Internship PPT Sonu Final
Internship PPT Sonu Final
08/05/24 10
1. Practicing field procedures for efficient data collection
in various conditions.
2. Knowing how to maintain and calibrate the total station
for optimal performance.
3. Understanding safety protocols to prevent accidents
during surveying activities.
4. Basic data processing techniques for generating
accurate survey reports and maps.
5. Recognizing and minimizing errors to ensure accurate
results.
08/05/24 11
3.Road Survey
1. RL of road and other point taken by the GPS
Satellite(751) which is provided by PM.
2. Then sight the backside and foreside on the prisim of
starting chainage and noted as record.
3. Still we done survey up to the Designation chainage
(2+170) to (12+260).TBM-15 to 106
4. All The data Recorded in TS Automatically.
5. Then after that all the data are imported in excel sheet.
6. In last calculation is done in excel and draw the profile
in Autocad.
08/05/24 12
WORK DONE
Brick work
• Brick work was done using cement mortar
and Brick.
• Mix ratio of mortar was 1:4 cement-sand
by volume and water cement ratio was
0.35.
• Brick wall was done for Main wall, mortar
was placed and brick were laid layer by
layer.
• Wall was erected 1m every day and cured
everyday.
08/05/24 © R R INSTITUTE OF TECHNOLOGY BANGALORE,-90 13
© R R INSTITUTIONS , BANGALORE
WORK DONE
Plastering
• Surface of wall was made even,
cleaned and watered to make it moist.
• Mortar mix of ratio 1:4 was prepared
for one side of wall.
• Mortar of 0.5 inch was laid on the
wall and fully finished plastering was
done.
• Outer walls were semi finished for tile
laying.
• Curing of 7 days were done.
08/05/24 © R R INSTITUTE OF TECHNOLOGY BANGALORE,-90 14
© R R INSTITUTIONS , BANGALORE
ROLES AND
RESPONSIBILITES
• To observe the work at site and suggest appropriate mix proportion.
• To complete the demands of workers at the site.
• Analyzing survey data to determine the optimal route for the road
and ensuring compliance with engineering standards and
regulations.
• Collaborating with surveyors, technicians, and other team members
to coordinate surveying efforts.
• Monitoring construction progress to ensure adherence to plans and
specifications.