Project Control
04/21/24 Dr Teshale T
Overview
• Project Control Elements
• Project Control Processes
• Post Control Report
• Controlling Change
04/21/24 Dr Teshale T
Purposes of Control
• There are two fundamental objectives of control:
1. The regulation of results through the modification of
activities
2. The steward ship of organizational assets
• The project manager needs to be equally attentive to
both regulation and conservation
• The project manager must guard the physical assets of
the organization, its human resources, and its financial
resources
– Performance
– Cost
Cost Time
– Time
04/21/24 Dr Teshale T Chapter 11-1
Controlling Performance
04/21/24 Dr Teshale T
Go/No-go Controls
• Take the form of testing to see if some specific
precondition has been met
• Most of the control in project management falls into this
category
• This type of control can be used on almost every aspect
of a project
• Go/no-go controls operate only when and if the
controller uses them
1 (2 / 3) X (6 / 4) = 1.0
2 (2 / 3) X (6 / 6) = .67
3 (3 / 3) X (4 / 6) = .67
4 (3 / 2) X (6 / 6) = 1.5
5 (3 / 3) X (6 / 4) = 1.5