Get the full version of this framework and
You Exec provides business resources that move your career access our library of hundreds of other
forward. Access our full library of presentations, spreadsheet
models, and business book summaries. We do the work, you take
business resources.
the credit.
Join You Exec Plus today and take your career to new
Errors & Omissions Liability (E&O): You Exec makes no heights. Receive premium business resources in your
guarantee that the statements, analysis, projections, estimates, inbox every week.
graphs, reports, numbers, and any derivatives sourced from this
presentation are free of errors and omissions. You Exec assumes
no liability for erroneous outcomes derived from this
presentation. Start today
Found an error, have suggestions? Feedback
A3 PROBLEM-SOLVING SHEET
STEP 1: Subject/Background/History STEP 5: Countermeasures/Suggested Actions/Changes
• What are we trying to achieve with this process? • What specific actions are needed to eliminate the problem?
• What is the Background to the problem (be as specific as possible).
• Give an explanation which helps people to better understand the problem.
• State the importance of the problem.
DO (5-6)
STEP 2: Current Condition STEP 6: Implementation
• Draw a diagram of current condition. WHAT WHEN (DATE) WHO
• Highlight the problem. Task A Jan 3, 20XX Tom Jerry
• Use data to explain the size of the problem.
Task B March 8, 20XX Joan Appleseed
PLAN (1-4)
Task C Oct 25, 20XX Grant Parker
STEP 3: Root Cause Analysis STEP 7: Evaluation
CHECK (7)
• Collect and analyze data to identify root cause. • Check the result.
• Use 5 Whys, Fishbone Diagrams, Pareto Charts • Did the improvement work?
• Did it work as well as we predicted?
• Collect data and compare before and after.
STEP 4: Target Condition/Future State/Desired Outcome STEP 8: Follow-up
ACT (8)
• Draw a diagram of what the new process will look like. • What actions must we take in future to sustain the improvement?
• Identify WHERE the Root Cause is being eliminated. • Did we achieve at 7/30/90 days what we wanted?
• Define Target to support proposed improvement. • Is the problem eliminated and does the process show measurable improvement?
• Can we close this problem-solving process and achieve it as Complete/Closed?
ANALYSIS DESIGN: WORK PLANNING
Issue/Hypothesis Analysis Data Sources Responsibility Due Date
Does the new process require special facilities? Diana
Technical Specification Articles, Interviews 3 June
NO
List of Facilities that meet new Jorge
Facilities management, interviews 5 July
criteria
If it does require special facilities, can we acquire Facilities management, thrum-mat Stephanie
Map of “facilities gap” 7 August
them? YES line supervisors
Sources of required Chin-Yang
Operations, trade publications 7 September
facilities/equipment
Operations, contractors, Jane
Costs to fill gaps 10 November
interviews
Finance department, prior Jerome
Effect on Project rate of return 12 December
analysis
FISHBONE DIAGRAM
• Wrong specification of the material • Wrong size of the mold • Machine malfunction
• Poor storage conditions − Blueprint mistake − Employee’s fault
• Worn out material − Production mistake − Machine defect
MATERIAL MEASUREMENT MACHINE
The part is
produced in the
wrong size
METHOD ENVIRONMENT PEOPLE
• Wrong production procedure • Wrong production conditions • Employee mistake
− Too hot − Mistaken machine settings
− Too cold − Mistake in production
− Too humid procedures
FMEA MATRIX Probability
< 1% 1%-5% 5%-25% 25%-50% >50%
Severity & Equipment/ Remote Extremely Very Unlikely Likely
Classification Safety Maintenance Cost Production Environment Unlikely Unlikely
Multiple fatalities, > 5. Large
Disastrous
Major loss, not recoverable. Major pollution with sustained
effects on large external Extensive damage
5 More than 3 days lost environmental consequences external 5 10 15 20 25
inhabited zones- several >$8M
production to the site
fatalities
Catastrophic
Lethal effect on several persons
Major loss. Up to 50% not
(several fatalities). Lethal external Major damage Major pollution external to the site.
4 recoverable Up to 3 days lost 4 8 12 16 20
effect - one fatality, several physical $6M-$8M Evacuation of persons
production.
injuries
Medium loss, not wholly
Lethal effect on one person and/or
Major
Localized damage recoverable through normal Moderate pollution, within site
3 several permanent invalidities. 3 6 9 12 15
$2M-$6M production < 24 hours lost limits. Product liability
Permanent external effects
production
Minor loss, recoverable Spill or release of pollutant requiring
Serious
Permanent injury, lost time accident. Minor damage
2 through normal production 2 a declaration to authorities but 2 4 6 8 10
Non-permanent external effects $200K-$2M
to 8 hours lost production without environmental consequences
No permanent injury,
Moderate
Little to no effect. Production
recordable with no lost Slight damage Minor spill or release of pollutant,
1 easily recovered. < 2 hour 1 2 3 4 5
time/medical treatment. No < $200K not requiring a declaration
lost production.
external effect
OUTCOME EVALUATION
ITEMS DONE NOT DONE
N % N %
Assessment collecting, organizing, validating, and documenting client data 70 100 0 0
Analyze and synthesize data. Problem identification. 68 97.1 2 2.9
Planning/goal/outcome determining how to prevent, reduce, or resolve
66 94.3 4 5.7
the identified client problems
Implementation carry out the planned interventions. 70 100 0 0
Evaluation measuring the degree to which goal/outcomes have been achieved and identifying factors
55 78.6 15 21.4
that positively or negatively influence goal achievement.
8%
15%
COUNTERMEASURE IMPLEMENTATION Plan Do Act Check
62% 15%
BASED ON PDCA
Target Completion Next
Item Corrective Action Responsible Start Date P D A C
Completion Date Follow Up
Create a standard for starting with
preferred candidates, then switching to
01 Leader #1 10-Feb 10-Feb 10-Feb C 10-Feb
min quals. Based on set parameters
02 Communicate standard from #1 Leader #2 17-Feb 2-Mar D
Leader #3 to meet with operations
03 Leader #3 7-Feb 7-Feb 7-Feb C 7-Feb
managers and finalize success profile
Communicate the finalized success
04 Leader #4 14-Feb 14-Feb A
profile to recruiting team
Schedule and attend meeting to discuss
05 roles and responsibilities between HR & Leader #5 10-Feb 10-Feb 10-Feb C 10-Feb
BL #1 dev. specialist
Align Success Profile to behavioral
06 Leader #6 14-Apr 14-Apr A
interview questions, phone screen
Create a new assessment scoring matrix
07 Leader #7 28-Feb 28-Feb 28-Feb C 28-Feb
that is PASS/FAIL oriented
Get the full version of this
presentation with this slide when
you join You Exec Plus.
Start today
Get the full version of this
presentation with this slide when
you join You Exec Plus.
Start today
Get the full version of this
presentation with this slide when
you join You Exec Plus.
Start today
Get the full version of this
presentation with this slide when
you join You Exec Plus.
Start today
Get the full version of this
presentation with this slide when
you join You Exec Plus.
Start today
Related
The following resources are related to
this framework and can save you
hours of work.
If you’re a free or paid member, log
into You Exec first for a better Decision-Making Models Root Cause Analysis
download experience.
MECE Principle Business Continuity