BTS installation Position > Internal Only
Front aligned of the BTS Must be done with the adjacent rack
Correct alignment incorrect alignment
The vertical deviation of the cabinets shall not exceed 1‰ of the cabinet height.
The front side of the same row of cabinets shall be on the same surface, with a deviation
not more than 5mm allowed.
The first cabinets of all the rows shall also be on the same surface, with a deviation not
more than 5mm allowed.
© ZTE Corporation. All rights
reserved.
Procedure for BTS Grouting > Internal Only
• Select the installation position as per the design documents.
Minimum required gap with the adjacent rack should be 100mm.
• Do marking with the marking template.
Marks for drilling
Measurement
Marking
Use drill machine to make holes for expansion bolts.
Fastener at hole
Hammering
Drilling Holes
© ZTE Corporation. All rights
reserved.
BTS Grouting continued > Internal Only
Tight bolt fully Remove bolt
Put insulation pad Fix base plate using
b/w Base and floor. fastener
© ZTE Corporation. All rights
reserved.
Check Insulation
> Internal Only
© ZTE Corporation. All rights
reserved.
Fix the cabinet. > Internal Only
Use isolation pad between floor and BTS. 1- Bolt
Expansion bolts must be installed properly. 2- Spring washer
Washers must be installed in correct order i.e. 3- Flat washer
Insulation washer >Flat washer>Spring 4- Insulation
washer>Nut . washer
© ZTE Corporation. All rights
reserved.
• Check Vertical and Horizontal Leveling errors > Internal Only
Horaizontal Leveling Error check
by Spirit level
VERTICAL
© ZTE Corporation. All rights
reserved.
Installation of RU cards > Internal Only
Correct process of card installation
Wrong process
X
© ZTE Corporation. All rights
reserved.
Internal Cable routing and connections > Internal Only
1st
2nd
3rd
(Confirm with plan)
Sec Sec Sec
Reserved for expansion
(Use dummy cards)
© ZTE Corporation. All rights
reserved.
SA cable > Internal Only
SA cable: with SCSI50 connector at one end and three connectors
(DB44, DB9, DB25) at the other end.
© ZTE Corporation. All rights
reserved.
Install SA connector > Internal Only
SA E1 cable External
CO alarm
N NEC
TOR cable
SA Ground
cable
SA ground
connection
© ZTE Corporation. All rights
reserved.
Power cable introduction > Internal Only
“-48V” power cable Protection Ground cable
“-48V RTN” power cable
> Blue, > Yellow-Green
> Black,
Hot shrink tubes
Copper Lugs
Same diameter
according to power
cable
© ZTE Corporation. All rights
reserved.
Lug Preparation Note : Use correct size of crimping tool, > Internal Only
Dia of crimping tool should be same as cable diameter
Crimping tool
Lug
Core cable Correct (black on black)
Lug
X
Wrong
Note : Use same color Hot shrinkable tube © ZTE Corporation. All rights
reserved.
PGND Cable Installation > Internal Only
At BTS At IGB
© ZTE Corporation. All rights
reserved.
Power connections > Internal Only
AT BTS
63 Amp
MCB
© ZTE Corporation. All rights
reserved.
Power cable installation (Black color -48VRTN) > Internal Only
One end at “-48VRTN” point at Other end of Black cable needs to connect
BTS PDU on +ve bus bar of SMPS/DCDB
© ZTE Corporation. All rights
reserved.
Power cable routing > Internal Only
Use white ties at regular intervals
Power cable entry to BTS
Wrong
Extra power cable length should not be coiled
must be cut. © ZTE Corporation. All rights
reserved.
> Internal Only
Cable routing at BTS
Tie spacing 200mm,
Use Only
white tie inside
shelter
Diversity
Main
© ZTE Corporation. All rights
reserved.
DDF Installation
> Internal Only
From Tx Rack From BTS
Height 1.5 mts from floor
GND cable rout Check level with sprit level
© ZTE Corporation. All rights
reserved.
Labeling > Internal Only
All equipments & cables must be labeled for identification and easy maintenance.
The labels of cable are filled in and stuck correctly and reliably. They must be tidy
position and same direction. They must be stuck on a position 2 cm away from their
connectors. They can be made in a uniform way according to customer requirement.
Power cable (remote) Power cable (local)
‘R’ marked on labels is short for ‘Remote’.
Generally, it is on the left of the label. ‘L’ is
POWER CABLE ( R ) POWER CABLE ( L )
for ‘Local’ and usually on the right of the ZXDU 300 GND BTS GND
label.
Equipment name Power ground Equipment name Power ground
© ZTE Corporation. All rights
reserved.
Examples of power cable labeling > Internal Only
At BTS end At SMPS
At IGB
MCB labeling
© ZTE Corporation. All rights
reserved.
Example of E-1, alarm, RS232 cables
> Internal Only
Labeling of E1,Ex-
Alarm,RS 232 Cable
at BTS
Labeling of PGND,Ex-Alarm & RS-232
Cable at DDF
© ZTE Corporation. All rights
reserved.
Antenna & Feeder Installation > Internal Only
© ZTE Corporation. All rights
reserved.
Safety rules for antenna & feeder installation > Internal Only
Wear safety belt,
Helmet & safety
shoes
Work on the tower
carefully
© ZTE Corporation. All rights
reserved.
Antenna Pole mount Position
> Internal Only
Installation of antenna shall be below the lightning rod and within its
protective range.
The protective angle in the plains shall not be more than 45° and in the mountains not more
than 30°.
© ZTE Corporation. All rights
reserved.
Check points (to be check before mounting antenna)- > Internal Only
Check Mount height,
(From mount Center to ground)
Check Mount Orientation
Check Mount tilt should be 0
All above check results should match
to Site RF plan
Ensure mount fixing is proper & 2
nuts are used for fixing.
© ZTE Corporation. All rights
reserved.
Installation- > Internal Only
1. Assemble the antenna 2. Connect ½” RF Jumpers
clamps.
3. Do the weather proofing on connectors
© ZTE Corporation. All rights
reserved.
> Internal Only
Weather proofing process-
1- Wrap three layer of insulation tape on connector
2- Wrap three layers of water-proof daub
3- Finally, wrap three layer of insulation tape again.
Wrapping requirement: Wrap one layer from bottom upward, one
layer from top to bottom, and finally one layer from bottom
upward. When wrapping the tape or daub, make sure that the
upper layer covers 1/3 of the lower layer. The daub must be
stretched to 50%. The tape must be wrapped smoothly.
© ZTE Corporation. All rights
reserved.
Mounting of Antenna & Feeder > Internal Only
Process for antenna &
feeder mounting
Pulley block
Feeder head
bandage
Label
T ie the pull-up rope
0.4m and 3.4m away
from the feeder
Pull the feeder away from
the iron tower with this
rope to avoid damage to
the feeder or feeder head
Pull-up rope
© ZTE Corporation. All rights
reserved.
. Fix the antenna. As per plan > Internal Only
2. Set Azimuth according to plan
Maximum interval between two
feeder clamps should not increase
more than 1~1.5 meters.
Jumper must be routed
300mm straight at the connectors.
Bending radius should not be less than 20times
of the feeder diameter.
© ZTE Corporation. All rights
reserved.
7/8 inch feeder cable connector03 > Internal Only
Figure
13-7 © ZTE Corporation. All rights
reserved.
7/8 inch feeder cable connector04 > Internal Only
© ZTE Corporation. All rights
reserved.
7/8 inch feeder cable connector > Internal Only
© ZTE Corporation. All rights
reserved.
7/8 inch feeder cable connector06 > Internal Only
© ZTE Corporation. All rights
reserved.
> Internal Only
Cable stacker
© ZTE Corporation. All rights
reserved.
Feeder installation > Internal Only
1. Distance between two clamps should be 1~1.5 meter.
3. Feeder bending should be smooth & radius
shouldn’t be less than 20d (d=diameter of feeder).
2. Water drip arch must be given at
the feeder window
4. Feeder window must be seal to avoid water inside the shelter
© ZTE Corporation. All rights
reserved.
> Internal Only
Grounding clipper
© ZTE Corporation. All rights
reserved.
Grounding Clip installation > Internal Only
For feeder length <20 meters 2nd is near the outdoor feeder window
1st Ground point within 1.5 m from the point and connected to the outdoor ground
where it leaves the iron tower or the rooftop; bar;
Within 1.5 mts of
© ZTE Corporation. All rights
reserved.
Use Conflux bar if IGB/EGB not available > Internal Only
© ZTE Corporation. All rights
reserved.
Grounding Clip installation > Internal Only
For feeder length 20m < its length ≤ 60m,
Add a ground point with 2m from the point where it leaves the
iron tower or the rooftop;
Within 1.5 mts of
If feeder length is more than 60 mts, add one grounding at every 20 mts
© ZTE Corporation. All rights
reserved.
Standard Grounding > Internal Only
© ZTE Corporation. All rights
reserved.
Antenna, feeder & jumper connections > Internal Only
© ZTE Corporation. All rights
reserved.
RF Jumper & Feeder labels > Internal Only
RF Jumper & Feeder Labeling Scheme For Aircel UPE
2G SECTOR -1 2G SECTOR-2 2G SECTOR-3
TX/RX RX TX/RX RX TX/RX RX
S-1 ANT-1 S-1 ANT-2 S-2 ANT-1 S-2 ANT-2 S-3 ANT-1 S-3 ANT-2
3G SECTOR -1 3G SECTOR-2 3G SECTOR-3
TX/RX RX TX/RX RX TX/RX RX
S-4 ANT-1 S-4 ANT-2 S-5 ANT-1 S-5 ANT-2 S-6 ANT-1 S-6 ANT-2
Available Labels for RF Jumpers & Feeders
© ZTE Corporation. All rights
reserved.
Feeder & Jumper Labels > Internal Only
Feeder & Jumper cable labels must have minimum 200mm distance from their connector.
Distance needs to modify
200mm 200mm