
4.3 PLUMBING 4.2.1.2.2 INSTALLATION
OF COOLING TOWER
4.2.1.2 INSTALLATION OF
4. SERVICES 6 DG SETS
4.4 FIRE FIGHTING
4.2.1.2.3 ATS PANEL
5. FINISHING CONECTION,TESTING
AND COMMISSIONING
4.5 BMS
6. SITE DEVELOPMENT
4.6 LIFT AND
ESCALATORS
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
INSTALLATION
2. SUB STRUCTURE 4.2.1 HIGH SIDE 4.2.2.3.2 PEAK-LDB
4.2.2.2
4.2 ELECTRICAL CABLING,EARTHING &
BASEMENT)
WIRING
3. SUPER STRUCTURE 4.2.2 LOW SIDE 4.2.2.3.3 NON PEAK-LDB
4.2.2.3 PANEL & DB
4.3 PLUMBING
INSTALLATION
4. SERVICES 4.2.2.3.4 UPS- DB
4.2.2.4 TERMINATION
4.4 FIRE FIGHTING ,TESTING AND
COMMISSIONING 4.2.2.3.5 RAW POWER –
5. FINISHING
DB
4.5 BMS
6. SITE DEVELOPMENT 4.2.2.3.6 INVERTOR-DB
4.6 LIFT AND
ESCALATORS
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
4.1 Electrical
Low Side
4.1.1 Conduiting
4.1.2 Installation of busbars
4.1.3 Wiring
4.1.4 Distribution box/MCB
4.1.5 Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
4.1.6 Point wiring (Wiring for light point /fan point/exhaust fan point )
4.1.7 Junction boxes
4.1.8 Switches and sockets
4.1.9 Light fixtures and fans
4.1.10 public addressal system fixtures
4.1.11 Passive LAN wiring
4.1.12 Steel and PVC conduiting
High Side
4.1.13 Installation of transformers 2x 630KVA and 3x1500KVA
4.1.14 Installation of HT panel
4.1.15 Installation of LT panel
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
2. SUB STRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARAION
4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
4.2 ELECTRICAL
BASEMENT)
4.5 BMS
6. SITE DEVELOPMENT
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
4.2 Plumbing
Low Side
4.2.1 Water supply pipes
4.2.2 Concealed PVC pipes
4.2.3 Pvc pipes exposed in ducts and terrace
4.2.4 External piping (From main lineto a particular area)
4.2.5 Drainage Pipes (Waste Pipes ,Soil pipes, Vent pipes)
4.2.6 Gratings,Drains and Traps
4.2.7 SWR pipe 110mm dia
4.2.8 Sanitary Installation
4.2.9 Wash basins, WC,urinals ,taps ,health faucets
4.2.10 Pillar Taps ,Valves and heaters
4.2.11 Laying of pipes
High Side
4.2.14 Treated Water Tank (4x200KL)
4.2.15 Installation of Sump Tanks-Rainwater tank(4 X100KL)
4.2.16 Installation of Overhead Domestic Water tank (5Kl)
4.2.17 Installation of Overhead Water tank for AHU (5Kl)
4.2.18 Installation of Pumps
4.2.19 Installation of STP
4.2.20 Construction of Manholes
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARAION
4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARAION
(CONVENTION CENTRE &
4.1 HVAC
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
4.2 ELECTRICAL
BASEMENT)
3. SUPER STRUCTURE
4.3 PLUMBING
4. SERVICES 4.4.1 HIGH SIDE
4.4.2.1.1 BEAM
4.4.2.1 FIRE ALARM
4.4 FIRE FIGHTING DETECTORS,SMOKE
SYSTEM
DETECTORS
5. FINISHING 4.4.2 LOW SIDE
4.4.2.2 SPRINKLER
4.5 BMS
SYSTEM
6. SITE DEVELOPMENT
4.6 LIFT AND
ESCALATORS
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARAION
4.1 HVAC
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
4.2 ELECTRICAL
BASEMENT)
3. SUPER STRUCTURE
4.3 PLUMBING
4.5.1 LIGHTING
4. SERVICES
INTEGRATION
4.4 FIRE FIGHTING
4.5.2 CCTV SYSTEM
5. FINISHING
INTEGRATION
4.5 BMS
4.5.3 FIRE ALARM SYSTEM
6. SITE DEVELOPMENT
INTEGRATION
4.6 LIFT AND ESCALATORS
4.5.4 ACCESS AND CONTROL
ROOMS
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
1. SITE PREPARAION
(CONVENTION CENTRE &
4.1 HVAC
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
4.2 ELECTRICAL
BASEMENT)
3. SUPER STRUCTURE
4.3 PLUMBING
4. SERVICES
4.5 BMS
4.6.2 TESTING ,
6. SITE DEVELOPMENT COMMISIONING
&LISENCING
4.6 LIFT AND ESCALATORS
4.6.3 ESCALATOR
INSTALLATION
4.6.4 TESTING
,COMMISIONING AND
LISENCING
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
SUBSTRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
5.1.1.1.1 RUBBER
OVERLAY
5.1.1.1. IPS FLOORING
5.1.1.1.2 CARPET FLOOR
TILE/ FIRE RETARDENT
CARPET FLOOR
5.1.1.2.4 ITALIAN
5.1.1.2. STONE MARBLE FLOORING
2. SUB STRUCTURE
FLOORING WITH CARPET OVERLAY
5.1.1. FLOORING
BASEMENT)
5.1.1.2.5 POLISHED
3. SUPER STRUCTURE
GRANITE FLOORING
5.1.3. WALL FINISH
4. SERVICES 5.1.1.3.6 VITRIFIED TILES
5.1. INTERNAL FINISHES 5.1.4. CEILING 5.1.1.3. TILE FLOORING
5. FINISHING 5.1.1.3.7 ANTI STATIC
TILES
5.2. EXTERNAL FINISHES 5.1.5. PARTITIONS 5.1.1.4 SKIRTING
6. SITE DEVELOPMENT
5.1.6. ACCESSORIES
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
1. SITE PREPARATION
(CONVENTION CENTRE &
5.1.1.2.2 RIGATO/SAND
BLASTED FINISHED
3. SUPER STRUCTURE
NATURAL DHAULPUR
5.1.1.3 FABRIC STONE CLADDING
5.1.3. WALL FINISH
PANELLING (4FT – 8FT)
4. SERVICES
5.1. INTERNAL FINISHES 5.1.4. CEILING 5.1.1.4 PAINTING
5.1.1.5.1 MICRO-
5. FINISHING PERFORATED WOODEN
5.1.1.5 ACOUSTIC PANELLING
5.2. EXTERNAL FINISHES 5.1.5. PARTITIONS
TREATMENT 5.1.1.5.2 0.7 NRC
6. SITE DEVELOPMENT STRETCHED FABRIC
PANRLLING
5.1.6. ACCESSORIES
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
5.1.1.2.1 GYPSUM
BOARD CEILING
5.1.1.5 P5.LASTERING
WITH OBD/ WHITE
WASH
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
5.1.1. FLOORING
BASEMENT)
3. SUPER STRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
BASEMENT)
3. SUPER STRUCTURE
5.2.1.1 STEEL SUPPORT
FRAME FIXED WITH RCC
STRUCTURE
4. SERVICES 5.2.1 GRC CLADDING
5.2.1.2 FIXING OF GRC PANEL
5.1. INTERNAL FINISHES
TO STEEL SUPPORT FRAME
5. FINISHING 5.2.2 ALUMINIUM CLADDING
5.2.4 INSTALLATION OF
HELIPAD
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
BASEMENT)
3. SUPER STRUCTURE
5.2.3.1 INSTALLING
GALVANISED STEEL FRAME
4. SERVICES 5.2.1 GRC CLADDING ONTO RCC STRUCTURE
5.2.5 INSTALLATION OF
HELIPAD
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
2. SUB STRUCTURE
CENTRE & BASEMENT)
3. SUPER STRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
2. SUB STRUCTURE
CENTRE & BASEMENT)
3. SUPER STRUCTURE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
FINISHING
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION 6.1.1. SITE WORK
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
6.1. LANDSCAPING
6.1.4. LANDSCAPE WORK FOR
4. SERVICES
PATHWAYS
6.2. ROADS
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
3. SUPER STRUCTURE
6.2.2 FILLING (3 LAYER
6.1. LANDSCAPING
ROLLING)
4. SERVICES
5. FINISHING
6. SITE DEVELOPMENT
6.2.5 CONCRETE SUB BASE
6.4. WALK WAY
OVER SUBGRADE
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
BASEMENT)
6.1. LANDSCAPING
6.2. ROADS
6.3.6 FINISHING
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
(CONVENTION CENTRE &
IECC, PRAGATI MAIDAN
2. SUB STRUCTURE
BASEMENT)
3. SUPER STRUCTURE
6.1. LANDSCAPING
4. SERVICES
5. FINISHING
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
1. SITE PREPARATION
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
6.EXTERNAL DEVELOPMENT
6.1 LANDSCAPE WORKS
6.1.1 Site Work
6.1.1.1 Cleaning of site
6.1.1.2 Demarcation of area for work
6.1.1.3 Leveling of site
6.1.1.4 Dig trench for installation of plumbing pipes for water circulation
6.1.1.5 Installation of drip irrigation as per design
6.1.1.6 laying of electric wires
6.1.1.7 Installation of light poles
6.1.2 Construction of stepped areas
6.1.2.1 Marking of area
6.1.2.2 Excavation of earth
6.1.2.3 Doing RCC work
6.1.2.4 primary water proofing and protective plaster laying
6.1.2.5 Light weight fill and 100 mm Thk PCC over it
6.1.2.6 30 MM thick stone laying
6.1.3 Laying of grass/Shurbs
6.1.3.1 Marking of area
6.1.3.2 Excavation of earth
6.1.3.3 Doing RCC work
6.1.3.4 Primary water proofing and protective plaster laying
6.1.3.5 Screed laying for slope
6.1.3.6 Secondary water proofing
6.1.3.7 High density polyehyene drainage
6.1.3.8 Earthfilling or cutting as required
6.1.3.9 Laying of grass/Shurbs
6.1.3.10Fertilizing
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
6.1.4 Landscape work for pathways
6.1.4.1 Demarcation and cleaning of surface
6.1.4.2 Installation of curb stone
6.1.4.3 Leveling the surface between curb stone
6.1.4.4 Achieving the desired level of pathway by pouring PCC
6.1.4.5 Laying of interlocking tiles/Stepping stones
6.1.5 External Lighting
6.1.5.1 Excavation for pedestal of light poles
6.1.5.2 constructing pedestal as per detail drawing
6.1.5.3 Fixing the ligh pole to the top of pedestal
6.1.6 Insallation of fountain and water body
6.1.6.1 Demarcation and excavation of the area
6.1.6.2 placing the foundation as per drawing provided
6.1.6.3 Construction of fountain and water bodystructure as per detail drawing provided
6.1.6.4 Installation of wire/conduit for electric motor
6.1.6.5 Finishing the fountain structure as per detail drawing provided
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
6.2 ROADS
6.2.1 Earthwork
6.2.2 Filling (3 layer Rolling)
6.2.3 RCC wok
6.2.4 Preparation of subgrade
6.2.5 laying Concrete Sub base over subgrade
6.3 BOUNDARY WALL
6.3.1 Earthwork
6.3.1.1 Excavation
6.3.1.2 Soil stabilization
6.3.1.3 Ramming of earth
6.3.2 Foundation
6.3.2.1 Laying of PCC bed
6.3.2.2 Centering
6.3.2.3 Construction of footing
6.3.2.4 Laying DPC
6.3.3 Brickwork above ground level
6.3.4 Earth backfilling
6.3.4.1 Backfill at side of foundation
6.3.4.2 Compaction of earth
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
OBSERVATION
DECK SLAB
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
OBSERVATION AND INFERENCES
TRUSSES
450mm
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
ROOF ASSEMBLY DETAIL
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
ROOF ASSEMBLY DETAIL
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
ROOF ASSEMBLY DETAIL
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
WATER PROOFING DETAIL
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC
TIMBER PROFILE DETAIL
WBS
RE-DEVELOPMENT OF PRAGATI MAIDAN INTO IECC