The document summarizes the findings of a safety audit conducted at BPSCL, Bokaro. It notes some positive safety practices currently in place, but identifies several areas of improvement needed to fulfill statutory safety provisions. Key issues found include a lack of occupational health facilities, inadequate emergency response capabilities, and general housekeeping problems across the plant. Recommendations are provided to address deficiencies, strengthen safety management systems, and improve safety culture.

Uploaded by

Nicholas Davis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views13 pages

PP Audit Rep 2018 BPSCL

The document summarizes the findings of a safety audit conducted at BPSCL, Bokaro. It notes some positive safety practices currently in place, but identifies several areas of improvement needed to fulfill statutory safety provisions. Key issues found include a lack of occupational health facilities, inadequate emergency response capabilities, and general housekeeping problems across the plant. Recommendations are provided to address deficiencies, strengthen safety management systems, and improve safety culture.

Uploaded by

Nicholas Davis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Executive Summary of Safety

Audit for BPSCL, Bokaro

1
Good safety practices prevailing:
 
• Positive & supportive attitude by all employees towards
safety.
• All Safety documents are maintained in Safety Deptt.
• Safety issues are discussed in the Daily Planning
Meeting.
• Daily safety inspections are carried out by the Safety
Officer.
• Use of Safety Helmets with Chin Straps on.
• Submission of Online Annual return on safety to Factory
Inspectorate.

2
Statutory Provisions required to be fulfilled
Sl. No Statutory points / issues Observations Recommendations
1 Safety Manual & Policy as per Factories Safety Manual is To be approved and
Act & CEA Regulation-2011 prepared and Policy to be displayed
submitted to CEO at site
2 On Site Emergency Plan and Mock Emergency Plan is To be approved by
Drill, prepared and CIF, Jharkhand
(MSIHC Rule) submitted to CEO.
3 Constitution of Plant Safety Committee Committee Equal representation
and meetings(Factories Act- Sec 41G) constituted and of management as
regular meetings well as workers
are organized. should be there.
4 Inspection and testing of Lifting tools Done by Display of SWL, Next
and tackles/Lifts & Hoists(Factories Act- Competent Person due date to be done.
Sec 28 & 29) in July-2018. Copy of all such test
reports should be
available in Safety
Department

5 Establishment of Occupational Health OHC is not No qualified Doctor.


Centre and posting of Qualified established.
Medical Officer(Factories Act- Sec 41C)
3
Statutory Provisions required to be fulfilled
Sl. No Statutory points / issues Observations Recommendations
6 Provision of First Aid Centre and First Aid center is not At least one First aid
First Aid Boxes at Plant established with center should be
area(Factories Act- Sec 45) trained Pharmacist and established.
First Aider. But first aid
boxes are deployed at
various locations of
plant.

7 Reporting of Head of Safety Manager (Safety) is Head of Safety should


(As per Factories Act- Sec 40B) reporting to DGM report directly to CEO
(Maint) (BPSCL)
8 Safety of Building & Structures Done as per Statutory This is to be done
(Factories Act-Sec 40) requirement in July every year.
2018
9 Deployment of Electrical Inspector No electrical inspector Electrical Inspector to
(CEA Regulation) is deployed. be deployed as per
CEA regulation 2011
10 Welfare Officer (Factories Act- Sec No welfare officer is Welfare officer to be
49) deployed. deployed as per
Factories Act- Sec 49
4
System Improvement:
 
• Cross Functional Safety Team – Concept may be
implemented for further improvement in OSH system.
• Display of Safety instructions / messages throughout the
plant in local language.
• Safety Park / Safety Centre may be established.
• Capacity building of safety professionals.
• Specific budget allocation / Imprest money for Safety
Department

5
General observations
• Growth of heavy grasses & bushes inside entire plant &
peripheral area.
• Accumulation of Scraps and unwanted material
scattered in entire plant,
• Conveyor belt scrap accumulated near Hammer crusher
behind SMS II bursting yard which is prone to Fire
hazard
• All the structure and metallic parts are either rusted /
corroded or discolored need urgent repainting.
• Growth of grasses and vegetation on roof tops of boiler
and turbine main building, conveyor gallery ,window
sheds & all temporary sheds.
• Temporary stores and sheds below gas pipeline behind
GMI/c PP’s office and ID & FD fan area
6
• Almost All the doors ,windows , structures and Equipments are
found having thick coat of dust
• Lack of Safety display boards, signage and area identification
boards in entire plants
• Exclusive agency for Fire protection and prevention needs to be
engaged to take care of fire eventualities. Static water tank,
jockey pumps, fire tenders are not available in the plant.
• Trench covers found missing in many areas in entire Power Plant
• Two level crossings are found without manning.

7
Site Observations

8
A. Switch yard:
 
• Wild vegetation inside the switch yard.
• Entry gate should be in closed position.
• Proper Display of “un authorized entry restricted “to be made
 
 
B. TG Building: (I – VIII)
 
• Unguarded trench and openings at various locations at “0” mtr.
• Electrical panel boards without back covers
• Loose wires with temp. Joints lying on ground
• Connection taken from boards without plug top
• H2 cylinder Manifold rooms found in open condition.
• Motor Earthing found missing in some cases
• T.G Hall out side wall towards Boiler found totally damaged
because of seepage of Water. 9
C. PTW system: (UCR)
• LOTO system is not implemented.
• One single format for all types of permits.
• Format is not matching with the present situation, needs review
• Checklist for different types of jobs can be made to ensure better safety.
• Safety department should be involved in permit checking
• Fire protection system in UCR to be installed (Inert Gas system)
 
D. Boiler: (I – V)
• Extended / projected rods / channels at number of locations in Zero meter
• Temporary welding sheds (Unit # I – V) needs to be removed
• All platforms and walk ways should have toe guards
• Very bad house keeping in front of defunct lifts
• All opening should be adequately covered or guarded
• Obstruction in front of stair case going down to be removed
• Damaged and hanging insulation on coal pipe lines at various location
• Shabby cabling at different locations
• Damaged stair case and hand rails at various elevations/locations
• Coupling guards and motor terminal boards missing in AC plant room motor at
13 meter.
• Electrical panel boards without back covers
• All ID Fan coupling Guards are not there 10
E. FOS :
• No display Board near Unloading area for Furnace Oil Tank ,
• Foam Pouring System is not available for Fire Fighting.
• Sprinkler network for external cooling of tank is also not installed.
• Lot of wild vegetation found inside dyke area.
• Oil Tank earthing and lightning arrester found missing.

F. WCTP Plant :
• Repainting of display board near entry gate to be done
• No Eye shower installed in entire WCTP plant
• No insulating Rubber mats found in front of control panel
• Loose & Temp. wires found everywhere in very shabby condition.
• Proper Dos & Donts to be displayed in local language

11
G. CHP Area :
• Housekeeping to be improved in crusher house & all conveyor
galleries.
• Lot of coal dust accumulated on various floors of crusher house
• DE system to be made functional
• Photo cell barrier on both side of wagon tippler may be installed for
restriction of trespassers
• Water sprinkling system is not available in conveyor galleries
• Water logging seepage, slippery floors of walkways in almost all
conveyor galleries
• Roof ceiling found damage at many places of gallery & below gallery
• Barricading near entrance of Track Hopper to be provided
• No Warning boards & public alarm system found in this area .
• Speed of the Coal Rake found higher and unsafe
• Workers are engaged for clearing of boulders from the grating area
which was found very unsafe.
• Wagon is in tilted position for almost half an hour instead of 3
minutes cycle which is another dangerous situation.
• Caution boards to be displayed on either sides of railway track 12