TECHNICAL PLANNING AND DESIGN 1.
0+ CMG
CWTF#3 VERMICOMPOSTING STRUCTURE
March 13, 2024
VERMICOMPOSTING AREA
O1 PROJECT
DETAILS
CMG BALLPARK COST
PROJECT DETAILS
Option 1
CMG BALLPARK COST
PROJECT DETAILS
Option 2
LOCATION AND AREA
PROJECT DETAILS
SITE 2 SITE LOCATION MAP
CWTF#3 NOT TO SCALE
FPIP TOTAL LOT AREA:
1 SITE DEVELOPMENT PLAN
NOT TO SCALE
300 SQ.M.
RBF Y2 TE CONNECTIVITY
O2 UTILITIES & ARCHITECTURAL
LAYOUT
DESIGN CONSIDERATIONS AND REFERENCE
Existing Vermicomposting Facility at CWTF No.2
LAYOUT
SITE
FPIP
2 KEY PLAN
NOT TO SCALE
EXISTING FACILITY
Civil / Structural Members
Columns , Girders and Purlins – Structural I Beam
Materials in Pre painted Finish
Drying Bed Area – Made of Concrete and
Conventional CHB. Includes walkway with railing in
between beds.
Roofing – Drying Bed area made of visible to light
material.
Electrical , Plumbing and Sanitary Works
Lighting – Weatherproof Polycarbonate LED Lights
Sanitary System – Sewer UPVC Drain line for
Leachate / Filtrate Collection
Downspout and Drainage – UPVC Pipes for
Downspout and Stainless Steel Gutters for Roof Drain
with designated catch basins and common drainage
line made up of 250 mm dia. RCP.
LAYOUT (OPTION 1)
ARCHITECTURAL
SITE
FPIP
2 KEY PLAN
NOT TO SCALE
VERMICOMPOSTING STRUCTURE
1 GENERAL ARRANGEMENT PLAN
NOT TO SCALE
LEGEND
SYMBOL DESCRIPTION
Proposed Concrete Beds
Proposed Storm Drain Line
Proposed Storm Manhole
Existing Storm Line 900 dia.
Existing Tapping Manhole
Proposed Leachate Drain
VERMICOMPOSTING STRUCTURE
3 ROOF PLAN
NOT TO SCALE
LAYOUT (OPTION 1)
ARCHITECTURAL
SITE
FPIP
2 KEY PLAN
NOT TO SCALE
VERMICOMPOSTING STRUCTURE
1 GENERAL ARRANGEMENT PLAN
NOT TO SCALE
LEGEND
SYMBOL DESCRIPTION
Proposed Concrete Beds
Proposed Storm Drain Line
Proposed Storm Manhole
Existing Storm Line 900 dia.
Existing Tapping Manhole
Proposed Leachate Drain
VERMICOMPOSTING STRUCTURE
3 ROOF PLAN
NOT TO SCALE
End of Report