0% found this document useful (0 votes)
31 views20 pages

Project Status - 06.11.2024

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views20 pages

Project Status - 06.11.2024

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 20

Ministry of Transport, Communication &

Information Technology (MOTC&IT)

SULTANTE OF OMAN

DESIGN AND BUILT OF WADI BANI JABER ROAD SECTION – 2


(SOUTH AL SHARQIYYA GOVERNORATE)

Current Status of Project

November 06 , 2024

Al Arabia National Engineering & Cont. Co.


NATIONAL ENGINEERING SERVICES PAKISTAN & PARTNERS L.L.C
P.O. Box No. 3506, RUWI-112 Sultanate of Oman
CONTRACT DETAILS

Ministry of Transport, Communication & Information


The Employer
Technology

Designer Alsas Engineering Consultant and Services

Supervisory Consultant National Engineering Services Pakistan & Partners LLC

Contractor Al Arabia National Engineering & Cont. Co. LLC.

Contract Value 4,437,300.525 (OMR)

Contract Duration 90 days Mobilization + 12 Months Construction

Project Award Date ( LOA ) February 01, 2024

Letter of Commencement / Mobilization Start Date February 01, 2024

Work Commencement Date May 01, 2024

Original Completion Date April 30, 2025


Planned Physical Progress for October-2024 6.60%
Achieved Physical Progress October-2024 2.23%
Planned up to November 06, 2024 35.29%
Achieved up to November 06,2024 12.09%

Lag 23.20%
ENGINEERING DESIGN SERVICES

o New Proposed Alignment submitted and approved. Dated October 16,2024


o Hydrology Study, Hydraulic Study details submitted by Contractor 18/October 2024 recommended by Nespak.
o Detailed Design approval by NESPAK.
Culverts Details

Sr. Hydrology Method Mix


Location Km Size Location Cross-Section
No. Study Statement Design

Main RFI
1 0+215 2(2x1.50) OK
Road submitted

Main
2 1+020 2(2x1.50) OK
Road

Main
3 1+400 1(2x1.50) OK
Road

Main
4 1+620 1(2x1.50) OK
Road

Main
5 2+250 7(2x1.50) OK
Road

Main
6 3+250 4(2x1.50) OK
Road

Main
7 3+996 4(2x1.50) OK
Road

Main
8 4+091 2(2x1.50) OK
Road
Site Activities

o IPC: The contractor has completed 70% one-off mobilization efforts. Payment is still awaited

2nd IPC # 2 submitted by the Contractor on 3/11/2024 and forwarded by Nespak on 06-11-2024 (OMR 301,566)

o Culvert: Survey work for location of Culvert has started .

o Contractor Material Engineer Joined the project site on 26 October 2024 has commenced work on setting up the site laboratory.

o Control points for survey: From Km 0+000 to Km 6+400 have been successfully established.

o Unclassified excavation : is currently underway between Km 0+130 ~ 1+100 and Km 2+300 ~ 4+000.

o Blasting work: First Blasting achieved from CH. 0.00 + 210 ~ 0.00 +260 . From CH 0.00+260 ~ 0.00+290 on 20 th October 2024.

and From 0+290 ~ 0+390 on 4/11/2024

o OGL :0+00~1+500 Checked and verified. Km 1+500 ~ 4+500 is in process. From Km 4+500 ~ 6+420 some area is missing and
asked to resubmit as per required 10-meter interval

o Contractor increased the number of Machinery on 1/11/24 at site included Two Dozer for removing of blast material, and two
Excavator.

o Benching and slope in Cutting work


Due to delay in Geotechnical Study report Resident Engineer conducted a meeting on 27/10/24 and 28/10/24 with Engineer
Alaa Musallam Salim Hubis from Geo- Soil Company ( Sub-contractor) with Project Coordinator Halal and Project Manager Kamal
regarding to boost the work of Cutting and blasting Procedure and suggested that the Geo company submit rock classification details
of at least one –Kilometer in a week to start the work, Engineer Alaa Musallam Salim Hubis from Geo- Soil Company after site visit
suggested for Hard rock slope 1:.5 and other will be 1.1. But Resident Engineer told that this report should be submitted officially
to design office in a week.
Following delay effected progress

Description Status Remarks


Delay in The contractor start setting up the site laboratory. According to Project Manager Power
Establishment of
Establishment supply ,Apparatus for Soil Classification , Concrete Slump Apparatus, Calibration of all
Laboratory
(still In Process) equipments will required three weeks more.
Al Tasneem (Sub-Contractor Visit/ QC Documents is not submitted.
Conditionally
for Asphalt, Box and Pipe RE has approved Al Tasneem (Sub-Contractor for Asphalt, Box and Pipe Culverts)
Approved.
Culverts) (Contractor will liaison a factory visit with the consultant and DGR Material Engineer)
Report and study from Delay
Delay in Hydrology and Hydraulic study, Geotechnical report ,Rock slope stabilization.
Contractor's Design Office ( still in process)
Testing of Material . Still not started For filling work .
Filling work Not started Material Available.
Commencement Date
Sub Grade Delay 3- months
24/7/24
Commencement Date
Sub Base 31/7/24 Delay 3-months

Commencement Date
Aggregate Base Course Delay 3- months
8/8/24
Commencement
Box culvert Date 29/8/24 Delay 2- months

Delay in Starting of
Blasting Blasting First blasting conducted on 20th October 2024.
PENDING ISSUES

Description Remarks

Contractor did not established workshop at site and currently


Set up workshop he is managing the maintenance of machineries from
outsourcing.
Warehouse has been established but commissioning is under
Warehouse facilities
progress.
Laydown area has been established but commissioning (Like
Set-up laydown areas
as Boundary wall, Fence, Security Gate) is still remaining.

Contractor office Full Commissioning is remaining

Furnished except Photocopier machine/Desk Top/Printer etc. is


MTCIT/Engineer office
not provided.

Mobilization/Machinery Will be provided as per site requirement

Contractor Planned to pre-cast some items at site and will take


Mobilization of Concrete and Asphalt Plant the materials of concrete and asphalt from Al Tasneem Sub-
Contractor.

Safety officer (HSE officer Omani) Not appointed

Recovery Plan Not Submitted


PHYSICAL PROGRESS

Bill No. BOQ Value of Work BOQ Weightage


Description (%) Completion (%)
(OMR)

1 Preliminaries 401,470.000 9.50% 3.55%

2 Earthworks 1,866,095.000 44.16% 8.54%

Granular Subbase & Aggregate


base, Base Course & Stabilized 97,000.000
3 Base Courses 2.30%

4 Bituminous Pavement 565,210.000 13.37%

Concrete & Concrete


5 Structure 322,080.000 7.62%

6 Incidental construction 914,947.500 21.65%

9 Pumping Station and utilities 59,198.000 1.40%

Total 4,226,000.50 100% 12.09%

Note: Unclassified Excavation achieved progress is about 20 %


PLANNED VS ACHIEVED (BILL WISE)

Scheduled Date Physical Progress


Bill # Description Start Finish Planned % Achieved % Difference %

I Preliminaries 1-Feb-24 30-Apr-25 61.45% 37.33% (24.12)

II Earthworks 1-May-24 5-Mar-25 61.36% 19.35% (42.02)

Granular Subbase & Aggregate base,


III 31-Jul-24 29-Mar-25 40.66% 0.00% (40.66)
Base Course & Stabilized Base Courses

IV Bituminous Pavement 22-Sep-24 13-Apr-25 22.17% 0.00% (22.17)

V Concrete & Concrete Structure 29-Aug-24 28-Apr-25 28.51% 0.00% (28.51)

VI Incidental construction 25-Sep-24 30-Apr-25 19.35% 0.00% (19.35)

IX Pumping Station and utilities 19-May-24 5-Jun-24 100.00% 0.00% (100.00)


S-CURVE

WADI BANI JABER PHYSICAL PROGRESS (S-CURVE)


120.00%

100.00%

80.00%

60.00%

40.00%

20.00%

0.00%
Mobilization May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 Demobilization Maintenance
(Feb-Apr 24) Period (1 year)

Cumulative Planned (%) Cumulative Achieved (%)


Mobilization Maintenance
Month (Feb-Apr 24) May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 DemobilizationPeriod (1 year)

Cumulative Planned (%) 4.89% 5.01% 9.87% 14.72% 20.70% 27.12% 33.72% 41.59% 50.53% 61.80% 73.29% 81.61% 91.07% 96.24% 100.00%

Cumulative Achieved (%) 0.00% 0.00% 1.66% 4.89% 6.44% 9.38% 11.61%
Cumulative Difference (%) (4.89) (5.01) (8.21) (9.84) (14.26) (17.74) (22.11)
FINANCIALPROGRESS

SUMMARY OF CONTRACTOR'S PAYMENT CERTIFICATES

Amortisation
Gross Amount Retention of Advance Net Amount
IPC # (OMR) Money (OMR) Payment (OMR) VAT (OMR) (OMR) Remarks
Advance Payment 443,730.052
1 133,393.900 13,339.390 13,339.390 5,335.756 112,050.876 Submitted to DGR
2 359,006.683 35,900.668 35,900.668 14,360.267 301,565.614 Submitted to DGR
RESOURCES
o CONTRACTOR’S SITE STAFF
• Project Manager 1 No

• Construction Engineer 1 No

• Quantity Surveyor 1 No

• Interface Manager 1 No

• Land Surveyors 2 Nos

• Material Engineer 1 Nos

• HR & PRO 1 No

• Foreman 1 No

• Operator 10 Nos

• Un-Skilled Labour 7 Nos


o EQUIPMENT AT SITE
• Dozer 3 No

• Excavator 6 No

• Drilling Machine 1 No

• Pickup / Cars 4 no
NO OBJECTION CERTIFICATES (As per initial alignment)

Sr. No Description Status Approval Date Remarks

1. Ministry of Housing & Urban Planning Approved 28-02-2024

Public Authority for Electricity & Water In process In process


2.

Ministry of Environmental and Climate Approved 21.08.2024


3. Affairs -

4. Excavation Permit Approved 06-03-2024

Oman Telecommunication Company


5. Approved -
(OMANTEL)

6. Ooredoo Approved 06-03-2024


Final approval
will be after
7. Royal Oman Police (ROP) In process -
DGR&LT
Approval

8. Ministry of Heritage & Culture Approved 03-04-2024


SITE INSTRUCTIONS / NCR

Date Site Instructions Action


Collection of sample/Establishment of Lab/Approval of Material/Dump
excavated material on site /Soil investigation report /OGL from 2+000~
18/8/24 5+500 not as per approved alignment Part2/ Diversion and Competent No Action
authority approval/HSE not adopted
Progress counted/ inspection/Testing /No drawing details as per Clause7.5
24/9/24 No action
Condition of Contract

Date Non-Compliance Report (NCR) Action


25/9/24 Safety PPE not provided/ Excavated material Dumped at site No action
SITE PHOTOGRAPHS
UNCLASSIFIED EXCAVATION IN PROGRESS
UNCLASSIFIED EXCAVATION IN PROGRESS
LABORATORY SET UP IN PROGRESS
LABORATORY SET UP IN PROGRESS