ZTE 3 ZXSDR BS8800 Installation Criterion V2.0

The document provides installation criteria for ZXSDR BS8800 equipment. It details guidelines for: 1) Properly aligning equipment racks with no more than 1‰ vertical deviation and 5mm horizontal deviation between cabinets and rows. 2) Preparing foundation bolts and ensuring proper insulation, order of washers, and tightening of bolts to securely mount cabinets. 3) Guidelines for internal cable routing and connections, including reserving space for expansion and using dummy cards. 4) Labeling all equipment and cables clearly for identification and maintenance.

Uploaded by

Vikas ruhela
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views45 pages

ZTE 3 ZXSDR BS8800 Installation Criterion V2.0

The document provides installation criteria for ZXSDR BS8800 equipment. It details guidelines for: 1) Properly aligning equipment racks with no more than 1‰ vertical deviation and 5mm horizontal deviation between cabinets and rows. 2) Preparing foundation bolts and ensuring proper insulation, order of washers, and tightening of bolts to securely mount cabinets. 3) Guidelines for internal cable routing and connections, including reserving space for expansion and using dummy cards. 4) Labeling all equipment and cables clearly for identification and maintenance.

Uploaded by

Vikas ruhela
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 45

ZXSDR BS8800 Installation Criterion

Updated Date
18 Dec 2010
BTS installation Position > Internal Only

 Front aligned of the BTS Must be done with the adjacent rack

Correct alignment incorrect alignment


 The vertical deviation of the cabinets shall not exceed 1‰ of the cabinet height.
 The front side of the same row of cabinets shall be on the same surface, with a deviation
not more than 5mm allowed.
 The first cabinets of all the rows shall also be on the same surface, with a deviation not
more than 5mm allowed.
© ZTE Corporation. All rights
reserved.
Procedure for BTS Grouting > Internal Only

• Select the installation position as per the design documents.


Minimum required gap with the adjacent rack should be 100mm.
• Do marking with the marking template.

Marks for drilling

Measurement
Marking
Use drill machine to make holes for expansion bolts.

Fastener at hole

Hammering
Drilling Holes
© ZTE Corporation. All rights
reserved.
BTS Grouting continued > Internal Only

Tight bolt fully Remove bolt

Put insulation pad Fix base plate using


b/w Base and floor. fastener
© ZTE Corporation. All rights
reserved.
Check Insulation
> Internal Only

© ZTE Corporation. All rights


reserved.
Fix the cabinet. > Internal Only

 Use isolation pad between floor and BTS. 1- Bolt


 Expansion bolts must be installed properly. 2- Spring washer
 Washers must be installed in correct order i.e. 3- Flat washer
 Insulation washer >Flat washer>Spring 4- Insulation
washer>Nut . washer
© ZTE Corporation. All rights
reserved.
• Check Vertical and Horizontal Leveling errors > Internal Only

Horaizontal Leveling Error check


by Spirit level

VERTICAL

© ZTE Corporation. All rights


reserved.
Installation of RU cards > Internal Only

Correct process of card installation

Wrong process

X
© ZTE Corporation. All rights
reserved.
Internal Cable routing and connections > Internal Only

1st
2nd
3rd
(Confirm with plan)
Sec Sec Sec
Reserved for expansion
(Use dummy cards)

© ZTE Corporation. All rights


reserved.
SA cable > Internal Only

SA cable: with SCSI50 connector at one end and three connectors


(DB44, DB9, DB25) at the other end.
© ZTE Corporation. All rights
reserved.
Install SA connector > Internal Only

SA E1 cable External
CO alarm
N NEC
TOR cable

SA Ground
cable

SA ground
connection

© ZTE Corporation. All rights


reserved.
Power cable introduction > Internal Only

“-48V” power cable Protection Ground cable


“-48V RTN” power cable
> Blue, > Yellow-Green
> Black,

Hot shrink tubes


Copper Lugs
Same diameter
according to power
cable

© ZTE Corporation. All rights


reserved.
Lug Preparation Note : Use correct size of crimping tool, > Internal Only

Dia of crimping tool should be same as cable diameter

Crimping tool

Lug

Core cable Correct (black on black)


Lug

X
Wrong

Note : Use same color Hot shrinkable tube © ZTE Corporation. All rights
reserved.
PGND Cable Installation > Internal Only

At BTS At IGB

© ZTE Corporation. All rights


reserved.
Power connections > Internal Only

AT BTS

63 Amp
MCB

© ZTE Corporation. All rights


reserved.
Power cable installation (Black color -48VRTN) > Internal Only

One end at “-48VRTN” point at Other end of Black cable needs to connect
BTS PDU on +ve bus bar of SMPS/DCDB
© ZTE Corporation. All rights
reserved.
Power cable routing > Internal Only

 Use white ties at regular intervals

 Power cable entry to BTS

Wrong
 Extra power cable length should not be coiled
must be cut. © ZTE Corporation. All rights
reserved.
> Internal Only

Cable routing at BTS


Tie spacing 200mm,

Use Only
white tie inside
shelter

Diversity

Main

© ZTE Corporation. All rights


reserved.
DDF Installation
> Internal Only

From Tx Rack From BTS

Height 1.5 mts from floor


GND cable rout Check level with sprit level
© ZTE Corporation. All rights
reserved.
Labeling > Internal Only

 All equipments & cables must be labeled for identification and easy maintenance.
 The labels of cable are filled in and stuck correctly and reliably. They must be tidy
position and same direction. They must be stuck on a position 2 cm away from their
connectors. They can be made in a uniform way according to customer requirement.

Power cable (remote) Power cable (local)


‘R’ marked on labels is short for ‘Remote’.
Generally, it is on the left of the label. ‘L’ is
POWER CABLE ( R ) POWER CABLE ( L )
for ‘Local’ and usually on the right of the ZXDU 300 GND BTS GND
label.
Equipment name Power ground Equipment name Power ground

© ZTE Corporation. All rights


reserved.
Examples of power cable labeling > Internal Only

At BTS end At SMPS

At IGB

MCB labeling

© ZTE Corporation. All rights


reserved.
Example of E-1, alarm, RS232 cables
> Internal Only

Labeling of E1,Ex-
Alarm,RS 232 Cable
at BTS

Labeling of PGND,Ex-Alarm & RS-232


Cable at DDF

© ZTE Corporation. All rights


reserved.
Antenna & Feeder Installation > Internal Only

© ZTE Corporation. All rights


reserved.
Safety rules for antenna & feeder installation > Internal Only

Wear safety belt,


Helmet & safety
shoes

Work on the tower


carefully

© ZTE Corporation. All rights


reserved.
Antenna Pole mount Position
> Internal Only

Installation of antenna shall be below the lightning rod and within its
protective range.
The protective angle in the plains shall not be more than 45° and in the mountains not more
than 30°.
© ZTE Corporation. All rights
reserved.
Check points (to be check before mounting antenna)- > Internal Only

Check Mount height,


(From mount Center to ground)

Check Mount Orientation


Check Mount tilt should be 0
All above check results should match
to Site RF plan

Ensure mount fixing is proper & 2


nuts are used for fixing.
© ZTE Corporation. All rights
reserved.
Installation- > Internal Only

1. Assemble the antenna 2. Connect ½” RF Jumpers


clamps.
3. Do the weather proofing on connectors

© ZTE Corporation. All rights


reserved.
> Internal Only

Weather proofing process-


1- Wrap three layer of insulation tape on connector
2- Wrap three layers of water-proof daub
3- Finally, wrap three layer of insulation tape again.
Wrapping requirement: Wrap one layer from bottom upward, one
layer from top to bottom, and finally one layer from bottom
upward. When wrapping the tape or daub, make sure that the
upper layer covers 1/3 of the lower layer. The daub must be
stretched to 50%. The tape must be wrapped smoothly.
© ZTE Corporation. All rights
reserved.
Mounting of Antenna & Feeder > Internal Only

Process for antenna &


feeder mounting
Pulley block

Feeder head
bandage
Label
T ie the pull-up rope
0.4m and 3.4m away
from the feeder
Pull the feeder away from
the iron tower with this
rope to avoid damage to
the feeder or feeder head
Pull-up rope

© ZTE Corporation. All rights


reserved.
. Fix the antenna. As per plan > Internal Only

2. Set Azimuth according to plan

Maximum interval between two


feeder clamps should not increase
more than 1~1.5 meters.

Jumper must be routed


300mm straight at the connectors.
Bending radius should not be less than 20times
of the feeder diameter.
© ZTE Corporation. All rights
reserved.
7/8 inch feeder cable connector03 > Internal Only

Figure
13-7 © ZTE Corporation. All rights
reserved.
7/8 inch feeder cable connector04 > Internal Only

© ZTE Corporation. All rights


reserved.
7/8 inch feeder cable connector > Internal Only

© ZTE Corporation. All rights


reserved.
7/8 inch feeder cable connector06 > Internal Only

© ZTE Corporation. All rights


reserved.
> Internal Only

Cable stacker

© ZTE Corporation. All rights


reserved.
Feeder installation > Internal Only

1. Distance between two clamps should be 1~1.5 meter.

3. Feeder bending should be smooth & radius


shouldn’t be less than 20d (d=diameter of feeder).
2. Water drip arch must be given at
the feeder window

4. Feeder window must be seal to avoid water inside the shelter


© ZTE Corporation. All rights
reserved.
> Internal Only

Grounding clipper

© ZTE Corporation. All rights


reserved.
Grounding Clip installation > Internal Only

For feeder length <20 meters 2nd is near the outdoor feeder window
1st Ground point within 1.5 m from the point and connected to the outdoor ground
where it leaves the iron tower or the rooftop; bar;

Within 1.5 mts of

© ZTE Corporation. All rights


reserved.
Use Conflux bar if IGB/EGB not available > Internal Only

© ZTE Corporation. All rights


reserved.
Grounding Clip installation > Internal Only

For feeder length 20m < its length ≤ 60m,


Add a ground point with 2m from the point where it leaves the
iron tower or the rooftop;

Within 1.5 mts of


If feeder length is more than 60 mts, add one grounding at every 20 mts
© ZTE Corporation. All rights
reserved.
Standard Grounding > Internal Only

© ZTE Corporation. All rights


reserved.
Antenna, feeder & jumper connections > Internal Only

© ZTE Corporation. All rights


reserved.
RF Jumper & Feeder labels > Internal Only

RF Jumper & Feeder Labeling Scheme For Aircel UPE


2G SECTOR -1 2G SECTOR-2 2G SECTOR-3
TX/RX RX TX/RX RX TX/RX RX
S-1 ANT-1 S-1 ANT-2 S-2 ANT-1 S-2 ANT-2 S-3 ANT-1 S-3 ANT-2
3G SECTOR -1 3G SECTOR-2 3G SECTOR-3
TX/RX RX TX/RX RX TX/RX RX
S-4 ANT-1 S-4 ANT-2 S-5 ANT-1 S-5 ANT-2 S-6 ANT-1 S-6 ANT-2

Available Labels for RF Jumpers & Feeders

© ZTE Corporation. All rights


reserved.
Feeder & Jumper Labels > Internal Only

 Feeder & Jumper cable labels must have minimum 200mm distance from their connector.

Distance needs to modify


200mm 200mm

© ZTE Corporation. All rights